ADDENDUM NO. 2
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 10085: Landscaping - Water Treatment Plant
OPENING DATE: 3:00 PM (Our Clock) December 4, 2024
To all prospective bidders under the specifications and contract documents described above, the
following changes/additions are hereby made and detailed in the following sections of this
addendum:
Exhibit 1 —Questions and Answers
Exhibit 2 — Updated Section 00300
Exhibit 3 — Updated Cost Schedule excel form.
Please contact Jake Rector, Senior Buyer, at (970) 221-6776 or jrector@fcgov.com with any
questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID OR QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
Addendum#2
10085 Page 1 of 8
Exhibit 1
Questions and Answers
1. Irrigation Line needs to be added to Bid Schedule.
A: Irrigation is accurately captured in the existing Bid Schedule. See below:
Description Quantity Unit Unitcost TotaL Cost AdditionaL Notes
Landscaping
Site Clearing-Sod Removal 5880 SF $
Site Clearing-CobblelMisc Removal 2380 SF $ -
Site Clearing-CMU Bloch Wall Hem oval 67 LF $
SiteClearing-Concrete Walk Removal 26 SF $
Earthwork/Wall Backfill 1 LS $
Boulder Retaining Wall w/Drain 125 LF $
Concrete Paving(4") 40 SF $ -
Boulders-Outcroppings(Blocky) 82 EA $
Rock Mulch-VLRiprapBuffwll-1/2"Cherokee 5925 SF $
Shrub Bed Edge-Steel 309 LF $
Native Turf Seed wl erosion control blanket 1806 SF $
Evergreen Tree,4"htB&B 2 EA $
Evergreen Tree,6'htB&B 8 EA $
Deciduous Tree,6'ht B&B(or 1.5"cal} 2 EA $
Shrubs,#5 Container 147 EA $
Shrubs,#1 Container 50 EA $
Perennials&Grasses,#1 Container 127 EA $
Subtotai Landscaping $ -
Subtotal Irrigation
Combinedsubtotar $ -
Mobilization&General Conditions
10%Contingency
Total
Please use the following quantities when bidding the "Subtotal Irrigation Line:
Irrigation Mobilization 1 LS
Irrigation Demolition 1 LS
Irrigation Sleeving 15 LF
Irrigation 1-Inch Lateral Pipe 350 LF
Irrigation Manifold Pipe 200 LF
Irrigation Drip Lateral Pipe 400 LF
Irrigation Filter Assembly 2 EA
Irrigation Zone Control Valve Assembly 7 EA
Irrigation Flush Cap Assembly 9 EA
Irrigation Pop-Up Rotary Sprinkler Assembly 25 EA
2. Boulder placement as designed?
A: Boulder placement may change. BID project as designed. Any changes will be made via a
Change Order with the awarded firm if requested.
3. Are there any permitted staging areas for equipment and materials?
A: Permitted staging area in green below:
Addendum#2
10085 Page 2 of 8
�r
M '
7 7-
4. Where are the boulders from the construction drawings that are being repurposed?
A: The boulders reside on the east side of the property.
PROJECT SITE
STOCKPILE
R F.
5. The specifications call for wood mulch around the plants, but you also specify the use of
squeegees in the mulched beds.The plans also specify that riprap is to be used. What Mulch is
to be used?
A: Riprap shall be used in the areas shown on plans.The specified mulch around individual
plants is squeegee, per Section 32 93 00, subsection 2.03. Mulch around trees and shrubs will
extend to the saucer rings per details. Mulch around perennials should be approximately 12"to
18" in diameter, depending on pot size. Please disregard the word "wood" in subsection
3.05.A.2.
6. Landscape: SF calculations on the plans do not match SF calculations in the bid tab.
A: Bid schedule included adjustments to 2D SF quantities for slope. Bid Schedule has been
revised to match 2D plan quantities—Contractor shall price as it sees fit to account for slope.
7. Landscape: Is the intent to be all rock mulch and no wood mulch? The shrub detail on page 6
calls for a 4" layer of wood at the base of the plant but all others only call for mulch per plans. Is
this correct or inconsistent?
A: Please disregard the word "wood" in Detail 3, Sheet L-5.The specified mulch around all
individual plants is squeegee, per Section 32 93 00, subsection 2.03.
Addendum#2
10085 Page 3 of 8
8. Landscape: Several discrepancies with plant quantities: ARFI 9 in plans (7 in schedule), ERNN 11
in plans (12 in schedule), SYOC 15 in plans(14 in schedule), BELY 18 in plans(23 in schedule)
A: We apologize for the errors. Plant schedule has been reconciled with plans and a new Sheet L-
3 has been issued with revisions noted. Bid Schedule has been updated.
9. Landscape: 3 CY/1000sf of soil amendment for native plants? Industry standard is 1CY/1000sf
for shrub beds/native plants. Please advise
A: Please use industry standard 1CY/1000sf.
10. Landscape: Where should concrete be included in the bid tab?
A: Bid Schedule has been revised to include concrete removal and concrete paving.
11. Irrigation: Is there a concern that the 2" valves will not operate at low flow conditions (less than
10GPM)?
A:This is not a concern as irrigation manufacturer literature indicate that irrigation valves can
operate with flows less than 1 GPM.
12. Irrigation: How will warranty work with manual drip zones?
A: Refer to specification 32 84 00, 1.8 Guarantee/Warranty and Replacement. Warranty is two
years from formal written acceptance by City of Fort Collins Representative.
13. Can we confirm there are 83 boulders in that pile onsite to meet specs for boulder outcrop
areas?
A: It is assumed that the boulder stockpile will satisfy approximately 2/3 of the required number
of boulders for the outcrop areas. Contractor shall budget for approximately 1/3 of the boulders
for the outcrops to be purchased (match in appearance/rock type). Payment will not
differentiate between the salvaged and purchased boulders.
14. Price walls as new buff sandstone?
A: Yes, assume all material for walls will be purchased buff sandstone.
15. Type of edging not called out. Roll top galvanized or interlocking ProGreen?
A: Specification Section 32 93 00 is amended as follows:
Add subsection 2.03.0—Edging: 3/16"x 6"x 16' galvanized steel edging. Flat or roll top
accepted.
16. Can we have access to visit site and boulder storage area?
A: No, we will not be arranging for another site visit.The area is easily accessible. See graphic in
question 4.
17. Will any of the new retaining wall construction be taking place over existing utilities or pipes?
A: Yes,there are existing utilities in the area of existing and proposed walls—refer to plans.
Anticipated depth of excavation for walls not to exceed 12". Utilities should not be encountered.
See Utilities Notes on Sheet L-0. Detailed utilities schematic will be provided during construction.
Addendum#2
10085 Page 4 of 8
1 2 3 4 5 6
PLANT SCHEDULE z
NOTE: SPECIES HAVE BEEN SELECTED TO ACHIEVE XERISCAPE AND AESTHETIC OBJECTIVES. CONTRACTOR SHALL ATTEMPT TO IDENTIFY SOURCES PRIOR TO BIDDING. SUBSTITUTIONS (INCLUDING
LEGEND CULTIVARS OF SPECIES) WILL NOT BE ACCEPTED, UNLESS WRITTEN APPROVAL OF THE LANDSCAPE ARCHITECT HAS BEEN OBTAINED PRIOR TO BIDDING. SIZES SPECIFIED ARE THE DESIRED SIZES AND
50% TYPE VL RIPRAP - BUFF SANDSTONE
SHALL BE THE BASIS OF BIDS. ALTERNATIVE SIZES WILL BE CONSIDERED IF CONTRACTOR DEMONSTRATES A GOOD FAITH EFFORT OF OBTAINING SPECIFIED SIZES WITH COST ADJUSTMENTS
I �
i (2" TO 12", D50=6") Q� NEGOTIATED.
50% 1 1/2" CHEROKEE (TOP DRESSING) + Q
COMBINED DEPTH: 6" AVG, 4" MIN. O - = Trees & Shrubs 152 Total
• ORNAMENTAL U
TREE Key QtY Size Botanic Name Common Name FC List Sun Water Height Width (U V)
'• • '. ' • '. ' NATIVE TURF SEED MIX x O + DECIDUOUS CRAM 2 6' B&B Crataegus ambigua Russian hawthorn XIP list Full Sun / Part Sun Very Low, Low, Moderate 15-20' 12-16' �' Q O
' °°° SHRUBS z
°° ° JUSC 3 6 B&B Juniperus scopulorum Rocky Mountain Juniper XIP list Full Sun Low, Moderate 20-30 10-15 `7 Z M
A ° + JUSS 5 6' B&B Juniperus scopulorum'Skyrocket' Skyrocket Juniper XIP list Full Sun Low Moderate 15-20' 2-4'
(�� BOULDER 'OUTCROPS' O G > >
l—J PIAR 2 4 B&B Pinus aristata Bristlecone Pine FC database Full Sun Low 20-40 10-20 p p J
O :�
CACTI &
BRODLEAF EVERGREENS AMUT 5 #5 CNT Amelanchier utahensis Utah Serviceberry XIP list Full Sun Very Low 6-12' 6-12'
�0 BOULDER RETAINING WALL 0 AMNA 10 #5 CNT Amorpha nana Dwarf Leadplant XIP list Full Sun / Part Sun Very Low, Low, Moderate 2-3' 2-3'
0 PERENNIAL STEEL EDGING ARCA 8 #5 CNT Artemisia cana Silver Sage XIP list Full Sun Very Low, Low 14 2-3'
° //X O FORBS ARFI 9 #5 CNT Artemisia filifolia (Oligosporus filifolius) Sand Sage XIP list Full Sun Very Low 2-5' 2-3'
EVERGREEN TREE CELE 5 #5 CNT Cercocarpus ledifolius CurlleafMountain Mahogany XIP list Full Sun Very Low 6-7 6-7 O GRASSES ERNN 11 #1 CNT Ericameiia nauseosa ssp. nauseosa var. nauseosa Dwarf Rabbitbrush XIP list Full Sun / Part Sun Very Low, Low 1-Y 1-Y V) w w
+ COLUMNAR JUNIPER
Ln V)
(Chrysothanmus nauseosus nauseosus) _
FAPA 9 #5 CNT Fallugiaparadoxa Apache Plume XIP list Full Sun /Part Sun Very Low, Low 4-6' 4-6' 0 m m
GUSA 8 #1 CNT 0itierrezia sarothrae Broom Snakeweed FC database Full Sun Very Low 1-2' 1-2' 0 0 0
JAAM 4 #5 CNT Jamesia americana Waxflower FC database Part Sun / Shade Low 4-6' 4-6' U U o O
CALL 811 TWO NATIVE TURF SEED MIX KRLA 11 #5 CNT Krascheninnikovialanata Winterfat
U o 0 0 0
BUSINESS DAYS IN Buchloe dactyloides* Buffalograss (Texoca or Sharp's Improved 11) 60% min / 75% max PRPB 7 #5 CNT Prunus besseyi'Pawnee Buttes' Pawnee Buttes Sand Cherry XIP list Full Sun Low, Moderate 1-3' 4-6' U
ADVANCE BEFORE Bouteloua gracilis Blue Grama (Hachita ) 25% min / 40% max PUTR 3 #5 CNT Purshia tridentata Antelope Bitterbrush XIP list Full Sun Very Low 2-6' 2-8'
YOU DIG, GRADE, OR RHAA 9 #5 CNT Rhus trilobata 'Autumn Amber' Autumn Amber Sumac XIP list Full Sun Very Low, Low, Moderate 0-l' 6-8' � N V- N o
EXCAVATE FOR 'k Treated with KNO3 2 o c4 o c4
MARKING OF o RHTR 5 #5 CNT Rhus trilobata v. trilobata Threeleaf Sumac XIP list Full Sun Very Low,Low, Moderate 3-6 3-8 �, N o N ,
Application rate: 4 Ibs PLS/1,000 SF (broadcast rate - reduce 50/ for drilled) � -- N
Kr�El� UNDERGROUND RIAU 5 #5 CNT Ribes aureum Yellow Flowering Currant XIP list Full Sun / Part Sun / Shade Very Low,Low, Moderate 4-6' 4-6' a) M � N
cj� o CM MEMBER UTILITIES. Pre-approved products: Xeriscape Lawn Mix by Western Native Seed (Coaldale, CO) ROWO 9 #5 CNT Rosa woodsii Woods' Rose XIP list Full Sun / Part Sun Very Low,Low, Moderate 3-8' 3-8' — oo v7 —
Buffalo Brand Native Turf Mix by Buffalo Brand Seed (Greeley, CO) RUDE 7 #5 CNT Rubus deliciosus Thimbleberry (Boulder Raspberry) XIP list Full Sun / Part Sun Very Low, Low 3-6' 3-6' —
SYOC 15 #5 CNT Symphoricarpos occidentalis Western Snowberry XIP list Full Sun / Part Sun Low, Moderate 1-Y 3-5'
Cacti & Broadleaf Evergreens 57 Total N opy 66,
B Key Qty Size Botanic Name Common Name FC List Sun Water Height Width Y
�- o 5
EPEQ 7 #5 Ephedra equisetina Bluestein Jolllt Fir XIP list Full Sun Very Low, Low 4-6' 3-8' —' o Q
HEPA 13 #5 Hesperaloe parviflora Red (False) Yucca FC database Full Sun Very Low,Low 34 2-3'
MARE 21 #1 Mahonia repens Creeping Grape Holly XIP list Full Sun,Part Sun, Shade Low,Moderate 1-2' 1-2'
OPPO 10 #1 Opuntia polyacantha (O. basilaris) Prickly Pear (Beavertail Cactus) XIP list Full Sun Very Low 1-2' 2-3'
YUGL 6 #5 Yucca glauca Soapweed Yucca XIP list Full Sun Very Low 34 2-3
Forbs 108 Total
Size Botanic Name Common Name FC List Flower Color Flower Season Sun
�j/i•• 6—BELY Key Qty w z
• .• / 1—YUGL BELY 18 #1 CNT Berlandiera lyrata Chocolate Flower XIP list yellow June, July, August, September Full Sun — U_o U)
3—ACRO . // 1—RHAA LU
CAIN 6 #1 CNT Calhrhoe involucrata Wine Cups XIP list purple May , Jun , Jul, Aug , Sep Full Sun, Part Sun C `4 o Z V. a
' ENPE 17 #1 CNT Engelmannia penstenia Engelmann Daisy FC database yellow May , Jun , Jul, Aug , Sep Full Sun :LU w
1—GAIN �/ , C> �w�
1—PUTR B //o IPLE 6 #1 CNT Ipomoea leptophylla Bush Morning Glory FC database pink June, July, August Full Sun � 0 w z
1—JUSC // o O 4—ERNN LILE 21 #1 CNT Linumlewisii Blue Flax FC database blue June, July, August Full Sun, Part Sun O ..Z o 0
r 2—FAPA •— a °
i/i/ • 1—RIAU MIMU 4 #1 CNT Mirabilis multiflora Desert Four QClock XIP list pink June, July, August, September Full Sun (/� .� a°o
/ PEEA 10 #1 CNT Penstemon eatonii Firecracker Penstemon XIP list red May, June Full Sun -_ Z Ln Q
3-PEEA y�
N
jj / PEST 26 #1 CNT Penstemon strictus Rocky Mountain Pt XIP list blue/purple June July, August Full Sun Part Sun w
1—RHAA \ > U z
=a ZE
1—CAIN /iiii . i !i
2—HEPA ji / ' o w��
Y
ERAS SFQ
\ 19 Total �� 9°o w
. /j .,. • • i i 1
IX B .j •% ACRO 9 #1 CNT Achnatherumrobusta Robust Needlegrass FC database 3-5' Full Sun o z L
EX B i /./
/ 5—BELY MURE 10 #1 CNT Muhlenbergia reverchonii'PUNDOIS' Undaunted Ruby Muhly XIP list 2-3' Full Sun U C H Z_j 3:
o 3—AMNA •,z o
r — `�o�
i. 3—BELY 3 MURE O 2°
° 1—CAIN 2—ROWO > w °
2—HEPA 3—HEPA 2—IPLE o �
1—YUGL 6—LICE 6—PEST\- 3—MUD \ UQ o —
/ o j . 1—OPPO 4—BELY 3—AMNA 2—CELE 9—MARE Qa 3—ENPE i i ; / 1—EPEQ 1—AMNA 1—PRPB 3-0PP 2—EP / z u,
1—RHAA -` 2—FAPA �' 2—SYOC 1—RHAA 3—RUDE 6—MARE / / cn°U
1—YUGL — 2—JUSS 1—MIMU —S—PEEA / Q 5'w
3—RHTR 2—RHAA 2—ARFI 2—JUSS 4—GUSA 1—CRAM r L w w o
1—MIMU 1—PUTR ,"� � o °
3—ENPE 2—PEEA 1—PIAR 2—RUDE 1—JUSS 2—EPEQ —' _ _ -: • : 9—LICE / O •(/� O =
1—FAPA 1—RHAA 1—U1SC 1—CELE — 3—ARFI _ 440, SF'I i/ �L w
1—RHAA 1—AMUT — — � � w�
�
2—IP U.LE _ T ,. % (� °o
' / � 'z
2—ROWO — ' . • : - — — . % ,/� i %/' ' i. i.i iiii. % % . / J Z L Q
• / i
/ . w
_ i
2 SYOC % . /iiii ./ .%i'. %i . � �Q0
2-CELE , .,// ij . : • : • : ' . , o ° oI _ • Q o' // / �ii/� �ii� // . - oZU
2-AMUT i
5—PEST 3—YUGL ° o / i % /—ACRO � -- 0 % w
-
1—SYOC //�j;. ji o o / j / �i �% /i%' i j / / _ • i % ° / * * * * % i/ 0-0
2—PRPB
1—PIAR / i / / / // . � � o • 0 • , / k�' / / — i i . .// . .iiii�� i. .%iiii ���%%i // :%!� '' '
/ / / Uj5—PEST
Ly
x x j/ /. %
/j/ j/ EX B o00000 /j//%%•� • �� i /. / i / i / /. — i, /. %/.% /. * * * 0 c w
• • • / i/. //. ' Uj
o �' U)
• -; . • 1 / ° O O ° • iiii i %%ice: 3-SYOC 'n U o W
o • °
�• ' . ' . ' . ' . ' . ' . 785SF ' . ' . • : • ; • ; O � - / . 3—JAAM N
X `�
D - - -
/� O O O O
7—ERNN 8—ARCA 1—SY0C 1—RHAAE]y 4—GUSA 2—EPEQ 3—AMNA _ 6—MARE
/, CL J M U
1-MIMU _ �- ii/!!! 6-LICE � �
3-HEPA 1-FAPA 2-RHTR 1-ROWO 6-KRLA 3-OPPO 6-PEST 4-PEST 2-SYOC 1-SYOC Z= L,
1-JUSC 3-HEPA 1-MIMU 1-SYOC 2-IPLE 3-CAIN 1-PRPB 4-ARFI 1-PUTR 2-RUDE 2-RIAU W o
4-MURE 5-KRLA 1-ROWO 6-ENPE 5-ENPE 2-AMUT 3-ROWO 1-CRAM _j
LL
3—ACRO 2—SYOC \ 1—JAAM ZW D
3—PRPB �o
EX B = EXISTING BOULDER U °
v
O
10 0 5 10 20 Sheet:
1 Planting Plan 4 of
Scale: 1 —10
1 " = 10'
Exhibit 2
SECTION 00300
BID FORM
PROJECT: 10085 Landscaping —Water Treatment Plant Date:
1. In compliance with your Invitation to Bid dated 20 and subject to all
conditions thereof, the undersigned,
a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole
Proprietor) authorized to do business in the State of Colorado, hereby proposes to
furnish and do everything required by the CONTRACT Documents to which this refers
for the construction of all items listed on the following Bid Schedule or Bid Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal is made
in good faith, without collusion or connection with any other person or persons Bidding
for the same Work, and that it is made in pursuance of and subject to all the terms and
conditions of the CONTRACT Documents pertaining to the Work to be done, all of
which have been examined by the undersigned.
3. Accompanying this Bid is a Bid Bond in the sum of
($ ) in accordance with the Invitation to Bid and Instructions to
Bidders.
4. The undersigned Bidder agrees to execute the CONTRACT and a Performance Bond
and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar
days from the date when the written Notice of Award is delivered to the address given
on this Bid. The name and address of the corporate SURETY with which the Bidder
proposes to furnish the specified Performance and Payment Bonds is as follows:
5. All the various phases of Work enumerated in the CONTRACT Documents with their
individual jobs and overhead, whether specifically mentioned, included by implication
or appurtenant thereto, are to be performed by the CONTRACTOR under one of the
items listed in the Bid Schedule, irrespective of whether it is named in the list.
6. Payment for Work performed will be in accordance with the Bid Schedule(s) subject to
change(s) as provided in the CONTRACT Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through
8. COLORADO OPEN RECORDS ACT
The undersigned Bidder acknowledges that the City is a governmental entity subject
to the Colorado Open Records Act, C.R.S. §§24-72-200.1 et seq. ("CORA"). Any bids
submitted hereunder is subject to public disclosure by the City pursuant to CORA and
City ordinances. All provisions and pricing of submitted bids, Bid Forms, and the
Addendum#2
10085 Page 5 of 8
awarded contract will be, without redaction, considered public records subject
to disclosure under CORA. By responding to this Bid, Contractor hereby waives any
and all claims against the City relating to CORA.
9. The undersigned Bidder hereby acknowledges the documents listed below are
required elements of the Bid and must be submitted with the Bid. The City may reject
any incomplete Bids as non-responsive.
❑ Bid Form (this Section 00300)
❑ Electronic Bid Bond (Item 3 above and Section 00410) for five (5) percent of the
base Bid amount
❑ Acknowledgement of Bid Addenda (Item 7 above)
❑ Statement of Bidder's Qualifications (Section 00420)
❑ Schedule of Subcontractors (Section 00430)
❑ Safety Form (Section 00440)
10. BID SCHEDULE (Base Bid)
At the City's option the basis of award is the low responsive and responsible Bidder
based on the total price for Base Bid or the total price for the Base Bid plus selected
Alternates. This Bid Schedule has also been uploaded to RMEPS as a separate
Microsoft Excel document titled 10085 BID SCHEDULE.
Unit
Description Quantity Unit Cost Total Cost Additional Notes
Landscaping
Site Clearing-Sod Removal 5880 SF $Site Clearing-Cobble/Misc
Removal 2380 SF $Site Clearing-CMU Block Wall
Removal 67 LF $Site Clearing-Concrete Walk
Removal 26 SF $ -
Earthwork/Wall Backfill 1 LS $ -
Boulder Retaining Wall w/Drain 125 LF $ -
Concrete Paving(4") 40 SF $ -
Boulders-Outcroppings(Blocky) 82 EA $ -
Rock Mulch-VL Riprap Buff w/1-
1/2"Cherokee 5925 SF $ -
Shrub Bed Edge-Steel 309 LF $ -
Native Turf Seed w/erosion control
blanket 1806 SF $ -
Addendum#2
10085 Page 6 of 8
Evergreen Tree,4"ht B&B 2 EA $ -
Evergreen Tree,6' ht B&B 8 EA $ -
Deciduous Tree,6'ht B&B(or 1.5"
cal) 2 EA $ -
Shrubs,#5 Container 147 EA $ -
Shrubs,#1 Container 50 EA $ -
Perennials&Grasses,#1 Container 127 EA $ -
Subtotal Landscaping $ -
Subtotal Irrigation
Combined Subtotal $ -
Mobilization&General
Conditions
10%Contingency
Total $ -
BASE BID IN WORDS:
PROPOSED FINAL COMPLETION DATE:
ADD ALTERNATE: Provide unit pricing on irrigation work to be performed in case
additional work is required.
Irrigation Mobilization 1 LS $
Irrigation Demolition 1 LS $
Irrigation Sleeving 15 LF $
Irrigation 1-Inch Lateral Pipe 350 LF $
Irrigation Manifold Pipe 200 LF $
Irrigation Drip Lateral Pipe 400 LF $
Irrigation Filter Assembly 2 EA $
Irrigation Zone Control Valve Assembly 7 EA $
Irrigation Flush Cap Assembly 9 EA $
Irrigation Pop-Up Rotary Sprinkler Assembly 25 EA $
11. PRICES
The foregoing prices shall include but is not limited to all labor, materials, overhead,
profit, insurance, etc., for completion of the Work.
Bidder acknowledges that the OWNER has the right to change items before award or
during Construction at their sole discretion without affecting the CONTRACT or prices
of any item so long as the deletion or change does not exceed twenty-five percent
(25%) of the total CONTRACT Price.
RESPECTFULLY SUBMITTED:
Addendum#2
10085 Page 7 of 8
Legal Firm Name:
Physical Address:
Remit to Address:
Phone:
Name of Authorized Agent of Firm:
Signature of Authorized Agent:
Primary Contact for Project:
Title: Email Address:
Phone: Cell Phone:
(Seal - if Bid is by corporation)
Attest:
Address
Telephone
Email
Addendum#2
10085 Page 8 of 8