HomeMy WebLinkAboutIN-SITU - Filed SEPD-SURFACE EXPLORATION/PAVEMENT DESIGN REPORT -SUBSURFACE EXPLORATION REPORT
IN -SITU, INC. HEADQUARTERS
FORT COLLINS, COLORADO
EEC PROJECT NO. 1032165
October 13, 2003
In -Situ, Inc.
P.O. Box 1
Laramie, Wyoming 82073-0920
Attn: Mr. Robert S. Blythe, President
Re: Subsurface Exploration Report
In -Situ, Inc. Headquarters
Fort Collins, Colorado
EEC Project No. 1032165
Mr. Blythe:
SEC
EARTH ENGINEERING
CONSULTANTS, INC.
Enclosed, herewith, are the results of the geotechnical subsurface exploration you requested
for the proposed In -Situ Inc. Headquarters to be constructed on Lincoln Avenue in north Fort
Collins, Colorado. In summary, the subsurface soils encountered in the test borings
consisted of low to moderate plasticity lean clays underlain at depths of approximately 1 %a
to 3 feet by sands and gravels. Groundwater was observed in the proposed building area at
depths of approximately 8 % to 9 feet below ground surface after the completion of drilling.
Based on the materials observed at the test boring locations, it is our opinion the proposed
lightly loaded office building could be supported on conventional footing foundations
bearing on the near surface sand and gravel soils. The lean clay soils above the granular
stratum exhibited low potential to change volume with variation in moisture content at
current moisture and density conditions. As such, it is our opinion the upper clay soils could
be used for support of floor slabs and exterior flatwork and pavements. Geotechnical
recommendations concerning design and construction of the foundations and support of floor
slabs and pavements are provided in the text of the attached report.
CENTRE FOR ADVANCED TECHNOLOGY
2301 RESEARCH BOULEVARD, SUITE 104
FORT COLLINS, COLORADO 80526
970) 224- 1 522 (FAX) 224-4564
Earth Engineering Consultants, Inc.
EEC Project No. 1032165
October 13, 2003
Page 2
We appreciate the opportunity to be of service to you on this project. If you have any
questions concerning the enclosed information, or if we can be of further service to you in
any other way, please do not hesitate to contact us.
Very truly yours,
Earth Engineering Consultants, Inc.
00 RE6/sl
SCs
H/pF,y
FP
o
v
270Z
N
isa R. Schoenfeld, P.E.
Senior Project Engineer
cc: Mr. Mark Gausepohl — Vaught Frye Architects
Mr. Gary Weeks — Weeks and Associates
Principal Engineer
SUBSURFACE EXPLORATION REPORT
IN -SITU, INC. HEADQUARTERS
FORT COLLINS, COLORADO
EEC PROJECT NO. 1032165
INTRODUCTION
October 13, 2003
The subsurface exploration for the In -Situ, Inc. Headquarters to be constructed on the south
side of Lincoln Avenue at 2nd and 3rd Streets in Fort Collins, Colorado, has been completed.
Three soil borings extending to depths of approximately 14 to 15 feet below present site
grades were advanced in the building area to obtain information on existing subsurface
conditions. Two other borings were advanced to depths of approximately 9 feet in proposed
pavement areas. Individual boring logs and a diagram indicating the approximate boring
locations are included with this report.
We understand this project involves the construction of a single -story, pre -cast concrete
office building with slab -on -grade construction, approximately 30,000 square feet in plan
area. Foundation loads for the structure are expected to be light, with continuous wall loads
less than 3 kips per lineal foot and individual column loads less than 70 kips. Floor loads are
expected to be light. Small grade changes will be required to develop the site grades in the
new building area. Paved drive and parking areas will be constructed in conjunction with the
new structure. We expect the pavements will be used almost exclusively by automobiles and
light trucks.
The purpose of this report is to describe the subsurface conditions encountered in the
borings, analyze and evaluate the test data and provide geotechnical recommendations
concerning design and construction of the building foundations and support of floor slabs
and pavements.
Earth Engineering Consultants, Inc.
EEC Project No. 1032165
October 13, 2003
Page 2
EXPLORATION AND TESTING PROCEDURES
The boring locations were established in the field by a representative of Earth Engineering
Consultants, Inc. (EEC) by pacing and estimating angles from identifiable site features. The
approximate boring locations are indicated on the attached boring location diagram. The
locations of the borings should be considerate accurate only to the degree implied by the
methods used to make the field measurements.
The borings were performed using a truck -mounted, CME-45 drill rig equipped with a
hydraulic head employed in drilling and sampling operations. The boreholes were advanced
using 4-inch nominal diameter continuous flight augers. Samples of the subsurface materials
encountered were obtained using split -barrel sampling techniques in general accordance with
ASTM Specification D-1586. In addition, relatively undisturbed soil samples were obtained
by pushing thin -walled Shelby tubes into the subsurface soils. All samples obtained in the
field were sealed and returned to the laboratory for further examination, classification and
testing.
Moisture content tests were completed on each of the recovered samples. Washed sieve
analysis and Atterberg limits tests were performed on selected samples to evaluate the
quantity and plasticity of the fines in the subgrade materials. Swell/consolidation tests were
completed on selected samples to evaluate the tendency of the soil to change volume with
variation in moisture content. Results of the field borings and laboratory testing are
indicated on the attached boring logs and summary sheets.
As a part of the testing program, all samples were examined in the laboratory by an engineer
and classified in accordance with the attached General Notes and the Unified Soil
Classification System based on the texture and plasticity of the soil. The estimated group
symbol for the Unified Soil Classification System is shown on the boring logs. A brief
description of the Unified Soil Classification System is included with this report.
Earth Engineering Consultants, Inc.
EEC Project No. 1032165
October 13, 2003
Page 3
SITE AND SUBSURFACE CONDITIONS
The proposed office building will be located on the south side of Lincoln Avenue between
2nd and 3rd Streets in north Fort Collins, Colorado. The project site slopes gently to the
south, with a maximum difference in ground surface elevation across the lot estimated to be
approximately 3 to 4 feet. The southwest portion of the property extends to the Cache La
Poudre River. Evidence of prior building construction was not noted in the proposed
development area.
An EEC field engineer was on site during drilling to direct the drilling activities and evaluate
the subsurface materials encountered. Field logs prepared by EEC site personnel were based
on visual and tactual observation of disturbed samples and auger cuttings. The final boring
logs included with this report may contain modifications to the field logs based on results of
laboratory testing and engineering evaluation. Based on results of the field boring and
laboratory testing, subsurface conditions can be generalized as follows:
Approximately 3 to 6 inches of vegetation and topsoil were observed at the surface of the
test borings. Lean clay with minor to moderate quantities of sand was encountered below the
topsoil and extended to depths of approximately 1 %2 to 3 feet. The lean clay is stiff to very
stiff and exhibits low swell potential at current moisture and density conditions. Sand and
gravel with apparent scattered cobbles was encountered below the clay stratum and extended
to a shale bedrock stratum at approximately 11 feet or to the depths explored, approximately
9 to 15 feet. The granular stratum is medium dense to very dense. Weathered shale bedrock
was encountered in Boring B-4 and extended to the depth explored, approximately 15 feet.
The stratification boundaries indicated on the boring logs represent the approximate location
of changes in soil and bedrock types. In -situ, the transition of materials may be gradual and
indistinct.
r
EEC Project No. 1032165
October 13, 2003
Page 4
GROUNDWATER CONDITIONS
Earth Engineering Consultants, Inc.
Observations were made while drilling and after completion of the borings to detect the
presence and depth to hydrostatic groundwater. Groundwater was measured in the open
boreholes at depths of approximately 8%2 and 9 feet below ground surface in borings B-2
through B-4 after the completion of drilling. Groundwater was not observed in the
completed pavement borings B-1 and B-5 after drilling.
Groundwater levels could be affected by water levels in the adjacent Cache La Poudre River.
Fluctuations in groundwater levels can occur over time depending on variations in
hydrologic conditions and other conditions not apparent at the time of this report. Perched
groundwater may also be encountered in more permeable zones in the subgrade soils at times
throughout the year. Perched water is commonly encountered in soils overlying less
permeable bedrock.
ANALYSIS AND RECOMMENDATIONS
Foundations
Based on the materials observed at the boring locations, it is our opinion the proposed lightly
loaded structure could be supported on conventional footing foundations bearing on the
medium dense to very dense sand and gravel stratum. For design of footing foundations
bearing on the granular stratum, we recommend using a net allowable total load bearing
pressure not to exceed 3,000 psf. The net bearing pressure refers to the pressure at
foundation bearing level in excess of the minimum surrounding overburden pressure. Total
load includes full dead and live loads.
Exterior foundations and foundations in unheated areas should be located a minimum of 30
inches below final adjacent exterior grade to provide frost protection. We recommend
formed continuous footings have a minimum width of 12 inches and isolated column
foundations have a minimum width of 24 inches. Trenched foundations or grade beam
foundations should not be used in the site granular soils.
Earth Engineering Consultants, Inc.
EEC Project No. 1032165
October 13, 2003
Page 5
No unusual problems are anticipated in completing the excavations required for construction
of the footing foundations. Care should be taken to avoid disturbing the foundation bearing
materials. Materials loosened or disturbed by the construction activities should be reworked
in place prior to construction of the footing foundations.
We estimate the long-term settlement of footing foundations designed and constructed as
outlined above would be less than 1 inch.
Slabs-on-Grade/Pavement Sub2rades
Any existing vegetation and/or topsoil should be removed from within the limits of planned
slabs -on -grade and pavements. After stripping and completing all cuts and prior to
placement of any fill, slabs -on -grade or pavement, we recommend the in -place soils be
scarified to a minimum depth of 9 inches, adjusted to within f2% of optimum moisture
content and compacted to at least 95% of standard Proctor maximum dry density as
determined in accordance with ASTM Specification D-698.
Fill soils required to develop the slab -on -grade and pavement subgrades should consist of
approved, low -volume -change materials which are free from organic matter and debris. The
near surface cohesive soils could be used as fill in these areas. Alternatively, imported soils
with at least 15% fines, a liquid limit less than 40 and a plasticity index less than 18 could
also be used as fill in these areas. We recommend the fill soils be placed in maximum 9 inch
loose lifts and be moisture -conditioned and compacted as recommended for the scarified
soils.
Care should be taken after preparation of the subgrades to avoid disturbing the subgrade
materials. Materials which are loosened or disturbed by the construction activities or
materials which become dry and desiccated or wet and softened should be removed and
replaced or reworked in place prior to placement of the overlying slabs -on -grade or
pavements.
Earth Engineering Consultants, Inc.
EEC Project No. 1032165
October 13, 2003
Page 6
Pavements
Based on prior experience with similar soil subgrade conditions, we recommend the
pavement section consist of 3% inches of hot bituminous pavement (HBP) overlying 6 inches
of aggregate base course. Heavier sections would be appropriate in areas carrying truck
traffic with the design section depending on the type and number of trucks expected. The
hot bituminous pavement should be consistent with City of Fort Collins requirements for
grading S or SX materials. The aggregate base course should be consistent with CDOT
requirements for Class 5 or Class 6 aggregate base course.
Heavier pavement sections will also be required in truck access drives. An asphalt section
including at least 4 inches of grading S or SX pavement overlying 8 to 12 inches of Class 5
or 6 aggregate base course could be considered in these areas although a heavier section may
be warranted for heavier truck traffic.
The recommended pavement sections are minimums and, as such, periodic maintenance
requirements should be expected. In areas with significant truck turning movements or in
dumpster areas, the asphalt pavement will likely show poor performance. Use of Portland
cement concrete should be considered for such high stress areas. A minimum 5-inch thick
concrete section could be considered in these areas.
Portland cement concrete for the pavements should have a minimum 28-day design
compressive strength of 3,500 psi and should be air -entrained. The recommended pavement
section is based on non -reinforced concrete although woven wire or fiber mesh should be
considered for control of shrinkage cracks.
Positive drainage should be developed across the pavements and away from the pavement
edges to avoid wetting the pavement subgrades. Subgrades allowed to become wetted
subsequent to construction can result in unsatisfactory performance of those improvements
over time.
Earth Engineering Consultants, Inc.
EEC Project No. 1032165
October 13, 2003
Page 7
Other Considerations
Positive drainage should be developed away from the structure with a minimum slope of 1
inch per foot for the first 10 feet away from the building in landscape areas. Flatter slopes
could be used in landscape areas. Care should be taken in planning of landscaping adjacent
to the building to avoid features which would pond water adjacent to the foundations or
stemwalls.
GENERAL COMMENTS
The analysis and recommendations presented in this report are based upon the data obtained
from the soil borings performed at the indicated locations and from any other information
discussed in this report. This report does not reflect any variations which may occur
between borings or across the site. The nature and extent of such variations may not become
evident until further exploration or construction. If variations appear evident, it will be
necessary to re-evaluate the recommendations of this report.
It is recommended that the geotechnical engineer be retained to review the plans and
specifications so comments can be made regarding the interpretation and implementation of
our geotechnical recommendations in the design and specifications. It is further
recommended that the geotechnical engineer be retained for testing and observations during
earthwork and foundation construction phases to help determine that the design requirements
are fulfilled.
This report has been prepared for the exclusive use of In -Situ, Inc. for specific application to
the project discussed and has been prepared in accordance with generally accepted
geotechnical engineering practices. No warranty, express or implied, is made. In the event
that any changes in the nature, design or location of the project as outlined in this report are
planned, the conclusions and recommendations contained in this report shall not be
considered valid unless the changes are reviewed and the conclusions of this report are
modified or verified in writing by the geotechnical engineer.
j LINCOLN AVENUE
NEW RM
4PPOLIDRE
RIVER B
LEGEND " \•
B- I BORING LOCATION
SITE PHOTOS
PHOTOS TAKEN FROM APPROXIMATE SYMBOL LOCATION N DIRECTION OP ARROW
O
SNeadt
DEVELOPMENTAREA
BORING LOCATION DIAGRAM
IN -SITU, INC. HEADQUARTERS
FORT COLLINS, COLORADO
PROJECT NUMBER: 1032165 DATE: OCTOBER 2003
LOT, 11WIN MINOR
SUSONISKw
REC/GS000700
N
Not To Scale
EARTH ENGINEERING CONSULTANTS
IN -SITU, INC. HEADQUARTERS
FORT COLLINS, COLORADO
EEC PROJECT No. 1032165
OCTOBER 2003 SEC1J
DRILLING AND EXPLORATION
DRILLING & SAMPLING SYMBOLS:
SS: Split Spoon - 13/8" I.D., 2" O.D., unless otherwise noted PS: Piston Sample
ST: Thin -Walled Tube - 2" O.D., unless otherwise noted WS: Wash Sample
R: Ring Barrel Sampler - 2.42" I.D., 3" O.D. unless otherwise noted
PA: Power Auger FT: Fish Tail Bit
HA: Hand Auger RB: Rock Bit
DB: Diamond Bit = 4", N, B BS: Bulk Sample
AS: Auger Sample PM: Pressure Meter
HS: Hollow Stem Auger WB: Wash Bore
Standard "N" Penetration: Blows per foot of a 140 pound hammer falling 30 inches on a 2-inch O.D. split spoon, except where
WATER LEVEL MEASUREMENT SYMBOLS:
WL : Water Level WS : While Sampling
WCI: Wet Cave in WD : While Drilling
DCI: Dry Cave in BCR: Before Casing Removal
AB : After Boring ACR: After Casting Removal
Water levels indicated on the boring logs are the levels measured in the borings at the time indicated. In pervious soils, the indic
levels may reflect the location of ground water. In low permeability soils, the accurate determination of ground water levels is
possible with only short term observations.
DESCRIPTIVE SOIL CLASSIFICATION
Soil Classification is based on the Unified Soil Classification
system and the ASTM Designations D-2488. Coarse Grained
Soils have move than 50% of their dry weight retained on a
200 sieve; they are described as: boulders, cobbles, gravel or
sand. Fine Grained Soils have less than 50% of their dry weight
retained on a #200 sieve; they are described as : clays, if they
are plastic, and silts if they are slightly plastic or non -plastic.
Major constituents may be added as modifiers and minor
constituents may be added according to the relative proportions
based on grain size. In addition to gradation, coarse grained
soils are defined on the basis of their relative in -place density
and fine grained soils on the basis of their consistency.
Example: Lean clay with sand, trace gravel, stiff (CL); silty
sand, trace gravel, medium dense (SM).
CONSISTENCY OF FINE-GRAINED SOILS
Unconfined Compressive
Strength, Qu, psf Consistency
500 Very Soft
500 - 1,000 Soft
1,001 - 2,000 Medium
2,001 - 4,000 Stiff
4,001 - 8,000 Very Stiff
8,001 - 16,000 Very Hard
RELATIVE DENSITY OF COARSE -GRAINED SOILS:
N-Blows/ft Relative Density
0-3 Very Loose
4-9 Loose
10-29 Medium Dense
30-49 Dense
50-80 Very Dense
80 + Extremely Dense
PHYSICAL PROPERTIES OF BEDROCK
DEGREE OF WEATHERING:
Slight Slight decomposition of parent material
joints. May be color change.
Moderate Some decomposition and color cha:
throughout.
High Rock highly decomposed, may be extren
broken.
HARDNESS AND DEGREE OF CEMENTATION:
Limestone and Dolomite:
Hard Difficult to scratch with knife.
Moderately Can be scratched easily with knife.
Hard Cannot be scratched with fingernail.
Soft Can be scratched with fingemail.
Shale, Siltstone and Claystone:
Hard Can be scratched easily with knife, cannot
scratched with fingernail.
Moderately Can be scratched with fingernail.
Hard
Soft Can be easily dented but not molded w
fingers.
Sandstone and Conglomerate:
Well apale of scratching a knife blade.
Cemented
Cemented Can be scratched with knife.
Poorly Can be broken apart easily with fingers.
Cemented
UIDED SIGEL C LASS11.7CA'I ION SYSTEM
Criteria for Assigning Group Symbols and Group names Using Laboratory Tests
Soil Classification
Group Group Name
Symbol
Coarse —Grained Grovels more than Clean Gravels Less
Soils more than 50% of coarse than 5% fines Cu>4 and <c<3E GW Well —graded gravel`
50% retained on fraction retained
No. 200 sieve on No. 4 sieve Cu<4 and/or 1>Cc>3E GP Poorly —graded gravel`
Gravels with Fines Fines classify as ML or MH GM Silty gravel, G,H
more than 12%
fines Fines classify as CL or CH GC Clayey Grovel °GH
Sands 50% or Clean Sands Less Cu>6 and 1«c<3E SW Well —graded sand'
more coarse than 5% fines
fraction passes Cu<6 and/or 1>Cc>3E SP Poorly —graded sand'
No. 4 sieve
Sands with Fines Fines classify as ML or MH SM Silty sand`"'
more than 12%
fines Fines classify as CL or CH SC Clayey sand',','
Fine —Grained Silts and Clays inorganic PI>7 and plots on or above "Aline' CL Lean clay" '
Soils 50% or Liquid Limit less
more passes the than 50 PI<4 or plots below "A"Line' ML Sllt
No. 200 sieve
organic Liquid Limit — oven dried clay"11-N
0.75 OILOrganic
Liquid Limit — not dried Organic silt
Silts and Clays inorganic PI plots on or above "Aline CH Fat clay L
Liquid Limit 50 or
more PI plots below "Aline MH Elastic Silt ""'
organic Liquid Limit — oven dried Organic clay"<
0.75 OH
Liquid Limit — not dried Organic silt"•`"•q
Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat
ABased on the material passing the 3-in, (75- E Cu=D6o/Df Cc= D If soil contains 15 to 29%plus No. 200. add
with "withmm) sieve D x sand" or grovel", whichever is
elf field sample contained cobbles or boulders, predominant.
or both, add "with cobbles or boulders, or both" If soil contains 2 30" plus No, 200
to group name. if soil contains 215% sand, add"with sand"to predominantly sand, add "sandy to group
CGroveis with 5 to 12% fines required dual
symbols:
group name.
afines classify as CL-ML, use dual symbol name.
If
soil contains 30% lus No. 200 2pgravely"
GW-GM well graded grovel with silt G C or SC-SM. predominantly gravel, add to group GW-
GC well -graded gravel with clay GP -
GM poorly -graded gravel with silt fin
Ifffineareorganic, add"with organic fines"to Name. PI24 andplots on or above "A" line. GP -GC
poorly-greded gravel with cloy oSonds with
5 to 12% fines require dual me group1f
soil
nacontains >15%grovel, odd"with gravel" PPI54 or plots below plots an
or A" line.
above "A"
line. Symbols: to
group
name. JIf Atterberg
limits plots shaded area, soil is a oPi PI plotsbelow A" line. SW-SM
well -graded sand with silt CL-ML, silty clay. SW -SC
well -graded sand with cloy SP-SM
poorly graded sand with silt SP-SC
poorly graded sand with clay d 6(
5(
IP
For
Classification
of Me -grained soils and fine-
grained fraction of coarse- grained sails•
Equotlon of "
A" -line Horizontal at
PI-4 to LL-25.5, CG, then PI-
0.73 (LL-20) U"-line
Equoticn ofVerticalat
LL-16 to PI=7, T then
PI-0.9 (LL-8) G O
09-
MHOROH
G M
L
OR O L CL -ML00l0
20 30 40 50 60 70 80 90 100 110 LIQUID LIMIT (
LL)
IN -SITU, INC. HEADQUARTERS
FORT COLLINS, COLORADO
PROJECT NO: 1032165 DATE: OCTOBER2003
LOG OF BORING B-1
RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH
FOREMAN: JJB START DATE 10/01/2003 WHILE DRILLING None
AUGER TYPE: 4" CFA FINISH DATE 10/0112003 AFTER DRILLING None SPT HAMMER: MANUAL SURFACE ELEV
N/A 24 HOUR N/A SOIL DESCRIPTION D N QU
Mc DD A -LIMITS 200 SWELL LL I PI PRESSURE 6
GD S00 PSF TYPE FEE BLOWS! PS Pc4" Vegetation and Topsoil LEAN
CLAY (CL) 1 brown
stiff 2 9000 9.
4
37 14
86.3 1100 psf 1.2% with scattered gravel ST 3sS2255007.
5
SAND AND GRAVEL (SP-GP)
4 brown/tan medium dense 5
with scattered
cobbles 6 7
increasing cobbles with
depth
8
9 BOTTOM OF BORING
9.
0'
10 11 12 13 14
15
16
17
18
19
20
21
22
23
24
25
Earth
Engineering
Consultants
IN -SITU, INC. HEADQUARTERS
FORT COLLINS, COLORADO
PROJECT NO: 1032165 DATE: OCTOBER 2003
LOG OF BORING B-2
RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH
FOREMAN: JJB START DATE 10/01/2003 WHILE DRILLING 9.0'
AUGER TYPE: 4" CFA FINISH DATE 10/01/2003 AFTER DRILLING 9.0'
SPT HAMMER: MANUAL SURFACE ELEV NIA 24 HOUR N/A
SOIL DESCRIPTION D N QU MC DD A-LIMnS 200 SWELL
LL PI PRESSURE @ 50OPSFTYPEFEETBLOWS/F7 PS PCF
4" Vegetation and Topsoil
LEAN CLAY WITH SAND (CL) 1
brown
stiff to very stiff 2
with scattered gravel
3
SAND AND GRAVEL (SP-GP)
brown/tan 4
medium dense
3017" 2.4withscatteredcobblesSS5
6
7
8
9
increasing cobbles with depth IS—S 10 50/8" 14.7
11
12
13
14
Is—, 15 50 12.9
BOTTOM OF BORING 15.0'
16
17
18
19
20
21
22
23
24
25
Earth Engineering Consultants
IN -SITU, INC. HEADQUARTERS
FORT COLLINS, COLORADO
PROJECT NO: 1032165 DATE: OCTOBER 2003
LOG OF BORING B-3
RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH
FOREMAN: JJB START DATE 10/01/2003 WHILE DRILLING 8.5'
AUGER TYPE: 4" CFA FINISH DATE 1010112003 AFTER DRILLING 8.5'
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A
SOIL DESCRIPTION D N QU MC DD A -LIMBS 210 SWELL
IL PI PRESSURE S00 PSFTYPEFEETBLOWS/FT PSF PC
3" Vegetation and Topsoil
LEAN CLAY WITH SAND (CL) 1
dark brown, stiff to very stiff, with scattered gravel
2
SAND AND GRAVEL
brown/tan 3
medium dense
with scattered cobbles 4
SS 5 25 2.5
Dry Caveat 5.0'
6
Dry Cave at 7.0' 7
8
increasing cobbles with depth 9
10
11
12
13
14
BOTTOM OF BORING 14.0'
15
16
17
18
19
20
21
22
23
24
25
Earth Engineering Consultants
IN -SITU, INC. HEADQUARTERS
FORT COLLINS, COLORADO
PROJECT NO: 1032165 DATE: OCTOBER 2003
LOG OF BORING B-4
RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH
FOREMAN: JJB START DATE 10/01/2003 WHILE DRILLING 9.0'
AUGER TYPE: 4" CFA FINISH DATE 1010112003 AFTER DRILLING 9.0'
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR N/A
SOIL DESCRIPTION D N QU MC DD A -LIMITS 200 SWELL
LL PI PRESSURE 500 PSFTYPEFEEBLOWS/ PS PCF
3" Vegetation and Topsoil
LEAN CLAY WITH SAND (CL) 1
dark brown
stiff to very stiff 2
with scattered gravel
3
SAND AND GRAVEL (SP-GP)
brown/tan/red 4
very dense
32/7" 1.2withscatteredcobblesE,, 5
Dry Cave at 6.0' 6
7
increasing cobbles with depth 8
9
10
11
12WEATHEREDSHALEBEDROCK
light gray/blue
soft 13
14
SS 15 19 18.2
16BOTTOMOFBORING15.5'
17
18
19
20
21
22
23
24
25
Earth Engineering consultants
IN -SITU, INC. HEADQUARTERS
FORT COLLINS, COLORADO
PROJECT NO: 1032165 DATE: OCTOBER 2003
LOG OF BORING B•5
RIG TYPE: CME45 SHEET 1 OF 1 WATER DEPTH
FOREMAN: JJB START DATE 101011200 3 WHILE DRILLING None
AUGER TYPE: 4" CFA FINISH DATE 10/01/2003 AFTER DRILLING None
SPT HAMMER: MANUAL SURFACE ELEV N/A 24 HOUR NIA
SOIL DESCRIPTION HIP D N OU Mc DO I A -LIMBS 200 SWELL
r LL PI 7 PRESSURE 500 PSFEIPEFEEBLOWS! PSF 1%
6" Vegetation and Topsoil
LEAN CLAY WITH SAND (CL) 1
7500 6.6 88.8 33 11 71.5 600 psf 0.2darkbrownST
stiff to very stiff, calcareous 2
SS 3277" 5.2
SAND AND GRAVEL (SP-GP) 3
brown/tan
very dense 4
with scattered cobbles
5
6
increasing cobbles with depth 7
8
9
BOTTOM OF BORING 9.0'
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Earth Engineering Consultants
SWELL / CONSOLIDATION TEST RESULTS
Material Description: Brown Lean Clay
Sample Location: B-1, S-1 @ 2-2.5'
Liquid Limit: 37 IPlasticity Index: 14 Passing #200: 86.3%
Beginning Moisture: 9.1% JDry Density: 89.0 pcf IEnding Moisture: 28.8%
Swell Pressure: 1100psf 1% Swell @ 500 psf: 1.2%
10
8--
a)6 -
U)
4
2 -
E
0
0 -
Q
atn ded
IL -2
4 -
2
ca
u) C-6
i I I
I
10
0.01 0.1 1 10
Load(TSF)
Project: In -Situ Inc. Headquarters
Location: Lincoln Avenue, Fort Collins, Colorado
Project No.: 1032165
Date: October 2003
EECI
SWELL / CONSOLIDATION TEST RESULTS
Material Description: Brown Lean Clay with Sand
Sample Location: B-5, S-1 @ 1-1.5'
Liquid Limit: 33 Plasticity Index: 11 Passing #200: 71.5%
Beginning Moisture: 6.2% JDry Density: 90.2 pcf JEnding Moisture: 27.9%
JSwell Pressure: 600 psf 1% Swell @ 500 psf: 0.2%
10
Ij
8
a)6
ii
r_ 2
a)
E
a)
0
0
p W ter Added
D
a. -2
4
2
CU
C-6
0
8 -
10
0.01 0.1 1 10
Load(TSF)
Project: In -Situ Inc. Headquarters
Location: Lincoln Avenue, Fort Collins, Colorado
Project No.: 1032165
Date: October 2003