Loading...
HomeMy WebLinkAboutBITUMINOUS DENSITY - Filed CT-CONCRETE TEST - (3)Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 1 10/09/23 Asphalt Placement: Whisperwind Ln. - northbound lane, approximately 60 feet north of Conquest St. - center of lane Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 143.0 Backscatter 93 92 / 96 A 3812 Matte, Ryan 2 10/09/23 Asphalt Placement: Whisperwind Ln. - northbound lane, approximately 260 feet north of Conquest St. - 3 feet from centerline Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 142.2 Backscatter 92 92 / 96 A 3812 Matte, Ryan 3 10/09/23 Asphalt Placement: Whisperwind Ln. - northbound lane, approximately 460 feet north of Conquest St. - 3 feet from curb Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 144.5 Backscatter 94 92 / 96 A 3812 Matte, Ryan 4 10/09/23 Asphalt Placement: Whisperwind Ln. - northbound lane, approximately 660 feet north of Conquest St. - 4 feet from centerline Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 143.9 Backscatter 93 92 / 96 A 3812 Matte, Ryan 5 10/09/23 Asphalt Placement: Whisperwind Ln. - northbound lane, approximately 860 feet north of Conquest St. - center of lane Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 143.3 Backscatter 93 92 / 96 A 3812 Matte, Ryan 6 10/09/23 Asphalt Placement: Whisperwind Ln. - southbound lane, approximately 75 feet north of Conquest St. - center of lane Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 143.6 Backscatter 93 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 1 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 7 10/09/23 Asphalt Placement: Whisperwind Ln. - southbound lane, approximately 275 feet north of Conquest St. - 3 feet from curb Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 143.4 Backscatter 93 92 / 96 A 3812 Matte, Ryan 8 10/09/23 Asphalt Placement: Whisperwind Ln. - southbound lane, approximately 475 feet north of Conquest St. - 3 feet from centerline Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 142.0 Backscatter 92 92 / 96 A 3812 Matte, Ryan 9 10/09/23 Asphalt Placement: Whisperwind Ln. - southbound lane, approximately 675 feet north of Conquest St. - 4 feet from curb Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 142.8 Backscatter 93 92 / 96 A 3812 Matte, Ryan 10 10/09/23 Asphalt Placement: Whisperwind Ln. - southbound lane, approximately 875 feet north of Conquest St. - 4 feet from curb Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 143.5 Backscatter 93 92 / 96 A 3812 Matte, Ryan 11 10/09/23 Asphalt Placement: Barnstormer St. - westbound lane, adjacent to Lot 2 Block 1 - center of lane Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 142.2 Backscatter 92 92 / 96 A 3812 Matte, Ryan 12 10/09/23 Asphalt Placement: Barnstormer St. - eastbound lane, adjacent to Lot 1 Block 2 - center of lane Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 142.8 Backscatter 93 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 2 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 13 10/09/23 Asphalt Placement: Conquest St. - westbound lane, approximately 30 feet west of Whisperwind Ln. - center of lane Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 143.6 Backscatter 93 92 / 96 A 3812 Matte, Ryan 14 10/09/23 Asphalt Placement: Conquest St. - westbound lane, approximately 140 feet west of Whisperwind Ln. - 3 feet from centerline Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 143.3 Backscatter 93 92 / 96 A 3812 Matte, Ryan 15 10/09/23 Asphalt Placement: Conquest St. - eastbound lane, intersection of Whisperwind Ln. - 3 feet from curb Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 143.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan 16 10/09/23 Asphalt Placement: Conquest St. - eastbound lane, approximately 115 feet west of Whisperwind Ln. - 3 feet from centerline Base Lift 1 2 154.3 10-9-23 Mix 5493 Taft / Rice 143.1 Backscatter 93 92 / 96 A 3812 Matte, Ryan 17 10/13/23 Asphalt Placement: Barnstormer St. - westbound lane, approximately 70 feet west of Whisperwind Ln. - center of lane Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 143.9 Backscatter 93 92 / 96 A 3812 Matte, Ryan 18 10/13/23 Asphalt Placement: Barnstormer St. - eastbound lane, approximately 130 feet west of Whisperwind Ln. - center of lane Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 143.3 Backscatter 93 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 3 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 19 10/13/23 Asphalt Placement: Whisperwind Ln. - northbound lane, approximately 40 feet north of Aria Way - 3 feet from centerline Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 143.8 Backscatter 93 92 / 96 A 3812 Matte, Ryan 20 10/13/23 Asphalt Placement: Whisperwind Ln. - northbound lane, approximately 160 feet south of Aria Way - 3 feet from curb Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 143.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan 21 10/13/23 Asphalt Placement: Whisperwind Ln. - northbound lane, approximately 360 feet south of Aria Way - center of lane Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 143.4 Backscatter 93 92 / 96 A 3812 Matte, Ryan 22 10/13/23 Asphalt Placement: Whisperwind Ln. - northbound lane, approximately 560 feet south of Aria Way - 4 feet from centerline Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 143.5 Backscatter 93 92 / 96 A 3812 Matte, Ryan 23 10/13/23 Asphalt Placement: Whisperwind Ln. - northbound lane, approximately 760 feet south of Aria Way - center of lane Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 142.7 Backscatter 92 92 / 96 A 3812 Matte, Ryan 24 10/13/23 Asphalt Placement: Whisperwind Ln. - southbound lane, approximately 85 feet north of Aria Way - 3 feet from curb Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 142.7 Backscatter 92 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 4 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 25 10/13/23 Asphalt Placement: Whisperwind Ln. - southbound lane, approximately 115 feet south of Aria Way - 3 feet from centerline Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 142.8 Backscatter 92 92 / 96 A 3812 Matte, Ryan 26 10/13/23 Asphalt Placement: Whisperwind Ln. - southbound lane, approximately 315 feet south of Aria Way - center of lane Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 144.2 Backscatter 93 92 / 96 A 3812 Matte, Ryan 27 10/13/23 Asphalt Placement: Whisperwind Ln. - southbound lane, approximately 515 feet south of Aria Way - 3 feet from curb Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 143.9 Backscatter 93 92 / 96 A 3812 Matte, Ryan 28 10/13/23 Asphalt Placement: Whisperwind Ln. - southbound lane, approximately 715 feet south of Aria Way - center of lane Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 143.5 Backscatter 93 92 / 96 A 3812 Matte, Ryan 29 10/13/23 Asphalt Placement: Conquest St. - westbound lane, approximately 50 feet west of Whisperwind Ln. - 3 feet from curb Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 143.8 Backscatter 93 92 / 96 A 3812 Matte, Ryan 30 10/13/23 Asphalt Placement: Conquest St. - westbound lane, approximately 160 feet west of Whisperwind Ln. - center of lane Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 143.1 Backscatter 92 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 5 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 31 10/13/23 Asphalt Placement: Conquest St. - eastbound lane, intersection of Whisperwind Ln. - center of lane Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 143.8 Backscatter 93 92 / 96 A 3812 Matte, Ryan 32 10/13/23 Asphalt Placement: Conquest St. - eastbound lane, approximately 120 feet west of Whisperwind Ln. - 3 feet from centerline Top Lift 2 154.8 10-13-23 Mix 5493 Taft / Rice 143.5 Backscatter 93 92 / 96 A 3812 Matte, Ryan 33 10/18/23 Asphalt Placement: Greenfields Dr. - south of roundabout, northbound lane, approximately 30 feet south of edge of concrete, outside lane, 4 feet from curb Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 143.3 Backscatter 93 92 / 96 A 3812 Matte, Ryan 34 10/18/23 Asphalt Placement: Greenfields Dr. - south of roundabout, northbound lane, approximately 100 feet south of edge of concrete, inside lane, 5 feet from curb Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 143.6 Backscatter 93 92 / 96 A 3812 Matte, Ryan 35 10/18/23 Asphalt Placement: Greenfields Dr. - south of roundabout, southbound lane, approximately 50 feet south of edge of concrete, inside turn lane, 5 feet from curb Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 143.4 Backscatter 93 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 6 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 36 10/18/23 Asphalt Placement: Greenfields Dr. - south of roundabout, southbound lane, approximately 75 feet south of edge of concrete, center lane, center of lane Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 143.8 Backscatter 93 92 / 96 A 3812 Matte, Ryan 37 10/18/23 Asphalt Placement: Greenfields Dr. - south of roundabout, southbound lane, approximately 120 feet south of edge of concrete, outside turn lane, 8 feet from curb Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 143.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan 38 10/18/23 Asphalt Placement: Greenfields Dr. - south of roundabout, southbound lane, approximately 30 feet south of edge of concrete, outside turn lane, 2 feet from curb Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 144.5 Backscatter 93 92 / 96 A 3812 Matte, Ryan 39 10/18/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 60 feet north of edge of concrete, outside lane, 6 feet from curb Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 144.3 Backscatter 93 92 / 96 A 3812 Matte, Ryan 40 10/18/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 260 feet north of edge of concrete, inside lane, 4 feet from centerline Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 143.1 Backscatter 92 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 7 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 41 10/18/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 460 feet north of edge of concrete, outside lane, 7 feet from curb Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 144.1 Backscatter 93 92 / 96 A 3812 Matte, Ryan 42 10/18/23 Asphalt Placement: Greenfields Dr. - northbound lane, intersection of Donella Dr. - inside lane, center of lane Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 143.2 Backscatter 92 92 / 96 A 3812 Matte, Ryan 43 10/18/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 200 feet north of Donella Dr. - outside lane, 4 feet from curb Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 144.4 Backscatter 93 92 / 96 A 3812 Matte, Ryan 44 10/18/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 400 feet north of Donella Dr. - inside lane, 3 feet from centerline Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 143.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan 45 10/18/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 600 feet north of Donella Dr. - outside lane, 7 feet from curb Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 145.2 Backscatter 94 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 8 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 46 10/18/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 800 feet north of Donella Dr. - inside lane, 9 feet from centerline Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 143.6 Backscatter 93 92 / 96 A 3812 Matte, Ryan 47 10/18/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 1000 feet north of Donella Dr. - outside lane, 2 feet from curb Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 143.3 Backscatter 93 92 / 96 A 3812 Matte, Ryan 48 10/18/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 1150 feet north of Donella Dr. - inside lane, 2 feet from centerline Base Lift 1 3 154.9 10-18-23 Mix 5493 Taft / Rice 143.9 Backscatter 93 92 / 96 A 3812 Matte, Ryan 49 10/19/23 Asphalt Placement: Greenfields Dr. - southbound lane, approximately 100 feet north of edge of concrete north of roundabout, outside lane , 5 feet from curb Base Lift 1 3 154.6 10-19-23 Mix 5493 Taft / Rice 143.2 Backscatter 93 92 / 96 A 3812 Matte, Ryan 50 10/19/23 Asphalt Placement: Greenfields Dr. - southbound lane, approximately 300 feet north of edge of concrete north of roundabout, inside lane , 4 feet from centerline Base Lift 1 3 154.6 10-19-23 Mix 5493 Taft / Rice 143.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 9 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 51 10/19/23 Asphalt Placement: Greenfields Dr. - southbound lane, approximately 500 feet north of edge of concrete north of roundabout, outside lane, 6 feet from curb Base Lift 1 3 154.6 10-19-23 Mix 5493 Taft / Rice 143.5 Backscatter 93 92 / 96 A 3812 Matte, Ryan 52 10/19/23 Asphalt Placement: Greenfields Dr. - southbound lane, intersection of Donella Dr. - inside lane, 5 feet from centerline Base Lift 1 3 154.6 10-19-23 Mix 5493 Taft / Rice 143.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan 53 10/19/23 Asphalt Placement: Greenfields Dr. - southbound lane, approximately 200 feet north of Donella Dr. - outside lane, 3 feet from curb Base Lift 1 3 154.6 10-19-23 Mix 5493 Taft / Rice 142.9 Backscatter 92 92 / 96 A 3812 Matte, Ryan 54 10/19/23 Asphalt Placement: Greenfields Dr. - southbound lane, approximately 400 feet north of Donella Dr. - inside lane, 9 feet from centerline Base Lift 1 3 154.6 10-19-23 Mix 5493 Taft / Rice 144.5 Backscatter 93 92 / 96 A 3812 Matte, Ryan 55 10/19/23 Asphalt Placement: Greenfields Dr. - southbound lane, approximately 600 feet north of Donella Dr. - outside lane, 9 feet from curb Base Lift 1 3 154.6 10-19-23 Mix 5493 Taft / Rice 145.1 Backscatter 94 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 10 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 56 10/19/23 Asphalt Placement: Greenfields Dr. - southbound lane, approximately 800 feet north of Donella Dr. - inside lane, 3 feet from centerline Base Lift 1 3 154.6 10-19-23 Mix 5493 Taft / Rice 143.9 Backscatter 93 92 / 96 A 3812 Matte, Ryan 57 10/19/23 Asphalt Placement: Greenfields Dr. - southbound lane, approximately 100 feet north of Donella Dr. - outside lane, 5 feet from curb Base Lift 1 3 154.6 10-19-23 Mix 5493 Taft / Rice 142.9 Backscatter 92 92 / 96 A 3812 Matte, Ryan 58 10/19/23 Asphalt Placement: Greenfields Dr. - southbound lane, approximately 1150 feet north of Donella Dr. - inside lane, 2 feet from centerline Base Lift 1 3 154.6 10-19-23 Mix 5493 Taft / Rice 144.8 Backscatter 94 92 / 96 A 3812 Matte, Ryan 59 10/19/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 30 feet north of edge of concrete north of roundabout - inside lane, 4 feet from curb Base Lift 2 2 154.6 10-19-23 Mix 5493 Taft / Rice 143.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan 60 10/19/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 230 feet north of edge of concrete north of roundabout - outside lane, 5 feet from curb Base Lift 2 2 154.6 10-19-23 Mix 5493 Taft / Rice 143.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 11 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 61 10/19/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 430 feet north of edge of concrete north of roundabout - inside lane, 4 feet from centerline Base Lift 2 2 154.6 10-19-23 Mix 5493 Taft / Rice 142.3 Backscatter 92 92 / 96 A 3812 Matte, Ryan 62 10/19/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 630 feet north of edge of concrete north of roundabout - outside lane, 12 feet from curb Base Lift 2 2 154.6 10-19-23 Mix 5493 Taft / Rice 143.2 Backscatter 93 92 / 96 A 3812 Matte, Ryan 63 10/19/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 140 feet north of Donella Dr. - inside lane, 6 feet from centerline Base Lift 2 2 154.6 10-19-23 Mix 5493 Taft / Rice 144.6 Backscatter 94 92 / 96 A 3812 Matte, Ryan 64 10/19/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 340 feet north of Donella Dr. - outside lane, 20 feet from curb Base Lift 2 2 154.6 10-19-23 Mix 5493 Taft / Rice 143.6 Backscatter 93 92 / 96 A 3812 Matte, Ryan 65 10/19/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 540 feet north of Donella Dr. - inside lane, 2 feet from centerline Base Lift 2 2 154.6 10-19-23 Mix 5493 Taft / Rice 143.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 12 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 66 10/19/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 740 feet north of Donella Dr. - outside lane, 3 feet from curb Base Lift 2 2 154.6 10-19-23 Mix 5493 Taft / Rice 143.8 Backscatter 93 92 / 96 A 3812 Matte, Ryan 67 10/19/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 940 feet north of Donella Dr. - inside lane, 7 feet from centerline Base Lift 2 2 154.6 10-19-23 Mix 5493 Taft / Rice 143.5 Backscatter 93 92 / 96 A 3812 Matte, Ryan 68 10/19/23 Asphalt Placement: Greenfields Dr. - northbound lane, approximately 1140 feet north of Donella Dr. - outside lane, 8 feet from curb Base Lift 2 2 154.6 10-19-23 Mix 5493 Taft / Rice 144.4 Backscatter 93 92 / 96 A 3812 Matte, Ryan 69 10/21/23 Asphalt Placement: Frontage Rd. - east of roundabout, eastbound lane, approximately 20 feet east of edge of concrete, 2 feet from curb Top Lift 2.5 153.9 10-21-23 Mix 5473 Taft / Rice 143.1 Backscatter 93 92 / 96 A 3812 Matte, Ryan 70 10/21/23 Asphalt Placement: Frontage Rd. - east of roundabout, eastbound lane, approximately 220 feet east of edge of concrete, 4 feet from centerline Top Lift 2.5 153.9 10-21-23 Mix 5473 Taft / Rice 145.1 Backscatter 94 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 13 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 71 10/21/23 Asphalt Placement: Frontage Rd. - east of roundabout, eastbound lane, approximately 330 feet east of edge of concrete, center of lane Top Lift 2.5 153.9 10-21-23 Mix 5473 Taft / Rice 145.9 Backscatter 95 92 / 96 A 3812 Matte, Ryan 72 10/21/23 Asphalt Placement: Frontage Rd. - east of roundabout, westbound lane, approximately 300 feet east of edge of concrete, 3 feet from curb Top Lift 2.5 153.9 10-21-23 Mix 5473 Taft / Rice 142.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan 73 10/21/23 Asphalt Placement: Frontage Rd. - east of roundabout, westbound lane, approximately 100 feet east of edge of concrete, 4 feet from centerline Top Lift 2.5 153.9 10-21-23 Mix 5473 Taft / Rice 143.0 Backscatter 93 92 / 96 A 3812 Matte, Ryan 74 10/21/23 Asphalt Placement: Frontage Rd. - east of roundabout, westbound lane, approximately 10 feet east of edge of concrete, center of lane Top Lift 2.5 153.9 10-21-23 Mix 5473 Taft / Rice 144.8 Backscatter 94 92 / 96 A 3812 Matte, Ryan 75 10/21/23 Asphalt Placement: Frontage Rd. - west of roundabout, eastbound lane, approximately 35 feet west of edge of concrete, 3 feet from centerline Top Lift 2.5 153.9 10-21-23 Mix 5473 Taft / Rice 144.6 Backscatter 94 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 14 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 76 10/21/23 Asphalt Placement: Frontage Rd. - west of roundabout, eastbound lane, approximately 235 feet west of edge of concrete, 5 feet from curb Top Lift 2.5 153.9 10-21-23 Mix 5473 Taft / Rice 143.1 Backscatter 93 92 / 96 A 3812 Matte, Ryan 77 10/21/23 Asphalt Placement: Frontage Rd. - west of roundabout, eastbound lane, approximately 435 feet west of edge of concrete, center of lane Top Lift 2.5 153.9 10-21-23 Mix 5473 Taft / Rice 142.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan 78 10/21/23 Asphalt Placement: Frontage Rd. - west of roundabout, westbound lane, approximately 500 feet west of edge of concrete, 4 feet from curb Top Lift 2.5 153.9 10-21-23 Mix 5473 Taft / Rice 141.7 Backscatter 92 92 / 96 A 3812 Matte, Ryan 79 10/21/23 Asphalt Placement: Frontage Rd. - west of roundabout, westbound lane, approximately 300 feet west of edge of concrete, 3 feet from centerline Top Lift 2.5 153.9 10-21-23 Mix 5473 Taft / Rice 142.5 Backscatter 93 92 / 96 A 3812 Matte, Ryan 80 10/21/23 Asphalt Placement: Frontage Rd. - west of roundabout, westbound lane, approximately 100 feet west of edge of concrete, center of lane Top Lift 2.5 153.9 10-21-23 Mix 5473 Taft / Rice 143.2 Backscatter 93 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 15 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 81 10/24/23 Asphalt Placement: Greenfields Dr. - southbound lane, north of roundabout, approximately 45 feet north of edge of concrete, inside lane, 2 feet from curb Base Lift 2 2 154.4 10-24-23 Mix 5493 Taft / Rice 143.2 Backscatter 93 92 / 96 A 3812 Matte, Ryan 82 10/24/23 Asphalt Placement: Greenfields Dr. - southbound lane, north of roundabout, approximately 245 feet north of edge of concrete, outside lane, 5 feet from curb Base Lift 2 2 154.4 10-24-23 Mix 5493 Taft / Rice 143.2 Backscatter 93 92 / 96 A 3812 Matte, Ryan 83 10/24/23 Asphalt Placement: Greenfields Dr. - southbound lane, north of roundabout, approximately 445 feet north of edge of concrete, inside lane, 8 feet from centerline Base Lift 2 2 154.4 10-24-23 Mix 5493 Taft / Rice 143.9 Backscatter 93 92 / 96 A 3812 Matte, Ryan 84 10/24/23 Asphalt Placement: Greenfields Dr. - southbound lane, north of roundabout, approximately 645 feet north of edge of concrete, outside lane, 2 feet from curb Base Lift 2 2 154.4 10-24-23 Mix 5493 Taft / Rice 144.4 Backscatter 94 92 / 96 A 3812 Matte, Ryan 85 10/24/23 Asphalt Placement: Greenfields Dr. - southbound lane, approximately 140 feet north of Donella Dr. - inside lane, 2 feet from centerline Base Lift 2 2 154.4 10-24-23 Mix 5493 Taft / Rice 143.2 Backscatter 93 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 16 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 86 10/24/23 Asphalt Placement: Greenfields Dr. - southbound lane, approximately 340 feet north of Donella Dr. - outside lane, 10 feet from curb Base Lift 2 2 154.4 10-24-23 Mix 5493 Taft / Rice 143.1 Backscatter 93 92 / 96 A 3812 Matte, Ryan 87 10/24/23 Asphalt Placement: Greenfields Dr. - southbound lane, approximately 540 feet north of Donella Dr. - inside lane, 6 feet from centerline Base Lift 2 2 154.4 10-24-23 Mix 5493 Taft / Rice 143.2 Backscatter 93 92 / 96 A 3812 Matte, Ryan 88 10/24/23 Asphalt Placement: Greenfields Dr. - southbound lane, approximately 740 feet north of Donella Dr. - outside lane, 5 feet from curb Base Lift 2 2 154.4 10-24-23 Mix 5493 Taft / Rice 144.4 Backscatter 94 92 / 96 A 3812 Matte, Ryan 89 10/24/23 Asphalt Placement: Greenfields Dr. - southbound lane, approximately 940 feet north of Donella Dr. - inside lane, 7 feet from centerline Base Lift 2 2 154.4 10-24-23 Mix 5493 Taft / Rice 144.8 Backscatter 94 92 / 96 A 3812 Matte, Ryan 90 10/24/23 Asphalt Placement: Greenfields Dr. - southbound lane, approximately 1140 feet north of Donella Dr. - outside lane, 3 feet from curb Base Lift 2 2 154.4 10-24-23 Mix 5493 Taft / Rice 143.8 Backscatter 93 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 17 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 91 10/24/23 Asphalt Placement: Greenfields Dr. - northbound lane, south of roundabout, approximately 20 feet south of edge of concrete - inside lane, 3 feet from curb Base Lift 2 2 154.4 10-24-23 Mix 5493 Taft / Rice 144.0 Backscatter 93 92 / 96 A 3812 Matte, Ryan 92 10/24/23 Asphalt Placement: Greenfields Dr. - northbound lane, south of roundabout, approximately 100 feet south of edge of concrete - outside lane, 4 feet from curb Base Lift 2 2 154.4 10-24-23 Mix 5493 Taft / Rice 143.5 Backscatter 93 92 / 96 A 3812 Matte, Ryan 93 10/24/23 Asphalt Placement: Greenfields Dr. - southbound lane, south of roundabout, approximately 10 feet south of edge of concrete - inside lane, 4 feet from curb Base Lift 2 2 154.4 10-24-23 Mix 5493 Taft / Rice 143.9 Backscatter 93 92 / 96 A 3812 Matte, Ryan 94 10/24/23 Asphalt Placement: Greenfields Dr. - southbound lane, south of roundabout, approximately 50 feet south of edge of concrete - middle lane, center of lane Base Lift 2 2 154.4 10-24-23 Mix 5493 Taft / Rice 144.6 Backscatter 94 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 18 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 95 10/24/23 Asphalt Placement: Greenfields Dr. - southbound lane, south of roundabout, approximately 100 feet south of edge of concrete - outside lane, 3 feet from curb Base Lift 2 2 154.4 10-24-23 Mix 5493 Taft / Rice 143.4 Backscatter 93 92 / 96 A 3812 Matte, Ryan 96 10/25/23 Asphalt Placement: Greenfields Dr. - northbound lane, south of roundabout, approximately 15 feet south of edge of concrete - inside lane, 5 feet from curb Top Lift 2 153.2 10-25-23 Mix 5473 Taft / Rice 145.5 Backscatter 95 92 / 96 A 3812 Matte, Ryan 97 10/25/23 Asphalt Placement: Greenfields Dr. - northbound lane, south of roundabout, approximately 130 feet south of edge of concrete - outside lane, 10 feet from centerline Top Lift 2 153.2 10-25-23 Mix 5473 Taft / Rice 144.1 Backscatter 94 92 / 96 A 3812 Matte, Ryan 98 10/25/23 Asphalt Placement: Greenfields Dr. - southbound lane, south of roundabout, approximately 100 feet south of edge of concrete - inside turn lane, 3 feet from curb Top Lift 2 153.2 10-25-23 Mix 5473 Taft / Rice 141.9 Backscatter 93 92 / 96 A 3812 Matte, Ryan This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 19 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins Test Results Test # Retest Of Test Date Test Location Material Mix Design Thickness (in) Max Density (pcf) Max Density Source In Place Density (pcf) Probe Depth (in) Percent Comp. Min/Max Comp. (%)Remark Gauge SN Technician 99 10/25/23 Asphalt Placement: Greenfields Dr. - southbound lane, south of roundabout, approximately 70 feet south of edge of concrete - middle lane, center of lane Top Lift 2 153.2 10-25-23 Mix 5473 Taft / Rice 145.6 Backscatter 95 92 / 96 A 3812 Matte, Ryan 100 10/25/23 Asphalt Placement: Greenfields Dr. - southbound lane, south of roundabout, approximately 150 feet south of edge of concrete - outside turn lane, 18 feet from curb Top Lift 2 153.2 10-25-23 Mix 5473 Taft / Rice 145.1 Backscatter 95 92 / 96 A 3812 Matte, Ryan Gauge Information Gauge SN Make Model Density Count Moisture Count Standard Count Date Last Calibration Date Last Calibrated By 3812 XPLORER 3500 2457 695 10/09/23 07/18/19 Instrotek 3812 XPLORER 3500 2414 695 10/13/23 07/18/19 Instrotek 3812 XPLORER 3500 2437 688 10/18/23 07/18/19 Instrotek 3812 XPLORER 3500 2460 694 10/19/23 07/18/19 Instrotek 3812 XPLORER 3500 2439 693 10/21/23 07/18/19 Instrotek 3812 XPLORER 3500 2437 697 10/24/23 07/18/19 Instrotek 3812 XPLORER 3500 2435 693 10/25/23 07/18/19 Instrotek Remarks A: Test results comply with specifications. Comments Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter" This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 20 of 20 Bituminous Density Test Method: ASTM D2950 Report Date: 02/16/2024 Report #: BNG-000001 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-355 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins