HomeMy WebLinkAboutAddendum 8 - BID - 9963 HVAC Equipment Replacement - Three (3) LocationsAddendum # 8
9963 HVAC Equipment Replacements – Three (3) Buildings
ADDENDUM NO. 8
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 9963: HVAC Equipment Replacements - Three (3) Locations
OPENING DATE: 3:00 PM (Our Clock) May 1, 2024
To all prospective bidders under the specifications and contract documents described above, the
following changes/additions are hereby made and detailed in the following sections of this
addendum:
Approved alternate equipment at Senior Center – Trane ERV and Bosch Heat Pumps
are acceptable.
Exhibit 1 – Trane ERV specification
Please contact Jake Rector, Senior Buyer, at (970) 221-6776 or jrector@fcgov.com with any
questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID OR QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Submittal Trane U.S. Inc.
Prepared For:
Sold To:
Date:4/24/2024
Customer P.O. Number:
Job Number:
Customer Project Number:
Job Name:Senior Center HVAC Retrofit - City of Fort
Collins
Trane is pleased to provide the enclosed submittal for your review and approval.
Product Summary
The attached information describes the equipment we propose
to furnish for this project and is submitted for your approval.
Qty Model Description
1 Horizon™ (OAD/N Rev6 - OADG/OANG) - Horizon™ - Outdoor Air Unit (Revision 6)
EXHIBIT 1
Product Data -Horizon™ - Outdoor Air Unit (Revision 6)
Size Qty Description Model Number
D000 1 Horizon™ - Outdoor Air Unit (Revision 6)OADG000C3-000000000-J3ALJ3AJ3-00A20E01B-
A01002000-AA0000400-00AK00000
Tag(s):ERV-3
Unit Voltage: 460-3-60
Curb Selection: Standard Knockdown Curb - Energy Recovery Wheel Cabinet
Warranty: 1-Year Parts Only (manufacturer warranty)
Airflow Configuration: Vertical Discharge/Vertical Return
Supply Fan Motor Type: Direct Drive w/Shaft Grounding Ring w/VFD Exhaust
Fan Motor Type: Direct Drive w/Shaft Grounding Ring w/VFD
Fan Piezo Rings: Supply & Exhaust Fan Piezo Rings/Taps
Filter Options: MERV-8,30%
Energy Recovery: ERV-Composite Construction with Frost Protection w/ VFD
Energy Recovery Wheel Size: ERC-5262C
Damper Options: 100% OA 2-Position Damper
Exhaust Dampers: Isolation Dampers
Electrical Options: Non-Fused Disconnect "Circuit Breaker"
Outdoor Air Monitoring: Airflow Probes
Smoke Detector: Return Smoke Detector
Installation: Outdoor
Convenience Outlet: Convenience Outlet
Supply Discharge Air Sensor (FLD)
2 inch Double Wall Construction
Stainless Steel Drip Pan
Blower HP - 5
Blower RPM - 1350
Supply Fan - ANPA 22
Exhaust RPM - 1640
Exhaust HP - 5
Exhaust Fan - ANPA 20
Unit Amps - FLA: 14 Amps
Min Circuit Ampacity - MCA: 15.6 Amps
Maximum Fuse Size - MFS: 20 Amps
FLD = Furnished by Trane / Installed by Others Page 2 of 12Trane Equipment Submittal
April 24, 2024Senior Center HVAC Retrofit - City of Fort Collins
Comments:Tag:ERV-3
Weight Operating:
Note:
lb*
Weight does not include CURB weight.
See CURB submittal for actual
3158
Unit Information
Model:Horizon™ (OAD/N
Rev6 -
OADG/OANG)
Unit Length:214 in
Size:D000 Unit Width:95 in
Quantity:1 Unit Height:68 in
Supply Airflow:5,400 CFM Elevation:5,000 ft
Outside Airflow:5,400 CFM Ambient Air DB:F
Minimum Airflow:1,068 CFM
Refrigerant Charge
Circuit 1:lbs
in H20in H20
Energy Recovery Wheel
CFMAirflow:
ERC-5262C
DB:
WB:
81.3
62.1
F
F
CFMAirflow:
DB:
WB:
75.0
62.0
F
F
CFM**Airflow:
DB:
WB:
95.0
63.0
F
F
CFM5,187Airflow:
ERV PD:0.71 in H20
Ventilation Supply Outside
ExhaustReturn
CFMAirflow:
DB:
WB:
60.3
58.0
F
F
CFMAirflow:
DB:
WB:
70.0
70.0
F
F
CFM**Airflow:
DB:
WB:
-5.0
-5.0
F
F
CFM5,187Airflow:
Ventilation Supply Outside
ExhaustReturn
5,400 5,717
ERV PD:0.71 in H20
PD:0.78 PD:0.78
DB:
WB:
89.9
63.2
F
F
DB:
WB:
49.4
44.0
F
F
4,870 4,870
5,400
ESP:1.54 in H20 ESP:1.54 in H20
Summer Conditions Winter Conditions
5,717
** TAB Outside airflow through OA Intake to this value
Total Capacity:12.17 MBH Eff.685.0
%
Total Capacity:343.48 MBH Eff.59.0%
Sensible Capacity:63.84 MBH Eff.74.0%Sensible Capacity:89.10 MBH Eff:27.0%
Latent Capacity:51.67 MBH Eff:70.0%Latent Capacity:254.38 MBH Eff:70.0%
FLD = Furnished by Trane / Installed by Others Page 3 of 12Trane Equipment Submittal
April 24, 2024Senior Center HVAC Retrofit - City of Fort Collins
Supply Pressure Drop Summary
1.50 in H2O
0.09 in H2O
0.78 in H2O
External Static Pressure:
Filter:
ERV OA:
Outdoor:0.12 in H2O
Total Static Pressure:2.49 in H2O
Supply Fan Conditions
Fan Motor BHP:3.56 BHP
Operating RPM:1350 RPM
Minimum RPM:796 RPM
Supply Fan ANPA 22
Exhaust Fan ANPA 20
Exhaust Fan Conditions
Fan Motor BHP:2.86 BHP
Operating RPM:1640 RPM
Exhaust Pressure Drop Summary
Return External Static Pressure:1.54 in H2O
ERV Return Filter PD:0.2 in H2O
ERV Wheel PD:0.71 in H2O
Total Exhaust Static Pressure 2.45 in H2O
FLD = Furnished by Trane / Installed by Others Page 4 of 12Trane Equipment Submittal
April 24, 2024Senior Center HVAC Retrofit - City of Fort Collins
Notes
•Unit Electrical amps include the greater of compressor or electrical heat amps.
•Unit’s electrical as shown above are for single point power.
Unit Electrical Data
Unit Voltage-Ph-Hz:460-3-60 Min Circuit Ampacity - MCA:15.6 Amps
Unit Amps - FLA:14.0 Amps Maximum Fuse Size - MFS:20 Amps
Electrical Summary
Component Fan Service Qty HP (ea.)FLA (ea.)RLA (ea.)LRA (ea.)
ERV/HRV 1 0.17 0.44
Exhaust 1 5 6.3
Supply 1 5 6.3
Controls 1 1
FLD = Furnished by Trane / Installed by Others Page 5 of 12Trane Equipment Submittal
April 24, 2024Senior Center HVAC Retrofit - City of Fort Collins
Drawing Accurate for OAD NC
Qty: 1 Tag(s): ERV-3
FLD = Furnished by Trane / Installed by Others Page 6 of 12Trane Equipment Submittal
April 24, 2024Senior Center HVAC Retrofit - City of Fort Collins
Drawing Accurate for OAD NC
Qty: 1 Tag(s): ERV-3
FLD = Furnished by Trane / Installed by Others Page 7 of 12Trane Equipment Submittal
April 24, 2024Senior Center HVAC Retrofit - City of Fort Collins
Drawing Accurate for OAD NC
Qty: 1 Tag(s): ERV-3
FLD = Furnished by Trane / Installed by Others Page 8 of 12Trane Equipment Submittal
April 24, 2024Senior Center HVAC Retrofit - City of Fort Collins
Drawing Accurate for OAD NC and OAD INC
Qty: 1 Tag(s): ERV-3
FLD = Furnished by Trane / Installed by Others Page 9 of 12Trane Equipment Submittal
April 24, 2024Senior Center HVAC Retrofit - City of Fort Collins
FLD = Furnished by Trane / Installed by Others Page 10 of 12Trane Equipment Submittal
April 24, 2024Senior Center HVAC Retrofit - City of Fort Collins
Mechanical Specifications - ERV-3Tag(s):
Casing
Unit casing shall be constructed of zinc coated, heavy gauge, galvanized steel. Exterior surfaces shall be cleaned,
phosphatized, and finished with a weather-resistant baked enamel finish. Unit's surface shall be tested 672 hours in a
salt spray test in compliance with ASTM B117. Unit shall have 2 inch thick Antimicrobial two component rigid
polyurethane foam insulation, metal encapsulated with no exposed edges. Initial R value of 6.7 per inch of thickness.
The unit's base pan shall have no penetrations within the perimeter of the curb other than the raised downflow
supply/return openings to provide an added water integrity precaution, if the condensate drain backs up.
Unit Top
The top cover shall be one piece construction or, where seams exist, it shall be double-hemmed and gasket-sealed.
The ribbed top adds extra strength and enhances water removal from unit top
Sensors
A factory installed combination outdoor air sensor located in the outdoor air hood is designed to sense both outdoor
air temperature and relative humidity for use by the microprocessor controller to make required ventilation, cooling,
dehumidification and heating decisions. Refer to the Sequence of Operations section of the Installation, Operation
and Maintenance manual for detailed unit control and operational modes. A factory installed sensing tube is designed
to sense the supply air temperature downstream of the indoor fan section.
Heat Capacity - Primary: 150 MBH, (10:1 Turndown NG, 8:1 Turndown LP)
Primary heat is supplied using indirect fired gas heating. The heating section shall have a progressive tubular heat
exchanger design using Stainless Steel burners and type 439 Stainless Steel tubes. An induced draft combustion
blower shall be used to pull the combustion products through the firing tubes. The heater shall use a direct spark
ignition (DS) system. On initial call for heat, the combustion blower shall purge the heat exchanger for 20 seconds
before ignition. After three unsuccessful ignition attempts, the entire heating system shall be locked out until manually
reset at the thermostat/zone sensor. Units shall be comply with the California requirement for low NOx emissions.
Unit shall be suitable for use with Natural Gas. Minimum incoming gas pressure of 7" W.C. and Maximum pressure of
14" W.C. required. Factory provided 25 year heat exchanger warranty.
Fan Piezo Rings: Supply & Exhaust Fan Piezo Rings/Taps
Air flow measurement will be accomplished through the use of Piezo Ring/Tap technology installed in the supply and
Exhaust fan wheel area.
Filter Options: MERV-8,30%
Aluminum Mesh Filters (D, K and N Cabinets) and Galvanized Mesh Bird Screen (B and G Cabinets) shall be installed
on the intake of the unit. In addition, one row of 2 inch MERV-8 rated filters (30 percent) shall be installed prior to the
evaporator coil. Unit shall be equipped with a 6” filter rack upstream of the evaporator. Frame shall be field-adjustable
to match any filter combination specified in the attached selection.
Energy Recovery: ERV-Composite Construction with Frost Protection w/ VFD
Energy recovery wheel performance shall be AHRI 1060 certified and bear the AHRI certified label. The rotating
wheel heat exchanger is composed of a rotating cylinder in an insulated cassette frame complete with removable
energy transfer media, seals, drive motor and drive belt. Energy transfer media shall be constructed of a durable
synthetic lightweight polymer. The total energy recovery wheel is coated with a desiccant tat shall be either Type-A
silica gel or 3A molecular sieve and permanently bonded to the energy transfer media without the use of binders or
adhesives. The lightweight polymer substrate will not degrade nor require additional coatings for application in marine
or coastal environments. Coated segments are cleanable outside of the cabinet with detergent or alkaline coil cleaner
and water. Desiccant will not dissolve nor deliquesce in the presence of water or high humidity.
Damper Options: 100% OA 2-Position Damper
The unit shall have a factory installed and integrated 100% outdoor air hood with damper controlled a by direct
coupled actuator and 2 inch permanent and washable aluminum mesh filters accessible through a hinged access
panel. The return air damper tray is blocked off to allow 100% outdoor airflow.
Electrical Options: Non-Fused Disconnect "Circuit Breaker"
FLD = Furnished by Trane / Installed by Others Page 11 of 12Trane Equipment Submittal
April 24, 2024Senior Center HVAC Retrofit - City of Fort Collins
A 3-pole, molded case, HACR circuit breaker with provisions for through the base electrical connections shall be
factory installed. Wiring will be provided from the circuit breaker to the unit high voltage terminal block. The switch will
be UL/CSA agency recognized. The circuit breaker will be sized per NEC and UL guidelines.
Factory wired Voltage/Phase monitor shall be included as standard. In the event of any of the following, the units will
be shut down and upon correction of the fault condition the unit will reset and restart automatically.
1. Phase Unbalance Protection: Factory set 2%
2. Over/Under/Brown Out Voltage Protection: +/-10% of nameplate voltage
3. Phase Loss/Reversal
Outdoor Air Monitoring: Airflow Probes
The Greentrol GF-2100-A and GF-2200-A are high quality economical programmable dual-output airflow/temperature
measurement and control instruments with options for analog air flow, temperature,and alarm. It is designed for
installation in specified critical applications that require precise measurement of air flow (down to zero flow). The
instrument includes factory calibrated probes and an advanced microprocessor
controlled transmitter/controller. Each sensor probe is equipped with a high reliability bead-in-glass heated thermistor
element, factory calibrated to NIST traceable standards from zero flow to 2,000 FPM. The transmitter is fully
independent of the probe and does not require
field matching to the probe. An advanced microprocessor processes the raw probe signals and provides versatile
programmable
airflow measurement and alarm options with direct LED drive or N.O./N.C. relay dry contacts, and selectable analog
output signal options. A powerful variable input signal integration option can be engaged to reduce the effects
of transient input signal variations, and an innovative Field Calibration Wizard allows for simple, automated field
adjustment of the instrument if required. A 16 character LCD display indicates airflow, temperature, system status and
is also used for configuration and diagnostics. Field configuration is accomplished using a simple four-button user
interface.
Smoke Detector: Return Smoke Detector
Smoke detector shall be factory installed photoelectric smoke detector mounted in the return air section. The
detector will be wired for continuous power whenever the unit is energized. Upon detection of smoke, the detector will
shut down all unit operations. Local codes may dictate the location of detectors.
Convenience Outlet: Convenience Outlet
A powered 120 volt, 15 amp, 2 plug convenience outlet shall be factory installed. A service receptacle disconnect shall
be installed. The convenience outlet is powered from the line side of the disconnect or circuit breaker, and therefore
will not be affected by the position of the disconnect or circuit breaker.
FLD = Furnished by Trane / Installed by Others Page 12 of 12Trane Equipment Submittal
April 24, 2024Senior Center HVAC Retrofit - City of Fort Collins