HomeMy WebLinkAboutAddendum 1 - BID - 10002 Poudre River Trail at I-25 Premanufactured Pedestrian BridgeAddendum # 1
RFP 9996 Poudre River Trail At I-25 Premanufactured Pedestrian Bridge Page 1 of 2
ADDENDUM NO. 1
Description of ITB 10002: Poudre River Trail At I-25 Premanufactured Pedestrian Bridge
ITB DUE DATE: 3:00 PM (Our Clock) June 24, 2024
To all prospective Bridge Design & Manufacturers under the invitation to bid documents described
above, the following changes/additions are hereby made and detailed in the following sections of
this addendum:
Exhibit 1- Questions and Answers
Please contact Adam Hill, Senior Buyer, at 970-221-6777 or adhill@fcgov.com with any questions
regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE ITB STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Addendum # 1
RFP 9996 Poudre River Trail At I-25 Premanufactured Pedestrian Bridge Page 2 of 2
Exhibit 1 – Questions and Answers
1. Please define the specific decking material required for the pedestrian bridge.
Response: The decking material for the bridge is 5” colored concrete with Fiber mesh.
2. Not sure why we would need to provide a person on-site when we send instructions on
how to offload? Also, when is the requested delivery date?
Response: If the selected manufacturer provides clear and concise detailed pick
plans for the offloading and setting of the bridge a representative from the manufacturer
may not be required. The City would prefer to have this representation on the site for
this activity.
The bridge delivery date, as outlined in the bid advertisement is the week of November
4th, 2024.