HomeMy WebLinkAboutAddendum 4 - BID - 10084 Parking Services EV Charger InstallationAddendum # 4
10084
ADDENDUM NO. 4
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 10084: Parking Services EV Charger Installation
OPENING DATE: 3:00 PM (Our Clock) December 10, 2024
To all prospective bidders under the specifications and contract documents described above, the
following changes/additions are hereby made and detailed in the following sections of this
addendum:
Exhibit 1 – Equipment Specifications for OFCI Panel and Transformer
Exhibit 2 – Questions and Answers
Please contact Jake Rector, Senior Buyer, at (970) 221-6776 or jrector@fcgov.com with any
questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID OR QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Internal
Prepared By:
Jacob Hischke
2405 W. 5th Ave.
Denver,CO 80204
D:303-829-1436
Proposal Name: FoCo Parking Services Relocation
Quote Name: FoCo Parking Services Relocation
Proposal Number: P-241111-4858881
Quote Number: Q-5484372
Quote Date: 11/13/2024
Through Addenda Number: 0
Sales Representative: Michael Vuolo
Conditions of Sale
This Quotation is subject to Coordinated Project Terms. See https://www.se.com/us/en/download/document/0100PL0043/
Quoted price in currencies other than U.S. Dollars is per the annual Schneider Electric exchange guidance.
Quote is valid for 30 days. Quoted lead times are approximate and subject to change.
Schneider Electric reserves the right to amend, withdraw or otherwise alter this submission without penalty or charge as a
result of any event beyond its control arising from or due to the current Covid-19 epidemic or events subsequent to this
epidemic / pandemic including changes in laws, regulations, by laws or direction from a competent authority.
Page 1 of 2
EXHIBIT 1
Proposal Name: FoCo Parking Services
Relocation
Quote Name: FoCo Parking Services Relocation
Quote Number: Q-5484372
Quote Date: 11/13/2024
Seq # Qty Product Description
1 1 Designation : PSVC
Product Details:
1 - NQ MB Panel (INTERIOR)-NQ Panelboard
Consisting of
208Y/120V 3Ph 4W 60Hz SCCR: 22kA
Fully Rated
Single Main: 400A/3P LA Circuit Breaker
Incoming Conductors: 1 - #1 - 600,(2)#1 - 250
kcml
AL Ground Bar
Bus: 400A Rated Copper: Silver/Tin Plated
42 Circuit Interior
Type 1,Box: 62H x 20W x 5.75D
Incoming: Bottom Trim: Surface with Door
Box Cat No: MH62 Front Cat No: NC62VS
Ref. Drawing: PBA710A
Feeders:
8 - 60A/2P QOB-VH
26 - 20A/1P QOB-VH Prepared Space
Optional Features:
Standard Panel (Box Ahead),Standard Solid
Neutral,Standard Ground Bar
1 - MH62-PANELBOARD ENCLOSURE/BOX TYPE 1 62H 20W
1 - NC62VS-PANELBOARD COVER/TRIM NF TYPE 1 VS 62H
Seq # Qty Product Description
2 1 Designation : Disc-PSVC
Product Details:
1 - VH364N-HDSS TYPE1 600V 200 AMP 3 POLE Fuse
Enclosure Type: Type 1
Interrupting Rating (AIR): 200kA
Fuse Capability: Class R
Max System Voltage: 600 Vac / 600 Vdc
Switch Current Rating: 200A
System Used: 4 Wire (3 Poles, 1 Neutral)
Neutral Kit: Include
Covering View Window: Factory Add
Processed by ACE 2.0 - 04172018
Seq # Qty Product Description
3 1 Designation :
Product Details:
1 - EXN150T3HCU-Transformer Dry Type 150kvVA 480D208Y
Transformer Type: DOE 2016 EX or EXN
Transformer Rating: 150kVA
Transformer Phase: Three Phase
Primary Voltage: 480V Delta
Secondary Voltage: 208Y/120V
Transformer Taps: 6 - 2.5% 2+4- Taps
Frequency: 60Hz
Transformer Winding Material: Copper
Sound Level: 44DB
Insulation & Temperature: Class 220 (H), 150
Deg C
Enclosure Material: Standard Painted ANSI 49
Grey
UL Labeled
Primary Lug Kits: DASKP250
Secondary Lug Kits: DASKGS600
1 - DASKP250-DASKP250 LUG KIT
1 - DASKGS600-MECHANICAL LUG KITS
Page 2 of 2
Addendum # 4
10084
Exhibit 2
Questions and Answers
1. Spec Section 26 05 00 D, E, and F calls for a coordination study and an arc flash analysis
to be done. We are wanting to verify that this would be done only for this scope of work
and does not include any other arc flash analysis, specifically for the rest of the building’s
electrical equipment. Our understanding is there has been no other arc flash analysis
done on the rest of the building at this point.
A: Please BID as spec’d in the drawings. An ARC flash analysis will be required for just
this part of the project. Not the entire building.