Loading...
HomeMy WebLinkAboutCOMPACTION TESTING - Filed CT-CONCRETE TEST - (3)Test Information Test #Test Location Elevation Reference Gauge Make / Model / SN / Calibrated Field Technician 683 Underdrain Trench: 4" underdrain/sand filter at the east end of Robud Farms Dr. - approximately station 13+30 1.0 Below final grade (feet)XPLORER / 3500 / 3812 / 07/18/2019 Matte, Ryan Remarks A: Test results comply with specifications. Comments Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on file with the testing agency. Test Results Test # Retest Of Test Date Proctor ID Method Soil Classification Optimum Moisture (%) Maximum Dry Density (pcf) In Place Moisture (%) In Place Dry Density (pcf) In Place Wet Density (pcf) Probe Depth (in) Percent Compaction Min Comp. (%)Remark 683 01/25/24 7 698B Granular 9.5 126.0 11.0 120.1 133.3 12 95 95 A This report presents opinions formed as a result of our observations of fill placement and the test results shown above. Test data are not the sole basis for opinions whether the fill meets project specifications. The contractor is responsible to apply necessary compaction effort and moisture to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. Page 1 of 1 Compaction Testing Test Method: ASTM D 6938 Report Date: 02/09/2024 Report #: SNG-000015 Client: Hartford Homes Construction Timnath, CO 80547 4801 Goodman St Project: Bloom Filing 1 FC07733.001F-320 400 North Link Lane Fort Collins, CO 80524 Phone: 970-206-9455 Fort Collins