Loading...
HomeMy WebLinkAboutADDENDA 5 - BID - 9807 2023 UV CURED-IN-PLACE PIPE PROJECTS Addendum #5 Bid 9807 Cured-in-Place Pipe Projects Page 1 of 1 ADDENDUM NO. 5 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid 9807: Cured-in-Place Pipe Projects OPENING DATE: 3:00 PM (Our Clock) September 26, 2023 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made: One additional question and answer: Q: Section 00300, 10. states “At the City’s option the basis of award is the low responsive and responsible Bid per project, group of projects or on a total bid basis, whichever is most beneficial to the City. The City reserves the right to accept or reject any and all bids, and to waive any irregularities or informalities.”    Based on this statement, with a mobilization item included for each individual diameter, does the City consider each diameter an individual “project”? Does the City anticipate awarding each “project” individually, or in smaller groups than the full base bid?. My concern is that the mobilization costs for each individual “project” will be exceptionally high if they can be awarded individually, or in smaller groups.    A: The City intends to award to the lowest bidder per the group of projects (Stormwater or Wastewater) or on a total bid basis. An award won’t be made on a per project basis. One firm could be the low on both the Stormwater and Wastewater projects and therefore be awarded the total bid.    Please contact Pat Johnson, CPPB, Senior Buyer, at pjohnson@fcgov.com with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing