Loading...
HomeMy WebLinkAboutRFP - 9808 CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) SERVICES FOR LAPORTE AVE IMPROVEMENTS - FISHBACK TO SUNSET RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 1 of 145 REQUEST FOR PROPOSAL RFP 9808 CONSTRUCTION MANAGER/ GENERAL CONTRACTOR (CM/GC) SERVICES FOR LAPORTE AVE IMPROVEMENTS – FISHBACK TO SUNSET RFP DUE: 3:00 PM MT (Mountain Time), July 14, 2023 The City of Fort Collins is requesting proposals from qualified Construction Managers/General Contractors (CM/GCs) for CM/GC services related to the construction of corridor safety improvements to include pedestrian paths and separated bikeways on Laporte Ave from N Sunset St to Fishback Ave. The project will be completed in two (2) phases. The first phase will be the East Segment which will be from Fishback Ave. to Frey Ave as shown in in the Attachment 1 - 95% plan set. It is the City’s goal to have construction completed on the East Segment in 2023. The second phase will be the West Segment which will be from the east of Taft Hill Road to Sunset Street as indicated in Attachment 2 – 30% plan set. A portion of the West Segment just west of Taft Hill Road near Poudre School is to be constructed in an existing flood plain, design of this area is currently being developed. The West Segment will also need to coordinate closely with Poudre School District and local businesses in order for them to maintain operations. No full road closures will be allowed, all construction must be phased to maintain access throughout project duration. Construction for the West Segment is not currently funded, but the City anticipates funding to be in place for construction in the 2024 season. This project will seek Institute for Sustainable Infrastructure ENVISION verification at a level to be determined through the Construction Manager/ General Contractor (CM/GC) process. As part of the City’s commitment to sustainability, proposals must be submitted online through the Rocky Mountain E-Purchasing System (RMEPS) at http://www.bidnetdirect.com/colorado/city- of-fort-collins. Note: please ensure adequate time to submit proposals through RMEPS. Proposals not submitted by the designated Opening Date and Time will not be accepted by RMEPS. A pre-proposal meeting will be held at 10:00 AM MT on June 27, 2023. The pre-proposal meeting will be hosted on-line via Microsoft Teams or Zoom. Select or copy/paste the below link into your browser for access to the meeting. Please be prepared to announce your name and mute your microphone and enter in the comments section your Name, Company and email address: Click here to join the meeting https://teams.microsoft.com/l/meetup- join/19%3ameeting_OTc1ODljYjQtOTdmMi00ODEzLTg3N2UtNDM3ZTI2ZmI5YWQw%40threa d.v2/0?context=%7b%22Tid%22%3a%2247fa2f5f-0d0a-4a68-b431- 6d1a27b66660%22%2c%22Oid%22%3a%2237299b31-8a43-4b66-8642- b5358a21cda9%22%7d Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 2 of 145 Alternatively, the pre-proposal meeting can be accessed via phone at the below call-in and conference ID. This option will only allow you to hear the audio presentation. Call-in number: 1 970-628-0892 Conference ID: 825 182 341# All questions should be submitted, in writing via email, to Adam Hill, Senior Buyer at adhill@fcgov.com, with a copy to Dillon Willett, Project Manager, dwillett@fcgov.com, no later than 3:00 PM MT on July 7, 2023. Please format your e-mail to include: RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset in the subject line. Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an addendum and posted on the Rocky Mountain E-Purchasing System webpage. Rocky Mountain E-Purchasing System hosted by BidNet A copy of the RFP may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins. This RFP has been posted utilizing the following Commodity Code(s): 911 15 C.I.P Construction/ Rehabilitation 911 17 C.I.P. Construction Roads 911 48 C.I.P. Pre-Construction Services 911 51 C.I.P. Project Management 913 27 Construction, Highway & Road 913 50 Construction, Street Major and Residential 925 44 General Construction Management, Scheduling and Cost Estimation 958 26 Construction Management Services Prohibition of Unlawful Discrimination: The City of Fort Collins, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d- 4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality. The City also strictly prohibits unlawful harassment in the workplace, including sexual harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding. The City requires its Construction Managers/General Contractors to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment and RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 3 of 145 retaliation. This requirement applies to all third-party Construction Managers/General Contractors and their subcontractors/subconsultants at every tier. Public Viewing Copy: The City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. Construction Managers/General Contractors may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version of the proposal, Construction Managers/General Contractors may redact text and/or data that it deems confidential or proprietary pursuant to CORA. All pricing will be considered public records subject to disclosure under CORA and as such pricing cannot be redacted from the “FOR PUBLIC VIEWING” version of the proposal. Failure to provide a public viewing copy will be considered a waiver of any claim of confidentiality under CORA without regard to how the applicant’s proposal or certain pages of the proposal are marked confidential, proprietary, or similar. Such statement does not necessarily exempt such documentation from public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other applicable law. Generally, under CORA trade secrets, confidential commercial information and financial data information may not be disclosed by the City. Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. By responding to this RFP, Construction Managers/General Contractors hereby waives any and all claims for damages against the City for the City’s good faith compliance with CORA. All provisions and pricing of any contract resulting from this request for proposal will be public information. Construction Managers/General Contractors Registration: The City requires new Construction Managers/General Contractors receiving awards from the City to submit IRS form W-9 and requires all Construction Managers/General Contractors to accept Direct Deposit (Electronic) payment. If needed, the W-9 form and the Vendor Direct Deposit Authorization Form can be found on the City’s Purchasing website at www.fcgov.com/purchasing under Vendor Reference Documents. Please do not submit these documents with your proposal, however, if you take exception to participating in Direct Deposit (Electronic) payments please clearly note such in your proposal as an exception. The City may waive the requirement to participate in Direct Deposit (Electronic) payments at its sole discretion. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Collusive or Sham Proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow other state and local governmental agencies, political subdivisions, and/or school districts to utilize the resulting award under all terms and conditions specified and upon agreement by all RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 4 of 145 parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in the current term or in any future terms. The selected Construction Manager/General Contractor shall be required to sign the City’s Agreement prior to commencing services (see sample attached to this document). Sincerely, Gerry Paul Purchasing Director RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 5 of 145 I. PROJECT BACKGROUND INFORMATION, STATUS, SCOPE OF WORK AND REQUIREMENTS A. Background Information The City of Fort Collins is requesting proposals from qualified Construction Managers/General Contractors (CM/GCs) for CM/GC services related to the construction of corridor safety improvements on Laporte Ave from N Sunset St to Fishback Ave. The project proposes to add safe and comfortable bicycle and pedestrian facilities along approximately 0.75 miles of roadway corridor. The Laporte Corridor Improvements are based on preliminary plans that are available in Attachments 1 & 2. Attachment 1 plans are 95% plans for the East Segment. Attachment 2 plans are approximately 30% design plans for the West Segment. Also included within the RFP are copies of Attachment 3 - East Final Hydraulics Report and Attachment 4 – 95% Project Specifications. The Laporte Ave Improvements project is significant to the City of Fort Collins for many reasons, including but not limited to the following: • Safety – Reported pedestrian and bicycle crashes in the area, specifically in conjunction with people trying to get to and from Poudre High School. • Pedestrian and bicycle connections – Currently there is only one sidewalk on the south side of the roadway and limited bike lanes. • Calming traffic by creating perceived constraints, building horizontal and vertical constraints and innovative facilities will be key to safety and multimodal accessibility. • Arterial roadways – Both Laporte and Taft Hill are arterial roads in the City and connect to major amenities including Poudre High School and the Poudre School District Offices. The footprint for the improvements has been completed to approximately 95% design for the East Segment and 30% design for the West Segment. The City is actively acquiring (East Segment) and assessing (West Segment) Right of Way needs to accommodate the improvements. Final project funding for the West Segment is yet to be finalized. Current funding for the improvements includes the following sources: • Transportation Alternatives Program (TAP) • Multimodal Transportation and Mitigation Options Fund (MMOF) • Revitalizing Main Streets (RMS) • Local City of Fort Collins • Pending applications for additional Federal / State Funds. The prioritized Project Goals have been determined to be: 1. Complete safety, operational, mobility, and infrastructure improvements per grant funding requirements, and available funding. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 6 of 145 2. Substantial Completion of East Segment within 2023. 3. Final completion of East Segment by spring of 2024 and West Segment by spring of 2025. 4. Improve bike and pedestrian network with a focus on safety and mobility for all modes, including Transfort bus stop locations. 5. Provide strong placemaking through urban design and landscape elements. 6. Collaborate with adjacent development activity to produce win/win scenarios for drainage, urban design, etc. 7. Provide a high quality final constructed improvement. The Construction Manager/General Contractor should address their approach to accomplishing these goals. Note as there are federal funds in the project funding, the Construction Manager/General Contractor must address federal funding goals. Refer to submittal requirements in Section II Contract Goals. This RFP shall cover construction management and general contractor services for all of the work identified above and in all attachments. B. Project Status The City and their consultant have completed significant portions of the project development. The general timelines for design milestones are as follows: East Segment (Frey Ave to Fishback Ave) 30% Design Submittal March 2023 95% Design Submittal May 2023 ROW Acquisition Authorized and Initiated Spring 2023 Construction Notice to Proceed (NTP) Summer 2023 Right of Way acquisition is underway and is expected to be completed by Summer 2023. West Segment (N Sunset St to N Taft Hill Rd) 30% Design Submittal May 2023 60% Design Submittal Summer 2023 90% Design Submittal Fall 2023 ROW Acquisition Authorized and Initiated Fall 2023 Construction Notice to Proceed (NTP) Spring 2024 (Contingent on funding) Right of Way acquisition is expected to be completed by Spring 2024 C. CM/GC Scope of Work CM/GC is a contracting method that involves the Construction Manager/General Contractor in the design process. The selected CM/GC will be required to enter into a Services Agreement – Work Order type. The City anticipates award of separate Work RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 7 of 145 Orders for each phase of the project including; 1) Preconstruction Support Services; and 2) Construction Services. The intent is to form a partnership with the City of Fort Collins (the owner), the designer working for the City of Fort Collins (Horrocks Engineering), and the Construction Manager/General Contractor. The focus is on a partnership and a collaborative design development to minimize risk for all parties involved including the traveling public, improve the construction schedule, promote innovation, and a cost- efficient construction. The Construction Manager will have a chance to negotiate a price to complete the construction of the project. If negotiations are successful, they will become the General Contractor. The Construction Manager becoming the General Contractor is not guaranteed. Key Personnel for the project are the Project Manager, the Preconstruction Support Services Manager and construction Project Superintendent. Key Personnel should be highly committed to this project for the duration of the work (i.e. Project Manager for the entire duration of the project, Preconstruction Support Services Manager for the preconstruction phase of the project and Project Superintendent for preconstruction/ constructability support and construction phase of the project). Any revisions to the Key Personnel must be presented to the City Project Manager for approval. 1. Preconstruction Support Services The CM/GC team relies on the expertise of the Construction Manager/General Contractor to deliver a better project in less time and at a cost competitive with traditional design-bid-build construction processes. The Construction Manager/General Contractor is required to provide the following expertise during the Preconstruction Support Services Phase of the project:  The skills and knowledge to estimate the quantities of materials, labor, and equipment needed to construct the project.  The skills and knowledge to determine the tasks (work breakdown structure) needed to complete the project and estimate the costs, duration, and sequence of these tasks.  An understanding of the availability, cost, and capacities of materials, labor, and equipment.  The skills and knowledge to identify potential risks (including cost and schedule risks) and methods to mitigate them during the design process.  The skills and knowledge to determine constructability of various designs and to develop construction phasing and maintenance of traffic schemes for various designs and construction approaches.  The skills, knowledge and experience necessary to coordinate the project work with significant anticipated utilities conflicts and relocations. If significant portions of the construction are to be primarily completed by a subcontractor, the Construction Manager/General Contractor must include the subcontractor in the proposal and they must be willing to be involved with Preconstruction Support Services at the same level as the Construction Manager/General Contractor to discuss in detail construction costs, techniques, etc. as detailed above. The subcontractor must also be willing to adhere to the City’s “open book” negotiation policy as detailed below in Section I.C.2.b. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 8 of 145 It is expected that any subcontractor that the City, in its sole discretion, deems to be significant and critical to the overall project delivery be available throughout the Preconstruction Support Services Phase of the project and adhere to the City’s “open book” negotiation policy. The Construction Manager/General Contractor shall involve the City in the subcontractor procurement process for any subcontractors performing significant or critical work who are not part of the proposal and original proposed team. Examples of subcontracted work the City would consider to be significant and critical may be: - Drainage system - Pedestrian Bridge - Concrete pavement, curb and gutter, sidewalk - Asphalt placement - Landscaping - Public utility relocation - Traffic control – Coordination with Poudre School District and local businesses - Understanding and ability to confirm The selected Construction Manager/General Contractor will be awarded a Preconstruction Support Services contract, prepared and administered by the City. The cost of the contract will be based upon a final negotiated scope, total hours and unit rate for each key employee for “Preconstruction Support Services” submitted as part of the Unit Price Cost Proposal. The Preconstruction Support Services contract will be in the form of a Work Order, issued per the attached Section VI, Sample Agreement. The Preconstruction Support Services Work Order may include any or all the following activities: a. Partnering: The City expects a strong partnering relationship with the selected Construction Manager/General Contractor. A formal Partnering Session will be held with the selected Construction Manager/General Contractor, City of Fort Collins team members and contract Architects and Engineers (the Horrocks Engineering design team) soon after the selection process is completed. Successful CM/GC project delivery requires an environment where trust and teamwork prevent disputes, fosters a cooperative bond to everyone’s benefit, and facilitates the completion of a successful project. Adversarial relationships between the Construction Manager/General Contractor and owner will not be acceptable on the project, and could lead to the termination of the contract. b. Initial Risk Assessment Workshop: Participate in an initial project introduction and Risk Assessment workshop to develop a risk register. The workshop will be conducted in Fort Collins and will include the following tasks: i. Project site walkthrough ii. Introduction to the project and the project stakeholders iii. Project status, goals, objectives, funding, etc. iv. Presentation of project elements v. Review phasing options for construction vi. Development of alternative phasing concepts vii. Assessment of primary project risks in terms of cost, quality and schedule RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 9 of 145 c. Design Reviews (collaborative design development): Participate in up to three (3) formal design reviews. For each review the Construction Manager/General Contractor may be asked to perform any or all of the following tasks: i. Provide constructability reviews ii. Work with the designer to prepare draft construction phasing and maintenance of traffic schemes iii. Develop construction schedules iv. Provide construction cost estimates v. Perform a risk assessment in terms of cost, quality and schedule vi. Provide value engineering to reduce risk, cost and schedule vii. Engage and coordinate with stakeholders and property owners The Construction Manager/General Contractor may be asked to perform any of the above tasks throughout the design phase, and not necessarily during formal design reviews. It is anticipated the Construction Manager/General Contractor will be fully engaged throughout the design process and be willing to provide input when requested. The Construction Manager/General Contractor shall be compensated for all their time spent providing design assistance as identified above, in accordance with the Preconstruction Support Services Work Order. It is likely that the Construction Manager/General Contractor will be required to attend bi-weekly or monthly coordination meetings as identified by the City. The Construction Manager/General Contractor may be required to engage and coordinate with stakeholders and property owners prior to construction. 2. Construction Contract Price Negotiations When the City, the Designer, and the Construction Manager/General Contractor agree that the project has been designed to a sufficient level of detail to allow the Construction Manager/General Contractor to accurately price construction elements of the project, Construction Contract Price Negotiations will commence. In order to expedite the project, Construction Contract Price Negotiation may start before the completion of the Preconstruction Support Services. The Construction Manager/General Contractor’s work effort for Construction Contract Price Negotiations will be separate from its Preconstruction Support Services and will not be compensated by the City. The Construction Manager/General Contractor will be compensated for construction cost estimates prepared during the design process prior to Construction Contract Price Negotiations. The City will determine when Construction Contract Price Negotiations have begun. a. Price Negotiation Process: The following procedures will be used for Construction Contract Price Negotiations. i. The Designer will produce a set of the relevant plans and specifications showing the work to be accomplished. The plans will also show all work accomplished under any previous construction packages. ii. The Construction Manager/General Contractor will prepare a “bid” to perform the work shown. The Construction Manager/General Contractor will use the unit prices submitted as part of the Proposal unless a new unit price is justified based off factors discussed with the City throughout the design process and identified in the original project proposal. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 10 of 145 iii. The City will produce an independent construction cost estimate for the work. iv. Upon opening the Construction Manager/General Contractor’s “bid” the City will determine the acceptability of the “bid” by comparing it to its independent construction cost estimate. v. If the prices are acceptable, the City will prepare a Work Order for construction services. If a previous Work Order for construction services had been entered into, this work may be added to that contract by change order. vi. If the prices are not acceptable the City and the Construction Manager/General Contractor will conduct a price negotiation meeting to discuss the variances between the “bid” and independent construction cost estimates. vii. Following the price negotiation meeting the Construction Contract Negotiations will enter into subsequent iteration of the above noted process. viii. The City reserves the right to require the Construction Manager/General Contractor to enter into “open book” cost model price negotiations at any time through this process, where the Construction Manager/General Contractor will be required to reveal and defend its detailed pricing breakdowns including labor, materials, equipment, subcontractor and supplier quotes, mobilization, overhead, mark-up, and profit. See below for the City’s “open book” negotiation requirements. ix. At any time, if the City determines that an agreement cannot be successfully negotiated, the City reserves the right to terminate construction contract negotiations and the Preconstruction Support Services contract and procure the construction of the project by other means. If the City then offers the project up for public bids the Construction Manager/General Contractor will not be eligible to bid on the project. b. “Open Book” Negotiations Process: Negotiations may require any or all of the following information. The Construction Manager/General Contractor shall submit information as requested by the City to the extent necessary to permit the City to determine the reasonableness of the “bid” price. The Construction Manager/General Contractor shall provide cost or pricing data, broken down by individual work item, for the Construction Manager/General Contractor and each major subcontractor. The Construction Manager/General Contractor shall submit material and subcontractor quotes, anticipated labor and equipment usage, and anticipated production rates. If requested, submit a written proposal for the work identifying the major elements of the work, the quantity of the element, and its contribution to the proposed price. Provide further breakdowns if requested by the City. Material: Furnish quotes and/or material invoices showing the cost of material to be incorporated in the work. Labor: Show basic hourly rates, fringe benefits, applicable payroll costs (workers compensation, insurance, etc.) paid subsistence, and travel costs for each labor classification and foreman employed in the work. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 11 of 145 Equipment: Provide a complete descriptive listing of equipment to be used in the work including make, model and year of manufacture. Support rented or leased equipment costs with invoices. Other direct costs: Furnish documentation of invoices to support any other direct costs to be incurred that are not included above (e.g., bonds, mobilization, permits, etc.). Production Rates: Provide actual hours of performance, on a daily basis, for each labor classification and for each piece of equipment. Subcontract Costs: Provide supporting data as required above. Overhead: Identify overhead rates and list the types of costs that are included in overhead. Profit: Include a reasonable profit reflecting the efficiency and economy of the Construction Manager/General Contractor and subcontractors in performing the work, the contract risk type, the work difficulty, and management effectiveness. Markup: List any markup cost for subcontractors or other items. Provide backup information as requested for a breakdown and justification of markup expenses. 3. Construction Requirements The City expects the CM/GC, if negotiations are successful, to provide full construction services related to the completion of the Project. The CM/GC will be required to sign a Work Order for construction services. A template of the City’s Work Order for construction Services is available upon written request. Construction services will be contracted and performed in accordance with the City’s standard processes for traditional design-bid-build projects. These services are to include, but not be limited to the following:  Provide construction services according to the Agreement and contract documents including self-performance with a goal of at least 50% of the physical work (including overhead, profit and materials).  Provide qualified full time site supervision and management of trade subcontractors to meet or exceed the defined project schedule.  Provide open procurement of subcontractors and suppliers that are not part of the team proposed under the RFP. Include the City in the procurement process. A minimum of 3 quotes may be required for the subcontractor procurement process. If less than 3 subcontractor quotes are obtained for a given item of work, justification must be provided to, and agreed upon by, the City. The City may choose to limit the amount of subcontractor quotes at their discretion.  Provide storm water management and BMP maintenance for the site complying with State and City regulations. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 12 of 145  Provide construction delivery scheduling, meeting attendance and reporting according to contract document and federal or state requirements. This includes progress reporting and subcontractor work participation.  Provide site security and protection during construction. Provide all site safety management and compliance with OSHA standards and criteria. Implement a site safety program that is reported on regularly.  Provide for quality control program that meets or exceeds minimum job/contract document and industry standards. Coordinate all quality control testing and inspections through the City.  Meet all licensing and permitting requirements as set forth by the City of Fort Collins and the State of Colorado for both General Contractor and subcontracted work. Construction Managers/General Contractors must be pre-qualified with the Colorado Department of Transportation for work on state highways. To become pre-qualified during the proposal period, contact the project manager. Applications must be submitted within one week of the initial RFP release.  Provide work that complies with the Larimer County Urban Area Street Standards (LCUASS), the Colorado Department of Transportation Standard Specifications for Road and Bridge Construction, City of Fort Collins Development Construction Standards for Water, Wastewater and Stormwater dated June 2017 and project construction contract and general and special provisions as amended by the contract. See Attachment 4 – Contract Provisions for the current set of Contract Provisions. This is not an exhaustive list, and more project provisions may be included as design progresses.  Provide services to manage participation in project close out process.  Provide State and City required documentation prior to and during construction, including but not limited to: payrolls for Construction Manager/General Contractor and subcontractors completed in B2GNow, CDOT Form 205 completed in LCPTracker for each subcontractor, material submittals and certifications, schedule updates, etc. and other documentation as required in the final contract documents. Early Procurement of Long Time Materials and Other Services: The Construction Manager/General Contractor may be asked to procure long lead materials that may be in short supply or require longer than desired lead times from purchase to delivery. The City may also procure through the Construction Manager/General Contractor such services as pavement cores, pipe videos, potholes, or other investigations to facilitate the design. The City may choose to exercise this option if the early procurement saves significant construction time, money, or avoids potential delays once the project begins, etc. The procedures as previously described will be used to negotiate early materials procurements. The City may ask to procure these items at any reasonable time throughout the design and construction phase of the project. Early Action Construction Contracts: Similar to early materials procurements early action construction projects may be initiated before the design as a whole is RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 13 of 145 completed for the project. The Construction Contract Price Negotiation process will be followed for the negotiation of early action construction contracts. Early construction may be done in an effort to coordinate with other entities, including the ditch company, City Traffic Department, local businesses, utility owners, etc. The City may choose to exercise this action to save construction time, money, or avoid potential delays and rework once the project begins, etc. 4. CM/GC Process and Fees The City intends to enter into a work order unit price contract with the selected CMGC for the East Segment work utilizing the pricing submitted with this proposal. The City intends to negotiate a unit price contract for the West Segment scope of work, using the East Segment pricing as a baseline, that shall reflect the entire scope of construction services with the selected Construction Manager/General Contractor and may require the City’s “Open Book Negotiation Process” as detailed above. The Construction Manager/General Contractor will also be required to provide input on estimated quantities for each Major Line Item, and the City and Construction Manager/General Contractor will come to a final agreed upon quantity. The Major Line Items will be determined by the City with input from the Construction Manager/General Contractor. The East Segment and West Segment of the project will have separate negotiations for quantities and pricing. The contractor submitted unit prices for the East Segment will be the basis for negotiation of pricing for the West Segment. Once the final quantities are agreed to, a quantity allowance for each item will be negotiated (typically less than five percent). The final quantities plus allowance for each item will encompass the total contract amount for each item. This will be the Guaranteed Maximum Quantity for each item, similar to a Guaranteed Maximum Price. The Construction Manager/General Contractor shall be fully responsible for any costs associated to complete the work above the negotiated Maximum Quantity, unless there is an agreed upon change in scope for any item that overruns the Maximum Quantity. The Construction Manager/General Contractor shall include industry standard overhead, profit and markup rates as applicable to each task and item. Maximum overhead, profit and markup rates for any line item shall be set with the Preconstruction Support Services contract in accordance with the Construction Managers/General Contractors Unit Price Cost Proposal (see Section II Cost Proposal and Approach to Unit Prices). The Construction Manager/General Contractor shall utilize the unit pricing, overhead, profit and markup rates stated in Attachment 7, unless other rates are negotiated. Individual line items may have different overhead, profit or markup rates appropriate for the given risk and difficulty of the work, provided they are less than the maximum amount set in the Preconstruction Support Services Contract. 5. Services Agreement and Construction Contract The CM/GC will be required to enter into Services Agreement – Work Order type (found in Section VI. Sample Agreement), and sign a Work Order for the RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 14 of 145 Preconstruction Support Services. Following successful completion of the Preconstruction Support Services, the CM/GC will enter into a Work Order for construction services. A template of the City’s Work Order for construction services is available upon written request. For the most part, construction services will be performed in accordance with the City’s standard processes for traditional design- bid-build projects. See Attachment 6 for applicable general and special provisions at this time. These special provisions will be modified and expanded as design progresses and will be included as part of the final contract. Any exceptions to the agreements must be stated with your submission of qualifications for this project. The City makes no guarantees it will change the agreements but may consider the exceptions. C. Anticipated Schedule The following represents the City’s target schedule for the RFP. The City reserves the right to amend the target schedule at any time. • RFP issuance: June 14, 2023 • Pre-Proposal Meeting: June 27, 2023 @ 10:00 AM MST • Question deadline: July 7, 2023 @ 3:00 PM MST • Final Addendum Issued: July 10, 2023 • Proposal due date: July 14, 2023 @ 3:00 PM MST • Interviews (tentative): Week of July 24, 2023 • Award of Contract (tentative): Week of August 31, 2023 D. Interviews In addition to submitting a written proposal, the top-rated Construction Managers/General Contractors may be interviewed by the RFP assessment team and asked to participate in an oral presentation to provide an overview of the company, approach to the project and to address questions. The evaluation criteria for the oral interviews will be the same as the criteria for the written evaluations and is included in Section III. Key project team members must attend the interview. The City may use non-traditional methods for the optional interview phase of the assessment process. The City will receive and score written proposals. However, instead of traditional in-person interviews for the optional interview session, the City may opt to use alternate methods including, but not limited to remote interviews through a platform such as Microsoft Teams. E. Travel & Expenses Subject to the terms of the applicable Work Order, reasonable expenses will be reimbursable per the current rates found at www.gsa.gov. F. Subcontractors/Subconsultants Construction Manager/General Contractor will be responsible for identifying any subcontractors and/or subconsultants in their proposal. Please note that the City will RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 15 of 145 contract solely with the awarded Construction Manager/General Contractor; therefore, subcontractors and/or subconsultants will be the responsibility of the Construction Manager/General Contractor. G. Financial Qualifications (CONFIDENTIAL) Construction Managers/General Contractors selected as finalists may be required to submit a banking reference and the most recent financial statement (audited preferred) including balance sheet and income statement, as well as a statement of cash flows (the “Financial Information”). H. Current standards All work and/or materials must meet current standards in force by recognized technical and professional societies, trade and materials supply associations, institutes and organizations, bureaus and testing laboratories, and national, federal, state, county, and local laws, codes and ordinances. I. Fees, Licenses, Permits The successful Construction Manager/General Contractor shall be responsible for obtaining any necessary licenses, fees or permits without additional expense to the City. All vehicles and equipment shall be properly licensed and insured, carry the appropriate permits and be placarded as required by law. J. Laws and Regulations ADA Compliance. In performing the Services required hereunder, the Contractor agrees to meet all the requirements of the Americans With Disabilities Act of 1990, and all applicable rules and regulations (the 'ADA'), which are imposed directly on the Contractor or which would be imposed on the City as a public entity. The Contractor agrees to be responsible for knowing all applicable requirements of the ADA and to defend, indemnify and hold harmless the City, its officials, agents and employees from and against any and all claims, actions, suits or proceedings of any kind brought against said parties as a result of any acts or omissions of the Contractor or its agents in violation of the ADA. K. Work Orders The awarded Construction Manager/General Contractor(s) will be required to sign the City’s Work Order Type Agreement, a sample of which is attached as Section VI for reference purposes. In the event that the City has agreements with multiple Construction Managers/General Contractors for the Work, the City reserves the right to request proposals for individual Work Order assignments from the awarded Construction Managers/General Contractors or assign Work Orders directly to a Construction Manager/General Contractor at its sole discretion. Selection for individual Work Orders may be based on, but not limited to, availability, approach, prior experience, firm capability, and cost. Individual Work assignments will be requested and agreed to utilizing the City’s Work Order (included in the Agreement). Each Work Order must include a start and completion date, total cost and a Scope of Work. Subsequent supporting documentation pages may include a project schedule, deliverables, hours, cost detail supporting total cost, and RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 16 of 145 personnel details. Fees outlined in the Work Order will conform with those stated in the Agreement. No Work Order over $7,500 will be considered valid until signed, at a minimum, by the Construction Manager/General Contractor, project manager and Purchasing Department representative. Depending on the cost and nature of the Work, additional signature authorization may be required. Any changes to the dates, cost or scope of any Work Order must be agreed upon in writing utilizing the City’s Change Order (included in the Agreement) and will not be considered valid until signed, at a minimum, by the Construction Manager/General Contractor, project manager and Purchasing Department representative. L. Invoicing and Payment Invoices should be emailed monthly to invoices@fcgov.com with a copy to the Project Manager. The cost of the work completed shall be paid to the Construction Manager/General Contractor each month following the submittal of a correct invoice by the Construction Manager/General Contractor indicating the project name, Purchase Order number, task description, hours worked, personnel/work type category, hourly rate for each employee/work type category, date of the work performed specific to the task, percentage of that work that has been completed by task, 3rd party supporting documentation with the same detail and a brief progress report. Payments will be made using the prices stated in the Work Order and Agreement. In the event a service is requested which is not stated in the Work Order and/or Agreement, the Construction Manager/General Contractor and the City will negotiate an appropriate unit price for the service prior to the Construction Manager/General Contractor initiating such work. The City pays invoices on Net 30 terms. M. COVID-19 Compliance The Service Provider and its subcontractors/consultants shall comply with all state, county, and local laws, ordinances, and public health orders established to reduce the spread of COVID-19, as applicable. The Service Provider shall ensure employees and subcontractors/subconsultants with COVID-19 symptoms do not report to the job site. Service Provider must organize work to ensure individuals minimize contact and maximize social distancing. Individuals must wear all standard worksite personal protective equipment (PPE). In addition, individuals should wear a mask or cloth face covering consistent with local public health recommendations and other applicable safety requirements. N. Sample Agreement Included with this request for proposals is a sample Agreement that the City intends to use for obtaining the services of the Construction Manager/General Contractor. The Construction Manager/General Contractor is required to review this Agreement and indicate any objections to the terms of the contract. If revisions to the contractual terms are requested, provide suggested revisions. O. Acknowledgement RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 17 of 145 The Acknowledgement form is attached as Section V. Complete the attached form indicating the Construction Manager/General Contractor hereby acknowledges receipt of the City of Fort Collins Request for Proposal and acknowledges that the Construction Manager/General Contractor has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP. II. SUBMITTAL REQUIREMENTS CM/GC firms that have the requisite experience and qualifications are encouraged to submit proposals. General Company Information Name of firm, contact person for this proposal, title, phone number, fax number, email, street and mailing addresses, and previous names of firm in last 10 years; date firm was established. Describe how the firm is organized. Provide general contracting licenses held by firm. Include a summary of contract defaults, liquidated damages, debarments, lawsuits, or failures to complete any awarded work. Profile Projects Provide a brief project description and history of projects, similar in scope to this project, completed in the last 5 years. Limit profile projects lists to 5 projects max. Identify any Key Personnel that were involved with the profile projects and will be assigned to this project as well. Include the following information: 1. Project description that includes the project name and scope, firms that comprised the design team (if project is a design-build or CM/GC delivery), and site location. Be sure to note scope items that are similar to the scope of this project such as high traffic areas, bridge construction, concrete and asphalt pavement reconstruction, utilities coordination and relocation, etc. 2. Project history that includes the original schedule agreed upon at the time of signing the contract, the actual duration of construction, and any special characteristics of the project that affected delivery. 3. Type of project delivery model used. 4. Original contract cost. 5. Cost at completion and number of change orders. 6. Contractor, subcontractor or owner initiated claims and their resolution. 7. Original contract time and actual completion time. 8. Owner name and contact information. Provide a brief discussion of any unusual factors that affected the project delivery (e.g. owner initiated delays, additions to the work, etc.). Provide an owner reference for cited projects. Project Profiles should be limited to no more than two pages in length for each profile. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 18 of 145 Key Personnel Names and resumes of proposed Key Personnel should be provided. Key Personnel for the project are the Project Manager, the Preconstruction Support Services Manager and construction Project Superintendent. Include two references for each assigned person. Detail the availability and commitment of Key Personnel. (Note: Key Personnel should be highly committed to this project for the duration of their phase of the work (i.e. Project Manager for the entire duration of the project, Preconstruction Support Services Manager for the preconstruction phase of the project and construction Project Superintendent for the construction phase of the project). Resumes for Key Personnel should be limited to no more than two pages for each person. For the Preconstruction Support Services Manager it is the City’s preference that the contractor provides a highly experienced senior manager with the authority to make contractual decisions for the construction contract pricing. Project Approach Describe the approach to the overall project scope, schedule and impacts, process and coordination. The City will require that an industry recognized software is used to develop and manage the project schedule; fully base-lined, critical path shown and float managed. Address your firms’ capability, resources and key project staff as it relates to the scope of the project identified in this RFP. Discuss any potential and known subcontracted work along with potential subcontractors. Discuss your firms’ experience in reconstructing high- traffic, major arterial intersections. Delivering the project on or ahead of schedule is critical to the City, however, it is important that this is balanced with impacts to the traveling public (i.e. large impacts to the traveling public should provide a proportional benefit to productivity, efficiency and project schedule). In addition, the project will impact access to several residential properties and businesses that must always maintain access. Discuss how your project approach will prioritize and sequence work in a way that accelerates the project schedule while balancing impacts to the public and local businesses. Include in your proposal any potential traffic phasing options, early construction options or innovative construction methods that will benefit the project schedule and reduce overall impacts. Describe your approach to managing protection, relocation, and management of third party relocations for significant utilities under high-traffic scenarios. Your approach and ability to maintain overall project schedule in this high-utility environment is paramount to project success. Describe your approach to the CM/GC process and coordination with City Departments and the City’s design engineering firm (Horrocks Engineering). Discuss any relevant experience in similar projects and what your company’s approach to coordinating several different entities including other contractors, owners and designers. The City is seeking to hire a CM/GC that is committed to working together with the City and the State in order to expedite all of the intersection work while minimizing impacts to the public and local businesses. The contractor will be expected to develop strong working relationships with City Engineering Department and the City’s design engineer (Horrocks RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 19 of 145 Engineering) among others. The CM/GC may also be required to meet with local business owners and associations and incorporate feedback into construction phasing and traffic control options. The City shall be involved and facilitate these meetings. Cost Proposal and Approach to Unit Prices Submit a unit price cost proposal (Attachment 5 – Unit Price Cost Proposal) for the provided East Segment quantities based on your understanding of the project from the information provided with this RFP and its supporting materials. Given the level of design on the East Segment of Laporte, the City intends to execute a contract with the selected CMGC utilizing the submitted unit prices, as the design is nearly final and there is limited ability to substantially modify the current design. The West Segment of Laporte quantities are provided as information to the CMGC to better understand the entire project scope that will be delivered with this contract. The East Segment unit prices will be used as a base unit price proposal for the West Segment scope of work. The final West Segment unit prices will be negotiated prior to construction based on factors identified in the Unit Price Cost Proposal. Any other reasonable factors, as determined by the City and the CM/GC, that are identified through the design process will be considered during the unit price negotiation and may increase or decrease the final unit price. The unit price provided should reflect the Construction Managers/General Contractors thought process, assumptions, risks, mitigation, etc. given the current level of design. Describe your approach to being transparent and ‘open book’ when developing a cost for this project. The Cost Proposal and Approach to Unit Prices will be graded per the evaluation criteria listed in Section III. It is the City’s desire to execute a reasonable and competitive construction contract on the project. Cost proposals and unit prices that are competitive, within a reasonable range of the average, and that are supported by reasonable assumptions and risk discussions will be scored higher. Excessively high or low unit prices in the City’s judgement could result in a lowering of the overall proposal score, unless appropriately justified. Describe your approach to unit prices as it relates to the overall unit price. Include any assumptions made on construction methods, phasing, and work sequencing that impact your price. Be sure to include all major items and factors that were included in the unit price (i.e. labor rates, productivity, traffic control/phasing, etc.). Discuss how you will price future pay items and your approach to finalizing a unit price. Be sure to include profit, mark-up, and overhead percentages and how those are applied to the overall unit price. List any major risk items that may cause the unit price to either increase or decrease. Discuss your approach to potential value engineering opportunities throughout design and construction to enhance the work product while potentially saving cost. Include any other issues or considerations that would cause the unit price to change. Quality Control and Contractor Performance Provide details on your firm’s quality control program. Explain how your team administers a quality control program during construction, how performance measures are documented and how quality issues are addressed. Provide examples of when your firm exceeded quality standards, gained industry recognition or received quality awards. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 20 of 145 The City values quality work at all levels from physical construction to traffic control and coordination to managing an effective schedule. Describe how your quality control procedures dictate overall performance on construction contracts. Safety Record Provide the firm’s OSHA reportable accident rate and current workman’s compensation insurance multiplier for the last 3 years. Provide the OSHA reportable accident rate on projects managed by the proposed superintendent or project manager over the three year period. Provide a list of all projects in the last 5 years that have received an OSHA citation either to the General Contractor or subcontractor on the jobsite and provide a narrative of the citations. Financial Statement The City may request a recent financial statement (audited if possible) as part of the final selection and prior to contract award. This will be considered a confidential submission at contractor request. Bonding Company Reference Provide the name, address and phone number of the firm’s bonding agent. Provide a letter from the bonding agent indicating the firm’s bonding capacity is adequate to undertake this work. Insurance Company Provide the name, address and phone number of the firm’s insurance agent(s). Provide certificate of insurance outlining coverage and policy limits. Provide statements to answer the following questions. (See also Insurance Requirements in Section VI. Sample Agreement). 1. Does coverage meet minimum project requirements? 2. Does coverage include builder’s risk? 3. Can this coverage be extended for work on this project? 4. Can coverage be increased? 5. The City will need to be listed as an additional insured. This is a requirement for the final contract. 6. Are there any current claims that will affect coverage limits available for this project? Contract Goals The City of Fort Collins and CDOT have established Contract Goals for Disadvantaged Business Enterprise (DBE) and On the Job Training (OJT). The Contractor shall submit documentation necessary to meet these goals. Attached is a copy of CDOT Form 1414 which must be filled out and returned with your proposal, see Attachment #6 for this RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 21 of 145 form. Form 1414 and other related forms will be updated in conjunction with submittal of the construction work order bid. The DBE and OJT goals for the East Segment of this project are: • DBE – 10% • OJT – 320 Proposal Format The following sections should not exceed 15 pages (double-sided) or 30 pages (single sided) combined in length, with a minimum font size of 11 pt. Up to four of the pages may be 11” x 17” if used for graphical presentation. • Project Approach • Cost Proposal and Approach to Unit Prices (Attachment 5 – Unit Price Cost Proposal is not included in the page count) • Quality Control and Contractor Performance • Safety Record • Contract Goals – Complete CDOT Form 1414 (Attachment 6) • Complete Forms: Attachment 07 - Byrd Anti-Lobbying Certification and Attachment 8 – Buy America Certification must be filled out and provided with proposals. III. REVIEW AND ASSESSMENT CRITERIA A. PROPOSAL AND INTERVIEW CRITERIA Construction Managers/General Contractors will be evaluated on the following criteria. This set of criteria will be the basis for review and assessment of the written proposals and optional interview session. At the discretion of the City, interviews of the top-rated Construction Managers/General Contractors may be conducted. The rating scale shall be from 1 to 10, a rating of 1 doesn’t meet minimum requirements, a rating of 5 means the category fulfills the minimum requirements, and 10 exceeds minimum requirements in that category. WEIGHTING FACTOR CATEGORY STANDARD QUESTIONS 2.0 Assigned Project Team Does the proposed team have the necessary skills and experience to fulfill the requirements of the project, including alternate delivery? Is the key staff available and committed to do the work for the full duration of the project? 2.0 Firm Experience Has the Construction Manager/General Contractor worked on projects similar in scope to this project? Does the Construction Manager/General Contractor have the experience necessary for this project? Does the Construction Manager/General Contractor have local experience? Has the Construction Manager/General Contractor worked in collaborative settings with owners and RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 22 of 145 designers, providing and incorporating feedback in an iterative process to improve the end result? Does the Construction Manager/General Contractor have a strong safety record? Does the Construction Manager/General Contractor develop strong working relationships? Is the Construction Manager/General Contractor’s experience supported with strong references? 2.0 Cost Proposal and Approach to Unit Prices Has the Construction Manager/General Contractor presented detailed and thorough assumptions and risk factors in its unit price forms (Attachment 5 – Unit Cost Price Proposal)? Has the Construction Manager/General Contractor submitted reasonable and competitive unit prices based on current design assumptions? Is the Construction Manager/General Contractor willing to participate in “Open Book” negotiations and does their approach to unit price negotiations align with the City’s? 1.0 Quality Control, Safety and Construction Performance Do the Construction Manager/General Contractor’s past projects reflect favorably in respect to schedule, cost and owner satisfaction? Does the Construction Manager/General Contractors Quality Control procedures provide for a high-quality and successful project? Does the Construction Manager/General have an effective safety program and rating? 2.0 Project Approach Does the project approach present a well thought out and constructible construction phasing plan? Does the written project approach reflect a good balance between construction efficiency, maintenance of traffic, access to businesses and pedestrian access during construction? Does the method of construction and project approach provide a strong approach to meeting and exceeding the project schedule? Does the project approach include meaningful and firm contractual commitment to exceed the minimum requirements of the contract in ways that are beneficial to the project? 1.0 Sustainability Does the CMGC present a commitment towards sustainability with policies, suppliers, subcontractors, etc.? Does the approach to this project have sustainability as one of the top goals towards success? Is the Contractor familiar with Envision certification? RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 23 of 145 Reference evaluation process (top rated firm) Below is the typical reference evaluation process for the City, however, the City reserves the right to check references at any point after submittals are received. After the interviews (if necessary) have been conducted, the evaluation committee will select the top rated firm and the Project Manager may check references for overall performance, timetable, completeness, budget and job knowledge of selected project/references. A satisfactory/unsatisfactory rating shall be given to each reference contacted. If references check out for the top firm, then the City of Fort Collins will work to negotiate a contract for CMGC services with the top firm. If the top firm references do not check out, then the selection committee will look to the second ranked firm and check their references. During this phase of the selection process, the City may also review and analyze the financial statement(s) provided with the proposal to assign a satisfactory/unsatisfactory rating. QUALIFICATION STANDARD Overall Performance Would you hire this Construction Manager/General Contractor again? Working Relationship Did you have a constructive, positive and collaborative working relationship? Timetable Was the original Scope of Work completed within the specified time? Were interim deadlines met in a timely manner? Completeness Was the Construction Manager/General Contractor responsive to client needs; did they anticipate problems? Were problems solved quickly and effectively? Budget Was the original Scope of Work completed within the project budget? Job Knowledge Did Construction Manager/General Contractor personnel exhibit the knowledge and skills necessary for the efficient completion of the scope or work? RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 24 of 145 IV. ATTACHMENTS All attachments posted to Rocky Mountain E-Purchasing System as separate file and titled “Construction Manager/General Contractor (CM/GC) services related to the construction of intersection improvements at Laporte Corridor from Sunset St to Fishback Ave – ATTACHMENT 01: 95% PLANS – LAPORTE CORRIDOR EAST SEGMENT – FREY TO FISHBACK ATTACHMENT 02: 30% PLANS – LAPORTE CORRIDOR WEST SEGMENT – SUNSET TO TAFT HILL ATTACHMENT 03: HYDRAULIC REPORT ATTACHMENT 04: CONTRACT PROVISIONS (GENERAL AND SPECIAL) ATTACHMENT 05: UNIT PRICE COST PROPOSAL ATTACHMENT 06: CDOT FORM 1414 ANTICIPATED DBE PARTICIPATION PLAN ATTACHMENT 07: BYRD ANTI-LOBBYING AMENDMENT CERTIFICATION ATTACHMENT 08: BUY AMERICA CERTIFICATION RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 25 of 145 V. ACKNOWLEDGEMENT Construction Manager/General Contractor hereby acknowledges receipt of the City of Fort Collins Request for Proposal and acknowledges that it has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset and sample Agreement except as otherwise noted. Additionally, Construction Manager/General Contractor hereby makes the following representations to City: a. All of the statements and representations made in this proposal are true to the best of the Construction Manager/General Contractor’s knowledge and belief. b. Construction Manager/General Contractor commits that it is able to meet the terms provided in this proposal. c. This proposal is a firm and binding offer, for a period of 90 days from the date hereof. d. Construction Manager/General Contractor further agrees that the method of award is acceptable. e. Construction Manager/General Contractor acknowledges and agrees to achieve the DBE contract goal of 10% and OJT contract goal of 320 Hours. f. Construction Manager/General Contractor also agrees to complete the proposed Agreement with the City of Fort Collins within 10 days of notice of award. If contract is not completed and signed within 10 days, City reserves the right to cancel and award to the next highest rated firm. g. Construction Manager/General Contractor acknowledges receipt of addenda. h. Construction Manager/General Contractor acknowledges no conflict of interest. i. Failure to provide a public viewing copy will be considered a waiver of any claim of confidentiality under Colorado Open Records Act (CORA). Construction Manager/General Contractor hereby waives any and all claims for damages against the City for the City’s good faith compliance with CORA. Legal Firm Name: Physical Address: Remit to Address: Phone: Name of Authorized Agent of Firm: Signature of Authorized Agent: Primary Contact for Project: Title: Email Address: Phone: Cell Phone: RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 26 of 145 NOTE: ACKNOWLEDGMENT IS TO BE SIGNED & RETURNED WITH YOUR PROPOSAL. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 27 of 145 VI. SAMPLE AGREEMENT (FOR REFERENCE ONLY – DO NOT SIGN ) SERVICES AGREEMENT WORK ORDER TYPE THIS AGREEMENT made and entered into the day and year set forth below, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and hereinafter referred to as "Service Provider". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Services to be Performed. a. This Agreement shall constitute the basic agreement between the parties for RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset. The conditions set forth herein shall apply to all services performed by the Service Provider on behalf of the City and particularly described in Work Orders agreed upon in writing by the parties from time to time. Such Work Orders, samples of which are attached hereto as Exhibit A & B, consisting of two (2) and ( ) pages and incorporated herein by this reference, shall include a description of the services to be performed, the location and time for performance, the amount of payment, any materials to be supplied by the City and any other special circumstances relating to the performance of services. A general scope of services is attached hereto as Exhibit , consisting of ( ) pages, and incorporated herein by this reference. The only services authorized under this Agreement are those which are performed after receipt of such Work Order, except in emergency circumstances where oral work requests may be issued. Oral requests for emergency actions will be confirmed by issuance of a written Work Order within two (2) working days. Irrespective of references in Exhibit A & B to certain named third parties, Service Provider shall be solely responsible for performance of all duties hereunder. b. The City may, at any time during the term of a particular Work Order and without invalidating such Work Order, make changes to the scope of the particular services. Such changes shall be agreed upon in writing by the parties by Change Order, a sample of which is attached hereto as Exhibit C, consisting of ( ) page(s), and incorporated herein by this reference. 2. Changes in the Work. The City reserves the right to independently bid any services rather than issuing work to the Service Provider pursuant to this Agreement. Nothing within this Agreement shall obligate the City to have any particular service performed by the Service Provider. 3. Time of Commencement and Completion of Services. The services to be performed RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 28 of 145 pursuant to this Agreement shall be initiated as specified by each written Work Order or oral emergency service request. Oral emergency service requests will be acted upon without waiting for a written Work Order. Time is of the essence. 4. Contract Period. This Agreement shall commence and shall continue in full force and effect until , unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for additional one year periods not to exceed four (4) additional one year periods. Renewals and pricing changes shall be negotiated by and agreed to by both parties only at the time of renewal. Written notice of renewal shall be provided to the Service Provider and mailed no later than thirty (30) days prior to contract end. 5. Delay. If either party is prevented in whole or in part from performing its obligations by unforeseeable causes beyond its reasonable control and without is fault or negligence, then the party so prevented shall be excused from whatever performance is prevented by such cause. To the extent that the performance is actually prevented, the Service Provider must provide written notice to the City of such condition within ten (10) days from the onset of such condition. 6. Early Termination by City/Notices. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Service Provider. Such notice shall be mailed at least ten (10) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective immediately when emailed or three business days from the date of the notice when mailed to the following addresses: Service Provider: City: Copy to: Attn: email address City of Fort Collins Attn: Dillon Willett PO Box 580 Fort Collins, CO 80522 dwillett@fcgov.com City of Fort Collins Attn: Purchasing Dept. PO Box 580 Fort Collins, CO 80522 purchasing@fcgov.com In the event of early termination by the City, the Service Provider shall be paid for services rendered to the date of termination, subject only to the satisfactory performance of the Service Provider's obligations under this Agreement. Service Provider shall submit a final invoice within ten (10) days of the effective date of termination. Undisputed invoices shall be paid Net 30 days of the date of the invoice. Such payment shall be the Service Provider's sole right and remedy for such termination. 7. Contract Sum. This is an open-end indefinite quantity Agreement with no fixed price. The actual amount of work to be performed will be stated on the individual Work Orders. The City makes no guarantee as to the number of Work Orders that may be issued or the actual amount of services which will in fact be requested. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 29 of 145 8. Payments. a. The City agrees to pay and the Service Provider agrees to accept as full payment for all work done and all materials furnished and for all costs and expenses incurred in performance of the work the sums set forth for the hourly labor rate and material costs, with markups, stated within the Bid Schedule Proposal Form, attached hereto as Exhibit , consisting of ( ) pages, and incorporated herein by this reference. b. Invoices shall be emailed to invoices@fcgov.com with a copy to the Project Manager. The cost of the work completed shall be paid to the Service Provider following the submittal of a correct itemized invoice by the Service Provider. Payment shall be made by the City only upon acceptance of the work by the City and upon the Service Provider furnishing satisfactory evidence of payment of all wages, taxes, supplies and materials, and other costs incurred in connection with the performance of such work. The City is exempt from sales and use tax. The City’s Certificate of Exemption license number is 09804502. A copy of the license is available upon written request. The City pays invoices on Net 30 days from the date of the invoice. 9. Appropriation. To the extent this Agreement or any provision in it constitutes a multiple fiscal year debt or financial obligation of the City, it shall be subject to annual appropriation by City Council as required in Article V, Section 8(b) of the City Charter, City Code Section 8-186, and Article X, Section 20 of the Colorado Constitution. The City shall have no obligation to continue this Agreement in any fiscal year for which no such supporting appropriation has been made. 10. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in the Work Order, plus any extensions thereof allowed in accordance with Article 12 of the General conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONSTRUCTION MANAGER/GENERAL CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONSTRUCTION MANAGER/GENERAL CONTRACTOR shall pay OWNER the amount set forth in each Work Order. 11. City Representative. The City's representative will be shown on the specific Work Order and shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the work requested. All requests concerning this Agreement shall be directed to the City Representative. 12. Independent Contractor. It is agreed that in the performance of any services hereunder, the Service Provider is an independent contractor responsible to the City only as to the results to be obtained in the particular work assignment and to the extent that the work shall be done in accordance with the terms, plans and specifications furnished by the City. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 30 of 145 13. Subcontractors/subconsultants. Service Provider may not subcontract any of the Work set forth in the subsequent Work Orders without the prior written consent of the city, which shall not be unreasonably withheld. If any of the Work is subcontracted hereunder (with the consent of the City), then the following provisions shall apply: (a) the subcontractor/subconsultant must be a reputable, qualified firm with an established record of successful performance in its respective trade performing identical or substantially similar work, (b) the subcontractor/subconsultant will be required to comply with all applicable terms of this Agreement, (c) the subcontract will not create any contractual relationship between any such subcontractor/subconsultant and the City, nor will it obligate the City to pay or see to the payment of any subcontractor/subconsultant, and (d) the work of the subcontractor/subconsultant will be subject to inspection by the City to the same extent as the work of the Service Provider. 14. Personal Services. It is understood that the City enters into the Agreement based on the special abilities of the Service Provider and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Service Provider shall neither assign any responsibilities nor delegate any duties arising under the Agreement without the prior written consent of the city. 15. Acceptance Not Waiver. The City's approval or acceptance of, or payment for any of the services shall not be construed to operate as a waiver of any rights under the Agreement or of any cause of action arising out of the performance of this Agreement. 16. Performance Standards. a. Service Provider shall perform work with the highest degree of competence and care in accordance with accepted standards for work of a similar nature. b. Unless otherwise provided in the Agreement, all materials and equipment incorporated into any work shall be new and, where not specified, of the most suitable grade of their respective kinds for their intended use, and all workmanship shall be acceptable to City. 17. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this Agreement, such party may be declared in default thereof. 18. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail themselves of any other remedy at law or equity. If the non-defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees and costs incurred because of the default. 19. Entire Agreement; Binding Effect; Order of Precedence; Authority to Execute. This Agreement, along with all Exhibits and other documents incorporated herein, shall constitute RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 31 of 145 the entire Agreement of the parties regarding this transaction and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. Covenants or representations not contained in this Agreement shall not be binding on the parties. In the event of a conflict between terms of the Agreement and any exhibit or attachment, the terms of the Agreement shall prevail. Each person executing this Agreement affirms that they have the necessary authority to sign on behalf of their respective party and to bind such party to the terms of this Agreement. 20. Indemnity/Insurance. a. The Service Provider agrees to indemnify and save harmless the City and the State, its officers, agents and employees against and from any and all actions, suits, claims, demands or liability of any character whatsoever, brought or asserted for injuries to or death of any person or persons, or damages to property arising out of, result from or occurring in connection with the performance of any service hereunder. b. The Service Provider shall take all necessary precautions in performing the work hereunder to prevent injury to persons and property. c. Without limiting any of the Service Provider's obligations hereunder, the Service Provider shall provide and maintain insurance coverage naming the City and the State as an additional insured under this Agreement of the type and with the limits specified within Exhibit , consisting of ( ) page(s), attached hereto, and incorporated herein by this reference. The Service Provider before commencing services hereunder shall deliver to the City's Purchasing Director, purchasing@fcgov.com, P. O. Box 580, Fort Collins, Colorado 80522 one copy of a certificate evidencing the insurance coverage required from an insurance company acceptable to the city. 21. Law/Severability. The laws of the State of Colorado shall govern the construction, interpretation, execution, and enforcement of this Agreement. The Parties further agree that Larimer County District Court is the proper venue for all disputes. If the City subsequently agrees in writing that the matter may be heard in federal court, venue will be in Denver District Court. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. 22. Governmental Immunity Act. No term or condition of this Agreement shall be construed or interpreted as a waiver, express or implied, of any of the notices, requirements, immunities, rights, benefits, protections, limitations of liability, and other provisions of the Colorado Governmental Immunity Act, C.R.S. § 24-10-101 et seq. and under any other applicable law. 23. Prohibition Against Unlawful Discrimination. The City of Fort Collins, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 32 of 145 enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality. The City also strictly prohibits unlawful harassment in the workplace, including sexual harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding. The City requires its vendors to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment, and retaliation. This requirement applies to all third-party vendors and their subcontractors/subconsultants at every tier. 24. Dust Control. The Service Provider shall abide by the City of Fort Collins “Dust Control and Prevention Manual,” which is available for public download at https://www.fcgov.com/airquality/pdf/dust-prevention-and-control-manual.pdf, and is incorporated herein by this reference. The City of Fort Collins has implemented this manual for all projects performed for the City of Fort Collins or located within the City of Fort Collins City limits. 25. Colorado Open Records Act. The City is subject to Sec. 24-72-201 et seq. of the Colorado Revised Statute (CORA). This Agreement is subject to public disclosure in whole pursuant to CORA. 26. Order of Precedence. In the event of a conflict or ambiguity in terms the following order of precedence shall prevail: 1. General Conditions 2. Services Agreement 3. Project Specials 4. Work Order 5. Contract Drawings 6. CDOT Standard Specifications 7. LCUASS 8. Other Project Documents RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 33 of 145 27. Special Provisions. Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit - Confidentiality, consisting of ( ) page(s), and Exhibit , Section 00700 General Conditions consisting of fifty-three (53) pages. [Signature Page Follows] RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 34 of 145 THE CITY OF FORT COLLINS, COLORADO By: Gerry Paul Purchasing Director Date: ATTEST: APPROVED AS TO FORM: SERVICE PROVIDER'S NAME By: Printed: Title: Date: RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 35 of 145 EXHIBIT A WORK ORDER FORM (Short form) PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND SERVICE PROVIDER'S NAME WORK ORDER NUMBER: PM's Tracking # PROJECT TITLE: ORIGINAL BID/RFP NUMBER & NAME: RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset MASTER AGREEMENT EFFECTIVE DATE: Original Contract Date WORK ORDER COMMENCEMENT DATE: WORK ORDER COMPLETION DATE: MAXIMUM FEE: (time and reimbursable direct costs): PROJECT DESCRIPTION/SCOPE OF SERVICES: Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of ( ) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: Name, Title ACCEPTANCE: Date: Dillon Willett, Project Manager REVIEWED: Date: Adam Hill, Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 36 of 145 EXHIBIT B WORK ORDER FORM (Construction over $100,000) CONSTRUCTION WORK ORDER FOR RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset WORK ORDER NO. TITLED (WORK ORDER TITLE) DATE: CONSTRUCTION MANAGER/GENERAL CONTRACTOR: RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 37 of 145 TABLE OF CONTENTS AGREEMENT FORMS 00525 Work Order & Notice of Award 00530 Work Order Notice to Proceed 00600 Bonds and Certificates 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONSTRUCTION MANAGER/GENERAL CONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate CONDITIONS OF THE CONTRACT 00700 General Conditions Exhibit GC-A GC-A1 - GC-A2 00800 Supplementary Conditions Davis Bacon Wage Rates Federal Terms and Conditions 00900 Addenda, Modifications and Payment 00950 Work Order Change Order Form 00960 Application for Payment RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 38 of 145 SECTION 00500 CONSTRUCTION WORK ORDER AGREEMENT FORMS 00525 Work Order, Notice of Award & Bid Schedule 00530 Work Order Notice to Proceed RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 39 of 145 SECTION 00525 WORK ORDER, NOTICE OF AWARD AND BID SCHEDULE TO (CONTRACTOR OR CM/GC): WORK ORDER # & TITLE: PURCHASE ORDER: ORIGINAL BID/RFP # & TITLE: RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset ENGINEER: OWNER’S REPRESENTATIVE: Dillon Willett NOTICE OF AWARD DATE: OWNER: City of Fort Collins (hereinafter referred to as OWNER) 1. WORK. You are hereby notified that your bid dated , for the above Work Order has been considered. Pursuant to your AGREEMENT with OWNER dated , you have been awarded a Work Order for this Work Order Description: A. See Section 01100 – Summary of Work. 2. CONTRACT PRICE, BONDS AND CERTIFICATES. The price of your Work Order is ($ ). Pursuant to the AGREEMENT and the Contract Documents, Performance and Payment Bonds and insurance are required. 3. CONTRACT TIMES. Pursuant to the AGREEMENT and the Contract Documents, the date for Substantial Completion of this Work Order is , and after Substantial Completion, the date for Final Completion is . 4. LIQUIDATED DAMAGES. OWNER and CONSTRUCTION MANAGER/GENERAL CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly instead of requiring any such proof, OWNER and CONSTRUCTION MANAGER/GENERAL CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTACTOR shall pay OWNER the amounts set forth hereafter. 1) Substantial Completion: One Thousand Dollars and Zero Cents ($1,000.00) for each calendar day or fraction thereof that expires after until the work is Substantially Complete. 2) Final Acceptance: After Substantial Completion One Thousand Dollars and Zero Cents ($1,000.00) for each calendar day or fraction thereof that expires after the period for Final Payment and Acceptance until the Work is ready for Final Payment and Acceptance. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 40 of 145 5. PAYMENT PROCEDURES. CONSTRUCTION MANAGER/GENERAL CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1 PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONSTRUCTION MANAGER/GENERAL CONTRACTOR's Application for Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. 5.1.1 Prior to Substantial Completion, Owner will be entitled to withhold as contract retainage five percent (5%) of each progress payment, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. If , in the sole discretion of Owner, on recommendation of Engineer, Owner determines that the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 95% of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application Section 00960. 5.1.2 Upon Substantial Completion payment will be made in an amount sufficient, if necessary, to increase total payments to CONSTRUCTION MANAGER/GENERAL CONTRACTOR to 95% of the Contract Price, less such amounts as ENGINEER shall determine or OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. 5.2 FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. 6. CONSTRUCTION MANAGER/GENERAL CONTRACTOR'S REPRESENTATION. In order to induce OWNER to enter into this Agreement, CONSTRUCTION MANAGER/GENERAL CONTRACTOR makes the following representations: 6.1 CONSTRUCTION MANAGER/GENERAL CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 41 of 145 6.2 CONSTRUCTION MANAGER/GENERAL CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3 CONSTRUCTION MANAGER/GENERAL CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONSTRUCTION MANAGER/GENERAL CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONSTRUCTION MANAGER/GENERAL CONTRACTOR for such purposes. 6.4 CONSTRUCTION MANAGER/GENERAL CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONSTRUCTION MANAGER/GENERAL CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. 6.5 CONSTRUCTION MANAGER/GENERAL CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6 CONSTRUCTION MANAGER/GENERAL CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONSTRUCTION MANAGER/GENERAL CONTRACTOR. 7. CONTRACT DOCUMENTS. 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONSTRUCTION MANAGER/GENERAL CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of “Contract Documents” in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 42 of 145 7.2 Forms for use by CONSTRUCTION MANAGER/GENERAL CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: 7.2.1 Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3 Lien Waiver Releases 7.2.4 Consent of Surety 7.2.5 Application for Exemption Certificate 7.2.6 Application for Payment 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: The Contract Drawings shall be stamped "Final for Construction" and dated. Any revisions made shall be clearly identified and dated. 7.4 The Contract Documents also include all written amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 7.5 There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. 8. MISCELLANEOUS 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 8.3. OWNER and CONSTRUCTION MANAGER/GENERAL CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, Agreement and obligations contained in the Contract Document. 9. EXECUTION. Three (3) copies of this proposed Work Order & Notice of Award, and accompanying amendments or supplements to the Contract Documents (except any applicable Drawings) incorporated herein, are provided. Three (3) sets of any applicable RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 43 of 145 Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is, by . A. You must deliver to OWNER three (3) fully-executed counterparts of this Work Order, including all amendments or supplements to the Contract Documents incorporated herein. Each Work Order must bear your signature as provided. B. You must deliver with the executed Work Order the Contract Security (Bonds) and insurance, as specified in the Agreement, this Work Order, the General Conditions (Article 5.1) and the Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned and to annul this Work Order & Notice of Award. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully-signed counterpart of this Work Order with any amendments or supplements to the Contract Documents attached. CONSTRUCTION MANAGER/GENERAL CONTRACTOR’S NOTICE OF AWARD REPRESENTATION & EXECUTION: CONSTRUCTION MANAGER/GENERAL CONTRACTOR agrees to perform the services identified above, in accordance with the terms and conditions contained herein and in the AGREEMENT dated , and the NOTICE OF AWARD dated , between the parties. In the event of a conflict between or ambiguity in the terms of the AGREEMENT or specific Work Orders, the AGREEMENT shall control. CONSTRUCTION MANAGER/GENERAL CONTRACTOR: By: Date: Name: Title: RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 44 of 145 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference and the attached Notice to Proceed is hereby given. ACCEPTANCE: Date: _____ Dillon Willett, Projects Manager OWNER: CITY OF FORT COLLINS ACCEPTANCE: ___________________________________________ Date: __________ Kelly DiMartino, Interim City Manager (if greater than $1,000,000) ACCEPTANCE: ___________________________________________ Date: __________ Gerry Paul, Purchasing Director (if greater than $60,000) APPROVED AS TO FORM: __________________________________ Date: __________ ATTEST: ___ ________________________________________ Date: __________ RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 45 of 145 BID SCHEDULE RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 2 of 145 SECTION 00530 WORK ORDER NOTICE TO PROCEED NOTICE TO PROCEED DATE: WORK ORDER TITLE: WORK ORDER NUMBER: ORIGINAL BID/RFP # & TITLE: RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset TO: Attn: This notice is to advise you: That the Work Order and all amendments and supplements to the Contract Documents covering the above described Work have been fully executed by the CONSTRUCTION MANAGER/GENERAL CONTRACTOR and the OWNER. That the required CONSTRUCTION MANAGER/GENERAL CONTRACTOR's Performance and Payment Bonds and insurance have been received by the OWNER. That the OWNER has approved the said Work Order and Contract Documents. Therefore, as the CONSTRUCTION MANAGER/GENERAL CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Work Order and the AGREEMENT. The dates for Substantial Completion and Final Acceptance shall be , and , respectively. Dated this _____________ day of ___________, _____. CITY OF FORT COLLINS (OWNER) By: ___________________________________________ ___________________________________________ Name & Title RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 3 of 145 ACKNOWLEDGMENT OF NOTICE Receipt of the above Work Order Notice to Proceed is hereby acknowledged this _____________ day of ___________, _____. (CONSTRUCTION MANAGER/GENERAL CONTRACTOR) By: ___________________________________________ ___________________________________________ Name & Title RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 4 of 145 SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONSTRUCTION MANAGER/GENERAL CONTRACTOR) 00651 Lien Waiver Release (SUBCONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 5 of 145 SECTION 00610 PERFORMANCE BOND Bond No __ KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 Laporte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , 2 , for RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled , Work Order Number , dated the day of , , a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Work Order and Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Work Order and Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONSTRUCTION MANAGER/GENERAL CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 6 of 145 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _____ day of ___________, _____. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners _____________________________ By: _____________________________ By: IN PRESENCE OF: Surety _____________________________ By: _____________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONSTRUCTION MANAGER/GENERAL CONTRACTOR is Partnership, all partners should execute Bond. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 7 of 145 SECTION 00615 PAYMENT BOND Bond No __ KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , , for RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset, a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled , Work Order Number , dated the day of , , a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Work Order and Agreement and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 8 of 145 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _____ day of ___________, _____. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners _____________________________ By: _____________________________ By: IN PRESENCE OF: Surety _____________________________ By: _____________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONSTRUCTION MANAGER/GENERAL CONTRACTOR is Partnership, all partners should execute Bond. RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 9 of 145 SECTION 00630 CERTIFICATE OF INSURANCE CONSTRUCTION MANAGER/GENERAL CONTRACTOR shall insert his own standard form for Certificate of Insurance in accordance with the following: 1. The Construction Manager/General Contractor will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Construction Manager/General Contractor shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: “The insurance evidenced by this Certificate will not reduce coverage or limits and will not be cancelled, except after thirty (30) days written notice has been received by the City of Fort Collins.” In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Construction Manager/General Contractor, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Construction Manager/General Contractor under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Construction Manager/General Contractor’s general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Construction Manager/General Contractor shall maintain during the life of this Agreement for all of the Construction Manager/General Contractor's employees engaged in work performed under this agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Construction Manager/General Contractor shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Construction Manager/General Contractor shall be responsible for any liability directly or RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset Page 10 of 145 indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) WORK ORDER # & TITLE: DATE OF SUBSTANTIAL COMPLETION: ORIGINAL BID/RFP # & TITLE: RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado INCLUDE: OWNER: City of Fort Collins CONSTRUCTION MANAGER/GENERAL CONTRACTOR: WORK ORDER DATE: The Work performed under this Work Order, pursuant to the Contract Documents, has been inspected by authorized representatives of the OWNER, CONSTRUCTION MANAGER/GENERAL CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONSTRUCTION MANAGER/GENERAL CONTRACTOR to complete all the Work in accordance with the Contract Documents. _____________________________ By: __________________________ ________ PROJECT MANAGER AUTHORIZED REPRESENTATIVE DATE The CONSTRUCTION MANAGER/GENERAL CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. _____________________________ By: __________________________ ________ CONSTRUCTION MANAGER/GENERAL CONTRACTOR AUTHORIZED REPRESENTATIVE _____________ DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS ________ By: __________________________ ________ OWNER AUTHORIZED REPRESENTATIVE DATE REMARKS: _________________________________________________________________ ____________________________________________________________________________ SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE DATE: ________________, _____ TO: Gentlemen: You are hereby notified that on the day of , , the City of Fort Collins, Colorado, has accepted the Work completed by , for the City of Fort Collins Work Order, titled , Work Order Number under RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset A check is attached hereto in the amount of $ as Final Payment for all Work done, subject to the terms of the Contract Documents, including the Work Order, which is dated , and the AGREEMENT, which is dated . In conformance with the Work Order and Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date: ___________________, _____. Sincerely, City of Fort Collins OWNER By: ___________________________________________ ___________________________________________ Name & Title ATTEST: _________________________________________ ___________________________________________ Name & Title SECTION 00650 LIEN WAIVER RELEASE (CONSTRUCTION MANAGER/GENERAL CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: (CONSTRUCTION MANAGER/GENERAL CONTRACTOR) WORK ORDER TITLE: WORK ORDER NUMBER: ORIGINAL BID/RFP # & TITLE: RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset 1. The CONSTRUCTION MANAGER/GENERAL CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONSTRUCTION MANAGER/GENERAL CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONSTRUCTION MANAGER/GENERAL CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONSTRUCTION MANAGER/GENERAL CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONSTRUCTION MANAGER/GENERAL CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONSTRUCTION MANAGER/GENERAL CONTRACTOR or its agents, employees, and servants, or by and through the CONSTRUCTION MANAGER/GENERAL CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONSTRUCTION MANAGER/GENERAL CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONSTRUCTION MANAGER/GENERAL CONTRACTOR's Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes an adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Signed this ______ day of __________, ___. CONSTRUCTION MANAGER/GENERAL CONTRACTOR: By: ___________________________________________ ___________________________________________ Name & Title ATTEST: _____________________________ Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this _________ day of __________, _____, by ________________________________________________________________. Witness my hand and official seal. My Commission Expires: ___________________________. _________________________ Notary Public SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONSTRUCTION MANAGER/GENERAL CONTRACTOR: WORK ORDER # & TITLE: ORIGINAL BID/RFP # & TITLE: RFP 9808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset CONTRACT DATE: WORK ORDER DATE: In accordance with the provisions of the Work Order and Contract between the OWNER and the CONSTRUCTION MANAGER/GENERAL CONTRACTOR as indicated above, for the Work Order titled on bond of , (Surety) _______________________________________ hereby approves of the Final Payment to the CONSTRUCTION MANAGER/GENERAL CONTRACTOR, and agrees that Final Payment to the CONSTRUCTION MANAGER/GENERAL CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this _________ day of _________ _, _____. ____________________________________________ (Surety Company) By: ________________________________________ (Name) Attorney-in-Fact ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact. SECTION 00670 APPLICATION FOR EXEMPTION CERTIFICATE SECTION 00700 GENERAL CONDITIONS SECTION 00800 CDOT SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the corresponding paragraphs as indicated of the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins modifications) and other provisions of the Contract Documents as indicated below. SC-4.2 Subsurface and Physical Conditions: A. Add the following language to paragraph 4.2.1 of the General Conditions. 4.2.1.1.1 The following report(s) of exploration and tests of subsurface conditions at the site of the Work: Hydraulic Design Report Dated May 3, 2023 Subsurface Utility Engineering (SUE) Report to be completed as required and incorporated into the Construction Work Order Contractor may rely upon the accuracy of the technical data contained in the geotechnical documents, but not upon nontechnical data, interpretations or opinions contained therein or upon the completeness of any information in the report. SC-5.3.2 Add the following: The State of Colorado shall be added as an additional insured. SC-5.4.8 Limits of Liability A. Add the following language at the end of paragraph 5.4.8. The State of Colorado shall be added as an additional insured. The limits of liability for the insurance required by paragraphs 5.4.1 through 5.4.6 inclusive and requirements of 5.4.7 through 5.4.10 inclusive shall be in accordance with Section 00630 of the Agreement. SC-6.4.1 Purchasing Restrictions Delete the complete paragraph SC-6.4.2 Cement Restrictions Delete the complete paragraph SC-6.5 Contractor Responsibilities—Amended in its entirety to read: All materials and equipment shall be of good quality and new, except as otherwise provided in the Contract Documents. All warranties, if any, provided in the Specifications shall run specifically to the benefit of Owner. If required by Engineer prior to final payment as provided for herein, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the kind and quality of the materials and equipment. All materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with instructions of the applicable Supplier, except as otherwise provided in the Contract Documents. SC- 6.30.1. - Contractor General Warranty and Guarantee- Delete the complete paragraph 6.30.1.1 Specific Warranties. Contractor further warrants and guarantees that any Work covered by a specific warranty provision contained in the Specifications shall be performed in accordance with the applicable warranty and any such Work shall conform to the warranty requirements during the warranty period stated in the specific warranty. SC-13.12 Correction Period Delete the complete paragraph SC-14.15.1- Waiver of Claims- Amended in its entirety to read: 14.15.1 a waiver of all claims by Owner against Contractor, except claims arising from unsettled Liens, from defective Work identified and reported to Contractor during final inspection pursuant to 14.11, from failure to comply with the Contract Documents, or the terms of any specific guarantees or warranties specified therein, or from Contractors’ continuing obligations under the Contract Documents; SC-17.6.1 Delete the complete paragraph SC-DB Davis Bacon Wage Rates A. The terms and conditions set forth in the following pages are hereby incorporated as part of this Agreement. SC-FED Federal Terms & Conditions A. The terms and conditions set forth in the following pages are hereby incorporated as part of this Agreement. CURRENT DAVIS BACON WAGE RATES TO BE INCORPORATED WITH CONSTRUCTION WORK ORDER FEDERAL TERMS AND CONDITIONS 1. NO FEDERAL GOVERNMENT OBLIGATION TO THIRD PARTIES Applies to all FTA-Assisted Third-Party Contracts and Subcontracts. No Obligation by the Federal Government. 1. The Purchaser and Contractor acknowledge and agree that, notwithstanding any concurrence by the Federal Government in or approval of the solicitation or award of the underlying contract, absent the express written consent by the Federal Government, the Federal Government is not a party to this contract and shall not be subject to any obligations or liabilities to the Purchaser, Contractor, or any other party (whether or not a party to that contract) pertaining to any matter resulting from the underlying contract. 2. The Contractor agrees to include the above clause in each subcontract financed in whole or in part with Federal assistance provided by FTA. It is further agreed that the clause shall not be modified, except to identify the sub-contractor who will be subject to it provisions. 2. RECORDS RETENTIONS AND ACCESS TO SITES OF PERFORMANCE Applies to all FTA-Assisted Third-Party Contracts and Subcontracts. 1. For a period of three years following Contract closing, the Contractor and its subcontractors shall maintain, preserve and make available to the City, the FTA Administrator, the Comptroller General of the United States, and any of their authorized representatives, access at all reasonable times to any books, documents, papers and records of Contractor which are directly pertinent to this Contract for the purposes of making audits, examinations, excerpts and transcriptions. Contractor also agrees, otherwise comply with 49 U.S.C. § 5325(g), and federal access to records requirements as set forth in the applicable U.S. DOT Common Rule. 2. The Contractor shall maintain and the City shall have the right to examine and audit all records and other evidence sufficient to reflect properly all prices, costs or rates negotiated and invoiced in performance of this Contract. This right of examination shall include inspection at all reasonable times of the Contractor’s offices engaged in performing the Contract. 3. If this Contract is completely or partially terminated, the Contractor shall make available the records relating to the work terminated until 3 years after any resulting final termination settlement. The Contractor shall make available records relating to appeals under the Disputes clause or to litigation or the settlement of claims arising under or relating to this Contract until such appeals, litigation, or claims are finally resolved. 4. Access to Records and Reports” applies with equal force and effect to any subcontractors hired by the Contractor to perform Work under this Contract. The Contractor shall insert this provision in all subcontracts under this Contract and require subcontractor compliance therewith. 5. Access to the Sites of Performance. The Recipient agrees to permit, and to require its Third Party Participants to permit, FTA to have access to the sites of performance of its Award, the accompanying Underlying Agreement, and any Amendments thereto, and to make site visits as needed in compliance with the U.S. DOT Common Rules. 6. Closeout. Closeout of the Award does not alter the record retention or access requirements of this section of this Master Agreement. 3. FEDERAL CHANGES Applies to all FTA-Assisted Third-Party Contracts and Subcontracts. Federal Changes - Contractor shall at all times comply with all applicable FTA regulations, policies, procedures and directives, including without limitation those listed directly or by reference in the Master Agreement between Purchaser and FTA, as they may be amended or promulgated from time to time during the term of this contract. Contractor's failure to so comply shall constitute a material breach of this contract. 4. CIVIL RIGHTS (EEO, TITLE VI & ADA) Applies to all FTA-Assisted Third-Party Contracts and Subcontracts. The following requirements apply to the underlying contract: a) The Recipient agrees that it must comply with applicable federal civil rights laws, regulations, requirements, and guidance, and follow applicable federal guidance, except as the Federal Government determines otherwise in writing. Therefore, unless a Recipient or a federal program, including the Tribal Transit Program or the Indian Tribe Recipient, is specifically exempted from a civil rights statute, FTA requires compliance with that civil rights statute, including compliance with equity in service. b) Nondiscrimination in Federal Public Transportation Programs. The Recipient agrees to, and assures that it and each Third-Party Participant, will: (1) Prohibit discrimination based on the basis of race, color, religion, national origin, sex, disability, or age. (2) Prohibit the: (a) Exclusion from participation in employment or a business opportunity for reasons identified in 49 U.S.C. § 5332, (b) Denial of program benefits in employment or a business opportunity identified in 49 U.S.C. § 5332, or (c) Discrimination, including discrimination in employment or a business opportunity identified in 49 U.S.C. § 5332. (3) Follow: (a) The most recent edition of FTA Circular 4702.1, “Title VI Requirements and Guidelines for Federal Transit Administration Recipients,” to the extent consistent with applicable federal laws, regulations, requirements, and guidance, and other applicable federal guidance that may be issued, but (b) FTA does not require an Indian Tribe to comply with FTA program- specific guidelines for Title VI when administering its Underlying Agreement supported with federal assistance under the Tribal Transit Program. c) Nondiscrimination – Title VI of the Civil Rights Act. The Recipient agrees to, and assures that each Third Party Participant, will: (1) Prohibit discrimination based on race, color, or national origin, (2) Comply with: (a) Title VI of the Civil Rights Act of 1964, as amended, 42 U.S.C. § 2000d et seq., (b) U.S. DOT regulations, “Nondiscrimination in Federally-Assisted Programs of the Department of Transportation – Effectuation of Title VI of the Civil Rights Act of 1964,” 49 C.F.R. part 21, and (c) Federal transit law, specifically 49 U.S.C. § 5332, and (3) Follow: (a) The most recent edition of FTA Circular 4702.1, “Title VI Requirements and Guidelines for Federal Transit Administration Recipients,” to the extent consistent with applicable federal laws, regulations, requirements, and guidance, (b) U.S. DOJ, “Guidelines for the enforcement of Title VI, Civil Rights Act of 1964,” 28 C.F.R. § 50.3, and (c) All other applicable federal guidance that may be issued. d) Equal Employment Opportunity. (1) Federal Requirements and Guidance. The Recipient agrees to, and assures that each Third Party Participant will, prohibit discrimination on the basis of race, color, religion, sex, or national origin, and: (a) Comply with Title VII of the Civil Rights Act of 1964, as amended, 42 U.S.C. § 2000e et seq., (b) Facilitate compliance with Executive Order No. 11246, “Equal Employment Opportunity,” as amended by Executive Order No. 11375, “Amending Executive Order No. 11246, Relating to Equal Employment Opportunity,” 42U.S.C. § 2000e note, (c) Comply with Federal transit law, specifically 49 U.S.C. § 5332, as stated in section a, and (d) Comply with FTA Circular 4704.1other applicable EEO laws and regulations, as provided in Federal guidance, including laws and regulations prohibiting discrimination on the basis of disability, except as the Federal Government determines otherwise in writing, (2) General. The Recipient agrees to: (a) Ensure that applicants for employment are employed and employees are treated during employment without discrimination on the basis of their: 1 Race, 2 Color, 3 Religion, 4 Sex, 5 Disability, 6 Age, or 7 National origin, (b) Take affirmative action that includes, but is not limited to: 1 Recruitment advertising, 2 Recruitment, 3Employment, 4 Rates of pay, 5 Other forms of compensation, 6 Selection for training, including apprenticeship, 7 Upgrading, 8 Transfers, 9 Demotions, 10 Layoffs, and 11 Terminations, but (b) Indian Tribe. Title VII of the Civil Rights Act of 1964, as amended, exempts Indian Tribes under the definition of "Employer". (3) Equal Employment Opportunity Requirements for Construction Activities. In addition to the foregoing, when undertaking “construction” as recognized by the U.S. Department of Labor (U.S. DOL), the Recipient agrees to comply, and assures the compliance of each Third Party Participant, with: (a) U.S. DOL regulations, “Office of Federal Contract Compliance Programs, September 2019 Equal Employment Opportunity, Department of Labor,” 41 C.F.R. chapter 60, and (b) Executive Order No. 11246, “Equal Employment Opportunity,” as amended by Executive Order No. 11375, “Amending Executive Order No. 11246, Relating to Equal Employment Opportunity,” 42U.S.C. § 2000e note. e) Disadvantaged Business Enterprise. To the extent authorized by applicable federal laws and regulations, the Recipient agrees to facilitate, and assures that each Third- Party Participant will facilitate, participation by small business concerns owned and controlled by socially and economically disadvantaged individuals, also referred to as “Disadvantaged Business Enterprises” (DBEs), in the Underlying Agreement as follows: (1) Statutory and Regulatory Requirements. The Recipient agrees to comply with: (a) Section 1101(b) of the FAST Act, 23 U.S.C. §101 note, (b) U.S. DOT regulations, “Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs,” 49 C.F.R. part 26, and (c) Federal transit law, specifically 49 U.S.C. § 5332, as provided in section 12a of this Master Agreement. (2) DBE Program Requirements. A Recipient that receives planning, capital and/or operating assistance and that will award prime third-party contracts exceeding $250,000 in a federal fiscal year must have a DBE program meeting the requirements of 49 C.F.R. Part 26, which is approved by FTA, and establish an annual DBE participation goal. (3) Special Requirements for a Transit Vehicle Manufacturer (TVM). The Recipient agrees that: (a) TVM Certification. Each TVM, as a condition of being authorized to bid or propose on FTA-assisted transit vehicle procurements, must certify that it has complied with the requirements of 49 C.F.R. part 26, and (b) Reporting TVM Awards. Within 30 days of any third-party contract award for a vehicle purchase, the Recipient must submit to FTA the name of the TVM contractor and the total dollar value of the third-party contract and notify FTA that this information has been attached to FTA’s electronic award and management system, the Recipient must also submit subsequent notifications if options are exercised in subsequent years to ensure the TVM is still in good standing. (4) Assurance. As required by 49 C.F.R. § 26.13(a): (a) Recipient Assurance. The Recipient agrees and assures that: 1 It must not discriminate on the basis of race, color, national origin, or sex in the award and performance of any FTA or U.S. DOT-assisted contract, or in the administration of its DBE program or the requirements of 49 C.F.R. part 26, 2 It must take all necessary and reasonable steps under 49 C.F.R. part 26 to ensure nondiscrimination in the award and administration of U.S. DOT- assisted contracts, 3 Its DBE program, as required under 49 C.F.R. part 26 and as approved by U.S. DOT, is incorporated by reference and made part of the Underlying Agreement, and 4 Implementation of its DBE program approved by U.S. DOT is a legal obligation and failure to carry out its terms shall be treated as a violation of this Master Agreement. (b) Subrecipient/Third Party Contractor/Third Party Subcontractor Assurance. The Recipient agrees and assures that it will include the following assurance in each subagreement and third party contract it signs with a Subrecipient or Third Party Contractor and agrees to obtain the agreement of each of its Subrecipients, Third Party Contractors, and Third Party Subcontractors to include the following assurance in every subagreement and third party contract it signs: 1 The Subrecipient, each Third Party Contractor, and each Third Party Subcontractor must not discriminate on the basis of race, color, national origin, or sex in the award and performance of any FTA or U.S. DOT-assisted subagreement, third party contract, and third party subcontract, as applicable, and the administration of its DBE program or the requirements of 49 C.F.R. part 26, 2 The Subrecipient, each Third Party Contractor, and each Third Party Subcontractor must take all necessary and reasonable steps under 49 C.F.R. part 26 to ensure nondiscrimination in the award and administration of U.S. DOT-assisted subagreements, third party contracts, and third party subcontracts, as applicable, 3 Failure by the Subrecipient and any of its Third Party Contractors or Third Party Subcontractors to carry out the requirements of this subparagraph 13.d(4)(b) is a material breach of this subagreement, third party contract, or third party subcontract, as applicable, and 4 The following remedies, or such other remedy as the Recipient deems appropriate, include, but are not limited to, withholding monthly progress payments; assessing sanctions; liquidated damages; and/or disqualifying the Subrecipient, Third Party Contractor, or Third Party Subcontractor from future bidding as non-responsible. (5) Remedies. Upon notification to the Recipient of its failure to carry out its approved program, FTA or U.S. DOT may impose sanctions as provided for under 49 C.F.R. part 26, and, in appropriate cases, refer the matter for enforcement under either or both 18 U.S.C. § 1001, and/or the Program Fraud Civil Remedies Act of 1986, 31 U.S.C. § 3801 et seq. f) Nondiscrimination on the Basis of Sex. The Recipient agrees to comply with federal prohibitions against discrimination on the basis of sex, including: (1) Title IX of the Education Amendments of 1972, as amended, 20 U.S.C. § 1681 et seq., (2) U.S. DOT regulations, “Nondiscrimination on the Basis of Sex in Education Programs or Activities Receiving Federal Financial Assistance,” 49 C.F.R. part 25, and (3) Federal transit law, specifically 49 U.S.C. § 5332. g) Nondiscrimination on the Basis of Age. The Recipient agrees to comply with federal prohibitions against discrimination on the basis of age, including: (1) The Age Discrimination in Employment Act, 29 U.S.C. §§ 621 – 634, which prohibits discrimination on the basis of age, (2) U.S. Equal Employment Opportunity Commission (U.S. EEOC) regulations, “Age Discrimination in Employment Act,” 29 C.F.R. part 1625, (3) The Age Discrimination Act of 1975, as amended, 42 U.S.C. § 6101 et seq., which prohibits discrimination against individuals on the basis of age in the administration of Programs, Projects, and related activities receiving federal assistance, (4) U.S. Health and Human Services regulations, “Nondiscrimination on the Basis of Age in Programs or Activities Receiving Federal Financial Assistance,” 45 C.F.R. part 90, and (5) Federal transit law, specifically 49 U.S.C. § 5332. h) Nondiscrimination on the Basis of Disability. The Recipient agrees to comply with the following federal prohibitions against discrimination on the basis of disability: (1) Federal laws, including: (a) section 504 of the Rehabilitation Act of 1973, as amended, 29 U.S.C. § 794, which prohibits discrimination on the basis of disability in the administration of federally assisted Programs, Projects, or activities, (b) The Americans with Disabilities Act of 1990 (ADA), as amended, 42 U.S.C. § 12101 et seq., which requires that accessible facilities and services be made available to individuals with disabilities: 1 For FTA Recipients generally, Titles I, II, and III of the ADA apply, but 2 For Indian Tribes, Titles II and III of the ADA apply, but Title I of the ADA does not apply because it exempts Indian Tribes from the definition of “employer,” (c) The Architectural Barriers Act of 1968, as amended, 42 U.S.C. § 4151 et seq., which requires that buildings and public accommodations be accessible to individuals with disabilities, (d) Federal transit law, specifically 49 U.S.C. § 5332, which now includes disability as a prohibited basis for discrimination, and (e) Other applicable federal laws, regulations and requirements pertaining to access for seniors or individuals with disabilities. (2) Federal regulations, including: (a) U.S. DOT regulations, “Transportation Services for Individuals with Disabilities (ADA),” 49 C.F.R. part 37, (b) U.S. DOT regulations, “Nondiscrimination on the Basis of Disability in Programs and Activities Receiving or Benefiting from Federal Financial Assistance,” 49 C.F.R. part 27, (c) Joint U.S. Architectural and Transportation Barriers Compliance Board (U.S. ATBCB) and U.S. DOT regulations, “Americans With Disabilities (ADA) Accessibility Specifications for Transportation Vehicles,” 36 C.F.R. part 1192 and 49 C.F.R. part 38, (d) U.S. DOT regulations, “Transportation for Individuals with Disabilities: Passenger Vessels,” 49 C.F.R. part 39, (e) U.S. DOJ regulations, “Nondiscrimination on the Basis of Disability in State and Local Government Services,” 28 C.F.R. part 35, (f) U.S. DOJ regulations, “Nondiscrimination on the Basis of Disability by Public Accommodations and in Commercial Facilities,” 28 C.F.R. part 36, (g) U.S. EEOC, “Regulations to Implement the Equal Employment Provisions of the Americans with Disabilities Act,” 29 C.F.R. part 1630, (h) U.S. Federal Communications Commission regulations, “Telecommunications Relay Services and Related Customer Premises Equipment for Persons with Disabilities,” 47 C.F.R. part 64, Subpart F, (i) U.S. ATBCB regulations, “Electronic and Information Technology Accessibility Standards,” 36 C.F.R. part 1194, and (j) FTA regulations, “Transportation for Elderly and Handicapped Persons,” 49 C.F.R. part 609, and (k) Other applicable federal civil rights and nondiscrimination guidance. (i) Drug or Alcohol Abuse - Confidentiality and Other Civil Rights Protections. The Recipient agrees to comply with the confidentiality and civil rights protections of: (1) The Drug Abuse Office and Treatment Act of 1972, as amended, 21 U.S.C. § 1101 et seq., (2) The Comprehensive Alcohol Abuse and Alcoholism Prevention, Treatment and Rehabilitation Act of 1970, as amended, 42 U.S.C. § 4541 et seq., and (3) The Public Health Service Act, as amended, 42 U.S.C. §§ 290dd – 290dd-2. (j) Access to Services for Persons with Limited English Proficiency. The Recipient agrees to promote accessibility of public transportation services to persons with limited understanding of English by following: (1) Executive Order No. 13166, “Improving Access to Services for Persons with Limited English Proficiency,” August 11, 2000, 42 U.S.C. § 2000d-1 note, and (2) U.S. DOT Notice, “DOT Policy Guidance Concerning Recipients’ Responsibilities to Limited English Proficiency (LEP) Persons,” 70 Fed. Reg. 74087, December 14, 2005. (k) Other Nondiscrimination Laws, Regulations, Requirements, and Guidance. The Recipient agrees to comply with other applicable federal nondiscrimination laws, regulations, and requirements, and follow federal guidance prohibiting discrimination. (l) Remedies. Remedies for failure to comply with applicable federal Civil Rights laws, regulations, requirements, and guidance may be enforced as provided in those federal laws, regulations, or requirements. (m) Free Speech and Religious Liberty. The recipient shall ensure that Federal funding is expended in full accordance with the U.S. Constitution, Federal Law, and statutory and public policy requirements: including, but not limited to, those protecting free speech, religious liberty, public welfare, the environment, and prohibiting discrimination. 5. INCORPORATION OF FEDERAL TRANSIT ADMINISTRATION (FTA) TERMS (Per FTA C 4330.1F) Applies to all FTA-Assisted Third-Party Contracts and Subcontracts. Incorporation of Federal Transit Administration (FTA) Terms - The preceding provisions include, in part, certain Standard Terms and Conditions required by DOT, whether or not expressly set forth in the preceding contract provisions. All contractual provisions required by DOT, as set forth in FTA Circular 4220.1F, are hereby incorporated by reference. Anything to the contrary herein notwithstanding, all FTA mandated terms shall be deemed to control in the event of a conflict with other provisions contained in this Agreement. The Contractor shall not perform any act, fail to perform any act, or refuse to comply with any City requests which would cause the City to be in violation of the FTA terms and conditions. 6. ENERGY CONSERVATION REQUIREMENTS Applies to all FTA-Assisted Third-Party Contracts and Subcontracts. Energy Conservation - The contractor agrees to comply with mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plans under the Energy Policy and Conservation Act, as amended 42 U.S.C. § 6321, et. seq., and perform an energy assessment for any building constructed, reconstructed, or modified with federal assistance required under FTA regulations, “Requirements for Energy Assessments,” 49 CFR Part 622, subpart C. 7. VETERANS EMPLOYEMENT Applies to all FTA-Assisted Third-Party Contracts and Subcontracts. Veterans Employment. As provided by 49 U.S.C. § 5325(k): To the extent practicable, the contractor agrees and assures that each of its subcontractors: 1. Will give a hiring preference to veterans (as defined in 5 U.S.C. § 2108), who have the skills and abilities required to perform construction work required under a third-party contract in connection with a capital project supported with funds made available or appropriated for 49 U.S.C. chapter 53, and 2. Will not require an employer to give a preference to any veteran over any equally qualified applicant who is a member of any racial or ethnic minority, female, an individual with a disability, or a former employee. 8. PROHIBITION ON CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (2 CFR §200.216) Applies to all FTA-Assisted Third-Party Contracts and Subcontracts. Contractor is prohibited from using equipment, services, or systems that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. As described in Public Law 115-232, section 889, covered telecommunications equipment is telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities). a. For the purpose of public safety, security of government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities). b. Telecommunications or video surveillance services provided by such entities or using such equipment. c. Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of the National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country. 9. TERMINATION PROVISIONS (APPENDIX II TO PART 200) Applies to all contracts except micro-purchases. a. Termination for Convenience. The City may terminate this Contract, in whole or in part, for any reason, upon five (5) days written notice to the Contractor. In such event, the City shall pay the Contractor its costs, including reasonable Contract close-out costs, and profit on Work performed up to the time of termination. The Contractor shall promptly submit its termination claim to the City to be paid the Contractor. If the Contractor has any property in its possession belonging to the City, the Contractor will account for the same, and dispose of it in a manner the City directs. b. Termination for Breach. Either Party’s failure to perform any of its material obligations under this Contract, in whole or in part or in a timely or satisfactory manner, will be a breach. The institution of proceedings under any bankruptcy, insolvency, reorganization or similar law, by or against Contractor, or the appointment of a receiver or similar officer for Contractor or any of its property, which is not vacated or fully stayed within thirty (30) days after the institution of such proceeding, will also constitute a breach. In the event of a breach, the non-breaching Party may provide written notice of the breach to the other Party. If the notified Party does not cure the breach, at its sole expense, within thirty (30) days after delivery of notice, the non-breaching Party may exercise any of its remedies provided under this Contract or at law, including immediate termination of the Contract. 10. GOVERNMENT-WIDE DEBARMENT AND SUSPENSION Applies to all contracts and subcontracts exceeding $25,000. Suspension and Debarment Executive. The contractor attests that it is not listed on the government-wide exclusions in the System for Award Management (SAM). The Contractor agrees to the following: (a) It will comply with the requirements of 2 C.F.R. part 180, subpart C, as adopted and supplemented by U.S. DOT regulations at 2 C.F.R. part 1200, which include the following: (a) It will not enter into any arrangement to participate in the development or implementation of the Project with any Third Party Participant that is debarred or suspended except as authorized by: 1 U.S. DOT regulations, “Non-procurement Suspension and Debarment,” 2 C.F.R. part 1200, 2 U.S. OMB, “Guidelines to Agencies on Government wide Debarment and Suspension (Non-procurement),” 2 C.F.R. part 180, including any amendments thereto, and 3 Executive Orders Nos. 12549 and 12689, “Debarment and Suspension,” 31 U.S.C. § 6101 note, (b) It will review the U.S. GSA “System for Award Management,” https://www.sam.gov, if required by U.S. DOT regulations, 2 C.F.R. part 1200, and (c) It will include, and require each of its Third Party Participants to include, a similar provision in each lower tier covered transaction, ensuring that each lower tier Third Party Participant: 1 Will comply with Federal debarment and suspension requirements, and 2 Reviews the “System for Award Management” at https://www.sam.gov, if necessary to comply with U.S. DOT regulations, 2 C.F.R. part 1200, and (b) If the Recipient suspends, debars, or takes any similar action against a Third-Party Participant or individual, the Recipient will provide immediate written notice to the: (a) FTA Regional Counsel for the Region in which the Recipient is located or implements the Project, (b) FTA Project Manager if the Project is administered by an FTA Headquarters Office, or (c) FTA Chief Counsel. 11. NOTICE TO FTA AND U.S. DOT INSPECTOR GENERAL OF INFORMATION RELATED TO FRAUD, WASTE, ABUSE OR OTHER LEGAL MATTERS Applies to all contracts and subcontracts exceeding $25,000. The prime contractor is required to “flow down” this requirement to subcontractors. a. If a current or prospective legal matter that may affect the Federal Government emerges, the Recipient must promptly notify the FTA Chief Counsel and FTA Regional Counsel for the Region in which the Recipient is located. The Recipient must include a similar notification requirement in its Third Party Agreements and must require each Third Party Participant to include an equivalent provision in its subagreements at every tier, for any agreement that is a “covered transaction” according to 2 C.F.R. §§ 180.220 and 1200.220. 1. The types of legal matters that require notification include, but are not limited to, a major dispute, breach, default, litigation, or naming the Federal Government as a party to litigation or a legal disagreement in any forum for any reason. 2. Matters that may affect the Federal Government include, but are not limited to, the Federal Government’s interests in the Award, the accompanying Underlying Agreement, and any Amendments thereto, or the Federal Government’s administration or enforcement of federal laws, regulations, and requirements. 3. Additional Notice to U.S. DOT Inspector General. The Recipient must promptly notify the U.S. DOT Inspector General in addition to the FTA Chief Counsel or Regional Counsel for the Region in which the Recipient is located, if the Recipient has knowledge of potential fraud, waste, or abuse occurring on a Project receiving assistance from FTA. The notification provision applies if a person has or may have submitted a false claim under the False Claims Act, 31 U.S.C. § 3729, et seq., or has or may have committed a criminal or civil violation of law pertaining to such matters as fraud, conflict of interest, bid rigging, misappropriation or embezzlement, bribery, gratuity, or similar misconduct involving federal assistance. This responsibility occurs whether the Project is subject to this Agreement or another agreement between the Recipient and FTA, or an agreement involving a principal, officer, employee, agent, or Third Party Participant of the Recipient. It also applies to subcontractors at any tier. Knowledge, as used in this paragraph, includes, but is not limited to, knowledge of a criminal or civil investigation by a Federal, state, or local law enforcement or other investigative agency, a criminal indictment or civil complaint, or probable cause that could support a criminal indictment, or any other credible information in the possession of the Recipient. In this paragraph, “promptly” means to refer information without delay and without change. This notification provision applies to all divisions of the Recipient, including divisions tasked with law enforcement or investigatory functions. b. Federal Interest in Recovery. The Federal Government retains the right to a proportionate share of any proceeds recovered from any third party, based on the percentage of the federal share for the Underlying Agreement. Notwithstanding the preceding sentence, the Recipient may return all liquidated damages it receives to its Award Budget for its Underlying Agreement rather than return the federal share of those liquidated damages to the Federal Government, provided that the Recipient receives FTA’s prior written concurrence. c. Enforcement. The Recipient must pursue its legal rights and remedies available under any third party agreement or any federal, state, or local law or regulation. 12. BYRD ANTI-LOBBYING AMENDMENT (31 U.S.C. 1352) Applies to all contracts exceeding $100,000. Byrd Anti-Lobbying Amendment (31 U.S.C. 1352). Contractor attests that it has filed the required certification under the Byrd Anti-Lobbying Amendment. Contractor attests that it has certified that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal Contract, grant or any other award covered by 31 U.S.C. 1352. Contractor further attests that it has disclosed, and will continue to disclose, any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. If contract exceeds $100,000 the contractor is required to sign the attached certification. 13. BUY AMERICA REQUIREMENTS Applies to contracts exceeding $150,000 (When tangible property of construction is acquired.) Buy America – The domestic preference requirements of 49 U.S.C. § 5323(j), and FTA regulations, “Buy America Requirements,” 49 CFR Part 661, to the extent consistent with 49 U.S.C. 5323(j) apply to this contract. Uniform Administrative Requirements. Compliance with FTA’s Buy America requirements shall be deemed to satisfy 2 CFR § 200.322, “Domestic Preference for Procurements”. Limitations on Certain Rolling Stock Procurements. The contractor will comply with the limitations on certain rolling stock procurements at 49 U.S.C. § 5323(u). If contract exceeds $150,000, the contractor is required to sign the attached certification, except those subject to a general waiver. 14. CLEAN AIR AND FEDERAL WATER POLLUTION CONTROL ACT Applies to all contracts exceeding $150,000. Clean Air Act (42 U.S.C. 7401-7671q.) and the Federal Water Pollution Control Act (33 U.S.C. 1251-1387), as amended. a. All parties agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251-1387). All parties shall report violations to the Federal awarding agency and the Regional Office of the Environmental Protection Agency (EPA). b. The Contractor agrees to report each violation to the City and understands and agrees that the City will, in turn, report each violation as required to assure notification to the Federal Emergency Management Agency, and the appropriate Environmental Protection Agency Regional Office. c. The Contractor agrees to include these requirements in each subcontract exceeding $150,000 financed in whole or in part with Federal funds. 15. ADMINISTRATIVE, CONTRACTUAL, OR LEGAL REMEDIES OR BREACH – (APPENDIX II TO PART 200) Applies to all contracts over $250,000. Breach. Any breach of the Contract by Contractor shall be governed by the termination and remedies provisions of the Contract. Additionally, in the event that the City incurs damages as a result of Contractor’s breach, the City may pursue recovery of such damages from Contractor. The City further retains the right to seek specific performance of the Contract at any time as authorized by law. The City further retains the right to otherwise pursue any remedies available to the City as a result of the Contractor’s breach, including but not limited to administrative, Contractual, or legal remedies, as well as any applicable sanctions and penalties. Remedies for Non-Performance. If Contractor fails to perform any of its obligations under this Contract, the City may, at its sole discretion, exercise one or more of the following remedies, which shall survive expiration or termination of this Contract: a. Suspend Performance: The City may require the Contractor to suspend performance of all or any portion of the Work pending necessary corrective action specified by the City and without entitling Contractor to an increase in compensation or extension of the performance schedule. Contractor must promptly stop performance and incurring costs upon delivery of a notice of suspension by the City. b. Withhold Payment Pending Corrections: The City may permit Contractor to correct any rejected Work at the City ’s discretion. Upon City ’s request, Contractor must correct rejected Work at Contractor’s sole expense within the time frame established by the City. Upon completion of the corrections satisfactory to the City, City will remit payment to Contractor. c. Deny Payment: City may deny payment for any Work that does not comply with the requirements of the Contract or that Contractor otherwise fails to provide or complete, as determined by the City in its sole discretion. Upon City request, Contractor will promptly refund any amounts prepaid by the City with respect to such non-compliant Work. d. Removal: Upon City ’s request, Contractor will remove any of its employees or agents from performance of the Work, if the City, in its sole discretion, deems any such person to be incompetent, careless, unsuitable, or otherwise unacceptable. 16. CARGO PREFERENCE REQUIREMENTS Applies to purchases of property suitable for shipment by ocean vessel. Cargo Preference - Use of United States-Flag Vessels - The contractor agrees comply with the shipping requirements of 46 U.S.C. § 55305, and U.S. Maritime Administration regulations, “Cargo Preference – U.S.-Flag Vessels,” 46 CFR Part 381. 17. FLY AMERICA REQUIREMENTS Applies to property or persons transported by air between U.S. and foreign destinations, or between foreign locations. Fly America Requirements. The contractor agrees to air transportation requirements of Section 5 of the International Air Transportation Fair Competitive Practices Act of 1974, as amended, 49 U.S.C. § 40118, and U.S. General Services Administration (U.S. GSA) regulations, “Use of United States Flag Air Carriers,” 41 C.F.R. §§ 301-10.131 – 301-10.143. 18. DAVIS-BACON ACT (APPENDIX II TO PART 200) Applies to all prime construction contracts in excess of $2,000. Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). Contractor must fully comply with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”). In accordance therewith, Contractor must pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, Contractors must be required to pay wages not less than once a week. The applicable Davis-Bacon Wage Determination is attached hereto. 19. COPELAND ANTI-KICKBACK ACTS (APPENDIX II TO PART 200) Applies to all prime construction contracts in excess of $2,000. Copeland “Anti-Kickback” Act (40 U.S.C. 3145). Contractor must fully comply with the Copeland “Anti-Kickback” Act (40 U.S.C. 3145), as supplemented by Department of Labor regulations (29 CFR Part 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). Pursuant to the Act, Contractor is prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled. The City shall report all suspected or reported violations of the Copeland “Anti-Kickback” Act to the Federal awarding agency. 20. CONTRACT WORK HOURS AND SAFETY STANDARDS ACT (APPENDIX II TO PART 200) Applies to all contracts over $100,000 that involve the employment of mechanics or laborers. Contractor must fully comply with the Contract Work Hours and Safety Standard Act (40 U.S.C. 3701-3708), including 40 U.S.C. 3702 and 3704, as supplemented by Department of Labor regulations (29 CFR Part 5). Under 40 U.S.C. 3702 of the Act, Contract is required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. 3704 are applicable to construction work and provide that no laborer or mechanic must be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or Contracts for transportation or transmission of intelligence. a. Overtime requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one- half times the basic rate of pay for all hours worked in excess of forty hours in such workweek. b. Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph (a) of this section the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (a) of this section, in the sum of $26 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (a) of this section. c. Withholding for unpaid wages and liquidated damages. The FEMA shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b) of this section. d. Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraph (a) through (d) of this section and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (a) through (d) of this section. 21. BONDING REQUIREMENTS (2 CRF 200.326) Applies to construction or facility improvement contracts or subcontracts exceeding the Simplified Acquisition Threshold ($250,000). Except where the Federal awarding agency or pass-through entity has made a determination that alternative bonding policy and requirements adequately protect the Federal interest, Contractor agrees to comply with the following minimum bonding requirements: a. Contractor must provide a bid guarantee equivalent to five percent of the bid price. The "bid guarantee" must consist of a firm commitment such as a bid bond, certified check, or other negotiable instrument accompanying a bid as assurance that the Contractor will, upon acceptance of the bid, execute such Contractual documents as may be required within the time specified. b. Contractor must provide a performance bond on the part of the Contractor for 100 percent of the Contract price. A "performance bond" is one executed in connection with a Contract to secure fulfillment of all the Contractor's obligations under such Contract. c. Contractor must provide a payment bond on the part of the Contractor for 100 percent of the Contract price. A "payment bond" is one executed in connection with a Contract to assure payment as required by law of all persons supplying labor and material in the execution of the work provided for in the Contract. 22. EQUAL EMPLOYMENT OPPORTUNITY (APPENDIX II TO PART 200) Applies to all contracts that meet the definition of “federally assisted construction contract”. Equal Employment Opportunity. Contractor agrees to comply with the Equal Opportunity Clause provided under 41 CFR 60-1.4(a) (Government Contracts) and 41 CFR 60-1.4(b) (Federal Assisted Construction Contracts), in accordance with Executive Order 11246, “Equal Employment Opportunity” (30 FR 12319, 12935, 3 CFR Part, 1964-1965 Comp., p. 339), as amended by Executive Order 11375, “Amending Executive Order 11246 Relating to Equal Employment Opportunity,” and implementing regulations at 41 CFR part 60, “Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor.” Contractor further agrees to include this provision, including the Equal Opportunity Clause or a reference thereto, in any subcontracts it enters into pursuant to the Contract. During the performance of this Contract, the Contractor agrees as follows: (1) The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin. Such action shall include, but not be limited to the following: Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. (2) The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin. (3) The Contractor will not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant. This provision shall not apply to instances in which an employee who has access to the compensation information of other employees or applicants as a part of such employee's essential job functions discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or is consistent with the Contractor's legal duty to furnish information. (4) The Contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other Contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. (5) The Contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. (6) The Contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. (7) In the event of the Contractor's noncompliance with the nondiscrimination clauses of this Contract or with any of the said rules, regulations, or orders, this Contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government Contracts or federally assisted construction Contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law. (8) The Contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (8) in every subContract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The Contractor will take such action with respect to any subContract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance: Provided, however, that in the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the Contractor may request the United States to enter into such litigation to protect the interests of the United States. The applicant further agrees that it will be bound by the above equal opportunity clause with respect to its own employment practices when it participates in federally assisted construction work: Provided, that if the applicant so participating is a State or local government, the above equal opportunity clause is not applicable to any agency, instrumentality or subdivision of such government which does not participate in work on or under the Contract. The applicant agrees that it will assist and cooperate actively with the administering agency and the Secretary of Labor in obtaining the compliance of Contractors and subcontractors with the equal opportunity clause and the rules, regulations, and relevant orders of the Secretary of Labor, that it will furnish the administering agency and the Secretary of Labor such information as they may require for the supervision of such compliance, and that it will otherwise assist the administering agency in the discharge of the agency's primary responsibility for securing compliance. The applicant further agrees that it will refrain from entering into any Contract or Contract modification subject to Executive Order 11246 of September 24, 1965, with a Contractor debarred from, or who has not demonstrated eligibility for, Government Contracts and federally assisted construction Contracts pursuant to the Executive Order and will carry out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon Contractors and subcontractors by the administering agency or the Secretary of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the applicant agrees that if it fails or refuses to comply with these undertakings, the administering agency may take any or all of the following actions: Cancel, terminate, or suspend in whole or in part this grant (Contract, loan, insurance, guarantee); refrain from extending any further assistance to the applicant under the program with respect to which the failure or refund occurred until satisfactory assurance of future compliance has been received from such applicant; and refer the case to the Department of Justice for appropriate legal proceedings. (9) [Reserved] (c) Subcontracts. Each nonexempt prime Contractor or subcontractor shall include the equal opportunity clause in each of its nonexempt subcontracts. (d) Inclusion of the equal opportunity clause by reference. The equal opportunity clause may be included by reference in all Government Contracts and subcontracts, including Government bills of lading, transportation requests, Contracts for deposit of Government funds, and Contracts for issuing and paying U.S. savings bonds and notes, and such other Contracts and subcontracts as the Director of OFCCP may designate. (e) Incorporation by operation of the order. By operation of the order, the equal opportunity clause shall be considered to be a part of every Contract and subContract required by the order and the regulations in this part to include such a clause whether or not it is physically incorporated in such Contracts and whether or not the Contract between the agency and the Contractor is written. (f) Adaptation of language. Such necessary changes in language may be made in the equal opportunity clause as shall be appropriate to identify properly the parties and their undertakings. 23. SPECIAL DOL CLAUSE Applies to contracts for construction exceeding $10,000. 41 CFR Part 60 – See Section 15 – Contract Clause Civil Rights Requirements 24. DISADVANTAGED BUSINESS ENTERPRISE (DBE) & PROMPT PAYMENT (49 CFR Part 26) Applies to contracts awarded on the basis of a bid or proposal offering to use DBEs. Disadvantaged Business Enterprises a. This contract is subject to the requirements of Title 49, Code of Federal Regulations, Part 26, Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs. The national goal for participation of Disadvantaged Business Enterprises (DBE) is 10%. The agency’s overall goal for DBE participation is 3%. A contract goal of 9.5% DBE participation has been established for this procurement. b. The contractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of this DOT-assisted contract. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the City of Fort Collins deems appropriate. Each subcontract the contractor signs with a subcontractor must include the assurance in this paragraph (see 49 CFR 26.13(b)). c. Bidders/offerors are required to document sufficient DBE participation to meet these goals or, alternatively, document adequate good faith efforts to do so, as provided for in 49 CFR 26.53. Award of this contract is conditioned on submission of the following concurrent with and accompanying sealed bid: 1. The names and addresses of DBE firms that will participate in this contract; 2. A description of the work each DBE will perform; 3. The dollar amount of the participation of each DBE firm participating; 4. Written documentation of the bidder/offeror’s commitment to use a DBE subcontractor whose participation it submits to meet the contract goal; 5. Written confirmation from the DBE that it is participating in the contract as provided in the prime contractor’s commitment; and 6. If the contract goal is not met, evidence of good faith efforts to do so. Bidders must present the information required above as a matter of responsiveness (see 49 CFR 26.53(3)). 25. PROMPT PAYMENT AND RETURN OF RETAINAGE Applies to all contracts except micro-purchases. The contractor is required to pay its subcontractors performing work related to this contract for satisfactory performance of that work no later than 30 days after the contractor’s receipt of payment for that work from the City. In addition, the contractor may not hold retainage from its subcontractors. The contractor must promptly notify the City whenever a DBE subcontractor performing work related to this contract is terminated or fails to complete its work and must make good faith efforts to engage another DBE subcontractor to perform at least the same amount of work. The contractor may not terminate any DBE subcontractor and perform that work through its own forces or those of an affiliate without prior written consent of the City. 26. 6002 OF THE SOLID WASTE DISPOSAL ACT (2 CFR 200.322) Applies to all contracts except micro-purchases. Recovered Materials - All parties agree to comply with all applicable requirements of Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. The requirements of Section 6002 include procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at 40 CFR part 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines. a. In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired: • Competitively within a timeframe providing for compliance with the contract performance schedule; • Meeting contract performance requirements; or • At a reasonable price. b. Information about this requirement, along with the list of EPA-designated items, is available at EPA’s Comprehensive Procurement Guidelines web site: https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program 27. ASSIGNABILITY Applies to all contracts except micro-purchases. Neither the City nor the Contractor shall assign or transfer any of its rights or obligations hereunder without the prior written consent of the other. 28. CITY OF FORT COLLINS BID PROTEST PROCEDURES Applies to all contracts except micro-purchases. The City of Fort Collins has a protest procedure, covering any phase of solicitation or award, including but not limited to specification or award. The protest procedures are available from the Purchasing Department, City of Fort Collins, 215 N. Mason, Street, 2nd Floor, P. O. Box 580, Fort Collins, CO. 80522. You may also request a copy of the procedures by emailing: Purchasing@fcgov.com or calling 970-221-6775. 29. TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Applies to all contracts except micro-purchases. The sub-grantee, contractor, subcontractor, successor, transferee, and assignee shall comply with Title VI of the Civil Rights Act of 1964, which prohibits recipients of federal financial assistance from excluding from a program or activity, denying benefits of, or otherwise discriminating against a person on the basis of race, color, or national origin (42 U.S.C. § 2000d et seq.), as implemented by the Department of the Treasury’s Title VI regulations, 31 CFR Part 22, which are herein incorporated by reference and made a part of this contract (or agreement). Title VI also includes protection to persons with “Limited English Proficiency” in any program or activity receiving federal financial assistance, 42 U.S.C. § 2000d et seq., as implemented by the Department of the Treasury’s Title VI regulations, 31 CFR Part 22, and herein incorporated by reference and made a part of this contract or agreement. 30. INCREASING SEAT BELT USE IN THE UNITED STATES Applies to all contracts except micro-purchases. Pursuant to Executive Order 13043, 62 FR 19217 (Apr. 18, 1997), the City encourages its contractors to adopt and enforce on-the-job seat belt policies and programs for their employees when operating company-owned, rented, or personally owned vehicles. 31. REDUCING TEXT MESSAGING WHILE DRIVING Applies to all contracts except micro-purchases. Pursuant to Executive Order 13513, 74 FR 51225 (Oct. 6, 2009), the City encourages its employees, subrecipients, and contractors to adopt and enforce policies that ban text messaging while driving, and the City has established workplace safety policies to decrease accidents caused by distracted drivers. SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Change Order 00960 Application for Payment SECTION 00950 CHANGE ORDER FORM CHANGE ORDER NO. CONSTRUCTION MANAGER/GENERAL CONTRACTOR: WORK ORDER TITLE & NO. : ORIGINAL BID/RFP # & TITLE: RFP 808 CM/GC Services for Laporte Ave Improvements – Fishback to Sunset DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost: 4. Change in Contract Time: ORIGINAL CONTRACT COSTS $ ________________ TOTAL APPROVED CHANGE ORDER(S) $ ________________ TOTAL PENDING CHANGE ORDER(S) $ ________________ TOTAL THIS CHANGE ORDER $ ________________ TOTAL % OF ORIGINAL CONTRACT, THIS CO: _______________ % TOTAL % OF ORIGINAL CONTRACT, ALL CO’S: _______________ % ADJUSTED CONTRACT COST $ ________________ (Assuming all change orders approved) ACCEPTED BY: _____________________________________ DATE: ____________ Construction Manager/General Contractor's Representative ACCEPTED BY: _____________________________________ DATE: ____________ Project Manager REVIEWED BY: _____________________________________ DATE: ____________ Title: APPROVED BY: _____________________________________ DATE: ____________ Title: APPROVED BY: _____________________________________ DATE: ____________ (Purchasing Agent if > $60,000) cc: City Clerk Architect/Engineer Finance Purchasing Project Manager Construction Manager/General Contractor SECTION 00960 PAYMENT APPLICATION SECTION 00960 APPLICATION FOR PAYMENT APPLICATION FOR PAYMENT PAGE 1 OF 4 OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER: APPLICATION DATE: PERIOD BEGINNING: ENGINEER: CONTRACTOR: PERIOD ENDING: PROJECT NUMBER: CHANGE ORDERS Application is made for Payment as shown below in connection with Contract NUMBER DATE AMOUNT The present status of the account for this Contract is as follows: 1 2 Original Contract Amount: 3 Net Change by Change Order: Current contract Amount: $0.00 Total Completed and Stored to Date: Less Previous Applications: Amount Due this Application - Before Retainage: $0.00 Less Retainage: Net Change by Change Order $0.00 AMOUNT DUE THIS APPLICATION: $0.00 CERTIFICATION: The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with the Work have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract. The above Amount Due This Application is requested by the CONTRACTOR. Date: By: Payment of the above Amount Due This Application is recommended by the ENGINEER. Date: By: Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager. Date: By: Payment of the above Amount Due This Application is approved by the OWNER. Date: By: CONTRACT AMOUNTS APPLICATION FOR PAYMENT PAGE 2 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 CHANGE ORDERS APPLICATION FOR PAYMENT PAGE 3 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS CHANGE ORDERS $0.00 $0.00 $0.00 $0.00 $0.00 PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 STORED MATERIALS SUMMARY PAGE 4 OF 4 On Hand Received Installed On Hand Item Invoice Previous This This This Number Number Description Application Period Period Application $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00