Loading...
HomeMy WebLinkAboutAddendum 4 - BID - 10084 Parking Services EV Charger InstallationAddendum # 4 10084 ADDENDUM NO. 4 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 10084: Parking Services EV Charger Installation OPENING DATE: 3:00 PM (Our Clock) December 10, 2024 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Equipment Specifications for OFCI Panel and Transformer Exhibit 2 – Questions and Answers Please contact Jake Rector, Senior Buyer, at (970) 221-6776 or jrector@fcgov.com with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID OR QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Internal Prepared By: Jacob Hischke 2405 W. 5th Ave. Denver,CO 80204 D:303-829-1436 Proposal Name: FoCo Parking Services Relocation Quote Name: FoCo Parking Services Relocation Proposal Number: P-241111-4858881 Quote Number: Q-5484372 Quote Date: 11/13/2024 Through Addenda Number: 0 Sales Representative: Michael Vuolo Conditions of Sale This Quotation is subject to Coordinated Project Terms. See https://www.se.com/us/en/download/document/0100PL0043/ Quoted price in currencies other than U.S. Dollars is per the annual Schneider Electric exchange guidance. Quote is valid for 30 days. Quoted lead times are approximate and subject to change. Schneider Electric reserves the right to amend, withdraw or otherwise alter this submission without penalty or charge as a result of any event beyond its control arising from or due to the current Covid-19 epidemic or events subsequent to this epidemic / pandemic including changes in laws, regulations, by laws or direction from a competent authority. Page 1 of 2 EXHIBIT 1 Proposal Name: FoCo Parking Services Relocation Quote Name: FoCo Parking Services Relocation Quote Number: Q-5484372 Quote Date: 11/13/2024 Seq # Qty Product Description 1 1 Designation : PSVC Product Details: 1 - NQ MB Panel (INTERIOR)-NQ Panelboard Consisting of 208Y/120V 3Ph 4W 60Hz SCCR: 22kA Fully Rated Single Main: 400A/3P LA Circuit Breaker Incoming Conductors: 1 - #1 - 600,(2)#1 - 250 kcml AL Ground Bar Bus: 400A Rated Copper: Silver/Tin Plated 42 Circuit Interior Type 1,Box: 62H x 20W x 5.75D Incoming: Bottom Trim: Surface with Door Box Cat No: MH62 Front Cat No: NC62VS Ref. Drawing: PBA710A Feeders: 8 - 60A/2P QOB-VH 26 - 20A/1P QOB-VH Prepared Space Optional Features: Standard Panel (Box Ahead),Standard Solid Neutral,Standard Ground Bar 1 - MH62-PANELBOARD ENCLOSURE/BOX TYPE 1 62H 20W 1 - NC62VS-PANELBOARD COVER/TRIM NF TYPE 1 VS 62H Seq # Qty Product Description 2 1 Designation : Disc-PSVC Product Details: 1 - VH364N-HDSS TYPE1 600V 200 AMP 3 POLE Fuse Enclosure Type: Type 1 Interrupting Rating (AIR): 200kA Fuse Capability: Class R Max System Voltage: 600 Vac / 600 Vdc Switch Current Rating: 200A System Used: 4 Wire (3 Poles, 1 Neutral) Neutral Kit: Include Covering View Window: Factory Add Processed by ACE 2.0 - 04172018 Seq # Qty Product Description 3 1 Designation : Product Details: 1 - EXN150T3HCU-Transformer Dry Type 150kvVA 480D208Y Transformer Type: DOE 2016 EX or EXN Transformer Rating: 150kVA Transformer Phase: Three Phase Primary Voltage: 480V Delta Secondary Voltage: 208Y/120V Transformer Taps: 6 - 2.5% 2+4- Taps Frequency: 60Hz Transformer Winding Material: Copper Sound Level: 44DB Insulation & Temperature: Class 220 (H), 150 Deg C Enclosure Material: Standard Painted ANSI 49 Grey UL Labeled Primary Lug Kits: DASKP250 Secondary Lug Kits: DASKGS600 1 - DASKP250-DASKP250 LUG KIT 1 - DASKGS600-MECHANICAL LUG KITS Page 2 of 2 Addendum # 4 10084 Exhibit 2 Questions and Answers 1. Spec Section 26 05 00 D, E, and F calls for a coordination study and an arc flash analysis to be done. We are wanting to verify that this would be done only for this scope of work and does not include any other arc flash analysis, specifically for the rest of the building’s electrical equipment. Our understanding is there has been no other arc flash analysis done on the rest of the building at this point. A: Please BID as spec’d in the drawings. An ARC flash analysis will be required for just this part of the project. Not the entire building.