Loading...
HomeMy WebLinkAboutAddendum 1 - RFP - 9942 Parking Demand Study ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of RFP 9942: Parking Demand Study OPENING DATE: 3:00 PM (Our Clock) October 16, 2024 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Questions and Answers Please contact Ed Bonnette, C.P.M., CPPB, Senior Buyer, at ebonnette@fcgov.com or (970) 416-2247 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE PROPOSAL STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 1 of 102 Exhibit 1 Questions and Answers 1)Is there a budget for this effort or special set-aside/allocation within the City's current operating budget? Answer: Yes- Parking Services has received appropriations from City Council. Therefore, local funds will be used for this study. 2)What are the defined boundaries of the study area? Answer: Primarily the downtown area, map attached, however, the study will likely include the Residential Parking Permit Areas around Colorado State University, map attached, and some of the Travel Demand Management surface parking lots along the MAX transit route. 3)Can we get copies of a) the City's Public Engagement Guidelines, b) the most recent Parking & Travel Habits Survey, and c) a map of their RP3 zones and associated regulations? Answer: a) There is a pending update to the City’s Practical Guide to Inclusive Community Engagement, b) likely- I will need to confirm with the Downtown Development Authority prior to sharing, and c) attached. 4)Has the City undertaken a study of this scale before and if so, when was it performed and by whom? Answer: Yes: o 2013-Parking Plan: Downtown and Surrounding Neighborhoods https://www.fcgov.com/planning/pdf/parking-plan.pdf?1382479486 o 2017-Downtown Plan https://www.fcgov.com/planning/downtown/pdf/2017_0322_DowntownPlan_appen dices_8.5x11.pdf with a robust parking section o 2019-Transit Master Plan https://fcgov.com/cityplan/files/transit-plan.pdf with a touch on parking 5)What does "TBL" stand for and does the City have an established sustainability/TBL policy and/or metrics? Answer: TBL stands for Triple Bottom Line of Environmental, Economic, and Social sustainability. https://www.fcgov.com/planning/pdf/appendix_f_triple_bottom_line_analysis.pdf 6)There does not appear to be anything in the RFP regarding schedule? Does the City have any expectations and/or critical deadlines to consider when developing a proposed schedule? Answer: The goal is to present recommendations and an implementation plan to City Council in the fall of 2025. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 2 of 102 7)Does the City have an opinion/reservations on the use of aerial drones to augment data collection? Answer: Confirming allowance. Questions 8-11 pertain to "Condition assessment of existing assets, i.e.- parking structures, to determine appropriate pricing model and use to support regularly and ongoing maintenance to ensure safe use and prolong usability of these assets." Can the City please confirm: 8)If we are providing structural and waterproofing assessment for the parking garage? Answer: More of an assessment to prolong life span, which includes a pricing assessment to fund regular and ongoing maintenance, and to provide a set-aside reserve balance. 9)If we are providing structural and waterproofing assessment for the parking garage to understand current maintenance and repair items? Answer: The City conducts a five-year condition assessment, with CCPS and OTPS wrapping up deferred maintenance this year. The CCPS and OTPS condition assessments were conducted in 2019, the FAPS condition assessment was conducted in 2024. 10)Is the parking garage assessment scope portion intended to only identify parking rates within the structures? Answer: To identify the appropriate rates in relation to on-street paid parking rates, to ensure maintenance needs may be met. 11)Has the City conducted assessments/repairs on the parking structures previously? If so, when? Can you please share those reports? Answer: CCPS and OTPS- 2019. FAPS – 2024 (attached). 12)Can you please confirm if the City intends to not do in-person interviews? Please clarify interview intentions. Answer: If the City should happen to short-list vendors for an oral interview round, it will be conducted virtually via Microsoft Teams. 13)Can you please clarify if/how much assessment/development of recommendations for parking technology will be part of this scope? Answer: The parking methodology is a focus of this study, to include recommendations to bring forward to Council for implementation. Recommendations in this arena would benefit the purpose of the study. Questions 14-15 pertain to "Consultant coordination with City staff and Downtown Development Authority (DDA) for related issues like parking code revisions, curbside management." Can the City please confirm: 14)Could the City clarify what the intended request of the chosen qualified Professional is with respect to parking code revisions? Answer: Parking Code revisions- more aligned with any adjustments made to our model Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 3 of 102 and any applicable Code update recommendations that may be required to support said changes. 15)Does the City expect the Professional to propose word-for-word markup and amendments to Code language itself or is the City simply looking for recommended Code-related strategies and solutions? Answer: No- the City will draft applicable Code updates/changes, recommendations only, including adjusted/scalable fine(s) for repeat and/or social behavior violations; such as parking in a bicycle lane or in a crosswalk. 16)Would the City like the consultant to prepare a data collection plan as part of this project? Answer: Yes – the City has Data Analysts but would like direction for a data collection plan. 17)Does the City have the parking space inventory by block face for the Downtown area? Answer: Yes. 18)Can the City provide a map of the study area or confirm the boundaries? If available, is there a list of off-street locations the City would like data for? Answer: Attached- Downtown Parking map and Residential Parking Permit zones around Colorado State University. Off-street would consist of City managed parking structures and surface lots; including surface parking lots along the MAX transit route. 19)What parking data will be available to the selected consultant? Have there been previous data collection efforts and when? Answer: Yes- Parking has captured a few (summer 2020, summer 2021, spring 2023, summer 2023, and spring 2024) point-in-time parking studies for block face occupancy, duration of stay, and unique user. 20)We understand that the City manages public parking for three garages and five surface lots. Does that city have a capital improvement plan (and/or budgets for deferred maintenance) for its public parking assets? Answer: Yes- the City conducts a five-year condition assessment, with CCPS and OTPS wrapping up deferred maintenance this year. The FAPS condition assessment was conducted in 2024. Parking Services does have set-aside annual funding for each structure. Operation Services assesses surface lot maintenance needs and, depending on responsible party, will notify Parking Services of planned maintenance, for funding approval. 21)When was the most recent condition assessment completed for each facility? Answer: CCPS and OTPS- 2019. FAPS – 2024 (attached) 22)Should the consultant team provide a scope and budget to complete condition assessment for these facilities, or is this task item looking for more general best practices on appropriate budgets for capital improvements? Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 4 of 102 Answer: More of an assessment to prolong life span, which includes a pricing assessment to fund regular and ongoing maintenance, and to provide a set-aside reserve balance. 23)Did the DDA conduct a Travel Habit survey in 2024? Answer: The DDA conducted a 2023 Downtown Fort Collins Parking & Travel Habits Survey. 24)Will past survey results be made available to the consultant team? Answer: Confidently, yes- I will need to confirm with the Downtown Development Authority prior to sharing. 25)Are there other survey tools or models (FC Moves, Transportation Master Plan, NFRMPO travel demand model, CDOT forecasting, etc) that we should anticipate utilizing to inform this task? Answer: The City has quit a few completed study’s. Some specific to Parking Services: o 2013-Parking Plan: Downtown and Surrounding Neighborhoods https://www.fcgov.com/planning/pdf/parking-plan.pdf?1382479486 o 2017-DowntownPlan https://www.fcgov.com/planning/downtown/pdf/2017_0322_DowntownPlan_appen dices_8.5x11.pdf with a robust parking section o 2019- Transit Master Plan https://fcgov.com/cityplan/files/transit-plan.pdf with a touch on parking 26)Does the City currently utilize any subscription-based services (Streetlight or similar) that track origin and destination information? Answer: Not in Parking Services. 27)Will Transfort be included in the stakeholder/Steering Committee and how will public transportation ridership data be incorporated into this study? Answer: Stakeholder/Committee member groups will be discussed. For TDM information Transfort ridership may be useful; including surface parking lots along the MAX transit route. 28)What other organizations / departments will be part of the stakeholder / Steering Committee group? Answer: Stakeholder/Committee member groups will be discussed- however; the DDA has a good network of downtown businesses who will be included. 29)Does the City have a budget for this project? Answer: Yes- Parking Services has received appropriations from City Council. Therefore, local funds will be used for this study. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 5 of 102 CIVIC CENTER PARK LEE MARTINEZ COMMUNITY PARK LIBRARY PARK WASHINGTON PARK OLD FORT COLLINS HERITAGE PARK OAK ST PLAZA PARK BUCKINGHAM PARK E Laurel St E Myrtle St E Plum St Locust St E Elizabeth St Isotope Dr Maple St Ma t h e w s S t Sycamore St N W h i t c o m b S t N S h e r w o o d S t Wh e d b e e S t Sm i t h S t W Myrtle St W Olive St W Oak St Old Main Dr E Oak St ri d i a n A v e Ea s t D r S M a s o n S t N M e l d r u m S t W Plum St Ct Re m b r a n d t D r S M e l d r u m S t N L o o m i s A v e E Mulberry St Laporte Ave W Laurel St W Mulberry St Re m i n g t o n S t N M a s o n S t N College Ave  GUSTAV SWANSON NATURAL AREA UDALL NATURAL AREA PO U D R E T R A I L PO U D R E T R A I L POU D R E T R A I L POU D R E T R A I L POU D R E T R A I L POU D R E T R A I L POUDRE TRAILPOUDRE TRAIL Oak St N LEE MARTINEZ COMMUNITY PARK CIVIC CENTER PARK COLORADO STATE UNIVERSITY OLD FORT COLLINS HERITAGE PARK UDALL NATURAL AREA GUSTAV SWANSON NATURAL AREA PO U D R E R I V E R BUCKINGHAM PARK LIBRARY PARK OLD T O W N S Q U A R E OAK ST PLAZA PARK MUSEUM OF ART MULBERRY POOL OLD TOWN LIBRARYCARNEGIE CENTER FORCREATIVITY THE LINCOLN CENTER UNITED STATES POSTAL SERVICE WASHINGTON PARK 215 LOT CIVIC CENTER PARKING STRUCTURE MUSEUM OF DISCOVERY DOWNTOWN TRANSIT CENTER CITY HALL OLD TOWN PARKING STRUCTURE FIREHOUSE ALLEY PARKING STRUCTURE CIVIC CENTER PARKING STRUCTURE OLD TOWN PARKING STRUCTURE FIREHOUSE ALLEY PARKING STRUCTURE MASON LOT OAK/ REMINGTON LOT OLIVE LOT JEFF E R S O N L O T CITY HALL LOT Co l l e g e A v e Co l l e g e A v e Co l l e g e A v e Co l l e g e A v e Ma s o n S t Ma s o n S t Rive r s i d e A v e Rive r s i d e A v e Mountain AveMountain Ave Mulberry StMulberry St Ma s o n S t Me l d r u m S t Me l d r u m S t Lo o m i s A v e Ho w e s S t Me l d r u m S t Lo o m i s A v e Wh i t c o m b S t Sh e r w o o d S t Ho w e s S t Wh i t c o m b S t Sh e r w o o d S t Ho w e s S t Co l l e g e A v e Re m i n g t o n S t Ma t h e w s S t Pe t e r s o n S t Wh e d b e e S t Sm i t h S t Re m i n g t o n S t Oak St Olive St Can y o n A v e Olive St Cherry St Maple St Laporte Ave Mountain Ave Waln u t S t Je e r s o n S t Willo w S t Lind e n S t Pou d r e S t Linc o l n A v e Che s t n u t S t Mulberry St Magnolia St Magnolia St Myrtle StMyrtle St Laurel StLaurel St DOWNTOWN PARKING MAP F O R T C O L L I N S Rev. 04-10-2023 22-23999 15-30 min 1 hr 2 hr Permit Only School Zone No Parking Parking Structure RESTRICTEDPARKING ParkingLot DowntownTransit Center RP3 Zones - Permit Required Old TownSquare MAXStations MAX Residential Parking Only 2-Hour Parking Permitted Walking Area (All city lots and structures have accessible spaces) Lots/Structures Cost & Restrictions •Civic Center Parking Structure: $1/hr., permit •Old Town Parking Structure: $1/hr., permit •Firehouse Alley Parking Structure: $1/hr., permit, hotel •Jeerson Lot: 2 hr., Permit •Oak/Remington Lot: 2 hr., Permit •Olive Lot: Permit •Mason Lot: $1/hr., Permit •215 Mason Lot: 2 hr. •City Hall Lot: 2 hr. Accessible Parking Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 6 of 102 COLORADO STATE UNIVERSITY SPRING PARK ROLLAND MOORE COMMUNITY PARK CITY PARK Columbia Rd N Gr a n t Av e HarvardSt Rutgers Ave Sc o t t A v e E Laurel St St o v e r S t E Stuart St City Park Ave Baystone Dr E Magnolia St E Lake St ShireCt Gilgalad Way Purdu e Cir Che s t n u t St Wate r s Edg e E Myrtle St E Pitkin St HillPondRd Worthington Cir Sm i t h S t Akin Ave Ma t h e w s S t E Olive St S M a c k S t Juniper Ln AlpertCt E Villanova Ct Wind Trl Ly o n s St BungalowCt W Myrtle St N M a c k St Alpert Ct W W Oak St Perennial Ln W Pitkin St Spring Creek Ln Ja c k s o n A v e University Ave S Loomis Ave S W h i t c o m b S t Pe a r l St W Stuart St Johnson Dr DartmouthTrl VillageParkCt City ParkDr Ci r c l e D r Deines Ct Newsom St Sunset Ave RollandMoore Dr Shadowmere Ct Pe r s o n C t Crestmore Pl Yale Way Br a i d e n Dr Stanford Rd Spring Park Dr EvenstarCt W Lake St Merid ianAve Bay Dr W Mountain Ave YaleAve W Plum St WestwardDr Alpert Ave S M e l d r u m S t S S h e r w o o d S t Duke Ln HobbitSt Wa g n e r Dr Booth Rd Lincoln Ave El l i s D r Lo y o l a Av e Fa i r v i e w D r Phemister Rd LakesideAve Pe t e r s o n Pl Mo b y D r CanyonAve Je n s e n Rd FreedomLn Brown Ave Research Blvd Cross Rd Raintree Dr Hughes Way Birky Pl Cornell Ave Bennett Rd HeritageCir W Prospect Rd He a t h e r i d g e Rd Bay Rd Tulane Dr Waln u t St Sheely Dr Oval Dr Pe t e r s o n S t Purdue R d S Mason St Ma t h e w s S t Gillette D r PioneerAve Ly n n w o o d D r WinfieldDr Sheldon Dr CentreAve Duke Sq Center Avenue Ml Max Guideway Ukiah Ln Ch o i c e Ce n t e r Dr Torino Cir NativePlantWay Wallenberg Dr S W a s h i n g t o n A v e E Oak St E Mulberry St E Plum St Garfield St E Elizabeth St Edwards St Mo n t e z u m a Fu l l e r A l y W Olive St Wh e d b e e S t Ce n t e r Av e PROSPECT RIVE R S I D E MULBERRY MOUNTAIN LAUREL MA S O N HO W E S ELIZABETH CO L L E G E SH I E L D S RE M I N G T O N Zone 1 Zone 2 Zone 4 Zone 5 Zone 6 Zone 7 Zone 8 Zone 9 Zone 10 Zone 12 Residential Parking Permit Program (RP3) CITY OF FORT COLLINS GEOGRAPHIC INFORMATION SYSTEM MAP PRODUCTS These map products and all underlying data are developed for use by the City of Fort Collins for its internal purposes only, and were not designed or intended for general use by members of the public. The City makes no representation or warranty as to its accuracy, timeliness, or completeness, and in particular, its accuracy in labeling or displaying dimensions, contours, property boundaries, or placement of location of any map features thereon. THE CITY OF FORT COLLINS MAKES NO WARRANTY OF MERCHANTABILITY OR WARRANTY FOR FITNESS OF USE FOR PARTICULAR PURPOSE, EXPRESSED OR IMPLIED, WITH RESPECT TO THESE MAP PRODUCTS OR THE UNDERLYING DATA. Any users of these map products, map applications, or data, accepts them AS IS, WITH ALL FAULTS, and assumes all responsibility of the use thereof, and further covenants and agrees to hold the City harmless from and against all damage, loss, or liability arising from any use of this map product, in consideration of the City's having made this information available. Independent verification of all data contained herein should be obtained by any users of these products, or underlying data. The City disclaims, and shall not be held liable for any and all damage, loss, or liability, whether direct, indirect, or consequential, which arises or may arise from these map products or the use thereof by any person or entity. Printed: June 12, 2019 ³ Do c u m e n t P a t h : \ \ c s . c i t y . f c g o v . c o m \ c i t y \ D e p t \ P D T \ T r a n s f o r t \ S H A R E D \ S R V D E V \ P A R K I N G \ R P 3 \ M a p s \ Z o n e m a p s \ I m p l e m e n t a t i o n \ W o r k i n g \ T e m p l a t e s \ F C G o v _ P o r t r a i t 2 . m x d 0 0.25 0.50.125 Miles Student Parking Zone 3 Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 7 of 102 Civic Center Parking Garage Structural Condition Assessment 120 NORTH MASON STREET FORT COLLINS, COLORADO 80524 Prepared for: Mark McLean City of Fort Collins – Operations/Parking Services 300 West Laporte, Building B Fort Collins, Colorado 80521 April 11, 2019 Martin/Martin, Inc. Project No.: 18.0400.S.01 MARTIN/MARTIN, INC. 12499 West Colfax Avenue Lakewood, Colorado 80215 303.431.6100 Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 8 of 102 TABLE OF CONTENTS SECTION 1: EXECUTIVE SUMMARY ............................................................................................... 1 SECTION 2: FACILITY INFORMATION ............................................................................................ 3 Narrative of Structured Areas Reviewed .............................................................................................. 3 Information Provided by Client ............................................................................................................. 4 Table 2.1: Structurally Supported Parking Characteristics ................................................................... 5 SECTION 3: REPAIR RECOMMENDATIONS AND PHOTOS ............................................................... 6 Immediate Repair Needs (Less than 1 Year) ......................................................................................... 6 Critical Repair Needs (Within 24 Months) ............................................................................................ 7 Critical Repair Photos ............................................................................................................................ 7 Preventive Repair Needs (2 Years to 5 Years)..................................................................................... 18 Preventive Repair Photos.................................................................................................................... 18 SECTION 4: ANTICIPATED REPAIR COSTS .................................................................................... 29 Cost Opinion Assumptions .................................................................................................................. 29 Immediate Repair Construction Cost Estimate .................................................................................. 30 Table 4.1 – Immediate Repair Construction Cost ............................................................................... 30 Critical Repair Construction Cost Estimate ......................................................................................... 31 Table 4.2 – Critical Repair Construction Costs .................................................................................... 31 Preventive Repair Construction Cost Estimate ................................................................................... 33 Table 4.3 – Preventive Repair Construction Cost ............................................................................... 33 SECTION 5: PREVENTIVE MAINTENANCE RELATED PHOTOS AND DESCRIPTIONS ......................... 34 Needed Maintenance Photos ............................................................................................................. 34 SECTION 6: LIMITATIONS ........................................................................................................... 35 Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 9 of 102 April 11, 2019 SECTION 1: EXECUTIVE SUMMARY We have completed our condition assessment of Civic Center Parking Garage, located at 120 North Mason Street in Fort Collins, Colorado. The purpose of our assessment was to evaluate the current condition of the garage’s structural and waterproofing systems and to provide recommendations for repair and maintenance items to be addressed. Our findings, which include observations and repair recommendations with photographs and preliminary opinion of costs are provided in the sections below. Review of the attached retail and office space at the west side of the structure at Mason Street are outside the scope of this report. The parking garage is in good condition. There are some areas where routine maintenance is needed to maintain the integrity and prolong the useful service life of the structure. We did not identify areas that would be classified as an immediate life safety concern. Martin/Martin, Inc. previously completed a condition assessment in August 2013, with subsequent repairs taking place between 2014 and 2018. This repair history was used as reference in our development of recommendations for ongoing. repair. The recent completion of the five-year repair and maintenance program has established an improved baseline level of integrity to reduce future repair costs. We present our repair recommendations for work to be completed in three time-periods: 1) Immediate repair conditions to be addressed within 12 months, 2) Critical repair conditions to be addressed between within 24 months, and 3) Preventive repair conditions to be addressed between 24 months and 60 months. Summaries of the Immediate and Critical recommendations are listed below. Immediate Repair and Life Safety Concerns 1. No immediate repair items were identified. Critical Structural and Waterproofing Concerns 1. Deteriorated concrete stair treads and landings. 2. Loose brick masonry on west and north façade 3. Deteriorated overhead and vertical concrete. 4. Leaking joints and cracks. 5. Spalling and delaminated concrete slabs. 6. Worn traffic coating on levels 4 & 5 inverted tee beams 7. Deteriorated vertical joint sealants at interior face level 4 and 5 column-to-spandrel joints 8. Metal deck deterioration at pedestrian bridge 9. Precast infill panel damage 10. Tee-to-tee flange connection failure 11. Fireproofing concerns. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 10 of 102 Civic Center Parking Garage April 11, 2019 P a g e 2 | 35 The anticipated construction cost for the three repair categories are as follows:  Immediate - Less than 12 months: $0  Critical - Within 24 months: $149,000  Preventive - 24 to 60 months: $310,000 The remaining report sections include facility-specific information, photos, descriptions of the observations, and a list of preventative maintenance items. All the recommendations should be completed within the timeframe for each category to properly maintain the structure and prolong the useful service life of the structure. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 11 of 102 Civic Center Parking Garage April 11, 2019 P a g e 3 | 35 SECTION 2: FACILITY INFORMATION Narrative of Structured Areas Reviewed The Civic Center Parking Garage is approximately 393 feet in the north-south direction and 180 feet in the east-west direction and contains five levels of parking. Retail and office storefront are integral with the garage on the west side of Level 1 along North Mason Street. The primary structural system for the garage consists of precast double-tee members supported on precast inverted tee beams, double L-beams, and walls at the interior, and precast spandrel beams and walls at the exterior. There are both 10-foot and 8-foot wide by 24-inch deep pre-topped precast double tees with an approximate 4-inch flange thickness. Precast beams are supported on precast concrete columns down to the foundation. The bottom floor of the garage is a concrete slab-on-grade. The lateral force resisting system for the garage consists of precast concrete shear walls in both orthogonal directions. The foundations for the garage are drilled concrete piers bearing on bedrock. Ramping for vehicle travel between levels occurs internal to the garage at the east structural bay. The garage is terraced between Levels 4 and 5 where level 5 excludes the west and northmost structural bays. The garage is bounded by Laporte Avenue on the north, North Mason Street on the West, and service alleys on the east and south. Vehicle entrances and exits to Level 1 are located off Laporte Avenue from the north, and near the southwest corner from North Mason Street. Stairs between all levels are located at the northwest, southwest, and southeast corners. Stairs are cast-in-place concrete treads and landings. Elevators are located adjacent to the northwest and southeast stair. There is a steel framed pedestrian bridge with concrete slab-on-metal deck from Level 2 at the southeast corner of the garage which connects to an adjacent building to the East. There is also a steel framed awning over the Level 1 entry from North Mason Street at the southwest corner. Typical Roof Level 4/5 Parking Typical Interior Parking Ground Level Vehicle Entrance at Southwest With West Elevation East Elevation Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 12 of 102 Civic Center Parking Garage April 11, 2019 P a g e 4 | 35 Information Provided by Client Martin/Martin, Inc. staff performed a condition assessment of the parking structure on January 9, 2019. Craig Racey, PE, and Benjamin Estrich, PE, SE, were on-site for the assessment. The weather at the time of visit was partly cloudy and cold, with temperatures between 20°F and 30°F. There was minimal snow piled on the deck at the time of our visit. We also had a discussion with Jerimiah from the City maintenance staff who was on-site for other work in the garage. He directed to us several joints between double tees that are actively leaking. During our evaluation period, we reviewed the following documents to assist us in understanding the existing structural and waterproofing characteristics of the structure:  Original Structural and Architectural Drawings, dated March 29, 2000, by Walker Parking and Fentress Bradburn. Martin/Martin, Inc. has provided structural engineering services related to the garage beginning in 2013. Below is a list of the assessments and documents reviewed as part of this work.  2013 Structural and Waterproofing Condition Assessment.  2013 Emergency Repair Engineering Analysis and Documents.  2014 Construction Documents for Level 4 and Level 5 repairs.  2014 Construction Administration field reports which generally include Level 5 repairs.  2015 Construction Administration field reports which generally include Levels 4 and 5 repairs.  2016 Construction Documents for Level 2, Level 3, and the pedestrian bridge repairs.  2016/2017/2018 Construction Administration field reports for the 2016 Construction Documents. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 13 of 102 Civic Center Parking Garage April 11, 2019 P a g e 5 | 35 Table 2.1: Structurally Supported Parking Characteristics Item The Quadrant Parking Garage Comments Year Constructed Approximately 2000 Parking Area (Approximate) Level 2 – Structured Parking 71,000 ± S.F. Level 3 – Structured Parking 71,000 ± S.F. Level 4 – Structured Parking 71,000 ± S.F. Level 5 – Structured Parking (Roof Level) 22,700 ± S.F. Total 285,950 ± S.F. includes both roof and covered parking. Level 1 includes the loading dock but not retail. inverted tee beams, double L-beams, walls, spandrels, and columns. for detailed description. bearing waterproofing membrane (traffic coating) installed over the retail space, south-side parking office, and mechanical room below the ramp. Levels 4 and 5, where exposed to sky, have a traffic coating installed on the slab over the precast concrete inverted tee beams. Joint sealants are installed in the slabs between the precast double tees and inverted tee beams. Cove joint sealants are installed at the transition from the double tees to the concrete walls, spandrels, and columns. towers, separating them structurally from the garage structure. parking areas. structural drawings. corner. corner, and one at the southeast corner. and southwest stairs are enclosed at the roof level. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 14 of 102 Civic Center Parking Garage April 11, 2019 P a g e 6 | 35 SECTION 3: REPAIR RECOMMENDATIONS AND PHOTOS Immediate Repair Needs (Less than 1 Year) Immediate repairs are those required to occur as soon as possible to reduce the hazard of collapse, loss of life/serious harm, or significant structural damage. No immediate repairs were observed. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 15 of 102 Civic Center Parking Garage April 11, 2019 P a g e 7 | 35 Critical Repair Needs (Within 24 Months) Critical repairs are those required to address structural serviceability concerns and other crucial items that are not considered to be immediate life safety issues. They are noted within this category when conditions are such that Martin/Martin, Inc. recommends repairs be performed within 24 months of the report date. Photos and descriptions of the Critical Repair recommendations are included below. Critical Repair Photos Photo 1 Photo 2 Photo 3 landings are experiencing spalling and delamination, especially at the perimeter edges. As the concrete deteriorates it may become a hazard to vehicles in the alley below or pedestrians. There is evidence that spalling has already occurred in some isolated locations. The deteriorated concrete surfaces should be repaired using partial depth concrete repair methods. Exposed reinforcing steel that is corroded should be observed for section loss requiring structural strengthening. Penetrations of the vertical metal handrail posts into the surrounding concrete should be sealed against moisture intrusion with silicone sealant. It may be necessary to remove concrete surrounding the posts to observe and clean corrosion from the metal post and install a protective coating. Depending on the condition of the embedded section of guardrail posts, it may be necessary to replace or strengthen the posts. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 16 of 102 Civic Center Parking Garage April 11, 2019 P a g e 8 | 35 Photo 4 Photo 5 northwest stair treads and landings are experiencing spalling, scaling, and deterioration. The deterioration is likely a result of freeze-thaw damage and the use of deicing chemicals. We recommend installing a heavy-duty pedestrian traffic coating to the concrete stair top and side surfaces. This does not include installation over the architecturally exposed features on the northwest stair as those areas appear in good condition. A drip edge should be created at the underside of the slab to shed moisture off the concrete surfaces and help prevent further deterioration. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 17 of 102 Civic Center Parking Garage April 11, 2019 P a g e 9 | 35 Photo 6 Photo 7 Photo 8 Photo 9 Areas of the architectural façade along the east, south, and north elevations have locations of loose or damaged brick occurring at the interface of the brick to the underside of steel lintels. It appears a gap was originally intended between the brick and steel lintel acting as a control joint filled with sealant. That gap is non-existent in these locations which is causing the steel lintel to contact the bricks below. The result is the surrounding brick has shifted, cracked, and split. This condition can be a potential hazard if the bricks become loose and fall to the sidewalk below. We recommend removing the bricks in these locations, cutting the bricks to re-establish the gap between brick and steel lintel, and reinstalling them back into place with new mortar and joint sealant. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 18 of 102 Civic Center Parking Garage April 11, 2019 P a g e 10 | 35 Photo 10 Photo 11 Photo 12 delamination of concrete surfaces is noted in some areas. The typical areas are adjacent to embedded steel connections in the precast members, at Level 5 stub columns, and in isolated locations around the Level 5 walls, likely at lifting points for the precast construction. These areas should be addressed using partial depth concrete repair methods, and the new repair material painted to match the surroundings where applicable. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 19 of 102 Civic Center Parking Garage April 11, 2019 P a g e 11 | 35 Photo 13 Photo 14 Photo 15 areas where cast-in-place concrete infill are installed. This occurs over precast inverted tee beams, over L-beams, and adjacent to the corner stairs on most levels. The original structural drawings show reinforcing steel being concentrated in these areas. Subsequent corrosion of embedded reinforcing steel or too little concrete cover can leave them prone to deterioration. Deteriorated concrete should be repaired using partial depth concrete repair methods. Joint sealants should be replaced in the vicinity of the beams as part of this repair process. We also recommend installing traffic coating over these areas, which is further discussed in the next item Photo 16 tee (IT) beams and L-beams on the exposed roof portions of Levels 4 and 5 are topped with a polyurethane traffic coating that is worn and at the end of its useful service life. Other levels are not coated in these areas. We recommend replacing the traffic coating over the width of the beams using a heavy-duty polymer-based coating. Due to the increased concrete deterioration occurring at these locations relative to other garage slab surfaces, and their susceptibility to future deterioration, we also recommend installing a traffic coating system infill slabs adjacent to the stairs on all levels, and over beams on Levels 2 and 3. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 20 of 102 Civic Center Parking Garage April 11, 2019 P a g e 12 | 35 Photo 17 Photo 18 Photo 19 double tees in isolated locations of the exposed roof Levels 4 and 5. Some sealants are visibly damaged or have lost adhesion to the concrete substrate, whereas others appear as streaks and stains on the painted overhead surfaces. Some surface staining may have occurred prior to the joint sealant installation in 2014. Jerimiah with the City maintenance staff pointed out several joints that he was aware were actively leaking during rain or snow events. Leaking or deteriorated joint material should be removed and replaced with new silicone sealants. Due to the joints having been installed in 2014, we expect that moist joints are still in serviceable condition overall and do not require replacement over the entire level. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 21 of 102 Civic Center Parking Garage April 11, 2019 P a g e 13 | 35 Photo 20 Photo 21 Slab cracks are visible in some area that are either unfilled with sealant, have deteriorated sealant, or are leaking when observed from below. We recommend replacing crack sealants that have failed and routing and sealing slab cracks greater than 1/16" in width. Photo 22 Spalling and delamination are occurring in isolated areas of the double tee flange top surfaces. These areas should be repaired using partial depth concrete repair methods. Joint sealants in the vicinity of the repair may need to be replaced as part of this work. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 22 of 102 Civic Center Parking Garage April 11, 2019 P a g e 14 | 35 Photo 23 Photo 24 Photo 25 perimeter stub columns and adjacent spandrel at the interior face of spandrel are deteriorated on roof Levels 4 and 5. Additionally there are several instances of failed vertical joint sealants in other isolated locations. The deteriorated joints at the interior face of spandrel on level 4 and 5 appear to be much older than the joint sealants at the exterior, which are in good condition and appear to have been recently replaced. From review of the 2015 repair drawings prepared by Martin/Martin, it appears these vertical joints at level 4 and 5 stub columns were intended to be replaced with the previous exterior joint sealant work. That work does not appear to have been performed, and the Client may want to discuss this item with the Contractor as a potential warranty request. If not replaceable under warranty, we recommend removing and replacing all remaining deteriorated vertical joint sealants. A cost for this work is provided in the cost estimates. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 23 of 102 Civic Center Parking Garage April 11, 2019 P a g e 15 | 35 Photo 26 Photo 27 A vertical expansion joint seal adjacent to the southeast elevator tower at Level 4 is deteriorated and at the end of its useful service life. Similar to the previous item, this joint may have been intended to be replaced as part of the recent repairs and was overlooked by the contractor. The Client may want to discuss this item as a potential warranty repair with the Contractor. If not replaceable under warranty, we recommend this joint material be replaced with an expansion joint suitable for vertical applications. A cost for this work is provided in the cost estimates. Photo 28 Photo 29 The pedestrian bridge at the southeast corner of Level 2 has signs of corrosion at the underside of the metal deck supporting the concrete slab, especially near the northwest corner. This bridge is currently under repair to seal the concrete slab surface against future moisture intrusion and clean corrosion from the metal deck for a protective coating application. It is our understanding the Contractor performing the work is going to clean and paint these surfaces in the weeks following our site observation. The corrosion damage does not appear to be a structural integrity issue currently, and the bridge repairs are meant to address further moisture intrusion. These areas should be regularly monitored by qualified staff for continued deterioration which might require structural strengthening. No cost associated with repair is included at this time. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 24 of 102 Civic Center Parking Garage April 11, 2019 P a g e 16 | 35 Photo 30 Photo 31 Photo 32 spandrels are significantly cracked and damaged, possibly as a result of vehicle impact or the panels not having adequate movement capability between the spandrels. These precast concrete infill panels are to be attached to the top of exterior spandrels, possibly braced at the top to the underside of the spandrel above and appear to be non- load bearing architectural elements. We recommend repairing the infill panels using concrete repair methods. Depending on the depth of damage, it may be necessary to partially rebuild the panels. The top of the panels may need to be exposed to determine the connection details and provide release to the panels if they are improperly connected between the spandrel panels. Photo 33 Several openings placed through concrete shear walls as a flow path for topping slab drainage channels are deteriorated or not properly sealed against moisture intrusion. We recommend performing concrete or epoxy repair and installing sealants in the joints at these openings since they are subject to constant moisture as water flows to drain. We also recommend installing a traffic coating to the topping surface through the opening to provide an extra level of durability. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 25 of 102 Civic Center Parking Garage April 11, 2019 P a g e 17 | 35 Photo 34 Photo 35 Double tee supplemental flange-to-flange connections appear to be installed improperly at one tee-to-tee joint on Level 2. The connections appear to be carbon fiber biscuit type repairs. The biscuits appear to have possibly lost bond to the surrounding concrete due to observed cracking in the surrounding epoxy material. The joint “clunks” as vehicle travel above which is an indication of inadequate or broken joint connections. Additionally, the biscuits are not recessed below the joint sealant which can allow moisture intrusion. We recommend cutting the existing biscuits down to below the joint sealant, installing new supplemental flange connections to re-establish adequate load transfer across the joint, and replacing the joint sealant. Photo 36 Fireproofing does not appear to be installed on several steel haunch supports at the underside of Level 2 along the interior concrete wall opposite the retail divider concrete masonry (CMU) wall. It is possible the paint is acting as an intumescent coating, but further investigation is needed. We recommend investigating these connections to verify if existing fireproofing is installed. If unprotected, a spray or paint-applied fireproofing should be applied to the steel haunch supports. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 26 of 102 Civic Center Parking Garage April 11, 2019 P a g e 18 | 35 Preventive Repair Needs (2 Years to 5 Years) Preventive repairs are those required to prolong the service life of the structure and/or maintain safety of the garage users. Items are noted within this category when conditions are such that Martin/Martin, Inc. recommends repairs be performed between 24 months and 60 months of the report date. Photos and descriptions of the Preventive Repair recommendations are listed below. Preventive Repair Photos Photo 37 Concrete topping surrounding floor drains is cracked and deteriorated in several locations and shows signs of leaking below. We recommend replacing the concrete topping surrounding the drains where leaks are occurring and installing silicone sealants at the interface between the drain, topping, and precast double tee. Photo 38 Photo 39 There are isolated areas of spandrel cracks and double tee stem cracks that appear to exceed 1/16” in width. The previous Martin/Martin recommended repair program identified cracks of this width for repair using epoxy injection to re-establish concrete interlock and seal the joint against moisture intrusion. We recommend continuing the repair program for cracking of this type using an epoxy injection repair method. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 27 of 102 Civic Center Parking Garage April 11, 2019 P a g e 19 | 35 Photo 40 Photo 41 pan system installed below. It was indicated to Martin/Martin by a prior building engineer that these pans were used as part of a de-icing system that has since been abandoned. If the deicing system has been abandoned, then we recommend these pans be permanently removed to observe the area around the drains for leaks or deterioration. Photo 42 Spalling is occurring at connections of steel guardrails to the tops of precast spandrels at the garage perimeter. Wedge anchors attaching the guardrail to the spandrel were placed too near the inside face of the spandrels which has resulted in spalling concrete. We recommend removing the existing wedge anchors, performing partial depth concrete repairs, and reinstalling new epoxy anchors. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 28 of 102 Civic Center Parking Garage April 11, 2019 P a g e 20 | 35 Photo 43 Photo 44 Photo 45 Photo 46 Cove joint sealants are typically in good condition except for locations of snow plow related damage, deterioration of the cove joints at the perimeter of the northwest stair landings/lobbies, and deterioration of sealants around the interior pedestrian path bollards. We recommend replacing damaged, missing, or leaking cove joints sealants. The Client should take note that at there is evidence of surface corrosion staining below the exterior steel channel members at the north façade of the northwest stair. These steel members frame the edge of the lobby slab which is partially visible in photo 44. The visible lobby slabs consist of an architectural terrazzo wear slab over a concrete structural slab. Terrazzo is an inherently porous material that can allow water to infiltrate and site on top of the concrete structural slab. While we are recommending replacing the cove joint sealants at the perimeter of the lobby at the interface between the steel and terrazzo slab, this may not eliminate all moisture intrusion through the slab that is causing the steel member corrosion. The porous terrazzo is likely allowing moisture ingress through the slab. One method to completely prevent further moisture intrusion at the perimeter would be to remove the terrazzo slab in strips at the exterior perimeter and install a concrete curb that could then be properly waterproofed. A cost for this is not included at this time, but Martin/Martin would be pleased to provide an estimate at your request. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 29 of 102 Civic Center Parking Garage April 11, 2019 P a g e 21 | 35 Photo 47 Photo 48 Vertical joint sealants are split or have lost adhesion in the CMU wall between the Level 1 parking area and the retail space. This typically occurs in vertical control joints and where double tee stems penetrate the wall. There are also cracks occurring in the CMU wall. Failed sealants and cracks in the wall can affect the energy efficiency and fire rating of the barrier wall. Joint sealants should be replaced, and cracks in the CMU should be tuck- pointed with new mortar or routed and sealed. Photo 49 Photo 50 The expansion joints separating the southwest and southeast stair towers from the rest of the garage structure are nearing the end of their useful service life. In some instances, the joints have lost adhesive bond to the concrete shoulders. The elastomeric joint material has hardened with age and has lost flexibility. There is no deterioration currently associated with leaking at the joints, but this could accelerate in the future if not addressed. The expansion joint at the northwest stair is less than two years old according to the repair documents. These joints show signs of possible separation of the joint from the concrete shoulders. If leaks are noted or the joint moves within the slab opening, then this may be a warrantable item should the Client wish to pursue. Cost for this repair is not included. We recommend replacing expansion joints the southwest and southeast stairs on all levels with new elastomeric joints. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 30 of 102 Civic Center Parking Garage April 11, 2019 P a g e 22 | 35 Photo 51 Photo 52 Photo 53 A protective coating is installed to the inside face and tops of the perimeter spandrel crash wall panels that is deteriorated in some isolated areas. There are also additional areas of random map cracking at exterior stub columns and interior lite walls at Levels 4 and 5. We recommend removing and replacing coating in areas where deterioration is noted and installing a new protective coating to columns and walls where random map cracking is visible. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 31 of 102 Civic Center Parking Garage April 11, 2019 P a g e 23 | 35 Photo 54 Photo 55 Photo 56 site that appeared to be cleaning and painting the southeast stair metal guardrail and handrail elements. The southwest stair rails and steel elements are also exhibiting coating loss and surface corrosion. We recommend removing surface corrosion and recoating the southwest stair guardrails, handrails, and steel framing elements if not already scheduled for such work. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 32 of 102 Civic Center Parking Garage April 11, 2019 P a g e 24 | 35 Photo 57 Cracks with white efflorescence stains, and areas of other small rust stains, are showing through the painted coating at the exterior spandrel faces along the east façade of the structure. We recommend recoating the exterior spandrel surfaces at the east façade during this timeframe. There is no deterioration currently associated with the cracking, but long-term moisture infiltration into cracks on exposed surfaces can result in eventual concrete deterioration. Photo 58 Photo 59 There are minor areas of rust staining present on the stair from Level 4 to Level 5 near the center of the garage. The stair treads and structural steel members appear to be performing adequately otherwise. We recommend removing surface corrosion and coating these stairs. Installing joint sealants to prevent moisture intrusion into the rust prone areas is also recommended. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 33 of 102 Civic Center Parking Garage April 11, 2019 P a g e 25 | 35 Photo 60 Photo 61 Photo 62 Surface corrosion and protective coating deterioration is occurring at various embedded steel connections between precast members and at the center lite wall metal barrier cable connection elements. Most connections have been recently painted and are in good condition. Only isolated additional locations are showing surface corrosion. We recommend removing corrosion and applying a protective coating or primer to metal connection elements at the affected areas. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 34 of 102 Civic Center Parking Garage April 11, 2019 P a g e 26 | 35 Photo 63 Photo 64 Photo 65 Staining from moisture leaks is visible on overhead painted surfaces of precast concrete elements along joints in various locations. Most staining appears leftover from before the recent joint sealant replacement. We recommend cleaning and painting the overhead surfaces to match the surrounding areas. This will make it more straightforward in future years to identify actively leaking joints for replacement of joints on an “as needed” basis as part of ongoing preventive maintenance. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 35 of 102 Civic Center Parking Garage April 11, 2019 P a g e 27 | 35 Photo 66 Photo 67 Photo 68 Several control joints in the brick exterior façade at the west elevation are not continuous vertically and horizontally. This appears unintentional but can lead to cracking or restraint related brick damage. There are cracks in the brick noted in other isolated locations. The incomplete control joint detailing can lead to future potential issues, but currently no deterioration is observed to be associated with the incomplete jointing. We recommend that qualified staff or a 3rd party engineer regularly monitor these areas for increased cracking or brick distress. If distress is noted, the control joints should be continued and completed where possible, filling the control joints with sealant material. Cracks in the façade can be tuck pointed or the bricks replaced where necessary. (No Photo Included) the slabs at all supported levels within the last 3 to 4 years per the now completed 5-year repair program. The typical expected recoating period for penetrating silane sealers is 3 to 5 years, which means that these surfaces will be ready for a recoat in this time-period. An estimated cost to reapply a penetrating sealer to all supported level non-traffic coated slab surfaces is included in the opinion of cost. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 36 of 102 Civic Center Parking Garage April 11, 2019 P a g e 28 | 35 Photo 69 Photo 70 Replace or repair missing or damaged flashing at decorative concrete caps. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 37 of 102 Civic Center Parking Garage April 11, 2019 P a g e 29 | 35 SECTION 4: ANTICIPATED REPAIR COSTS This section of the report will offer an opinion of the approximate construction cost in 2019 dollars that will be associated with the repairs recommended in the previous section. The costs listed below are meant to be general in nature and serve only as a “ballpark” estimate to establish a rough order of the construction costs and do not include any markups for future inflation. Our repair recommendations do not provide specific repair details or methods, construction contract documents, material specifications, or details to develop the construction cost from a contractor. The values listed below were developed based on Martin/Martin, Inc. internal historical pricing data for projects of similar scope. Most costs are determined by defining approximate quantities of differing work items and multiplying those quantities by the average unit price for the same work item from recent competitively bid projects. Category contingencies are added to account for potential growth in deterioration. Project contingency is added to account for bidding, regulatory, and project management variations that may affect total project costs. Some work items are extremely difficult to accurately approximate costs because the quantities are very small, the scope is still undefined even though the item is identified, the repair is unusual and therefore has limited past pricing history or the costs are heavily affected by regulatory or other variable constraints. In these cases, we have identified such costs as an “Allowance” to identify it and may vary significantly from the anticipated costs. Once total work item costs are calculated, a series of multiplication factors are added to account for general conditions and mobilization during construction. The approximate cost estimate totals listed below include a construction contingency to allow for minor changes to the scope of repairs due to deficient items discovered during the implementation of the repairs. Cost Opinion Assumptions Note the following basic assumptions used during the development of our cost opinion: 1. Cost opinions are based on Martin/Martin, Inc. internal historical data and experience with similar types of work and are in 2019 dollars. 2. Actual costs may vary due to time of year, local economy, or other factors. 3. Cost opinions do not include costs for unusual phasing, inflation, financing, unusual bidding/contract conditions, or other unusual Owner requirements. 4. Cost opinions do not include structural upgrades such as seismic upgrades. 5. The structure has not been reviewed for the presence of, or subsequent mitigation of, hazardous materials, including but not limited to, asbestos, mold, and PCB. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 38 of 102 Civic Center Parking Garage April 11, 2019 P a g e 30 | 35 Immediate Repair Construction Cost Estimate No work is recommended to be performed prior to April 2020. Table 4.1 – Immediate Repair Construction Cost Work Item Repair General Location Approximate Quantity Unit Cost Subtotal $0 Mobilization/General Conditions/Contingency Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 39 of 102 Civic Center Parking Garage April 11, 2019 P a g e 31 | 35 Critical Repair Construction Cost Estimate Work recommended to be performed prior to April 2021. Table 4.2 – Critical Repair Construction Costs Work Item Repair General Location Approximate Quantity Unit Cost 1 Perform overhead and vertical concrete repairs coating to stair treads and landings southwest, and northwest stair towers control joint in façade vertical concrete repairs supported parking - All levels concrete repairs at concrete infill over precast beams supported parking - All levels rated traffic coating system over precast beams, including removal of existing coating supported parking - All levels sealants supported parking - Levels 4 and 5 supported parking - All levels concrete repairs supported parking - All levels sealants and columns joint stair tower, Level 3 at northwest All Levels sealants at drain channels through walls Levels Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 40 of 102 Civic Center Parking Garage April 11, 2019 P a g e 32 | 35 Work Item Repair General Location Approximate Quantity Unit Cost 14 Install supplemental connection at DT flanges and replace sealant supplemental fireproofing at steel haunch supports SUM Conditions/Contingency Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 41 of 102 Civic Center Parking Garage April 11, 2019 P a g e 33 | 35 Preventive Repair Construction Cost Estimate Work recommended to be performed between April 2021 and April 2024. Table 4.3 – Preventive Repair Construction Cost Work Item Repair General Location Approximate Quantity Unit Cost 1 Repair concrete topping at floor drains parking - All levels than 1/16" width DT stems - All Levels below existing drains parking - All levels and repair concrete Level 1 and 2 where damaged or leaking parking - All levels and repair cracks in CMU and parking - Level 1 slabs and northwest stairs interior spandrel walls recoat metal guardrails, handrails, and steel framing SUM surfaces recoat stair framing stair SUM and barrier cable connections parking - All levels SUM surfaces parking - All levels SUM control joint sealants SUM sealer parking – All levels wall cap flashing walls SUM Conditions/Contingency Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 42 of 102 Civic Center Parking Garage April 11, 2019 P a g e 34 | 35 SECTION 5: PREVENTIVE MAINTENANCE RELATED PHOTOS AND DESCRIPTIONS Martin/Martin, Inc. recommends the maintenance items described below should be performed immediately for the initial maintenance, then at regular intervals as noted in the maintenance manual provided separate of this report. Cost for preventive maintenance related items listed below is not included in the estimated construction cost tables. Needed Maintenance Photos Photo 71 Clean or flush clogged floor drains. Photo 72 Replace missing garage wayfinding signage. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 43 of 102 Civic Center Parking Garage April 11, 2019 P a g e 35 | 35 SECTION 6: LIMITATIONS The recommended repair and maintenance items and approximate timeframes offered above are based on the conditions of structural elements and waterproofing materials that were readily observable at the time of this report. Our estimated timeline for repair is based on our experience with similar structures and their performance in this climate. Martin/Martin, Inc. does not accept responsibility for structural or material deficiencies not readily evident during an evaluation of this type. No warranty, expressed or implied, is given regarding any general or specific conditions as they affect the current or future owners of the building. The recommendations and/or opinions contained in this report are to be used to aid in establishing future budgeting efforts for the parking garage structure, however, a Contractor’s cost estimate should be obtained in addition to this report. A review of the facility for Building Code compliance and compliance with the Americans with Disabilities Act (ADA) requirements was not part of the scope of this project. However, it should be noted that whenever significant repair, rehabilitation or restoration is undertaken in an existing structure, ADA design requirements may become applicable if there are currently unmet ADA requirements. Similarly, we have not reviewed or evaluated the presence of, or the subsequent mitigation of, hazardous materials including, but not limited to, asbestos, and PCB. G:\PROJECTS\18.0400.S.01-Civic Center - 2018 Scope\Word Processing\Draft Reports\18_0400S01_Jan_28_2019_R0-Rpt.docx Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 44 of 102 Fort Collins Firehouse Parking Garage Structural Condition Assessment Property Address: 165 Chestnut Street Fort Collins, Colorado 80524 Report Date: February 8, 2024 Produced For: Jerod Cordell, City of Fort Collins Written By: Rosemay Dudenbostel, PE Reviewed By: Craig Racey, PE Project No.: 24.0012.S.01 Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 45 of 102 TABLE OF CONTENTS SECTION 1: EXECUTIVE SUMMARY ............................................................................................................1 SECTION 2: FACILITY INFORMATION .........................................................................................................2 Narrative of Structured Areas Reviewed .............................................................................................................2 Site Visit Information and Documentation Review .............................................................................................3 Table 2.1: Structure Characteristics .....................................................................................................................4 SECTION 3: REPAIR RECOMMENDATIONS AND PHOTOS ............................................................................5 High Priority Repair Needs (Within 12 Months) ..................................................................................................5 High Priority Repair Photos, Discussions, and Recommendations ......................................................................5 Medium Priority Repair Needs (12 Months to 36 Months) .............................................................................. 12 Medium Priority Repair Photos, Discussions, and Recommendations ............................................................. 12 Low Priority Repair Needs (36 Months to 60 Months) ..................................................................................... 15 Low Priority Repair Photos ............................................................................................................................... 15 SECTION 4: ANTICIPATED REPAIR COSTS ................................................................................................. 20 Cost Opinion Assumptions ................................................................................................................................ 20 High Priority Repair Construction Cost Estimate .............................................................................................. 21 Table 4.2 – High Priority Repair Construction Costs ......................................................................................... 21 Medium Priority Repair Construction Cost Estimate ........................................................................................ 23 Table 4.3 – Medium Priority Repair Construction Cost .................................................................................... 23 Low Priority Repair Construction Cost Estimate ............................................................................................... 24 Table 4.4 – Low Priority Repair Construction Costs .......................................................................................... 24 SECTION 5.1: PREVENTATIVE MAINTENANCE .......................................................................................... 25 Section 5.1 – Preventive Maintenance Related Photos and Descriptions ........................................................ 25 SECTION 6: LIMITATIONS AND CONCLUSION ........................................................................................... 27 Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 46 of 102 SECTION 1: EXECUTIVE SUMMARY We have completed our condition assessment of the parking garage located at 165 Chestnut Street, Fort Collins, Colorado. The purpose of our assessment was to evaluate the current condition of the structural and waterproofing systems as they relate to the parking structure and provide recommendations for addressing repair and maintenance items. An engineer’s opinion of the anticipated repair construction cost is provided to help develop ballpark repair budgets in the noted timeframes. The parking garage is in good condition. There are areas where repairs and maintenance are needed to maintain the integrity and prolong the useful life of the structure. We did not observe any areas that we classify as a potential hazard or life safety concern that are recommended to be addressed as immediate priority concerns. We present our repair recommendations for work to be completed into three time periods based on the severity and importance of the item to the performance of the parking structure: 1) High Priority conditions to be addressed within 12 months, 2) Medium Priority conditions to be addressed between 12 months and 36 months, and 3) Low Priority repairs to be addressed between 36 and 60 months. A summary of the Immediate and High Priority recommendations is listed below. High Priority Structural and Waterproofing Concerns 1. Stair storefront windows 2. Leaking joints 3. Spalling concrete 4. Ponding 5. Slab cracking 6. Double-tee beam bearing pad A summary of the anticipated construction cost for the three repair categories is as follows:  High Priority (Less than 12 months): $230,000  Medium Priority (12 to 36 months): $250,000  Low Priority (36 to 60 months): $50,000 The remaining report sections include facility specific information, photos, descriptions of the observations, and a list of preventative maintenance items. All the recommendations should be completed within the timeframe for each category to properly maintain and prolong the useful life of the structure. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 47 of 102 Fort Collins Firehouse Parking Garage - Structural Condition Assessment February 8, 2024 P a g e 2 | 27 SECTION 2: FACILITY INFORMATION Narrative of Structured Areas Reviewed The parking garage is approximately 243 feet by 175 feet and contains three levels of parking. For the purposes of this report, Chestnut Street is considered the south side of the garage with Jefferson Street on the east, Firehouse Alley on the west, and an unnamed alley on the north. The primary structural system for the garage consists of precast double tees with a cast-in-place concrete topping slab supported by precast concrete inverted tee beams at the interior and precast spandrels at the exterior. The double tees, beams, and spandrels are supported on concrete columns and walls. The lowest floor of the garage is a concrete slab-on-grade. The lateral force resisting system for the garage concrete shear walls. The foundations for the garage are concrete drilled piers. Commercial/retail space is located on the southwest side of the building along Firehouse Alley. Future commercial/retail space is located on the northeast side of the building along Jefferson Street. The structural system above these spaces consists of a split-slab buried waterproofing system. Vehicles enter and exit the garage from Chestnut Street. There are two stair towers in the garage, one in the northeast and one in the southwest. An elevator is located with the southwest stair tower. Photovoltaics are installed on the top level of the garage on a steel structure supported by the primary concrete frame. Review of the steel structure is outside the scope of this report. Photo 1: ENTRANCE ON CHESTNUT STREET Photo 2: TYPICAL PARKING Photo 3: NORTH STAIR CORE Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 48 of 102 Fort Collins Firehouse Parking Garage - Structural Condition Assessment February 8, 2024 P a g e 3 | 27 Site Visit Information and Documentation Review Rosemay Dudenbostel, PE of Martin/Martin, Inc. performed a condition assessment of the parking garage on January 10, 2024. The weather at the time of visit was sunny and windy with an approximate temperature of 35 degrees F. In addition to our on-site observations, we had conversations with Jerod Cordell, City of Fort Collins Facilities Maintenance Supervisor, Robert Lozen III, and Ed Hersch with the City staff. During our evaluation period, we reviewed the following documents to assist us in understanding the existing structural and waterproofing characteristics:  Original Design Drawings by S.A. Miro, Inc. dated May 13, 2016  Maintenance Manual by Martin/Martin, Inc. dated April 22, 2019 Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 49 of 102 Fort Collins Firehouse Parking Garage - Structural Condition Assessment February 8, 2024 P a g e 4 | 27 Table 2.1: Structure Characteristics Year Constructed Approximately 2018 Original Design Drawings Docks Included Level 2 – Above-Grade: .......................................... ± 42,100 S.F. Roof Level 3: ........................................................... ± 38,300 S.F. Total: .....................................................................± 122,500 S.F. on precast concrete inverted-tee beams, walls, and spandrels. The foundation consists of concrete grade beams and piers. for detailed description waterproofing membrane system and has a buried waterproofing membrane system above the commercial/retail space along Firehouse Alley and the future commercial/retail space along Jefferson Street. Joint sealants were observed between concrete joints, within cracked concrete surfaces, between slab edges and adjacent walls/curbs. garage entrance. corner. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 50 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 5 | 27 SECTION 3: REPAIR RECOMMENDATIONS AND PHOTOS High Priority Repair Needs (Within 12 Months) High Priority repairs are those required to address structural serviceability concerns and other crucial items that are not considered to be immediate life safety issues. They are noted within this category when conditions are such that Martin/Martin, Inc. recommends repairs be performed between zero and 12 months of the report date. Photos and descriptions of the High Priority Repair Recommendations are included below. High Priority Repair Photos, Discussions, and Recommendations Photo 4 Maintenance staff indicated that storefront windows slide out of the framing during strong winds creating a gap between the framing and the windowpane. It is possible that the windowpanes are undersized for the frames. This is a life safety hazard as the windows could slide out of the frames and fall out. As a temporary preventative measure, we recommend sealing around the windowpanes. We recommend an investigation to find out how the windows were constructed and why the windowpanes are sliding out of the frames and provide further recommendations for repairs. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 51 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 6 | 27 Photo 5 Photo 6 Photo 7 Horizontal joint sealants in the slabs above joints between precast double-tees, beams, and walls and cove joints between slabs and vertical surfaces were observed to be deteriorated and split on roof level 3. Leaks were observed on the underside of the slab along various joints causing painted surfaces to bubble and peel. Delaminated concrete was observed along the joints in isolated areas, causing the sealant to split and fail. We recommend reprofiling deteriorated joint edges and replacing all joint sealants on Level 3. After all joint sealants are replaced, we recommend cleaning the undersides of the joints and repainting damaged painted surfaces to match existing. From discussions with Jerod Cordell during our site visit, we understand that the City is planning to replace all horizontal and cove joint sealants within the garage in 2024. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 52 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 7 | 27 Photo 8 Spalling and delaminated concrete was observed on the underside of the double-tee flanges throughout the garage, especially near the interior concrete shear walls. We recommend performing partial depth overhead concrete repairs at these locations. Photo 9 Columns on level 3 were observed to have delaminated and spalling concrete, especially near the column base. Conversations with maintenance staff indicated that the snowplows are hitting the corners of the columns during plowing procedures. We recommend performing partial depth concrete repairs at the columns. The maintenance staff could consider installing steel corner guards to prevent future deterioration. Photo 10 Delaminated and spalled concrete was observed in isolated locations on the level 2 and level 3 slabs. We recommend performing partial depth concrete slab repairs at these locations. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 53 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 8 | 27 Photo 11 Photo 12 Cracks on the parking slab surfaces were observed throughout the garage. We recommend routing and sealing leaking cracks and cracks greater than 1/16”. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 54 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 9 | 27 Photo 13 Photo 14 Photo 15 Maintenance staff indicated that the parking surfaces do not adequately slope in all areas to allow proper drainage for water to flow to the installed drains. They indicated that most floor drains in the garage are positioned in locations where they do not collect any water. Epoxy overlay has been installed at two drains on the roof level to help mitigate ponding and direct water to the drains. Maintenance staff indicated that the epoxy overlay was installed in the Spring of 2023, and we observed that some of the epoxy overlay has delaminated. A more long-term and durable approach would be to install additional floor drains and piping within the drainage paths or areas where significant ponding is occurring. A thin overlay could be installed to help direct drainage where drains cannot be installed. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 55 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 10 | 27 Photo 16 Maintenance staff indicated that the joint at the bottom of the ramp to level 3 does not have proper drainage. Water was observed to be ponding at the bottom of the ramp. We recommend installing new drains at the bottom of the ramp, installing an overlay to direct water to the drains, and installing a traffic coating to protect the area. Photo 17 The bearing pad at a precast double-tee stem on the underside of level 3 was observed to have shifted. The pad is still providing bearing but is not centered under the double tee stem. We recommend monitoring all double-tee stems along the centerline wall panels for any movement and to notify the engineer if they have shifted off-center. An allowance to shore and lift the double-tee stem to reposition the bearing pad is included in the cost tables. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 56 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 11 | 27 Photo 18 Photo 19 A full depth section of double tee flange was observed to be missing on the underside of the level 3 near the north stair. A metal plate was observed to be attached above. Light can be seen from underneath and indications of water intrusion at the column and inverted tee beam was observed. We recommend performing full depth concrete repair at the double-tee beam flange, sealing around the metal plate, and installing a traffic coating to prevent water intrusion. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 57 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 12 | 27 Medium Priority Repair Needs (12 Months to 36 Months) Medium Priority repairs are those required to prolong the service life of the structure and/or maintain safety of the garage users. Items are noted within this category when conditions are such that Martin/Martin, Inc. recommends repairs be performed between 12 months and 36 months of the report date. Photos and descriptions of the Medium Priority Repair Recommendations are listed below. Medium Priority Repair Photos, Discussions, and Recommendations Photo 20 Photo 21 Similar to the level 3 joints noted in the high priority needs category, failed horizontal joint sealants and evidence of leaking joints were observed on the underside of level 2 but on a more isolated basis. Spalling concrete along the joint shoulders was also observed. We recommend replacing the joints on level 2 and reprofiling the concrete joints shoulders as needed. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 58 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 13 | 27 Photo 22 Photo 23 Pitting and scaling concrete was observed on the level 3 slab surfaces. Scaling is generally moderate, with the aggregate exposed but still embedded in the concrete slabs. Scaling on level 3 is likely due to the magnesium chloride salts eroding the top of the concrete. We recommend installing a thin overlay to level the pitted, scaled, or delaminated areas. Additional protection to the slabs is recommended to improve the long-term durability of the surfaces by installing a penetrating silane sealer. Silane sealers provide near surface protection and need to be reapplied every three to five years to maintain their effectiveness. Silane sealers do not have the capability to bridge cracks. Enhanced protection to the scaled and pitted areas, especially on level 3, could include installing a traffic coating in lieu of penetrating sealer to waterproof the concrete surface. Traffic coatings have a longer service life than silane, can be re-top coated, and have capability to bridge cracks and joints that silane does not. We have included this option as an alternate within the cost estimate. Photo 24 A thin overlay was observed to be delaminated and spalling at areas on level 3 parking deck. It appears that the overlay was installed as a cricket along the interior walls. We recommend repairing the deteriorated overlay. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 59 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 14 | 27 Photo 25 Spalling and delaminated concrete was observed at several corbels supporting precast double tee stems along the center walls at the underside of level 3 near the top of the ramp. The existing structural drawings indicate that these are weld-on steel corbels and the concrete is installed for fire-proofing encasement. This would need to be verified prior to repair. Should the corbels have been cast with the concrete walls, then temporary shoring may be needed during the repair process. We recommend repairing the concrete fireproofing encasement at the corbels. Photo 26 Photo 27 Maintenance staff indicated that water from the level 3 ramp runs over the slab edge and leaks down the enter lite walls during rain or snow events. This condition could cause concrete to deteriorate along the walls and at double-tees and corbels. The original design drawings indicate a sloped concrete wash was specified along the center walls at the ramp side, however it does not appear the sloped washes were placed. Washes would have moved drainage water away from the edge of ramp if installed and mitigated water intrusion along and down the light wall openings. We recommend installing a sloped wash or curb on the level 3 ramp edges to direct water away from the slab edge. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 60 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 15 | 27 Low Priority Repair Needs (36 Months to 60 Months) Low Priority repairs are those required to prolong the service life of the structure and/or maintain safety of the garage users. Items are noted within this category when conditions are such that Martin/Martin, Inc. recommends repairs be performed between 36 months and 60 months of the report date. Photos and descriptions of the Low Priority Repair Recommendations are listed below. Low Priority Repair Photos Photo 28 Random map cracked cast stone caps over the retail space was observed. We recommend protecting the cast stone caps with an elastomeric coating. A lift will be needed to access the cast stone caps. Photo 29 Delaminated concrete at the level 1 slab-on-grade was observed in isolated areas. The concrete could spall and create a tripping hazard. We recommend repairing the delaminated concrete. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 61 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 16 | 27 Photo 30 The level 2 slab over the future commercial/retail space along Jefferson Street contains buried drains to drain the surface and buried waterproofing system. A buried drain on the underside of level 2 was observed to be capped. This could be trapping water in the split slab buried waterproofing system on level 2. We recommend uncapping the pipe to allow water to drain from the slab. If the discharge from the pipe is a nuisance it can be piped to a column for controlled discharge onto the slab. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 62 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 17 | 27 Photo 31 Photo 32 Photo 33 Deteriorated CMU blocks were observed in both stairwells. The deterioration was observed to only occur on the face shells. The CMU walls are buried behind metal cladding on the exterior of the stair enclosure. Replacement of the deteriorated CMU blocks would require removing the metal cladding before replacing the CMU blocks and installing cove joint on the exterior of the CMU wall before replacing the metal cladding. At this time, we do not recommend replacing the deteriorated CMU blocks and instead recommend monitoring the CMU blocks for additional deterioration. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 63 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 18 | 27 Photo 34 Corrosion was observed at exposed steel surfaces throughout the garage. We recommend removing corrosion and painting with a corrosion inhibiting steel coating. Photo 35 Cracks in the stair landings of both stairs were observed. There was no corrosion observed on the underside of the stairs. We recommend rout and sealing all visible cracks. Photo 36 Chipping paint and corrosion was observed at the metal stair nosing at both stairs. We recommend painting them with a corrosion inhibiting steel coating to match the existing color. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 64 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 19 | 27 Photo 37 Damaged metal cladding was observed at the exterior of the south stair enclosure on level 3. We recommend repairing the metal cladding and installing a bollard to prevent further damage from vehicle impact. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 65 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 20 | 27 SECTION 4: ANTICIPATED REPAIR COSTS This section of the report will offer an opinion of the approximate construction cost in 2024 dollars that will be associated with the repairs recommended in the previous section. The costs listed below are meant to be general in nature and serve only as a “ballpark” estimate to establish a rough order of the construction costs and do not include any markups for future inflation. The values listed below were developed based on Martin/Martin, Inc. internal historical pricing data for projects of similar scope. Most costs are determined by defining approximate quantities of differing work items and multiplying those quantities by the average unit price for the same work item from recent competitively bid projects. In addition to the approximate cost estimates listed below, we recommend that the yearly budgets include a construction contingency of 15 to 20%. This contingency will allow for minor changes to the scope of repairs due to deficient or latent items discovered during the implementation of the repairs. The cost estimated contained in this report are to be used as an aid in establishing future budgeting efforts for the parking structure; however, a Contractor’s cost estimate using engineered repaired drawings should be obtained in addition to this report for more accurate pricing. Cost Opinion Assumptions Note the following basic assumptions used during the development of our cost opinion: 1. Cost opinions are based on Martin/Martin, Inc. internal historical data and experience with similar types of work and are in 2024 dollars. 2. Actual costs may vary due to time of year, local economy, or other factors. 3. Cost opinions do not include costs for unusual phasing, inflation, financing, unusual bidding/contract conditions, or other unusual Owner requirements. 4. The structure has not been reviewed for the presence of, or subsequent mitigation of, hazardous materials, including but not limited to, asbestos, mold, and PCB. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 66 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 21 | 27 High Priority Repair Construction Cost Estimate Work recommended to be performed prior to February 2025. Table 4.2 – High Priority Repair Construction Costs Work Item Repair Description General Location Approx. Quantity Unit Cost 1 Investigation of storefront system South stair 1 LUMP SUM $ 8,000 2 Remove and replace deteriorated horizontal joint sealants Level 3 4,800 LF $ 35,000 3 Re-profile joints in topping slab with an epoxy and sand binder Level 3 500 LF $ 25,000 4 Remove and replace deteriorated cove joint sealants Level 3 1,700 LF $ 15,000 5 Repair delaminated and spalling concrete on overhead and vertical surfaces of double-tee flanges, walls, and columns Underside of Level 2, Level 3 50 SF $ 10,000 6 Repair partial depth horizontal concrete repairs Level 2 and 3 100 SF $ 7,000 7 Rout and seal cracks Level 2 and 3 1,000 LF $ 15,000 8 Install thin sloped overlay to mitigate ponding Level 2 and 3 150 SF $ 3,000 9 Repair delaminated epoxy overlay Level 3 50 SF $ 1,000 10 Allowance to install drains at low points in the slab Level 3 4 LOC $ 30,000 11 Install drain at low point in the slab Bottom of ramp to level 3 2 LOC $ 15,000 12 Install thin sloped overlay to mitigate ponding Bottom of ramp to level 3 30 SF $ 1,000 13 Install traffic coating at drains Bottom of ramp to level 3 20 SF $ 1,000 14 Allowance to install shoring, lift double-tee stem, and reposition bearing pad Underside of Level 3 1 LOC $ 5,000 15 flange repair stair 10 SF $ 3,000 16 Install sealant at metal plate Level 3 north stair 10 LF $ 1,000 Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 67 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 22 | 27 Work Item Repair Description General Location Approx. Quantity Unit Cost 17 plate stair 20 SF $ 1,000 Repair Subtotal $ 176,000 Estimated Contractor General Conditions, Mobilization, Overhead, Profit, Etc.$ 27,000 Recommended Repair Contingency $ 27,000 Anticipated Total Construction Costs $ 230,000 Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 68 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 23 | 27 Medium Priority Repair Construction Cost Estimate Work recommended to be performed between February 2025 and February 2027 Table 4.3 – Medium Priority Repair Construction Cost Work Item Repair Description General Location Approx. Quantity Unit Cost 1 Remove and replace deteriorated horizontal joint sealants Level 2 4,300 LF $ 30,000 2 Re-profile joints in topping slab with an epoxy and sand binder. Level 3 175 LF $ 8,000 3 Remove and replace deteriorated cove joint sealants Level 2 1,700 LF $ 15,000 4 Install thin overlay at pitting and scaling concrete surfaces Level 3 3,400 SF $ 40,000 5 Repair delaminated concrete overlay Level 3 100 SF $ 2,000 6 Install silane sealer Ramp to Level 3, Level 3 41,000 SF $ 50,000 7 Repair delaminated concrete at corbels Underside of Level 3 4 LOC $ 2,000 8 to direct water away from lite wall Level 3 Ramp 325 LF $ 45,000 Repair Subtotal $ 192,000 Estimated Contractor General Conditions, Mobilization, Overhead, Profit, Etc.$ 29,000 Recommended Repair Contingency $ 29,000 Anticipated Total Construction Costs $ 250,000 Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 69 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 24 | 27 Low Priority Repair Construction Cost Estimate Work anticipated to be needed between February 2027 and February 2029 Table 4.4 – Low Priority Repair Construction Costs Work Item Repair Description General Location Approx. Quantity Unit Cost 1 Install elastomeric coating on cast stone caps Level 3 1 LUMP SUM $25,000 2 Perform partial depth horizontal concrete at slab-on-grade Level 1 10 SF $1,000 3 Install pipe to discharge bi-level drain Level 1 1 LUMP SUM $1,000 4 Clean corrosion from steel surfaces and paint with corrosion inhibiting steel coating Throughout Garage 100 SF $6,000 5 Rout and seal cracks North and South Stairs 50 LF $4,000 6 Repair damaged metal cladding and install bollard Level 3 near south stair 1 LUMP SUM $1,000 Repair Subtotal $38,000 Estimated Contractor General Conditions, Mobilization, Overhead, Profit, Etc.$6,000 Recommended Repair Contingency $6,000 Anticipated Total Construction Costs $50,000 Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 70 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 25 | 27 SECTION 5.1: PREVENTATIVE MAINTENANCE Section 5.1 – Preventive Maintenance Related Photos and Descriptions Martin/Martin, Inc. recommends the maintenance items described below be performed immediately for the initial maintenance, then at regular intervals. Costs for these items are not included in the estimated probable costs. Photo 38 Maintenance indicated that the emergency call box located at the south stair core does not work due to the water that leaks from above. We recommend fixing the broken emergency call box. Photo 39 Overhead concrete repairs were observed on the underside of level 2. We recommend painting the repairs to match the existing color. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 71 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 26 | 27 Photo 40 A damaged bollard was observed near the south stair on level 3. We recommend resetting the bollard. Photo 41 The drains on the roof above the retail areas along Firehouse Alley were observed to be missing. We recommend replacing the missing drain covers. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 72 of 102 Fort Collins Firehouse Parking Garage – Structural Condition Assessment February 8, 2024 P a g e 27 | 27 SECTION 6: LIMITATIONS AND CONCLUSION This report is based on conditions of structural elements that were readily observable at the time of our visit. No invasive testing or inspections were performed. Martin/Martin, Inc. does not accept responsibility for structural deficiencies not evident during an assessment of this type. This report does not provide any kind of guarantee or warranty on our findings and recommendations. Our assessment was based on and limited to the agreed scope of work. Neither the investigation nor this report is intended to cover mechanical, electrical, architectural, or other nonstructural features beyond those described above. We appreciate this opportunity to be of service. Please call us at (303) 431-6100 if you have any questions regarding this report or if we may be of further assistance. Sincerely, Rosemay Dudenbostel, PE Craig Racey, PE Professional Engineer, Investigative Engineering Senior Project Engineer, Investigative Engineering \\Mmstruct.martin.local\str\PROJECTS\24.0012.S.01-Firehouse Parking Garage-Struct Condition Assessment\Draft Letters_Narratives_Reports_Specs\Draft Reports\24_0012S01_Feb_08_2024_R0_Rpt.docx Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 73 of 102 Old Town Parking Garage Structural Condition Assessment 102 REMINGTON STREET FORT COLLINS, COLORADO 80524 Prepared for: Mark McLean City of Fort Collins – Operations/Parking Services 300 West Laporte, Building B Fort Collins, Colorado 80521 April 11, 2019 Martin/Martin, Inc. Project No.: 18.0401.S.01 MARTIN/MARTIN, INC. 12499 West Colfax Avenue Lakewood, Colorado 80215 303.431.6100 Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 74 of 102 TABLE OF CONTENTS SECTION 1: EXECUTIVE SUMMARY ............................................................................................... 1 SECTION 2: FACILITY INFORMATION ............................................................................................ 3 Narrative of Structured Areas Reviewed .............................................................................................. 3 Information Provided by Client ............................................................................................................. 4 Table 2.1: Structurally Supported Parking Characteristics ................................................................... 5 SECTION 3: REPAIR RECOMMENDATIONS AND PHOTOS ............................................................... 6 Immediate Repair Needs (Less than 1 Year) ......................................................................................... 6 Critical Repair Needs (Within 24 Months) ............................................................................................ 7 Critical Repair Photos ............................................................................................................................ 7 Preventive Repair Needs (2 Years to 5 Years)..................................................................................... 14 Preventive Repair Photos.................................................................................................................... 14 SECTION 4: ANTICIPATED REPAIR COSTS .................................................................................... 20 Cost Opinion Assumptions .................................................................................................................. 20 Immediate Repair Construction Cost Estimate .................................................................................. 21 Table 4.1 – Immediate Repair Construction Cost ............................................................................... 21 Critical Repair Construction Cost Estimate ......................................................................................... 22 Table 4.2 – Critical Repair Construction Costs .................................................................................... 22 Preventive Repair Construction Cost Estimate ................................................................................... 23 Table 4.3 – Preventive Repair Construction Cost ............................................................................... 23 SECTION 5: PREVENTIVE MAINTENANCE RELATED PHOTOS AND DESCRIPTIONS ......................... 24 Needed Maintenance Photos ............................................................................................................. 24 SECTION 6: LIMITATIONS ........................................................................................................... 27 Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 75 of 102 April 11, 2019 SECTION 1: EXECUTIVE SUMMARY We have completed our condition assessment of the Old Town Parking Garage, located at 102 Remington Street in Fort Collins, Colorado. The purpose of our assessment was to evaluate the current condition of the garage’s structural and waterproofing systems and to provide recommendations for repair and maintenance items to be addressed. Our findings, which include observations and repair recommendations with photographs and preliminary opinion of costs, are provided in the sections below. Review of the attached Poudre Valley Fire Authority (PFA) office space at the west side of the structure at Remington Street is outside the scope of this report. The parking garage is in good condition. There are some areas where routine maintenance is needed to maintain the integrity and prolong the useful service life of the structure. We did not identify areas that would be classified as an immediate life safety concern. Martin/Martin, Inc. previously completed a condition assessment in August 2013, with subsequent repairs taking place between 2014 and 2018. This repair history was used as a reference in our development of recommendations for ongoing repair. The recent completion of the five-year repair and maintenance program has established an improved baseline level of integrity to reduce future repair costs. We present our repair recommendations for work to be completed in three time-periods: 1) Immediate repair conditions to be addressed within 12 months, 2) Critical repair conditions to be addressed between within 24 months, and 3) Preventive repair conditions to be addressed between 24 months and 60 months. Summaries of the Immediate and Critical recommendations are listed below. Immediate Repair and Life Safety Concerns 1. No immediate repair items were identified. Critical Structural and Waterproofing Concerns 1. Possible metal deck damage at pedestrian bridge connecting the garage to northwest stair. 2. Deteriorated overhead and vertical concrete. 3. Deteriorated and leaking horizontal joint sealants. 4. Isolated damaged cove joint sealants. 5. Spalling and delaminated concrete slabs. 6. Deteriorated and cracking concrete at stair treads and landings. 7. Broken tee-to-tee flange connections. 8. Worn wall coating at isolated areas. 9. Worn traffic coating at isolated areas. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 76 of 102 Civic Center Parking Garage April 11, 2019 P a g e 2 | 27 The anticipated construction cost for the three repair categories are as follows:  Immediate - Less than 12 months: $0  Critical - Within 24 months: $110,000  Preventive - 24 to 60 months: $250,000 The remaining report sections include facility-specific information, photos, descriptions of the observations, and a list of preventative maintenance items. All the recommendations should be completed within the timeframe for each category to properly maintain the structure and prolong the useful service life of the structure. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 77 of 102 Civic Center Parking Garage April 11, 2019 P a g e 3 | 35 SECTION 2: FACILITY INFORMATION Narrative of Structured Areas Reviewed The Old Town Parking Garage is approximately 245 feet in the north-south direction by 108 feet in the east-west direction and contains four levels of parking. Office space for PFA is adjacent to the garage on the west side of Level 1 through Level 3 along Remington Street. The primary structural system for the garage consists of 10-foot wide by 24-inch deep precast double tees with a three-inch thick cast-in-place concrete topping slab. The precast double tees are supported on precast inverted tee beams and walls at the interior, and precast spandrel beams and walls at the exterior. Precast concrete beams are supported on precast concrete columns and walls down to the foundation. The bottom floor of the garage is a concrete slab-on-grade. The lateral force resisting system for the garage consists of precast concrete shear walls in both orthogonal directions. The foundations for the garage are drilled concrete piers bearing on bedrock. Ramping for vehicle travel between levels is internal to the garage at the east structural bay with a short east-to-west ramp at the middle of the structure between the east and west structural bays. The garage is bounded by East Mountain Avenue on the north, Remington Street on the West, a service alley on the east, and an office building/surface parking lot on the south. Vehicle entrances and exits into garage Level 1 are located from East Mountain Avenue at the north, and from Remington Street at the southwest corner. Stairs between all levels are located at the northwest corner and near the southwest corner. Stairs are concrete filled metal pan treads and landings supported by steel framing. An elevator is located adjacent to the northwest stair. There is a steel framed pedestrian access bridge with concrete slab-on-metal deck connecting the garage to the northwest stair/elevator tower at all supported levels. There is a steel framed awning over the Level 1 vehicle entrance/exit from Remington Street. Typical Roof Level 4 Parking Typical Interior Parking North Vehicle Entrance/Exit Access to the Northwest Stair/Elevator Tower Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 78 of 102 P a g e 4 | 27 Information Provided by Client Martin/Martin, Inc. staff performed a condition assessment of the parking structure on December 18, 2018. Craig Racey, PE, and Benjamin Estrich, PE, SE, were on-site for the assessment. The weather at the time of visit was partly cloudy and cold, with temperatures ranging between 20°F to 40°F. There was minimal snow piled on the deck at the time of our visit. During our evaluation period, we reviewed the following documents to assist us in understanding the existing structural and waterproofing characteristics of the structure:  Original Structural and Architectural Drawings dated January 16, 1984, by Walker Parking and ZVFK Architects. Martin/Martin, Inc. has provided structural engineering services related to the garage beginning in 2013. Below is a list of the assessments and documents reviewed as part of this work.  2013 Structural and Waterproofing Condition Assessment.  2014 Construction Documents for isolated concrete and waterproofing repairs.  2014 Construction Administration field reports for the 2014 Construction Documents.  2015 Construction Documents for repairs at Level 4, including traffic coating, NW bridge repairs, and isolated waterproofing repairs on Level 2 and Level 3.  2015 Construction Administration field reports for the 2015 Construction Documents.  2016 Construction Documents for remaining garage repairs. Repairs were phased between 2016 base bid and 2017/2018 alternates. For 2016, repairs were completed on Level 4 wall joints and coating application, and isolated repairs at Level 3. Repairs performed in 2017/2018 included Silane sealer at exterior walls/spandrels, and Level 2 and Level 3 slabs, Level 2 and Level 3 joint sealants, NW stair repairs, and overhead and vertical concrete repairs on all levels.  2016/2017/2018 Construction Administration field reports for the 2016 Construction Documents. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 79 of 102 P a g e 5 | 27 Table 2.1: Structurally Supported Parking Characteristics Item The Quadrant Parking Garage Comments Year Constructed Approximately 1984 Parking Area (Approximate) Level 2 – Structured Parking 26,650 ± S.F. Level 3 – Structured Parking 26,650 ± S.F. Level 4 – Structured Parking (Roof Level) 26,150 ± S.F. Total 106,100 ± S.F. include PFA office space or the northwest stair/elevator tower. supported on precast inverted tee beams, walls, spandrels, and columns. for detailed description. bearing waterproofing membrane (traffic coating) installed over the entire level, including the east-west ramp. Joint sealants are installed in the slabs between the precast double tees and inverted tee beams. Cove joint sealants are installed at the transition from the double tees to the concrete walls, spandrels, and columns. the garage and office space wall and pedestrian bridge where applicable. parking areas. structural drawings. corner. The southwest stair is enclosed at Level 4, and the northwest stair is enclosed at all levels. Remington Street at the southwest. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 80 of 102 P a g e 6 | 27 SECTION 3: REPAIR RECOMMENDATIONS AND PHOTOS Immediate Repair Needs (Less than 1 Year) Immediate repairs are those required to occur as soon as possible to reduce the hazard of collapse, loss of life/serious harm, or significant structural damage. No immediate repairs were observed. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 81 of 102 P a g e 7 | 27 Critical Repair Needs (Within 24 Months) Critical repairs are those required to address structural serviceability concerns and other crucial items that are not considered to be immediate life safety issues. They are noted within this category when conditions are such that Martin/Martin, Inc. recommends repairs be performed within 24 months of the report date. Photos and descriptions of the Critical Repair recommendations are included below. Critical Repair Photos Photo 1 Photo 2 The metal decking below the concrete topped pedestrian bridges connecting the garage to the northwest stair shows signs of moisture induced corrosion at the underside of Level 2 and Level 3 in the small areas we were able to observe. Level 4 pedestrian bridge was repaired with the 2015/2016 repairs and is coated with a traffic coating, whereas the other two structured levels are uncoated with the joints and cracks are sealed. There is a decorative metal panel that conceals most of the underside of the metal deck that should be removed for Martin/Martin, Inc. to observe the deck and provide recommendations for repair. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 82 of 102 P a g e 8 | 27 Photo 3 Photo 4 Photo 5 There are minor isolated areas of spalling and delamination occurring at the overhead and vertical concrete surfaces. We recommend continuing to repair the isolated concrete deterioration at the overhead and vertical surfaces using partial depth concrete repair methods. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 83 of 102 P a g e 9 | 27 Photo 6 Photo 7 Photo 8 Photo 9 Horizontal joint sealants in the concrete topping over joints between precast members appear to be failing in numerous areas on Level 2 and Level 3. From review of the 2016 repair drawings prepared by Martin/Martin, Inc., it appears these joints were intended to be replaced as part of those drawings. It was confirmed with the Contractor that the joint sealant replacement was only performed in spot areas on Level 3. We recommend replacing all horizontal joint sealants on Level 2 and Level 3. The shoulders of the concrete topping along the joints may need to be reprofiled in some locations with epoxy to create a sound surface to install joint sealant. A cost for the shoulder work and joint sealant replacement is provided in the cost estimates. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 84 of 102 P a g e 10 | 27 Photo 10 Photo 11 Cove joint sealants are in good condition overall except for some locations on Level 4 where it appears likely that the cove sealants were damaged from a snow plow. We recommend replacing damaged and leaking cove joint sealants. Photo 12 Photo 13 There are isolated areas of spalling and delaminated concrete at the topping slabs on Level 2 and Level 3. These areas should be addressed with partial depth concrete repair methods. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 85 of 102 P a g e 11 | 27 Photo 14 Photo 15 The southwest and northwest stair are showing signs of cracks and deterioration in the concrete slabs. Cracks should be routed and sealed against moisture intrusion and deteriorated concrete repaired with partial depth concrete repair methods. Photo 16 Photo 17 Two double tee joint flange-to-flange connections on Level 2 were repaired using carbon biscuits. The concrete topping in the vicinity of the biscuits has cracked and likely caused the biscuit to lose effectiveness in reestablishing connection of the slabs across the joint between precast double tees. The joint sealant is split at these joints, and the joints audibly “clunk” when vehicles travel across the joints which indicates the connections have likely failed. The garage in these locations appears to be experiencing larger movements (thermal expansion/contraction) than is typical in rest of the garage. Repairing these joints with additional carbon biscuits may shift the movement joint to adjacent tees which could cause those joints to fail instead. Since these joints are exhibiting movement that has caused damaged around the added flange connections, we recommend installing a more robust steel support across the joint at the underside of the double tees that allows expansion/contraction to occur while transferring the necessary lateral diaphragm forces. We also recommend installing sealant material capable of taking the expected joint movement. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 86 of 102 P a g e 12 | 27 Photo 18 Photo 19 The coating at the inside face of spandrel wall is worn in areas subject to snow plow blade contact on level 4. We recommend recoating these areas with a coating appropriate for contact with snow plow blades. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 87 of 102 P a g e 13 | 27 Photo 20 Photo 21 Photo 22 Isolated areas of traffic coating on Level 4 installed in 2015 are wearing faster than surrounding areas. There are also isolated areas of bubbles in the top coat that have torn and burnouts from car tires have worn through the coating. We recommend repairing these areas. Bubbles occurring in the surface may fall under the original installers warranty and could be a warrantable item should the Owner want to pursue a warranty claim. Photo 23 Related to the above, there are a couple areas of potential splits in the traffic coating above joint sealants. It is possible the joint sealant material has failed in those locations. We recommend those coating areas with new over-banding of coating and replacing any deteriorated joint sealants. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 88 of 102 P a g e 14 | 27 Preventive Repair Needs (2 Years to 5 Years) Preventive repairs are those required to prolong the service life of the structure and/or maintain safety of the garage users. Items are noted within this category when conditions are such that Martin/Martin, Inc. recommends repairs be performed between 24 months and 60 months of the report date. Photos and descriptions of the Preventive Repair recommendations are listed below. Preventive Repair Photos Photo 24 Photo 25 The traffic coating on Level 4 and at Level 2 over the electrical room which were installed in 2015 will be due for a new top coat within this timeframe. We recommend installing a new top coat to these locations, expected in years 2021 or 2022. Photo 26 The silane sealer installed in 2018 to the horizontal concrete slab surfaces on Level 2 and Level 3, and exterior precast walls and spandrels will be nearing the end of the expected service life within this timeframe. Silane sealer should be considered for reapplication to the slab and spandrel surfaces starting in 2023. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 89 of 102 P a g e 15 | 27 Photo 27 Ponding water is occurring in isolated areas of Level 4 and other levels. While there does not appear to be deterioration currently associated with the ponding, that could accelerate as the garage ages. Ponding is also a nuisance to the garage maintenance. We recommend installing epoxy leveling compound where possible to reprofile the topping surface to mitigate ponding. Where reprofiling is not possible, supplemental drain installation may be needed. This work will include removing and replacing traffic coating where applicable to install the leveling compound. Photo 28 Photo 29 The expansion joint along the west edge of the garage on Level 2 and Level 3 appears to be nearing the end of its useful service life. There are signs of adhesion loss and tearing of the sealant material. The joint should be replaced in this timeframe to prevent moisture intrusion and future concrete damage. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 90 of 102 P a g e 16 | 27 Photo 30 Photo 31 Cable guardrails above precast spandrels at the east and north edges of garage Level 1 through Level 3 are loose and not performing as intended. While the cables can be tightened, they do not meet current building code mandated requirements for spacing between rails. This could be a potential liability to the City. We recommend these guardrails be considered for upgrades to meet current building code. This could be accomplished by removing the cable rails and designing a metal rail to attach to the top of precast spandrel. No price as been provided due to the currently unknown method of retrofit. Photo 32 There are cracks in the precast spandrels, beams, and ends of double tees which could exceed 1/16” width and have not yet been addressed as part of the previous epoxy injection program. We recommend continuing the program of epoxy injection to all remaining cracks in the spandrels and beams exceeding 1/16” in width. Photo 33 Large gaps exist between vertical precast concrete shear wall panels bordering the east-west vehicle ramp. These gaps allow water to infiltrate to the lower levels. We recommend installing sealants into these gaps where exposed on level 4. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 91 of 102 P a g e 17 | 27 Photo 34 Photo 35 Photo 36 Exterior facing steel beams at the north and west sides of the northwest stair/elevator tower are faded and showing signs of light corrosion. These beams should be cleaned and painted with a high-performance coating. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 92 of 102 P a g e 18 | 27 Photo 37 Photo 38 The surfaces of the light poles on Level 4 are faded and showing signs of light surface corrosion. The light pole surfaces should be cleaned and painted with a high-performance coating. Photo 39 Photo 40 The surfaces at the underside of the metal pan stairs at the southwest appear to have been primed in some areas but not painted to match the surrounding surfaces. Other areas are exhibiting surface corrosion. These areas of primed metal surfaces should be painted to match the surrounding surfaces and other corroded surfaces cleaned and painted. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 93 of 102 P a g e 19 | 27 Photo 41 Photo 42 Photo 43 The storefront system surfaces at Level 4 of the southwest stair are faded and showing signs of light surface corrosion. The metal storefront framing should be cleaned and painted with a high-performance coating. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 94 of 102 P a g e 20 | 27 SECTION 4: ANTICIPATED REPAIR COSTS This section of the report will offer an opinion of the approximate construction cost in 2019 dollars that will be associated with the repairs recommended in the previous section. The costs listed below are meant to be general in nature and serve only as a “ballpark” estimate to establish a rough order of the construction costs and do not include any markups for future inflation. Our repair recommendations do not provide specific repair details or methods, construction contract documents, material specifications, or details to develop the construction cost from a Contractor. The values listed below were developed based on Martin/Martin, Inc. internal historical pricing data for projects of similar scope. Most costs are determined by defining approximate quantities of differing work items and multiplying those quantities by the average unit price for the same work item from recent competitively bid projects. Category contingencies are added to account for potential growth in deterioration. Project contingency is added to account for bidding, regulatory, and project management variations that may affect total project costs. Some work items are extremely difficult to accurately approximate costs because the quantities are very small, the scope is still undefined even though the item is identified, the repair is unusual and therefore has limited past pricing history or the costs are heavily affected by regulatory or other variable constraints. In these cases, we have identified such costs as an “Allowance” to identify it and may vary significantly from the anticipated costs. Once total work item costs are calculated, a series of multiplication factors are added to account for general conditions and mobilization during construction. The approximate cost estimate totals listed below include a construction contingency to allow for minor changes to the scope of repairs due to deficient items discovered during the implementation of the repairs. Cost Opinion Assumptions Note the following basic assumptions used during the development of our cost opinion: 1. Cost opinions are based on Martin/Martin, Inc. internal historical data and experience with similar types of work and are in 2019 dollars. 2. Actual costs may vary due to time of year, local economy, or other factors. 3. Cost opinions do not include costs for unusual phasing, inflation, financing, unusual bidding/contract conditions, or other unusual Owner requirements. 4. Cost opinions do not include structural upgrades such as seismic upgrades. 5. The structure has not been reviewed for the presence of, or subsequent mitigation of, hazardous materials, including but not limited to, asbestos, mold, and PCB. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 95 of 102 P a g e 21 | 27 Immediate Repair Construction Cost Estimate No work is recommended to be performed prior to April 2020. Table 4.1 – Immediate Repair Construction Cost Work Item Repair General Location Approximate Quantity Unit Cost Subtotal $0 Mobilization/General Conditions/Contingency Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 96 of 102 P a g e 22 | 27 Critical Repair Construction Cost Estimate Work recommended to be performed prior to April 2021. Table 4.2 – Critical Repair Construction Costs Work Item Repair General Location Approximate Quantity Unit Cost 1 Remove decorative metal panel for follow-up observation underside of Levels 2 and 3 2 EA $1,500 overhead concrete spall repairs levels 100 SF $17,500 sealants Slabs 2,750 LF $15,500 1,150 LF $6,000 horizontal concrete repairs Slabs 25 SF $1,500 treads and landings 100 SF $6,500 tee-to-tee joint 2 Joint $20,000 coating walls 3,300 SF $16,500 coating repair 100 SF $2,000 replace traffic coating bands 250 LF $3,000 $90,000 Conditions/Contingency $20,000 $110,000 Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 97 of 102 P a g e 23 | 27 Preventive Repair Construction Cost Estimate Work recommended to be performed between April 2021 and April 2024. Table 4.3 – Preventive Repair Construction Cost Work Item Repair General Location Approximate Quantity Unit Cost 1 Install traffic coating top coat Slabs at Level 4, level 2 over electrical room 26,200 SF $66,000 2 Install silane sealer Level 2 and 3 slabs 49,150 SF $21,000 3 Install leveling compound at ponded areas with new traffic coating 400 SF $8,000 4 Install supplemental floor drains 2 EA $8,000 5 Replace horizontal expansion joint 410 LF $72,000 6 Epoxy inject cracks exceeding 1/16" width levels 75 LF $4,500 7 Install sealant into vertical wall gaps 100 LF $1,000 8 Clean and coat exterior exposed steel beams stair/elevator tower 1 Sum $15,000 9 Clean and coat light poles Level 4 1 Sum $7,500 10 Paint stair treads and landings metal pans 1 Sum $2,000 11 Clean and coat storefront framing 1 Sum $5,000 Subtotal Mobilization/General Conditions/Contingency $40,000 $250,000 Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 98 of 102 P a g e 24 | 27 SECTION 5: PREVENTIVE MAINTENANCE RELATED PHOTOS AND DESCRIPTIONS Martin/Martin, Inc. recommends the maintenance items described below should be performed immediately for the initial maintenance, then at regular intervals as noted in the maintenance manual provided separate of this report. Needed Maintenance Photos Photo 44 Oil stains are prevalent on the parking surfaces that should be cleaned Photo 45 Evidence of graffiti is present along the west and south sides of the structure that should be cleaned and painted. (No Photo Provided) Photo 46 Bird roosting appears to be a nuisance in the garage. The bird nests should be removed, and roosting prevention devices such as spikes could be installed to discourage bird roosting. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 99 of 102 P a g e 25 | 27 Photo 47 Photo 48 We located one instance of a disconnected conduit for the overhead parking space occupancy lighting. Additionally, the ends of the conduits are not sealed and could let moisture or debris into the conduit. Photo 49 A wayfinding sign is missing at one location and should be replaced. Photo 50 It appears there is soot or some other dark material on the ceiling of Level 1 (underside of Level 2). We recommend cleaning and/or repainting these areas to match the surroundings and provide more light reflection. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 100 of 102 P a g e 26 | 27 Photo 51 A utility box at the front of parking stalls on Level 1 is prone to damage and has been damaged previously by vehicle impact. We recommend installing a protective metal guard and/or painting the box traffic yellow to make it more visible to drivers. Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 101 of 102 P a g e 27 | 27 SECTION 6: LIMITATIONS The recommended repair and maintenance items and approximate timeframes offered above are based on the conditions of structural elements and waterproofing materials that were readily observable at the time of this report. Our estimated timeline for repair is based on our experience with similar structures and their performance in this climate. Martin/Martin, Inc. does not accept responsibility for structural or material deficiencies not readily evident during an evaluation of this type. No warranty, expressed or implied, is given regarding any general or specific conditions as they affect the current or future owners of the building. The recommendations and/or opinions contained in this report are to be used to aid in establishing future budgeting efforts for the parking garage structure; however, a Contractor’s cost estimate should be obtained in addition to this report. A review of the facility for Building Code compliance and compliance with the Americans with Disabilities Act (ADA) requirements was not part of the scope of this project. However, it should be noted that whenever significant repair, rehabilitation or restoration is undertaken in an existing structure, ADA design requirements may become applicable if there are currently unmet ADA requirements. Similarly, we have not reviewed or evaluated the presence of, or the subsequent mitigation of, hazardous materials including, but not limited to, asbestos, and PCB. G:\PROJECTS\18.0401.S.01-Old Town - 2018 Scope\Word Processing\Draft Reports\18_0401S01_Apr_11_2019_R0_Rpt.docx Addendum 1 - Questions & Answers RFP 9942 Parking Demand Study Page 102 of 102