REPORT
OF A
GEOTECIINICAL INVESTIGATION
FOR
PAVEMENT DESIGN
COLLINS BUSINESS PARK
ft 7 s-ETo o7r/ . R vs"iEss PORK
COLLINS PARK VENTURE
DENVER, COLORADO
PROJECT NO. 11703-82
BY
EMPIRE LAI3ORATORIES, INC.
214 NORTH NOWES STREET
FORT COLLINS, COLORADO 80521
TABLE OF CONTENTS
Table of Contents i
Letter of Transmittal
Report 1
Appendix A A-1
Test Boring Location Plan A-2
Key to Borings A-3
Log of Borings A-4
Appendix B E3-1
iivoern Stabilometer Results E3-2
Summary of Test Results 13-3
Appendix C C-1
Inc.
Branch Offices
Empire La atoriea, In 1242 Bramwood Place
MATERIALS AND FOUNDATION ENGINEERS
Longmont,Colorado 3I
11P.O. Box 35
214 No. Howes Fort Collins,Colorado 80522 303) 776 3921
P.O.Box 429 (303)484-0359 3151 Nation Way
Cheyenne,Wyoming 82001
P.O. Box 10076
March 30, 1982 307) 632-9224
Collins Park Venture
1660 South Albion Street
Denver, Colorado 80222
Attention: Mr. Phil Christensen
Gentlemen:
We are pleased to submit our Report of a Geotechnical investigation
prepared for the streets In Collins Business Park located in southeast
Fort Collins, Colorado.
Based upon our findings In the subsurface, we feel that the site is
suitable for the proposed roadway construction, providing the design
criteria and recommendations set forth In this report are met. The
accompanying report presents our findings in the subsurface and our
recou mcI*d3tions based upon these findings,
Very truly yours,
EMPIRE LABORATO ES, it 1F,
logo7 . cl
Iiff
I' c I R. Sherred k' '".».' '•.*' 09 .d°
Senior Engineering Geologist 14c0,, R. stor. %
444"FaBSIJN _
Reviewed by: r
F,S .. ,e.•
vim . ia n 1
I
Chester C. Smith, P.E.li. 1.
President
cic
I
r •
I (;i)\. •
cc JMmts 11. Stewart and Associates, Inc.
atb
IV M
MEMBER OF CONSULTING ENGINEERS COUNCIL
r) li
REPORT
OF A
GEOTECHNI CAL INVESTIGATION
SCOPE
This report presents the results of a geotechnical evaluation
prepared for the design of the proposed streets In Collins pusfness
Park, located at the southwest corner of Horsetooth and Timberline
Roads in southeast Fort Collins, Colorado. The scope of the project
included test borings and laboratory testing of samples obtained from
these borings.
The objectives of this study were to (1) determine the soil and
groundwater conditions at the site, (2) determine criteria for pavement
design, and (3) make recommendations regarding the proposed street
improvements, pavement types, and thicknesses at the site.
SITE EXPLORATION
The field exploration, carried out on March 16, 1962, consisted of
drilling, logging, and sampling five (5) test borings. The locations of
the test borings are shown on the Test Boring Location Plan Included In
Appendix A of this report. Boring logs prepared from the field logs are
shown in. Appendix A. These logs show soils encountered, location of
sampling, and groundwater at the time of the exploration.
The borings were advanced with a four-Inch diameter, continuous-
type, power-flight auger drill. During the drilling operations, a
geotechnicai engineer from Empire Laboratories, Inc. was- present and
made continuous observations of the soils encountered.
1-
a
SITE LOCATION AND DESCRIPTION
The property Is located at the southwest corner of Itorsetooth and
Timberline Roads In southeast Fort Collins, Colorado. More particularly,
the site is described as Collins Business Park, First Filing, situate in
the northeast 1/4 of Section 31 , Township 7 North, Range 68 West of the
Sixth P.M. , Ladner County, Colorado.
The site consists of fallow farm land bordered on the north by
IL,rsetuoth Road, on the east by Timberline Road, and on the west by
the Union Pacific railroad. The property currently Is sparsely vegetated
with grass and weeds.. The tract. Is relatively flat and has minor
drainage to the east.
LABORATORY TESTS AND EVALUATION
Samples obtained from the test borings were subjected to testing in
the laboratory to provide a sound basis for evaluating the physical
properties of the soils encountered. Moisture contents, dry unit weights,
and the Atterbery limits were determined. A summary' of the test.
results is included In Appendix B. Hveern stabliorne ter tests were run
0
to determine "R" values, and curves showing these data are included i,
Appendix B.
SOIL Atii GROUNDWATER CONDITIONS
The soil profile at the site consists of strata of materials ar -
ranged in different combinations. In order of Increasing depths, they
are as follows:
1 ) Silt ... Topsoil: A six (6) to twelve (12) inch layer of silty
topsoil was encountered in Borings 1 , 3, and 5 at the surface.
The upper six (6) inches of the topsoil has been penetrated
by root growth and organic matter and should not he used for
roadway subdrade or as embankment material.
2-
2) Fill P1e+terlal: A six (6) Inch layer of fill material was •
encountered at the surface of Boring 4 and consists of a
heterogeneous mixture of silt. sand, and gravel. Six (6)
Inches of gravel base and/or subbase material was encountered
at the surface of Boring 2.
3) Sandiy_Silty. Clay: This stratum underlies the topsoil and fill
and extends to the depths explored. The silty clay is plastic
and contains varying amounts of sand. It varies from a brown
slightly sandy silty clay to a tan to red sandy silty clay
containing traces of gravel. In general, the clay stratum is
moderately plastic and is damp to moist In Its natural in situ
condition.
4) Groundwater: At the time of the investigation, free
groundwater was encountered in Boring 5 at a depth of seven
7) feet below the surface. llo free groundwater was
encountered In the remaining test borings to depths eight (8)
feet below the surface. Water levels in this area may .be
subject to change due to seasonal variations and irrigation
demands on and/or adjacent to the •site.
RECOMMENDATIONS AND DISCUSSION.
It Is our understanding that East Horsetooth Road Is to be widened,
Timberline toad Is to be (reproved and reconstructed, and local
conenerclal streets will be built within the proposed Collins Business
Perk. Based on profiles provided to us by .James II. Stewart and
Associates, Inc. , maximum cuts and fills of less than two (2) feet are
proposed for all streets within the business park.
Both rigid and flexible pavement sections have been evaluated for
the proposed streets at the site. The street design is based on the City
of Fort Collins "Design Criteria and Standards for Streets," dated
September 1961 . Eighteen (18) kip equivalent daily load applications for
iorsetuuth and Timberline Roads were provided by James H. Stewart and
3-
Associates, Inc. , and eighteen (18) kip equivalent daily load applications
fur the local commercial streets were assumed• by Empire Laboratories,
inc. The City of Fort Collins "Design Criteria and Standards for
Streets," a projected eighteen (18) kip equivalent daily load application
of fifty (S0) for East Horsetooth and Timberline Roads and twenty (20)
for the local commercial streets, and an "R" value of 15 determined from
ilveem stablioreeter tests correlated with a "K" value of one hundred
twenty (120) pounds per square inch per inch were utilized for the
pavement design.
Site_Gradlreer1
It is recommended that the upper six (6) inches of topsoil below
proposed streets be stripped and stockpiled for reuse In planted areas.
The existing asphalt along Timberline Road should also be removed and
wasted off the site. The upper six (6) Inches of the natural subgrade
or existing gravel base which may be utilized as. subgrade should be
scarified and recompacted at or wet of optimum moisture to at least
ninety-five percent (95%) o.f Standard Proctor Density ASTM D 69B-78.
See Appendix C.)
All till should consist of on-site soils or Imported eiateriai having an
II" value of 15 or greater and approved by the geotechnical engineer.
The fill should be placed In uniform six (6) to eight (8) inch lifts and
compacted at or wet of optimum moisture to at least ninety-five percent
95%) of Standard Proctor Density ASTM D 698-78. Finished subgrade In
cut sections should be scarified a minimum of six (6) inches and
recompacted at or wet of optimum moisture to at least ninety-five percent
95%) of Standard Proctor Density ASTM D 698-78. Cut and fill slopes
should be pieced on grades no steeper than 2:1 .
Each successive lift of fill placed on embankment slopes should be
benched slightly into the existing grade. All street subgrade should be
i)leeed a minimum of three (3) feet abovu existing groundwater
elevations. It Is recommended that all stripping, subgrade preparation,
and fill placement be inspected by the geotechnical engineer. Field
density tests should be taken. in the compacted subgrade and fill under
6-
the supervision of the gcotechnical engineer to ensure proper
compaction.
Flexible Pavement
It Is our opinion that flexible pavement Is a suittable alternate for
roadway construction at the site. The flexible pavement alternate at. the
site should consist of asphaltic concrete underlain by crushed aggregate.
base course Or asphaltic concrete underlain by plant mix bituminous
base cour ie. Using the City of Fort Collins "Design Criteria and
Standards for Streets," a serviceability index of 2.5, u regional factor of
0.75, an "R" value, of 15, a twenty (20) year design life, an eighteen
18) kip equivalent daily load application of fifty (50) for ilorsetooth and
Timberline Roads and twenty (20) for local commercial streets, and
weighted structural numbers of 2.85 for Ilorsetoot.h and Timberline Roads
and 2.50 for local commercial streets, the following pavement thicknesses
are recommended:
Iior-5ctooth and Timberline goads
Asphaltic Concrete 9"
Crushed Aggregate Base Course 9"
Total Pavement Thickness 13"
Asphaltic Concrete 3"
tiI Bituminous Base Course 4}"
Total Pay.cent Thickness 7;'+
Local Commercial Streets
Asphaltic Concrete 3"
Crushed Aggregate Base Course 10"
Total Pavement Thickness 13"
5-
Asphaltic. Concrete 2"
Plant Mix Bituminous Base Course . 31"
Total Pavement Thickness 5}=
The crushed aggregate base course should meet City of Fort Collins
Class 6 apecificationa. The subgrade below the proposed asphalt
paverient should be prepared in accordance with the recommendations
dh.r`ussed in the "Site Grading" section of this report. Upon proper
preparation of the subgrado, the base course should be placed and
compacted at optimum moisture to at least ninety-eight percent (98%) of
Standard Proctor Density ASTP-t i) 698-78. (See Appendix C.)
It is recommended that the asphaltic concrete and/or plant mix
bituminous base be placed in two (2) to three (3) Inch lifts. Ali plant
mix lrt:;e course and asphaltic concrete should meet City of Fort Collins
specifications and should be placed In accordance with those
specifications. All base course material should have a minimum "R" value
of 78, the piarst Alai( bituminous base should have an Rt value of 90 or
greater anti the asphaltic concrete should have an F'.t value of 95 or
greater. Field density tests should be taken in the aggregate base,
bituminous base, and asphalt under the direction of the geotechnlcal
engineer.
itigid Pavement
A feasible foundation alternate at the site would be rigid pavement.
Using the eighteen (18) kip equivalent daily load applications described
above, a modulus of subgrade reaction of one hundred twenty (120)
pounds per squire inch per inch based on an "R" value of 15, a design
life of twc.rnty (20) years, and a concrete design with a modulus of.
rupture of five hundred fifty (550) pounds per square inch, the
following pavement thicknesses are recommended:
Iiorsetooth and Timberline Roads
F cnrelnforced Concrete - 51"
6-
l.c>cal Commercial Streets
NonreIr forced Concrete - 41"
it is recommended that ell existing asphalt along Timberline Road be
removed. The suhgrade below propcsod roadways should be prepared In
ae:cerdencc with the recommendations discussed in the "Site Grading"
section of this report. The concrete pavement should be placed directly
on the subgrada that has been uniformly and properly prepared in
accordance with the above recommendations. All concrete used In the
pavement shall meet ASTi.t specifications, and all aggregate shall conform
to ASTM C-33 specifications. The concrete should be designed with a
minimum modulus of rupture of five hundred fifty (550) pounds per
squire inch In twenty-eight (28) days. It Is recommended that
laboratory mix designs be done to determine the proper proportions of
aggregate, cement, and water necessary to meet the requirements. It is
essential that the concrete have a low water-cement ratio, an adequate
cement factor, and sufficient quantities of entrained air. Joints should
be carefully designed and constructed In accordance with the City of
Fort Collins "Design Criteria and Standards for Streets" to insure good
performance of the pavement.
It is recommended that all concrete pavement be placed in
accordance with City of Fort Collins specifications. If paving is done
during cold weather, acceptable cold weather procedures as outlined in
the City specifications should he utilized. The concrete pavement should
be properly cured and protected in accordance with the above
specificetions. Concrete injured by frost should be removed and
replaced. It is recommended that the pavement not be opened to traffic
until a flexible strength of five hundred fifty (550) pounds per square
inch is obtained er .i rni irnunt of fourteen (14) days after the concrete
hes been pieced
GENERAL COMMENTS
This report hue been prepared to old In the evaluation of the
prole-rty end to neeist the engineer In the design of this project. In
7-
the event that any changes in the design of the pavement structure are
planned, the conclusions and recommendations contained In this report
will not be considered valid unless said changes are reviewed and
conclusions of this report modified or approved in writing by Empire
i_ahorctorie;s, Inc. , the gentcchnical engineer of record.
Every effort was made to provide comprehensive site coverage
through careful locations of the test borings, while keeping the site
investigation economically feasible. Variations In soil and groundwater
conditions between test borings may he encountered during construction.
In order to permit correlation between the reported subsurface conditions
nd the actual conditions encountered during construction and to aid in
carrying out the plans and specifications as originally contemplated, it
is recommended that Erirlre Laboratories, Inc. be retained to perform
ccnntiiesoun construction review during the excavation and foundation
phescs of the work. Empire Laboratories, Inc. assumes no responsibility
for compliance with the recommendations included in this report unless
they have been retained to perform adequate on-site construction review
during the course of construction.
8-
APPENDIX A.
TEST BORING LOCATION PLAN
GoLLi t\ s bJls i rAr
Ite12-5 -rexf r.,0A >
31 .7, 68
t-c. I2
3 2 1 Q .
f 3 0
ul
r 3o0I
A-2
i t n ir-
4 KEY TO BORING LOGS I
i TOPSOIL GRAVEL
de,
FILL SAND& GRAVEL
Owilhoo
e
SILT e i•/ SILTY SAND& GRAVEL
r—,1 CLAYEY SILT sp COBBLES
i •SANDY SILT a• SAND,GRAVEL& COBBLESi. ,.
CLAY WEATHERED BEDROCK
ElSILTY CLAY SILTSTONE BEDROCK
SANDY CLAY NEN CLAYSTONE BEDROCK
SAND SANDSTONE BEDROCK
SILTY SAND s LIMESTONE
CLAYEY SAND 17111311 GRANITE
SANDY SILTY CLAY
SHELBY TUBE SAMPLE
nSTANDARD PENETRATION DRIVE SAMPLER
WATER TABLE 7 Days AFTER DRILLING
C HOLE CAVED
5/12 Indicates that 5 blows of a 140 pound hammer falling 30 inches was required to penetrate 12 inches.
A-3
a
LOG OF BORINGS
t7i N_ 2 N 3_
0
7. •
8/12 9/12 NC. 16/12 ,/
5
10/12 •l 11/12 •/ 10/12 1
10
15
A-4
EMPIRE LABORATORIES, INC.
LOG OF BORINGS
1.1Q
0
9/12 (/. 5/12
5
4/12
10
EMPIRE I.ABORATdRIES, INC.
APPENDIX B.
111
1 I- _I -1 _ I:_, ( 1 E I - '
j_ R E l_1 [_ 1 `._,
1:1 I F1 L. 1.-IL I.IH5 VEI•ITUF E
II'I•,:, I II..1 4 I'!'_; }:.1_1'_.T NE-L.'
7. ('r't='1
1 I_ + . +"+ •
I.' ' I I ,_,-...n 1 12.1, 1i • 1 e`. IA.i1 V I 1 . 1.
I1II
I.I I'9
IrL
7 I
i
t
1 [c.,•-
I
I k
kI a.J. L.• _1 I _ 1 l La1_I •J I .1_• JJ .L.1 ..L l_1 a ' • 1_I 1.11_l11_ L .a.
f': 1,1:. : • u• t'f ". . l:r : . I
l
I
B-2
C e
N N •N N N N N ® N Nmr-=: r. r r r I r rP.
m m CO C) 01 r- tO O 01 LO d-
d
r r- r r-
U
cc
E
0 O Nto'=
U
N N
a l0 M CO
Cj kC l0 LO LO 1.0
C-) Q 7 cL L) C.) d U Q
12.m
eh t N co co
O to C") N N 4-4.
co
a
r., r
X
O r- CO. fir)
v aE 00 r LO Ln ir
d
C
v«
O O GO Cr) C
3 E ae I- to LO
CI) J-I Cr) Cr) Cr) COM
I
Cn ZW =
Ct a cii
1-
W
N
F" Q
U. 2 m CC
O 1•;g 00
N y J.
CC W
2 a
2 m g a W.
N
Cl) co a°'
a
C
w Cu.
Ca
C U)
U
a- 01 it Cr) N. r
e C-)
0 m O. O Cr) N l0, r
0' CO O cm O.
r
mI.O N- Cr)O CO LO LC) LO Cr)N r N LI) 01
0"E l0 N N h 00 *et O d r 4- 1 CO en LO
2 I- N r r r r I- i r I- N N
t_ 0 0 O O O CD O 0 0 0 0 O O O
m LL N Cn CO N M CO N M CO N Cr) • N M CO
0`1 1 I I I I I I I I I I I I
CD O C)O O CD O O O O O O O. O
r N N-r N I\e- N N r N r N
01 •
OZ r N Cr) d' LO
CO
R_Z
CV
e.)O O n Cr) U) CO r
J ...
11) r- to r-- gzrct r U lD
Cr) CV r CO r-
cr) L11 CO Cr) I17 CO
cr r- - r- IC)• M I U tD
Cr) CV r to 1
CV
Cr) CO n r tO CV r
1 J v
C) O In O It) Cr, N U tD
Cr) CV r- CO r 1
r-
V)
CD
a
w
CO
cc O O tO tD d Cr)
Lad J v
C\I r L1) Cr) r r Cr) U tO
CY) C\! r I
O
cM CO CO O n d tD
J -+•
r O n 01 03 CV 1D C..) tD
Ch r r- L1) 1
r
0
CZ I-- Z O O
LJ F— ti r O 1--4
m -I E N X F- O
I . >-- W Q
O 2 --• J F- CD 0 U F=
L U C U •-• •-' U 0 2
CD LU 0 •-• •--• Cl) Lii
D •--• F- F- N O V) •- It)
V) V). Cr V) L.L_
O• O' J J O
CL J Q
CO J 0- fZ CD U 0 Q
APPENDIX C.
APPENDIX C.
Suggested Specifications for Placement of Compacted Earth Fill
and/or Backfills.
GENERAL
A soils engineer shall be on-site to provide continuous observation
during filling and grading operations and shall be the owner's repre-
sentative to inspect placement of all compacted fill and/or backfill on
the project. The soils engineer shall approve all earth materials prior
to their use, the methods of placing, and the degree of compaction
obtained.
MATERIALS
Soils used for all compacted fill and backfill shall be approved by the
soils engineer prior to their use. The upper two (2) feet of compacted
earth backfill placed adjacent to exterior foundation walls shall be an
impervious, nonexpansive material . No material , including rock, having
a maximum dimension greater than six inches shall be placed in any fill .
Any fill containing rock should be carefully mixed to avoid nesting and
creation of voids. In no case shall frozen material be used as a fill
and/or backfill material.
PREPARATION OF SUBGRADE
All topsoil , vegetation (including trees and brush), timber, debris,
rubbish, and other unsuitable material shall be removed to a depth
satisfactory to the soils engineer and disposed of by suitable means
before beginning preparation of the subgrade. The subgrade surface of
the area to be filled shall be scarified a minimum depth of six inches,
moistened a.s necessary, and compacted in a manner specified below for
the subsequent layers of fill . Fill shall not be placed on frozen or
muddy ground.
PLACING FILL
No sod, brush, frozen or thawing material , or other unsuitable material
shall be placed in the fill , and no fill shall be placed during unfavorable
weather conditions. All clods shall be broken into small pieces, and
distribution of material in the fill shall be such as to preclude the
formation of lenses of material differing from the surrounding material.
The materials shall be delivered to and spread on the fill surface in a
manner which will result in a uniformly compacted fill . Each layer
shall be thoroughly blade mixed during spreading to insure uniformity of
material and moisture in each layer. Prior to compacting, each layer
shall have a maximum thickness of eight inches, and its upper surface
shall be approximately horizontal . Each successive 6" to 8" lift of
fill being placed on slopes or hillsides should be benched into the
existing slopes, providing good bond between the fill and existing
ground.
MOISTURE CONTROL
While being compacted, the fill material in each layer shall as nearly
as practical contain the amount of moisture required for optimum compaction
or as specified, and the moisture shall be uniform throughout the fill .
The contractor may be required to add necessary moisture to the fill
material and to uniformly mix the water with the fill material if, in
the opinion of the soils engineer, it is not possible to obtain uniform
moisture content by adding water on the fill surface. If, in the opinion
of the soils engineer, the material proposed for use in the compacted
fill is too wet to permit adequate compaction, it shall be dried in an
acceptable manner prior to placement and compaction.
COMPACTION
When an acceptable, uniform moisture content is obtained, each layer
shall be compacted by a method acceptable to the soils engineer and as
specified in the foregoing report as determined by applicable standards.
Compaction shall be performed by rolling with approved tamping rollers,
r_
pneumatic-tired rollers, three-wheel power rollers, vibratory compactors,
or other approved equipment well-suited to the soil being compacted. If
a sheepfoot roller is used, it shall be provided with cleaner bars
attached in a manner which will prevent the accumulation of material
between the tamper feet. The' rollers should be designed so that effective
weight can be increased.
MOISTURE-DENSITY DETERMINATION
Samples of representative fill materials to be placed shall be furnished
by the contractor to the soils engineer for determination of maximum
density and optimum moisture or percent of Relative Density for these
materials. Tests for this determination will be made using methods
conforming to requirements of ASTM D 698, ASTM D 1557, or ASTM D 2049.
Copies of the results of these tests will be furnished to the owner, the
project engineer, and the contractor. These test results shall be the
basis of control for all compaction effort.
DENSITY TESTS
The density and moisture content of each layer of compacted fill will be
determined by the soils engineer in accordance with ASTM D 1556, ASTM D
2167, or ASTM D 2922. Any material found not to comply with the minimum
specified density shall be recompacted until the required density is
obtained. Sufficient density tests shall be made and submitted to
support the soils engineer's recommendations. The results of density
tests will also be furnished to the owner, the project engineer, and the
contractor by the soils engineer.