Loading...
HomeMy WebLinkAboutADDENDA 1 - RFP - 9886 BUILDING AUTOMATION SYSTEM DESIGN AND INSTALLATION ON-CALLAddendum # 1 RFP 9886 Page 1 of 2 ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of RFP 9886 BUILDING AUTOMATION SYSTEM DESIGN AND INSTALLATION ON-CALL DUE DATE: 3:00 PM (Our Clock) December 5, 2023 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – PreProposal Meeting Attendance Roster & Meeting Recording Link Exhibit 2 – PreProposal Presentation Powerpoint .pdf Please contact Jake Rector, Senior Buyer, at (970) 221-6776 or jrector@fcgov.com with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE PROPOSAL STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum # 1 RFP 9886 Page 2 of 2 EXHIBIT 1 PREPROPOSAL ATTENDANCE ROSTER AND MEETING RECORDING LINK ZOOM MEETING RECORDING LINK https://us02web.zoom.us/rec/share/8jxSBdV4hKUZoFAf8Uyq9VovKaaCVHU3FfmNExfRmTj38QpDhRvOQbGl6l mQfpfl.VBCXYalwaj9eDWVa Passcode: 18q*8ib% Attendance Roster Brent Bass, LONG Building Tech, BBass@LONG.com Keith Jones, BCER, kjones@bcer.com, 303 478 5070 Chance Hixon, Johnson Controls, chance.hixon@jci.com Jess Gonzalez - Trane Technologies (jess.gonzalez@trane.com) November 16, 2023 9886 BAS Design and Installation On-Call Jake Rector and Stu Reeve EXHIBIT 2 9886 BAS Design and Installation On-Call -Introductions Jake Rector – Senior Buyer Stu Reeve – Sr. Energy Manager David Pritchett – Sr. Technician, Facilities -Please enter Name, Company and Email in Chat Line RFP Schedule Review RFP Issued – November 9, 2023 Pre-Proposal Meeting – 1:00PM MT November 16, 2023 Question Deadline – 3:00PM MT November 21, 2023 Proposals Due – 3:00PM MT December 5, 2023 Interview (if necessary) – Week of December 18th, 2023 Award – December 2023 2 9886 BAS Design and Installation On-Call 3 The City of Fort Collins is requesting proposals from qualified Service Providers to perform pre-construction, cost estimating, & installation services for new and existing BAS systems located at multiple City buildings and facilities. Intent to Award to Multiple Service Providers. 9886 BAS Design and Installation On-Call 4 Scope of Work Provide BAS consultation and design services as requested. 1. City uses Distech Controls. Service Provider to provide all requirements as outlined in the following Attachments: 1. Attachment 1 – Building Management System Device & Object Naming Standard 2. Attachment 2 - BMS Technology Implementation Guide 3. Attachment 3 - Section 23 09 23 - DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC of the City of Fort Collins Design Standards 9886 BAS Design and Installation On-Call Construction Requirements BAS contractor will contract with the mechanical contractor and some projects directly with the City. The City will make that determination on a project by project basis. Bonding Up to $150,000.00. Only projects over $100k would require bonding. Qualifications Niagara Level 1 Technical Certified Techinicians Ability to source and service Distech Controls. 5 9886 BAS Design and Installation On-Call 6 Evaluation Criteria 20% - Scope of Proposal 50% - Firm Capability/Assigned Personnel 10% - Sustainability/TBL Methodology 20% - Cost & Work Hours 9886 BAS Design and Installation On-Call Colorado Open Records Act (CORA) C.R.S. §§24-72-200.1 et seq. -Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. -Vendors may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” -Such statement does not necessarily exempt such documentation from public disclosure if awarded the project as all provisions of any contract resulting from this request for proposal will be public information. 7 9886 BAS Design and Installation On-Call 8 Questions? Please send to Jake Rector at jrector@fcgov.com RFP Schedule Review RFP Issued – November 9, 2023 Pre-Proposal Meeting – 1:00PM MT November 16, 2023 Question Deadline – 3:00PM MT November 21, 2023 Proposals Due – 3:00PM MT December 5, 2023 Interview (if neccesary) – Week of December 18th, 2023 Award – December 2023