HomeMy WebLinkAboutBITUMINOUS DENSITY - Filed CT-CONCRETE TEST - (2)Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
101 10/25/23 Asphalt Placement:
Greenfields Dr. -
southbound lane, south
of roundabout,
approximately 30 feet
south of edge of
concrete - outside turn
lane, 4 feet from curb
Top Lift 2 153.2 10-25-23
Mix 5473
Taft /
Rice
145.6 Backscatter 95 92 / 96 A 3812 Matte, Ryan
102 11/01/23 Asphalt Placement: Aria
Way - northbound lane,
approximately 150 feet
north of Sykes Dr. -
center of lane
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
144.0 Backscatter 93 92 / 96 A 3812 Matte, Ryan
103 11/01/23 Asphalt Placement: Aria
Way - northbound lane,
approximately 350 feet
north of Sykes Dr. - 3
feet from curb
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
143.2 Backscatter 92 92 / 96 A 3812 Matte, Ryan
104 11/01/23 Asphalt Placement: Aria
Way - northbound lane,
approximately 550 feet
north of Sykes Dr. - 4
feet from centerline
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
144.3 Backscatter 93 92 / 96 A 3812 Matte, Ryan
105 11/01/23 Asphalt Placement: Aria
Way - northbound lane,
approximately 750 feet
north of Sykes Dr. -
center of lane
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
143.9 Backscatter 93 92 / 96 A 3812 Matte, Ryan
106 11/01/23 Asphalt Placement: Aria
Way - northbound lane,
approximately 950 feet
north of Sykes Dr. - 2
feet from centerline
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
145.3 Backscatter 94 92 / 96 A 3812 Matte, Ryan
107 11/01/23 Asphalt Placement: Aria
Way - northbound lane,
approximately 1150 feet
north of Sykes Dr. -
center of lane
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
147.8 Backscatter 95 92 / 96 A 3812 Matte, Ryan
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 1 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins
Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
108 11/01/23 Asphalt Placement: Aria
Way - northbound lane,
approximately 1350 feet
north of Sykes Dr. - 4
feet from curb
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
143.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan
109 11/01/23 Asphalt Placement: Aria
Way - southbound lane,
approximately 100 feet
north of Sykes Dr. -
center of lane
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
142.9 Backscatter 92 92 / 96 A 3812 Matte, Ryan
110 11/01/23 Asphalt Placement: Aria
Way - southbound lane,
approximately 300 feet
north of Sykes Dr. - 2
feet from centerline
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
143.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan
111 11/01/23 Asphalt Placement: Aria
Way - southbound lane,
approximately 500 feet
north of Sykes Dr. - 4
feet from curb
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
143.1 Backscatter 92 92 / 96 A 3812 Matte, Ryan
112 11/01/23 Asphalt Placement: Aria
Way - southbound lane,
approximately 700 feet
north of Sykes Dr. - 4
feet from centerline
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
143.0 Backscatter 92 92 / 96 A 3812 Matte, Ryan
113 11/01/23 Asphalt Placement: Aria
Way - southbound lane,
approximately 900 feet
north of Sykes Dr. -
center of lane
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
143.6 Backscatter 93 92 / 96 A 3812 Matte, Ryan
114 11/01/23 Asphalt Placement: Aria
Way - southbound lane,
approximately 1100 feet
north of Sykes Dr. - 3
feet from curb
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
143.2 Backscatter 92 92 / 96 A 3812 Matte, Ryan
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 2 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins
Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
115 11/01/23 Asphalt Placement: Aria
Way - southbound lane,
approximately 1300 feet
north of Sykes Dr. -
center of lane
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
144.0 Backscatter 93 92 / 96 A 3812 Matte, Ryan
116 11/01/23 Asphalt Placement:
Tourmaline Pl. -
eastbound lane,
approximately 60 feet
east of Whisperwind Ln.
- 2 feet from curb
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
145.3 Backscatter 94 92 / 96 A 3812 Matte, Ryan
117 11/01/23 Asphalt Placement:
Tourmaline Pl. -
eastbound lane,
approximately 260 feet
east of Whisperwind Ln.
- center of lane
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
143.8 Backscatter 93 92 / 96 A 3812 Matte, Ryan
118 11/01/23 Asphalt Placement:
Tourmaline Pl. -
westbound lane,
approximately 110 feet
east of Whisperwind Ln.
- center of lane
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
143.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan
119 11/01/23 Asphalt Placement:
Tourmaline Pl. -
westbound lane,
approximately 310 feet
east of Whisperwind Ln.
- 3 feet from centerline
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
143.4 Backscatter 92 92 / 96 A 3812 Matte, Ryan
120 11/01/23 Asphalt Placement:
Robud Farms Dr. -
westbound lane,
approximately 90 feet
east of Whisperwind Ln.
- 3 feet from curb
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
143.6 Backscatter 93 92 / 96 A 3812 Matte, Ryan
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 3 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins
Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
121 11/01/23 Asphalt Placement:
Robud Farms Dr. -
westbound lane,
approximately 290 feet
east of Whisperwind Ln.
- center of lane
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
143.5 Backscatter 93 92 / 96 A 3812 Matte, Ryan
122 11/01/23 Asphalt Placement:
Robud Farms Dr. -
westbound lane,
approximately 450 feet
east of Whisperwind Ln.
- 3 feet from centerline
Base Lift 1 2 155.1 11-1-23
5493
Taft /
Rice
144.9 Backscatter 93 92 / 96 A 3812 Matte, Ryan
123 11/02/23 Asphalt Placement:
Robud Farms Dr. -
eastbound lane,
approximately 50 feet
west of Aria Way -
center of lane
Base Lift 1 2 155.4 11-2-23
Mix 5493
Taft /
Rice
142.7 Backscatter 92 92 / 96 A 3812 Matte, Ryan
124 11/02/23 Asphalt Placement:
Robud Farms Dr. -
eastbound lane,
approximately 250 feet
west of Aria Way - 4
feet from centerline
Base Lift 1 2 155.4 11-2-23
Mix 5493
Taft /
Rice
142.9 Backscatter 92 92 / 96 A 3812 Matte, Ryan
125 11/02/23 Asphalt Placement:
Robud Farms Dr. -
eastbound lane,
approximately 440 feet
west of Aria Way - 3
feet from curb
Base Lift 1 2 155.4 11-2-23
Mix 5493
Taft /
Rice
143.7 Backscatter 92 92 / 96 A 3812 Matte, Ryan
126 11/02/23 Asphalt Placement:
Conquest St. -
eastbound lane,
approximately 110 feet
east of Whisperwind Ln.
- 3 feet from curb
Base Lift 1 2 155.4 11-2-23
Mix 5493
Taft /
Rice
144.0 Backscatter 93 92 / 96 A 3812 Matte, Ryan
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 4 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins
Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
127 11/02/23 Asphalt Placement:
Conquest St. -
eastbound lane,
approximately 310 feet
east of Whisperwind Ln.
- 4 feet from curb
Base Lift 1 2 155.4 11-2-23
Mix 5493
Taft /
Rice
144.6 Backscatter 93 92 / 96 A 3812 Matte, Ryan
128 11/02/23 Asphalt Placement:
Conquest St. -
eastbound lane,
approximately 450 feet
east of Whisperwind Ln.
- 4 feet from centerline
Base Lift 1 2 155.4 11-2-23
Mix 5493
Taft /
Rice
143.8 Backscatter 93 92 / 96 A 3812 Matte, Ryan
129 11/02/23 Asphalt Placement:
Conquest St. -
westbound lane,
approximately 60 feet
east of Whisperwind Ln.
- 5 feet from curb
Base Lift 1 2 155.4 11-2-23
Mix 5493
Taft /
Rice
144.3 Backscatter 93 92 / 96 A 3812 Matte, Ryan
130 11/02/23 Asphalt Placement:
Conquest St. -
westbound lane,
approximately 260 feet
east of Whisperwind Ln.
- center of lane
Base Lift 1 2 155.4 11-2-23
Mix 5493
Taft /
Rice
144.4 Backscatter 93 92 / 96 A 3812 Matte, Ryan
131 11/02/23 Asphalt Placement:
Conquest St. -
westbound lane,
approximately 430 feet
east of Whisperwind Ln.
- 2 feet from centerline
Base Lift 1 2 155.4 11-2-23
Mix 5493
Taft /
Rice
144.6 Backscatter 93 92 / 96 A 3812 Matte, Ryan
132 11/06/23 Asphalt Placement: Aria
Way - northbound lane,
approximately 120 feet
north of Sykes Dr. - 2
feet from curb
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
143.8 Backscatter 93 92 / 96 A 3812 Matte, Ryan
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 5 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins
Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
133 11/06/23 Asphalt Placement: Aria
Way - northbound lane,
approximately 320 feet
north of Sykes Dr. -
center of lane
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
143.3 Backscatter 93 92 / 96 A 3812 Matte, Ryan
134 11/06/23 Asphalt Placement: Aria
Way - northbound lane,
approximately 520 feet
north of Sykes Dr. - 3
feet from centerline
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
141.5 Backscatter 92 92 / 96 A 3812 Matte, Ryan
135 11/06/23 Asphalt Placement: Aria
Way - northbound lane,
approximately 720 feet
north of Sykes Dr. -
center of lane
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
143.6 Backscatter 93 92 / 96 A 3812 Matte, Ryan
136 11/06/23 Asphalt Placement: Aria
Way - northbound lane,
approximately 920 feet
north of Sykes Dr. - 4
feet from curb
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
144.1 Backscatter 94 92 / 96 A 3812 Matte, Ryan
137 11/06/23 Asphalt Placement: Aria
Way - northbound lane,
approximately 1120 feet
north of Sykes Dr. - 3
feet from centerline
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
143.9 Backscatter 94 92 / 96 A 3812 Matte, Ryan
138 11/06/23 Asphalt Placement: Aria
Way - northbound lane,
approximately 1320 feet
north of Sykes Dr. -
center of lane
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
147.3 Backscatter 96 92 / 96 A 3812 Matte, Ryan
139 11/06/23 Asphalt Placement: Aria
Way - southbound lane,
approximately 170 feet
north of Sykes Dr. -
center of lane
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
142.2 Backscatter 92 92 / 96 A 3812 Matte, Ryan
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 6 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins
Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
140 11/06/23 Asphalt Placement: Aria
Way - southbound lane,
approximately 370 feet
north of Sykes Dr. - 3
feet from curb
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
143.4 Backscatter 93 92 / 96 A 3812 Matte, Ryan
141 11/06/23 Asphalt Placement: Aria
Way - southbound lane,
approximately 570 feet
north of Sykes Dr. - 3
feet from centerline
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
145.5 Backscatter 95 92 / 96 A 3812 Matte, Ryan
142 11/06/23 Asphalt Placement: Aria
Way - southbound lane,
approximately 770 feet
north of Sykes Dr. -
center of lane
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
143.2 Backscatter 93 92 / 96 A 3812 Matte, Ryan
143 11/06/23 Asphalt Placement: Aria
Way - southbound lane,
approximately 970 feet
north of Sykes Dr. - 4
feet from centerline
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
144.2 Backscatter 94 92 / 96 A 3812 Matte, Ryan
144 11/06/23 Asphalt Placement: Aria
Way - southbound lane,
approximately 1170 feet
north of Sykes Dr. - 3
feet from curb
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
146.1 Backscatter 95 92 / 96 A 3812 Matte, Ryan
145 11/06/23 Asphalt Placement: Aria
Way - southbound lane,
approximately 1370 feet
north of Sykes Dr. -
center of lane
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
147.4 Backscatter 96 92 / 96 A 3812 Matte, Ryan
146 11/06/23 Asphalt Placement:
Tourmaline Pl. -
westbound lane,
approximately 50 feet
east of Whisperwind Ln.
- 4 feet from curb
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
143.0 Backscatter 93 92 / 96 A 3812 Matte, Ryan
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 7 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins
Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
147 11/06/23 Asphalt Placement:
Tourmaline Pl. -
westbound lane,
approximately 250 feet
east of Whisperwind Ln.
- center of lane
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
143.1 Backscatter 93 92 / 96 A 3812 Matte, Ryan
148 11/06/23 Asphalt Placement:
Tourmaline Pl. -
eastbound lane,
approximately 100 feet
east of Whisperwind Ln.
- 2 feet from centerline
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
145.3 Backscatter 94 92 / 96 A 3812 Matte, Ryan
149 11/06/23 Asphalt Placement:
Tourmaline Pl. -
eastbound lane,
approximately 300 feet
east of Whisperwind Ln.
- center of lane
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
143.4 Backscatter 93 92 / 96 A 3812 Matte, Ryan
150 11/06/23 Asphalt Placement:
Robud Farms Dr. -
eastbound lane,
approximately 110 feet
west of Aria Way -
center of lane
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
142.9 Backscatter 93 92 / 96 A 3812 Matte, Ryan
151 11/06/23 Asphalt Placement:
Robud Farms Dr. -
eastbound lane,
approximately 310 feet
west of Aria Way - 2
feet from curb
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
142.5 Backscatter 93 92 / 96 A 3812 Matte, Ryan
152 11/06/23 Asphalt Placement:
Robud Farms Dr. -
eastbound lane,
approximately 460 feet
west of Aria Way -
center of lane
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
143.8 Backscatter 93 92 / 96 A 3812 Matte, Ryan
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 8 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins
Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
153 11/06/23 Asphalt Placement:
Robud Farms Dr. -
westbound lane,
approximately 60 feet
west of Aria Way - 2
feet from centerline
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
142.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan
154 11/06/23 Asphalt Placement:
Robud Farms Dr. -
westbound lane,
approximately 260 feet
west of Aria Way - 3
feet from curb
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
142.4 Backscatter 93 92 / 96 A 3812 Matte, Ryan
155 11/06/23 Asphalt Placement:
Robud Farms Dr. -
westbound lane,
approximately 440 feet
west of Aria Way -
center of lane
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
143.5 Backscatter 93 92 / 96 A 3812 Matte, Ryan
156 11/06/23 Asphalt Placement:
Conquest St. -
eastbound lane,
approximately 95 feet
east Whisperwind Ln. -
center of lane
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
142.1 Backscatter 92 92 / 96 A 3812 Matte, Ryan
157 11/06/23 Asphalt Placement:
Conquest St. -
eastbound lane,
approximately 295 feet
east Whisperwind Ln. -
4 feet from curb
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
143.4 Backscatter 93 92 / 96 A 3812 Matte, Ryan
158 11/06/23 Asphalt Placement:
Conquest St. -
eastbound lane,
approximately 450 feet
east Whisperwind Ln. -
4 feet from centerline
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
143.8 Backscatter 93 92 / 96 A 3812 Matte, Ryan
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 9 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins
Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
159 11/06/23 Asphalt Placement:
Conquest St. -
westbound lane,
approximately 45 feet
east Whisperwind Ln. -
4 feet from curb
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
142.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan
160 11/06/23 Asphalt Placement:
Conquest St. -
westbound lane,
approximately 245 feet
east Whisperwind Ln. -
center of lane
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
143.0 Backscatter 93 92 / 96 A 3812 Matte, Ryan
161 11/06/23 Asphalt Placement:
Conquest St. -
westbound lane,
approximately 400 feet
east Whisperwind Ln. -
2 feet from centerline
Top Lift 2 153.9 11-6-23
Mix 5493
Taft /
Rice
143.2 Backscatter 93 92 / 96 A 3812 Matte, Ryan
162 11/15/23 Asphalt Placement:
Southbound outside
paving lane of
Greenfields Dr, 275'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
142.9 Backscatter 93 92 / 96 A 63046 Sanger, Jason
163 11/15/23 Asphalt Placement:
Southbound outside
paving lane of
Greenfields Dr, 655'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
142.8 Backscatter 93 92 / 96 A 63046 Sanger, Jason
164 11/15/23 Asphalt Placement:
Southbound outside
paving lane of
Greenfields Dr, 1090'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
143.2 Backscatter 93 92 / 96 A 63046 Sanger, Jason
165 11/15/23 Asphalt Placement:
Southbound outside
paving lane of
Greenfields Dr, 1140'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
142.1 Backscatter 92 92 / 96 A 63046 Sanger, Jason
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 10 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins
Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
166 11/15/23 Asphalt Placement:
Southbound outside
paving lane of
Greenfields Dr, 1480'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
143.1 Backscatter 93 92 / 96 A 63046 Sanger, Jason
167 11/15/23 Asphalt Placement:
Southbound outside
paving lane of
Greenfields Dr, 1700'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
143.0 Backscatter 93 92 / 96 A 63046 Sanger, Jason
168 11/15/23 Asphalt Placement:
Southbound inside
paving lane of
Greenfields Dr, 250'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
142.0 Backscatter 92 92 / 96 A 63046 Sanger, Jason
169 11/15/23 Asphalt Placement:
Southbound inside
paving lane of
Greenfields Dr, 680'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
142.7 Backscatter 93 92 / 96 A 63046 Sanger, Jason
170 11/15/23 Asphalt Placement:
Southbound inside
paving lane of
Greenfields Dr, 1140'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
143.7 Backscatter 93 92 / 96 A 63046 Sanger, Jason
171 11/15/23 Asphalt Placement:
Southbound inside
paving lane of
Greenfields Dr, 1620'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
142.4 Backscatter 93 92 / 96 A 63046 Sanger, Jason
172 11/15/23 Asphalt Placement:
Northbound outside
paving lane of
Greenfields Dr, 1650'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
141.9 Backscatter 92 92 / 96 A 63046 Sanger, Jason
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 11 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins
Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
173 11/15/23 Asphalt Placement:
Northbound outside
paving lane of
Greenfields Dr, 1180'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
143.0 Backscatter 93 92 / 96 A 63046 Sanger, Jason
174 11/15/23 Asphalt Placement:
Northbound outside
paving lane of
Greenfields Dr, 700'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
142.0 Backscatter 92 92 / 96 A 63046 Sanger, Jason
175 11/15/23 Asphalt Placement:
Northbound outside
paving lane of
Greenfields Dr, 285'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
142.6 Backscatter 93 92 / 96 A 63046 Sanger, Jason
176 11/15/23 Asphalt Placement:
Northbound inside
paving lane of
Greenfields Dr, 285'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
142.5 Backscatter 93 92 / 96 A 63046 Sanger, Jason
177 11/15/23 Asphalt Placement:
Northbound inside
paving lane of
Greenfields Dr, 615'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
143.1 Backscatter 93 92 / 96 A 63046 Sanger, Jason
178 11/15/23 Asphalt Placement:
Northbound inside
paving lane of
Greenfields Dr, 1150'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
143.3 Backscatter 93 92 / 96 A 63046 Sanger, Jason
179 11/15/23 Asphalt Placement:
Northbound inside
paving lane of
Greenfields Dr, 1460'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
142.6 Backscatter 93 92 / 96 A 63046 Sanger, Jason
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 12 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins
Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
180 11/15/23 Asphalt Placement:
Northbound inside
paving lane of
Greenfields Dr, 1750'
north of roundabout
Top Lift 2 153.9 11-15-23
Mix 5473
Taft /
Rice
142.9 Backscatter 93 92 / 96 A 63046 Sanger, Jason
181 12/04/23 Asphalt Placement:
Sykes Dr. - westbound
lane, intersection of
Delozier Rd. - 4 feet
from centerline
Base Lift 1 3 155.4 12-4-23
Mix 5493
Taft /
Rice
142.2 Backscatter 92 92 / 96 A 3812 Matte, Ryan
182 12/04/23 Asphalt Placement:
Sykes Dr. - westbound
lane, approximately 200
feet east of Delozier Rd.
- 4 feet from curb
Base Lift 1 3 155.4 12-4-23
Mix 5493
Taft /
Rice
143.5 Backscatter 92 92 / 96 A 3812 Matte, Ryan
183 12/04/23 Asphalt Placement:
Sykes Dr. - westbound
lane, approximately 400
feet east of Delozier Rd.
- center of lane
Base Lift 1 3 155.4 12-4-23
Mix 5493
Taft /
Rice
144.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan
184 12/04/23 Asphalt Placement:
Sykes Dr. - westbound
lane, approximately 600
feet east of Delozier Rd.
- 7 feet from curb
Base Lift 1 3 155.4 12-4-23
Mix 5493
Taft /
Rice
144.4 Backscatter 93 92 / 96 A 3812 Matte, Ryan
185 12/04/23 Asphalt Placement:
Sykes Dr. - westbound
lane, approximately 800
feet east of Delozier Rd.
- center of lane
Base Lift 1 3 155.4 12-4-23
Mix 5493
Taft /
Rice
143.8 Backscatter 93 92 / 96 A 3812 Matte, Ryan
186 12/04/23 Asphalt Placement:
Sykes Dr. - westbound
lane, approximately
1000 feet east of
Delozier Rd. - 3 feet
from center line
Base Lift 1 3 155.4 12-4-23
Mix 5493
Taft /
Rice
143.7 Backscatter 92 92 / 96 A 3812 Matte, Ryan
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 13 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins
Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
187 12/04/23 Asphalt Placement:
Sykes Dr. - westbound
lane, approximately
1200 feet east of
Delozier Rd. - 9 feet
from curb
Base Lift 1 3 155.4 12-4-23
Mix 5493
Taft /
Rice
143.6 Backscatter 92 92 / 96 A 3812 Matte, Ryan
188 12/04/23 Asphalt Placement:
Sykes Dr. - westbound
lane, approximately
1350 feet east of
Delozier Rd. - 8 feet
from centerline
Base Lift 1 3 155.4 12-4-23
Mix 5493
Taft /
Rice
144.2 Backscatter 93 92 / 96 A 3812 Matte, Ryan
189 12/04/23 Asphalt Placement:
Sykes Dr. - eastbound
lane, approximately 100
feet east of Delozier Rd.
- 4 feet from curb
Base Lift 1 3 155.4 12-4-23
Mix 5493
Taft /
Rice
144.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan
190 12/04/23 Asphalt Placement:
Sykes Dr. - eastbound
lane, approximately 300
feet east of Delozier Rd.
- center of lane
Base Lift 1 3 155.4 12-4-23
Mix 5493
Taft /
Rice
144.3 Backscatter 93 92 / 96 A 3812 Matte, Ryan
191 12/04/23 Asphalt Placement:
Sykes Dr. - eastbound
lane, approximately 500
feet east of Delozier Rd.
- 5 feet from curb
Base Lift 1 3 155.4 12-4-23
Mix 5493
Taft /
Rice
143.5 Backscatter 92 92 / 96 A 3812 Matte, Ryan
192 12/04/23 Asphalt Placement:
Sykes Dr. - eastbound
lane, approximately 700
feet east of Delozier Rd.
(intersection of Aria
Way) - 5 feet from
centerline
Base Lift 1 3 155.4 12-4-23
Mix 5493
Taft /
Rice
145.3 Backscatter 94 92 / 96 A 3812 Matte, Ryan
193 12/04/23 Asphalt Placement:
Sykes Dr. - eastbound
lane, approximately 900
feet east of Delozier Rd.
- 8 feet from curb
Base Lift 1 3 155.4 12-4-23
Mix 5493
Taft /
Rice
143.2 Backscatter 92 92 / 96 A 3812 Matte, Ryan
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 14 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins
Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
194 12/04/23 Asphalt Placement:
Sykes Dr. - eastbound
lane, approximately
1100 feet east of
Delozier Rd. - 7 feet
from curb
Base Lift 1 3 155.4 12-4-23
Mix 5493
Taft /
Rice
143.2 Backscatter 92 92 / 96 A 3812 Matte, Ryan
195 12/04/23 Asphalt Placement:
Sykes Dr. - eastbound
lane, approximately
1300 feet east of
Delozier Rd. - 2 feet
from curb
Base Lift 1 3 155.4 12-4-23
Mix 5493
Taft /
Rice
143.8 Backscatter 93 92 / 96 A 3812 Matte, Ryan
196 12/05/23 Asphalt Placement:
Sykes Dr. - eastbound
lane, approximately
1100 feet east of
Delozier Rd. - 3 feet
from centerline
Base Lift 1 3 155.8 12-5-23
Mix 5493
Taft /
Rice
144.5 Backscatter 93 92 / 96 A 3812 Matte, Ryan
197 12/05/23 Asphalt Placement:
Sykes Dr. - eastbound
lane, approximately
1300 feet east of
Delozier Rd. - 9 feet
from centerline
Base Lift 1 3 155.8 12-5-23
Mix 5493
Taft /
Rice
143.3 Backscatter 92 92 / 96 A 3812 Matte, Ryan
198 12/05/23 Asphalt Placement:
Greenfields Dr. -
southbound lane,
intersection of Sykes Dr.
- center of lane
Base Lift 1 3 155.8 12-5-23
Mix 5493
Taft /
Rice
144.7 Backscatter 93 92 / 96 A 3812 Matte, Ryan
199 12/05/23 Asphalt Placement:
Greenfields Dr. -
southbound lane,
approximately 200 feet
south of Sykes Dr. - 3
feet from centerline
Base Lift 1 3 155.8 12-5-23
Mix 5493
Taft /
Rice
143.8 Backscatter 92 92 / 96 A 3812 Matte, Ryan
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 15 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins
Test Results
Test #
Retest
Of
Test
Date Test Location Material
Mix
Design
Thickness
(in)
Max Density
(pcf)
Max
Density
Source
In Place
Density
(pcf)
Probe
Depth
(in)
Percent
Comp.
Min/Max
Comp.
(%)Remark
Gauge
SN Technician
200 12/05/23 Asphalt Placement:
Greenfields Dr. -
southbound lane,
approximately 400 feet
south of Sykes Dr. - 3
feet from curb
Base Lift 1 3 155.8 12-5-23
Mix 5493
Taft /
Rice
144.2 Backscatter 93 92 / 96 A 3812 Matte, Ryan
Gauge Information
Gauge SN Make Model Density Count Moisture Count Standard Count Date Last Calibration Date Last Calibrated By
3812 XPLORER 3500 2435 693 10/25/23 07/18/19 Instrotek
3812 XPLORER 3500 2453 687 11/01/23 07/18/19 Instrotek
3812 XPLORER 3500 2415 699 11/02/23 07/18/19 Instrotek
3812 XPLORER 3500 2456 691 11/06/23 07/18/19 Instrotek
3812 XPLORER 3500 2414 694 12/04/23 07/18/19 Instrotek
3812 XPLORER 3500 2446 702 12/05/23 07/18/19 Instrotek
63046 TROXLER 3430 1932 644 11/15/23
Remarks
A: Test results comply with specifications.
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter"
This report presents opinions formed as a result of our observations of asphalt placement and the test results shown above. Test data are not the sole basis for
opinions whether the asphalt meets project specifications. The contractor is responsible to apply necessary compaction effort to comply with project specifications.
Our test results, observations and opinions do not constitute acceptance of the work.
Page 16 of 16
Bituminous Density
Test Method: ASTM D2950
Report Date: 02/16/2024
Report #: BNG-000002
Client:
Hartford Homes Construction
Timnath, CO 80547
4801 Goodman St
Project:
Bloom Filing 1
FC07733.001F-355
400 North Link Lane
Fort Collins, CO 80524
Phone: 970-206-9455
Fort Collins