ADDENDUM NO. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project
Proposal Due Date: 3:00 PM (Our Clock) January 27, 2025
To all prospective bidders under the specifications and contract documents described above, the
following changes/additions are hereby made and detailed in the following sections of this
addendum:
Exhibit 1 - Questions and Answers
Exhibit 2 - Pre-Proposal Meeting Attendance Record
Exhibit 3 - Pre-Proposal Meeting Presentation
Exhibit 4— Pre-Proposal Meeting Video Recording
Please contact JD McCune, Senior Buyer, at jmccune@fcgov.com with any questions regarding
this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE RFP STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
Addendum# 1
RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project
Page 1 of 1
Exhibit 1
Questions and Answers
1. Does the City have a report from the diving contractor?
The City has a dive inspection report that includes information from the condition
assessment completed in August 2020. The results from this condition assessment are
summarized in the 2022 Known Conditions Technical Memorandum by HDR
Engineering that was included in the reference documents for this RFP. Additional
information from the dive in October 2024 will be provided to the selected contractor.
2. Was the diving contractor able to access and inspect the bulkhead slot?
Yes, the diving contractor was able to remove the stop log slot cover on the intake
structure with a single diver by hand and visually inspect and measure the stop log slot
with a flashlight. This inspection occurred in October 2024.
3. Was there sediment in the intake structure?
During the October 2024 dive, the diving contractor observed minor amounts of
sediment on the base of the intake structure and a few cobbles. The City has historically
not had challenges with sediment at Joe Wright Reservoir.
4. Are there hatches in the room of the control house?
The control house has grated hatches in the floor to access the three different gate shaft
vaults vertically. The front door of the control house is large enough to transport the
existing gates and other hardware through and the roof of the control house has two
holes that can be used to attach the gates to a crane once the gates are inside of the
control house.
5. Is the City willing to waive the requirements under CRS 8-17-101?
The City will evaluate whether or not there is cause for CRS 8-17-101 to be waived after
the receipt of proposals. Such determination will be made in accordance with the
provision which states in part:
§8-17-101(1)
"The governmental body financing a public works project shall waive the 80% Colorado
labor requirement if there is reasonable evidence to demonstrate insufficient Colorado
labor to perform the work of the project and if compliance with the law would create an
undue burden that would substantially prevent a project from proceeding to completion.
A governmental body that allows a waiver shall post notice of the waiver and a
justification for the waiver on its website. A governmental body shall not impose
contractual damages on a contractor for delay in work due to the waiver process."
ATTENDANCE RECORD- PRE-PROPOSAL MEETING
PROJECT: 10082 CM/GC Serivices for Joe Wright Reservoir Gate Replacement Project
TIME: 1:00 PM MT DATE: December 17, 2024
LOCATION: via Microsoft Teams
NAME FIRM NAME EMAIL ADDRESS
Kris Jensen HEI Civil kris.iensen@heicivil.com
Phil Grow Barnard Structures bsi.pgrow@gmail.com
Gerry Granahan Gracon LLC ggranahan@graconllc.com
Daylon Hutton Ballard Marine Construction daylon.hutton@ballardmc.com
Lee Frankel TFW Construction lee.f.tfwconstruction@comsast.net
Shawn Greenwood American West Construction sgreenwood@trustawc.com
McKenzie Zimmerman SEMA Construction estimating.co@sema.inc
Ian Stephens Marine Diving Solutions ian@marinedivingsolutions.com
Lauren Collins JF Brennan Icollins@ifbrennan.com
Gary Haas Garney Construction ghaas@garney.com
Merril Collins JF Brennan mcollins@ifbrennan.com
Dustin Wilson Global Diving dwilson@gdiving.com
Raen Schechinger JF Brennan Company rschechinger@ifbrennan.com
Pete Sweczak Zak Dirt pisewszak@zakdirt.com
Jake Taylor JF Brennan itaylor@ifbrennan.com
Joel Haberl SEMA Construction ihaberl@sema.inc
Sully Nolan AMS LLC snolan@amiercanmineservices.com
Adrian Miller Ulliman Schutte Construction amiller@ullimanschutte.com
David Hutchinson JF Brennan dhutchinson@ifbrennan.com
John Schue Michels Ischue@michels.us
It s
4
y
i'11110
City
��'" rsP. �r '�,'- ,i a: :� � - r ,yr. , � *�-, �'�'r{14+/t >t i `'.xi •yr i :� �
� .Y`il$s��c'�a' �3' �'���?F. �t f. ,. n.s�• ;_4w� -.: 4c.. , .� - . . .F� -
<3.5•' ♦� �.�.��-��tr4`dr ��� k -���.• ,% �-4_E, 3 >. f�*,.s�,r r.� u r «4,� �bx5,�,. . o'•�*:} ••� �^,
s''I,�' .',�Sr ts�i �' c Y wF t x ,s0.,� s �+• � .'` r r:�.•+..r1di'.Y� rlj�.w �G i t :,. .•0
x
0
of Joe=right Reservoir Gate Replacement
Fort Collins Pre-proposal Meeting
RFP 10082 12/17/2024
City of
Fort Collins
City Introductions
JD McCune Gregg Stonecipher
Senior Buyer, Purchasing Director, Plant Operations
Taylor Scott Ross Lamb
Project Manager, Capital Projects Supervisor, Plant Operations
Matt F ate r
Director, Civil Engineering `� J
Jeremy Woolf
Sr. Director, Water Operations
ALA
City of
Fort •
Safety Share
Joe Wright Location
• High altitude
• Remote
• No cell reception - - '
• Rapidly changing and variable weather
• Partially filled reservoir during construction
• Planning and communication will be key
aspects of a successful construction
• Preconstruction scope will aid with both 7 y :
aspectsr
City of
Fort Collins
Agenda
1 . Meeting Format
• Remote meeting information
.ti
• Presentation and Questions
2. Proposal Information
• Proposal Schedule ';.
k
• Proposal Submittal
• Proposal Evaluations
3. Project Information
• Background & Objectives
• Scope of Work
c.4 "te
City of
Fort Collins
Remote Meeting Information
Sign-in Instructions Question Information
• Enter the following in the Teams chat • Submit all questions in writing via
for attendance records: email to JD McCune after pre-
Full name proposal meeting
• Vendor name • Questions and answers will be
• Email address included in an addendum
General Meeting Considerations Answers to questions that require
Please turn on video additional information of clarification
Please mute audio until you have during this meeting will be included in
questions an addendum
• Use the raise hand feature in Teams
• A copy of this presentation will be
Can use the chat feature in Teams for included in an addendum
questions
• Meeting will be recorded
City of
Fort Collins
Proposal Sch
Milestone
' All questions must be
RFP Issued December 6, 2024 submitted in writing via
Pre-Proposal Meeting 1 :00pm MST, December 17, 2024 email to JD McCune at
Questions & NDA .0of imccune ,fcgov.com
Request Deadline 3:OOpm MST, January 8, 2025
Final Addendum Issued January 15, 2025 Proposals to be
Proposals Due 3:00pm MST January 27, 2025 —► submitted online via
Interviews (tentative) Week of February 17, 2025* RMEPS (BidNet)
We encourage you to ask questions prior to the question deadline
* Updated interview week (RFP had week of February 10)
City of
Fort Collins
Background • . • . • Non-Disclosure Agreement
Contact JD McCune via email to request the background information documents
through the NDA process (see Section K of RFP)
• 1980 Select Outlet and Gate Record Drawings — Select sheets from Joe Wright Dam
record drawings that are marked up with specific gate replacement information
• 2022 Gate Condition and Operation Report — Created by HDR Engineering includes
most recent detailed condition assessment of the gates with pictures and
recommendations for risk reduction measures
• 2022 Alternatives Evaluation — Created by HDR Engineering to evaluate numerous
alternatives for risk reduction measures for the Joe Wright gates based on operating
conditions and recommendations in the Gate Condition and Operation Report.
City of
Fort Collins
Proposal Su
Proposals must include: Proposal Format
A. Cover Letter / Executive Summary • 20 single-sided pages max
B. Contractor Information Letter size — 8.51)x11 "
C. Cost and Work Hours • Page count can exclude cover page,
D. Scope of Proposal table of contents, section dividers,
bonding company references, resumes,
E. Firm Capability and Acknowledgement Form
F. Safety Record • Include all items listed in order in the
RFP (included to the left) and include
G. Sustainability / TBL Methodology City's questions from the RFP
H. Additional Information
Also include completed Acknowledgment
Form (Section V of RFP)
City of
Fort •
Proposal Details
B. Contractor Information
• General overview of your business and background with summary of services offered
• Licenses and certifications held by the business
• Ownership, location, and contact information
C. Cost and Work Hours
• Work Order I : Preconstruction Services
• Lump sum, not to exceed cost for preconstruction scope (Section 2.A. 1 of RFP)
• Detailed cost breakdown with hourly rates and personnel adding to this lump sum
• Schedule of unburdened rates for preconstruction personnel
• Work Order II : Construction Services
• CM/GC Fee percentage (covers insurance, overhead, mark-up, profit)
• Schedules of billing rates for personnel and equipment
• Bonding company reference and insurance
• Fill out CM/GC cost proposal Attachment
City of
Fort •
Proposal Details
D. Scope of Proposal
• Preconstruction services approach to sequencing and scheduling
• Construction cost estimate and cost control approach
• Prospective subcontractors and self-performed work breakdown
• Approach to negotiating construction GMP
• Construction method summary and insights
• Approach to quality control during construction
E. Firm Capability
• Share proposed personnel with an organization chart and resumes (include PM and
construction superintendent at a minimum)
• Main point of contact
• Five example projects similar to this gate replacement from the past 15 years
0 Were proposed personnel part of these projects?
City of
Fort •
Proposal Details
F. Safety Record
• Complete and submit safety record sheet attached to RFP
G. Sustainability / TBL Methodology
• Social — programs or initiatives that support Equity, Diversity and Inclusion
• Environmental — experience delivering projects with a focus on environmental health priorities,
water quality, watershed protection, regulatory performance, air quality, and solid waste reduction.
• Economic — emphasis on financial planning that supports things like job creation, business
development, asset management, transparency, stakeholder engagement, etc.
• How are these practices incorporated into your workplace? Provide examples.
• How will you incorporate them into this project? Provide ideas.
H. Additional Information
• Other distinguishing information about your company or project approach
• Exceptions to the sample agreement included in the RFP for negotiation
City of
Fort Collins
Proposal Ev. . •
Most-applicable
Criteria • • Factor •
1 . Firm Capability & Experience 45% Al B, E, F, H
2. Cost & Work Hours 30% C
3. Project Approach / Schedule 20% D, H
4. Sustainability / TBL Methodology 5% A, G
*The criteria will be evaluated considering the entire proposal, but these sections
will be primarily considered for the respective criteria
Fort of
Questions on Proposal and Procurement
kA
` �1 II-
I 1,
-+�
.%' u=
f
r
y;ta.
Fort of
Project Location
St a k �+ ■•� _,® die. an ling
p m is
"Riles ,
.p lace•'
Fort Collins
TIrrInatl7
zs
MascnOl
/ A
ageL"�n-J_atr l.ra�ernicua �r s ', r._>tf 10 mi
Fort of
Joe Wright Dam Layout
Emergency Spillway
lift
J .
r ^ Control House .
Dam Crest
fP
s, A 2
tp- �+t° �s2"k�. �'°yrb .d�. eK �'C^�,i�rs"'�,~"��m �y; 4 ;r, 7,� • �� _
eagle Earth � w }
City of
Fort CollinsGeneral
Dam Type Earthen embankment, completed in 1980
Hazard Classification High Hazard
Structural Height 148 ft
Crest Length 27300 ft
Dam Crest El. 9,978 ft
Normal Capacity 7, 161 ac-ft
Outlet Conduit 72-inch RCP through dam
Outlet Control Two 42x42-inch vertical slide gates; One 6x6-inch low flow knife gate
Service Spillway Uncontrolled concrete drop weir in outlet tower — 380 cfs
Emergency Spillway Uncontrolled trapezoidal concrete chute — 3,400 cfs
City of
Fort Collins
WorksOutlet . . • Profile
^e#I I/hIlF Off YCL WbE riTN■eCMWI/ ~��- � f1 �� ��.,t _
aT 16'+pow¢o+InL E.E bbrw-s � f
rLnOWFE l[L NAT Y 't+,.-� N,
of ;7X,4i p�•OIITICT YLRH[ �\ �..� -
r f
er°
r eeb PLAN VIEW
pill r _ osr oaaTu
-Wti.E,e /. I' - fTIUI1KM
titi � r PP � eeM[TwseL
l rrx �!'� ��r� 1 � � �f j j � I
r I f . f
� r �
_ ¢ r ✓ � f � l j 41
1
f .�:-'- l r�F �` • uwrH wa PiwT' * • � I �"*`* .�-
Reservoir _e Intake 72-in RCP Outlet , , a e Control Tower
M1b3.
�ifl)r uw!"oe
arr/a Iran f/N
ewre e
suwr
,q IAMM seluu.rHrolert �-
.rP .PL[�iTINTPI� ^ ! r -_-_ - �/II HTCi _ kml
PROFILE VIEW
r/t.�ra �...B.U_ w/ff aY+r n6reA/ �.
u ,
R' /'-e^b11�IT ', Tea. • -' -
1K LVN 4A 1811e I— S•YIM
ppVL
±I [L YH4G
�rau Nu/i �19„_nff rrr m[u'n le�rr//1rltL MI
FL V RWT[I PNf[i•- L s —
�f111s11f4 ■INell'R �Ilf SiTIpIS l[IrIL 716E Nor Tllle T[ F
aaw' �saa�l�4►Mib h, _ ra[a RFw III r[�e[ /me ar Leur nIL IPaI[Isn.
City of
Fort Collins
WorksOutlet •
CONTROL TOWER BOTTOM __ F j ,`I CONTROL TOWER TOP
x
x
Gate Operators
In Control House
6-inch Low Flow
,I
Gate _: Service Spillway
•.el
Overflow
Reservoi r
_ x
42-inch Upstream Gate
_ . kpr lay
- abwY 4lx.
a4 y[
yl I •suf
42-inch Downstream SHAFT CONSTRI1CTId4i
J0114T DETAIL
Gate P ° x°•°
w�
_ PROULE ON
City of
Fort Collins
Gate Condition
42-inch Upstream Gate �►
• Spray leakage from left side of gate
• Erosion of left wall within chamber
• Corrosion of bottom sill
• Can over-open when indicated fully open
• Does open fully for normal operations and is
exercised annually
42-inch Downstream Gate
• Gate stem keyway damage, lower stem key
missing, and gate stem misalignment
• Cannot be operated to fully open without
damaging stem guide and keyway
• Damage to operator tower floor from cavitation /
erosion
City of
Fort Collins
Project Goals
• Replace critical source water infrastructure with known deficiencies
• Increase operational flexibility and reliability of water control gates
• Reduce ongoing maintenance needs
• Provide a long-term solution for accessing the upstream gate chamber using the existing stop log
slot on the intake structure
• Create a culture of collaboration during preconstruction and construction to help safely and
successfully replace the gates
• Develop a robust plan to execute the replacement considering unique safety, location, and
schedule risks
• Use a holistic, triple bottom line approach to the project that considers sustainability, people, and
value.
City, CM/GC, and Design Engineer will revisit goals during kickoff workshop
City of
Fort •
Project Scope
Replace two 42-inch x 42-inch water control slide gates
• Condition of gates and stems indicate repair or replacement is necessary
• Operation challenges with damage to stem and keyway
• Provide operational flexibility by reducing cavitation due to throttling of releases
• Replace any items that are required to provide desired operability (frames, stems, seals,
operators)
• Potential for simple automated gate operators
• Procure and install all gate materials and appurtenances (stems, guides, operators, etc.)
Procure and temporarily install new upstream bulkhead
• May be used for this project and / or future projects
• Currently have stop logs that can be placed in slot within intake, want a more reliable and robust
system
City of
Fort •
Project Scope
1 . Preconstruction Support Services
• CM/GC will join at 30% design; design includes long-lead procurement package, 90% Design
package, and Issued for Construction package
• Workshops and meeting participation
• Kickoff, partnering, and 30% design review
• Design review for long-lead procurement package and 90% Design package
• Routine preconstruction design meetings (bi-weekly)
• Cost model and estimating
• Open book cost estimating with goal of GMP after 90% design
• Construction scheduling
• Long-lead gate procurement
• Contractor will review design of long-lead gate procurement materials
• Contractor will get bids (if necessary) and procure materials during preconstruction with
separate work order for gates and upstream bulkhead
City of
Fort •
Project Scope
2. Construction Services Requirements
• Separate General Contractor Work Order
• If agreement on GMP is reached with the City
• Replacement of two 42-inch gates and appurtenances a
• New bulkhead temporary installation and removal e .
underwater
• Construction oversight and quality control
a
• Measurements, layout and control in the field `
• Self-perform 40% of gate replacement work
Construction progress meetings `
• Construction troubleshooting after gate replacement
City of
Fort Collins
Project Scope
3. Construction Contract Price Negotiations Contractor
Construction
• Contractor and City agree on timing for negotiations,
90% design typical
• Complete price to complete work (including pre L�7 -I F_ --I
-
procured gate and bulkhead materials) City Accepts City does n•
Independent Cost Estimator retained by City during Accept
preconstruction
• Develop work items as an integrated team General F Price
Open-book costs for each work item Contractor Negotiation
• Actual construction costs will be tracked by work Work Order M " " '
item in the field based on quantity completed or item
completed (for unit price items) Price
• Similar to traditional bid project Iterations
6NEW,NE11i
Construction
Work Order or
Public • • •
City of
Fort •
City Expectations
City Expectations Anticipated Project Schedule
• Partnering relationship with City, Design o
Engineer, ICE Preconstruction kickoff & 30 /o March 2025
Design Review
• Retain key staff during preconstruction and
Long-lead Gate Material Design June 2025
construction & Procurement
• Open and honest communication 90% Design Review September 2025
• Timely contract management and agreement
IFC Design Submittal October 2025
discussions
• Industry-expected performance standards Construction NTP August 2026
• Safety first always mindset End of Construction Window Late-October 2026