Loading...
HomeMy WebLinkAboutCOMPACTION TESTING - Filed CT-CONCRETE TEST - (9)Test Results Test # Retest Of Test Date Proctor ID Method Soil Classification Optimum Moisture (%) Maximum Dry Density (pcf) In Place Moisture (%) In Place Dry Density (pcf) In Place Wet Density (pcf) Probe Depth (in) Percent Compaction Min Comp. (%) Optimum Moisture Tolerance (%)Remark 348 05/10/24 5 698B Granular 11.5 119.0 8.2 129.8 140.4 8 109 95 -2 / 2 B 349 05/10/24 5 698B Granular 11.5 119.0 7.9 129.2 139.4 8 109 95 -2 / 2 B 350 05/10/24 15 698C Granular 7.5 129.0 6.1 127.9 135.7 8 99 95 -2 / 2 A Test Information Test #Test Location Elevation Reference Gauge Make / Model / SN / Calibrated Field Technician 348 Storm Sewer Trench Backfill: 24" RCP backfill, Existing inlet on Delozier Road, 140' south of Crusader Street, south side of RCP 0.0 below grade(feet)XPLORER / 3500 / 3383 / 01/24/2018 Braun, Frederick 349 Storm Sewer Trench Backfill: 24" RCP backfill, Existing inlet on Delozier Road, 140' south of Crusader Street, north side of RCP 0.0 below grade(feet)XPLORER / 3500 / 3383 / 01/24/2018 Braun, Frederick 350 Storm Sewer Trench Backfill: 24" RCP backfill, Existing inlet on Delozier Road, 140' south of Crusader Street, basecourse 0.0 below grade(feet)XPLORER / 3500 / 3383 / 01/24/2018 Braun, Frederick Remarks B: Test results do not comply with specifications. A: Test results comply with specifications. Comments Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on file with the testing agency. This report presents opinions formed as a result of our observations of fill placement and the test results shown above. Test data are not the sole basis for opinions whether the fill meets project specifications. The contractor is responsible to apply necessary compaction effort and moisture to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 1 of 1 Compaction Testing Test Method: ASTM D 6938 Report Date: 05/23/2024 Report #: SNG-000015 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-325 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins