HomeMy WebLinkAboutADDENDUM 2 - BID - 9753 CONCRETE MAINTENANCE PROJECT PHASE IIAddendum 2 Page 1 of 3 ADDENDUM NO. 2 PRE-PROPOSAL MEETING ITEMS Description of BID 9753: Concrete Maintenance Phase II BIDS DUE: 3:00 PM MT (Our Clock) March 1, 2023 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Questions and Answers Exhibit 2 – Revised Exhibit B - Specification Section 02000 Special Revisions. The revisions have been highlighted in yellow. Please contact Adam Hill, Senior Buyer, at adhill@fcgov.com with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 2 Page 2 of 3 EXHIBIT 1 –QUESTIONS & ANSWERS 1. Should our bid bond for the base bid amount or base bid plus alternates and what is the engineers estimate for this work? Response: The bid bond should be for the base bid amount without alternates and the engineers estimate is $1,250,000. 2. Will the award be based on the lowest base bid total? Response: Please see response to question 4 in Addendum 1. 3. What truncated dome material is required? Response: There are several items that relate to adding truncated domes to ramps. Section 608 & 609 state that “Truncated dome panels shall be cast iron, 2-foot by 2-foot, East Jordan DURALAST Item # 00700571 or equal, and shall meet all American with Disabilities Act (ADA) requirements. The type of truncated dome panels to be used shall be submitted to the Engineer for approval prior to installation.” 4. Does the City provide truncated dome panels for installation of line item 608.31 Add Truncated Domes to Existing Ramp – Dry Set Placement? Response: Yes. The City will provide cast iron truncated dome panels for line item “608.31 Add Truncated Domes to Existing Ramp – Dry Set Placement.” As per the revised specifications in section 608 & 609 this line item is “intended to cover all costs associated with the installation of the dome panels per the manufacturer’s instructions. The City of Fort Collins will supply the dome panels in either a two-foot by two-foot (2’ x 2’) or a two-foot by four-foot (2’ x 4’) variety along with the drive pins, adhesive and caulking, which is used to seal around the perimeter of the domes. The work included in this installation may include cleaning the existing surface, applying adhesive, impact drill, and installing hardware, and any other specific instructions per the manufacture’s specifications.” This is the only line item where the City will provide truncated dome panels to the contractor; the contractor shall provide truncated dome panels in all other installations outside of this dry set placement line item. 5. When do you want to start this project? Response: Ideally spring would be the start of this project. Ten (10) days after the Notice to Proceed (NTP), the contractor has One Hundred Twenty (120) working days to complete the project plus any added days due to change orders. Work is limited to the months of March to December. Addendum 2 Page 3 of 3 6. When are liquidated damages assessed? Response: Liquidated damages is addressed in detail in section 108.08 and 108.09 in the specifications.