Loading...
HomeMy WebLinkAboutAddendum 1 - BID - 9922 Water Meter Box InstallationAddendum #1 9922 Water Meter Box Installation Page 1 of 2 ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 9922: Water Meter Box Installation OPENING DATE: 3:00 PM (Our Clock) March 21, 2024 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Questions and Answers Revised Bid Submittal issued separately on BidNet. Bidders shall use this document. Please contact Pat Johnson, CPPB, Senior Buyer, at (970) 221-6816 or pjohnson@fcgov.com with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum #1 9922 Water Meter Box Installation Page 2 of 2 Exhibit 1 Questions & Answers Q1: In the Bid Submittal, Section 00300 (Bid Form), under Work Site Examples, the following changes were made. These are in red in the Bid Submittal. When submitting your bid, please use the Revised Bid Submittal document issued with this addendum. A1: #3 Changed to 2+12+12+3 #4 should be 2+3+4 #5 should be 1+3 #6 Change from 24 Sq Ft to approximately 160 Sq Ft. Pricing will be 8+4+6+1+3+10 #7 should be 15+16+17 Q2: How should the cost of concrete or asphalt be handled, is there a minimum? When ordering from a concrete supplier their minimum is usually 5 yards. These projects likely won’t need 5 yards unless some are combined. A2: Minimum concrete or asphalt replacement is 160 sq ft for one or when combined with two projects near each other.