HomeMy WebLinkAboutAddendum 1 - BID - 10007 Timberline & Vine Road Widening ProjectAddendum # 1
RFP 10007 Timberline & Vine Road Widening Page 1 of 2
ADDENDUM NO. 1
Description of ITB 10007: Timberline & Vine Road Widening
ITB DUE DATE: 3:00 PM (Our Clock) July 18, 2024
To all prospective Bidders under the invitation to bid documents described above, the following
changes/additions are hereby made and detailed in the following sections of this addendum:
Exhibit 1- Questions and Answers
Please contact Adam Hill, Senior Buyer, at 970-221-6777 or adhill@fcgov.com with any questions
regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE ITB STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
nd Floor
970.221.6775
970.221.6707
fcgov.com/purchasing
Addendum # 1
RFP 10007 Timberline & Vine Road Widening Page 2 of 2
Exhibit 1 – Questions and Answers
1. Does the city have enough days for message boards for Phase 2? The line allows for 20
ea/day, which only allows for message boards during the closure period but not for any pre-
warning of the closure.
Response: See revised bid tab for 52 VMBs on the
Project. Please see description of the intended purpose of the VMBs below:
- 4 VMBs for 3 days advance notification prior to construction
- 4 VMBs for 5 days advance notification of the intersection closure
- 4 VMBs for the 5 days during the intersection closure
1 201-00000 Clearing & Grubbing LS 1 $0
2 202-00220 Removal of Asphalt Mat SY 650 $0
3 202-00240 Removal of Asphalt Mat (Planing)(2" Depth)SY 3,400 $0
4 202-00810 Removal of Ground Sign EACH 4 $0
5 202-01000 Removal of Fence LF 25 $0
6 203-00060 Embankment (CIP)(Roadway Widening)CY 300 $0
7 203-00050 Unsuitable Material CY 50 $0
8 207-00205 Topsoil CY 100 $0
9 208-00002 Erosion Control Management (ECS & BMP Devices) LS 1 $0
10 210-04010 Adjust Manhole EACH 2 $0
11 210-04050 Adjust Valve Box EACH 3 $0
12 212-00006 Seeding (Native)SQFT 6,500.00 $0
13 212-00032 Soil Conditioning SQFT 6,500.00 $0
14 213-00002 Mulching (Weed Free Hay) SQFT 6,500.00 $0
15 304-06000 Aggregate Base Course (Class 5 or 6)(2' wide shoulders @ 6")(Reconstruction at road widening 8") TON 400 $0
16 306-01000 Reconditioning SY 1,220 $0
17 403-33851 Hot Mix Asphalt (Grading S) (75) (PG 64-22) (6" @ Road Widening) & (2"-8" variable at overlay) TON 800 $0
18 403-34851 Hot Mix Asphalt (Grading SX) (75) (PG 64-28) (2") TON 510 $0
19 607-11455 Fence Wood (Privacy)LF 20 $0
20 608-00010 Concrete Curb Ramp SY 11 $0
21 620-00020 Sanitary Facility EACH 1 $0
22 626-00000 Mobilization LS 1 $0
23 629-01210 Adjust Monument Box EACH 1 $0
24 630-00000 Flagging HOUR 600 $0
25 630-00007 Traffic Control Inspection DAY 10 $0
26 630-00012 Traffic Control Management DAY 25 $0
27 630-XXXXX Traffic Control Devices LS 1 $0
28 630-80355 Portable Message Sign Panel EA/DAY 52 $0
29 700-70010 F/A Minor Contract Revisions FA $30,000.00 1 $30,000
30 700-70040 F/A BNSF Railroad (Construction C&M Agreement & Insurance) FA $10,000.00 1 $10,000
31 700-70042 F/A BNSF RR Flagger FA $25,000.00 1 $25,000
$65,000
TOTAL IN WORDS:
TOTAL:
ADDENDUM1 - 10007 Timberline& Vine Road Widening Project
ROADWAY
QUANTITY COST
ITEM NO.SECTION
NUMBER CONTRACT ITEM UNIT UNIT COST