HomeMy WebLinkAboutEASTBOROUGH - Filed CPIR-CONCRETE/PAVEMENT INSTALLATION REPORT -REPORT OF NEW CONCRETE INSTALLATION
CITY OF FORT COLLINS
Engineering Inspection
Revised October 15, 1977
ECI Form 24
Subdivisio
Contractor
Date Work Started
Date Work Completed _ljk` Inspector 'e r•
rive -over curb, gutter, & walk Sidewalk: width
Vertical curb & gutter
Drive -over curb & gutter
Other (specify)
Limits or Location of Work
Radius: number
Cross -pan: number
Catch basin: number
01
a.
Total Linear Footage Installed (report for curb, gutter and/or sidewalk)
r%xn.,c`. d 13So — Ale. r oytr C w •L
Qqjo `orec,n ssr Gi.Sb c t'u trC .a.
570
i
A- o
COMMENTS:
rojAe3c -- No QY ar CYoiS a-NS
Checked by: 'I : —la—
Original to Subdivision File
RbORT OF NEW CONCRETE INSTALLATIOi,
CITY OF FORT COLLINS
Engineering Inspection
Revised October 15, 1977
ECI Form 24
Subdivision or Project
Contractor
Date Work Started
Date Work Completed 6=10pety` Inspectors :N e e r
Drive -over curb, gutter, & walk Sidewalk: width
a -Vertical curb $ gutter J--Radius: number 2.
Drive -over curb gutter Cross -pan: number
Other (specify) Catch basin: number
Limits or Location of Work Ea_sk- S.s{e of 1,.e Mo.SA
r—
J
Total Linear Footage Installed report for curb, gutter and/or sidewalk)
COMMENTS:
Checked by: m
Original to Subdivision File
A y
CITY OF FORT COLLINS
Engineering Inspection
Revised October 15, 1977
ECI Form 24
R ORT OF NEtiY CONCRETE INSTALLATIO0
Subdivision or Project
Contractor ICr.'L oNcr,-Ac
Date Work Started
Date Work Completed Inspector
Drive -over curb, gutter, & walk
G—Vertical curb & gutter
Drive -over curb $ gutter
Other (specify)
Limits or Location of Work
D Sidewalk: width
Radius: number Y
Cross -pan: number Z,
Catch basin: number
Total Linear Footage Installed (report for curb, gutter and/or sidewalk)
U
Rp a' i C ro SS ?A J
i N d e r o
COkLMENTS :
Checked by:
Original to Subdivision File