Exhibit 1 – Questions & Answers
The Revised Bid Schedule is uploaded separately to BidNet. Contractors are to use this
new version, dated 9/15/2023.
Please contact Pat Johnson, CPPB, Senior Buyer, at pjohnson@fcgov.com with any questions
regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Addendum #3
Bid 9807 Cured-in-Place Pipe Projects Page 2 of 2
Exhibit 1
Questions & Answers
Q1. The following segments are no longer included in the drawings, but their absences aren’t
specifically addressed in the Q&A portion. Can you confirm these segments is not included in the
CIPP scope?
Segment 10141204 – no longer in the drawings
Segment 10139719 – no longer included in plans in Addendum 2
Removed from scope – detailed in revised bid schedule.
Segment 10127361 – no longer included in plans in Addendum 2
Segment 10054597 – no longer included in plans in Addendum 2
Segment 10050272 – shown in plans in Addendum 2, but not highlighted the same as
10050237 & 10055565
Segment 10050053 – shown in plans in Addendum 2, but not highlighted the same as
10050237 & 10055565
A1. Segments 10141204 and 10139719 were removed from the scope. The removal of 10141204
was missed in the revised bid schedule – this has been updated.
Segments 10127361 and 10054597 are still included in the scope – these maps were omitted
from the Addendum by mistake. Assume a depth of 4-5’ for segment 10127361 and a depth of 9-
10’ for segment 10054597.
Segments 10050272 and 10050053 are still included in the scope. Assume a depth of 13-15’.
*Video for several Stormwater segments was added after the issuance of the previous Addendum.
Video can be downloaded with the following link:
https://drive.google.com/file/d/1Gd_WYS5uXtA7KnmmPcZmTciJ0Qn-DYEX/view?usp=sharing
Q2. I noticed for all the sewer segments in the Addendum 2 plans, the tables with pipe data has been
removed. Are the plan sheets in Addendum 2 meant to replace the original plans or supplement the
original plans?
A2. Maps in the Addendum are meant to supplement the requested depth information. Scope
has not changed for Sanitary Sewer segments.