WORK ORDER NUMBER:
PROJECT TITLE:
ORIGINAL BID/RFP NUMBER � NAME:
Soarinq Vista Trail
9105 CMGC for Natural Areas
MASTER AGREEMENT EFFECTIVE DATE: August 1, 2020
WORK ORDER COMMENCEMENT DATE: 12/7/2020
WORK ORDER COMPLETION DATE: �;�$� 1/15/2021C��
MAXIMUM FEE: (time and reimbursable direct costs}: 74,478.38
PROJECT DESCRIPTION/SCOPE OF SERVICES: Install 10' foot pedestrian path at
approximatelv 1 mile. Remove material (4" ) compact and fill with base course. Disperse native
material on site. Install culvert at one crossing.
Service Provider agrees to perform the services identified above and on the attached forms in
accordance with the terms and conditions contained herein and in the Master Agreement between
the parties. In the event of a conflict between or ambiguity in the terms af the Master Agreement
and this Work Order (including the attached forms) the Master Agreement shall control.
The attached forms consisting of (� page(s) are hereby accepted and incorporated herein,
by this reference, and Notice to Proceed is hereby given after all parties have signsd this
document.
SERVICE PROVIDE
ACCEPTANCE:
Name,
VECE P�3+A��—
REVIEWED: �r�� �G���
Name, Buyer or Senior Buyer
�y� ���;
ACCEPTANCE: /�' ( v�
Gerry Paul, Purchasing Director
(if greater than $60,d00}
c;��.,:;
Work Order Form
Date: l2�`� ZoZfl
, �
.� �
., .; ,;�
Date: �, ` �? � �. �
12/8/2020
Date:
12/8/2020
Date:
Official Purchasing Form
�ast uptlated f0l2017
To: �ty Of Fort Collins
Address: 215 North Mason Street, 2nd Floor
Fort Collins, CO 80524
Contact: Ryan Kogut
Phone:
Fax:
Project Name: Soaring Vista Natural Area Trail Bid Number: SVNA R1
Project Location: Soaring Vista Natural Area, Fort Collins, CO Bid Dabe: li/30/2020
Item # Item Description Estimated Quantlty Unit Unit Price Total Price
1 Mobilization 1.00 LS $4,140.99 $4,140.99
2 Undassified Excavation (Cut 4" From Proposcd Trall 770.00 CY $12.78 $9,840.60
Corridor And Piace/Fine Grade In NE Portion 0( Open
Space)
3 Subrgade Preparation (Rip, Moisturize, Compact) 7,000.00 SY $1.36 $9,520.00
4 4" Aggregate Base Course (Placed Md Compacted) 1,450.00 TON $33.24 $48,198.00
5 12° CMP W/ (2) FES Culvert Crossing 1.00 EACH $1,202.43 $1,202.43
6 Vehide Tracking Pad (FODS Mats) 1.00 EACH $1,576.36 $1,576.36
Total Bid Price: $74,478.38
Notes:
' J-2 ConVacting Company proposes to fumish all labor, material, and equipment to perfiorm #he following work:
' Exclusions:
Permits, FeeS, Testing, Staking, Bond@1.44�/a, Repair of Unstable Subgrade, Dewatering
' This is a unit price bid, quantities are estimates only, payment to be made on field measufed quantities.
' QuotaUon void if not aaepted within 30 Days
' Payment terms are: Monthly progress payments due in 30 days net with 1 1/2% per month finance charqes for balar�ces over 30 days old
ACCEPTED:
The above priCes, specifications and conditions are satisFactory and
are hereby accepted.
Buyer:
I Signature:
I Date of Acceptance:
CONFIRMED:
]-2 Contracting Company
Authorized Signature:
Estimator:
11/30/2020 2:30;05 PM
Page 1 of 1