Loading...
HomeMy WebLinkAboutAddendum 1 - BID - 10002 Poudre River Trail at I-25 Premanufactured Pedestrian BridgeAddendum # 1 RFP 9996 Poudre River Trail At I-25 Premanufactured Pedestrian Bridge Page 1 of 2 ADDENDUM NO. 1 Description of ITB 10002: Poudre River Trail At I-25 Premanufactured Pedestrian Bridge ITB DUE DATE: 3:00 PM (Our Clock) June 24, 2024 To all prospective Bridge Design & Manufacturers under the invitation to bid documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1- Questions and Answers Please contact Adam Hill, Senior Buyer, at 970-221-6777 or adhill@fcgov.com with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE ITB STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum # 1 RFP 9996 Poudre River Trail At I-25 Premanufactured Pedestrian Bridge Page 2 of 2 Exhibit 1 – Questions and Answers 1. Please define the specific decking material required for the pedestrian bridge. Response: The decking material for the bridge is 5” colored concrete with Fiber mesh. 2. Not sure why we would need to provide a person on-site when we send instructions on how to offload? Also, when is the requested delivery date? Response: If the selected manufacturer provides clear and concise detailed pick plans for the offloading and setting of the bridge a representative from the manufacturer may not be required. The City would prefer to have this representation on the site for this activity. The bridge delivery date, as outlined in the bid advertisement is the week of November 4th, 2024.