HomeMy WebLinkAboutADDENDA 1 - RFQ - 9731 HVAC ARCHITECTURAL & ENGINEERING SERVICESAddendum 1 – 9731 HVAC A&E Services
ADDENDUM NO. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of RFQ 9731: HVAC Architectural & Engineering Services
OPENING DATE: 3:00 PM (Our Clock) March 28, 2023
To all prospective bidders under the specifications and contract documents described above, the
following changes/additions are hereby made and detailed in the following sections of this
addendum:
Exhibit 1 – PreProposal Meeting Power Point Presentation
Exhibit 2 – PreProposal Attendance Roster and Recorded Meeting Link
Please contact Jake Rector, Senior Buyer, at (970) 221-6776 or jrector@fcgov.com with any
questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE PROPOSAL STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
March 2, 2023
9731 HVAC Architectural & Engineering Services
Jake Rector and Stu Reeve
Exhibit 1
9731 HVAC A&E SERVICES
-Introductions
Jake Rector –Senior Buyer
Stu Reeve –Energy Manager
Brian Hergott –Asst. Director of Operation Services
-Please enter Name, Company and Email in Chat Line
The City of Fort Collins is requesting proposals from qualified Professionals with demonstrated
experience engineering Heating, Ventilation and Air Conditioning (HVAC) Retrofits.
These HVAC projects are replacing end of life equipment and moving from carbon-based fuels (natural
gas) to electrification in support of the City’s environmental and energy efficiency goals. The project is
to include the following:
a. Mechanical, electrical, and structural design.
b. Identify roofing repairs that are needed.
c. Evaluation of existing electrical loads at the facility.
d. Evaluation of existing electrical gear and system.
e. Cost estimating
f. Construction Administration
2
9731 HVAC A&E SERVICES
2023 Projects
1. City Hall Chiller
2. Edora Pool and Ice Center AHU #1
3. Museum of Discovery boiler #1
4. Police Services main data center Air Conditioning (A/C) units
5. Traffic Operations Roof Top Unit (RTU) #1.
The retrofits will include mechanical, electrical, and structural design
components and may require roofing repairs.
Multi-Year Agreement:
Multiple projects of similar size and scope in 2024 as well.
3
9731 HVAC A&E SERVICES
ARPA -American Recovery Plan Act Funded
-ARPA Federal Terms and Conditions Apply
-Multi-Phase Selection Process
Phase I: Selection by Qualifications
As part of this RFQ, the City will select multiple top ranked Professionals based
on the team’s evaluation of the qualifications, experience and approach as
outlined in the Professional’s proposal. The prospective Professional(s) will not
be compensated for Phase 1.
4
9731 HVAC A&E SERVICES
Phase 2: Selection of the Architectural & Engineering Professional
The City will select the top ranked Professionals to participate in a design
charette. The top ranked Professionals will prepare and submit a preliminary
design based on the information shared during the charette.
The City will furnish existing site architectural, structural, mechanical and
electrical drawings for each building. The prospective Professional(s) will not be
compensated for Phase 2.
Phase 3: Pricing and Negotiations
In Phase 3, the top ranked Professional will submit pricing for the City’s
evaluation subject to negotiation of fair and reasonable compensation.
5
9731 HVAC A&E SERVICES
6
9731 HVAC A&E SERVICES
PROJECT TIMELINE AND OTHER INFORMATION
-Designs completed by August 30, 2023.
-City plans to BID the HVAC projects by November 15, 2023
-City intends to issue independent bids for each project, therefore, each project
will require detailed design packages.
GOALS
-Design to be “Up-to-date” from an engineering perspective with a useful life of
10+ years and meet City’s electrification digits
-Reduce On-Going Operation, Maintenance and Repair Costs
-Reduce energy use and costs by a minimum of 10% with a stretch goal of a
20% reduction
7
9731 HVAC A&E SERVICES
Phase 1 Evaluation Criteria
50% -Firm Capability/ Experience/Assigned Personnel
30% -Schedule/Availability
20% -Sustainable Designs
SUSTAINABLE DESIGN
Definition of Sustainable Design: “Meeting the needs as a society today without
compromising the ability of future generations to meet their needs.”
Operating and maintenance costs over the typical life span of a City facility (75
plus years) can be many times the initial capital cost of the equipment.
Utilization of lifecycle economic analysis to guide the integrated design team to
the options that will produce the greatest savings over the life of the building is
essential. Functional and easily maintained building systems with low life cycle
operating costs is fundamental to effective and efficient operation of the finished
facility.
8
9731 HVAC A&E SERVICES
Commissioning
-City will provide 3rd party energy modeling and commissioning firm. It
is expected that the awarded A&E firm will coordinate design and
construction with the 3rd party.
9
9731 HVAC A&E SERVICES
Colorado Open Records Act (CORA) C.R.S. §§24-72-200.1 et seq.
-Any proposals submitted hereunder are subject to public disclosure by the City
pursuant to CORA and City ordinances.
-Vendors may submit one (1) additional complete proposal clearly marked “FOR
PUBLIC VIEWING.”
-Such statement does not necessarily exempt such documentation from
public disclosure if awarded the project as all provisions of any contract resulting
from this request for proposal will be public information.
10
9731 HVAC A&E SERVICES
11
Questions?
jrector@fcgov.com
sreeve@fcgov.com
Addendum 1 – 9731 HVAC A&E Services
Exhibit 2
Preproposal Attendance Roster and Recorded Meeting Link
Recorded Meeting Link
https://us02web.zoom.us/rec/share/YLJlFxW341Wo4IAZmbqVJ7l_f6uyEWpZAAnYsT4cCGCLH
1qUbByphaNomLEkAEfM.8bl2XOsa_DRdkvsq?startTime=1677790969000
Passcode: XDY?p+#6
Attendance Roster
• Krystal
04:43
K
Krystal Tubbs, The Ballard Group, Inc.
• ecluver
04:51
E
Eric Cluver, Farnsworth Group
• Taylor | 360 Engineering
04:53
T|
Taylor Reese, 360 Engineering
• Krystal
04:57
K
Addendum 1 – 9731 HVAC A&E Services
ktubbs@theballardgroup.com
• Thomas Segelhorst - IM
04:59
TS
Thomas Segelhorst
• Taylor | 360 Engineering
05:05
T|
treese@360eng.com
• Lacey - Integral Engineering Co.
05:08
L-
Lacey Goetz, Integral Engineering Co. Structural Engineers, 303-804-7003
Lacey@IntegralEngineeringCo.com
• Maggie Keirns-Iconergy
05:16
MK
Maggie Keirns, Iconergy, mkeirns@iconergyCO.com
• Natalie
05:17
N
Natalie Yemm | VFLA Architecture + Interiors | natalie@vfla.com
Addendum 1 – 9731 HVAC A&E Services
• Cairn Design
05:25
CD
Ken Caudle - Cairn Design, LLC Ken@CairnDesignLLC.com
• randy.helzer
05:25
R
Randy Helzer, PEC, randy.helzer@pec1.com
• Holly Fink
05:26
HF
Holly Fink, Collab Architecture | holly@collabarchitects.com
• Adam Acree
05:26
AA
Adam Acree, Cator Ruma & Assoc. aacree@catorruma.com
• Josh Dawkins
05:26
JD
Josh Dawkins, Farnsworth Group jdawkins@f-w.com
• SCampbell
Addendum 1 – 9731 HVAC A&E Services
05:36
S
Shannon Campbell
• Thomas Segelhorst - IM
05:39
TS
Thomas Segelhorst - Integrated Mechanical - Thomas-s@int-mech.com
• Jake Brown (PEC) jake.brown@pec1.com
05:41
JB
Jake Brown - PEC - jake.brown@pec1.com
• Creek Kamby
06:19
CK
Creek Kamby, ST+B Engineering, ckamby@stb.engineering
• SCampbell
06:23
S
Shannon Campbell
• Shannon Campbell - The Ballard Group - scampbell@theballardgroup.com