CHANGE ORDER
NO. 2
PROJECT TITLE: SCADA Master Plan
CONTRACTOR: Carollo Engineers Inc.
WORK ORDER NUMBER:C-SCADA-2019
PO NUMBER: 9191487
DESCRIPTION:
1. Reason for Change: Carollo Engineers to create a set of network drawings for MWRF, DWRF and the WTP.
2. Description of Change: Effort will include two site visits, one to WTP and another to DWRF to document
routing of the major network components.
3. Change in Work Order Price: $20,000.00
4. Completion Date (if changed): N/A
ORIGINAL WORK ORDER PRICE $ 97,461.00
TOTAL APPROVED CHANGE ORDER 96,448.80
TOTAL PENDING CHANGE ORDER
TOTAL THIS CHANGE ORDER 20,000.00
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O.% OF ORIGINAL WORK ORDER
ADJUSTED WORK ORDER COST $ 213,909.80
CONTRACTOR: Carollo engineering Inc.
By: Date:
Name: Title:
ACCEPTANCE: Date:
Josh Monsrud, Project Manager
REVIEWED: Date:
Pat Johnson, Senior Buyer
ACCEPTANCE: Date:
Mark Kempton, Interim Deputy Director Utilities
ACCEPTANCE: Date:
Jason Graham, Director of Water Reclamation & Biosolids Division
DocuSign Envelope ID: 24A95012-1139-4FE3-9FCF-391A9DFF4788
12/4/2020
Jason Garside
12/4/2020
Vice President
12/6/2020
12/7/2020
12/4/2020
390 Interlocken Crescent, Suite 800, Broomfield, Colorado 80021
P. 303.635.1220 F. 303.635.1373
A. | Carollo Change Order Request (Work Order C‐SCADA‐ )
November %,
Josh Monsrud
SCADA Systems Manager
City of Ft Collins Water Utilities
jmonsrud@fcgov.com
Subject: Change Order Request (Work Order No.: C‐SCADA‐ )
Dear Josh:
Carollo Engineers, Inc. (Carollo) requests a change order to the scope and fee for Work Order No.: C‐SCADA‐
. The additional work is at the request of the Fort Collins Utilities to support in the documentation and
long‐term SCADA planning for the City of Fort Collins’ water and wastewater treatment facilities. The
following tasks and associated fee of 8 , 9. is requested. The work will be completed in : days from
change order execution and will be completed prior to the existing Work Order Completion Date of March
: , . Please let me know if there are any questions or comments.
SCOPE ADDITION: CONSULTANT to create a set of network drawings for MWRF, DWRF and the
WTP. Effort will include two site visits, one to WTP and another to DWRF to document routing of the major
network components. The following drawings will be created for each facility:
MWRF:
· Overall Network site Plan
· System Architecture Plan
· Network Topology Plan
DWRF:
· Overall Network site Plan
· System Architecture Plan
· Network Topology Plan
WTP:
· Overall Network site Plan
· System Architecture Plan
· Network Topology Plan Ethernet TCP
· Network Topology Plan Modbus+
.
DocuSign Envelope ID: 24A95012-1139-4FE3-9FCF-391A9DFF4788
November %,
Page
carollo.com
FEE ADDITION:
Sincerely,
CAROLLO ENGINEERS, INC.
Jason C. Garside, P.E.
Vice President
cc:Ron Burdick
Work Order No.: C-SCADA-2019
CHANGE ORDER REQUEST
November 27, 2020 se
n
i
o
r
p
r
o
f
e
s
s
i
o
n
a
l
le
a
d
p
r
o
j
e
c
t
p
r
o
f
e
s
s
i
o
n
a
l
pr
o
j
e
c
t
p
r
o
f
e
s
s
i
o
n
a
l
te
c
h
n
i
c
i
a
n
s
do
c
u
m
e
n
t
p
r
c
o
e
s
s
i
n
g
/
c
l
e
r
i
c
a
l
TO
T
A
L
hourly rate 238.00$ 219.00$ 206.00$ 110.00$ 96.00$
MWRF:
· Overall Network site Plan 2 1 2 4 1 1,643.00$
· System Architecture Plan 2 1 2 4 1 1,643.00$
· Network Topology Plan 3 1 2 2 1 1,661.00$
DWRF:
· Overall Network site Plan 2 1 2 4 1 1,643.00$
· System Architecture Plan 2 1 2 5 2 1,849.00$
· Network Topology Plan 2 1 2 4 1 1,643.00$
WTP:
· Overall Network site Plan 2 0 4 10 1 2,496.00$
· System Architecture Plan 2 1 4 8 1 2,495.00$
· Network Topology Plan Ethernet TCP 2 1 4 8 1 2,495.00$
· Network Topology Plan Modbus+ 2 1 4 7.5 1 2,440.00$
TOTAL 20,008.00$