Loading...
HomeMy WebLinkAboutRFP - 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement ProjectRFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project REQUEST FOR PROPOSALS 10082 CM/GC SERVICES FOR JOE WRIGHT RESERVOIR GATE REPLACEMENT PROJECT PROPOSALS DUE: 3:00 PM MDT (our clock), January 27, 2025 The City of Fort Collins (City) is seeking Proposals from qualified Contractors (Contractor) for Construction Manager / General Contractor (CM/GC) services on behalf of the Fort Collins One Water Utility related to the design and construction of the Joe Wright Reservoir Gate Replacement Project. The project focuses on the replacement of two 42-inch x 42-inch water control slide gates that are part of Joe Wright Dam’s outlet works. Requested services include Construction Manager and long-lead material procurement tasks during the preconstruction phase and General Contractor tasks during construction. Rocky Mountain E-Purchasing System hosted by Bidnet As part of the City’s commitment to Sustainable Purchasing, proposals must be submitted online through the Rocky Mountain E-Purchasing System (RMEPS) at http://www.bidnetdirect.com/colorado/city-of-fort-collins. Note: please ensure adequate time to submit proposals through RMEPS. Proposals not submitted by the designated Opening Date and Time will not be accepted by the system. A pre-proposal meeting will be held at 1:00 PM MDT December 17, 2024. The pre-proposal meeting will be hosted online via Microsoft Teams. Copy and paste or click the link below for access to the meeting. Please enter your name, company name, and email address into the chat as this is what will be used to create the attendance record. https://teams.microsoft.com/l/meetup- join/19%3ameeting_MmRkOTllNWUtYWJjZi00NjVjLWEzNWYtOGU1MDJjOWY5NjJk%40threa d.v2/0?context=%7b%22Tid%22%3a%2247fa2f5f-0d0a-4a68-b431- 6d1a27b66660%22%2c%22Oid%22%3a%22cae08f8d-f0e9-4207-a434-c36c77f14498%22%7d Meeting ID: 250 631 183 506 Passcode: Df7pV3kC All questions should be submitted, in writing via email, to JD McCune, Senior Buyer at jmccune@fcgov.com, no later than 3:00 PM MDT (our clock) on January 8, 2025. Please format your e-mail to include: RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project in the subject line. Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an addendum and posted on the Rocky Mountain E-Purchasing System webpage. A copy of the RFP may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins. Prohibition of Unlawful Discrimination: The City, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality. The City also strictly prohibits unlawful harassment in the workplace, including sexual harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding. The City requires its Contractors to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment and retaliation. This requirement applies to all third-party contractors and their subcontractors at every tier. Public Viewing Copy: The City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. Contractors may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING”. In this version of the proposal, the Contractor may redact text and/or data that it deems confidential or proprietary pursuant to CORA. Such statement does not necessarily exempt such documentation from public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other applicable law. Generally, under CORA trade secrets, confidential commercial and financial data information is not required to be disclosed by the City. Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. All provisions of any contract resulting from this request for proposals will be public information. New Contractors: The City requires new Contractors receiving awards from the City to fill out and submit an IRS form W-9 and to register for Direct Deposit (Electronic) payment. If needed, the W-9 form and the Contractor Direct Deposit Authorization Form can be found on the City’s Purchasing website at www.fcgov.com/purchasing under Contractor Reference Documents. Please do not submit with your proposal. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City is prohibited. Collusive or Sham Proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City reserves the right to reject any and all proposals and to waive any irregularities or informalities. RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Utilization of Award by Other Agencies: The City reserves the right to allow other state and local governmental agencies, political subdivisions, and/or school districts to utilize the resulting award under all terms and conditions specified and upon agreement by all parties. Usage by any other entity shall not have a negative impact on the City in the current term or in any future terms. The selected Contractor shall be expected to sign the City’s standard Agreement prior to commencing Services (see sample attached to this Proposal). Sincerely, Gerry Paul Purchasing Director RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project I. GENERAL INFORMATION AND PROJECT TIMELINE & GOALS A. General Information Joe Wright Reservoir is a critical part of the City’s water supply and storage system. The reservoir stores a normal capacity of approximately 7,161-acre feet of raw water from the Michigan Ditch and Joe Wright Creek. Joe Wright Dam (aka Cameron Pass, Mountain Supply #20) was completed in 1980 and is classified as a high hazard dam by the Colorado Division of Water Resources, Dam Safety Branch (SEO). The reservoir is located approximately 3 miles east of Cameron Pass along Highway 14. The dam consists of a 148-foot-tall earthen embankment, 72-inch reinforced concrete pipe (RCP) outlet conduit through the embankment, concrete intake upstream of the embankment, concrete outlet control tower within the embankment, service spillway incorporated into the outlet control tower, and uncontrolled concrete emergency spillway. The concrete intake is typically submerged beneath the reservoir and has a slot for stop logs or a bulkhead should the upstream gate chamber need to be drained. The currently available stoplogs are original to the dam and require replacement with a new bulkhead to successfully control flow into the outlet conduit. The outlet control tower houses three manually operated slide gates: one upstream and one downstream 42- inch high-pressure slide gates at the base of the tower in line with the outlet conduit and one 6-inch knife gate valve mounted higher within the tower. The two 42-inch gates are operated throughout the year for normal releases and the 6-inch valve is used for low- flow releases. The outlet has a maximum capacity of 710 cfs with the reservoir at the dam crest elevation of 9,978 feet. An inspection of the outlet conduit, outlet control tower, and gates was performed in 2020 by Marine Diving Solutions. The inspection resulted in the following observations for the two 42-inch gates: • Upstream gate: stem and gate had a significant amount of sediment build up and corrosion, the seat had significant corrosion, and the right side of the seat was displaced and damaged causing leakage, the gate can over-open, and concrete damage downstream of the gate. • Downstream gate: stem and gate had a significant amount of sediment build up and corrosion, misaligned stem splices, missing stem set keys, and concrete damage upstream and downstream of the gate. Recommendations from the inspection included the replacement of the 6-inch low flow gate, which was completed in September of 2020, and the repair or replacement of the two 42-inch gates. Marine Diving Solutions adjusted the downstream 42-inch gate stem, splices, and thrust nut in September 2020 along with the low-flow gate replacement. The adjustments resulted in improved alignment and operability. The City completed a Gate Replacement Study with HDR Engineering and Marine Diving Solutions in 2022. The study included an alternatives evaluation comparing options for repairing or replacing the two 42-inch gates. The deficiencies observed during the 2020 inspection and input from City operations staff drove the multi-criteria analysis included in the study. Recommendations resulting from the study were used to develop the Scope of Work for this project. RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project A condition assessment and measurement of the existing gates and outlet control tower was conducted in October 2024 in preparation for the gate replacement project. The purpose of the dive inspection was to understand the actual dimensions and current conditions of the gates, frames, thimbles, clearances, and other items necessary for design to reduce the risk of field changes during the construction phase. The measurements and other results of this dive inspection will be included in the 30% design. It is anticipated that the reservoir will be partially drawn down for construction. The partially drawn down reservoir surface elevation will be a minimum of 35 vertical feet above the invert of the intake structure. The Contractor will be required to plan and execute placement of a newly fabricated bulkhead into the existing stop log slot on the intake structure while submerged. This will allow the outlet works conduit between the intake structure and the gate tower to drain so work on the gate replacement can be completed in the dry. The Contractor will be required to plan and execute removal of the bulkhead while submerged when construction is complete. The following background information is included as part of this RFP for Contractors to review while developing their proposal: • 1980 Joe Wright Dam Select Outlet and Gate Record Drawings – marked up with project specific replacement information • 2022 Gate Condition and Operation Report – HDR Engineering • 2022 Joe Wright Reservoir Gates Alternatives Evaluation – HDR Engineering These documents are available to prospective Contractors per the instructions in Section K, Non-Disclosure Agreement. Project Goals: • Replace critical source water infrastructure with known deficiencies • Increase operational flexibility and reliability of water control gates • Reduce ongoing maintenance needs • Provide a long-term solution for accessing the upstream gate chamber using the existing stop log slot on the intake structure • Create a culture of collaboration during preconstruction and construction to help safely and successfully replace the gates • Develop a robust plan to execute the replacement considering unique safety, location, and schedule risks • Use a holistic, triple bottom line approach to the project that considers sustainability, people, and value. B. Project Timeline The Joe Wright Gate Replacement Project is being designed by HDR Engineering, Inc. (design engineer). The design is currently being progressed to a 30% completion level. The 30% design will be available for the selected Contractor to review upon contract execution. The replacement gates will require long-lead procurement and fabrication. In order to streamline the procurement process considering the long-lead items, the City released this RFP while the design engineer works on the 30% design. As-constructed plans from original dam construction in 1980 and information from recent condition RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project inspections were included in this RFP in lieu of the 30% design package. The City will also contract with a third-party Independent Cost Estimator (ICE) during the preconstruction phase prior to the Long-lead Gate Procurement Design submittal. The following tentative timelines for design and phasing milestones are as follows: • • • • • • Due to the location of Joe Wright Dam, the selected Contractor should plan to demobilize before the end of October 2026. During the month of October and beyond, the risk for significant snow and other adverse weather conditions increases. The City understands that procurement and fabrication lead times vary by fabricator and depend on the customization of the gate materials and other factors. It is anticipated that the preconstruction schedule will not allow enough fabrication lead time for the gate materials to arrive by August 2025, so the assumed schedule includes a construction window starting August 2026 as a risk mitigation strategy. An alternative construction window starting August 2025 is available depending on the lead times for the gate materials. II. PROJECT SCOPE OF WORK AND OTHER REQUIREMENTS A. Contractor Scope of Work The City selected the CM/GC project delivery method to include the Contractor in the design process, allow time for early procurement of long-lead gate materials, and increase collaboration between the City, design engineer, ICE, and Contractor. The selected Contractor will be required to enter into a Services Agreement – Work Order type that defines each individual performance contract through Work Orders. The City anticipates award of separate Work Orders for each phase and procurement point of the project including 1) Preconstruction Services; 2) Long-lead Gate Material Early Procurement, and 3) Gate Replacement Construction. The intent is to form a strong partnership with the City, the design engineer, ICE, and selected Contractor team. The City expects the Contractor to provide pre-construction and construction services related to the completion of the Project. These services are to include, but not be limited to, the following: 1. Preconstruction Support Services (including long-lead gate material early procurement) The scope of the project is to provide CM/GC support services and long-lead gate material procurement tasks during preconstruction and CM/GC services to install and RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project remove an upstream stop log system and replace the two 42-inch slide gates during construction at Joe Wright Dam. The City will rely on the expertise of the Contractor to deliver a better product in less time and at a competitive cost compared to traditional design-bid-build construction project delivery. During the preconstruction phase (from 30% Design to IFC documents), the Contractor will perform the following: a) Workshop and Meeting Preparation and Participation. The Contractor will prepare and participate in the following workshops and meetings throughout preconstruction: i. Kickoff Workshop and 30% Design Review. This workshop is anticipated to occur once at the beginning of preconstruction and be approximately 4 hours in duration. The Contractor is expected to participate in a partnering session with the City and the design engineer, provide initial comments on the 30% Design, present value engineering proposals as needed, discuss the cost model development, and collaborate to develop project risks. ii. Design Review Meetings for the Long-lead Gate Procurement Design and the 90% Design. The Contractor will provide comments on the designs, cost estimating, inputs for project risks, and scheduling at each Design Review Meeting. These two meetings are expected to be approximately 4 hours in duration each. iii. Routine Preconstruction Meetings. These are estimated to occur every 2 weeks for approximately 5 months with an approximate duration of 1 hour each meeting. During these meetings, the Contractor is expected to provide general project support, constructability input, and scheduling input to the City, design engineer and ICE. b) Cost Model Development and Cost Estimating. The Contractor will provide a sample cost model as part of the 30% Design Review, a cost estimate based on the Long-lead Gate Procurement Design that includes gate material costs based on a bidding selection, and a final Guaranteed Maximum Price (GMP) based on the 90% Design. Each cost estimate will be open-book and reviewed independently by the City and the ICE. c) Bidding, Best Value Selection. The Contractor will manage the bidding process for any subcontractors and vendors, including the long-lead procurement of the gates and bulkhead. This bidding process shall include solicitation of at least 3 subcontractors/vendors (if practical) for each trade element of the project not self-performed by the Contractor and each of the material suppliers over $60k. Contractor will include City representatives in the process to ensure a competitive selection. The Contractor will manage the bidding and project pricing process to develop the final GMP that will be independently reviewed by the City and the ICE. d) Long-lead Gate and Bulkhead Material Procurement. The Contractor is expected to procure gate and upstream bulkhead materials that require long-lead fabrication time during the preconstruction phase. The Long-lead Gate Procurement Design Package will include design plans and specifications required by the Contractor and fabrication vendor. Upon selection of the long- lead material fabrication vendor, it is anticipated that a long-lead procurement work order will be processed so these materials can be procured as early as practical. RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project e) Design Review. The Contractor will be expected to provide formal plan and specification review comments to the City and design engineer at the 30%, Long- lead Gate Procurement, and 90% Design completion levels. The Contractor will present value engineering proposals to the City and design engineer as part of the Design Review tasks. f) Scheduling. The Contractor will prepare a Critical Path Method (CPM) construction schedule using industry recognized software such as MS Project, P6 or PowerProject. They will update this schedule routinely and present it to the City during the Design Review Meetings. g) Permitting Support. The Contractor will work with the City to develop a permitting summary that will be included in the Basis of Design and Final Design Reports produced by the design engineer. The permitting summary will be used to plan permit needs and schedule permitting lead times. This gives the Contractor the opportunity to begin acquiring necessary permits during the preconstruction phase. 2. Construction Services Requirements The Contractor will execute a separate Work Order with associated general and special conditions for the construction phase. The final negotiated GMP for the construction shall be based on the Contractor bidding process, self-performed work estimates, third party cost verification performed by the ICE and best value selection of subcontractors and vendors providing bids for the work. At any time, if the City determines that an agreement or negotiated GMP cannot be reached, the City reserves the right to end contract negotiations, pay the Contractor for work performed through the preconstruction contract and terminate the Contractor relationship. The City then can choose to procure construction services through another means as it sees necessary. In the event the City chooses to publicly bid the project, the Contractor will not be eligible to bid on the project. The Contractor will perform the following tasks during the construction phase once an agreement is reached: a) Construction services to complete the removal and replacement of the two 42- inch gates and appurtenances at Joe Wright Dam. The construction includes, but is not limited to, delivery and installation of temporary upstream bulkhead with reservoir storage, procurement of materials required for safe access into the tower and replacement of the gates, dewatering of the gate chamber, removal of existing gates and necessary appurtenances, repair of damaged concrete within gate chamber, installation of new replacement gates and appurtenances, testing and gate commissioning, troubleshooting of gates and operators as needed, and removal of temporary upstream bulkhead. b) Provide construction oversight and all quality control for all work self-performed and subcontracted. This includes quality control in coordination with the selected gate manufacturer during long-lead gate material fabrication. The City and design engineer will provide additional construction oversight and quality assurance, including third-party testing as needed. c) Responsible for all surveying, measurements, layout, and control to ensure that the construction is completed according to the plans, specifications, and other contract documents. d) Self-perform at least 40% of the work for the gate replacement. In this case, ‘work’ is defined as overhead, profit, diving operations, materials purchased and RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project installed, and other constructed improvements. e) Prepare for and attend construction progress meetings throughout the construction phase. Specific Contractor responsibilities for the progress meetings will include meeting agenda and notes, safety share and updates, progress and lookahead schedules, permitting overview, and other items as needed. 3. Construction Contract Price Negotiations When the City and the Contractor agree that the Project has been designed to a sufficient level of detail to allow the Contractor to accurately price construction elements of the Project, Construction Contract Price Negotiations (price negotiations) will commence. This milestone is typically reached at the 90% Design Package. To expedite the Project, price negotiations may start before the completion of the Preconstruction Support Services. The Contractor will be compensated for construction cost estimates prepared during the design process prior to price negotiations by their preconstruction services fee. However, the Contractor’s work effort for GMP price negotiations is considered part of Preconstruction Support Services and will not be compensated by the City. At the City’s discretion, the City may develop an independent construction cost estimate for the work or may engage an independent third party to perform the construction cost estimate to better inform their review of the Contractor’s costs. The City will determine when price negotiations have begun and will conclude with the establishment of a GMP Construction Work Order agreement. The Construction Work Order will incorporate general conditions using the General Conditions of the Construction Contract prepared by the Engineers Joint Contract Document Committee (EJCDC) and other provisions in accordance with the City’s construction contract requirements. a. Price Negotiation Process: The following procedures will be used for Construction Contract Price Negotiations. i. In collaboration with the Contractor, the design engineer will produce a set of the relevant plans and specifications, showing the work to be accomplished. The plans will also show all work accomplished under any previous construction packages. ii. At roughly the 90% Design Package the Contractor will prepare a complete price to perform the work. The price(s) may include detailed unit line-item pricing or lump sum items as appropriate but will include a minimum of 3 quotes for all subcontracted work over $60k unless otherwise approved by the City. iii. Upon reviewing the Contractor’s price for construction, the City will determine its acceptability by comparing it to its independent construction cost estimate (internal or 3rd party), by reviewing the competitive quotes, or employing other factors as determined to be in the best interests of the Project. iv. If the City determines the price is acceptable, the City will prepare a Work Order for construction services. If a previous Work Order for construction services had been entered into, this work may be added to that contract by change order. RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project v. If the price is not acceptable, the City and the Contractor will conduct a price negotiation meeting to discuss the variances between the price and independent construction cost estimates, or other factors that led to its unacceptability. The intent of the price negotiations is to target a cost variance of five percent (5%) however the City will evaluate each cost line on an individual basis. vi. Following the price negotiation meeting, the Construction Contract Negotiations will enter subsequent iterations of the above-noted process. vii. The City reserves the right to require the Contractor to enter into “open book” cost model price negotiations at any time through this process, where the Contractor will be required to reveal and defend its detailed pricing breakdowns including labor, materials, equipment, subcontractor and supplier quotes, mobilization, overhead, mark-up, and profit. The Contractor shall share quotes for materials and equipment they will provide these costs. If the Contractor plans to use equipment from their fleet the rates shall be comparable to those from a rental yard. See below for the City’s “open book” negotiation requirements. viii. At any time, if the City determine that an agreement cannot be successfully negotiated, the City reserve the right to end Construction Contract Cost Negotiations and procure the construction of the Project by other means. If the City then offers the Project up for public bids, the Contractor will not be eligible to bid on the Project. b. “Open Book” Negotiations Process: Negotiations may require any or all of the following information. The Contractor shall submit information as requested by the City, to the extent necessary to permit the City to determine the reasonableness of the construction price. The Contractor shall provide cost or pricing data, broken down by individual work items, for the Contractor and each subcontractor. Submit material and subcontractor quotes, anticipated labor, operator, and equipment usage, and anticipated production rates. If requested, submit a written proposal for the work identifying the major elements of the work, the quantity of the element, and its contribution to the proposed price. Provide further breakdowns if requested by the City: • Material: Furnish quotes and/or material invoices showing the cost of material to be incorporated into the work. • Labor: Show basic hourly rates, fringe benefits, applicable payroll costs (workers' compensation, insurance, etc.) paid subsistence, and travel costs for each labor classification and foreman employed in the work • Equipment: Provide a complete descriptive listing of equipment to be used in the work, including make, model, and year of manufacture. Support rented or leased equipment costs with invoices • Other direct costs: Furnish documentation of invoices to support any other direct costs to be incurred that are not included above (e.g., bonds, mobilization, permits, etc.) RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project • Production Rates: Provide actual hours of performance on a daily basis for each labor classification and for each piece of equipment. • Subcontract Costs: Provide supporting data as required above. • CM/GC Fee shall include the following:  Overhead: Identify overhead rates and list the types of costs that are included in overhead.  Profit: Include a reasonable profit reflecting the efficiency and economy of the Contractor and subcontractors in performing the work, the contract risk type, the work difficulty, and management effectiveness. • Subcontractor Markup: List any markup cost for subcontractors. Provide backup information as requested for a breakdown and justification of markup expenses. This open-book negotiation process does not stop with the GMP. It shall continue throughout the Project and be part of the process for change orders, etc. B. City’s Expectations and Delivery Schedule Partnering The City expects a partnering relationship with the selected Contractor. A formal Partnering Session will be held with the selected Contractor, City, and design engineer at the beginning of preconstruction. The City expects an environment where trust and teamwork prevent disputes, foster a cooperative bond to everyone’s benefit, and facilitate the completion of a successful Project. Traditional adversarial relationships between the Project participants are not an acceptable way of doing business on this Project. Key Staff The City expects the Contractor to commit key staff members to manage the Project through attendance of bi-weekly preconstruction Project meetings and construction meetings; preparation of RFIs; management of subcontractors, schedule, quality and cost. Key staff members for this Project are expected to include a project manager, superintendent and possibly a field engineer. If key staff are removed from this Project without City approval, the City reserves the right to terminate the Contract. The City expects the Contractor to request approval for any changes in staffing if they will differ from those identified in the proposal. Communication The City expects open and honest communication related to Project activities including subcontractor performance, cost control, schedule control, budget and quality issues as they may arise. The City expects communication to occur directly through the established chain of command which may involve working directly with, receiving direction from, and coordinating with City assigned personnel. Contract Management The City expects the Contractor to participate in contract management such that pay applications, work change directives, change orders, RFIs and other documents are managed timely and effectively to avoid delays in Project delivery. The City expects the Contractor to work with its Project Manager to gain approval and processing of these RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project documents in a coordinated fashion. Performance Standard The City expects Contractor performance to a standard that exceeds industry-accepted parameters. The City expects to pay fairly for all work performed and expects the Contractor to be profitable. Services and Construction Agreements, and Work Order Process The Contractor will be required to sign the City’s Services Agreement Work Order-type, similar to the Sample Agreement found in Section VII. Based on this Agreement, a Work Order for the pre-construction Work will be issued. The preconstruction services shall include (at minimum) review of designs for constructability, review of site layout and grading, estimating the cost of different options, alternatives, and components, providing opinions and recommendations on suitable methods and approaches to accomplish the work, offering value engineering suggestions to accomplish the desired objectives in the most cost-effective manner possible, and provide the team with up to date on-going cost status of the current Project design. Upon completion of the preconstruction services, the Contractor will be required to sign a Construction Work Order. A sample construction Work Order is included in Section VI. The construction services shall include (at minimum) full-time site supervision when trades are working, stormwater management and permitting of the Project site, site protection and security during construction, procurement of all subcontractors and suppliers to complete construction, Project sequencing and scheduling of manpower, materials and equipment, Project safety enforcement, management of quality control, management of testing, management of surveying, and management of Project close-out. The Work Order for construction services will be awarded at approximately 95% design completion based on the Contractor’s satisfactory performance under the preconstruction services Work Order. C. Anticipated RFP Schedule The following represents the City’s target schedule for the RFP. The City’s reserve the right to amend the target schedule at any time. • RFP Posted: December 6, 2024 • Pre-Proposal Meeting: 1:00 PM MT, December 17, 2024 • Question deadline: 3:00 PM MT, January 8, 2025 • NDA Request Deadline: 3:00 PM MT, January 8, 2025 • Final Addendum Issued: January 15, 2025 • Proposal due date: 3:00 PM MT (our clock), January 27, 2025 • Interviews: Week of February 10, 2025 (tentative) D. Interviews In addition to submitting a written proposal, the top-rated Contractors may be invited by the RFP assessment team and asked to participate in an oral presentation to provide an overview of the company and its approach to the Project, as well as to address questions. RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Shortlisted firms will be asked to submit fees prior to the interview. Instructions and fee proposal forms/details will be sent with the notice of shortlist and interview. Shortlisted firms may also be asked to provide details of the firms financial standing; including available credit and banking reference. A recent financial statement detailing current assets and liabilities may be required upon request as well. E. Laws and Regulations The Contractor agrees to comply fully with all applicable local, State of Colorado, and Federal laws and regulations and municipal ordinances. F. Fees, Licenses, Permits The successful Contractor shall be responsible for obtaining any necessary licenses, fees or permits without additional expense to the City. All equipment shall be properly licensed and insured, carry the appropriate permits, and be placarded as required by law. G. Hours Working hours are from 7:00 am to 5:00 pm Monday through Friday and does not include recognized holidays. The City’s Project Manager may agree, in writing, to weekend or night work if required. H. Subcontractors Contractor will be responsible for identifying any subcontractors in their proposal. Please note that the City will contract solely with the awarded Contractor; therefore, subcontractors will be the responsibility of the Contractor. I. Standard of Conduct The successful Contractor shall be responsible for maintaining satisfactory standards of employees' competency, conduct, courtesy, appearance, honesty, and integrity, and shall be responsible for taking such disciplinary action with respect to any employee, as may be necessary. The personal conduct of the Contractor and its staff has a direct impact on the quality of performance. Unacceptable personal conduct/behavior, as defined herein, may result in immediate or early termination of the Agreement. The City may request, at their sole discretion, the Contractor to immediately remove from this assignment any employee found unfit to perform duties due to one or more of the following reasons: (1) Neglect of duty. (2) Disorderly conduct, use of abusive or offensive language, quarreling, intimidation by words or actions, or fighting. (3) Theft, vandalism, immoral conduct, or any other criminal action. (4) Selling, consuming, possessing, or being under the influence of intoxicants, including alcohol or substances, while on assignment for the City. All City-owned or operated facilities and their grounds are non-smoking sites. RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project J. Invoicing and Payment Invoices should be emailed monthly to invoices@fcgov.com with a copy to Taylor Scott, tscott@fcgov.com. The cost of the work completed shall be paid to the Contractor each month following the submittal of a correct invoice by the Contractor indicating the project name, Purchase Order number, task description, hours worked, personnel/work type category, hourly rate for each employee/work type category, date of the work performed specific to the task, percentage of that work that has been completed by task, 3rd party supporting documentation with the same detail and a brief progress report. Payments will be made using the agreed-to prices described in the Agreement. In the event a service is requested which is not provided in the Agreement, the Contractor and the City will negotiate an appropriate unit price for the service prior to the Contractor initiating such work. The City pays invoices on Net 30 terms. K. Non-Disclosure Agreement The City will require all Contractors who would like to submit a proposal under this RFP to execute the City’s Non-Disclosure Agreement (NDA) in order to obtain access to the 1980 Joe Wright Reservoir Plan set, August 2020 Inspection Report, and the 2022 Joe Wright Reservoir Gates Alternatives Evaluation. A sample copy of the NDA the City will use for document access specified in this RFP is included as Attachment 1, attached hereto and incorporated by this reference. The City will not accept any edits to the NDA. Contact J.D. McCune, Sr. Buyer at jmccune@fcgov.com to request the NDA and provide Contractors legal company name, contact name, contact email, and title of person authorized to sign. The NDA will be routed via DocuSign for execution. Upon receipt of an executed NDA, the City will then release the documents to the Contractor. NDA request deadline is January 8, 2025, by 3:00 PM MT. III. PROPOSAL SUBMITTAL Contractor’s that have the requisite experience and qualifications are encouraged to submit proposals. It is highly recommended to limit proposals to twenty (20) single-sided 8 ½ x 11” pages (excluding cover pages, table of contents, dividers, bonding company references, resumes, and Section V, Acknowledgement form). Font shall be a minimum of 10 Arial, and margins are limited to no less than .5” for sides and top/bottom. Please, no embedded documents. The City shall not reimburse any firm for costs incurred in the preparation and presentation of their proposal. A. Cover Letter / Executive Summary The Executive Summary should highlight the content of the proposal and features of the program offered, including a general description of the program and any unique aspects or benefits provided by your firm. Indicate your availability to participate in the interviews/demonstrations on the proposed dates as stated in the Anticipated RFP Schedule section. B. Contractor Information 1. Describe the Contractor’s business and background, and provide a brief summary/overview of services the firm offers RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project 2. Provide general contracting licenses held by the firm 3. Number of years in the business 4. Size of the firm 5. Details about ownership, including the date the firm was established, how the firm is organized, and previous names of the firm in the last ten (10) years (if applicable) 6. Location(s) of the firm’s offices; if multiple, please identify which will be the primary for our account 7. Primary corporate contact information, including contact name(s) and title(s), mailing address(s), phone number(s), and email address(s); complete Section V, Acknowledgement C. Cost and Work Hours Complete Section VI CM/GC Cost Proposal, providing all construction cost factors that will be used to develop the cost of work. The following shall be provided: a. Work Order I (Pre-Construction) Services: 1. Cost estimate for pre-construction services. A. Provide a separate lump sum, not to exceed, cost for your involvement to complete pre-construction services, including meetings, cost estimating, value engineering and other related tasks included in the Preconstruction Support Services Scope of Work. Pre-construction ends once a GMP has been established. On a separate sheet, provide estimated hours per task and per personnel classification to complete the pre-construction services. B. On a separate sheet, provide unburdened labor rates for your personnel showing base pay and the percentage for labor burden. b. Work Order II (Construction) Services: 1. Provide your CM/GC Fee, expressed as a percentage, to be added to the direct cost of work, including all materials, labor, equipment and subcontractor. This Fee shall be used to cover all insurance, overhead, mark-up and profit and shall also be used on any project change orders. 2. Provide a schedule of billing rates by category of employee and job title to be used during the term of the Agreement during construction, including anticipated labor, operator and equipment usage. The rate schedule will be used as a basis for negotiation during construction contract pricing negotiations for self-performed work and change orders. As a part of their proposal, proposing firms are to provide the following: a. Bonding Company Reference: Provide the name, address, and phone number of the firm’s bonding agent. Provide a letter from the bonding agent indicating the firm’s bonding capacity is adequate to undertake this work. b. Insurance Company: Provide the name, address, and phone number of the firm’s insurance agent(s). Provide statements to answer the following questions. (See also Insurance RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Requirements in Section VII, Sample Agreement). i. Does coverage meet minimum Project requirements? ii. Does coverage include builder’s risk? iii. Can this coverage be extended for work on this Project? iv. Can coverage be increased? v. Can the City be listed as an additional insured? vi. Are there any current claims that will affect coverage limits available for this Project? D. Scope of Proposal If awarded the contract per the scope above, provide a detailed narrative of the services proposed. The narrative should include any options that may be beneficial for the City to consider. 1. Preconstruction and Construction Sequencing/Scheduling a. What makes your preconstruction services unique? What tools do you use to enhance the process? How will your preconstruction services benefit the City? Describe your approach and how you schedule, plan, and manage the preconstruction phase of the Project. b. Describe the scheduling software your firm typically uses for sequencing tasks and scheduling subcontractors, materials, and equipment. The City will require that industry-recognized software be used to develop and manage the Project schedule. c. Describe the way in which your firm develops, maintains, and updates Project schedules for projects of this size and nature. d. Describe your process and frequency for updating Project schedules and how your firm works to overcome challenges and works to maintain the original completion date. Submit an example of a project schedule for a similar size project. e. Describe your approach to the schedule, specifically identifying what you believe will be most important or critical to the schedule and if you believe a construction timeline is achievable. 2. Project Budget and Cost Control a. Describe your approach to developing cost estimates through preconstruction. b. Describe your approach to developing value engineering ideas through construction delivery to enhance the work product while potentially saving cost. c. Describe how the project timeline outlined in Section I. B. above affects your approach to pricing. d. Describe your approach to be transparent or open book when developing the GMP for this Project in cooperation with the City. 3. Trade Subcontractors & Self Performed Work Provide a listing of subcontractors for major trades your firm plans to engage to meet the City’s procurement requirements. Explain your relationship with these firms, how long they have worked with you on projects, and generally how your subcontractor procurement process works. Give examples of situations where these firms have performed to tight timeframes and accelerated schedules. Provide a full list of work that could potentially be self-performed on the Project, and RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project an estimate for the percent of the construction Project you plan to self-perform. 4. Approach to GMP Negotiation Describe in detail how your firm uses the markups, CM/GC percentage fee, and direct cost of work to develop the GMP for the Project. The City anticipates working with the Contractor to develop this cost for all known quantities of the Project. If unknown circumstances are discovered, the City will negotiate the costs with Contractor prior to the completion the work. The final not to exceed Project cost will be established as a GMP including a detailed bid schedule. 5. Method of Construction Submit a written narrative explaining your approach to the construction phase of the Project and achievement of the Project goals described in Section II. A. 2, Construction Requirements. 6. Quality Assurance/Quality Control Provide details on your firm’s quality control program. Explain how your team administers a quality control program during construction, how performance measures are documented, and how quality issues are addressed. Provide examples of when your firm exceeded quality standards, gained industry recognition, or received quality awards. E. Firm Capability 1. Company Resources & Assigned Personnel Provide an organizational chart for the resources proposed to be used on this Project and identify the main point of contact for the Project. Provide the names and resumes of proposed key Project staff, including the preconstruction team, proposed project manager, and construction project superintendent, and who will be our main point of contact. Detail the availability and commitment of the proposed staff. (Note: key personnel must be committed to this Project for its duration unless excused by the City. This requirement is non-negotiable.) 2. Relevant Project Experience Provide a brief project description and history of projects, similar in scope to this project, completed in the last 15 years. Profile projects should include the replacement and repair of large slide gates and appurtenances at storage reservoirs, specifically high hazard dams and / or remote locations. Highlight experience with gate material procurement, gate removal and demolition, installation, troubleshooting, and concrete repair. This project requires the Contractor to procure and temporarily place a bulkhead on the upstream intake structure under reservoir surcharge. Experience with diving and underwater construction is required from the proposed Contractor team. It is anticipated that the gate removal and replacement will occur in the dry once the bulkhead is properly installed. Include experience working in remote and mountainous areas on gate related water storage projects. Limit profile projects list to 5 projects maximum. Identify any Key Personnel that were involved with the profile projects that will be assigned to this project. Include the following information: RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project a. Project description that includes the project name, the design team's firms, and site location. Please include pictures of the work completed. b. Project history that includes the original schedule agreed upon at the time of signing the contract, the actual duration of construction, and any special characteristics of the project that affected delivery. c. Type of project delivery model used. d. Original contract cost. e. Cost at completion. f. Original contract time and actual completion time. g. Provide a brief discussion of any unusual factors that affected the project delivery (e.g. owner-initiated delays, additions to the work, etc.). Provide both an owner reference and consulting engineer/architect reference for cited projects, including name, contact name, email address, and phone number. F. Safety Record Complete Attachment 2, Contractor Safety Form, attached hereto and incorporated by this reference. G. Sustainability/TBL Methodology In concise terms (no more than two pages), please describe your organization’s commitment to sustainability and supporting values. Each element of the TBL sustainability criteria will receive equal consideration in determining the final Sustainability/TBL score. 1. Address how your firm strives to incorporate all three aspects (social, environmental, and economic) of Triple Bottom Line (TBL) sustainable practices into the workplace. Provide examples along with any metrics used to measure success within your firm. 2. Also, provide examples of how your firm has incorporated all three aspects of TBL sustainable practices in previous similar projects. Some examples are provided below: a. Environmental – Experience delivering projects/programs focused on environmental health priorities in the areas of climate resiliency, water quality and watershed protection, regulatory performance, management systems, air quality, renewable energy, sustainable building and design, construction materials management, and solid waste reduction. b. Economic – Experience working and delivering projects with an emphasis on strategic financial planning, job creation, business development, asset management, various project delivery methods, value engineering, regional partnerships, transparency, stakeholder engagement, strategic investments, aging infrastructure, repurposing of existing facilities, and competing financial priorities. c. Social – Experience working and delivering projects, programs, and/or initiatives that support Equity, Diversity, and Inclusion throughout your firm’s workplace, including leadership and supply chain. Examples of this may be a demonstration of working within cultural and language gaps, development of diversity programs, diverse project teams, equitable opportunity vendor supply chain, and how your RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project firm has applied an equity lens to processes such as recruitment, hiring, purchasing, career pathways, salaries, and staff engagement. 3. Provide the list of LEED Projects you have completed in the last 5 years and the level of certification achieved or anticipated. H. Additional Information Provide any information that distinguishes Contractor from its competition and any additional information applicable to this RFP that might be valuable in assessing Contractor’s proposal. Explain any concerns Contractor may have in maintaining objectivity in recommending the best solution. All potential conflicts of interest must be disclosed. Exceptions to the Scope of Services and City Sample Agreement (a sample of which is attached in Section VII) shall be documented. The City makes no guarantees to change the Agreement but may consider the exceptions. RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project IV. REVIEW AND ASSESSMENT CRITERIA Proposal and Interview Criteria Contractors will be evaluated on the following qualification criteria. This set of criteria will be the basis for review and assessment of the written proposals and optional interviews. At the sole discretion of the City, interviews of the top ranked firms may be conducted. The rating scale shall be from 1 to 10, a rating of 1 doesn’t meet minimum requirements, a rating of 5 means the category fulfills the minimum requirements, and 10 exceeds minim requirements in that category. NUMBER FACTOR RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project V. ACKNOWLEDGEMENT Contractor hereby acknowledges receipt of the City’s Request for Proposals and acknowledges that it has read and agrees to be fully bound by all of the terms, conditions, and other provisions set forth in the RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project and sample Agreement except as otherwise noted. Additionally, Contractor hereby makes the following representations to the City: a. All of the statements and representations made in this proposal are true to the best of the Contractor’s knowledge and belief. b. Contractor commits that it is able to meet the terms provided in this proposal. c. This proposal is a firm and binding offer, for a period of 90 days from the date hereof. d. Contractor further agrees that the method of award is acceptable. e. Contractor also agrees to complete the proposed Agreement with the City within 10 days of notice of award. If contract is not completed and signed within 10 days, City reserve the right to cancel and award to the next highest-rated firm. f. Contractor acknowledges receipt of addenda. g. Contractor acknowledges no conflict of interest. h. Contractor acknowledges that the City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. All provisions and pricing of any contract resulting from this request for proposal will be public information. Legal Firm Name: Physical Address: Remit to Address: Phone: Name of Authorized Agent of Firm: Signature of Authorized Agent: Primary Contact for Project: Title: Email Address: Phone: Cell Phone: NOTE: ACKNOWLEDGMENT IS TO BE SIGNED & RETURNED WITH YOUR PROPOSAL. RFP 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project VI. CM/GC COST PROPOSAL 1. Work Order I (Pre-Construction) Services: i. Provide a lump sum, not-to-exceed cost for your involvement to complete pre- construction services, including, but not limited to, meetings, cost estimating, value engineering and other related tasks. Pre-construction ends once a GMP has been established. $________________________________________ ii. On a separate sheet, provide unburdened labor rates for your personnel showing base pay, the percentage for labor burden and billing rate. 2. Work Order II (Construction) Services: i. Provide your CM/GC Fee, expressed as a percentage, as well as markups on all materials, equipment, subcontractors, and change order costs. The CM/GC fee shall be used to cover cost for insurance, overhead, mark-up and profit and shall also be used for fee on all project change orders. Fee Percentage: _______________________________% ii. On a separate sheet, provide a schedule of billing rates by category of employee and job title to be used during the term of the Agreement during construction, including anticipated labor, operator, and equipment usage. The rate schedule will be used as a basis for negotiation during construction contract pricing negotiations for self-performed work and change orders. Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 1 of 106 VII. SAMPLE SERVICES AGREEMENT (FOR REFERENCE ONLY – DO NOT SIGN) SERVICES AGREEMENT WORK ORDER TYPE THIS AGREEMENT made and entered into the day and year set forth below, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and hereinafter referred to as "Service Provider". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Services to be Performed. a. This Agreement shall constitute the basic agreement between the parties for 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project. The conditions set forth herein shall apply to all services performed by the Service Provider on behalf of the City and particularly described in Work Orders agreed upon in writing by the parties from time to time. Such Work Orders, samples of which are attached hereto as Exhibit A & B, consisting of two (2) and ninety two (92) pages and incorporated herein by this reference, shall include a description of the services to be performed, the location and time for performance, the amount of payment, any materials to be supplied by the City and any other special circumstances relating to the performance of services. A general scope of services is attached hereto as Exhibit C, consisting of one (1) page, and incorporated herein by this reference. The only services authorized under this Agreement are those which are performed after receipt of such Work Order, except in emergency circumstances where oral work requests may be issued. Oral requests for emergency actions will be confirmed by issuance of a written Work Order within two (2) working days. Irrespective of references in Exhibit A & B to certain named third parties, Service Provider shall be solely responsible for performance of all duties hereunder. b. The City may, at any time during the term of a particular Work Order and without invalidating such Work Order, make changes to the scope of the particular services. Such changes shall be agreed upon in writing by the parties by Change Order, a sample of which is attached hereto as Section 00950, consisting of one (1) page, and incorporated herein by this reference. 2. Changes in the Work. The City reserves the right to independently bid any services rather than issuing work to the Service Provider pursuant to this Agreement. Nothing within this Agreement shall obligate the City to have any particular service performed by the Service Provider. 3. Time of Commencement and Completion of Services. The services to be performed pursuant to this Agreement shall be initiated as specified by each written Work Order or oral Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 2 of 106 emergency service request. Oral emergency service requests will be acted upon without waiting for a written Work Order. Time is of the essence. 4. Contract Period. This Agreement shall commence and shall continue in full force and effect until , unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for additional one year periods not to exceed two (2) additional one year periods. At the discretion of the Purchasing Director, the agreement may be extended for one (1) additional year due to unforeseen circumstances that delay the project(s). Renewals and pricing changes shall be negotiated by and agreed to by both parties only at the time of renewal. Written notice of renewal shall be provided to the Service Provider and mailed no later than thirty (30) days prior to contract end. 5. Delay. If either party is prevented in whole or in part from performing its obligations by unforeseeable causes beyond its reasonable control and without is fault or negligence, then the party so prevented shall be excused from whatever performance is prevented by such cause. To the extent that the performance is actually prevented, the Service Provider must provide written notice to the City of such condition within ten (10) days from the onset of such condition. 6. Early Termination by City/Notices. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Service Provider. Such notice shall be mailed at least ten (10) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective immediately when emailed or three business days from the date of the notice when mailed to the following addresses: Service Provider: City: Copy to: Attn: email address City of Fort Collins Attn: Taylor Scott PO Box 580 Fort Collins, CO 80522 tscott@fcgov.com City of Fort Collins Attn: Purchasing Dept. PO Box 580 Fort Collins, CO 80522 purchasing@fcgov.com In the event of early termination by the City, the Service Provider shall be paid for services rendered to the date of termination, subject only to the satisfactory performance of the Service Provider's obligations under this Agreement. Service Provider shall submit a final invoice within ten (10) days of the effective date of termination. Undisputed invoices shall be paid Net 30 days of the date of the invoice. Such payment shall be the Service Provider's sole right and remedy for such termination. 7. Contract Sum. This is an open-end indefinite quantity Agreement with no fixed price. The actual amount of work to be performed will be stated on the individual Work Orders. The City makes no guarantee as to the number of Work Orders that may be issued or the actual amount of services which will in fact be requested. Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 3 of 106 8. Payments. a. The City agrees to pay and the Service Provider agrees to accept as full payment for all work done and all materials furnished and for all costs and expenses incurred in performance of the work the sums set forth for the hourly labor rate and material costs, with markups, stated within the Bid Schedule Proposal Form, attached hereto as Exhibit D, consisting of ( ) pages, and incorporated herein by this reference. b. Invoices shall be emailed to invoices@fcgov.com with a copy to the Project Manager. The cost of the work completed shall be paid to the Service Provider following the submittal of a correct itemized invoice by the Service Provider. Payment shall be made by the City only upon acceptance of the work by the City and upon the Service Provider furnishing satisfactory evidence of payment of all wages, taxes, supplies and materials, and other costs incurred in connection with the performance of such work. The City is exempt from sales and use tax. The City’s Certificate of Exemption license number is 09804502. A copy of the license is available upon written request. The City pays invoices on Net 30 days from the date of the invoice. 9. Appropriation. To the extent this Agreement or any provision in it constitutes a multiple fiscal year debt or financial obligation of the City, it shall be subject to annual appropriation by City Council as required in Article V, Section 8(b) of the City Charter, City Code Section 8-186, and Article X, Section 20 of the Colorado Constitution. The City shall have no obligation to continue this Agreement in any fiscal year for which no such supporting appropriation has been made. 10. Liquidated Damages. OWNER and CONTRCTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in the Work Order, plus any extensions thereof allowed in accordance with Article 12 of the General conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amount set forth in each Work Order. 11. City Representative. The City's representative will be shown on the specific Work Order and shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the work requested. All requests concerning this Agreement shall be directed to the City Representative. 12. Independent Contractor. It is agreed that in the performance of any services hereunder, the Service Provider is an independent contractor responsible to the City only as to the results to be obtained in the particular work assignment and to the extent that the work shall be done in accordance with the terms, plans and specifications furnished by the City. 13. Subcontractors/subconsultants. Service Provider may not subcontract any of the Work set forth in the subsequent Work Orders without the prior written consent of the city, which shall Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 4 of 106 not be unreasonably withheld. If any of the Work is subcontracted hereunder (with the consent of the City), then the following provisions shall apply: (a) the subcontractor/subconsultant must be a reputable, qualified firm with an established record of successful performance in its respective trade performing identical or substantially similar work, (b) the subcontractor/subconsultant will be required to comply with all applicable terms of this Agreement, (c) the subcontract will not create any contractual relationship between any such subcontractor/subconsultant and the City, nor will it obligate the City to pay or see to the payment of any subcontractor/subconsultant, and (d) the work of the subcontractor/subconsultant will be subject to inspection by the City to the same extent as the work of the Service Provider. 14. Personal Services. It is understood that the City enters into the Agreement based on the special abilities of the Service Provider and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Service Provider shall neither assign any responsibilities nor delegate any duties arising under the Agreement without the prior written consent of the city. 15. Acceptance Not Waiver. The City's approval or acceptance of, or payment for any of the services shall not be construed to operate as a waiver of any rights under the Agreement or of any cause of action arising out of the performance of this Agreement. 16. Warranty. a. Service Provider warrants that all work performed hereunder shall be performed with the highest degree of competence and care in accordance with accepted standards for work of a similar nature. b. Unless otherwise provided in the Agreement, all materials and equipment incorporated into any work shall be new and, where not specified, of the most suitable grade of their respective kinds for their intended use, and all workmanship shall be acceptable to City. c. Service Provider warrants all equipment, materials, labor and other work, provided under this Agreement, except City-furnished materials, equipment and labor, against defects and nonconformances in design, materials and workmanship/workwomanship for a period beginning with the start of the work and ending twenty-four (24) months from and after final acceptance under the Work Order, regardless whether the same were furnished or performed by Service Provider or by any of its subcontractors/subconsultants of any tier. Upon receipt of written notice from City of any such defect or nonconformances, the affected item or part thereof shall be redesigned, repaired, or replaced by Service Provider in a manner and at a time acceptable to City. 17. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this Agreement, such party may be declared in default thereof. 18. Remedies. In the event a party has been declared in default, such defaulting party shall be Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 5 of 106 allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail themselves of any other remedy at law or equity. If the non-defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees and costs incurred because of the default. 19. Entire Agreement; Binding Effect; Order of Precedence; Authority to Execute. This Agreement, along with all Exhibits and other documents incorporated herein, shall constitute the entire Agreement of the parties regarding this transaction and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. Covenants or representations not contained in this Agreement shall not be binding on the parties. In the event of a conflict between terms of the Agreement and any exhibit or attachment, the terms of the Agreement shall prevail. Each person executing this Agreement affirms that they have the necessary authority to sign on behalf of their respective party and to bind such party to the terms of this Agreement. 20. Indemnity/Insurance. a. The Service Provider agrees to indemnify and save harmless the City, its officers, agents and employees against and from any and all actions, suits, claims, demands or liability of any character whatsoever, brought or asserted for injuries to or death of any person or persons, or damages to property arising out of, result from or occurring in connection with the performance of any service hereunder. b. The Service Provider shall take all necessary precautions in performing the work hereunder to prevent injury to persons and property. c. Without limiting any of the Service Provider's obligations hereunder, the Service Provider shall provide and maintain insurance coverage naming the City as an additional insured under this Agreement of the type and with the limits specified within Section 00630, consisting of two (2) pages, attached hereto, and incorporated herein by this reference. The Service Provider before commencing services hereunder shall deliver to the City's Purchasing Director, purchasing@fcgov.com, P. O. Box 580, Fort Collins, Colorado 80522 one copy of a certificate evidencing the insurance coverage required from an insurance company acceptable to the city. 21. Law/Severability. The laws of the State of Colorado shall govern the construction, interpretation, execution, and enforcement of this Agreement. The Parties further agree that Larimer County District Court is the proper venue for all disputes. If the City subsequently agrees in writing that the matter may be heard in federal court, venue will be in Denver District Court. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 6 of 106 22. Governmental Immunity Act. No term or condition of this Agreement shall be construed or interpreted as a waiver, express or implied, of any of the notices, requirements, immunities, rights, benefits, protections, limitations of liability, and other provisions of the Colorado Governmental Immunity Act, C.R.S. § 24-10-101 et seq. and under any other applicable law. 23. Prohibition Against Unlawful Discrimination. The City of Fort Collins, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality. The City also strictly prohibits unlawful harassment in the workplace, including sexual harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding. The City requires its vendors to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment, and retaliation. This requirement applies to all third-party vendors and their subcontractors/subconsultants at every tier. 24. Dust Control. The Service Provider shall abide by the City of Fort Collins “Dust Control and Prevention Manual,” which is available for public download at https://www.fcgov.com/airquality/pdf/dust-prevention-and-control-manual.pdf, and is incorporated herein by this reference. The City of Fort Collins has implemented this manual for all projects performed for the City of Fort Collins or located within the City of Fort Collins City limits. 25. Colorado Open Records Act. The City is subject to Sec. 24-72-201 et seq. of the Colorado Revised Statute (CORA). This Agreement is subject to public disclosure in whole pursuant to CORA. 26. Special Provisions. Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit E - Confidentiality, consisting of four (4) page(s), and Exhibit , Section 00700 General Conditions consisting of fifty-three (53) pages. Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 7 of 106 [Signature Page Follows] THE CITY OF FORT COLLINS, COLORADO By: Gerry Paul Purchasing Director Date: ATTEST: APPROVED AS TO FORM: SERVICE PROVIDER'S NAME By: Printed: Title: Date: Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 8 of 106 EXHIBIT A WORK ORDER FORM (Short form) PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND SERVICE PROVIDER'S NAME WORK ORDER NUMBER: PM's Tracking # PROJECT TITLE: ORIGINAL BID/RFP NUMBER & NAME: 10082 GM/GC Services for Joe Wright Reservoir Gate Replacement Project MASTER AGREEMENT EFFECTIVE DATE: Original Contract Date WORK ORDER COMMENCEMENT DATE: WORK ORDER COMPLETION DATE: MAXIMUM FEE: (time and reimbursable direct costs): PROJECT DESCRIPTION/SCOPE OF SERVICES: Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of ( ) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: Name, Title ACCEPTANCE: Date: Name, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 9 of 106 EXHIBIT B WORK ORDER FORM (Construction over $100,000) CONSTRUCTION WORK ORDER FOR 10082 GM/GC SERVICES FOR JOE WRIGHT RESERVOIR GATE REPLACEMENT PROJECT WORK ORDER NO. TITLED (WORK ORDER TITLE) DATE: CONTRACTOR: Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 10 of 106 TABLE OF CONTENTS AGREEMENT FORMS 00525 Work Order & Notice of Award 00530 Work Order Notice to Proceed 00600 Bonds and Certificates 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate CONDITIONS OF THE CONTRACT 00700 General Conditions Exhibit GC-A GC-A1 - GC-A2 00800 Supplementary Conditions 00900 Addenda, Modifications and Payment 00950 Work Order Change Order Form 00960 Application for Payment Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 11 of 106 SECTION 00500 CONSTRUCTION WORK ORDER AGREEMENT FORMS 00525 Work Order, Notice of Award & Bid Schedule 00530 Work Order Notice to Proceed Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 12 of 106 SECTION 00525 WORK ORDER, NOTICE OF AWARD AND BID SCHEDULE TO (CONTRACTOR OR CM/GC): WORK ORDER # & TITLE: PURCHASE ORDER: ORIGINAL BID/RFP # & TITLE: 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project ENGINEER: OWNER’S REPRESENTATIVE: NOTICE OF AWARD DATE: OWNER: City of Fort Collins (hereinafter referred to as OWNER) 1. WORK. You are hereby notified that your bid dated , for the above Work Order has been considered. Pursuant to your AGREEMENT with OWNER dated , you have been awarded a Work Order for this Work Order Description: A. See Section 01100 – Summary of Work. 2. CONTRACT PRICE, BONDS AND CERTIFICATES. The price of your Work Order is ($ ). Pursuant to the AGREEMENT and the Contract Documents, Performance and Payment Bonds and insurance are required. 3. CONTRACT TIMES. Pursuant to the AGREEMENT and the Contract Documents, the date for Substantial Completion of this Work Order is forty five days from Notice to Proceed, and the date for Final Completion is sixty (60) days from Notice to Proceed. 4. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTACTOR shall pay OWNER the amounts set forth hereafter. 1. Substantial Completion: two hundred fifty dollars ($250) for each calendar day or fraction thereof that expires after forty five (45) days from Notice to Proceed. 2. Final Acceptance: After Substantial Completion one hundred fifty dollars ($150) per day after sixty (60) days from Notice to Proceed until the Work is ready for Final Payment and Acceptance. 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 13 of 106 5.1 PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. 5.1.1 Prior to Substantial Completion, Owner will be entitled to withhold as contract retainage five percent (5%) of each progress payment, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. If , in the sole discretion of Owner, on recommendation of Engineer, Owner determines that the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 95% of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application Section 00960. 5.1.2 Upon Substantial Completion payment will be made in an amount sufficient, if necessary, to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as ENGINEER shall determine or OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. 5.2 FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. 6. CONTRACTOR'S REPRESENTATION. In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 6.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 14 of 106 investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 6.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. 6.5 CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. 7. CONTRACT DOCUMENTS. 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of “Contract Documents” in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. 7.2 Forms for use by CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: 7.2.1 Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3 Lien Waiver Releases 7.2.4 Consent of Surety 7.2.5 Application for Exemption Certificate 7.2.6 Application for Payment 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 15 of 106 The Contract Drawings shall be stamped "Final for Construction" and dated. Any revisions made shall be clearly identified and dated. 7.4 The Contract Documents also include all written amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 7.5 There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. 8. MISCELLANEOUS 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 8.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, Agreement and obligations contained in the Contract Document. 9. EXECUTION. Three (3) copies of this proposed Work Order & Notice of Award, and accompanying amendments or supplements to the Contract Documents (except any applicable Drawings) incorporated herein, are provided. Three (3) sets of any applicable Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is, by . A. You must deliver to OWNER three (3) fully-executed counterparts of this Work Order, including all amendments or supplements to the Contract Documents incorporated herein. Each Work Order must bear your signature as provided. B. You must deliver with the executed Work Order the Contract Security (Bonds) and insurance, as specified in the Agreement, this Work Order, the General Conditions (Article 5.1) and the Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned and to annul this Work Order & Notice of Award. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully-signed counterpart of this Work Order with any amendments or supplements to the Contract Documents attached. Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 16 of 106 CONTRACTOR’S NOTICE OF AWARD REPRESENTATION & EXECUTION: CONTRACTOR agrees to perform the services identified above, in accordance with the terms and conditions contained herein and in the AGREEMENT dated , and the NOTICE OF AWARD dated , between the parties. In the event of a conflict between or ambiguity in the terms of the AGREEMENT or specific Work Orders, the AGREEMENT shall control. CONTRACTOR: By: Date: Name: Title: Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 17 of 106 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference and the attached Notice to Proceed is hereby given. ACCEPTANCE: Date: _____ , Projects Manager OWNER: CITY OF FORT COLLINS ACCEPTANCE: ___________________________________________ Date: __________ Kelly DiMartino, City Manager (if greater than $1,000,000) ACCEPTANCE: ___________________________________________ Date: __________ Gerry Paul, Purchasing Director (if greater than $60,000) APPROVED AS TO FORM: __________________________________ Date: __________ ATTEST: ___ ________________________________________ Date: __________ Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 18 of 106 BID SCHEDULE Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 2 of 106 SECTION 00530 WORK ORDER NOTICE TO PROCEED NOTICE TO PROCEED DATE: WORK ORDER TITLE: WORK ORDER NUMBER: ORIGINAL BID/RFP # & TITLE: 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project TO: Attn: This notice is to advise you: That the Work Order and all amendments and supplements to the Contract Documents covering the above described Work have been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance and Payment Bonds and insurance have been received by the OWNER. That the OWNER has approved the said Work Order and Contract Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Work Order and the AGREEMENT. The dates for Substantial Completion and Final Acceptance shall be , and , respectively. Dated this _____________ day of ___________, _____. CITY OF FORT COLLINS (OWNER) By: ___________________________________________ ___________________________________________ Name & Title ACKNOWLEDGMENT OF NOTICE Receipt of the above Work Order Notice to Proceed is hereby acknowledged this _____________ day of ___________, _____. (CONTRACTOR) By: ___________________________________________ ___________________________________________ Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 3 of 106 Name & Title Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 4 of 106 SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00651 Lien Waiver Release (SUBCONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 5 of 106 SECTION 00610 PERFORMANCE BOND Bond No __ KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , 2 , for 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled , Work Order Number , dated the day of , , a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Work Order and Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Work Order and Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 6 of 106 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _____ day of ___________, _____. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners By: By: IN PRESENCE OF: Surety By: (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 7 of 106 SECTION 00615 PAYMENT BOND Bond No __ KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , , for 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project, a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled , Work Order Number , dated the day of , , a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Work Order and Agreement and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 8 of 106 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _____ day of ___________, _____. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners By: By: IN PRESENCE OF: Surety By: (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 9 of 106 SECTION 00630 CERTIFICATE OF INSURANCE The CONTRACTOR will provide, from insurance companies acceptable to the OWNER, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this Bid, the CONTRACTOR shall furnish the OWNER with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies. In case of the breach of any provision of the Insurance Requirements, the OWNER, at its option, may take out and maintain, at the expense of the CONTRACTOR, insurance as the OWNER may deem proper and may deduct the cost of the insurance from any monies which may be due or become due the CONTRACTOR under this CONTRACT. Insurance certificates should show the certificate holder as follows: City of Fort Collins Purchasing Division PO Box 580 Fort Collins, CO 80522 The OWNER, its officers, agents and employees shall be named as additional insureds on the CONTRACTOR's general liability and automobile liability insurance policies by marking the appropriate box or adding a statement to this effect on the certificate, for any claims arising out of work performed under this CONTRACT. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The CONTRACTOR shall maintain during the life of this CONTRACT for all of the CONTRACTOR’s employees engaged in work performed under this CONTRACT. Workers' Compensation & Employer’s Liability insurance shall conform with statutory limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee, or as required by Colorado law. B. General Liability. The CONTRACTOR shall maintain during the life of this CONTRACT such General Liability as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this CONTRACT. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for General Liability, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. C. Automobile Liability. The CONTRACTOR shall maintain during the life of this CONTRACT such Automobile Liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this CONTRACT. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for Automobile Liability, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. D. Builder’s Risk. The CONTRACTOR shall maintain during the term of this CONTRACT builder’s risk insurance in the amount of full insurable replacement cost. The insurance Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 10 of 106 shall: Be written on a builder’s risk “all risk” policy form that shall at least include insurance for physical loss or damage to the Work, temporary buildings, falsework, and materials and equipment in transit, and shall insure against at least the following perils or causes of loss: fire; lightning; windstorm; riot; civil commotion; terrorism; vehicle impact; aircraft; smoke; theft; vandalism and malicious mischief; earthquake and other earth movement; flood; collapse; explosion; debris removal; demolition; and water damage (other than that caused by flood). Cover, as insured property, at least the following: (a) the Work and all materials, supplies, machinery, apparatus, equipment, fixtures, and other property of a similar nature that are to be incorporated into or used in the preparation, fabrication, construction, erection, or completion of the Work, including OWNER-furnished or assigned property; (b) spare parts inventory required within the scope of the CONTRACT; and (c) temporary works which are not intended to form part of the permanent constructed Work but which are intended to provide working access to the Site, or to the Work under construction, or which are intended to provide temporary support for the Work under construction, including scaffolding, form work, fences, shoring, falsework, and temporary structures E. Subcontractors. In the event any work is performed by a subcontractor, the CONTRACTOR shall be responsible for any liability directly or indirectly arising out of the work performed under this CONTRACT by a subcontractor, which liability is not covered by the subcontractor's insurance. F. Primary Coverage. For any claims related to the CONTRACT, CONTRACTOR’s insurance shall be primary coverage, and any insurance or self-insurance maintained by the OWNER, its officers, agents and employees shall be in excess of the CONTRACTOR’s insurance and shall not contribute with it. G. Waiver of Subrogation. CONTRACTOR will grant to the OWNER a waiver of any right of subrogation which any insurer of CONTRACTOR may acquire against the OWNER by virtue of any payment of any loss. CONTRACTOR agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the OWNER has received a waiver of subrogation endorsement from the insurer. In the event any work is performed by a subcontractor, the CONTRACTOR shall be responsible for any liability directly or indirectly arising out of the work performed under this CONTRACT by a subcontractor, which liability is not covered by the subcontractor's insurance. Services Agreement – Work Order Type 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project Page 11 of 106 SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) WORK ORDER # & TITLE: DATE OF SUBSTANTIAL COMPLETION: ORIGINAL BID/RFP # & TITLE: 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado INCLUDE: OWNER: City of Fort Collins CONTRACTOR: WORK ORDER DATE: The Work performed under this Work Order, pursuant to the Contract Documents, has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. _____________________________ By: __________________________ ________ PROJECT MANAGER AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. _____________________________ By: __________________________ ________ CONTRACTOR AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS ________ By: __________________________ ________ OWNER AUTHORIZED REPRESENTATIVE DATE REMARKS: _________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE DATE: ________________, _____ TO: Gentlemen: You are hereby notified that on the day of , , the City of Fort Collins, Colorado, has accepted the Work completed by , for the City of Fort Collins Work Order, titled , Work Order Number under 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project. A check is attached hereto in the amount of $ as Final Payment for all Work done, subject to the terms of the Contract Documents, including the Work Order, which is dated , and the AGREEMENT, which is dated . In conformance with the Work Order and Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date: ___________________, _____. Sincerely, City of Fort Collins OWNER By: ___________________________________________ ___________________________________________ Name & Title ATTEST: _________________________________________ ___________________________________________ Name & Title SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: (CONTRACTOR) WORK ORDER TITLE: WORK ORDER NUMBER: ORIGINAL BID/RFP # & TITLE: 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR's Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes an adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Signed this ______ day of __________, ___. CONTRACTOR: By: ___________________________________________ ___________________________________________ Name & Title ATTEST: _____________________________ Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this _________ day of __________, _____, by ________________________________________________________________. Witness my hand and official seal. My Commission Expires: ___________________________. _________________________ Notary Public SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: WORK ORDER # & TITLE: ORIGINAL BID/RFP # & TITLE: 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project CONTRACT DATE: WORK ORDER DATE: In accordance with the provisions of the Work Order and Contract between the OWNER and the CONTRACTOR as indicated above, for the Work Order titled on bond of , (Surety) _______________________________________ hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this _________ day of _________ _, _____. ____________________________________________ (Surety Company) By: ________________________________________ (Name) Attorney-in-Fact ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact. SECTION 00670 APPLICATION FOR EXEMPTION CERTIFICATE SECTION 00700 GENERAL CONDITIONS SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the CONTRACT These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins modifications) and other provisions of the CONTRACT Documents as indicated below. SC-1.46 Work Order A. Add the following new paragraph immediately after paragraph 1.43 of the General Conditions: 1.43 Work Order - A CONTRACT Document once executed by OWNER and CONTRACTOR, that provides for the construction of all or a portion of the Work, pursuant to the CONTRACT and CONTRACT Documents. SC-2.8 Preliminary Matters A. Delete paragraph 2.8 of the General Conditions entirely and replace it with the following paragraph: Preconstruction Conference. Within ten days after the CONTRACT Times for a Work Order start to run, but before any Work at the site is started, a conference attended by CONTRACTOR, ENGINEER and others as appropriate will be held to establish a working relationship among the parties as to the Work and to discuss the schedules referred to in paragraph 2.6, procedures for handling Shop Drawings and other submittals, processing Applications for Payment, and maintaining required records. Unless otherwise agreed by the parties, the CONTRACTOR shall be responsible for documenting the meeting minutes which shall be subject to the OWNER’S approval. SC-4.2 Subsurface and Physical Conditions: A. Add the following language to paragraph 4.2.1 of the General Conditions. 4.2.1.1.1 The following report(s) of exploration and tests of subsurface conditions at the site of the Work: None Contractor may rely upon the accuracy of the technical data contained in the geotechnical documents, but not upon nontechnical data, interpretations or opinions contained therein or upon the completeness of any information in the report. SC-5.4.7 Additional Insureds. Include the following parties or entities as additional insureds, as provided in paragraph 5.4.7 of the General Conditions: 5.4.7.1 City of Fort Collins, PO Box 580, Fort Collins, Colorado 80522 5.4.7.2 Ditesco, LLC, 2133 S. Timberline Road, Suite 110, Fort Collins, CO 80525 5.4.7.3 AECOM INC. 7595 East Technology Way, Suite 200, Denver, CO 80237 SC-5.4.8 Limits of Liability A. Add the following language at the end of paragraph 5.4.8. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed in paragraphs 5.4.1 through 5.4.10 of the General Conditions are as outlined in Section 00630 of the CONTRACT. The limits of liability for the insurance required by paragraphs 5.4.1 through 5.4.6 inclusive and requirements of 5.4.7 through 5.4.10 shall be in accordance with Section 00630 of the CONTRACT. SC-8.0 OWNER’s Responsibilities A. 8.1 Change reference to ENGINEER to PROJECT MANAGER B. Add the following language to ARTICLE 8: 8.10. The OWNER will provide a project manager (the Project Manager). The CONTRACTOR shall direct all questions concerning CONTRACT interpretation, Change Orders, and other requests for clarification or instruction to the Project Manager. 8.10.1 Authority: The Project Manager will be the OWNER's representative during the construction of the project. The Project Manager shall have the authority to reject work and materials whenever rejection may be necessary to ensure the proper performance of the Work in accordance with the CONTRACT Documents. 8.10.2 Duties and Responsibilities: The Project Manager will make periodic visits to the project site to observe the progress and quality of the Work and to determine, in general, if the Work is proceeding in accordance with the CONTRACT Documents. The Project Manager shall not be required to make comprehensive or continuous inspections to check the progress or quality of the Work. The Project Manager shall not be responsible for construction means, methods, techniques, sequences, or procedures, or for safety precautions or programs in connection with the Work, or for any failure of the CONTRACTOR to comply with laws and regulation applicable to the performance or furnishing of the Work. Visits and observations made by the Project Manager shall not relieve the CONTRACTOR of his obligation to conduct comprehensive inspections of the Work, to furnish materials and perform acceptable Work, and to provide adequate safety precautions in conformance with the CONTRACT Documents. The Project Manager shall at all times have access to the Work. The CONTRACTOR shall provide facilities for access so the Project Manager may perform his or her functions under the CONTRACT Documents. 8.10.3 One or more Construction Inspector(s) (CI) may be assigned to assist the Project Manager in providing observation of the Work, to determine whether or not the Work is proceeding according to the construction documents. CONTRACTOR will receive written notification from the OWNER of any CI assignments. The CI shall not supervise, direct or have control or authority over, nor be responsible for, CONTRACTOR's means, methods, techniques, sequences or procedures of construction or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the furnishing or performance of the Work. The CI will not be responsible for CONTRACTOR's failure to perform or furnish the Work in accordance with the CONTRACT Documents. The CI's dealings in matters pertaining to the on-site work will be to keep the Project Manager properly apprised about such matters. 8.10.4 Communications: All instructions, approvals, and decisions of the Project Manager shall be in writing. The CONTRACTOR may not rely on instructions, approvals, or decisions of the Project Manager until the same are reduced to writing. SC-11.6.2 Change of CONTRACT Price A. Add the following new paragraph to paragraph 11.6.2 of the General Conditions: 11.6.2.7. Cost of the Work. Allowances for profit, overhead and mark-up prescribed by Article 5 of the CONTRACT shall be used in lieu of any CONTRACTOR'S fee, overhead, profit or mark-up allowances as prescribed in paragraphs 11.6.2.1, 11.6.2.2, and 11.6.2.3. SC-12.3. Add the following language to the end of paragraph 12.3 of the General Conditions. No weather days have been included in the contract time. Should the Contractor be delayed due to weather, the Owner will process a Change Order extending the contract time for which the Contractor’s critical path of work has been delayed due to weather. SC-13.12 Correction Period: 13.12.1 If within two years after the date of Substantial Completion or a longer period of time as may be prescribed by Laws or Regulations or by the terms of any applicable special guarantee required by the CONTRACT Documents or by any specific provision of the CONTRACT Documents, and Work is found to be defective, CONTRACTOR shall promptly, without cost to OWNER and in accordance with OWNER’s written instructions correct the work to the acceptance of the OWNER. SC-14.1 Definitions Owner: City of Fort Collins Ditesco: Owner’s Representative and Engineer AECOM: Engineer of Record SC-CONFIDENTIALITY IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the “City”) pursuant to this CONTRACT (the “CONTRACT”), the Service Provider hereby acknowledges that it has been informed that the City has established policies and procedures with regard to the handling of confidential information and other sensitive materials. In consideration of access to certain information, data and material (hereinafter individually and collectively, regardless of nature, referred to as “information”) that are the property of and/or relate to the City or its employees, customers or suppliers, which access is related to the performance of services that the Service Provider has agreed to perform, the Service Provider hereby acknowledges and agrees as follows: That information that has or will come into its possession or knowledge in connection with the performance of services for the City may be confidential and/or proprietary. The Service Provider agrees to treat as confidential (a) all information that is owned by the City, or that relates to the business of the City, or that is used by the City in carrying on business, and (b) all information that is proprietary to a third party (including but not limited to customers and suppliers of the City). The Service Provider shall not disclose any such information to any person not having a legitimate need-to- know for purposes authorized by the City. Further, the Service Provider shall not use the information to obtain any economic or other benefit for itself, or any third party, except as specifically authorized by the City. The foregoing to the contrary notwithstanding, the Service Provider understands that it shall have no obligation under this CONTRACT with respect to information and material that (a) becomes generally known to the public by publication or some means other than a breach of duty of this CONTRACT, or (b) is required by law, regulation or court order to be disclosed, provided that the request for disclosure is proper and the disclosure does not exceed that which is required. In the event of any disclosure under (b) above, the Service Provider shall furnish a copy of this CONTRACT to anyone to whom it is required to make disclosure and shall promptly advise the City in writing of each disclosure. In the event that the Service Provider ceases to perform services for the City, or the City so requests for any reason, the Service Provider shall promptly return to the City any and all information described hereinabove, including all copies, notes and/or summaries (handwritten or mechanically produced) thereof, in its possession or control or as to which it otherwise has access. The Service Provider understands and agrees that the City’s remedies at law for a breach of the Service Provider’s obligations under this Confidentiality Agreement may be inadequate and that the City shall, in the event of any breach, be entitled to seek equitable relief (including without limitation preliminary and permanent injunctive relief and specific performance) in addition to all other remedies provided hereunder or available at law. SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Change Order 00960 Application for Payment SECTION 00950 CHANGE ORDER FORM CHANGE ORDER NO. CONTRACTOR: WORK ORDER TITLE & NO. : ORIGINAL BID/RFP # & TITLE: 10082 CM/GC Services for Joe Wright Reservoir Gate Replacement Project DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost: 4. Change in Contract Time: ORIGINAL CONTRACT COSTS $ ________________ TOTAL APPROVED CHANGE ORDER(S) $ ________________ TOTAL PENDING CHANGE ORDER(S) $ ________________ TOTAL THIS CHANGE ORDER $ ________________ TOTAL % OF ORIGINAL CONTRACT, THIS CO: _______________ % TOTAL % OF ORIGINAL CONTRACT, ALL CO’S: _______________ % ADJUSTED CONTRACT COST $ ________________ _________________ (Assuming all change orders approved) ACCEPTED BY: _____________________________________ DATE: ____________ Contractor's Representative ACCEPTED BY: _____________________________________ DATE: ____________ Project Manager REVIEWED BY: _____________________________________ DATE: ____________ Title: APPROVED BY: _____________________________________ DATE: ____________ Title: APPROVED BY: _____________________________________ DATE: ____________ (Purchasing Agent if > $60,000) cc: City Clerk Architect/Engineer Finance Purchasing Project Manager Contractor SECTION 00960 PAYMENT APPLICATION Section 00960 APPLICATION FOR PAYMENT PAGE 1 OF 4 OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER: APPLICATION DATE: PERIOD BEGINNING: ENGINEER: CONTRACTOR: PERIOD ENDING: PROJECT NUMBER: CHANGE ORDERS Application is made for Payment as shown below in connection with Contract NUMBER DATE AMOUNT The present status of the account for this Contract is as follows: 1 2 Original Contract Amount: 3 Net Change by Change Order: Current contract Amount: $0.00 Total Completed and Stored to Date: Less Previous Applications: Amount Due this Application - Before Retainage: $0.00 Less Retainage: Net Change by Change Order $0.00 AMOUNT DUE THIS APPLICATION: $0.00 CERTIFICATION: The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with the Work have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract. The above Amount Due This Application is requested by the CONTRACTOR. Date: By: Payment of the above Amount Due This Application is recommended by the ENGINEER. Date: By: Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager. Date: By: Payment of the above Amount Due This Application is approved by the OWNER. Date: By: CONTRACT AMOUNTS APPLICATION FOR PAYMENT PAGE 2 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Numbe Description Quantity Units Unit Price mount Qty. mount Qty. mount Qty. mount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CHANGE ORDERS PPLICATION FOR PAYMENT PAGE 3 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Numbe Description Quantity Units Unit Price mount Qty. mount Qty. mount Qty. mount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS CHANGE ORDERS $0.00 $0.00 $0.00 $0.00 $0.00 PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 STORED MATERIALS SUMMARY PAGE 4 OF 4 On Hand Received Installed On Hand Item Invoice Previous This This This Numbe Numbe Description pplication Period Period pplication $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00