Loading...
HomeMy WebLinkAboutAddendum 2 - BID - 10106 Schoolside Park Addendum # 2 RFP 10106 Schoolside Park ADDENDUM NO. 2 Description of Invitation to Bid (ITB) 10106: Schoolside Park ITB DUE DATE: 3:00 PM (Mountain Time) February 14, 2025 To all prospective Bidders under the invitation to bid documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1- Questions and Answers Exhibit 2 – Updated Bid Schedule Please contact Adam Hill, Senior Buyer, at 970-221-6777 or adhill@fcgov.com with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE ITB STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. nd Floor 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum # 2 RFP 10106 Schoolside Park Exhibit 1 – Questions and Answers 1. Q - Should we plan on caulking and painting of exterior siding, board and batten and trim in the field-the assumption would be to have it come factory primed with paint and caulk applied in field RESPONSE: This unit will come with factory primer and paint. It is not anticipate that the Contractor will responsible for priming, painting or caulking of the restroom. 2. Q - Is the door and frame requiring field finish-this is also not mentioned RESPONSE: No field finish will be required of the door and frame. 3. Q - The concrete at bathroom shelters at park is normally at the very least sealed with a basic densifier sealer for stain resistance-should we plan to provide and install a basic sealer at this time? RESPONSE: The specifications for the concrete under the open-air picnic shelter does not call for a sealer. The finishes inside of the restroom unit will be provided by the restroom vendor. 4. Q - Drawings show CMU walls at the bathroom shelters, in the past the CMU is block filled and coated with a Precast Epoxy paint for washability purposes-it is not called for at this time on the prints. Should we plan on block fill and paint. RESPONSE: The interior finishes for the restroom are being provided by the restroom vendor. 5. Q – The interior ceiling at the restroom is not specified as to whether it is exposed or Gyp and also no clarity on whether it will receive a finish or not RESPONSE: The interior finishes for the restroom are being provided by the restroom vendor. 6. Q - The Port O let enclosure is calling for Redwood, it would be the assumption this would require at the very least a clear coat. Could we please get clarity in regard to the intended field finish, if any, for the port o let wood enclosure RESPONSE: Yes, please include pricing to provide a clear seal coat to the wood. Also include cost to apply a non-sacrificial anti-graffiti coating to wood as well (Sherwin Williams Anti-Graffiti Coating; Clear; B97C00150 or approved equal). 7. Q – There appears to be a duplication of an item in the bid tab. Item 03 30 00 Concrete Paving - Playground Ramp 1 EA & Item 32 13 00 Concrete - Playground Ramp 1 EA seem to reference the same work item as I only see one playground ramp in the plans. RESPONSE: Correct, only one playground ramp is required. Bid form has been updated to reflect this change, please see attached update bid form.