Loading...
HomeMy WebLinkAboutRFP - 9996 Playground Designer and Manufacturer for Schoolside ParkRFP 9996 Playground Design and Manufacturer for Schoolside Park Page 1 of 218 REQUEST FOR PROPOSAL 9996 PLAYGROUND DESIGNER AND MANUFACTURER FOR SCHOOLSIDE PARK RFP DUE: 3:00 PM MT (Mountain Time), June 12, 2024 The City of Fort Collins is requesting proposals from qualified Playground Designer(s) and Manufacturer(s) to provide services for playground design, manufacture, and installation for the Schoolside Park Project. The City may choose to select (1) or more Playground Designer(s) and Manufacturer(s) at the City’s sole discretion. As part of the City’s commitment to sustainability, proposals must be submitted online through the Rocky Mountain E-Purchasing System (RMEPS) at http://www.bidnetdirect.com/colorado/city- of-fort-collins. Note: please ensure adequate time to submit proposals through RMEPS. Proposals not submitted by the designated Opening Date and Time will not be accepted by RMEPS. A pre-proposal meeting will be held at 10:00 AM MT on May 29, 2024. The pre-proposal meeting will be hosted on-line via Microsoft Teams or Zoom. Select or copy/paste the below link into your browser for access to the meeting. Please be prepared to announce your name and mute your microphone: Join the meeting now https://teams.microsoft.com/l/meetup- join/19%3ameeting_N2ZhZTE3OWYtZWU5Yy00MDJkLWE0ZWEtOGE0ZmVhOTljZTA5%40thr ead.v2/0?context=%7b%22Tid%22%3a%2247fa2f5f-0d0a-4a68-b431- 6d1a27b66660%22%2c%22Oid%22%3a%2237299b31-8a43-4b66-8642- b5358a21cda9%22%7d Alternatively, the pre-proposal meeting can be accessed via phone at the below call-in and conference ID. This option will only allow you to hear the audio presentation. Call-in number: 1-970-628-0892 Conference ID: 295 566 073# All questions should be submitted, in writing via email, to Adam Hill, Senior Buyer at adhill@fcgov.com, with a copy to Amanda Castelli, Project Manager, at acastelli@fcgov.com, no later than 3:00 PM MT on June 5, 2024. Please format your e-mail to include: RFP 9996 Playground Design and Manufacturer for Schoolside Park in the subject line. Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an addendum and posted on the Rocky Mountain E-Purchasing System webpage. Rocky Mountain E-Purchasing System hosted by BidNet A copy of the RFP may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins. This RFP has been posted utilizing the following Commodity Code(s): 650 12 Climbers, Playground Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 2 of 218 650 18 Combination Sets, Playground 650 38 Playground Equipment 650 54 Seesaws, Playground 650 60 Slides, Playground 650 72 Swings, Playground 931 65 Park, Playground, Swimming Pool Maintenance and Repair 988 73 Playground Equipment Maintenance and Repair Prohibition of Unlawful Discrimination: The City of Fort Collins, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d- 4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality. The City also strictly prohibits unlawful harassment in the workplace, including sexual harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding. The City requires its Playground Designer(s) and Manufacturer(s) to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment and retaliation. This requirement applies to all third-party Playground Designer(s) and Manufacturer(s) and their subcontractors/subconsultants at every tier. Public Viewing Copy: The City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. Playground Designer(s) and Manufacturer(s) may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version of the proposal, Playground Designer(s) and Manufacturer(s) may redact text and/or data that it deems confidential or proprietary pursuant to CORA. All pricing will be considered public records subject to disclosure under CORA and as such pricing cannot be redacted from the “FOR PUBLIC VIEWING” version of the proposal. Failure to provide a public viewing copy will be considered a waiver of any claim of confidentiality under CORA without regard to how the applicant’s proposal or certain pages of the proposal are marked confidential, proprietary, or similar. Such statement does not necessarily exempt such documentation from public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other applicable law. Generally, under CORA, trade secrets, confidential commercial information and financial data information may not be disclosed by the City. Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. By responding to this RFP, Playground Designer(s) and Manufacturer(s) hereby waives any and all claims for damages against the City for the City’s good faith compliance with CORA. All provisions and pricing of any contract resulting from this request for proposal will be public information. RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 3 of 218 Playground Designer(s) and Manufacturer(s) Registration: The City requires new Playground Designer(s) and Manufacturer(s) receiving awards from the City to submit IRS form W-9 and requires all Playground Designer(s) and Manufacturer(s) to accept Direct Deposit (Electronic) payment. If needed, the W-9 form and the Vendor Direct Deposit Authorization Form can be found on the City’s Purchasing website at www.fcgov.com/purchasing under Vendor Reference Documents. Please do not submit these documents with your proposal, however, if you take exception to participating in Direct Deposit (Electronic) payments please clearly note such in your proposal as an exception. The City may waive the requirement to participate in Direct Deposit (Electronic) payments at its sole discretion. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Collusive or Sham Proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow other state and local governmental agencies, political subdivisions, and/or school districts to utilize the resulting award under all terms and conditions specified and upon agreement by all parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in the current term or in any future terms. The selected Playground Designer(s) and Manufacturer(s) shall be required to sign the City’s Agreement prior to commencing services (see sample attached to this document). Sincerely, Gerry Paul Purchasing Director RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 4 of 218 I. OBJECTIVE & PROJECT OVERVIEW A. Objective On behalf of the Park Planning and Development Department, the City of Fort Collins is seeking proposals for playground designer(s) and manufacturer(s) to provide playground design and to manufacture, store, delivery and installation play equipment for Schoolside Park. The Playground Designer(s) and Manufacturer(s) is required to be knowledgeable of current Americans with Disabilities Act (ADA) standards, Fort Collins building codes, Consumer Product Safety Commission (CPSC) regulations, and American Society for Testing Materials (ASTM) standards, and is International Play Equipment Manufacturers Association (IPEMA) certified and can supply commercial grade-play equipment. B. Project Overview Schoolside Park is a 5.3 -acre park site and will include a children’s playground, sensory walk, teen hangout area and other supported park amenities. The park is located at 5830 South Timberline Road, north of Zephyr Road and adjacent to Bacon Elementary School in Fort Collins, Colorado. The site is triangular and is bordered by the Mail Creek Ditch to the north and east, South Timberline Road to the west, and Bacon Elementary to the south. See Attachment A – Park Location Map. Given safety setback requirements for playgrounds from busy streets such as Timberline Road and open water sources like the adjacent Mail Creek Ditch, the playground will need to be fenced. Schoolside Park will be built by a General Contractor (GC) selected by the City. The selected Playground Designer(s) and Manufacturer(s) will be required to work with the GC and the City Project Manager to schedule installation of the playground equipment. The City may have one or multiple Playground Designer(s) and Manufacturer(s) deliver the final playground equipment for the park. The City anticipates the scope of work to be divided into 2 major tasks:  Task 1: Playground design, development, and shop drawings;  Task 2: Manufacture, storage, delivery, and installation of the selected equipment; II. PROJECT DESCRIPTION AND PROJECT FUNDING A. Project Description The conceptual design for the park and conceptual site perspective are shown in Attachment B – Concept Plan and Attachment C – Concept Perspective. These images provide an overall look and feel desired for the park, but should not be interpreted as final, pre-determined park or play experiences. Bacon Elementary School, adjacent to the future park site offers a Center Based Autism Program designed to support students with Autism Spectrum Disorder (ASD). The school aims to create an inclusive and supportive environment where students with autism can thrive academically, socially, and emotionally. We would like to extend this same philosophy into the playground. In addition to the typical 2-12 age group, the school offers a pre-schol program. There are two (2) play zones this RFP includes: the Children’s Playground and Sensory Walk (2-12) and Teen Hangout Area (13+). RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 5 of 218 Children’s Playground & Sensory Walk A concept for the playground and sensory walk has been prepared, (See Attachment C – Concept Perspective & Attachment D – Playground & Sensory Walk Concept).The City is in search of a playground design with a theme that embraces a fresh and modern interpretation of nature and science. The City aims to create an inclusive environment with play equipment that encourages functional, interconnected play, catering to ages 2-12 with a few opportunieies to engage pre-school age children if possible. Through neighborhood outreach, we've identified bouldering, climbing, spinning, swinging, and a zipline as top priorities for the playground. Muted earth tones, such as muted yellows, greens, and blue are preferred over bright and vibrant shades. Given the proximity to the school and neighboring communities, the playground design should include lower structures with ground-level access, transfer stations, belting, or ramps, rather than large tower structures. Overall, the playground should provide a dynamic and immersive experience that blends modern aesthetics with nature and science-inspired elements. The playground surfacing for the playground is anticipated to include a combination of poured-in-place surfacing and engineered wood fiber, budget permitting. While playground surfacing is not included in the scope of this RFP, feel free to identify proposed surfacing options in your design concepts. The City will work with the selected Playground Designer(s) and Manufacturer(s) to refine and develop these concepts in more detail. The sensory walk is intended to incorporate a variety of sensory elements. These elements can be located along the walk, integrated into the walk itself, or interact with visitors overhead. The intent is to provide a sensory experience through textures, colors, and gentle sounds. An example of a sensory element that could be provides is a quiet seating nook. The sensory area is intended to be paved; Safety surfacing will not be provided in this area. Teen Hangout A general concept for the teen hangout area has been prepared, (See Attachment E – Teen Hangout Concept). The teen hangout area is intended for ages 13+. This area features a multi-use court, seating area and a fitness zone. The goal of the fitness zone is to provide small obstacle course and/or performance climbing boulder for ages 13 and older. The surfacing for the fitness zone is anticipated to include engineered wood fiber. The total square footage for the Children’s Playground is 7,340 sf. It is suggested that Play Area 1 include all play equipment for ages 2-5 and the structure for ages 5-12. Play Area 2 can acconmondate the zipline and all swings.(See Attachment D – Playground & Sensory Walk Concept) Playground Designer(s) and Manufacturer(s) can deviate from this suggestion if they believe they have a better alternative. Below is proposed breakdown the Children’s Playground:  Ages 2-5 Play Equipment: o Full-bucket toddler swings (2 swings); o Non-traditional play structure featuring inclusive play opportunities; o Spinner (preferably wheelchair accessible); o Freestanding equipment for motion, balance and climbing; RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 6 of 218 o Approximate budget $70-$150k (design, equipment, store, delivery & install) o Play surfacing (to be provided by others) o As space and budget allows, a small play house for pre-school age children;  Ages 5-12 Play Equipment: o Non-traditional play structure featuring inclusive play opportunities; o Freestanding equipment for motion, balance and climbing; o Swings (2 bays with 2 belt swings and 2 ADA swings) o Approximate budget $70-$150k (design, equipment, store, delivery & install) o Play surfacing (to be provided by others);  Sensory Walk: o All ages and abilities; o Communication sign (non-verbal); o Creative accessible sensory play feature/features not requiring safety surfacing; o Approximately 1,000 sf +/- (play elements to be placed throughout the space) o Approximate budget $8k (design, equipment, store, delivery & install) o Paved area; No safety surfacing provided;  Teen Hangout: o Ages 13+; o Approximately 790 sf +/- o Approximate budget $90-$100k (design, equipment, store, delivery & install) o Play surfacing (to be provided by others) The City is requesting from the Playground Designer(s) and Manufacturer(s) a design concept which includes all of the mentioned above bullets and fully utilizes the entire playground footprint while maintaining applicable fall zones. The Playground Designer(s) and Manufacturer(s) will be responsible for the design, engineering, ADA compliance, and cost estimating support necessary for completion of the playground project from schematic design through installation and acceptance. The City contracted GC will be responsible for preparing the existing site, including establishment of subgrades and installation of site work (access ramps, drainage systems, adjacent concrete sidewalks, and concrete curb walls). The City currently anticipates installation of the playground in summer-fall of 2025. B. Project Funding The playground equipment budget is approximately $238,000-$408,000. This budget includes design, manufacturing/fabrication, storage, delivery and installation. RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 7 of 218 III. SCOPE OF PROPOSAL A. Scope of Work The following is an outline of a general scope of work. Additional tasks that the Playground Designer(s) and Manufacturer(s) determine necessary to assure a good deliverable design product and ultimately a high-quality playground should be addressed in the proposal. Task One – Playground Design Development and Shop Drawings 1. Work with City staff to refine and advance the playground concept design (this may include several rounds of review and revisions) including progress plans and supporting documents of the playground design such as renderings and CAD drawings. 2. Participate in budgeting / value engineering as needed for the playground. 3. Attendance at and participation in several progress meetings (attendance may be via conference call/video conferencing). Task Two – Playground Manufacture, Storage, Delivery & Installation 1. Playground equipment will be manufactured & delivered to the site directly or if equipment arrives before intended installation date, the equipment will be stored by the Playground Designer(s) and Manufacturer(s). 2. Coordination of installation with the City’s Project Manager and the selected GC. 3. Playground equipment will be installed by the Playground Designer(s) and Manufacturer(s). 4. Playground Designer(s) and Manufacturer(s) sales representative and/or installer must attend a follow-up inspection with a Certified Playground Safety Inspector prior to City acceptance of the equipment, installation, and final payment. The City will hire the Certified Playground Safety Inspector. A timely correction of all non-compliant items noted by the auditor is expected. B. Anticipated Schedule The following represents the City’s target schedule for the RFP. The City reserves the right to amend the target schedule at any time.  RFP issuance: May 15, 2024  Pre-Proposal Meeting: 10:00 AM MST MT on May 29, 2024  Question deadline: 3:00 PM MT on June 5, 2024  Final Addendum Issued: June 7, 2024  Proposal due date: 3:00 PM MT on June 12, 2024  Potential Interviews: Week of June 17, 2024  Award of Contract (tentative): June 24, 2024 Project Schedule  Project Kick-Off Meeting Upon execution of Services Agreement and Work Order 1  Playground Final Design Complete October 2024  GC Mobilization Spring 2025 RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 8 of 218  GC Construction Spring 2025 – Fall 2025  Installation of Play Equipment Summer / Fall 2025 (To be coordinated with GC) IV. GENERAL GUIDELINES AND REQUIREMENTS A. Proposals 1. Cost of Proposal Preparation. No reimbursement will be made by the City for any costs incurred prior to a formal Notice to Proceed. 2. The City reserves the right to accept or reject any or all proposals and to waive irregularities or technicalities in any proposal when in the best interest of the City. 3. The submission of a proposal indicates acceptance of the terms and conditions of this RFP, unless otherwise stated. The City reserves the right to accept or reject any exception taken to the RFP. 4. In addition to submitting a written proposal, the top-rated proposers may be interviewed by the RFP assessment team and asked to participate in an oral presentation to provide an overview of the company, approach to the project and to address questions. 5. Any costs to the City not specifically set forth in this RFP will be the responsibility of the Playground Designer(s) and Manufacturer(s) and will be deemed included in the fees and charges proposed herein. This includes, but is not limited to, costs associated with design, manufacturer, storage, delivery, and installation. 6. Responses may be rejected if any of the following are not performed:  To adhere to one or more of the provisions established in this RFP;  To demonstrate competence, experience, and ability to provide the manufactured equipment described in this RFP;  To submit a response on or before the deadline and complete all required forms;  To respond to a written request for clarification or additional information by the stated deadline. 7. Financial Qualifications (CONFIDENTIAL) Playground Designer(s) and Manufacturer(s) selected as finalists may be required to submit a banking reference and the most recent financial statement (audited preferred) including balance sheet and income statement, as well as a statement of cash flows (the “Financial Information”). 8. Work Orders The awarded Playground Designer(s) and Manufacturer(s) will be required to sign the City’s Work Order Type Agreement, a sample of which is attached as Section VII for reference purposes. In the event that the City has agreements with multiple Playground Designer(s) and Manufacturer(s) for the Work, the City reserves the right to request proposals for individual Work Order assignments from the awarded RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 9 of 218 Playground Designer(s) and Manufacturer(s) or assign Work Orders directly to a Playground Designer(s) and Manufacturer(s) at its sole discretion. Selection for individual Work Orders may be based on, but not limited to, availability, approach, prior experience, firm capability, and cost. Individual Work assignments will be requested and agreed to utilizing the City’s Work Order (included in the Agreement). Each Work Order must include a start and completion date, total cost and a Scope of Work. Subsequent supporting documentation pages may include a project schedule, deliverables, hours, cost detail supporting total cost, and personnel details. Fees outlined in the Work Order will conform with those stated in the Agreement. No Work Order over $7,500 will be considered valid until signed, at a minimum, by the Playground Designer(s) and Manufacturer(s), project manager and Purchasing Department representative. Depending on the cost and nature of the Work, additional signature authorization may be required. Any changes to the dates, cost or scope of any Work Order must be agreed upon in writing utilizing the City’s Change Order (included in the Agreement) and will not be considered valid until signed, at a minimum, by the Playground Designer(s) and Manufacturer(s), project manager and Purchasing Department representative. B. Standards and General Information 1. The City has developed a Building Design Standards Manual. Design will follow these standards unless exempted by the City. This manual is available online and can be viewed at: https://www.fcgov.com/opserv/design-standards.php. 2. Current Standards: All work and/or materials must meet current standards in force by recognized technical and professional societies, trade and materials supply associations, institutes and organizations, bureaus and testing laboratories, and national, federal, state, county, and local laws, codes and ordinances. 3. Workmanship shall meet or exceed existing industry standards. All materials and/or service shall comply with applicable OSHA regulations in effect at the time materials are shipped and/or the service is performed. Material Safety Data Sheets (MSDS) are required in accordance with applicable regulations. Material Safety Data Sheets must be left on site immediately after materials and/or services have been provided. 4. The selected Playground Designer(s) and Manufacturer(s) will be required to provide the City with complete, signed, and sealed plans and specifications from an architect or engineer licensed in the State of Colorado, for custom playground structures, depending on the final design. 5. The City is exempt from all state taxation including state sales and use taxes. 6. Travel and Expenses: Not provided. 7. Fees, Licenses, Permits: The awarded Playground Designer(s) and Manufacturer(s) shall be responsible for obtaining any necessary licenses, fees or permits without additional expense to the City. All vehicles shall be properly licensed and insured, carry the appropriate permits and be placarded as required by law. RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 10 of 218 8. Laws & Regulations: The Playground Designer(s) and Manufacturer(s) agrees to comply fully with all applicable local, State of Colorado and Federal laws and regulations and municipal ordinances to include American Disabilities Act (ADA). C. Invoicing and Payment: 1. Invoices should be emailed monthly to invoices@fcgov.com with a copy to the Project Manager. The cost of the Work completed shall be paid to the Playground Designer and Manufacturer each month following the submittal of a correct invoice by the Playground Designer and Manufacturer indicating the project name, Purchase Order number, task description, hours worked, personnel/work type category, hourly rate for each employee/work type category, date of the work performed specific to the task, percentage of that work that has been completed by task, 3rd party supporting documentation with the same detail and a brief progress report. 2. Payments will be made using the prices listed on the agreed-to Price Schedule. In the event a service is requested which is not listed on the Price Schedule, the Vendor and the City will negotiate an appropriate unit price for the service prior to Consultant initiating such work. The City pays invoices on Net 30 term. V. SUBMITTAL REQUIREMENTS Qualified Playground Designer(s) and Manufacturer(s) interested in performing the work described in this RFP must submit a complete proposal which addresses all elements of this RFP. Proposals to be submitted in PDF format. Pages are to be numbered. Page length not to exceed (30) double sided or (60) single pages. Graphics or charts may be presented on 11” x 17” size paper if necessary. Cover pages, divider sheets, and Proposal Acknowledgement Form (See Section VII) are excluded from the page limit. Responses must include all items listed below. Font shall be a minimum of 10 Arial and margins are limited to no less than .5” for sides and top/bottom. Extended page sizes, such as 11” x 17”, count as a single page and may be used for detailed pricing. Proposals that do not conform to these requirements may be rejected. Playground Designer(s) and Manufacturer(s) are required to provide detailed written responses to the following items in the order outlined below. The responses shall be considered technical offers of what Playground Designer(s) and Manufacturer(s) propose to provide and shall be incorporated in the contract award as deemed appropriate by the City. A proposal that does not include all the information required may be deemed non- responsive and subject to rejection. A. Cover Letter/Executive Summary: Provide a summary of your understanding of the project, project complexities, project schedule, milestones, and project issues. RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 11 of 218 B. Company Overview: Provide a company overview description and indicate unique capabilities your organization will bring to this project, as indicated by prior successful completion of similar projects. Describe your company’s background, number of years in business, ownership details, an overview of services offered and qualifications, size, primary location and address, and primary contact information. List any liens or unsatisfied judgments presently existing against your organization. If your organization has no liens or unsatisfied judgments, please communicate this as well. Provide all company warranty information of both custom play equipment, “off-the shelf” equipment and installation. C. Team Profile/Subcontractors/Subconsultants: Provide information regarding the team you propose to work on this project, including the availability and commitment of key personnel, with titles and tasks identified. Include experience addressing: recreation and play opportunities, maintenance considerations, public safety, environmental and utility challenges and working in collaboration with a project design team including any experience with project completed under the GC approach. Playground Designer(s) and Manufacturer(s) will be responsible for identifying any subcontractors and/or subconsultants in their proposal. Please note that the City will contract solely with the awarded Playground Designer(s) and Manufacturer(s); therefore, subcontractors and/or subconsultants will be the responsibility of the Playground Designer(s) and Manufacturer(s). D. Similar Project Experience: Provide examples of similar sized and/or themed playgrounds, installed within the last 5years for a minimum of 3 and maximum of 5 projects. Provide project location and references from companies or agencies that have purchased playgrounds from your company (and have owned the product for at least one year). Include contact’s name, title, address, telephone numbers and e- mail addresses. E. Concept Plans & Images:  Provide a concept plan, imagery, sketches or illustrations that convey the general design intent for the Children’s Playground and Sensory Walk as well as for the Teen Hangout area.  The Schoolside Park project has a number of stated goals, including fun, accessible, creative, and healthy play environments. Please provide a description of how this incorporates the themes of science and nature. Design should clearly identify the number of play events, including ADA accessible events, included in each design concept. F. Schedule: Provide a project schedule based on installation window beginning Summer 2025 and installation completion by Fall 2025 (timing to be finalized in conjunction with the GC schedule).  Include major milestones including design, manufacture, delivery, and installation; G. Costs: Playground Designer(s) and Manufacturer(s) shall submit an itemized estimated cost to develop the design, manufacture, store, deliver and install the RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 12 of 218 proposed playground equipment. Please breakout cost by playground equipment piece, total cost per area and cumulative total project cost. H. Sustainability/TBL Methodology In concise terms (no more than two pages), please describe your organization’s commitment to sustainability and supporting values. Each element of the TBL sustainability criteria will receive equal consideration in determining the final Sustainability/TBL score. 1. Address how your firm strives to incorporate all three aspects (social, environmental, and economic) of Triple Bottom Line (TBL) sustainable practices into the workplace. Provide examples along with any metrics used to measure success within your firm. 2. Also provide examples of how your firm has incorporated all three aspects of TBL sustainable practices in previous similar projects on which your firm has been the prime Playground Designer(s) and Manufacturer(s). Some examples are provided below: a. Environmental – Experience delivering projects / programs focused on environmental health priorities in the areas of climate resiliency, water quality and watershed protection, regulatory performance, management systems, air quality, renewable energy, sustainable building and design, construction materials management, and solid waste reduction. b. Economic – Experience working and delivering projects with an emphasis on strategic financial planning, job creation, business development, asset management, various project delivery methods, value engineering, regional partnerships, transparency, stakeholder engagement, strategic investments, aging infrastructure, repurposing of existing facilities, and competing financial priorities. c. Social - Experience working and delivering projects, programs, and/or initiatives that support Equity, Diversity, and Inclusion throughout your firm’s workplace, including leadership, and supply chain. Examples of this may be demonstration of working within cultural and language gaps, development of diversity programs, diverse project teams, equitable opportunity vendor supply chain, and how your firm has applied an equity lens to processes such as recruitment, hiring, purchasing, career pathways, salaries, and staff engagement. I. Sample Agreement Included with this RFP is a sample Agreement that the City intends to use for obtaining the services of the Playground Designer(s) and Manufacturer(s). The Playground Designer(s) and Manufacturer(s) is required to review this Agreement and indicate any objections to the terms of the contract. If revisions to the contractual terms are requested, provide suggested revisions. J. Acknowledgement The Acknowledgement form is attached as Section VII. Complete the attached form indicating the Playground Designer(s) and Manufacturer(s) hereby acknowledges receipt of the City RFP and acknowledges that the Playground Designer(s) and Manufacturer(s) has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP. RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 13 of 218 VI. REVIEW AND ASSESSMENT An evaluation committee will independently evaluate the merit of proposals received, according to the criteria table shown below. The evaluation committee may conduct discussions with a Playground Designer(s) and Manufacturer(s) who submits an acceptable proposal. Playground Designer(s) and Manufacturer(s) shall be accorded fair and equal treatment with respect to any opportunity for discussion and revision of proposals. WEIGHTING FACTOR CATEGORY STANDARD QUESTIONS 1.0 Scope of Proposal Does the proposal address all elements of the RFP? Does the proposal show an understanding of the project objectives, methodology to be used and results/outcomes required by the project? 3.0 Company & Team Qualifications and Project Experience Does the firm have the resources, financial strength, capacity and support capabilities required to successfully complete the project on-time and in-budget? Has the firm successfully completed previous projects of this type and scope? 3.0 Creativity: Concept Plans & Images Are the concept plans and images creative and integrate the requested theme and play elements into design solutions? 2.0 Cost & Work Hours Does the proposal include a detailed cost break-down for each play area and are the line-item costs competitive? 1.0 Sustainability/TBL Methodology Does the firm demonstrate a commitment to Sustainability and incorporate Triple Bottom Line methodology in both their Scope of Work for the project, and their day-to-day business operating processes and procedures? Does the firm demonstrate a commitment to all three aspects (social, environmental, and economic) of the Triple Bottom Line (TBL) methodology of sustainability for this project and in their company value system as evidenced by their day-to-day business operating processes, practices and procedures? RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 14 of 218 Reference Evaluation (Top Rated Company) The Project Manager will check references using the following criteria. The evaluation rankings will be labeled Satisfactory/Unsatisfactory. QUALIFICATION STANDARD Overall Performance Would you hire this Playground Designer(s) and Manufacturer(s) again? Did they show the skills required by this project? Timetable Was the original Scope of Work completed within the specified time? Were interim deadlines met in a timely manner? Completeness Was the Playground Designer(s) and Manufacturer(s) responsive to client needs; did the Playground Designer(s) and Manufacturer(s) anticipate problems? Were problems solved quickly and effectively? Budget Was the original Scope of Work completed within the project budget? Job Knowledge Did the installed playground meet the Scope of Work? Was the project functional upon completion and did it operate properly? Were problems corrected quickly and effectively? RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 15 of 218 VII. ACKNOWLEDGEMENT Playground Designer(s) and Manufacturer(s) hereby acknowledges receipt of the City of Fort Collins Request for Proposal and acknowledges that it has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP 9996 Playground Design and Manufacturer for Schoolside Park and sample Agreement except as otherwise noted. Additionally, Playground Designer(s) and Manufacturer(s) hereby makes the following representations to City: a. All of the statements and representations made in this proposal are true to the best of the Playground Designer(s) and Manufacturer(s)’s knowledge and belief. b. Playground Designer(s) and Manufacturer(s) commits that it is able to meet the terms provided in this proposal. c. This proposal is a firm and binding offer, for a period of 90 days from the date hereof. d. Playground Designer(s) and Manufacturer(s) further agrees that the method of award is acceptable. e. Playground Designer(s) and Manufacturer(s) also agrees to complete the proposed Agreement with the City of Fort Collins within 10 days of notice of award. If contract is not completed and signed within 10 days, City reserves the right to cancel and award to the next highest rated firm. f. Playground Designer(s) and Manufacturer(s) acknowledges receipt of addenda. g. Playground Designer(s) and Manufacturer(s) acknowledges no conflict of interest. h. Playground Designer(s) and Manufacturer(s) acknowledges that the City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. Playground Designer(s) and Manufacturer(s) may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version of the proposal, Playground Designer(s) and Manufacturer(s) may redact text and/or data that it deems confidential or proprietary pursuant to CORA. All pricing will be considered public records subject to disclosure under CORA and as such pricing cannot be redacted from the “FOR PUBLIC VIEWING” version of the proposal. Failure to provide a public viewing copy will be considered a waiver of any claim of confidentiality under CORA without regard to how the applicant’s proposal or certain pages of the proposal are marked confidential, proprietary, or similar. Such statement does not necessarily exempt such documentation from public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other applicable law. Generally, under CORA, trade secrets, confidential commercial information and financial data information may not be disclosed by the City. Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. By responding to this RFP, Playground Designer(s) and Manufacturer(s) hereby waives any and all claims for damages against the City for the City’s good faith compliance with CORA. All provisions and pricing of any contract resulting from this request for proposal will be public information. Legal Firm Name: Physical Address: Remit to Address: RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 16 of 218 Phone: Name of Authorized Agent of Firm: Signature of Authorized Agent: Primary Contact for Project: Title: Email Address: Phone: Cell Phone: NOTE: ACKNOWLEDGMENT IS TO BE SIGNED & RETURNED WITH YOUR PROPOSAL. Official Purchasing Document Last updated 5/2024 Master Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 17 of 218 VIII. SAMPLE AGREEMENT (FOR REFERENCE ONLY – DO NOT SIGN ) MASTER PROFESSIONAL SERVICES AGREEMENT WORK ORDER TYPE THIS MASTER PROFESSIONAL SERVICES AGREEMENT (AGREEMENT) made and entered into the day and year set forth in the Agreement Period section below, by and between the CITY OF FORT COLLINS, COLORADO, a Colorado Municipal Corporation (CITY) and , a(n) [enter state] [business type] (PLAYGROUND DESIGNER AND MANUFACTURER). WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Scope of Service. The PLAYGROUND DESIGNER AND MANUFACTURER agrees to provide Services in accordance with any project Work Orders for , issued by the CITY. Such Work Orders will be incorporated into this Agreement. A blank sample of a Work Order is attached hereto as Exhibit A & B, consisting of one (1) and ninety-one (91) pages and incorporated herein, shall include a description of the services to be performed, the location and time for performance, the amount of payment, any materials to be supplied by the City and any other special circumstances relating to the performance of services. A General Scope of Services is attached hereto as Exhibit C, consisting of [# of Pages] and incorporated herein. The CITY reserves the right to independently solicit any project rather than issuing a Work Order to the PLAYGROUND DESIGNER AND MANUFACTURER for the same pursuant to this AGREEMENT. Irrespective of references to certain named third parties within this AGREEMENT or any Work Order, the PLAYGROUND DESIGNER AND MANUFACTURER shall be solely responsible for performance of all duties hereunder. The term Service as used in this AGREEMENT shall include the Services and deliverables contained in any Work Order issued by the CITY. The CITY may, at any time during the term of a particular Work Order and without invalidating the Work Order, make changes to the scope of the particular Service. Changes shall be agreed upon in writing by the parties by Change Order, a sample of which is attached hereto as Exhibit D, consisting of [# of Pages] and incorporated herein. 2. Work Order Schedule. The Services to be performed pursuant to this AGREEMENT shall be performed as specified on each Work Order. Time is of the essence. Any change in schedule must be agreed upon in writing by the parties hereto via a Change Order. 3. Changes. The CITY may, at any time during the term of the AGREEMENT, make changes to the AGREEMENT. Such changes shall be agreed upon in writing by the parties. 4. Agreement Period. This AGREEMENT shall commence , 20 (the Effective Date) and shall continue in full force and effect until , 20 , unless sooner terminated as herein provided. In addition, at the option of the CITY, the AGREEMENT may Official Purchasing Document Last updated 5/2024 Master Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 18 of 218 be extended for additional one (1) year periods not to exceed [choose one] additional one- year periods. Renewals and pricing changes shall be negotiated by and agreed to by both parties only at the time of renewal. Written notice of renewal shall be provided to the PLAYGROUND DESIGNER AND MANUFACTURER no later than thirty (30) days before AGREEMENT end. Should written notice of renewal be delayed, the parties agree that this AGREEMENT may automatically extend on a month-to-month basis until a renewal is completed. Upon expiration of the final renewal term, the AGREEMENT may continue but not to exceed one (1) year if required to complete any active Work Orders in accordance with Section 8-186 of City Code. 5. Early Termination by CITY. Notwithstanding the time periods contained herein, the CITY may terminate this AGREEMENT at any time without cause or penalty by providing at least ten (10) calendar days written notice of termination to the PLAYGROUND DESIGNER AND MANUFACTURER. In the event of early termination by the CITY, the PLAYGROUND DESIGNER AND MANUFACTURER shall be paid for Services rendered up to the date of termination, subject to the satisfactory performance of the PLAYGROUND DESIGNER AND MANUFACTURER's obligations under this AGREEMENT. PLAYGROUND DESIGNER AND MANUFACTURER shall submit a final invoice within ten (10) calendar days of the effective date of termination. Payment shall be the PLAYGROUND DESIGNER AND MANUFACTURER's sole right and remedy for termination. 6. Notices. All notices provided under this AGREEMENT shall be effective immediately when emailed or three (3) business days from the date of the notice when mailed to the following addresses: Playground Designer And Manufacturer: CITY: Copy to: Attn: Email Address City of Fort Collins Attn: Amanda Castelli PO Box 580 Fort Collins, CO 80522 acastelli@fcgov.com City of Fort Collins Attn: Purchasing Dept. PO Box 580 Fort Collins, CO 80522 purchasing@fcgov.com All notices under this AGREEMENT shall be written. 7. Compensation. In consideration of the Services to be performed pursuant to this AGREEMENT, the CITY agrees to pay the PLAYGROUND DESIGNER AND MANUFACTURER [choose one] as designated in Exhibit E, consisting of [# of Pages], attached and incorporated herein. At the election of the CITY, each Work Order may contain a maximum fee, which shall be negotiated by the parties hereto for each Work Order. Partial payments based upon the PLAYGROUND DESIGNER AND MANUFACTURER’s billings and itemized statements are permissible as defined in the applicable Work Order. The amounts of any partial payments shall be based upon the PLAYGROUND DESIGNER AND MANUFACTURER’s City-verified progress in completing the Service(s) to be performed Official Purchasing Document Last updated 5/2024 Master Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 19 of 218 pursuant to the Work Order and upon approval of the PLAYGROUND DESIGNER AND MANUFACTURER’s direct reimbursable expenses. Payment shall be made following acceptance of the Services by the CITY. Itemized invoices shall be emailed to invoices@fcgov.com with a copy to the Project Manager. The cost of the Services completed shall be paid to the PLAYGROUND DESIGNER AND MANUFACTURER following the submittal of a correct itemized invoice by the PLAYGROUND DESIGNER AND MANUFACTURER. The CITY is exempt from sales and use tax. The CITY’s Certificate of Exemption license number is 09804502. A copy of the license is available upon written request. The CITY pays undisputed invoices on Net 30 days from the date of the invoice submittal to the CITY or, for disputed invoices, Net 30 days from the date of CITY Project Manager’s approval. 8. Design and Service Standards. The PLAYGROUND DESIGNER AND MANUFACTURER warrants and shall be responsible for the Playground Designer and Manufacturer quality, technical accuracy, accessibility requirements under ADA and Public Accommodations and Technology Accessibility sections below, timely completion and the coordination of all Services rendered by the PLAYGROUND DESIGNER AND MANUFACTURER, and the Project Instruments as defined in the Project Instruments and License section below. The PLAYGROUND DESIGNER AND MANUFACTURER shall, without additional compensation, promptly remedy and correct any errors, omissions, or other deficiencies from such standards. 9. Indemnification. The PLAYGROUND DESIGNER AND MANUFACTURER shall indemnify, defend, and hold harmless the CITY and its officers and employees, to the maximum extent permitted under Colorado law, against and from any and all actions, suits, claims, demands, or liability of any character whatsoever claimed by the PLAYGROUND DESIGNER AND MANUFACTURER or third parties against the CITY arising out of or related to this AGREEMENT (not limited to contract, tort, intellectual property, accessibility, or otherwise). This obligation extends to reimbursement of the CITY's costs and reasonable attorney’s fees. 10. Insurance. The PLAYGROUND DESIGNER AND MANUFACTURER shall maintain insurance in accordance with Exhibit F, consisting of one (1) page, attached hereto and incorporated herein. 11. Appropriation. To the extent this AGREEMENT, or any provision in it, requires payment of any nature in fiscal years subsequent to the current fiscal year and constitutes a multiple fiscal year debt or financial obligation of the CITY, it shall be subject to annual appropriation by the Fort Collins City Council as required in Article V, Section 8(b) of the City Charter, City Code Section 8-186, and Article X, Section 20 of the Colorado Constitution. The CITY shall have no obligation to continue this AGREEMENT in any fiscal year for which there are no pledged cash reserves or supporting appropriations pledged irrevocably for purposes of payment obligations herein. Non-appropriation by the CITY shall not be construed as a Official Purchasing Document Last updated 5/2024 Master Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 20 of 218 breach of this AGREEMENT. 12. Project Instruments and License. a. Upon execution of this AGREEMENT, the PLAYGROUND DESIGNER AND MANUFACTURER grants to the CITY an irrevocable, unlimited and royalty free license to use any and all sketches, drawings, as-builts, specifications, designs, blueprints, data files, calculations, studies, analysis, renderings, models, plans, reports, and other Work Order deliverables (Project Instruments), in any form whatsoever and in any medium expressed, for purposes of constructing, using, maintaining, altering and adding to the project, provided that the CITY substantially performs its obligations under the AGREEMENT. The license granted hereunder permits the CITY and third parties reasonably authorized by the CITY to reproduce applicable portions of the Project Instruments for use in performing the Services or construction for the project. In addition, the license granted hereunder shall permit the CITY and third parties reasonably authorized by the CITY to reproduce and utilize the Project Instruments for similar projects, provided however, in such event the PLAYGROUND DESIGNER AND MANUFACTURER shall not be held responsible for the design to the extent the CITY deviates from the Project Instruments. This license shall survive termination of the AGREEMENT by default or otherwise. b. Upon payment under each applicable Work Order, Project Instruments rendered by the PLAYGROUND DESIGNER AND MANUFACTURER shall become the CITY’s property. The PLAYGROUND DESIGNER AND MANUFACTURER shall provide the CITY with the Project Instruments in electronic format in a mutually agreed upon file type. 13. CITY Project Manager. The CITY’s Project Manager will be shown on the specific Work Order and shall make, within the scope of the Project Manager’s authority, all necessary and proper decisions with reference to the Services requested under the applicable Work Order. All requests for contract interpretation, change order and other clarification or instruction shall be directed to the CITY Project Manager. The initial CITY Project Manager for this AGREEMENT is Amanda Castelli and can be reached at acastelli@fcgov.com. The CITY Project Manager is subject to change by the CITY. 14. Project Status Report. Project status reports may be required by Work Order and shall be submitted to the CITY Project Manager. Failure to provide any required status report may result in the suspension of the processing of any invoice. 15. Independent Contractor. The Services to be performed by the PLAYGROUND DESIGNER AND MANUFACTURER are those of an independent contractor and not of an employee of the CITY. The CITY shall not be responsible for withholding any portion of the PLAYGROUND DESIGNER AND MANUFACTURER's compensation hereunder for the payment of FICA, Workers' Compensation, unemployment insurance, other taxes or benefits or for any other purpose. Official Purchasing Document Last updated 5/2024 Master Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 21 of 218 16. Personal Services. It is understood that the CITY enters into this AGREEMENT based on the special abilities of the PLAYGROUND DESIGNER AND MANUFACTURER and that this AGREEMENT shall be considered as an AGREEMENT for personal services. Accordingly, the PLAYGROUND DESIGNER AND MANUFACTURER shall neither assign any responsibilities nor delegate any duties arising under this AGREEMENT without the prior written consent of the CITY. 17. Subcontractors/Subconsultants. The PLAYGROUND DESIGNER AND MANUFACTURER may not subcontract any of the Service(s) set forth in any Work Order without the prior written consent of the CITY, which shall not be unreasonably withheld. If any of the Services is subcontracted hereunder, with the consent of the CITY, then the following provisions shall apply: a. the subcontractor/subconsultant must be a reputable, qualified firm with an established record of successful performance in its respective trade performing identical or substantially similar Services; b. the subcontractor/subconsultant will be required to comply with all applicable terms of this AGREEMENT; c. the subcontract will not create any contractual relationship between any subcontractor/subconsultant and the CITY, nor will it obligate the CITY to pay or see to the payment of any subcontractor/subconsultant; and d. the Services of the subcontractor/subconsultant will be subject to inspection by the CITY to the same extent as the Service(s) of the PLAYGROUND DESIGNER AND MANUFACTURER. The PLAYGROUND DESIGNER AND MANUFACTURER shall require all subcontractor/subconsultants performing Service(s) hereunder to maintain insurance coverage naming the CITY as an additional insured under this AGREEMENT in accordance with Exhibit F. The PLAYGROUND DESIGNER AND MANUFACTURER shall maintain a copy of each subcontractor’s/subconsultant’s certificate evidencing the required insurance. Upon request, the PLAYGROUND DESIGNER AND MANUFACTURER shall promptly provide the CITY with a copy of the certificate(s) within two (2) business days. The PLAYGROUND DESIGNER AND MANUFACTURER shall be responsible for any liability directly or indirectly arising out of the Services performed under this AGREEMENT by a subcontractor/subconsultant, which liability is not covered by the subcontractor/subconsultant's insurance. 18. Acceptance Not Waiver. The CITY's approval of Project Instruments furnished hereunder shall not in any way relieve the PLAYGROUND DESIGNER AND MANUFACTURER of responsibility for the quality or technical accuracy of the Services. The CITY's approval or acceptance of, or payment for, any of the Services shall not be construed to operate as a waiver of any rights or benefits provided to the CITY under this AGREEMENT. 19. Default. Each and every term and condition hereof shall be deemed to be a material element Official Purchasing Document Last updated 5/2024 Master Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 22 of 218 of this AGREEMENT. In the event either party should fail to or refuse to perform according to the terms of this AGREEMENT, that party may be declared in default upon notice. 20. Remedies. In the event a party has been declared in default, that defaulting party shall be allowed a period of ten (10) calendar days from the date of notice within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to: a. terminate the AGREEMENT and seek damages; b. treat the AGREEMENT as continuing and require specific performance; or c. avail themselves of any other remedy at law or equity. In the event of a dispute between the parties regarding this AGREEMENT, each party shall bear its own attorney fees and costs, except as provided for in the Indemnification and Technology Accessibility sections. 21. Entire Agreement; Binding Effect; Authority to Execute. This AGREEMENT, along with all Exhibits, Work Orders and other documents incorporated herein, shall constitute the entire AGREEMENT of the parties regarding this transaction and the matter recited herein. This AGREEMENT shall supersede any prior agreements, promises, or understandings as to the matter recited herein. The AGREEMENT shall be binding upon the parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. Covenants or representations not contained in this AGREEMENT shall not be binding on the parties. In the event of a conflict between the terms of the AGREEMENT and any exhibit or attachment, the terms of the AGREEMENT shall prevail. Each person executing this AGREEMENT affirms that they have the necessary authority to sign on behalf of their respective party and to bind such party to the terms of this AGREEMENT. 22. Law/Severability. The laws of the State of Colorado and the City of Fort Collins Charter and Municipal Code shall govern the construction, interpretation, execution and enforcement of this AGREEMENT—without regard to choice of law or conflict of law principles. The Parties further agree that Larimer County District Court is the proper venue for all disputes. If the CITY subsequently agrees in writing that the matter may be heard in federal court, venue will be in U.S. District Court for the District of Colorado. In the event any provision of this AGREEMENT shall be held invalid or unenforceable by any court of competent jurisdiction, that holding shall not invalidate or render unenforceable any other provision of this AGREEMENT. 23. Prohibition Against Unlawful Discrimination. The PLAYGROUND DESIGNER AND MANUFACTURER acknowledges that the CITY, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. § 2000d to 2000d-4) , C.R.S. § 24-34-401, and any associated State or Federal laws and regulations, strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age forty (40) Official Purchasing Document Last updated 5/2024 Master Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 23 of 218 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. Pursuant to CITY policy, sexual orientation means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality. The CITY also strictly prohibits unlawful harassment in the workplace, including sexual harassment. Further, the CITY strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that the employee has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding. The PLAYGROUND DESIGNER AND MANUFACTURER shall comply with the CITY’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment and retaliation. This requirement applies to all third-party subcontractors/subconsultants at every tier. 24. ADA and Public Accommodations. In performing the Service(s) required hereunder, the PLAYGROUND DESIGNER AND MANUFACTURER agrees to meet all the requirements of the Americans with Disabilities Act of 1990, C.R.S. § 24-85-101, and all applicable rules and regulations (ADA), and all applicable Colorado public accommodation laws, which are imposed directly on the PLAYGROUND DESIGNER AND MANUFACTURER or which would be imposed on the CITY as a public entity. 25. Technology Accessibility. The PLAYGROUND DESIGNER AND MANUFACTURER represents that the Project Instruments hereunder, shall fully comply with all applicable provisions of C.R.S. § 24-85-101, and the Accessibility Standards for Individuals with a Disability, as established by the State of Colorado Governor’s Office of Information Technology (OIT) pursuant to C.R.S. § 24-85-103 (2.5), including all updates and amendments to those standards as provided by the OIT. The PLAYGROUND DESIGNER AND MANUFACTURER shall also comply with all State of Colorado technology standards related to technology accessibility and with Level AA of the most current version of the Web Content Accessibility Guidelines (WCAG), incorporated in the State of Colorado technology standards. To confirm that the Project Instruments meet these standards, the PLAYGROUND DESIGNER AND MANUFACTURER may be required to demonstrate compliance.  The PLAYGROUND DESIGNER AND MANUFACTURER shall indemnify, save, and hold harmless the CITY against any and all costs, expenses, claims, damages, liability, court awards and other amounts (including attorneys’ fees and related costs) incurred by the CITY in relation to the PLAYGROUND DESIGNER AND MANUFACTURER’s failure to comply with C.R.S. § 24-85-101, or the Accessibility Standards for Individuals with a Disability as established by OIT pursuant to C.R.S. § 24-85-103 (2.5). The CITY may require the PLAYGROUND DESIGNER AND MANUFACTURER’s compliance to the State’s Accessibility Standards to be determined by a third party selected by the CITY to attest to the Project Instruments and software compliance with C.R.S. § 24-85-101, and the Accessibility Standards for Individuals with a Disability as established by OIT pursuant to C.R.S. § 24-85-103 (2.5). Official Purchasing Document Last updated 5/2024 Master Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 24 of 218 26. Data Privacy. PLAYGROUND DESIGNER AND MANUFACTURER will comply with all applicable data privacy regulations and laws, specifically including Colorado’s Privacy Act C.R.S. § 6-1-1301 et. seq. (the Privacy Act). PLAYGROUND DESIGNER AND MANUFACTURER shall ensure that each person processing any personal data connected to the Services is subject to a duty of confidentiality with respect to the data. If applicable, PLAYGROUND DESIGNER AND MANUFACTURER shall require that any subcontractors meet the obligations of PLAYGROUND DESIGNER AND MANUFACTURER with respect to any personal data connected to this AGREEMENT and corresponding Work Orders. The Parties agree that upon termination of the Services that PLAYGROUND DESIGNER AND MANUFACTURER shall, at the CITY’s choice, delete or return all personal data to the CITY unless retention of the personal data is required by law. PLAYGROUND DESIGNER AND MANUFACTURER shall make available to the CITY all information necessary to demonstrate compliance with the obligations of the Privacy Act. PLAYGROUND DESIGNER AND MANUFACTURER shall allow for, and contribute to, reasonable audits and inspections by the CITY or the CITY’s designated auditor. 27. Governmental Immunity Act. No term or condition of this AGREEMENT shall be construed or interpreted as a waiver, express or implied, of any of the notices, requirements, immunities, rights, benefits, protections, limitations of liability, and other provisions of the Colorado Governmental Immunity Act, C.R.S. § 24-10-101 and under any other applicable law. 28. Colorado Open Records Act. The PLAYGROUND DESIGNER AND MANUFACTURER acknowledges the CITY is a governmental entity subject to the Colorado Open Records Act, C.R.S. § 24-72-200 (CORA), and documents in the CITY’s possession may be considered public records subject to disclosure under CORA. The PLAYGROUND DESIGNER AND MANUFACTURER hereby waives any claim for damages against the CITY for the CITY’s efforts to comply with CORA. 29. Delay. Time is of the essence. Subject to Force Majeure section of this AGREEMENT, if the PLAYGROUND DESIGNER AND MANUFACTURER is temporarily delayed in whole or in part from performing its obligations, then the PLAYGROUND DESIGNER AND MANUFACTURER shall provide written notice to the CITY within two (2) business days defining the nature of the delay. Provision of written notice under this Section shall not operate as a waiver of any rights or benefits provided to the CITY under this AGREEMENT. 30. Force Majeure. No party hereto shall be considered in default in the performance of an obligation hereunder to the extent that performance of such obligation is delayed, hindered, or prevented by force majeure. Force majeure shall be any cause beyond the control of the party that could not reasonably have been foreseen and guarded against. Force majeure includes, but is not limited to, acts of God, fires, riots, pandemics, incendiarism, interference by civil or military authorities, compliance with regulations or orders of military authorities, and acts of war (declared or undeclared), provided the cause could not have been reasonably foreseen and guarded against by the affected party. Force majeure shall not include increases in labor, commodity, utility, material, supply, fuel, or energy costs, or Official Purchasing Document Last updated 5/2024 Master Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 25 of 218 compliance with regulations or orders of civil authorities. To the extent that the performance is actually prevented, the PLAYGROUND DESIGNER AND MANUFACTURER must provide notice to the CITY of such condition within ten (10) days from the onset of the condition. 31. Special Provisions. Special provisions or conditions relating to the Service(s) to be performed pursuant to this AGREEMENT are set forth in Exhibit [choose one] - Confidentiality, consisting of four (4) pages, attached hereto and incorporated herein by this reference. 32. Order of Precedence. In the event of a conflict or inconsistency within this AGREEMENT, the conflict or inconsistency shall be resolved by giving preference to the documents in the following order of priority: a. The body of this AGREEMENT (and any written amendment), b. Exhibits to this AGREEMENT, c. Work Order(s) (and any applicable Change Order), and d. the Purchase Order document. 33. Prohibited Terms.  Nothing in any Exhibit, Work Order, or other attachment shall be construed as a waiver of any provision above. Any terms included in any Exhibit, Work Order, or other attachment that requires the CITY to indemnify or hold PLAYGROUND DESIGNER AND MANUFACTURER harmless; requires the CITY to agree to binding arbitration; limits PLAYGROUND DESIGNER AND MANUFACTURER’s liability; or that conflicts with statute, City Charter or City Code in any way, shall be void. [Signature Page Follows] Official Purchasing Document Last updated 5/2024 Master Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 26 of 218 THE CITY OF FORT COLLINS, COLORADO By: Gerry Paul Purchasing Director Date: ATTEST: APPROVED AS TO FORM: PLAYGROUND DESIGNER AND MANUFACTURER'S NAME By: Printed: Title: Date: Official Purchasing Document Last updated 5/2024 Master Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 27 of 218 EXHIBIT A WORK ORDER FORM PURSUANT TO THE PROFESSIONAL MASTER SERVICES AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND PLAYGROUND DESIGNER AND MANUFACTURER WORK ORDER NUMBER: PROJECT TITLE: ORIGINAL BID/RFP NUMBER & NAME: 9996 Playground Design & Manufacturer for Schoolside Park PROFESSIONAL MASTER SERVICES AGREEMENT EFFECTIVE DATE: Original Contract Date WORK ORDER COMMENCEMENT DATE: WORK ORDER COMPLETION DATE: MAXIMUM FEE (time and reimbursable direct costs): PROJECT DESCRIPTION/SCOPE OF SERVICES: PLAYGROUND DESIGNER AND MANUFACTURER agrees to perform the Service(s) identified above and on the attached forms in accordance with and subject to the terms and conditions contained herein and in the Master Services Agreement (AGREEMENT) between the parties. This Work Order is incorporated into the AGREEMENT, and the AGREEMENT and all prior amendments or other modifications to the AGREEMENT, if any, remain in full force and effect. In the event of a conflict between or ambiguity in the terms of the AGREEMENT and this Work Order (including the attached forms) the AGREEMENT as set forth in the Order of Precedence section of the AGREEMENT shall control. Pricing stated on this Work Order shall be consistent with the pricing in the AGREEMENT or subsequent renewals as of the Work Order commencement date and will be held firm through completion of this Work Order. The attached forms consisting of [choose # of pages] are hereby accepted and incorporated herein and Notice to Proceed is hereby given after all parties have signed this document. PLAYGROUND DESIGNER AND MANUFACTURER: __________________________ Date:___________________ Name, Title ACCEPTANCE: Date: Amanda Castelli, CITY Project Manager REVIEWED: Date: Adam Hill, Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 28 of 218 EXHIBIT B WORK ORDER FORM (Construction over $100,000) CONSTRUCTION WORK ORDER FOR [ORIGINAL PROJECT # AND NAME] WORK ORDER NO. TITLED (WORK ORDER TITLE) DATE: CONTRACTOR: Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 29 of 218 TABLE OF CONTENTS AGREEMENT FORMS 00525 Work Order & Notice of Award 00530 Work Order Notice to Proceed 00600 Bonds and Certificates 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate CONDITIONS OF THE CONTRACT 00700 General Conditions Exhibit GC-A GC-A1 - GC-A2 00800 Supplementary Conditions 00900 Addenda, Modifications and Payment 00950 Work Order Change Order Form 00960 Application for Payment Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 30 of 218 SECTION 00500 CONSTRUCTION WORK ORDER AGREEMENT FORMS 00525 Work Order, Notice of Award & Bid Schedule 00530 Work Order Notice to Proceed Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 31 of 218 SECTION 00525 WORK ORDER, NOTICE OF AWARD AND BID SCHEDULE TO (CONTRACTOR OR CM/GC): WORK ORDER # & TITLE: PURCHASE ORDER: ORIGINAL BID/RFP # & TITLE: ENGINEER: OWNER’S REPRESENTATIVE: NOTICE OF AWARD DATE: OWNER: City of Fort Collins (hereinafter referred to as OWNER) 1. WORK. You are hereby notified that your bid dated , for the above Work Order has been considered. Pursuant to your AGREEMENT with OWNER dated , you have been awarded a Work Order for this Work Order Description: A. See Section 01100 – Summary of Work. 2. CONTRACT PRICE, BONDS AND CERTIFICATES. The price of your Work Order is ($ ). Pursuant to the AGREEMENT and the Contract Documents, Performance and Payment Bonds and insurance are required. 3. CONTRACT TIMES. Pursuant to the AGREEMENT and the Contract Documents, the date for Substantial Completion of this Work Order is , and after Substantial Completion, the date for Final Completion is . 4. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTACTOR shall pay OWNER the amounts set forth hereafter. 1. Substantial Completion: ($ ) for each calendar day or fraction thereof that expires after until the work is Substantially Complete. 2. Final Acceptance: After Substantial Completion ($ ) for each calendar day or fraction thereof that expires after the period for Final Payment and Acceptance until the Work is ready for Final Payment and Acceptance. 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 32 of 218 5.1 PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. 5.1.1 Prior to Substantial Completion, Owner will be entitled to withhold as contract retainage five percent (5%) of each progress payment, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. If , in the sole discretion of Owner, on recommendation of Engineer, Owner determines that the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 95% of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application Section 00960. 5.1.2 Upon Substantial Completion payment will be made in an amount sufficient, if necessary, to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as ENGINEER shall determine or OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. 5.2 FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. 6. CONTRACTOR'S REPRESENTATION. In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 6.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 33 of 218 supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 6.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. 6.5 CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. 7. CONTRACT DOCUMENTS. 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of “Contract Documents” in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. 7.2 Forms for use by CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: 7.2.1 Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3 Lien Waiver Releases 7.2.4 Consent of Surety 7.2.5 Application for Exemption Certificate 7.2.6 Application for Payment 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 34 of 218 The Contract Drawings shall be stamped "Final for Construction" and dated. Any revisions made shall be clearly identified and dated. 7.4 The Contract Documents also include all written amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 7.5 There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. 8. MISCELLANEOUS 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 8.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, Agreement and obligations contained in the Contract Document. 9. EXECUTION. Three (3) copies of this proposed Work Order & Notice of Award, and accompanying amendments or supplements to the Contract Documents (except any applicable Drawings) incorporated herein, are provided. Three (3) sets of any applicable Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is, by . A. You must deliver to OWNER three (3) fully-executed counterparts of this Work Order, including all amendments or supplements to the Contract Documents incorporated herein. Each Work Order must bear your signature as provided. B. You must deliver with the executed Work Order the Contract Security (Bonds) and insurance, as specified in the Agreement, this Work Order, the General Conditions (Article 5.1) and the Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned and to annul this Work Order & Notice of Award. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully-signed counterpart of this Work Order with any amendments or supplements to the Contract Documents attached. Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 35 of 218 CONTRACTOR’S NOTICE OF AWARD REPRESENTATION & EXECUTION: CONTRACTOR agrees to perform the services identified above, in accordance with the terms and conditions contained herein and in the AGREEMENT dated , and the NOTICE OF AWARD dated , between the parties. In the event of a conflict between or ambiguity in the terms of the AGREEMENT or specific Work Orders, the AGREEMENT shall control. CONTRACTOR: By: Date: Name: Title: Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 36 of 218 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference and the attached Notice to Proceed is hereby given. ACCEPTANCE: Date: _____ , Projects Manager OWNER: CITY OF FORT COLLINS ACCEPTANCE: ___________________________________________ Date: __________ Kelly DiMartino, City Manager (if greater than $1,000,000) ACCEPTANCE: ___________________________________________ Date: __________ Gerry Paul, Purchasing Director (if greater than $60,000) APPROVED AS TO FORM: __________________________________ Date: __________ ATTEST: ___ ________________________________________ Date: __________ Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 37 of 218 BID SCHEDULE Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 2 of 218 SECTION 00530 WORK ORDER NOTICE TO PROCEED NOTICE TO PROCEED DATE: WORK ORDER TITLE: WORK ORDER NUMBER: ORIGINAL BID/RFP # & TITLE: TO: Attn: This notice is to advise you: That the Work Order and all amendments and supplements to the Contract Documents covering the above described Work have been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance and Payment Bonds and insurance have been received by the OWNER. That the OWNER has approved the said Work Order and Contract Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Work Order and the AGREEMENT. The dates for Substantial Completion and Final Acceptance shall be , and , respectively. Dated this _____________ day of ___________, _____. CITY OF FORT COLLINS (OWNER) By: ___________________________________________ ___________________________________________ Name & Title ACKNOWLEDGMENT OF NOTICE Receipt of the above Work Order Notice to Proceed is hereby acknowledged this _____________ day of ___________, _____. (CONTRACTOR) By: ___________________________________________ ___________________________________________ Name & Title Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 3 of 218 SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00651 Lien Waiver Release (SUBCONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 4 of 218 SECTION 00610 PERFORMANCE BOND Bond No __ KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , 2 , for (original bid/rfp # & name) a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled , Work Order Number , dated the day of , , a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Work Order and Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Work Order and Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 5 of 218 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _____ day of ___________, _____. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners By: By: IN PRESENCE OF: Surety By: (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 6 of 218 SECTION 00615 PAYMENT BOND Bond No __ KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , , for (original bid/rfp # & name), a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled , Work Order Number , dated the day of , , a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Work Order and Agreement and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 7 of 218 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _____ day of ___________, _____. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners By: By: IN PRESENCE OF: Surety By: (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 8 of 218 SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall insert his own standard form for Certificate of Insurance in accordance with the following: 1. The Contractor will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Contractor shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: “The insurance evidenced by this Certificate will not reduce coverage or limits and will not be cancelled, except after thirty (30) days written notice has been received by the City of Fort Collins.” In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Contractor, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Contractor under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Contractor’s general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Contractor shall maintain during the life of this Agreement for all of the Contractor's employees engaged in work performed under this agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Contractor shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Contractor shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. Official Purchasing Document Last updated 5/2024 SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) WORK ORDER # & TITLE: DATE OF SUBSTANTIAL COMPLETION: ORIGINAL BID/RFP # & TITLE: PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado INCLUDE: OWNER: City of Fort Collins CONTRACTOR: WORK ORDER DATE: The Work performed under this Work Order, pursuant to the Contract Documents, has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. _____________________________ By: __________________________ ________ PROJECT MANAGER AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. _____________________________ By: __________________________ ________ CONTRACTOR AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS ________ By: __________________________ ________ OWNER AUTHORIZED REPRESENTATIVE DATE REMARKS: _________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ Official Purchasing Document Last updated 5/2024 SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE DATE: ________________, _____ TO: Gentlemen: You are hereby notified that on the day of , , the City of Fort Collins, Colorado, has accepted the Work completed by , for the City of Fort Collins Work Order, titled , Work Order Number under (original bid/rfp # & name). A check is attached hereto in the amount of $ as Final Payment for all Work done, subject to the terms of the Contract Documents, including the Work Order, which is dated , and the AGREEMENT, which is dated . In conformance with the Work Order and Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date: ___________________, _____. Sincerely, City of Fort Collins OWNER By: ___________________________________________ ___________________________________________ Name & Title ATTEST: _________________________________________ ___________________________________________ Name & Title Official Purchasing Document Last updated 5/2024 SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: (CONTRACTOR) WORK ORDER TITLE: WORK ORDER NUMBER: ORIGINAL BID/RFP # & TITLE: 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR's Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes an adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and Official Purchasing Document Last updated 5/2024 may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Signed this ______ day of __________, ___. CONTRACTOR: By: ___________________________________________ ___________________________________________ Name & Title ATTEST: _____________________________ Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this _________ day of __________, _____, by ________________________________________________________________. Witness my hand and official seal. My Commission Expires: ___________________________. _________________________ Notary Public Official Purchasing Document Last updated 5/2024 SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: WORK ORDER # & TITLE: ORIGINAL BID/RFP # & TITLE: CONTRACT DATE: WORK ORDER DATE: In accordance with the provisions of the Work Order and Contract between the OWNER and the CONTRACTOR as indicated above, for the Work Order titled on bond of , (Surety) _______________________________________ hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this _________ day of _________ _, _____. ____________________________________________ (Surety Company) By: ________________________________________ (Name) Attorney-in-Fact ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact. Official Purchasing Document Last updated 5/2024 SECTION 00670 APPLICATION FOR EXEMPTION CERTIFICATE Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 SECTION 00700 GENERAL CONDITIONS Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition, with City of Fort Collins Modifications, Rev. 9/94) and other provisions of the Contract Documents as indicated below. SC-1 DEFINITIONS SC-1.38. Add the following language to the conclusion of paragraph 1.38 of the General Conditions: 1.38. Substantial Completion. .... Substantial Completion is further defined as that degree of completion of the operating facilities or systems of the Project defined in the Work Order sufficient to provide the OWNER the full time, uninterrupted, continuous, beneficial operation of the modifications, and all inspections required have been completed and identified conditions corrected. SC-1.43.A. Add the following new paragraph immediately after paragraph 1.43 of the General Conditions: 1.43.A. Work Order--A written document executed by OWNER and CONTRACTOR that provides for the construction of a portion of the Work, pursuant to the Agreement and all as required by the Contract Documents, and that becomes a Contract Document when executed. SC-2 PRELIMINARY MATTERS SC-2.8. Delete paragraph 2.8 of the General Conditions entirely and replace it with the following paragraph: 2.8. Preconstruction Conference. Within ten days after the Contract Times for a Work Order start to run, but before any Work at the site is started, a conference attended by CONTRACTOR, ENGINEER and others as appropriate will be held to establish a working relationship among the parties as to the Work and to discuss the schedules referred to in paragraph 2.6, procedures for handling Shop Drawings and other submittals, processing Applications for Payment, and maintaining required records. SC-2.10. Add the following new paragraph immediately after paragraph 2.9 of the General Conditions: 2.10. Work Order Required for All Work. References to the Agreement in this Article 2 and in the General and Supplementary Conditions and Contract Documents notwithstanding, no Work shall be initiated or performed until CONTRACTOR has received a signed and executed Work Order, incorporating the Notice to Proceed, from OWNER; and no provision of this Article 2 or of the General and Supplementary Official Purchasing Document Last updated 5/2024 Conditions and Contract Documents shall permit or require any action of CONTRACTOR in the absence of a signed and executed Work Order. All provisions of this Article 2 and of the General and Supplementary Conditions and Contract Documents referencing the Agreement or other parts of the Contract Documents, or permitting or requiring any action of CONTRACTOR, shall be read as referencing and, as appropriate, requiring a signed and executed Work Order. SC-4 AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS SC-4.2.1.2. Add the following new paragraph immediately following paragraph 4.2.1.2 of the General Conditions: 4.2.1.2.1. No drawing of physical conditions in or relating to existing surface or subsurface structures (except Underground Facilities referred to in paragraph 4.3) which are at or contiguous to the site have been utilized by the Engineer in preparation of the Contract Documents, except the following: SC-5 BONDS AND INSURANCE SC-5.4.7. Include the following parties or entities as additional insureds, as provided in paragraph 5.4.7 of the General Conditions: 5.4.7.1. City of Fort Collins, Colorado, 4316 LaPorte Avenue, Fort Collins, Colorado 80522 5.4.7.2. . SC-5.4.8.1. Add the following new paragraph immediately following paragraph 5.4.8 of the General Conditions: 9.4.8.1. Limits of Liability. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed below are as follows: For Paragraphs 5.02.A.1 and 5.02.A.2: Coverage A - Statutory Limits; Coverage B - $100,000 / $100,000 / $500,000. For Paragraphs 5.02.A.3 and 5.02.A.5: The Commercial General Liability policy will have limits of $1,000,000 combined single limits (CSL). This policy will include coverage for Explosion, Collapse, and Underground coverage unless waived by the Owner. For Paragraph 5.02.A.6: The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000 combined single limits (CSL). For Paragraph 5.02.B.3: This policy will include completed operations coverage / product liability coverage with limits of $1,000,000 combined single limits (CSL). This policy shall also include an Umbrella Excess Liability as follows: General liability and automobile liability insurance in an amount not less than $1,000,000 per occurrence in excess of the above stated primary limits. Official Purchasing Document Last updated 5/2024 SC-6 CONTRACTOR’S RESPONSIBILITIES SC-6.14.3. Add the following new paragraph immediately after paragraph 6.14.2 of the General Conditions: 6.14.3. The following Laws or Regulations are included in the Contract Documents as mandated by statute or for the convenience of the CONTRACTOR. Other Laws and Regulations apply which are not included herein, and are within the CONTRACTOR's duty and responsibility for compliance thereto: 6.14.3.1. Notice to owners of Underground Facilities is required prior to excavations in the vicinity of such facilities. 6.14.3.2. Unless otherwise decided by reason of the amount of the Contract Price involved, or other good reason, before or at the time that the contract is awarded to a corporation outside the State of Colorado, such corporation must carry out the proper procedure to become authorized to do business in the State of Colorado, designate a place of business therein, and appoint an agent for service of process. Such corporation must furnish the OWNER with a certificate from the Secretary of State of Colorado has been issued by its office and there shall also be procured from the Colorado Secretary of State of photostatic or certified copy of the designated of place of business and appointment of agent for service of process, or a letter from the Colorado Secretary of State that such designation of place of business and agent for service of process have been made. 6.14.3.3. The CONTRACTOR must conform to the rules and regulations of the Industrial Commission of Colorado. Particular reference is made to rules and regulations governing excavation Work adopted by the Industrial Commission of Colorado. SC-11 CHANGE OF CONTRACT PRICE SC-11.6.2.7. Add the following new paragraph to paragraph 11.6.2 of the General Conditions: 11.6.2.7. Cost of the Work. Allowances for profit, overhead and mark-up prescribed by Article 4 of the Agreement shall be used in lieu of any CONTRACTOR'S fee, overhead, profit or mark-up allowances as prescribed in paragraphs 11.6.2.1, 11.6.2.2, and 11.6.2.3. SC-12 CHANGE OF CONTRACT TIMES SC-12.3. Add the following language to the end of paragraph 12.3 of the General Conditions: 12.3. .... Lost days due to abnormal weather conditions will be allocated as required. SC-14 PAYMENTS TO CONTRACTOR AND COMPLETION Official Purchasing Document Last updated 5/2024 SC-14.1. Add the following language to the end of paragraph 14.1 of the General Conditions: 14.1. Schedule of Values. .... Progress payments on the fixed fee shall be in proportion to the cumulative actual Cost of the Work as a percentage of the Allowable Cost of the Work. An amount not to exceed fifteen (15%) percent of the fixed fee shall be advanced to the Contractor for mobilization in the first progress payment. Official Purchasing Document Last updated 5/2024 SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Change Order 00960 Application for Payment Official Purchasing Document Last updated 5/2024 SECTION 00950 CHANGE ORDER FORM CHANGE ORDER NO. CONTRACTOR: WORK ORDER TITLE & NO. : ORIGINAL BID/RFP # & TITLE: DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost: 4. Change in Contract Time: ORIGINAL CONTRACT COSTS $ ________________ TOTAL APPROVED CHANGE ORDER(S) $ ________________ TOTAL PENDING CHANGE ORDER(S) $ ________________ TOTAL THIS CHANGE ORDER $ ________________ TOTAL % OF ORIGINAL CONTRACT, THIS CO: _______________ % TOTAL % OF ORIGINAL CONTRACT, ALL CO’S: _______________ % ADJUSTED CONTRACT COST $ ________________ _________________ (Assuming all change orders approved) ACCEPTED BY: _____________________________________ DATE: ____________ Contractor's Representative ACCEPTED BY: _____________________________________ DATE: ____________ Project Manager REVIEWED BY: _____________________________________ DATE: ____________ Title: APPROVED BY: _____________________________________ DATE: ____________ Title: APPROVED BY: _____________________________________ DATE: ____________ (Purchasing Agent if > $60,000) cc: City Clerk Architect/Engineer Finance Purchasing Project Manager Contractor Official Purchasing Document Last updated 5/2024 SECTION 00960 PAYMENT APPLICATION Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 4 of 218 Section 00960 APPLICATION FOR PAYMENT PAGE 1 OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER: APPLICATION DATE: PERIOD BEGINNING: ENGINEER: CONTRACTOR: PERIOD ENDING: PROJECT NUMBER: CHANGE ORDERS Application is made for Payment as shown below in connection with Contract DATE AMOUNT The present status of the account for this Contract is as follows: Original Contract Amount: Net Change by Change Order: Current contract Amount: Total Completed and Stored to Date: Less Previous Applications: Amount Due this Application - Before Retainage: Less Retainage: e by Change Order $0.00 AMOUNT DUE THIS APPLICATION: ATION: signed CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract. Amount Due This Application is requested by the CONTRACTOR. By: of the above Amount Due This Application is recommended by the ENGINEER. By: of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager. By: of the above Amount Due This Application is approved by the OWNER. By: CONTRACT AMOUNTS APPLICATION FOR PAYMENT PAGE 2 Work Completed Work Completed Work Completed Stored This Month Previous Periods To Date Materials Total This Earned r Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 5 of 218 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 6 of 218 CHANGE ORDERS APPLICATION FOR PAYMENT PAGE 3 Work Completed Work Completed Work Completed Stored This Month Previous Periods To Date Materials Total This Earned r Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS CHANGE ORDERS $0.00 $0.00 $0.00 $0.00 $0.00 PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 STORED MATERIALS SUMMARY PAGE 4 OF On Hand Received Installed On Hand m Invoice Previous This This This ber Number Description Application Period Period Application $0.00 Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 7 of 218 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00 EXHIBIT B WORK ORDER FORM (Construction over $100,000) CONSTRUCTION WORK ORDER Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 8 of 218 FOR [ORIGINAL PROJECT # AND NAME] WORK ORDER NO. TITLED (WORK ORDER TITLE) DATE: CONTRACTOR: Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 9 of 218 TABLE OF CONTENTS AGREEMENT FORMS 00525 Work Order & Notice of Award 00530 Work Order Notice to Proceed 00600 Bonds and Certificates 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate CONDITIONS OF THE CONTRACT 00700 General Conditions Exhibit GC-A GC-A1 - GC-A2 00800 Supplementary Conditions 00900 Addenda, Modifications and Payment 00950 Work Order Change Order Form 00960 Application for Payment Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 10 of 218 SECTION 00500 CONSTRUCTION WORK ORDER AGREEMENT FORMS 00525 Work Order, Notice of Award & Bid Schedule 00530 Work Order Notice to Proceed Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 11 of 218 SECTION 00525 WORK ORDER, NOTICE OF AWARD AND BID SCHEDULE TO (CONTRACTOR OR CM/GC): WORK ORDER # & TITLE: PURCHASE ORDER: ORIGINAL BID/RFP # & TITLE: ENGINEER: OWNER’S REPRESENTATIVE: NOTICE OF AWARD DATE: OWNER: City of Fort Collins (hereinafter referred to as OWNER) 5. WORK. You are hereby notified that your bid dated , for the above Work Order has been considered. Pursuant to your AGREEMENT with OWNER dated , you have been awarded a Work Order for this Work Order Description: B. See Section 01100 – Summary of Work. 6. CONTRACT PRICE, BONDS AND CERTIFICATES. The price of your Work Order is ($ ). Pursuant to the AGREEMENT and the Contract Documents, Performance and Payment Bonds and insurance are required. 7. CONTRACT TIMES. Pursuant to the AGREEMENT and the Contract Documents, the date for Substantial Completion of this Work Order is , and after Substantial Completion, the date for Final Completion is . 8. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTACTOR shall pay OWNER the amounts set forth hereafter. 3. Substantial Completion: ($ ) for each calendar day or fraction thereof that expires after until the work is Substantially Complete. 4. Final Acceptance: After Substantial Completion ($ ) for each calendar day or fraction thereof that expires after the period for Final Payment and Acceptance until the Work is ready for Final Payment and Acceptance. 6. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 12 of 218 5.1 PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. 5.1.1 Prior to Substantial Completion, Owner will be entitled to withhold as contract retainage five percent (5%) of each progress payment, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. If , in the sole discretion of Owner, on recommendation of Engineer, Owner determines that the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 95% of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application Section 00960. 5.1.2 Upon Substantial Completion payment will be made in an amount sufficient, if necessary, to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as ENGINEER shall determine or OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. 5.2 FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. 7. CONTRACTOR'S REPRESENTATION. In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 6.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 13 of 218 supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 6.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. 6.5 CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. 9. CONTRACT DOCUMENTS. 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of “Contract Documents” in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. 7.2 Forms for use by CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: 7.2.1 Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3 Lien Waiver Releases 7.2.4 Consent of Surety 7.2.5 Application for Exemption Certificate 7.2.6 Application for Payment 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 14 of 218 The Contract Drawings shall be stamped "Final for Construction" and dated. Any revisions made shall be clearly identified and dated. 7.4 The Contract Documents also include all written amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 7.5 There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. 10. MISCELLANEOUS 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 8.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, Agreement and obligations contained in the Contract Document. 10. EXECUTION. Three (3) copies of this proposed Work Order & Notice of Award, and accompanying amendments or supplements to the Contract Documents (except any applicable Drawings) incorporated herein, are provided. Three (3) sets of any applicable Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is, by . C. You must deliver to OWNER three (3) fully-executed counterparts of this Work Order, including all amendments or supplements to the Contract Documents incorporated herein. Each Work Order must bear your signature as provided. D. You must deliver with the executed Work Order the Contract Security (Bonds) and insurance, as specified in the Agreement, this Work Order, the General Conditions (Article 5.1) and the Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned and to annul this Work Order & Notice of Award. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully-signed counterpart of this Work Order with any amendments or supplements to the Contract Documents attached. Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 15 of 218 CONTRACTOR’S NOTICE OF AWARD REPRESENTATION & EXECUTION: CONTRACTOR agrees to perform the services identified above, in accordance with the terms and conditions contained herein and in the AGREEMENT dated , and the NOTICE OF AWARD dated , between the parties. In the event of a conflict between or ambiguity in the terms of the AGREEMENT or specific Work Orders, the AGREEMENT shall control. CONTRACTOR: By: Date: Name: Title: Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 16 of 218 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference and the attached Notice to Proceed is hereby given. ACCEPTANCE: Date: _____ , Projects Manager OWNER: CITY OF FORT COLLINS ACCEPTANCE: ___________________________________________ Date: __________ Kelly DiMartino, City Manager (if greater than $1,000,000) ACCEPTANCE: ___________________________________________ Date: __________ Gerry Paul, Purchasing Director (if greater than $60,000) APPROVED AS TO FORM: __________________________________ Date: __________ ATTEST: ___ ________________________________________ Date: __________ Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 17 of 218 BID SCHEDULE Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 2 of 218 SECTION 00530 WORK ORDER NOTICE TO PROCEED NOTICE TO PROCEED DATE: WORK ORDER TITLE: WORK ORDER NUMBER: ORIGINAL BID/RFP # & TITLE: TO: Attn: This notice is to advise you: That the Work Order and all amendments and supplements to the Contract Documents covering the above described Work have been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance and Payment Bonds and insurance have been received by the OWNER. That the OWNER has approved the said Work Order and Contract Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Work Order and the AGREEMENT. The dates for Substantial Completion and Final Acceptance shall be , and , respectively. Dated this _____________ day of ___________, _____. CITY OF FORT COLLINS (OWNER) By: ___________________________________________ ___________________________________________ Name & Title ACKNOWLEDGMENT OF NOTICE Receipt of the above Work Order Notice to Proceed is hereby acknowledged this _____________ day of ___________, _____. (CONTRACTOR) By: ___________________________________________ ___________________________________________ Name & Title Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 3 of 218 SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00651 Lien Waiver Release (SUBCONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 4 of 218 SECTION 00610 PERFORMANCE BOND Bond No __ KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , 2 , for (original bid/rfp # & name) a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled , Work Order Number , dated the day of , , a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Work Order and Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Work Order and Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 5 of 218 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _____ day of ___________, _____. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners By: By: IN PRESENCE OF: Surety By: (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 6 of 218 SECTION 00615 PAYMENT BOND Bond No __ KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , , for (original bid/rfp # & name), a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled , Work Order Number , dated the day of , , a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Work Order and Agreement and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 7 of 218 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _____ day of ___________, _____. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners By: By: IN PRESENCE OF: Surety By: (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. Official Purchasing Document Last updated 5/2024 Services Agreement – Work Order Type RFP/BID [# and Title] Page 8 of 218 SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall insert his own standard form for Certificate of Insurance in accordance with the following: 2. The Contractor will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Contractor shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: “The insurance evidenced by this Certificate will not reduce coverage or limits and will not be cancelled, except after thirty (30) days written notice has been received by the City of Fort Collins.” In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Contractor, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Contractor under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Contractor’s general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Contractor shall maintain during the life of this Agreement for all of the Contractor's employees engaged in work performed under this agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Contractor shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Contractor shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. Official Purchasing Document Last updated 5/2024 SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) WORK ORDER # & TITLE: DATE OF SUBSTANTIAL COMPLETION: ORIGINAL BID/RFP # & TITLE: PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado INCLUDE: OWNER: City of Fort Collins CONTRACTOR: WORK ORDER DATE: The Work performed under this Work Order, pursuant to the Contract Documents, has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. _____________________________ By: __________________________ ________ PROJECT MANAGER AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. _____________________________ By: __________________________ ________ CONTRACTOR AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS ________ By: __________________________ ________ OWNER AUTHORIZED REPRESENTATIVE DATE REMARKS: _________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ Official Purchasing Document Last updated 5/2024 SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE DATE: ________________, _____ TO: Gentlemen: You are hereby notified that on the day of , , the City of Fort Collins, Colorado, has accepted the Work completed by , for the City of Fort Collins Work Order, titled , Work Order Number under (original bid/rfp # & name). A check is attached hereto in the amount of $ as Final Payment for all Work done, subject to the terms of the Contract Documents, including the Work Order, which is dated , and the AGREEMENT, which is dated . In conformance with the Work Order and Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date: ___________________, _____. Sincerely, City of Fort Collins OWNER By: ___________________________________________ ___________________________________________ Name & Title ATTEST: _________________________________________ ___________________________________________ Name & Title Official Purchasing Document Last updated 5/2024 SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: (CONTRACTOR) WORK ORDER TITLE: WORK ORDER NUMBER: ORIGINAL BID/RFP # & TITLE: 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR's Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes an adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and Official Purchasing Document Last updated 5/2024 may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Signed this ______ day of __________, ___. CONTRACTOR: By: ___________________________________________ ___________________________________________ Name & Title ATTEST: _____________________________ Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this _________ day of __________, _____, by ________________________________________________________________. Witness my hand and official seal. My Commission Expires: ___________________________. _________________________ Notary Public Official Purchasing Document Last updated 5/2024 SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: WORK ORDER # & TITLE: ORIGINAL BID/RFP # & TITLE: CONTRACT DATE: WORK ORDER DATE: In accordance with the provisions of the Work Order and Contract between the OWNER and the CONTRACTOR as indicated above, for the Work Order titled on bond of , (Surety) _______________________________________ hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this _________ day of _________ _, _____. ____________________________________________ (Surety Company) By: ________________________________________ (Name) Attorney-in-Fact ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact. Official Purchasing Document Last updated 5/2024 SECTION 00670 APPLICATION FOR EXEMPTION CERTIFICATE Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 SECTION 00700 GENERAL CONDITIONS Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 Official Purchasing Document Last updated 5/2024 SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition, with City of Fort Collins Modifications, Rev. 9/94) and other provisions of the Contract Documents as indicated below. SC-1 DEFINITIONS SC-1.38. Add the following language to the conclusion of paragraph 1.38 of the General Conditions: 1.38. Substantial Completion. .... Substantial Completion is further defined as that degree of completion of the operating facilities or systems of the Project defined in the Work Order sufficient to provide the OWNER the full time, uninterrupted, continuous, beneficial operation of the modifications, and all inspections required have been completed and identified conditions corrected. SC-1.43.A. Add the following new paragraph immediately after paragraph 1.43 of the General Conditions: 1.43.A. Work Order--A written document executed by OWNER and CONTRACTOR that provides for the construction of a portion of the Work, pursuant to the Agreement and all as required by the Contract Documents, and that becomes a Contract Document when executed. SC-2 PRELIMINARY MATTERS SC-2.8. Delete paragraph 2.8 of the General Conditions entirely and replace it with the following paragraph: 2.8. Preconstruction Conference. Within ten days after the Contract Times for a Work Order start to run, but before any Work at the site is started, a conference attended by CONTRACTOR, ENGINEER and others as appropriate will be held to establish a working relationship among the parties as to the Work and to discuss the schedules referred to in paragraph 2.6, procedures for handling Shop Drawings and other submittals, processing Applications for Payment, and maintaining required records. SC-2.10. Add the following new paragraph immediately after paragraph 2.9 of the General Conditions: 2.10. Work Order Required for All Work. References to the Agreement in this Article 2 and in the General and Supplementary Conditions and Contract Documents notwithstanding, no Work shall be initiated or performed until CONTRACTOR has received a signed and executed Work Order, incorporating the Notice to Proceed, from OWNER; and no provision of this Article 2 or of the General and Supplementary Official Purchasing Document Last updated 5/2024 Conditions and Contract Documents shall permit or require any action of CONTRACTOR in the absence of a signed and executed Work Order. All provisions of this Article 2 and of the General and Supplementary Conditions and Contract Documents referencing the Agreement or other parts of the Contract Documents, or permitting or requiring any action of CONTRACTOR, shall be read as referencing and, as appropriate, requiring a signed and executed Work Order. SC-4 AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS SC-4.2.1.2. Add the following new paragraph immediately following paragraph 4.2.1.2 of the General Conditions: 4.2.1.2.1. No drawing of physical conditions in or relating to existing surface or subsurface structures (except Underground Facilities referred to in paragraph 4.3) which are at or contiguous to the site have been utilized by the Engineer in preparation of the Contract Documents, except the following: SC-5 BONDS AND INSURANCE SC-5.4.7. Include the following parties or entities as additional insureds, as provided in paragraph 5.4.7 of the General Conditions: 5.4.7.1. City of Fort Collins, Colorado, 4316 LaPorte Avenue, Fort Collins, Colorado 80522 5.4.7.2. . SC-5.4.8.1. Add the following new paragraph immediately following paragraph 5.4.8 of the General Conditions: 10.4.8.1. Limits of Liability. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed below are as follows: For Paragraphs 5.02.A.1 and 5.02.A.2: Coverage A - Statutory Limits; Coverage B - $100,000 / $100,000 / $500,000. For Paragraphs 5.02.A.3 and 5.02.A.5: The Commercial General Liability policy will have limits of $1,000,000 combined single limits (CSL). This policy will include coverage for Explosion, Collapse, and Underground coverage unless waived by the Owner. For Paragraph 5.02.A.6: The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000 combined single limits (CSL). For Paragraph 5.02.B.3: This policy will include completed operations coverage / product liability coverage with limits of $1,000,000 combined single limits (CSL). This policy shall also include an Umbrella Excess Liability as follows: General liability and automobile liability insurance in an amount not less than $1,000,000 per occurrence in excess of the above stated primary limits. Official Purchasing Document Last updated 5/2024 SC-6 CONTRACTOR’S RESPONSIBILITIES SC-6.14.3. Add the following new paragraph immediately after paragraph 6.14.2 of the General Conditions: 6.14.3. The following Laws or Regulations are included in the Contract Documents as mandated by statute or for the convenience of the CONTRACTOR. Other Laws and Regulations apply which are not included herein, and are within the CONTRACTOR's duty and responsibility for compliance thereto: 6.14.3.1. Notice to owners of Underground Facilities is required prior to excavations in the vicinity of such facilities. 6.14.3.2. Unless otherwise decided by reason of the amount of the Contract Price involved, or other good reason, before or at the time that the contract is awarded to a corporation outside the State of Colorado, such corporation must carry out the proper procedure to become authorized to do business in the State of Colorado, designate a place of business therein, and appoint an agent for service of process. Such corporation must furnish the OWNER with a certificate from the Secretary of State of Colorado has been issued by its office and there shall also be procured from the Colorado Secretary of State of photostatic or certified copy of the designated of place of business and appointment of agent for service of process, or a letter from the Colorado Secretary of State that such designation of place of business and agent for service of process have been made. 6.14.3.3. The CONTRACTOR must conform to the rules and regulations of the Industrial Commission of Colorado. Particular reference is made to rules and regulations governing excavation Work adopted by the Industrial Commission of Colorado. SC-11 CHANGE OF CONTRACT PRICE SC-11.6.2.7. Add the following new paragraph to paragraph 11.6.2 of the General Conditions: 11.6.2.7. Cost of the Work. Allowances for profit, overhead and mark-up prescribed by Article 4 of the Agreement shall be used in lieu of any CONTRACTOR'S fee, overhead, profit or mark-up allowances as prescribed in paragraphs 11.6.2.1, 11.6.2.2, and 11.6.2.3. SC-12 CHANGE OF CONTRACT TIMES SC-12.3. Add the following language to the end of paragraph 12.3 of the General Conditions: 12.3. .... Lost days due to abnormal weather conditions will be allocated as required. SC-14 PAYMENTS TO CONTRACTOR AND COMPLETION Official Purchasing Document Last updated 5/2024 SC-14.1. Add the following language to the end of paragraph 14.1 of the General Conditions: 14.1. Schedule of Values. .... Progress payments on the fixed fee shall be in proportion to the cumulative actual Cost of the Work as a percentage of the Allowable Cost of the Work. An amount not to exceed fifteen (15%) percent of the fixed fee shall be advanced to the Contractor for mobilization in the first progress payment. Official Purchasing Document Last updated 5/2024 SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Change Order 00960 Application for Payment Official Purchasing Document Last updated 5/2024 SECTION 00950 CHANGE ORDER FORM CHANGE ORDER NO. CONTRACTOR: WORK ORDER TITLE & NO. : ORIGINAL BID/RFP # & TITLE: DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost: 4. Change in Contract Time: ORIGINAL CONTRACT COSTS $ ________________ TOTAL APPROVED CHANGE ORDER(S) $ ________________ TOTAL PENDING CHANGE ORDER(S) $ ________________ TOTAL THIS CHANGE ORDER $ ________________ TOTAL % OF ORIGINAL CONTRACT, THIS CO: _______________ % TOTAL % OF ORIGINAL CONTRACT, ALL CO’S: _______________ % ADJUSTED CONTRACT COST $ ________________ _________________ (Assuming all change orders approved) ACCEPTED BY: _____________________________________ DATE: ____________ Contractor's Representative ACCEPTED BY: _____________________________________ DATE: ____________ Project Manager REVIEWED BY: _____________________________________ DATE: ____________ Title: APPROVED BY: _____________________________________ DATE: ____________ Title: APPROVED BY: _____________________________________ DATE: ____________ (Purchasing Agent if > $60,000) cc: City Clerk Architect/Engineer Finance Purchasing Project Manager Contractor Official Purchasing Document Last updated 5/2024 SECTION 00960 PAYMENT APPLICATION Official Purchasing Document Last updated 5/2024 Section 00960 APPLICATION FOR PAYMENT PAGE 1 OF 4 OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER: APPLICATION DATE: PERIOD BEGINNING: ENGINEER: CONTRACTOR: PERIOD ENDING: PROJECT NUMBER: CHANGE ORDERS Application is made for Payment as shown below in connection with Contract NUMBER DATE AMOUNT The present status of the account for this Contract is as follows: 1 2 Original Contract Amount: 3 Net Change by Change Order: Current contract Amount: $0.00 Total Completed and Stored to Date: Less Previous Applications: Amount Due this Application - Before Retainage: $0.00 Less Retainage: Net Change by Change Order $0.00 AMOUNT DUE THIS APPLICATION: $0.00 CERTIFICATION: The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with the Work have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract. The above Amount Due This Application is requested by the CONTRACTOR. Date: By: Payment of the above Amount Due This Application is recommended by the ENGINEER. Date: By: Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager. Date: By: Payment of the above Amount Due This Application is approved by the OWNER. Date: By: Official Purchasing Document Last updated 5/2024 CONTRACT AMOUNTS APPLICATION FOR PAYMENT PAGE 2 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Official Purchasing Document Last updated 5/2024 CHANGE ORDERS APPLICATION FOR PAYMENT PAGE 3 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS CHANGE ORDERS $0.00 $0.00 $0.00 $0.00 $0.00 PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 Official Purchasing Document Last updated 5/2024 STORED MATERIALS SUMMARY PAGE 4 OF 4 On Hand Received Installed On Hand Item Invoice Previous This This This Number Number Description Application Period Period Application $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00 Official Purchasing Document Last updated 5/2024 EXHIBIT C GENERAL SCOPE OF WORK Official Purchasing Document Last updated 5/2024 EXHIBIT D CHANGE ORDER NO. PROJECT TITLE: PLAYGROUND DESIGNER AND MANUFACTURER: [Company Name] WORK ORDER NUMBER: PO NUMBER: ORIGINAL BID/RFP NUMBER & NAME: 9996 Playground Design & Manufacturer for Schoolside Park DESCRIPTION: 1. Reason for Change: Why is the change required? 2. Description of Change: Provide details of the changes to the Work 3. Change in Work Order Price: 4. Change in Work Order Time: ORIGINAL WORK ORDER PRICE $ .00 TOTAL APPROVED/PENDING CHANGE ORDERS .00 TOTAL THIS CHANGE ORDER .00 TOTAL CHANGE ORDER % OF ORIGINAL WORK ORDER % ADJUSTED WORK ORDER COST $ .00 PLAYGROUND DESIGNER AND MANUFACTURER: __________________________ Date:___________________ Name, Title ACCEPTANCE: Date: Amanda Castelli, CITY Project Manager REVIEWED: Date: Adam Hill, Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) Official Purchasing Document Last updated 5/2024 EXHIBIT E BID SCHEDULE/COMPENSATION The following pricing shall remain fixed for the initial term of this AGREEMENT. Any applicable price adjustments may only be negotiated and agreed to in writing at the time of renewal. Official Purchasing Document Last updated 5/2024 Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 11 of 218 EXHIBIT F INSURANCE REQUIREMENTS The PLAYGROUND DESIGNER AND MANUFACTURER will provide, from insurance companies acceptable to the CITY, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the PLAYGROUND DESIGNER AND MANUFACTURER shall furnish the CITY with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies. In case of the breach of any provision of the Insurance Requirements, the CITY, at its option, may take out and maintain, at the expense of the PLAYGROUND DESIGNER AND MANUFACTURER, insurance as the CITY may deem proper and may deduct the cost of the insurance from any monies which may be due or become due the PLAYGROUND DESIGNER AND MANUFACTURER under this AGREEMENT. Insurance certificates should show the certificate holder as follows: City of Fort Collins Purchasing Division PO Box 580 Fort Collins, CO 80522 The CITY, its officers, agents and employees shall be named as additional insureds on the PLAYGROUND DESIGNER AND MANUFACTURER 's general liability and automobile liability insurance policies by marking the appropriate box or adding a statement to this effect on the certificate, for any claims arising out of work performed under this AGREEMENT. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The PLAYGROUND DESIGNER AND MANUFACTURER shall maintain Worker’s Compensation and Employer’s Liability insurance during the life of this AGREEMENT for all of the PLAYGROUND DESIGNER AND MANUFACTURER's employees engaged in work performed under this AGREEMENT. Workers' Compensation & Employer’s Liability insurance shall conform with statutory limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee, or as required by Colorado law. B. General Liability. The PLAYGROUND DESIGNER AND MANUFACTURER shall maintain during the life of this AGREEMENT General Liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this AGREEMENT. Coverage for property damage shall be on a (broad form) basis. The amount of insurance for General Liability shall not be less than $1,000,000 combined single limits for bodily injury and property damage. C. Automobile Liability. The PLAYGROUND DESIGNER AND MANUFACTURER shall maintain during the life of this AGREEMENT Automobile Liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this AGREEMENT. Coverage for property damage shall be on a (broad form) basis. The amount of insurance for Automobile Liability shall not be less than $1,000,000 combined single limits for bodily injury and property damage. Official Purchasing Document Last updated 5/2024 Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 12 of 218 D. Errors and Omissions. The PLAYGROUND DESIGNER AND MANUFACTURER shall maintain errors and omissions insurance in the amount of $1,000,000. E. Cybersecurity. The PLAYGROUND DESIGNER AND MANUFACTURER shall maintain cybersecurity insurance in the amount of $5,000,000. Official Purchasing Document Last updated 5/2024 Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 13 of 218 EXHIBIT G CONFIDENTIALITY IN CONNECTION WITH THE SERVICES to be provided by PLAYGROUND DESIGNER AND MANUFACTURER under this AGREEMENT, the parties agree to comply with reasonable policies and procedures with regard to the exchange and handling of confidential information and other sensitive materials between the parties, as set forth below. 1. Definitions. For purposes of this AGREEMENT, the party who owns the referenced information and is disclosing same shall be referenced as the “Disclosing Party.” The party receiving the Disclosing Party’s information shall be referenced as the “Receiving Party.” 2. Confidential Information. Confidential Information controlled by this AGREEMENT refers to information that is not public and/or is proprietary, including but not limited to location information, network security system, business plans, formulae, processes, intellectual property, trade secrets, designs, photographs, plans, drawings, schematics, methods, specifications, samples, reports, mechanical and electronic design drawings, customer lists, financial information, studies, findings, inventions, ideas, CITY customer identifiable information (including account, address, billing, consumption, contact, and other customer data), utility metering data, service billing records, customer equipment information. To the extent practical, Confidential Information shall be marked “Confidential” or “Proprietary.” Nevertheless, PLAYGROUND DESIGNER AND MANUFACTURER shall treat as Confidential Information all customer identifiable information in any form, whether or not bearing a mark of confidentiality or otherwise requested by the CITY, including but not limited to the non-exclusive list of Confidential Information above. In the case of disclosure in non- documentary form of non-customer identifiable information, made orally or by visual inspection, the Disclosing Party shall have the right, or, if requested by the Receiving Party, the obligation to confirm in writing the fact and general nature of each disclosure within a reasonable time after it is made in order that it is treated as Confidential Information. Any information disclosed to the other party before the execution of this AGREEMENT and related to the services for which PLAYGROUND DESIGNER AND MANUFACTURER has been engaged shall be considered in the same manner and be subject to the same treatment as the information disclosed after the execution of this AGREEMENT with regard to protecting it as Confidential Information. 3. Use of Confidential Information. Receiving Party hereby agrees that it shall use the Confidential Information solely for the purpose of performing its obligations under this AGREEMENT and not in any way detrimental to Disclosing Party. Receiving Party agrees to use the same degree of care Receiving Party uses with respect to its own proprietary or confidential information, which in any event shall result in a reasonable standard of care to prevent unauthorized use or disclosure of the Confidential Information. Except as otherwise provided herein, Receiving Party shall keep confidential and not disclose the Confidential Information. The CITY and PLAYGROUND DESIGNER AND MANUFACTURER shall cause each of their directors, officers, employees, agents, representatives, and subcontractors to become familiar with, and abide by, the terms of this Exhibit, which shall survive this AGREEMENT as an on-going obligation of the Parties. Official Purchasing Document Last updated 5/2024 Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 14 of 218 PLAYGROUND DESIGNER AND MANUFACTURER shall not use such information to obtain any economic or other benefit for itself, or any third party, other than in the performance of obligations under this AGREEMENT. 4. Exclusions from Definition. The term “Confidential Information” as used herein does not include any data or information which is already known to the Receiving Party or which before being divulged by the Disclosing Party: (a) was generally known to the public through no wrongful act of the Receiving Party; (b) has been rightfully received by the Receiving Party from a third party without restriction on disclosure and without, to the knowledge of the Receiving Party, a breach of an obligation of confidentiality; (c) has been approved for release by a written authorization by the other party hereto; or (d) has been disclosed pursuant to a requirement of a governmental agency or by operation of law, subject to Paragraph 5 below. 5. Required Disclosure. Notwithstanding Paragraph 4(d) above, if the Receiving Party receives a request (by interrogatories, requests for information or documents, subpoena, civil investigative demand or similar process, or by federal, state, or local law, including without limitation, the Colorado Open Records Act) to disclose any Confidential Information, the Parties agree the Receiving Party will provide the Disclosing Party with immediate notice of such request, so the Disclosing Party may seek an appropriate protective order before disclosure or waive the Receiving Party’s compliance with this Exhibit. The Receiving Party shall furnish a copy of this Exhibit with any disclosure. Notwithstanding this Paragraph 5, Receiving Party shall not disclose Confidential Information to any person, directly or indirectly, nor use it in any way, except as required by law or authorized in writing by Disclosing Party. 6. Red Flags Rules. If applicable, PLAYGROUND DESIGNER AND MANUFACTURER must implement reasonable policies and procedures to detect, prevent and mitigate the risk of identity theft in compliance with the Identity Theft Red Flags Rules found at 16 Code of Federal Regulations part 681. Further, PLAYGROUND DESIGNER AND MANUFACTURER must take appropriate steps to mitigate identity theft if it occurs with any of the CITY’s covered information and must notify the CITY in writing within twenty-four (24) hours of discovery of any breaches of security or Red Flags to the CITY. 7. Data Protection and Data Security. PLAYGROUND DESIGNER AND MANUFACTURER shall have in place information security safeguards designed to conform to or exceed industry best practices regarding the protection of the confidentiality, integrity and availability of Confidential Information and shall have written agreements requiring any subcontractor to meet those standards. These information security safeguards (the “Information Security Program”) shall be materially consistent with, or more stringent than, the safeguards described in this Exhibit. (a) PLAYGROUND DESIGNER AND MANUFACTURER’s information security safeguards shall address the following elements:  Data Storage, Backups and Disposal  Logical Access Control (e.g., Role-Based) Official Purchasing Document Last updated 5/2024 Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 15 of 218  Information Classification and Handling  Secure Data Transfer (SFTP and Data Transfer Specification)  Secure Web Communications  Network and Security Monitoring  Application Development Security  Application Security Controls and Procedures (User Authentication, Security Controls, and Security Procedures, Policies and Logging)  Incident Response  Vulnerability Assessments  Hosted Services  Personnel Security (b) Subcontractors. PLAYGROUND DESIGNER AND MANUFACTURER may use subcontractors, though such activity shall not release or absolve PLAYGROUND DESIGNER AND MANUFACTURER from the obligation to satisfy all conditions of this AGREEMENT, including the data security measures described in this Exhibit, and to require a substantially similar level of data security, appropriate to the types of services provided and Confidential Information received, for any subcontractor PLAYGROUND DESIGNER AND MANUFACTURER may use. Accordingly, any release of data, confidential information, or failure to protect information under this AGREEMENT by a subcontractor or affiliated party shall be attributed to PLAYGROUND DESIGNER AND MANUFACTURER and may be considered to be a material breach of this AGREEMENT. 8. Information Storage. Confidential Information is not to be stored on any local workstation, laptop, or media such as CD/DVD, USB drives, external hard drives or other similar portable devices unless the PLAYGROUND DESIGNER AND MANUFACTURER can ensure security for the Confidential Information so stored. Workstations or laptops to be used in the Services will be required to have personal firewalls on each, as well as have current, active anti-virus definitions. 9. Continuing Obligation. The agreement not to disclose Confidential Information as set forth in this Exhibit shall apply during the term of the Services and or AGREEMENT and at any time thereafter unless specifically authorized by the CITY in writing. 10. Termination Remedy. If PLAYGROUND DESIGNER AND MANUFACTURER breaches any of the terms of this Exhibit, in the CITY’s sole discretion, the CITY may immediately terminate this AGREEMENT and withdraw PLAYGROUND DESIGNER AND MANUFACTURER’s right to access Confidential Information. 11. Return of Information. Notwithstanding any other provision of this AGREEMENT to provide Project Instruments and work product, all material, i.e., various physical forms of media in which Confidential Information is stored, including but not limited to writings, drawings, tapes, diskettes, prototypes or products, shall remain the sole property of the Disclosing Party and, upon request, shall be promptly returned, together with all copies thereof to the Disclosing Party. Upon return of such materials, all digital and electronic data shall also be deleted in a non-restorable way by which it is no longer available to the Receiving Party. Upon Disclosing Party’s request, written verification of the deletion (including date of deletion) is to be provided Official Purchasing Document Last updated 5/2024 Professional Services Agreement – Work Order Type RFP 9996 Playground Design and Manufacturer for Schoolside Park Page 16 of 218 to the Disclosing Party within ten (10) days after completion of engagement, whether it be via termination, completion or otherwise. 12. Injunctive Relief. PLAYGROUND DESIGNER AND MANUFACTURER Receiving Party acknowledges that the Disclosing Party may, based upon the representations made in this AGREEMENT, disclose security information that is critical to the continued success of the Discloser’s business. Accordingly, Receiving Party agrees that the Disclosing Party does not have an adequate remedy at law for breach of this AGREEMENT and therefore, the Disclosing Party shall be entitled, as a non-exclusive remedy, and in addition to an action for damages, to seek and obtain an injunction or decree of specific performance or any other remedy, from a court of competent jurisdiction to enjoin or remedy any violation of this AGREEMENT.