Loading...
HomeMy WebLinkAboutAddendum 2 - BID - 10060 Halligan Reservoir - Road ImprovementsAddendum # 2 ITB 10060 ADDENDUM NO. 2 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 10060: Halligan Reservoir - Road Improvements OPENING DATE: 3:00 PM (Our Clock) October 1, 2024 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Questions and Answers Please contact Jake Rector, Senior Buyer, at (970) 221-6776 or jrector@fcgov.com with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID OR QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum # 2 ITB 10060 Exhibit 1 Questions and Answers 1. Can an Excel version of Section 00300 Bid Tab be provided? A: See Attachment 1 to Addendum 2. 2. Is there a specification for the Rip Rap desired (Bid Item #8: Rip Rap: d50 6" - Detail 5 (CIP)) with regard to color/hardness? A: Material used for riprap shall meet requirements of tables 506-1 and 506-2 of the CDOT Standard Specifications for Road and Bridge Construction unless otherwise approved by the Engineer and Owner. Color preference is to match current rip rap materials and subject to approval by the Engineer/Owner. Riprap sourced from Pete Lien & Sons Quarry would be acceptable based on proximity/rock type. 3. Where is the closest location for construction water? What are the requirements to use the water? A: Water can be obtained from the City of Fort Collins ranch water station at 700 Wood Street at a cost of $13.76/1,000 gallons. All hauling to the site would be the responsibility of the selected bidder. What are the requirements for traffic control? Is it only through the county? A: Selected bidder will be required to maintain access for Owner and other users providing temporary entrance/exit with traffic control devices as necessary during construction operations in accordance with section 01 11 00. Traffic control within County right of way is not anticipated unless proposed for staging purposes and would be the selected bidder’s responsibility for permitting/coordination. 4. Does the city/county/state require a permit or license to work on the site? A: A permit for work on the City of Fort Collins easement is not required. The selected Addendum # 2 ITB 10060 bidder will need to comply with all applicable State of Colorado stormwater management requirements. 5. Regarding hydro mulch, is it necessary only on the top road in disturbed areas or also on the bottom road? Given tough road conditions and limited access, would hand-applied straw mulch or wood straw suffice? A: Hand applied/small equipment applied seed with straw mulch would be permitted in areas that cannot be reached with hydro mulch equipment.