HomeMy WebLinkAboutINVERNESS INNOVATION PARK FIRST FILING - Filed GR-GEOTECHNICAL REPORT/SOILS REPORT -fd 40 dMoVi• 1 .H C _,0 R! O R A `.i E 0. copy GEOLOGIC AND PRELIMINARY GEOTECHNICAL INVESTIGATION 300-500 EAST VINE DRIVE FORT COLLINS, COLORADO Prepared For: FORT COLLINS REAL ESTATE 1220 South College Avenue Fort Collins, Colorado 80524 Attention: Mr. Mike Jensen and Mr. Mike Bello Project No. FC04631-115 September 15, 2008 351 Linden Street I Suite 140 1 Fort Collins, Colorado 80524 Telephone:970- 206-9455 Fax:970-206-9441 I a TABLE OF CONTENTS SCOPE.......................................................................................................................1 SUMMARY OF CONCLUSIONS...............................................................................1 SITEDESCRIPTION.................................................................................................2 PROPOSED DEVELOPMENT..................................................................................2 PREVIOUS STUDIES................................................................................................2 FIELD AND LABORATORY INVESTIGATIONS.......................................................3 SUBSURFACE CONDITIONS...................................................................................3 SITEGEOLOGY........................................................................................................4 GEOLOGIC HAZARDS & CONSTRAINTS...............................................................4 Erosion...................................................................................................................4 Potentially Unstable Slopes...................................................................................5 DifficultExcavation.................................................................................................5 GroundWater.........................................................................................................5 SurfaceDrainage...................................................................................................6 ExpansiveSoils......................................................................................................6 FrostHeave............................................................................................................6 Seismicity................................................................................................................7 Radioactivity...........................................................................................................7 Subsurface and Surface Mining.............................................................................8 DEVELOPMENT RECOMMENDATIONS.................................................................8 ExistingFill.............................................................................................................8 SiteGrading......................................................................:.....................................8 ImportedFill............................................................................................................9 Permanent Cut and Fill Slopes..............................................................................9 UtilityConstruction................................................................................................10 UnderdrainSystem...............................................................................................11 PRELIMINARY PAVEMENT RECOMMENDATIONS.............................................11 SubgradePreparation..........................................................................................12 Preliminary Pavement Thickness Design............................................................12 PRELIMINARY RECOMMENDATIONS FOR STRUCTURES...............................13 Foundations..........................................................................................................13 Slabs -on -Grade and Floor Construction..............................................................13 SurfaceDrainage.................................................................................................13 WATER-SOLUBLE SULFATES..............................................................................14 RECOMMENDED FUTURE INVESTIGATIONS.....................................................14 LIMITATIONS...........................................................................................................15 u TABLE OF CONTENTS cont'd FIGURE 1 — LOCATIONS OF EXPLORATORY BORINGS AND TEST PITS FIGURE 2 — MEASURED DEPTH TO BEDROCK SURFACE FIGURE 3 — MEASURED DEPTH TO GROUNDWATER FIGURE 4 — GEOLOGIC MAP OF SITE AND SURROUNDING AREAS APPENDIX A — SUMMARY LOGS OF EXPLORATORY BORINGS APPENDIX B — LABORATORY TEST RESULTS APPENDIX C — EXAMPLE SITE GRADING SPECIFICATIONS SCOPE This report presents the results of our Geologic and Preliminary Geotechnical Investigation for the planned development at 300-500 East Vine Drive in Fort Collins, Colorado. The purpose of our investigation was to identify geologic hazards and constraints that may exist on the site and to evaluate the subsurface conditions to assist in planning for development. The report includes descriptions of site geology, our analysis of the impact of geologic conditions on site development, a description of soil, bedrock, and groundwater conditions found in our exploratory borings, and discussions of site development as influenced by geotechnical considerations. This report was prepared based upon our understanding of the planned development. The recommendations are considered preliminary and can be used as guidelines for further planning of the development and design of grading. We should review final development and grading plans to determine if additional investigation is merited, or if we need to revise our recommendations. Additional investigations will be required to design building foundations and pavements. A summary of our findings and recommendations is presented below. More detailed discussions of the data, analysis and recommendations are presented in the report. SUMMARY OF CONCLUSIONS 1. Our investigation did not reveal any geologic or geotechnical conditions which would preclude the proposed site development. Shallow ground water is the primary concern for site development. We believe proper engineering design and construction practices can substantially mitigate effects of the geologic and geotechnical constraints that were identified. 2. The subsurface conditions encountered in our borings were variable across the site. In general, the soils and bedrock encountered in our borings consisted of approximately 9 to 21 feet of clays, silts, sands, gravels and occasional cobbles and boulders over interbedded claystone and sandstone bedrock. Up to two feet of existing fill was encountered in several of the borings. Bedrock was encountered at depths ranging from approximately 14 to 21 feet belowthe existing ground surface. Ground waterwas encountered at depths ranging from approximately 2 to 8 feet below the existing ground surface. Groundwater levels will likely affect planned development at this site. FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE CTL I T PROJECT NO. FC04631-115 1 3. We measured very minor consolidation and low swell in several samples of clay, silt, and sand. The bedrock is at depths not likely to influence shallow foundations. We anticipate shallow foundations such as spread footings or mat foundations will be appropriate for most structures at this site. 4. Asphaltic pavement sections on the order of 5 to 6 inches and portland cement pavement sections on the order of 5 inches for streets, parking areas and access drives are anticipated for preliminary planning purposes. Higher volume pavement will likely require thicker sections, on the order of 6 to 8 inches for asphaltic pavement sections and 6 inches for Portland cement pavements. SITE DESCRIPTION The site is located on the north and south sides of East Vine Drive between Linden Street and Jerome Street in Fort Collins, Colorado. The site is generally in the plains and is sparsely vegetated with grasses, weeds, and mature trees. At the time of our exploration, the site was developed with utilities and paved roads on the east portion and dirt and gravel parking areas on the remaining areas. The approximately 9-acre parcel is relativelyflat, with a gentle slope to the east and has an irrigation ditch near the northern border. The Cache La Poudre River is located approximately 500-feet southwest of the site with ponds situated about 150-feet southwest. Several single -story, light commercial structures were observed throughout the site. PROPOSED DEVELOPMENT We understand the parcel is planned for development of four new buildings and associated paved areas. Paved areas may include parking areas and access drives. Storm water management will consist of pervious pavement sections and an infiltration or detention pond. Discussions with Apex Engineering (Civil Engineer) indicate the site may be elevated with 1 to 3 feet of fill to realize desired grades. As we understand it, two of the buildings will be one-story structures and two will be four-story structures. No below grade construction is planned. PREVIOUS STUDIES CTL I Thompson, Inc. recently provided a letter summarizing the results of three Double Ring Infiltrometer tests at the subject site (CTLIT Project No. FC04631-115, dated FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE 2 CTL ITPROJECTNO. FC04631-115 August 4, 2008). The infiltration testing was conducted in order to provide estimated infiltration rates across the site. These test results were used to evaluate the potential for an infiltration pond and pervious pavement sections at the site. FIELD AND LABORATORY INVESTIGATIONS Subsurface conditions were investigated by drilling eight exploratory borings and excavating one test pit at the approximate locations shown on Figure 1. The test holes were drilled using a truck -mounted drill rig with a 4-inch diameter, continuous -flight auger. The test pit was excavated using a mini -excavator. Our field representative observed drilling, logged the soils and bedrock found and obtained samples. Summary logs of the soils found and field penetration resistance values are presented in Appendix A. Figures 2 and 3 present measured depths to bedrock and ground water. Samples of soil and bedrock were obtained during drilling by driving a modified California -type sampler (2.5 inch O.D.) into the soils and bedrock using a 140-pound hammer falling 30 inches. Bulk samples were also collected from the test holes and test pit. Samples were returned to our laboratory and visually classified by the engineering geologist for the project. Laboratory testing included moisture content and dry density, swell - consolidation characteristics, Atterberg limits, particle -size analysis, standard Proctor compaction, and water-soluble sulfate content. Laboratory test results are presented in Appendix B. SUBSURFACE CONDITIONS Subsurface conditions encountered in the borings included approximately 9 to 21 feet of clays, silts, sands, gravels, cobbles and boulders over interbedded claystone and sandstone bedrock. Up to two feet of existing fill was encountered in several borings. Bedrock was encountered at depths ranging from 14 to 21 feet below the existing ground surface. Groundwater was encountered at depths ranging from approximately 2 to 7 feet below the existing ground surface during drilling. Water levels were measured between 2 and 8 feet when checked several days after drilling. Groundwater levels will affect the planned development at this site. FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE 3 CTL IT PROJECT NO. FC04631.115 SITE GEOLOGY The geology of the site was investigated through review of mapping (Geologic Map of the Boulder -Fort Collins -Greeley Area, Colton, R.B., 1978). Our engineering geologist visited the site to assess whether field conditions are consistent with the geologic mapping and reports, evaluate specific site features, and look for other geologic concerns. The geology was further evaluated through review of conditions found in exploratory borings, and our experience in the area. The site is mapped as Post -Piney Creek Alluvium (Upper Holocene) overlying the Pierre Shale (Upper Cretaceous). Typically in this area, the alluvial deposits consist of clays, silts, sands, and gravels. The Pierre Shale at the site consists of two members: the Upper Shale Member, consisting of shale and claystone, and the Richard Sandstone Member, consisting of sandstone, lesser shale, and claystone. Our subsurface investigation generally confirms our understanding of the site geology. GEOLOGIC HAZARDS & CONSTRAINTS No geologic hazards or constraints were indentified during our investigation that could preclude the proposed development. No economically valuable extractable minerals are known to occur in the immediate area of the site. Planning should consider the geologic hazards and constraints discussed below. The following sections discuss each of these geologic hazards, constraints and associated development concerns. Mitigation concepts are discussed below and in the DEVELOPMENT RECOMMENDATIONS section of the report. Erosion We believe the erosion potential is low for this site. The erosion potential can be expected to increase during construction, but should return to pre -construction rates or less if proper grading practices, surface drainage design and re -vegetation efforts are implemented. FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE 4 CTL I T PROJECT NO. FC04631-115 Potentially Unstable Slopes We did not observe evidence of slope instability on the parcel. Slopes on the property are typically less than 2 percent. We believe it is prudent to design cut and fill slopes to be as gentle as practical, to enhance stability, and decrease erosion potential. Guidelines for placement of fill on slopes are presented in the DEVELOPMENT RECOMMENDATIONS section below. Difficult Excavation Our borings encountered areas of gravels, cobbles, and boulders. These alluvial deposits will be relatively difficult to excavate. While not considered a geologic hazard, difficult excavation should be considered in planning for this development. Cuts should be minimized where possible. Excavation methods can likely be completed with heavy-duty excavation equipment. Depending upon the excavation procedures, some oversize material, not suitable for reuse in trench backfill, may be generated. Ground Water Ground water was encountered during drilling at depths between 2 and 7 feet and was measured between 2 and 8 feet from existing ground surface when checked several days after drilling. These findings are consistent with previous investigations and experience in the area. We expect current groundwater levels to affect site development. Groundwater may rise due to site development, seasonal fluctuations, and water levels in the adjacent ditches. The depth to ground water should be evaluated during a future design level geotechnical investigation at the site. In general, grading should be designed to raise the elevations in areas of shallow ground water. Construction of underdrain systems with the sanitary sewer trenches is a commonly employed method to mitigate the accumulation of shallow ground water after construction. A minimum separation of 3 feet is recommended between the groundwater elevations and the lowest elevation of any structure. FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE 5CTLiTPROJECTNO. FC04631-115 Surface Drainage The civil engineer should evaluate and quantify the potential flow in each drainage during peak precipitation events and design surface drainage and storm collection systems to accommodate the water. Active drainage ways should be avoided for development. Structures should not be located within a lateral distance from the crest equivalent to twice the depth of the drainage way where slopes are steeper than about 2:1. Storm drainage should be collected in detention or infiltration basins and released at historic rates or less. Development in the steeper areas should be carefully situated and engineered so as not to contribute to or become damaged by erosion. Evaluation of flood potential was not included in our scope of work. The civil engineer should evaluate whether the site is flood prone. Expansive Soils The soils at this site include clays, silts, sands, gravels, cobbles, and boulders. The overburden soils at this site are considered to be non -expansive. Much of the bedrock formation below the site consists of expansive interbedded claystone and sandstone bedrock; however, bedrock depths will likely buffer the influence on the proposed construction. Frost Heave Our borings indicate shallow ground water is present and the overburden soils atthe site consist of materials that are susceptible to frost heave. Based on our experience and local construction practice in the area, the minimum depth of cover for frost protection is 30 inches. We recommend foundations have a minimum cover of 30 inches. If the foundations are constructed with the appropriate frost protection, we do not believe frost heave will affect the proposed structures. Slabs -on -grade may experience some movement due to frost heave. If the buildings are insulated or heated, the potential for slab movement due to frost heave is minimal. If the buildings are not insulated or heated, slabs -on -grade should be constructed with frost protection. FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE 6CTLITPROJECTNO. FC04631-115 Seismicity This area, like most of central Colorado, is subject to a low degree of seismic risk. No indications of recent movements of any of the faults in the Larimer County area have been reported in the available geologic literature. As in most areas of recognized low seismicity, the record of the past earthquake activity in Colorado is somewhat incomplete. According to the 2006 International Building Code and the subsurface conditions encountered in our borings, this site classifies as a Site Class D. Only minor damage to relatively new, properly designed and built buildings would be expected. Wind loads, not seismic considerations, typically govern dynamic structural design in this area. A Remi Survey can be used to determine the shear wave velocities at the sites. A survey of this type may result in a lower seismic site class (Site Class C). However, in our experience this is unlikely. Radioactivity It is normal in the Front Range of Colorado and nearby eastern plains to measure radon gas in poorly ventilated spaces in contact with soil or bedrock. Radon 222 gas is considered a health hazard and is one of several radioactive products in the chain of the natural decay of uranium into stable lead. Radioactive nuclides are common in the soils and sedimentary rocks underlying the subject site. Because these sources exist on most sites, there is potential for radon gas accumulation in poorly ventilated spaces. The amount of soil gas that can accumulate is a function of many factors, including the radio -nuclide activity of the soil and bedrock, construction methods and materials, pathways for soil gas and existence of poorly -ventilated accumulation areas. It is difficult to predict the concentration of radon gas in finished construction. During our investigation, we did not detect any radiation levels above normal background levels for the area. We recommend testing to evaluate radon levels after construction is completed. If required, typical mitigation methods for residential construction may consist of sealing soil gas entry areas and periodic ventilation of below -grade spaces and perimeter drain systems. It is relatively economical to provide for ventilation of perimeter drain systems or underslab gravel layers at the time of construction, compared to retrofitting FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE 7CTLITPROJECTNO. FC04631-115 U a structure after construction. Radon rarely accumulates to significant levels in above - grade, heated and ventilated spaces. Subsurface and Surface Mininq No subsurface mining is known in the area. We do not anticipate the site is underlain by any economic mineral resources. DEVELOPMENT RECOMMENDATIONS Existing Fill Existing fill was encountered in four borings to depths of up to two feet. Deeper fill areas may be encountered during site development. The fill is of unknown origin and age. The fill presents a risk of movement to improvements supported by the fill. We recommend the fill be removed and recompacted in planned building areas. Foundations and other improvements should not be supported by existing fill. The existing fill can also affect pavements and exterior flatwork. The lowest risk alternative for exterior pavement and flatwork would also be complete removal and recompaction. The cost could be significant. If some movement and distress in these areas is acceptable, then partial depth removal is an alternative. We suggest removal of the existing fill to a depth of 1 to 2 feet below existing grade, proof rolling the exposed subgrade, and additional removal or stabilization of areas where soft, yielding, or organic soils or debris is encountered. After this, fill placement can proceed to construction grades. Site Grading Due to the preliminary nature of this project, site grading plans have not been prepared, and therefore not available for review in conjunction with this subsurface exploration program. Therefore, recommendations provided here are general and for planning purposes only. FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE 8CTLITPROJECTNO. FC04631-115 U Site grading will affect the proposed development. We understand fills of between 1 and 3 feet are expected on portions of the site. The existing on -site soils are suitable for re- use as fill material provided debris or deleterious organic materials are removed. Overburden soils may also include boulders that could require additional effort for removal. We believe grading can be accomplished using conventional construction techniques and heavy-duty equipment. Prior to fill placement, all trash and debris should be removed from fill areas and properly disposed. The ground surface in areas to be filled should be stripped of vegetation, topsoil and other deleterious materials, scarified to a depth of at least 8 inches, moisture conditioned and compacted as recommended below. Site soils should be expected to reduce volume by up to 5% with compaction. Site grading fill should be placed in thin, loose lifts, moisture conditioned and compacted. In areas of deep fill, we recommend higher compaction criteria to help reduce settlement of the fill. Compaction and moisture requirements are presented in Table B-1. The placement and compaction of fill should be observed and density tested during construction. Guideline site grading specifications are presented in Appendix C. Imported Fill If import material is required, samples from each source should be provided for our review. The material used beneath planned structures should be a sandy clay or clayey sand with a liquid limit of less than 35 and a plasticity index between 4 and 15. A minimum of 25 percent of the soil should pass the No. 200 sieve. The material should be spread in loose horizontal lifts, less than 12-inches thick, and be uniformly compacted to a minimum of 95 percent of the maximum Standard Proctor Density between minus 1 and plus 3 percent above optimum moisture content as determined by ASTM D 698. Permanent Cut and Fill Slopes We recommend permanent cut and fill slopes be designed with a maximum inclination of 3:1 (horizontal to vertical). Where fills will be placed on slopes exceeding 20 percent (5:1) the slope should be benched. Structures should be setback from the top or bottom of cut and fill slopes. If site constraints (property boundaries and streets) do not FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE 9CTLITPROJECTNO. FC04631-115 permit construction with recommended slopes, we should be contacted to evaluate the subsurface soils and steeper slopes. Utility Construction We believe excavations for utility installation in the overburden soils can be performed with conventional heavy-duty trenchers or large backhoes. Boulders are likely in the overburden soils. Ground water is anticipated in excavations. For excavations extending less than a few feet below ground water, dewatering may be accomplished by sloping excavations to occasional sumps where water can be removed by pumping. Deeper excavations will likely need a dewatering system to maintain constructible conditions. Utility trenches should be sloped or shored to meet local, State, and federal safety regulations. Based on our investigation, we believe the overburden soils classify as Type C soil and the bedrock as Type B soil based on OSHA standards. Excavation slopes specified by OSHA are dependent upon soil types and groundwater conditions encountered. Seepage and ground water conditions in trenches may downgrade the soil type. Contractors should identify the soils encountered in the excavation and refer to OSHA standards to determine appropriate slopes. Excavations deeper than 20 feet should be designed by a professional engineer. The width of the top of an excavation may be limited in some areas. Bracing or trench box" construction may be necessary. Bracing systems include sheet piling, braced sheeting, and others. Lateral loads on bracing depend on the depth of excavation, slope of excavation above the bracing, surface loads, hydrostatic pressures, and allowable movement. For trench boxes and bracing allowed to move enough to mobilize the strength of the soils, with associated cracking of the ground surface, the "active" earth pressure conditions are appropriate for design. We have assumed the lateral material will consist of sand and gravel for the purposed of design. If movement is not tolerable, the "at rest' earth pressures are appropriate. We suggest an equivalent fluid density of 35 pcf for the "active" earth pressure condition and 50 pcf for the "at rest" earth pressure condition, assuming level backfill. These pressures do not include allowances for surcharge loading or for hydrostatic conditions. We are available to assist further with bracing design if desired. FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE 1 OCTLITPROJECTNO. Fc04631-115 Water and sewer lines are usually constructed beneath paved roads. Compaction of trench backfill can have significant effect on the life and serviceability of pavements. We believe trench backfill should be placed in thin, loose lifts, and moisture conditioned to between optimum and 3 percent above optimum content for clay soils and within 2 percent of optimum moisture content for sand. Trench backfill should be compacted to at least 95 percent of maximum dry density (ASTM D 698). The placement and compaction of fill and backfill should be observed and tested by our firm during construction. If deep excavations are necessary for planned utilities, the compaction guidelines are provided in the EXAMPLE SITE GRADING SPECIFICATIONS presented in Appendix C of this report. Underdrain System The use of underdrain systems below sewer mains and services is a common method to control shallow groundwater in response to development. We recommend an underdrain system be incorporated into sanitary sewer and sewer collection systems. Underdrains should also be installed below sewer service lines. If installed, the underdrain should consist of free -draining gravel surrounding a rigid PVC pipe. The pipe should be sized for anticipated flow. The line should consist of smooth, perforated, or slotted rigid PVC pipe laid at a grade of at least 0.5 percent. A gravel cross- section of at least 2 square feet should be placed around the pipe. A positive cutoff collar concrete) should be constructed around the sewer pipe and underdrain pipe immediately downstream of the point the underdrain pipe leaves the sewer trench. Solid pipe should be used down gradient of this collar to the daylight point. Clean -outs should be provided along the system. The entity responsible for maintenance should be identified and guidelines developed for maintenance. The underdrain should be designed to discharge to a gravity outfall provided with a permanent concrete headwall and trash rack, or to a storm sewer with a check valve to control water backing up into the underdrain system. PRELIMINARY PAVEMENT RECOMMENDATIONS Due to the preliminary nature of this exploration, pavement section recommendations cannot be finalized until additional testing is performed. This section is provided for planning purposes only. FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE CTL I T PROJECT NO. FC04631-115 Subgrade Preparation Based on the borings, the near surface soils on this site will consist of clays, silts, and sands. Up to 2 feet of fill was encountered in four of our borings. If encountered, fill should be removed and replaced as described in the Site Grading section of this report. If soft or yielding soils are encountered, chemical or mechanical stabilization of these soils will improve their subgrade support characteristics, in addition to enhancing the workability of the clays and reducing water infiltration into the underlying subgrade and the potential movements under the pavements. Preliminary Pavement Thickness Design Preliminary guidelines for pavement systems on this site are provided. Final pavement sections should be determined based on the anticipated frequency of truck load applications and other traffic on the pavement during the desired design life. Flexible hot mixed asphaltic concrete pavement (HMAC) or rigid portland cement concrete (PCC) pavements can be used at this site for automobile and light truck traffic use. Rigid pavements are recommended in any areas subject to heavy truck traffic. We anticipate asphalt pavement sections for local residential streets will be on the order of 5 to 6 inches thick. Collectors and other higher volume pavement will likely require thicker pavement sections, estimated on the order 6 to 8 inches. Portland cement concrete (PCC) pavement is recommended in areas subject to any heavy truck traffic such as garbage pickup and/or dumpster trucks and any heavy delivery trucks. We recommend the use of 5 inches of portland cement concrete for general area pavements which are not subject to truck traffic. A minimum 6 inch thick section is recommended in main drives and any areas subject to some moderately heavy truck traffic. Any areas subject to frequent heavy trucks should be designed based on frequency and wheel loads. PCC pavements in this area are typically reinforced. Properly designed control joints and other joints systems are required to control cracking and allow pavement movement. FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE 12CTLITPROJECTNO. FC04631-115 PRELIMINARY RECOMMENDATIONS FOR STRUCTURES The field and laboratory data indicate the soil conditions vary across the site. The following discussions are preliminary and are not intended for design or construction. After grading is completed, a design level soils and foundation investigation should be performed. Due to the preliminary nature of this project, site grading plans have not been prepared, and therefore are not available for review in conjunction with this subsurface exploration program. Therefore, recommendations provided are general and for planning purposes only. Foundations Our investigation for this site indicates the anticipated structures may be founded on shallow foundations such as spread footings or mat foundations bearing on the native soil or engineered fill. A design level geotechnical investigation may identify conditions not indicated by our borings which may require a need for a deeper foundation system. Deep foundations may be required in areas of shallow bedrock, cuts that extend into bedrock and for structures with heavy column loads. Slabs -on -Grade and Floor Construction The soils at this site include clays, silts, sands, gravels, cobbles, and boulders. The overburden soils at this site are considered to be non -expansive; therefore we anticipate most of the site will be rated as low slab performance. Slab movement of 1 to 3 inches is considered "normal' for this level of risk. Slab performance risk should be more thoroughly defined during the design level geotechnical investigation. Surface Drainage The performance of foundations will be influenced by surface drainage. The ground surface around proposed structures should be shaped to provide runoff of surface water away from the structure and off of pavements. We generally recommend slopes of at least 12 inches in the first 10 feet where practical in the unpaved landscaping areas surrounding FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE 13CTLITPROJECTNO. FC04631-115 structures. There are practical limitations on achieving these slopes but they should be achieved wherever possible. Irrigation should be minimized to control wetting. Roof downspouts should discharge beyond the limits of backfill. Water should not be allowed to pond on or adjacent to pavements. Proper control of surface runoff is also important to limit the erosion of surface soils. Sheet flow should not be directed over unprotected slopes. Water should not be allowed to pond at the crest of slopes. Permanent slopes should be re - vegetated to reduce erosion. WATER-SOLUBLE SULFATES Concrete that comes into contact with soils can be subject to sulfate attack. We measured water-soluble sulfate concentrations in two samples from this site. Concentrations were below measurable limits in one sample and 0.02 percent in the second sample. Sulfate concentrations less than 0.1 percent indicate Class 0 exposure to sulfate attack for concrete that comes into contact with the subsoils, according to the American Concrete Institute (ACI). For this level of sulfate concentration, ACI indicates any type of cement can be used for concrete that comes into contact with the subsoils. In our experience, superficial damage may occur to the exposed surfaces of highly permeable concrete, even though sulfate levels are relatively low. To control this risk and to resist freeze -thaw deterioration, the water-to-cementitious material ratio should not exceed 0.50 for concrete in contact with soils that are likely to stay moist due to surface drainage or high water tables. Concrete should be air entrained. RECOMMENDED FUTURE INVESTIGATIONS Based on the results of this investigation and the proposed development, we recommend the following investigations be performed by our firm: 1. Review of final site grading plans; 2. Design and sizing of the underdrain systems; 3. Subgrade investigation and pavement design after grading; 4. Design -level soils and foundation investigations after grading; and 5. Construction testing and observation for site development and building construction. FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE 14CTLITPROJECTNO. FC04631-115 LIMITATIONS Our exploratory borings were located to obtain preliminary subsurface data indicative of conditions on this site. Although our borings were spaced to obtain a reasonably accurate picture of subsurface conditions, variations not indicated in our borings are always possible. We believe this investigation was conducted in a manner consistent with that level of skill and care ordinarily used by members of the profession currently practicing under similar conditions in the locality of this project. No warranty, express or implied, is made. This report was prepared from data developed during our field exploration, laboratory testing, engineering analysis and experience with similar conditions. The recommendations contained in this report were based upon our understanding of the planned construction. If plans change or differ from the assumptions presented herein, we should be contacted to review our recommendations. If we can be of further service in discussing the contents of this report or in the analysis of the planned development from the geotechnical point of view, please contact the undersigned. Very truly yours, CTL I THOMPSON, INC. B'.x•01— Benny I. Lujan Staff Engineer Reviewed by: R.B. "Chip" Leadbetter III, Geotechnical Department FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE CTL IT PROJECT NO. FC04631-115 i Robin Dourest, P.G. Project Manager 4-51, F s/ON ALA V f 15 APPROX. SCALB: + - jW ar FORT COL1INS - ESTATE 300. 500 EAST VINE DRIVE CTL I T PROJECT NO. FCC 31-115 LEGEND: TH- 1 INDICATES APPROXIMATE LOCATION OF EXPLORATORY BORING. TP- 5 INDICATES APPROXIMATE LOCATION OF TEST PIT. DR- 1 INDICATES APPROXIMATE LOCATION OF DOUBLE RING INFILTROMETER TEST. Locations of Exploratory Borings and Test Pits FIGURE 1 APPROX. SCALE: 1'= 100' 0 50' 100, r+ s n TH-6 DR-2 i IF LEGEND: TH-1 INDICATES APPROXIMATE DR-1 (2'1 O) 0 LOCATION OF EXPLORATORY BORING. TP-5 INDICATES APPROXIMATE LOCATION OF TEST PIT. DR-1 INDICATES APPROXIMATE LOCATION OF DOUBLE RING INFILTROMETER TEST. e 17,0) INDICATES APPROXIMATE DEPTHIm• TO BEDROCK. Measured Depth to Bedrock Surface FORT COLLINS REAL ESTATE ON CTL ICTPR PROJECTNO. FC0034-115 FIGURE 2 APPROX. SCALE: 1— 100' 0 50, too' F rr.+ TH- I 6) v, i DR-2 THE 4 m.w tm c.a• riw um T CG1i e1S R— ESTA. 300-500 EAST —E OR VE Cn I T PRO ECI-1 F-631115 THA DR-4 TP-5 TI1-T (5) M DR-3 (5) TH•1 DR-1 (• TH 3 7) LEGEND: TH-1 INDICATES APPROXIMATE LOCATION OF EXPLORATORY BORING. TP-5 INDICATES APPROXIMATE LOCATION OF TEST PIT. DR-1 INDICATES APPROXIMATE LOCATION OF DOUBLE RING INFILTROMETER TEST. 6) INDICATES APPROXIMATE DEPTH TO GROUNDWATER. Measured Depth to Groundwater FIGURE 3 APPROX. SCALE: V= 20001 D?ODO 0 V lI 1 .J %- Q'E FORT COLLWS REAL ESTATE 3W-600 EAST VINE DRW CTL I T PROJECT NO. FOU631-115 LEGEND: Qpp POST -PINEY CREEK ALLUVIUM - Clay, silt, sand, gravel, and cobbles Qs SLOCUM ALLUVIUM - Clay, silt, sand, gravel, and cobbles Kprl PIERRE SHALE, RICHARD SANDSTONE MEMBER - Sandstone with shale and daystone Kpu PIERRE SHALE, UPPER SHALE MEMBER - Shale and daystone Kpm PIERRE SHALE, MIDDLE SHALE MEMBER - Claystone, shale and siltstone Geologic Map of Site and Surrounding Areas FIGURE 4 APPENDIX A LOGS OF EXPLORATORY BORINGS FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE CTL I T PROJECT NO. FC04631-115 0 5 10 15 TH-1 ON i 2s/12 O b- a 0= 0= L; Q wLL 20 0DFawn 25 30 35 L40 FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE CTL I T PROJECT NO. FC04631-115 i r TH-2 TH-3 TH-4 0 9/12 26/12 17/12 5 a ' 46/12 23/12 30/12 a C o 0• 4&- a- D0= 0= fl 15 I- w 50/3 w 20 I - awn 25 — 30 35 40 SUMMARY LOGS OF EXPLORATORY BORINGS FIGURE A-1 TH-5 TH-6 TH-7 TH-6 TP-5 0 0 0 G: v D, i d' Q 4: 5 - C 8112 29f12 4112 5aa p: C'• 40/12 AA e• Y 10/12 ii 10 a. 10 15016 a 25112 w ® A' 20 r 20 w0 50/2 25 25 30 35 40 FORT COLLINS REN. ESTATE 300-50) EAST NNE DRIVE CTL IT PROJECT NO. FCORl91-115 LEGEND: ASPHALTIC CONCRETE AND BASE COURSE FILL, GRAVEL, SANDY, MOIST, BROWN, RED SILT, SANDY, GRAVELLY TO SAND, SILTY AND CLAY. SILTY, MOIST, LOOSE TO DENSE, SOFT TO VERY STIFF, BROWN (ML, SM. CL) GRAVEL, SANDY WITH OCCASIONAL COBBLES AND BOULDERS, MOIST TO WET, MEDIUM jd. DENSE TO DENSE, BROWN, REDDISH BROWN (GP, GW) INTERBEDDED CLAYSTONElSANDSTONE, MOIST TO WET, HARD TO VERY HARD, GRAYISH -BROWN, OLIVE -BROWN DRIVE SAMPLE. THE SYMBOL INDICATES BLOWS OF A 140-POUND HAMMER FALLING 30 INCHES WERE REQUIRED TO DRIVE A 2.54NCH O.D. SAMPLER INCHES. FDRIVE SAMPLE. THE SYMBOL INDICATES BLOWS OF A 140-POUND HAMMER FALLING 30 INCHES WERE REQUIRED TO DRIVE A 2.0-INCH O.D. SAMPLER INCHES. BULK SAMPLE FROM AUGER CUTTINGS. WATER LEVEL MEASURED AT TIME OF DRILLING. WATER LEVEL MEASURED AUGUST 12, 2008. 1 PRACTICAL DRILL REFUSAL. NOTES: 1. THE BORINGS WERE DRILLED ON AUGUST 1, 2008 USING 4-INCH DIAMETER CONTINUOUS FLIGHT AUGERS AND A TRUCK -MOUNTED DRILL RIG. 2. THESE LOGS ARE SUBJECT TO THE EXPLANATIONS, LIMITATIONS AND CONCLUSIONS IN THIS REPORT. 3. THE APPROXIMATE LOCATIONS OF THE BORINGS ARE INDICATED ON FIGURE 1 SUMMARY LOGS OF EXPLORATORY BORINGS FIGURE A-2 APPENDIX B LABORATORY TEST RESULTS FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE CTL I T PROJECT NO. FC04631-115 3 2 1 z 0 O rn z a _ 1a x W z -2 O W M -3 a 2 O U a Li ADDITIONAL COMPRESSION UNDER CONSTANT PRESSURE DUE TO WETTING ram-•-- - - - - - - --- ------ ---'1-7- ---T--------- ------r-4 r------- ____,_ 1_____________________ f _---- ---------------- --------- 1 r - I T--------- - - - - -- ------ - - - -- -- „ 0.1 1.0 APPLIED PRESSURE - KSF Sample of SILT, SANDY (ML) From TH -1 AT 4 FEET 3 2 1 z O 0 Z Q a X -1 W 0 z O -2 N N W IM AL -3 2 O v 10 100 DRY UNIT WEIGHT= 105 PCF MOISTURE CONTENT= 22.5 % ADDITIONAL COMPRESSION UNDER CONSTANT PRESSURE DUE I---------.-------------------------T WETTING y - _ _ _ - - -I_ _ 1 _ _ 1 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - - - _ J_-_______________________,___--- r r------,----,-----,---r, _-r--.---.------- r--------------------- ---a F------I------- --;----------- - - - - ------------------- - - - - ------ - - -- -i r------------------------------------------------------------=---------- =-1 0.1 APPLIED PRESSURE - KSF Sample of SAND, SILTY (SM) From TH - 2 AT 4 FEET FORT COLLINS REAL ESTATE 300.500 EAST VINE DRIVE CTL I T PROJECT NO. FC04631-115 1.0 10 100 DRY UNIT W EIGHT= 11 PCF MOISTURE CONTENT= 16.9 % Swell Consolidation Test Results FIGURE B-1 Z O rn Z a a W - 5 OR Z O -6 N N W W d -7 2 O 0 8 ADDITIONAL COMPRESSION UNDER CONSTANT PRESSURE DUE TO WETTING r--,---:---------.----------------- I -------- I, - ------- I ------------------ I - - -- - a L - ------------..----------- ------- I r _ _ _ _ - - - _ - _ - _ _ _ _ _ - _ _ _ _ - - - - r _ _ - - - - _ _ _ - _ _ - _ _ _ _ r _ - _ _, 1 ' I I I I i i I a.—i---—__ — — — _I—--_y_____--. I 1 i I I ' 1 I _ _ _ _ _ _ _ _ _ r — _ _ _ _ _ _ _ _ — _ _ _I— _ _ — — _ _ - _ - — _ _ _ _ _ _ _ L — — — — — — — — — — — 1 — — — — — — — — — — — — — — — — — - — — — — — — — — —— — — r _ _ _ - _ _ _ _ _ r _ - - - _ _ r----------- I ------- I --------------------------------------------------- - 1-i I--------------------------------------------- — 0.1 APPLIED PRESSURE - KSF Sample of SILT, SANDY (ML) From TH - 4 AT 4 FEET FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE CTL I T PROJECT NO. FC04631-115 1.0 10 100 DRY UNIT WEIGHT= 102 PCF MOISTURE CONTENT= 24.2 % Swell Consolidation Test Results FIGURE B-2 Z O W Z Q a -sx W O z O -6 N W X IL -7 2 O v 6 L---------------------=------------------------------ I I_ - _ _ - _ _ 1 _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ - _ 1 _ _ _ _ _ - - _ _ _ _ L _ _ - - - - - - - - - - - - - - _ _ _ - - - _ - - - I i I r_,_--- ________________--- _-_ I I a _ _ _ _I_ _ _ a _ - - _ _ _ _ - _ a - - _ - _ - _ _ _ - - - _ _ _ - - - _ _ _ _ 1 - - - _ _ - _ I I I a - _ _ _ - -I_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ I i _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ y _ 1 _ _ - _ - - _ _ _ _ _ 1 a--*-- - - - - - - - - - - - - - - J - _ _ _ _ - _ _ _ _ _ - - - - _ _ - - _ - - _ _ - I I t----------------------`------------------------- ----------------------j! r-------------------.------.--------------------------------------------- ---.I 0.1 1.0 APPLIED PRESSURE - KSF Sample of CLAY, SANDY (CL) From TH -SAT 4 FEET FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE CTL I T PROJECT NO. FC04631-115 10 100 DRY UNIT WEIGHT= 101 PCF MOISTURE CONTENT= 26.2 % Swell Consolidation Test Results FIGURE B-3 IF HYDROMETER - 11 1 11 11 11' I . •I 1 „ CLAY PLASTIC) TO SILT (NON -PLASTIC) Sample of GRAVEL, SANDY (GW) GRAVEL 55 % SAND 41 % From TH - 1 AT 9 FEET SILT & CLAY 4 % LIQUID LIMIT % PLASTICITY INDEX % HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR. TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN. 15 MIN. 60 MIN. 19 MIN. 4 MIN. 1 MIN. '200 -100 '50 -40 -30 116 110 -8 -4 3/8' W4' W 3' 516, B' 100 _—. _. — _. 0 T t. T 20 30 z -- wz a 60 40 ti w '-- ---t-------- a --- IrwCL60 30 70 20 10 90 0 001 0.002 .005 .009 .019 .037 .074 149 .297 0• 590 1.19 2.0 2.38 4.76 9.52 19.1 36.1 76.2 127 200 152 DIAMETER OF PARTICLE IN MILLIMETERS CLAY (PLASTIC) TO SILT (NON -PLASTIC) SANDS GRAVEL FINE I MEDIUM ICOARSEI FINE I COARSE I COBBLES Sample Of GRAVEL, SANDY (GP) GRAVEL 57 % SAND 39 % From TH - 7 AT 4 FEET SILT & CLAY 4 % LIQUID LIMIT % PLASTICITY INDEX % FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE PROJECT NO. FC04631-115 Gradation Test Results FIGURE B-4 140 r-----t--- ------r-{----------T--------- I--------------- L-=---- ---------- =---- '---------------- TP-5 135 T CURVE MAXIMUM DRY DENSITY 1------------------- 112.5 PCF I OPTIMUM MOISTURE CONTENT r--------r----------- r-------------------- --- 14.0 % 130 - -- -- J - - - - - - - - - - - - - - - - - - - - - - - - - - L _ _ _ _ _ _ - - L - 1 i _ _ _ _ _ -.- - .. _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ 1 _ _ _ i_ _ - - _ _ _ _ - r------,--r-------------- T-------------------__------ r--•------F---------------r-------- I - - -- ^-- -------- r-------- ------- 125 L- ---------------------I-' I------=--------= r - r r ZERO AIR VOIDS SPECIFIC GRAVITY = 2.71 120 LL V--------------------------------- ------ --,- a------- --------- - - r - -- N 115 a ...._._._ W---- - - - - -----------------------I------',--.--I------ ------l---------- I-- r----- - -. L- r--- --r-T----.--!------'I ---i -r----r----I--f -r- ------- ---r-T--- i___ r__-_r_Y---._,__--r---.--•-_----r_-_ a - 4-4- I I 110 I ; r------,--r-r-;-------------- L-r------- --- - - -- r-.- r ---- - - - -I- - - -- ----- -,--- -r- T -- I- -- ---- -- --- - - - - - -I- - -- -- -- 1 _ _ _ _ - - _ L - - _ - _ _ _ -- - - - - - - - - - - - - - - - - 105 r-'----!--r---,--.--,----r----,- r-------1'__----_-:-- r- --'------ ---- --- -- -----r----- --- r----i------ ^ - -- -- a - - - - - - - - - - - - - - - - - - - - 4 _ 1 - - - - - - - - - - - - - - _ _ _ _ - _ - - - - 7- 4 - - - i - - - - - _ - - - - I 100 r- ------ --- ^- --- - - --- ----- - - - I ----- T--- 1-1------r-L-1------i----'-L------- -"- -- 1-J--i----a-1-- I_ I_ _ _ _ - - _ _ - - - - - - i - - - 95 0 5 10 15 20 25 30 35 MOISTURE CONTENT - % Unified Soil Classification System(USCS) SILT, GRAVELLY, SANDY (ML) LIQUID LIMIT NP % AASHTO Soil Classification A-4 (0) PLASTICITY INDEX NC —% Location TP-5 @ V to 5' GRAVEL (USCS) 30 % 300-500 E. Vine SAND (USCS) 22 pie Compaction Test Procedure ASTM D 698-91 SILT AND CLAY 48 % METHOD C FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE Compaction CTL I T PROJECT NO. FC04631-115 Test Results FIGURE B-5 TABLE B-1 SUMMARY OF LABORATORY TESTING lit BORING DEPTH FEET) MOISTURE CONTENT DRY DENSITY PCF ATTERBERG LIMITS SWELL TEST RESULTS' PASSING NO.200 SIEVE SOLUBLE SULFATES DESCRIPTION LIQUID LIMIT PLASTICITY INDEX SWELL` APPLIED PRESSURE PSF) SWELL PRESSURE PSF TH-1 4 22.5 105 0.1 1,000 SILT, SANDY ML TH-1 9 6.0 4 GRAVEL, SANDY GW TH-2 4 16.9 111 NL NP 0.1 1,000 17 SAND, SILTY SM TH-2 9 8.9 5 GRAVEL, SANDY GP TH-3 4 0.020 GRAVEL, SANDY GP TH-3 9 7.6 4 GRAVEL, SANDY GP TH-3 19 20.8 21 SANDSTONE TH-4 4 24.2 102 0.1 1,000 SILT, SANDY ML TH-4 9 6.8 4 GRAVEL, SANDY GP TH-6 4 11.6 12 SAND, SILTY SM TH-7 4 7.7 4 GRAVEL, SANDY GP TH-7 14 15.5 38 SANDSTONE TH-8 4 26.2 101 0.1 1,000 0.002 CLAY, SILTY CL TH-8 24 19.9 100 33 ISANDSTONE TP-5 1-5 7.0 NL NP 48 ISILT, GRAVELLY, SANDY ML NEGATIVE VALUE INDICATES COMPRESSION. FORT COLLINS REAL ESTATE 300.500 EAST VINE DRIVE CTLIT PROJECT NO. FC04631-115 Page 1 of 1 APPENDIX C EXAMPLE SITE GRADING SPECIFICATIONS FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE CTL I T PROJECT NO. FC04631-115 EXAMPLE SITE GRADING SPECIFICATIONS DESCRIPTION This item shall consist of the excavation, transportation, placement, and compaction of materials from locations indicated on the plans, or staked by the Engineer, as necessary to achieve preliminary street and overlot elevations. These specifications shall also apply to compaction of excess cut materials that may be placed outside of the development boundaries. 2. GENERAL The Soils Engineer shall be the Owner's representative. The Soils Engineer shall approve fill materials, method of placement, moisture contents and percent compaction, and shall give written approval of the completed fill. 3. CLEARING JOB SITE The Contractor shall remove all vegetation and debris before excavation or fill placement is begun. The Contractor shall dispose of the cleared material to provide the Owner with a clean, neat appearing job site. Cleared material shall not be placed in areas to receive fill or where the material will support structures of any kind. 4. SCARIFYING AREA TO BE FILLED All topsoil and vegetable matter shall be removed from the ground surface upon which fill is to be placed. The surface shall then be plowed or scarified until the surface is free from ruts, hummocks or other uneven features, which would prevent uniform compaction. 5. COMPACTING AREA TO BE FILLED After the foundation for the fill has been cleared and scarified, it shall be disked or bladed until it is free from large clods, brought to the proper moisture content (0 to 3 percent above optimum moisture content for clays and within 2 percent of optimum moisture content for sands) and compacted to not less than 95 percent of maximum dry density as determined in accordance with ASTM D 698. 6. FILL MATERIALS Fill soils shall be free from organics, debris or other deleterious substances, and shall not contain rocks or lumps having a diameter greaterthan six (6) inches. Fill materials shall be obtained from cut areas shown on the plans or staked in the field by the Engineer. On -site materials classifying as CL, CH, SC, SM, SW, SP, GP, GC, and GM are acceptable. Concrete, asphalt, organic matter and other deleterious materials or debris shall not be used as fill. FORT COLLINS REAL ESTATE Appendix C-1300-500 EAST VINE DRIVE pp CTL IT PROJECT NO. FC04631-115 7. MOISTURE CONTENT AND DENSITY Fill material shall be moisture conditioned and compacted to the criteria in the table, below. Maximum density and optimum moisture content shall be determined from the appropriate Proctor compaction tests. Sufficient laboratory compaction tests shall be made to determine the optimum moisture content for the various soils encountered in borrow areas. FILL COMPACTION AND MOISTURE REQUIREMENTS Depth from Soil Moisture Requirement Final Grade Density Requirement Type from optimum) feet) Clay 0 to +3 95% of ASTM D 698 0 to 15 feet Sand 2 to +2 95% of ASTM D 698 Clay Greater than 15 feet 2 to +1 98% of ASTM D 698 Sand 2 to +1 95% of ASTM D 1557 The Contractor may be required to add moisture to the excavation materials in the borrow area if, in the opinion of the Soils Engineer, it is not possible to obtain uniform moisture content by adding water on the fill surface. The Contractor may be required to rake or disc the fill soils to provide uniform moisture content through the soils. The application of water to embankment materials shall be made with any type of watering equipment approved by the Soils Engineer, which will give the desired results. Water jets from the spreader shall not be directed at the embankment with such force that fill materials are washed out. Should too much water be added to any part of the fill, such that the material is too wet to permit the desired compaction from being obtained, rolling, and all work on that section of the fill shall be delayed until the material has been allowed to dry to the required moisture content. The Contractor will be permitted to rework wet material in an approved manner to hasten its drying. 8. COMPACTION OF FILL AREAS Selected fill material shall be placed and mixed in evenly spread layers. After each fill layer has been placed, it shall be uniformly compacted to not less than the specified percentage of maximum density. Fill shall be compacted to the criteria above. At the option of the Soils Engineer, soils classifying as SW, GP, GC, or GM may be compacted to 95 percent of maximum density as determined in accordance with ASTM D 1557 or 70 percent relative density for cohesionless sand soils. Fill materials shall be placed such that the thickness of loose materials does not exceed 12 inches and the compacted lift thickness does not exceed 6 inches. FORT COLLINS REAL ESTATE Appendix C-2 300-500 EAST VINE DRIVE CTL I T PROJECT NO. FC04631-115 Compaction as specified above shall be obtained by the use of sheepsfoot rollers, multiple -wheel pneumatic -tired rollers, or other equipment approved by the Engineer for soils classifying as CL, CH, or SC. Granular fill shall be compacted using vibratory equipment or other equipment approved by the Soils Engineer. Compaction shall be accomplished while the fill material is at the specified moisture content. Compaction of each layer shall be continuous over the entire area. Compaction equipment shall make sufficient trips to ensure that the required density is obtained. 9. COMPACTION OF SLOPES Fill slopes shall be compacted by means of sheepsfoot rollers or other suitable equipment. Compaction operations shall be continued until slopes are stable, but not too dense for planting, and there is not appreciable amount of loose soils on the slopes. Compaction of slopes may be done progressively in increments of three to five feet (3' to 5') in height or after the fill is brought to its total height. Permanent fill slopes shall not exceed 3:1 (horizontal to vertical). 10. PLACEMENT OF FILL ON NATURAL SLOPES Where natural slopes are steeper than 20 percent in grade and the placement of fill is required, benches shall be cut at the rate of one bench for each 5 feet in height minimum of two benches). Benches shall be at least 10 feet in width. Larger bench widths may be required by the Engineer. Fill shall be placed on completed benches as outlined within this specification. 11. DENSITY TESTS Field density tests shall be made by the Soils Engineer at locations and depths of his choosing. Where sheepsfoot rollers are used, the soil may be disturbed to a depth of several inches. Density tests shall be taken in compacted material below the disturbed surface. When density tests indicate that the density or moisture content of any layer of fill or portion thereof is not within specification, the particular layer or portion shall be reworked until the required density or moisture content has been achieved. 12. SEASONAL LIMITS No fill material shall be placed, spread or rolled while it is frozen, thawing, or during unfavorable weather conditions. When work is interrupted by heavy precipitation, fill operations shall not be resumed until the Soils Engineer indicates that the moisture content and density of previously placed materials are as specified. 13. NOTICE REGARDING START OF GRADING The Contractor shall submit notification to the Soils Engineer and Owner advising them of the start of grading operations at least three (3) days in advance of the starting date. Notification shall also be submitted at least 3 days in advance of any resumption dates when grading operations have been stopped for any reason other than adverse weather conditions. FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE CTL IT PROJECT NO. FC04631-115 Appendix C-3 14. REPORTING OF FIELD DENSITY TESTS Density tests made by the Soils Engineer, as specified under "Density Tests" above, shall be submitted progressively to the Owner. Dry density, moisture content, and percentage compaction shall be reported for each test taken. 15. DECLARATION REGARDING COMPLETED FILL The Soils Engineer shall provide a written declaration stating that the site was filled with acceptable materials, and was placed in general accordance with the specifications. FORT COLLINS REAL ESTATE 300-500 EAST VINE DRIVE CTL I T PROJECT NO. FC04631-115 Appendix C-4