HomeMy WebLinkAboutAddendum 3 - BID - 10084 Parking Services EV Charger InstallationAddendum # 3 10084 ADDENDUM NO. 3 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 10084: Parking Services EV Charger Installation OPENING DATE: 3:00 PM (Our Clock) December 10, 2024 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Questions and Answers Please contact Jake Rector, Senior Buyer, at (970) 221-6776 or jrector@fcgov.com with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID OR QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum # 3 10084 EXHIBIT 1 Questions and Answers 1. Are these chargers hard wired or do they require a NEMA 14-50 outlet A: The chargers are to be hardwired in. 2. Will the meter that is being installed be provided by the City or is that the contractor’s responsibility? A: Contractor is to furnish and install the meter can. City Utilities will furnish and install the meter. 3. Mural. Can we drill through the Mural? A: If the conduit run has no other path and needs to be drilled through the mural, then it will need to be routed through the wall as close to the ceiling as possible. The goal is to protect the mural in place as much as possible and to cause minimal disruption to the mural itself. Coordinate exact routing of conduit and any drilling with City Project Manager prior to commencing any drilling work.