Loading...
HomeMy WebLinkAboutNotice of Award - BID - 9959 HP ADS Storm PipeApril 11, 2024 Dana Kepner Company Attn: Jonathan Wheeler 700 Alcott Street Denver, CO 80204 jwheeler@danakepner.com RE: City of Fort Collins ITB 9959 Water HP ADS Storm Pipe Dear Jonathan, The City of Fort Collins Purchasing Department has considered Bids in response to its Invitation to Bid 9959. The City accepts your Bid for the products specified in Attachment 1, attached hereto and incorporated by this reference, to be provided in accordance with your Bid Submittal and Warranty Information. The term of this indefinite quantity contract shall be for one (1) year, from the date of the first Purchase Order with the option, at the City’s sole discretion, to renew annually for a period of up to two (2) additional one (1) year terms. At time of renewal only, you will be contacted and asked to complete a new Bid Form with updated pricing and delivery lead times. At their sole discretion, the City may choose to renew for an additional one (1) year term based off the updated information or may issue a new Bid. All terms and conditions stated in the Bid apply. The product specifications and warranty for any purchase made hereunder shall be in accordance with the Bid documents. If the award is acceptable to your firm, please sign this letter in the space provided within the next fifteen days of this award letter (via DocuSign). Please contact JD McCune, Senior Buyer at jmccune@fcgov.com if you have any questions regarding this matter. Sincerely, Gerry Paul Purchasing Director __________________________________________ _______________________________ Signature Date (Please indicate your agreement by signing this Notice of Award above within the next fifteen days.) GP:jg Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707- fax fcgov.com/purchasing Page 1 of 6 DocuSign Envelope ID: 8113D07A-F9E3-42D6-95CC-A0901ABE70AD 4/11/2024 HP ADS STORM PIPE BID 9959 Due to world conditions and supply chain issues, Dana Kepner Co. quotes are based on the manufacturers' pricing and availably at time of shipment. We urge that pricing be confirmed before delivery. JW031224A Jon Wheeler CITY OF FORT COLLINS Quote: Sales Rep: Customer: TakeOff 1TakeOff Name: Project Location:Bid Date: Ft. Collins 3701 Canal Drive Ft. Collins, CO 80524 Phone: 970.482.3311 On Call: 970.222.0093 Standard Hours: 7:00a to 5:00p Monday through Friday Phone: eMail: 406.370.7652 jwheeler@danakepner.com Quote Printed: Monday, March 18, 2024Page 1 of 5 Page 2 of 6 ATTACHMENT 1 DocuSign Envelope ID: 8113D07A-F9E3-42D6-95CC-A0901ABE70AD Terms and Conditions Due to the extreme volatility of raw material, energy, and transportation costs, the prices shown in this quotation are subject to the Manufacturers' price in effect at the time of shipment. Totals are for estimating purposes only. Unit prices prevail. Dana Kepner Company, Inc. is not responsible for manufacturers ability to ship material or hold prices. Due to volatility in the copper commodity market, copper tubing pricing will be determined at time of shipment. Quoted totals do not include taxes. PVC and HDPE pricing is based on manufacturer's ability to direct ship to the jobsite. This quote is for the supply of material only. The materials specifications, sizes, and quantities listed are the interpretations of Dana Kepner Company, Inc. and are believed to be correct, but are not guaranteed. Connecting hardware for Non-DK supplied material is not included in bid, unless otherwise noted. PVC Sewer Pipe may come in 13', 14', 20', & 22' lengths, based on availability. Regardless of product description in this proposal. Clay Pipe and Fittings are Non-Returnable. PVC and HDPE material are considered Freight-On-Board from the manufacturer. Terms are net 30, and Quote is based on award of complete project. All returns must be approved by management and will have a minimum 15% restock charge. Nonstocks are not returnable, and are shaded gray within this quote. Manufacturer standard warranty applies. Thank you for the opportunity to bid this project. Assumptions Per Plan/Customer specifications will prevail in this proposal. Quote Printed: Monday, March 18, 2024Page 2 of 5 Page 3 of 6 DocuSign Envelope ID: 8113D07A-F9E3-42D6-95CC-A0901ABE70AD ADS HP STORM PIPE 18"$78,480.00 24"$41,880.00 ADS HP STORM PIPE Total:$120,360.00 Total Quote before Taxes:$120,360.00 Quote Summary Quote Printed: Monday, March 18, 2024Page 3 of 5 Page 4 of 6 DocuSign Envelope ID: 8113D07A-F9E3-42D6-95CC-A0901ABE70AD ADS HP STORM PIPE 18" Qty Unit Description Price Total Price 1 3,000.0 FT ADS 18" X 20' HP STORM PIPE Q-1052198 V1 $26.16 $78,480.00 $78,480.00 Average Cost per Each:$26.16Total Units: 3,000.0 24" Qty Unit Description Price Total Price 1 1,200.0 FT ADS 24" X 20' HP STORM PIPE Q-1052198 V1 $34.90 $41,880.00 $41,880.00 Average Cost per Each:$34.90Total Units: 1,200.0 Quote Printed: Monday, March 18, 2024Page 4 of 5 Page 5 of 6 DocuSign Envelope ID: 8113D07A-F9E3-42D6-95CC-A0901ABE70AD Prod ID Description Unit Qty Unit Price Total Price 16HP1820NS ADS 18" X 20' HP STORM PIPE Q-1052198 V1 FT 3,000.0 $26.16 $78,480.00 16HP2420NS ADS 24" X 20' HP STORM PIPE Q-1052198 V1 FT 1,200.0 $34.90 $41,880.00 Total before Taxes:$120,360.00 Material List Quote Printed: Monday, March 18, 2024Page 5 of 5 Page 6 of 6 DocuSign Envelope ID: 8113D07A-F9E3-42D6-95CC-A0901ABE70AD