HomeMy WebLinkAboutBID - 9779 UTILITY SERVICE CENTER GATE REPLACEMENTS
INVITATION TO BID
9779 UTILITY SERVICE CENTER GATE REPLACEMENTS
BID OPENING: 3:00 PM MT (our clock), March 23, 2023
The City of Fort Collins is requesting proposals from qualified Contractors to remove all obsolete,
unsafe, and unreliable vehicle and employee automatic gates from the Utilities Service Center
(USC) and replace them with modern reliable equipment that will directly integrate with the City
of Fort Collins standard Access Control System “Continental Access Control”. This project is
chartered to replace a total of seven (7) automated vehicle gates and one employee gate with
access control.
As part of the City’s commitment to Sustainable Purchasing, electronic bid submission is
preferred. Bids shall be submitted online through the Rocky Mountain E-Purchasing
System (RMEPS) at http://www.bidnetdirect.com/colorado/city-of-fort-collins. Please note:
submitting bids through RMEPS may need additional time for completion. Bids not submitted by
the designated Opening Date and Time will not be accepted by the system.
The City encourages all disadvantaged business enterprises to submit bid in response to all
invitations to bid. No individual or business will be discriminated against on the grounds of race,
color, sex, or national origin. It is the City’s policy to create a level playing field on which DBEs
can compete fairly and to ensure nondiscrimination in the award and administration of all
contracts.
A pre-bid conference and job walk with representatives of prospective Contractors will be
held at 3:30 pm, on March 6, 2023 at 700 Wood Street, Fort Collins. Contractors are strongly
encouraged to attend and bring questions to this conference.
Public Bid Opening: Bid opening will be conducted via video conference shortly after 3:00 PM
MT March 24, 2023. Bids that have been duly received will be publicly opened and read aloud.
To access the public Bid opening, please follow the link to join the Zoom meeting.
Join Zoom Meeting
https://us02web.zoom.us/j/86744362151?pwd=UC9CSTZUSW1XNllxcStZd1h2cE95Zz09
Meeting ID: 867 4436 2151
Passcode: 456555
One tap mobile
+17193594580,,86744362151#,,,,*456555# US
+16699009128,,86744362151#,,,,*456555# US (San Jose)
All questions should be submitted, in writing via email, to Pat Johnson, CPPB, Senior
Buyer at pjohnson@fcgov.com, no later than 3:00 PM MT on March 16, 2023. Please format
your e-mail to include: Bid 9779 USC Gate Replacements in the subject line. Questions received
after this deadline may not be answered. Responses to all questions submitted before the
deadline will be addressed in an addendum and posted on RMEPS.
Rocky Mountain E-Purchasing System hosted by BidNet:
A copy of the Bid may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
fcgov.com/purchasing
9779 Utility Service Center Gate Replacements Page 1 of 63
Prohibition of Unlawful Discrimination: The City of Fort Collins, in accordance with the
provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d-
4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract
entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded
full and fair opportunity to submit bids in response to this invitation and will not be discriminated
against on the grounds of race, color, or national origin in consideration for an award.
The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of
gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age
40 years or older, marital status, disability, sexual orientation, genetic information, or other
characteristics protected by law. For the purpose of this policy “sexual orientation” means a
person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality.
The City also strictly prohibits unlawful harassment in the workplace, including sexual
harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages
in protected activity. Protected activity includes an employee complaining that he or she has been
discriminated against in violation of the above policy or participating in an employment
discrimination proceeding.
The City requires its Contractors to comply with the City’s policy for equal employment opportunity
and to prohibit unlawful discrimination, harassment and retaliation. This requirement applies to
all third-party Contractors and their subcontractors/subconsultants at every tier.
Public Viewing Copy: The City is a governmental entity subject to the Colorado Open Records
Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to
public disclosure by the City pursuant to CORA and City ordinances. Contractors may submit one
(1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version of the
proposal, Contractors may redact text and/or data that it deems confidential or proprietary
pursuant to CORA. Failure to provide a public viewing copy will be considered a waiver of any
claim of confidentiality under CORA without regard to how the applicant’s proposal or certain
pages of the proposal are marked confidential, proprietary, or similar. Such statement does not
necessarily exempt such documentation from public disclosure if required by CORA, by order of
a court of appropriate jurisdiction, or other applicable law. Generally, under CORA trade secrets,
confidential commercial and financial data information is not required to be disclosed by the City.
Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. By responding to this
BID, Contractors hereby waives any and all claims for damages against the City for the City’s
good faith compliance with CORA. All provisions of any contract resulting from this request
for proposal will be public information.
Special Instructions:
All bids must be properly signed by an authorized representative of the company with the legal
capacity to bind the company to the agreement. Bids may be withdrawn up to the date and hour
set for closing. Once bids have been accepted by the City and closing has occurred, failure to
enter into contract or honor the purchase order will be cause for removal of supplier's name from
the City of Fort Collins' bidders list for a period of twelve months from the date of the opening.
The City may also pursue any remedies available at law or in equity. Bid prices must be held firm
for a period of ninety (90) days after bid openings.
Submission of a bid is deemed as acceptance of all terms, conditions and specifications contained
in the City's specifications initially provided to the Contractors. Any proposed modification must
be accepted in writing by the City prior to award of the bid.
Only bids properly received by the Purchasing Office will be accepted. All bids should be
9779 Utility Service Center Gate Replacements Page 2 of 63
clearly identified by the bid number and bid name contained in the bid proposal.
No bid will be accepted from, or any purchase order awarded, to any person, firm or corporation
in default on any obligation to the City.
Bids must be furnished exclusive of any federal excise tax, wherever applicable.
Contractors must be properly licensed and secure necessary permits wherever applicable.
The City may elect where applicable, to award bids on an individual item/group basis or on a total
bid basis, whichever is most beneficial to the City. The City reserves the right to accept or reject
any and all bids, and to waive any irregularities or informalities.
Sales Prohibited/ Conflict of Interest: No officer, employee, or member of City Council, shall
have a financial interest in the sale to the City of any real or personal property, equipment,
material, supplies or services where such officer or employee exercises directly or indirectly any
decision-making authority concerning such sale or any supervisory authority over the services to
be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift,
gratuity, favor, entertainment, kickback or any items of monetary value from any person who has
or is seeking to do business with the City of Fort Collins is prohibited.
Freight Terms: Unless otherwise noted, all freight is F.O.B. Destination, Freight Prepaid. All
freight charges must be included in prices submitted on proposal.
Collusive or Sham Bids: Any bid deemed to be collusive or a sham bid will be rejected and
reported to authorities as such. Your authorized signature of this bid assures that such bid is
genuine and is not a collusive or sham bid.
Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow
other state and local governmental agencies, political subdivisions, and/or school districts to
utilize the resulting award under all terms and conditions specified and upon agreement by all
parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in
the current term or in any future terms.
Contractor Registration: The City requires new Contractors receiving awards from the City to
submit IRS form W-9 or W-8BEN/W8-BEN-E (international firms) and requires all Contractors to
accept Direct Deposit (Electronic) payment. If needed, the W-9 form and the Vendor Direct
Deposit Authorization Form can be found on the City’s Purchasing website at
www.fcgov.com/purchasing under Vendor Reference Documents. Please do not submit these
documents with your proposal, however, if you take exception to participating in Direct Deposit
(Electronic) payments please clearly note such in your proposal as an exception. The City may
waive the requirement to participate in Direct Deposit (Electronic) payments at its sole discretion.
Bid results are posted online at http://www.bidnetdirect.com/colorado/city-of-fort-collins.
Gerry Paul
Purchasing Director
9779 Utility Service Center Gate Replacements Page 3 of 63
CITY OF FORT COLLINS
GENERAL INFORMATION
I. BACKGROUND & OBJECTIVE / OVERVIEW
A. Objective
The City of Fort Collins is requesting proposals from qualified Contractors to remove all
obsolete, unsafe, and unreliable vehicle and employee automatic gates from the Utilities
Service Center (USC) and replace them with modern reliable equipment that will directly
integrate with the City of Fort Collins standard Access Control System “Continental Access
Control”. The gate materials and automated openers are to meet or exceed HySecurity
SlideDriver model 15 with AC power and Extreme drive
This project is chartered to replace a total of 7 automated vehicle gates and one employee gate
with access control. Removal of the old gates and recycling of them is also the responsibility of
the Contractor.
· 1 ingress and 1 egress gate and openers located at the Northwest corner of 700
wood street main building.
· 1 gate and opener located on the east end of 700 wood “warehouse transformer
storage yard”.
· 1 ingress and 1 egress gate and openers located on the south side of the main 700
building.
· 2 gates, openers and posts located at 701 water vehicle storage facility. These are
dual purpose ingress and egress gates.
· 1 employee gate located at 701 south.
B. Existing Conditions: The Utilities Service Center (USC) property at 700 and 701 Wood
Street, Fort Collins, CO 80522 consists of land and buildings that support the electric and
water utility operations and their associated fleet equipment, and office staff housing over
300 city employees. There are a total of 7 vehicle gates and 1 employee gate. All equipment
is at or past the end of their whole life cycles. Maintenance trouble calls have been
increasing over the past 3+ years, and replacement parts have become obsolete. Access to
701 wood Street facility has been limited to one entrance and exit gate for the last year.
C. Alignment: All gates shall have photo eyes, contact edges and in ground loops as required
for safety. All existing in ground loops will be tested by the Contractor and reused if found to
be in good and reliable condition. If loop replacement is required, it shall be logged in a
change log and reviewed and approved by the change committee (project sponsor and
stakeholders) prior to any out of scope work beginning. Gate systems will be installed by
Certified Gate Automation Technicians. Contractor will assume the responsibility for having
underground public utilities located and marked.
D. Final Product & Format: The completion of this project will produce safe functional and
more efficient flow of vehicle and pedestrian traffic to and from location. In addition to
reducing the number of maintenance and after hours calls due to chronic gate failure.
Increasing security, efficiency, while improving aesthetics.
9779 Utility Service Center Gate Replacements Page 4 of 63
II. SCOPE OF PROPOSAL
A. Scope of Work
The City of Fort Collins Utilities is seeking turnkey services to support the design and
installation of seven (7) automatic gates, posts, and automated openers. These services must
include necessary integrations with the City’s existing access control systems as well as the
removal, recycling/ disposal of the old equipment.
B. Pricing
701 Wood St: Install (2 each) 40' x 6’ Pro Access aluminum double track gates with
aluminum mesh infill on 4 new 4" posts. Frames set in concrete to design standards for
grading and concrete per city of Fort Collins code. Install HySecurity SlideDriver model 15
with AC power and Extreme drive. Install inground loops for automated exit. Integration of
pre-existing radio frequency remote openers is required. Removal and recycling of old
gates should be included per the attached specification.
701 Wood St: “Employee gate.” Install (1 each) 4' x 6’ employee gate with 2 new posts
for access control integration, closure, and hinging. Frames set in concrete to design
standards for grading and concrete per city of Fort Collins code.
700 Wood St: “North & South entry gates.” Install (4 each) 16’ x 6’ + 1’ security wire.
Pro Access aluminum single track gates with aluminum mesh infill on existing posts. Install
HySecurity SlideDriver model 15 with AC power and Extreme drive. Removal and
recycling of old gates should be included per the attached specification.
700 Wood St. East transformer yard gate: install (1 each) 30’ x 6’ + 1’ security wire. Pro
Access aluminum single track gate with aluminum mesh infill on existing posts. Install
HySecurity SlideDriver 15 with AC power and extreme drive. Removal and recycling of old
gate should be included per the attached specification.
C. Project Controls:
1. Project Management: The project will be assigned utilities Project Manager and
operations services representative, who may both serve multiple roles supporting
procurement, finance, communications, change control, and quality assurance and
quality control. A Project Manager or single point of contact for the Contractor will be
required of the Contractor that is awarded this work.
2. Change Control: Throughout the project, the scope of work must be closely monitored
by both the City and the Contractor PM. Out of scope items must be logged in a change
log and reviewed and approved by the change committee (project sponsor and
stakeholders) prior to any out of scope work beginning. If changes are approved, a
subsequent change order will be initiated by the City PM.
3. Schedule: A schedule will be developed by the Contractor PM and accepted by the City
PM based on the requirements and agreed upon timeline to properly deliver the project
within the 2023 calendar year. Submit schedule as part of Bid Submittal.
4. Resources: It is the responsibility of the City PM and operations services representative
to provide the appropriate resources and ensure that they are available to participate
and work within the defined project schedule. The Contractor PM will ensure that their
9779 Utility Service Center Gate Replacements Page 5 of 63
resources are available and enabled to accomplish their goals outlined in the project
schedule.
D. Equipment Specifications
Refer to Exhibit “A” for all specifications.
1. It is the responsibility of the Contractor to offer maintenance, service and operation
support including after hours service post installation and warranty period. Provide
information and pricing regarding this maintenance, service and operation support as
requested in the Bid Submittal.
2. Awarded Contractor will guarantee above fencing, gate and equipment free of defects
and workmanship warranty of one (1) year from completion of installation, as well as a
manufacturer warranty of five (5) years on the equipment for drive operators.
3. Material delivery and staging can take place at 700 Wood Street.
E. Maps and Pictures
Site Location 700 Wood Street and 701 Wood Street Facilities
9779 Utility Service Center Gate Replacements Page 6 of 63
700 Vehicle Gate – Main Light & Power Operations Yard
700 Vehicle Gate – Northwest Entrance/ Exit
9779 Utility Service Center Gate Replacements Page 7 of 63
700 Vehicle Gate – Light & Power Transformer Storage Yard
701 Employee Gate – Water Field Operations Equipment Shop and Yard
9779 Utility Service Center Gate Replacements Page 8 of 63
701 Northeast Vehicle Gate – Water Field Operations Equipment Shop and Yard
701 Southeast Vehicle Gate – Water Field Operations Equipment Shop and Yard
III. GENERAL INFORMATION
A. Schedule
The following represents the City’s target schedule for the bid. The City reserves the right to
amend the target schedule at any time.
· Bid issuance: February 28, 2023
· Pre-bid Meeting: 3:30 MT on March 6, 2023
· Question deadline: 3:00 PM MT on March 13, 2023
· Addendum issued: March 15, 2023
· Bid Opening Date: 3:00 MT (our clock) on March 24, 2023
· Award of Contract (tentative): March 30, 2023
· Estimated completion date: September 1, 2023
9779 Utility Service Center Gate Replacements Page 9 of 63
B. Method of Award
The City reserves the right to split the bid award in whatever percentages are most
advantageous to the City.
Award(s) from this bid will be based primarily on lowest bid price, the warranty and
maintenance and support plan costs over five (5) years. Delivery lead times, details of the
maintenance & support plans and exceptions taken will also be considered.
C. Agreement
The awarded Contractor will receive a Purchase Order from the City authorizing work under
this Agreement. Contractor should not begin any Work prior to receipt of the Purchase Order.
The awarded Contractor is also expected to sign the City’s Agreement, a sample of which is
attached.
Any changes to the dates, cost or scope of the Work must be agreed upon in writing utilizing
the City’s Change Order (included in the agreement) and will not be considered valid until
signed, at a minimum, by the Contractor, project manager and Purchasing Department
representative.
D. Invoices & Payments
Invoices should be emailed monthly or after a shipment to invoices@fcgov.com with a copy
to the Project Manager. The cost of the item(s) delivered shall be paid to the Contractor each
month following the submittal of a correct invoice. Contractor should include Purchase Order
Number and a detailed description of item(s) on each invoice submitted. The City pays
invoices on Net 30 terms.
E. Fees, Licenses, Permits
The successful Contractor shall be responsible for obtaining any necessary licenses, fees or
permits without additional expense to the City. All equipment shall be properly licensed and
insured, carry the appropriate permits and be placarded as required by law.
F. Laws and Regulations
All work and/or materials must meet current standards in force by recognized technical and
professional societies, trade and materials supply associations, institutes and organizations,
bureaus and testing laboratories.
The Contractor agrees to comply fully with all applicable local, State of Colorado and Federal
laws and regulations and municipal ordinances to include American Disabilities Act (ADA).
The Contractor further agrees to comply fully with the Occupational Safety and Health Act, all
regulations issued there under, and all state laws and regulations enacted and adopted
pursuant thereto.
G. Insurance
Contractor is responsible for providing the City with insurance as required in the attached
Agreement.
H. Warranty
Contractor warrants all equipment, materials, labor and other work, provided under this
Agreement, except City-furnished materials, equipment and labor, against defects and
nonconformances in design, materials and workmanship/workwomanship for a period
beginning with delivery and ending twelve (12) months from and after final acceptance under
9779 Utility Service Center Gate Replacements Page 10 of 63
the Agreement, regardless whether the same were furnished or performed by Contractor or
by any of its subcontractors of any tier. Upon receipt of written notice from City of any such
defect or nonconformances, the affected item or part thereof shall be redesigned, repaired or
replaced by Contractor in a manner and at a time acceptable to City.
I. Delivery
Delivery of all items shall be to the City of Fort Collins Warehouse. Please provide a 24-48
hour advance notice by calling Dan Hofeling – 970-221-6389 OR Steve Serna – 970-221-
6709. Delivery shall be made to:
700 Wood Street
Fort Collins, CO 80521
Freight terms: F.O.B. destination freight prepaid. All freight charges must be included in pricing
submitted on the Bid Schedule, and not entered as separate pricing. Any surcharges or
additional costs shall be noted & included in proposed pricing.
J. Standard of Conduct
The successful firm shall be responsible for maintaining satisfactory standards of employees'
competency, conduct, courtesy, appearance, honesty, and integrity, and shall be responsible
for taking such disciplinary action with respect to any employee, as may be necessary.
The City may request the successful Contractor to immediately remove from this assignment
any employee the City identifies to be unfit to perform duties due to one or more of the
following reasons:
1. Neglect of duty.
2. Disorderly conduct, use of abusive or offensive language, quarreling, intimidation by
words or actions or fighting.
3. Theft, vandalism, immoral conduct or any other criminal action.
4. Selling, consuming, possessing, or being under the influence of intoxicants, including
alcohol, or illegal substances while on assignment for the City.
5. Acting in an unsafe manner
All City owned or operated facilities and their grounds are non-smoking sites. All City parks,
trails and natural areas are also non-smoking.
Agents and employees of Contractor(s) working for the City shall present a clean and neat
appearance. Prior to performing any work for the City, Contractor(s) shall require each of their
employees to wear ID badges or uniforms identifying: Contractor by name, the first name of
their employee and a photograph of their employee if using an ID badge. Their employee shall
wear or attach the ID badge to the outer garments at all times.
K. Accident Reporting
Any incident/accident resulting in damage to property or causing personal injury within the
limits of a work site shall be immediately reported to the appropriate police agency, other
required agencies, Project Manager and the City of Fort Collins Risk Management
Department.
The Contractor shall immediately contact the Utility Operator/Owner and the City of Fort
Collins when damage to an underground facility is identified. If a natural or propane gas line
is damaged, the Contractor must call 911 prior to notifying the Utility Operator. The Contractor
shall not backfill around the underground utility line until the Utility Operator has repaired the
9779 Utility Service Center Gate Replacements Page 11 of 63
damage and has given clearance to backfill. The City of Fort Collins will not pay the Contractor
for labor, vehicles, material, or equipment or any other cost associated with the repair to any
at-fault damage. Failure to comply may result in a verbal warning, suspension of the crew,
loss of work, and/or termination of the Agreement.
L. Safety Practices, Safety Documentation and Training
Contractor shall comply with all engineering, safety, and operating requirements concerning
installation of equipment in, on or around utility facilities; obtaining access facilities; and
adhering to operating rules and requirements involving safe contact with utility equipment and
water, gas and power lines, and confined spaces. Contractor shall adopt Utility's minimum
safety standards as the baseline requirements.
M. Unsatisfactory Operations
Should it be necessary to halt the work because of incorrect or unsatisfactory operations under
the terms of the awarded contract or because of failure to follow safety standards applicable
hereto, the Contractor must take immediate steps to remedy the deficiencies. Should repair
or correction of any safety defect or deficiency not be immediately undertaken and should the
City of Fort Collins be required to protect the site or make the repair or correction, the cost of
such work shall be deducted from payment due the Contractor.
N. Traffic Control
The Contractor must provide all labor, materials and equipment, including optional traffic
control and barricading to accomplish the work in accordance with City standard specifications
and Erosion Control requirements. Replacement of curb, gutter and sidewalk shall match
existing, i.e., vertical curb shall be replaced with vertical curb, etc., or as directed by the Project
Manager.
O. Examination of Contract Documents and Site
It is the responsibility of each Bidder, before submitting a Bid, to (a) examine the Contract
Documents thoroughly, (b) visit the site to familiarize itself with local conditions that may in
any manner affect cost, progress or performance of the Work, (c) familiarize itself with federal,
state and local laws, ordinances, rules and regulations that may in any manner affect cost,
progress or performance of the Work, (d) study and carefully correlate Bidder's observations
with the Contract Documents, and (e) notify Project Manager of all conflicts, errors or
discrepancies in the Contract Documents.
The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder
has complied with every requirement of this section, that without exception the Bid is premised
upon performing and furnishing the Work required by the Contract Documents and such
means, methods, techniques, sequences or procedures of construction as may be indicated
in or required by the Contract Documents, and that the Contract Documents are sufficient in
scope and detail to indicate and convey understanding of all terms and conditions for
performance and furnishing of the Work.
P. Bid Bond
Each Bid must be accompanied by Bid Security in an amount no less than five (5) percent of
the Bid. If a SURETY does not issue electronic Bid Bonds, a scanned copy of the Bid Bond
must be submitted electronically through Rocky Mountain E-Purchasing System at the time of
bidding, and the hard copy Bid Bond must be mailed to the Purchasing Department at PO Box
580, Fort Collins CO 80522 and received by OWNER prior to contract execution.
9779 Utility Service Center Gate Replacements Page 12 of 63
The Bid Security of the successful Bidder will be retained until such Bidder has executed the
Agreement and furnished the required contract security, whereupon Bid Security will be
returned. If the successful Bidder fails to execute and deliver the Agreement and furnish the
required contract security within 15 days of the Notice of Award, OWNER may annul the
Notice of Award and the Bid Security of that Bidder will be forfeited. The Bid Security of
other Bidders whom OWNER believes to have reasonable chance receiving the award may
be retained by OWNER until the earlier of the seventh day after the effective date of the
Agreement or forty-five days after the Bid Opening, whereupon Bid Security furnished by
such Bidders will be returned. Bid Security with Bids which are not competitive will be
returned.
Q. Liquidated Damages
Provisions for liquidated damages are set forth in the Agreement, Section 00520.
R. Performance & Payment Bonds
Performance and Payment Bonds are required for this project. When the awarded Contractor
delivers the executed Agreement to the OWNER, it shall be accompanied by the required
contract bonds.
S. Retainage
Provisions concerning retainage are set forth in the Agreement.
T. Recyling/Disposal of Old Gates
Contractor shall follow the City’s recycling guidelines found at
https://www.fcgov.com/recycling/constructiondebris.
9779 Utility Service Center Gate Replacements Page 13 of 63
CITY OF FORT COLLINS
BID SUBMITTAL INSTRUCTIONS
The following items must be provided in the bid submittal package:
1) Completed Bid Submittal Form, including:
- Bid Form (Section 00300)
- Electronic Bid Bond
- Statement of Bidder's Qualifications (Section 00420)
- Schedule of Subcontractors (Section 00430)
- Safety Form (Section 00400)
- Bid Schedule
- Project Milestone Schedule – Estimated timeline for procurement and installation
by milestone/gate
- Support & Maintenance offering
- Acknowledgement
- Additional documents may be submitted in Word or PDF.
Failure to submit any of the above may result in your bid being considered non-responsive.
9779 Utility Service Center Gate Replacements Page 14 of 63
SECTION 00300
BID FORM
PROJECT: 9779 USC GATE REPLACEMENT Date:
1. In compliance with your Invitation to Bid dated , 20 and subject to all
conditions thereof, the undersigned a (Corporation, Limited Liability Company,
Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of
Colorado hereby proposes to furnish and do everything required by the Contract
Documents to which this refers for the construction of all items listed on the following Bid
Schedule or Bid Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in
good faith, without collusion or connection with any other person or persons Bidding for
the same Work, and that it is made in pursuance of and subject to all the terms and
conditions of the Contract Documents pertaining to the Work to be done, all of which
have been examined by the undersigned.
3. Accompanying this Bid is a Bid Bond in the sum of
($ ) in accordance with the Invitation to Bid and Instructions to
Bidders.
4. All the various phases of Work enumerated in the Contract Documents with their
individual jobs and overhead, whether specifically mentioned, included by implication or
appurtenant thereto, are to be performed by the CONTRACTOR under one of the items
listed in the Bid Schedule, irrespective of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule(s) subject to
change(s) as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through
.
8. The undersigned Bidder hereby acknowledges the documents listed below are required
elements of the Bid and must be submitted with the Bid. The City may reject any
incomplete Bids as non-responsive.
- Bid Form (this Section 00300)
- Electronic Bid Bond (Item 3 above and Section 00410) for five (5) percent of the
base Bid amount
- Acknowledgement of Bid Addenda (Item 7 above)
- Statement of Bidder's Qualifications (Section 00420)
- Schedule of Subcontractors (Section 00430)
- Safety Form (Section 00400)
- Bid Schedule
9779 Utility Service Center Gate Replacements Page 15 of 63
- Project Milestone Schedule – Estimated timeline for procurement and installation by
milestone/gate
- Support & Maintenance offering
- Acknowledgement
- Additional documents may be submitted in Word or PDF.
10. BID SCHEDULE (Base Bid)
At the City’s option the basis of award is the low responsive and responsible Bidder based
on the total price for Base Bid or the total price for the Base Bid plus selected Alternates.
Item # Description Unit Quantity Unit Cost Total Cost
HySecurity Gate – Pricing Includes Labor and Materials
700-N
Gate, Pro Access Aluminum, Single Track,
HySecurity Slide Driver Model 15, A/C
Power, Extreme Drive w/ Aluminum mesh
infill. Dimensions: 16’ W x 6’ H + 1’ H security
wire. Installation shall be on existing posts.
Removal and recycling of old gates should
be included per the attached specification.
Each 2
700-S
Gate, Pro Access Aluminum, Single Track,
HySecurity Slide Driver Model 15, A/C
Power, Extreme Drive w/ Aluminum mesh
infill. Dimensions: 16’ W x 6’ H + 1’ H
security wire. Installation shall be on
existing posts. Removal and recycling of
old gates should be included per the
attached specification. Each 2
700-E
Gate, Pro Access Aluminum, Single Track,
HySecurity Slide Driver Model 15, A/C
Power, Extreme Drive w/ Aluminum mesh
infill. Dimensions: 30’ W x 6’ H + 1’ H
security wire. Installation shall be on
existing posts. Removal and recycling of
old gates should be included per the
attached specification. Each 1
701-N
Gate, Pro Access Aluminum, Single Track,
HySecurity Slide Driver Model 15, A/C
Power, Extreme Drive w/ Aluminum mesh
infill. Dimensions: 40’ W x 6’, to include the
installation of (2) new posts. Removal and
recycling of old gates should be included
per the attached specification. Each 1
701-S
Gate, Pro Access Aluminum, Single Track,
HySecurity Slide Driver Model 15, A/C
Power, Extreme Drive w/ Aluminum mesh
infill. Dimensions: 40’ W x 6’, to include the
installation of (2) new posts. Removal and
recycling of old gates should be included Each 1
9779 Utility Service Center Gate Replacements Page 16 of 63
IN WORDS:
11. PRICES
The foregoing prices shall include but is not limited to all labor, materials, overhead,
profit, insurance, etc., for completion of the Work.
Bidder acknowledges that the OWNER has the right to change items prior to award or
during Construction at their sole discretion without affecting the Agreement or prices of
any item so long as the deletion or change does not exceed twenty-five percent (25%) of
the total Agreement Price.
RESPECTFULLY SUBMITTED:
Legal Firm Name:
Physical Address:
Remit to Address:
Phone: Email Address:
Name of Authorized Agent of Firm:
Signature of Authorized Agent:
Primary Contact for Project:
Title: Email Address:
Phone: Cell Phone:
(Seal - if Bid is by corporation)
Attest:
Address
Telephone
Email
per the attached specification.
701-P
Gate, Employee, w/ Aluminum mesh infill,
to include the installation of (2) new posts
for access control integration, closure, and
hinging. Each 1
TOTAL
9779 Utility Service Center Gate Replacements Page 17 of 63
SECTION 00400
SAFETY FORM
Please complete the following form to provide information about your Company’s safety records
and procedures. This information will be included in the evaluation of the submitted proposal. We
reserve the right to request additional documentation, at any point, that supports the accuracy of
this form.
Section 1. General Information
Company Name
Number of Employees Full Time: Part Time: Seasonal:
Insurance Carrier
Self-insured for Workers Compensation?
Y ☐ N ☐
Section 2. Health and Safety Professional Information
Does your company have a full-time dedicated Safety Officer?
Y ☐ N ☐
If yes, provide the following information for the dedicated Safety Officer:
Name:
Title:
Phone Number:
Email:
If no, provide the following information of the person responsible for safety in your company:
Name:
Title:
Phone Number:
Email:
Provide the following information for the site safety Point of Contact:
Name:
Title:
Phone Number:
Email:
Section 3. Health and Safety Program
Does your company have a written Company Safety Program?
Y ☐ N ☐
Does the written Company Safety Program cover the work activities proposed by your
company for this project?
Y ☐ N ☐
Does the written Company Safety Program include the following:
Health and Safety Training Y ☐ N ☐
Employee/Management Responsibility Y ☐ N ☐
9779 Utility Service Center Gate Replacements Page 18 of 63
Hazard Recognition and Control Y ☐ N ☐
Incident Reporting and Investigation Y ☐ N ☐
Describe a typical job site safety briefing (time, location, frequency, topics, documentation).
How does your company ensure health and safety program compliance throughout the project?
Does your company perform written Job Hazard Analysis’s (JHA’s) regularly and document
them?
Y ☐ N ☐
How often does your company conduct Health and Safety audits or inspections?
Does your company have a written corrective action plan for any findings?
Y ☐ N ☐
Section 4. Training and Certifications
List required safety training ALL employees receive:
List specialized safety training employees receive as needed:
9779 Utility Service Center Gate Replacements Page 19 of 63
Does your company maintain records of all safety training and certifications?
Y ☐ N ☐
Section 5. Safety Equipment (Engineered Controls)
Will your company be performing any Trenching/Excavation and Confined Space Activities?
Y ☐ N ☐
If yes, list what protective shoring equipment you will have available for the job site?
If entering Permit Required Confined Spaces (PRCS), such as vaults or sewers, what is your
procedure for these activities?
Section 6. Health and Safety Records
List the Company’s Experience Modification Rate (EMR) for the previous 3 years
Year: EMR:
Year: EMR:
Year: EMR:
For any EMR greater than 1, provide an explanation for the rating and describe the corrective
action taken by the Company. Use additional pages if needed.
9779 Utility Service Center Gate Replacements Page 20 of 63
Provide the number of injuries and illnesses recorded (OSHA 300 log or equivalent) in the
previous 3 years:
Calendar Year Year: Year: Year:
Number of Fatalities
Number of OSHA recordable cases
Number of OSHA modified duty cases
Number of OSHA lost time cases
OSHA Total Recordable Incident Rate
(TRIR)
Number of recordable cases x 200,000
Number of hours worked
OSHA DART Rate (Days Away Restricted
or Transferred)
Number of DART cases x 200,000
Number of hours worked
Average number of employees on payroll
Have any OSHA citations been issued to your company in the past 3 years?
Y ☐ N ☐
If yes, list the citations and for each, provide the type of violation, an explanation for the
citation, the penalty issued, and describe the corrective action taken by the Company. Limit
your response to projects that have occurred in the Rocky Mountain region. Use additional
pages if needed.
9779 Utility Service Center Gate Replacements Page 21 of 63
SECTION 00410
BID BOND
KNOW ALL PEOPLE BY THESE PRESENTS: that we, the undersigned
as PRINCIPAL, and , as SURETY, are hereby held and firmly
bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of $
($ ) for the payment of which, well and truly to be made, we hereby jointly and severally bind
ourselves, successors, and assigns.
THE CONDITION of this obligation is such that whereas the PRINCIPAL has submitted to the
City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into
a Construction Agreement for the construction of Fort Collins Project, .
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the PRINCIPAL shall execute the Contract attached
hereto (properly completed in accordance with said Bid) and shall furnish a BOND for
their faithful performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all other respects
perform the Agreement created by the acceptance of said Bid, then this obligation shall
be void; otherwise the same shall remain in force and effect, it being expressly
understood and agreed that the liability of the SURETY for any and all claims hereunder
shall, in no event, exceed the penal amount of this obligation as herein stated.
The SURETY, for value received, hereby stipulates and agrees that the obligations of said
SURETY and its BOND shall be in no way impaired or affected by any extension of the time
within which the OWNER may accept such Bid; and said SURETY does hereby waive notice of
any such extension.
SURETY Companies executing bonds must be authorized to transact business in the State of
Colorado and be accepted by the OWNER.
9779 Utility Service Center Gate Replacements Page 22 of 63
IN WITNESS WHEREOF, the PRINCIPAL and the SURETY have hereunto set their hands and
seals this day of , 20 , and such of them as are corporations have caused their
corporate seals to be hereto affixed and these presents to be signed by their proper officers, the
day and year first set forth above.
PRINCIPAL SURETY
Name:
Address:
By: By:
Title: Title:
ATTEST:
By:
(SEAL) (SEAL)
9779 Utility Service Center Gate Replacements Page 23 of 63
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered, and the data given must be clear and comprehensive. This
statement must be notarized. If necessary, questions may be answered on separate attached
sheets. The Bidder may submit any additional information if needed.
1. Name of Bidder:
3. When was Bidder’s firm organized:
4. If your firm is a corporation, where is the firm incorporated:
5. How many years has the firm been engaged in the contracting business under the
present firm or trade name?
6. Provide a list of the contracts on hand: (list these, showing the amount of each contract
and the appropriate anticipated dates of completion.)
7. What is the general character of Work performed by your company:
8. Have you or a firm for which you were a principal ever failed to complete any Work
awarded to you?
If so, where and why?
9. Has the firm ever defaulted on a contract?
If so, where and why?
9779 Utility Service Center Gate Replacements Page 24 of 63
10. Is the firm debarred by any government agency?
If yes, list agency name.
11. Provide the background and experience of the principal members of your organization,
including officers:
12. Credit available: $
13. Bank Reference:
14. Will you, upon request, provide a detailed financial statement for your Company and
furnish any other information that may be required by the OWNER?
15. Are any lawsuits pending against you or your firm at this time?
If yes, provide detail
16. REFERENCES
The undersigned Bidder shall provide three (3) completed or under construction project
references of similar scope and price from the past three (3) years. It is the City’s preference
that the reference projects use the same Project Manager as the CONTRACTOR is proposing
for this project. It is preferred that references are from three separate owners and shall include
a brief project description, owner contact information (name, title, email, and phone number),
and total contract value. References may be checked by the City and bids that do not include
the required and satisfactory references may be deemed non-responsive. The City reserves the
right to request additional project references at its sole discretion.
Project 1 Name:
Brief Description:
9779 Utility Service Center Gate Replacements Page 25 of 63
Contract Value:
Client:
Contact Name: Title:
Phone: Email:
Project 2 Name:
Brief Description:
Contract Value:
Client:
Contact Name: Title:
Phone: Email:
Project 3 Name:
Brief Description:
Contract Value:
Client:
Contact Name: Title:
Phone: Email:
17. The undersigned hereby authorizes and requests any person, firm or corporation to
furnish any information requested by the OWNER in verification of the recital comprising
this Statement of Bidder's Qualifications.
By signing below, the Contractor agrees that the answers to the foregoing questions and all
statements therein contained are true and correct.
9779 Utility Service Center Gate Replacements Page 26 of 63
Company:
By: Printed:
Title:
State of
County of ____________________
Signed before me on _______________________, 20____
by __________________________________ (name(s) of individual(s) making statement).
____________________________________
(Notary’s official signature)
____________________________________
(Title of office)
____________________________________
(Commission Expiration)
9779 Utility Service Center Gate Replacements Page 27 of 63
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
Please list all subcontractors and their corresponding Work items in the space below. If not
applicable, please note “N/A”.
ITEM SUBCONTRACTOR
9779 Utility Service Center Gate Replacements Page 28 of 63
ACKNOWLEDGEMENT
Contractor hereby acknowledges receipt of the City of Fort Collins Bid and acknowledges that
it has read and agrees to be fully bound by all of the terms, conditions and other provisions
set forth in 9779 USC Gate Replacements except as otherwise noted. Additionally, Contractor
hereby makes the following representations to City:
a. All of the statements and representations made in this proposal are true to the best of the
Contractor’s knowledge and belief.
b. Contractor commits that it is able to meet the terms provided in this proposal.
c. This proposal is a firm and binding offer, for a period of 90 days from the date hereof.
d. Contractor further agrees that the method of award is acceptable.
e. Contractor also agrees to complete the proposed Notice of Award (NOA) with the City of
Fort Collins within 10 days of notice of award. If NOA is not completed and signed within
10 days, City reserves the right to cancel and award to the next highest rated firm.
f. Contractor acknowledges receipt of addenda.
g. Contractor acknowledges no conflict of interest.
h. Failure to provide a public viewing copy will be considered a waiver of any claim of
confidentiality under Colorado Open Records Act (CORA). Contractor hereby waives any
and all claims for damages against the City for the City’s good faith compliance with
CORA.
Legal Firm Name:
Physical Address:
Remit to Address:
Phone: Email Address:
Name of Authorized Agent of Firm:
Signature of Authorized Agent:
Primary Contact for Project:
Title: Email Address:
Phone: Cell Phone:
NOTE: ALL BID SUBMITTAL FORM PAGES MUST BE COMPLETED, SIGNED WHERE
REQUIRED & RETURNED WITH YOUR BID PROPOSAL PACKAGE.
9779 Utility Service Center Gate Replacements Page 29 of 63
EXHIBIT A
SPECIFICATION
9779 Utility Service Center Gate Replacements Page 30 of 63
Slide Gate OperatorINDUSTRIAL
n Moves up to 20,000 lb
(9,072 kg) gates with ease
n Longest life and lowest
maintenance. SlideDriver reliably
secures tens of thousands of sites
worldwide and lasts decades
n Smooth travel and less wear.
1 ft/s (30 cm/s) to 3 ft/s (91 cm/s)
Emergency Fast Close available
on SlideDriver 50VF2/3
n Seamless synchronization
with all HySecurity operators
for dual gate, sally port or other
specialized applications
n 31 models including UPS,
Correctional Facility and Modular
SMART TOUCH CONTROLLER
provides the ultimate in
reliability, configurability and
system troubleshooting.
iNdUSTRiAL gRAdE
COMpONENTS
ensure extremely low
maintenance and
exceptionally long life.
iNSidE
ELECTRiCAL
ENCLOSURE
ExTREMELy RELiAbLE HydRAULiCS
contain only one gallon of high
performance environmentally friendly
hydraulic fluid. Operates without fail in
hottest and coldest climates.
SlideDriver ™
Aviation
Utilities
Corrections
1-800-321-9947 • www.hysecurity.com
SlideDriver 40
4,000 lb gates
(1,814 kg)
1 ft/s (30 cm/s)
SlideDriver 15
1,500 lb gates (680 kg)
1 ft/s (30 cm/s)
SlideDriver 80
8,000 lb gates
(3,629 kg)
1 ft/s (30 cm/s)
SlideDriver 200
20,000 lb gates
(9,072kg)
1 ft/s (30 cm/s)
SlideDriver 30F
3,000 lb gates
(1,361 kg)
1.7 ft/s (50 cm/s)
SlideDriver
50VF 2/3
5,000 lb gates
(2,268 kg)
Field adjustable 2.2
ft/s (70 cm/s) or
3 ft/s (90 cm/s) and
Emergency Fast Close
FASTFAST
Ultra reliable • Unlimited cycles • Secure • Long/Heavy gates • Low maintenance
Smart Touch Controller
keypad & display
For specifications, tech support,
pictures and email subscriptions
Visit www.hysecurity.com
9779 Utility Service Center Gate Replacements Page 31 of 63
INDUSTRIALdistributed by:Ultra ReliableHigh Security
See the latest from HySecurity at www.hysecurity.com
FAST Operators
1,500 lb (680 kg) gates
1 ft/s (30 cm/s)
4,000 lb (1,814 kg) gates
1 ft/s (30 cm/s)
8,000 lb (3,629 kg) gates
1 ft/s (30 cm/s)
20,000 lb (9,072 kg) gates
1 ft/s (30 cm/s)
3,000 lb (1,361 kg) gates
1.7 ft/s (50 cm/s)
5,000 lb (2,268 kg) gates
2.2 ft/s (70 cm/s) or
3 ft/s (91 cm/s)
Model SlideDriver 15 SlideDriver 40 SlideDriver 80 SlideDriver 200 SlideDriver 30F SlideDriver 50VF2/3
Part #222 SS ST 222 E ST 222 X1 ST 444 XS ST 222 EX 1.7 ST 222 X3 ST
Duty Cycle Continuous
Horsepower 1 hp 1 hp 2 hp 5 hp 2 hp 2 hp
Drive Hydraulic
Drive Wheels Two 6” (15 cm)
AdvanceDrive wheels
Two 6” (15 cm)
AdvanceDrive wheels
One 8” (20 cm) AdvanceDrive
wheel, One 8” XtremeDrive
wheel and 27 ft (8 m) of rack
Two 8” (20 cm) AdvanceDrive
wheels, Two 8” XtremeDrive
wheels and 52 ft (16 m) of rack
Two 6” (15 cm)
AdvanceDrive wheels
Two 8” (20 cm)
AdvanceDrive wheels
Gate Weight Max.1,500 lb (680 kg) 4,000 lb (1,814 kg)8,000 lb (3,629 kg) 20,000 lb (9,072 kg) 3,000 lb (1,361 kg) 5,000 lb (2,268 kg)
Gate Length Max.Limited only by weight
Drawbar Pull 300 lb (136 kg)300 lb (136 kg)600 lb (272 kg)1,200 lb (544 kg)300 lb (136 kg)300 lb (136 kg)
Rate of Travel 1 ft/s (30 cm/s)1.7 ft/s (50 cm/s)
Field adjustable, 2.2 ft/s
(70 cm/s) or 3 ft/s (91 cm/s)
Emergency Fast Close
3 ft/s (91 cm/s)
Temperature Rating -40º F to 158º F (-40º C to 70º C) using environmentally friendly Uniflow fluid or -10° F to 158° F (-23° C to 70° C) using biodegradeable fluid. No heater necessary.
1 Phase Power 115/208/230V 60 Hz
110/220V 50 Hz
115/208/230V 60 Hz
110/220V 50 Hz
208/230V 60 Hz
220V 50 Hz 230V 60 Hz 208/230V 60 Hz
220V 50 Hz
208/230V 60 Hz
220V 50 Hz
3 Phase Power 208/230/460/575V 60 Hz , 220/380V 50 Hz
Communication RS-232, RS-485, Ethernet option
User Controls Smart Touch Controller with 70+ configurable settings. Smart Touch keypad and display or a PC using S.T.A.R.T. software.
Relays Three configurable user relays: one 30VDC, 3A solid state and two 250VAC, 10A electromechanical
ETL Listed (UL 325)Usage Class I, II, III, IV Usage Class I, II, III, IV Usage Class III, IV Usage Class III, IV Usage Class III, IV Usage Class III, IV
Warranty 5 year
Additional SlideDriver models available
UPS Backup*SlideDriver 15 UPS* SlideDriver 40 UPS* SlideDriver 80 UPS* SlideDriver 200 UPS* SlideDriver 30F UPS*–
Correctional Facility –SlideDriver 40-C SlideDriver 80-C SlideDriver 200-C SlideDriver 30F-C SlideDriver 50VF2/3-C
Modular SlideDriver 15-M SlideDriver 40-M SlideDriver 80-M SlideDriver 200-M SlideDriver 30F-M SlideDriver 50VF2/3-M
* 1000 cycles/day expected duty cycle. Actual duty cycle depends on site specific conditions and gate configuration.
Programming Functions
Operating Functions
LCD
Display
Smart Touch Controller Keypad Smart Touch Controller Board
SMART TOUCH COnTROLLER AnD
S.T.A.R.T. (Smart Touch Analyze & Retrieve Tool)
HY-5A Vehicle
Detectors (up
to 4) plug into
sockets
Free
Exit
Inside
Loop
Outside
Loop
Center
Loop
n Microprocessor-based (Non-PLC)
n 21 field configurable inputs
n 3 field configurable user relay outputs
n 4 plug-in Hy-5A vehicle
detector sockets
n RS-485 and RS-232
n Date & time stamped
fault logs, errors and
security alerts
n PC interface provided for
easy configuration and
quick troubleshooting
using Smart Touch
Analyze and Retrieve Tool
(S.T.A.R.T.)The XtremeDrive traction rack
and drive wheel system
OPTiOnAL ACCESSORiES: Hy-5A intelligent vehicle detectors, 12 in (30 cm) base extension, tamper proof heavy gauge cover, cabinet lock, solenoid lock,
Fire and Emergency Access Lock Box, heater, strobe light, photo eye, snowbrush and blade kit, XtremeDrive rack kit, custom colors and more.
SySTEM DESiGn SUPPORT: Contact HySecurity for CAD drawings, tech manuals, help with custom site requirements or other specifications support.
Download operator specifications online at www.hysecurity.com or call to speak with a HySecurity representative today.
31 SlideDriver™ Models
Contact HySecurity for an operator/parts distributor near you.
phone 800-321-9947 fax 888-321-9946
www.hysecurity.com • info@hysecurity.com
D0504 081613
HySecurity operators secure the world’s critical
infrastructure and key assets where ultimate reliability
is vital. SlideDriver delivers uncompromising quality
to industrial customers worldwide, where ease of use,
consistent operation, low maintenance, long life and
high reliability is expected.
Standard Drive
WheelDrive Rail
Rack XtremeDrive
Wheel
The AdvanceDrive Wheel
9779 Utility Service Center Gate Replacements Page 32 of 63
9779 Utility Service Center Gate Replacements Page 33 of 63
SECTION 00510
NOTICE OF AWARD
DATE: [Date]
TO: [Contractor]
PROJECT:
OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the OWNER")
CONTRACTOR is hereby notified that your Bid dated [CONTRACTOR'S Bid Date] for the above
project has been considered. CONTRACTOR is the apparent successful Bidder and has been
awarded an Agreement for .
The Price of the Agreement is ($ ).
One (1) copy of all Contract Documents accompany this Notice of Award. Additional copies of the
drawings may be requested from the Project Manager.
CONTRACTOR must comply with the following conditions within fifteen (15) days of the date of
this Notice of Award, that is by [Date].
1. CONTRACTOR must deliver to the OWNER a fully executed Agreement
complete with authorized signature on the signature page.
2. CONTRACTOR must deliver with the executed Agreement the Contract
Security (Bonds) as specified in the Instructions to Bidders.
Failure to comply with these conditions within the time specified will entitle OWNER to consider
your Bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited.
City of Fort Collins
OWNER
By:
Gerry Paul
Purchasing Director
9779 Utility Service Center Gate Replacements Page 34 of 63
SECTION 00520
AGREEMENT
THIS AGREEMENT is dated as of the [Day] day of [Month] in the year of 20[Year] and shall be
effective on the date this AGREEMENT is signed by the City.
The City of Fort Collins (hereinafter called OWNER) and
[Contractor] (hereinafter called CONTRACTOR)
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth,
agree as follows:
ARTICLE 1. WORK
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.
The Project for which the Work under the Contract Documents may be the whole or only a part
is defined as the construction of the .
ARTICLE 2. CHANGE ORDERS
The City, may, at any time during the term and without invalidating the Agreement, make
changes to the particular services. Such changes shall be agreed upon in writing by the parties
by Change Order, a sample of which is attached hereto as 00950, consisting of one (1) page
and incorporated herein by this reference.
ARTICLE 3. CONTRACT TIMES
3.1. The Work shall be Substantially Completed by the CONTRACTOR, as evidenced
by the issuance of the Certificate of Substantial Completion, within one hundred
twenty-two (122) calendar days after the date of the Notice to Proceed.
3.2. The Work must be completed by the CONTRACTOR and ready for Final Payment
and Acceptance within thirty (30) calendar days after Substantial Completion.
3.3. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work is
not completed within the times specified in paragraphs 3.1 and 3.2 above, plus any
extensions thereof allowed.
They also recognize the delays, expenses and difficulties involved in proving in a
legal preceding the actual loss suffered by OWNER if the Work is not completed on
time. Accordingly, instead of requiring any such proof, OWNER and
CONTRACTOR agree that as Liquidated Damages for delay (but not as penalty)
CONTRACTOR shall pay OWNER the amounts set forth hereafter.
1) Substantial Completion. One thousand dollars ($1,000) for each calendar day
or fraction thereof, during one (1) to thirty (30) days after XX number of
calendar days OR the Substantial Completion date established in Section
00530 Notice to Proceed until the work is Substantially Complete; if incomplete
after thirty (30) days, the liquidated damages are five hundred dollars ($500)
per calendar day, or fraction thereof, until the work is Substantially Complete.
2) Final Payment and Acceptance: After Substantial Completion, five
hundred dollars ($500) for each calendar day or fraction thereof after XX
number of calendar days after Substantial Completion until the Work is
ready for Final Payment and Acceptance.
9779 Utility Service Center Gate Replacements Page 35 of 63
ARTICLE 4. CONTRACT PRICE
4.1 OWNER shall pay CONTRACTOR for performance of the Work in accordance with
the Contract Documents as follows: ($ ), in accordance with Section
00300, attached and incorporated herein by this reference.
ARTICLE 5. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with this Article.
Applications for Payment will be processed by OWNER.
5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account of
the Contract Price on the basis of CONTRACTOR's Application for Payment, once
each month during construction as provided below. All progress payments will be
calculated on the basis of the progress of the Work. I In the case of Unit Price
Work, progress payments will be based on the number of units completed and
pricing will be in accordance with the Bid Form, Section 00300.
5.1.1. APPLICATION FOR PAYMENT
Applications for Payment should be emailed monthly to
invoices@fcgov.com with a copy to the Project Manager. The cost of the
work completed shall be paid to the Contractor each month following the
submittal of a correct invoice completed in accordance with the Application
for Payment, Section 00960.
Payments will be made using the prices stated in the Work Order. In the
event a service is requested that is not stated in the Work Order, the
Contractor and the City will negotiate an appropriate unit price for the
service prior to the Contractor initiating such work.
The City pays invoices on Net 30 terms.
5.1.2. Prior to Substantial Completion, OWNER will be entitled to withhold as
contract retainage five percent (5%) of each progress payment, but, in each
case, less the aggregate of payments previously made and less such
amounts as OWNER shall determine, or OWNER may withhold. If, in the
sole discretion of OWNER, OWNER determines that the character and
progress of the Work have been satisfactory to OWNER, OWNER may
determine that as long as the character and progress of the Work remain
satisfactory to them, there will be no additional retainage on account of
Work completed in which case the remaining progress payments prior to
Substantial Completion will be in an amount equal to 100% of the Work
completed. 95% of materials and equipment not incorporated in the Work
(but delivered, suitably stored and accompanied by documentation
satisfactory to OWNER may be included in the Application for Payment
00960.
5.1.3. Upon Substantial Completion payment will be made in an amount sufficient,
if necessary, to increase total payments to CONTRACTOR to 95% of the
Contract Price, less such amounts as OWNER shall determine or OWNER
may withhold in accordance as provided by law.
9779 Utility Service Center Gate Replacements Page 36 of 63
5.2. FINAL PAYMENT AND ACCEPTANCE. Upon Final Payment and Acceptance of
the Work in accordance with Contract Documents, OWNER shall pay the
remainder of the Contract Price.
ARTICLE 6. CONTRACTOR'S REPRESENTATION
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the
following representations:
6.1. CONTRACTOR has familiarized himself with the nature and extent of the Contract
Documents, Work, site, locality, local conditions, and all applicable Laws and
Regulations that in any manner may affect cost, progress, performance or
furnishing of the Work.
6.2. CONTRACTOR has obtained and carefully studied (or assumes responsibility for
obtaining and carefully studying) all such examinations, investigations,
explorations, tests, reports, studies, and subsurface or physical conditions, at or
contiguous to the site or otherwise may affect the cost, progress, performance or
furnishing of the Work as CONTRACTOR considers necessary for the performance
or furnishing of the Work at the Contract Price, within the Contract Times and in
accordance with the other terms and conditions of the Contract Documents; and no
additional examinations, investigations, explorations, tests, reports, studies or
similar information or data are or will be required by CONTRACTOR for such
purposes.
6.4. CONTRACTOR has reviewed and checked all information and data shown or
indicated on the Contract Documents with respect to existing Underground
Facilities at or contiguous to the site and assumes responsibility for the accurate
location of said Underground Facilities. No additional examinations, investigations,
explorations, tests, reports, studies or similar information or data in respect of said
Underground Facilities are or will be required by CONTRACTOR in order to
perform and furnish the Work at the Contract Price, within the Contract Times and
in accordance with the other terms and conditions of the Contract Documents.
6.5. CONTRACTOR has correlated the results of all such observations, examinations,
investigations, tests, reports and data with the terms and conditions of the Contract
Documents.
6.6. CONTRACTOR has given OWNER written notice of all conflicts, errors or
discrepancies that he has discovered in the Contract Documents and the written
resolution thereof by OWNER is acceptable to CONTRACTOR.
ARTICLE 7. CONTRACT DOCUMENTS
7.1. The Contract Documents which comprise the entire Agreement between OWNER
and CONTRACTOR concerning the Work consist of the documents defined below,
all of which are incorporated herein by this reference.
7.2. Forms for use by CITY and/or CONTRACTOR in performing the Work and related
actions in carrying out the terms of this Agreement are deemed Contract
Documents and incorporated herein by this reference, and include, but are not
limited to, the following:
00300 Bid Form
9779 Utility Service Center Gate Replacements Page 37 of 63
00420 Statements of Bidders Qualifications
00430 Schedule of Subcontractors
00510 Notice of Award
00520 Agreement
00530 Notice to Proceed
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Releases
00660 Consent of SURETY
00960 Application for Payment
7.3 Specifications, Reports & Drawings, dated and consisting of a cover sheet
and sheets numbered as follows:
The Contract Drawings shall be stamped "Final for Construction" and dated. Any
revisions made shall be clearly identified and dated.
7.4. Addenda Numbers to , inclusive.
7.5. The Contract Documents also include all written amendments and other
documents amending, modifying, or supplementing the Contract Documents.
7.6. There are no Contract Documents other than those listed or incorporated by
reference in this Article 7. The Contract Documents may only be amended,
modified or supplemented as provided in Article 2 of this Agreement.
ARTICLE 8. MISCELLANEOUS
8.1. No assignment by a party hereto of any rights, obligations or interests in or under
the Contract Documents will be binding on another party hereto without the prior
written consent of the party sought to be bound; and specifically but not without
limitations, moneys that may become due and moneys that are due may not be
assigned without such consent and unless specifically stated to the contrary in any
written consent to an assignment no assignment will release or discharge that
assignor from any duty or responsibility under the Contract Documents. Any such
assignment without the required prior written consent of the OWNER, shall be
deemed null and void and have no effect.
8.2. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns
and legal representatives to the other party hereto, its partners, successors,
assigns and legal representatives in respect to all covenants, promises, and
obligations in this Agreement and in the Contract Documents.
8.3. To the extent this Agreement or any provision in it constitutes a multiple fiscal year
debt or financial obligation of the OWNER, it shall be subject to annual
appropriation by OWNER’S City Council as required in Article V, Section 8(b) of
the City Charter, City Code Section 8-186, and Article X, Section 20 of the
Colorado Constitution. The OWNER shall have no obligation to continue this
9779 Utility Service Center Gate Replacements Page 38 of 63
Agreement in any fiscal year for which no such supporting appropriation has been
made.
8.4. The laws of the State of Colorado shall govern the construction, interpretation,
execution, and enforcement of this Agreement. The Parties further agree that
Larimer County District Court is the proper venue for all disputes. If the OWNER
subsequently agrees in writing that the matter may be heard in federal court, venue
will be in Denver District Court.
8.5. All notices provided under this Agreement shall be effective immediately when
emailed or three business days from the date of the notice when mailed to the
following addresses:
Contractor: City: Copy to:
Attn:
email address
City of Fort Collins
Attn:
PO Box 580
Fort Collins, CO 80522
email address
City of Fort Collins
Attn: Purchasing Dept.
PO Box 580
Fort Collins, CO 80522
purchasing@fcgov.com
OWNER: CITY OF FORT COLLINS CONTRACTOR: [CONTRACTOR]
By: By:
, City Manager
(over $1,000,000)
PRINTED
By:
Gerry Paul, Purchasing Director Title:
Date: Date:
Attest: (CORPORATE SEAL)
City Clerk
Attest:
Approved as to Form
Assistant City Attorney
9779 Utility Service Center Gate Replacements Page 39 of 63
SECTION 00530
NOTICE TO PROCEED
Original Bid Number & Name
Description of Work:
To: [CONTRACTOR]
This notice is to advise you:
That the Contract covering the above described Work has been fully executed by the
CONTRACTOR and the OWNER.
That the required CONTRACTOR's Performance Bond and Payment Bond have been received
by the OWNER.
Therefore, as the CONTRACTOR for the above described Work, CONTRACTOR is hereby
authorized and directed to proceed with the Work to begin on .
The expected
dates for Substantial Completion and Final Acceptance shall be , 20 and ,
20 , respectively.
Dated this day of , 20 .
City of Fort Collins
OWNER
By:
Title:
ACKNOWLEDGMENT OF NOTICE
Receipt of the above Notice to Proceed is hereby acknowledged this day of
, 20__.
CONTRACTOR: [CONTRACTOR]
By:
Title:
9779 Utility Service Center Gate Replacements Page 40 of 63
SECTION 00600
BONDS AND CERTIFICATES
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (CONTRACTOR)
00660 Consent of SURETY
00670 Application for Exemption Certificate
9779 Utility Service Center Gate Replacements Page 41 of 63
SECTION 00610
PERFORMANCE BOND
Bond No.
KNOW ALL PEOPLE BY THESE PRESENTS:
(firm)
(address)
(an Individual), (a Partnership), (a Corporation) (a Limited Liability Company), hereinafter
referred to as the "PRINCIPAL" and
(Firm)
(Address)
hereinafter referred to as "the SURETY", are held and firmly bound unto City of Fort Collins, 300
Laporte Ave, Fort Collins, Colorado 80522, a home rule municipality, hereinafter referred to as
the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the
payment of which sum well and truly to be made, we bind ourselves, successors and assigns,
jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the PRINCIPAL entered into
a certain Agreement with the OWNER, dated the [Day] day of [Month] in the year of 20[Year], a
copy of which is hereto attached and made a part hereof for the performance of the City of Fort
Collins Project, number and title of project .
NOW, THEREFORE, if the PRINCIPAL shall well, truly and faithfully perform its duties, all the
undertakings, covenants, terms, conditions and agreements of said Agreement during the
original term thereof, and any extensions thereof which may be granted by the OWNER, with or
without any notice to the SURETY and during the life of the guaranty period, and if the Principal
shall satisfy all claims and demands incurred under such Agreement, and shall fully indemnify
and save harmless the OWNER from all cost and damages which it may suffer by reason of
failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the
OWNER may incur in making good any default then this obligation shall be void; otherwise to
remain in full force and effect.
PROVIDED, FURTHER, that the said SURETY, for value received, hereby stipulates and
agrees that no change, extension of time, alteration or addition to the terms of the Agreement or
to the Work to be performed thereunder or the Specifications accompanying the same shall in
any way affect its obligation on this bond; and it does hereby waive notice of any such change,
extension of time, alteration or addition to the terms of the Agreement or to the Work or to the
Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the PRINCIPAL shall
abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the SURETY Company must be authorized to transact business in
the State of Colorado and be acceptable to the OWNER.
9779 Utility Service Center Gate Replacements Page 42 of 63
IN WITNESS WHEREOF, this instrument is executed this _____ day of _____ ____, 20__.
IN PRESENCE OF: PRINCIPAL
(Title) (Title)
(Corporate Seal)
(Address)
IN PRESENCE OF: Other PARTNERS
_____________________________ By:
_____________________________ By:
IN PRESENCE OF: SURETY
_____________________________ By:_____________________________________
_____________________________
(Address)
(SURETY Seal)
NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is
Partnership, all partners should execute Bond.
Attach to form when submitted: Power of Attorney and Certificate of Authority of
Attorney(s)-in-Fact
9779 Utility Service Center Gate Replacements Page 43 of 63
SECTION 00615
PAYMENT BOND
Bond No.
KNOW ALL PEOPLE BY THESE PRESENTS: that
(firm)
(address)
(an Individual), (a Partnership), (a Corporation) (a Limited Liability Company), hereinafter
referred to as the "PRINCIPAL" and
(Firm)
(Address)
hereinafter referred to as "the SURETY", are held and firmly bound unto the City of Fort Collins,
300 Laporte Ave., Fort Collins, Colorado 80522 , a home rule municipality, a home rule
municipality, hereinafter referred to as "the OWNER", in the penal sum of ($ ) in
lawful money of the United States, for the payment of which sum well and truly to be made, we
bind ourselves, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the PRINCIPAL entered into
a certain Agreement with the OWNER, dated the [Day] day of [Month] in the year of 20[Year], a
copy of which is hereto attached and made a part hereof for the performance of the City of Fort
Collins Project, number and title of project .
NOW, THEREFORE, if the PRINCIPAL shall make payment to all persons, firms,
subcontractors, and corporations furnishing materials for or performing labor in the prosecution
of the Work provided for in such Agreement and any authorized extension or modification
thereof, including but not limited to, all amounts due for materials, lubricants, repairs on
machinery, equipment and tools, consumed, rented or used in connection with the construction
of such Work, and all insurance premiums on said Work, and for all labor, performed in such
Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to
remain in full force and effect.
PROVIDED, FURTHER, that the said SURETY, for value received, hereby stipulates and
agrees that no change, extension of time, alteration or addition to the terms of the Agreement or
to the Work to be performed thereunder or the Specifications accompanying the same shall in
any way affect its obligation on this bond; and it does hereby waive notice of any such change,
extension of time, alteration or addition to the terms of the Agreement or to the Work or to the
Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the PRINCIPAL shall
abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the SURETY Company must be authorized to transact business in
the State of Colorado and be acceptable to the OWNER.
9779 Utility Service Center Gate Replacements Page 44 of 63
IN WITNESS WHEREOF, this instrument is executed this day of , 20__.
IN PRESENCE OF: PRINCIPAL
(Title) (Title)
(Corporate Seal)
(Address)
IN PRESENCE OF: Other PARTNERS
_____________________________ By:
_____________________________ By:
IN PRESENCE OF: SURETY
_____________________________ By:_____________________________________
_____________________________
(Address)
(SURETY Seal)
NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is
Partnership, all partners should execute Bond.
Attach to form when submitted: Power of Attorney and Certificate of Authority of
Attorney(s)-in-Fact
9779 Utility Service Center Gate Replacements Page 45 of 63
SECTION 00630
CERTIFICATE OF INSURANCE
The CONTRACTOR will provide, from insurance companies acceptable to the City, the
insurance coverage designated hereinafter and pay all costs. Before commencing work under
this bid, the CONTRACTOR shall furnish the City with certificates of insurance showing the
type, amount, class of operations covered, effective dates and date of expiration of policies.
In case of the breach of any provision of the Insurance Requirements, the City, at its option,
may take out and maintain, at the expense of the Contractor, such insurance as the City may
deem proper and may deduct the cost of such insurance from any monies which may be due or
become due the CONTRACTOR under this Agreement.
Insurance certificates should show the certificate holder as follows:
City of Fort Collins
Purchasing Division
PO Box 580
Fort Collins, CO 80522
The City, its officers, agents and employees shall be named as additional insureds on the
Contractor 's general liability and automobile liability insurance policies by marking the
appropriate box or adding a statement to this effect on the certificate, for any claims
arising out of work performed under this Agreement.
Insurance coverages shall be as follows:
A. Workers' Compensation & Employer's Liability. The CONTRACTOR shall maintain
during the life of this Agreement for all of the CONTRACTOR’s employees engaged in
work performed under this agreement. Workers' Compensation & Employer’s Liability
insurance shall conform with statutory limits of $100,000 per accident, $500,000 disease
aggregate, and $100,000 disease each employee, or as required by Colorado law.
B. General Liability. The CONTRACTOR shall maintain during the life of this Agreement
such General Liability as will provide coverage for damage claims of personal injury,
including accidental death, as well as for claims for property damage, which may arise
directly or indirectly from the performance of work under this Agreement. Coverage for
property damage shall be on a "broad form" basis. The amount of insurance for General
Liability, shall not be less than $1,000,000 combined single limits for bodily injury and
property damage.
C. Automobile Liability. The CONTRACTOR shall maintain during the life of this
Agreement such Automobile Liability insurance as will provide coverage for damage
claims of personal injury, including accidental death, as well as for claims for property
damage, which may arise directly or indirectly from the performance of work under this
Agreement. Coverage for property damage shall be on a "broad form" basis. The
amount of insurance for Automobile Liability, shall not be less than $1,000,000 combined
single limits for bodily injury and property damage.
D. Builder’s Risk. The CONTRACTOR shall maintain during the term of this Agreement
builder’s risk insurance in the amount of full insurable replacement cost. The insurance
shall:
9779 Utility Service Center Gate Replacements Page 46 of 63
Be written on a builder’s risk “all risk” policy form that shall at least include insurance for
physical loss or damage to the Work, temporary buildings, falsework, and materials and
equipment in transit, and shall insure against at least the following perils or causes of
loss: fire; lightning; windstorm; riot; civil commotion; terrorism; vehicle impact; aircraft;
smoke; theft; vandalism and malicious mischief; earthquake and other earth movement;
flood; collapse; explosion; debris removal; demolition; and water damage (other than
that caused by flood).
Cover, as insured property, at least the following: (a) the Work and all materials,
supplies, machinery, apparatus, equipment, fixtures, and other property of a similar
nature that are to be incorporated into or used in the preparation, fabrication,
construction, erection, or completion of the Work, including OWNER-furnished or
assigned property; (b) spare parts inventory required within the scope of the Contract;
and (c) temporary works which are not intended to form part of the permanent
constructed Work but which are intended to provide working access to the Site, or to the
Work under construction, or which are intended to provide temporary support for the
Work under construction, including scaffolding, form work, fences, shoring, falsework,
and temporary structures
E. Subcontractors. In the event any work is performed by a subcontractor, the
CONTRACTOR shall be responsible for any liability directly or indirectly arising out of
the work performed under this Agreement by a subcontractor, which liability is not
covered by the subcontractor's insurance.
F. Primary Coverage. For any claims related to the Agreement, CONTRACTOR’s
insurance shall be primary coverage, and any insurance or self-insurance maintained by
the City, its officers, agents and employees shall be in excess of the CONTRACTOR’s
insurance and shall not contribute with it.
G. Waiver of Subrogation. CONTRACTOR will grant to the City a waiver of any right of
subrogation which any insurer of CONTRACTOR may acquire against the City by virtue
of any payment of any loss. CONTRACTOR agrees to obtain any endorsement that
may be necessary to affect this waiver of subrogation, but this provision applies
regardless of whether or not the City has received a waiver of subrogation endorsement
from the insurer.
In the event any work is performed by a subcontractor, the CONTRACTOR shall be responsible
for any liability directly or indirectly arising out of the work performed under this Agreement by a
subcontractor, which liability is not covered by the subcontractor's insurance.
9779 Utility Service Center Gate Replacements Page 47 of 63
SECTION 00635
CERTIFICATE OF SUBSTANTIAL COMPLETION
TO: CITY OF FORT COLLINS (OWNER)
DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE:
PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado
INCLUDE:
OWNER: City of Fort Collins
CONTRACTOR: [Contractor]
CONTRACT DATE: [Date]
The Work performed under this AGREEMENT has been inspected by authorized
representatives of the OWNER and CONTRACTOR and the Project or specified part of the
Project, as indicated above is hereby declared to have achieved Substantial Completion on the
above date.
Pursuant to the Contract Documents, CONTRACTOR has provided the following items, where
applicable:
Record Drawings (ie. final as-builts)
Operations & Maintenance Manuals
All applicable training
Commissioning
Third Party Warranties
Owner’s Extra Stock & Parts
Keys
Other:
A tentative list of items to be completed or corrected is appended hereto. This list may not be
exhaustive, and the failure to include an item on it does not alter the responsibility of the
CONTRACTOR to complete all the Work in accordance with the Contract Documents.
OWNER AUTHORIZED REPRESENTATIVE
DATE
The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to
complete and correct the items on the tentative list on or before the Final Acceptance and
Completion date of , 20 .
CONTRACTOR AUTHORIZED REPRESENTATIVE
DATE
9779 Utility Service Center Gate Replacements Page 48 of 63
The OWNER accepts the Project or specified area of the Project as substantially complete and
will assume full possession of the Project or specified area of the Project at 12:01 a.m.,
on , 20 .
CITY OF FORT COLLINS, COLORADO By:
OWNER AUTHORIZED REPRESENTATIVE
DATE
9779 Utility Service Center Gate Replacements Page 49 of 63
SECTION 00640
CERTIFICATE OF FINAL ACCEPTANCE AND COMPLETION
Month, day , 20
TO: [CONTRACTOR]
You are hereby notified that on the day of , 20__, the City of
Fort Collins, Colorado, has accepted the Work completed by [CONTRACTOR] for the City of
Fort Collins Project, .
Pursuant to the Contract Documents, CONTRACTOR has provided the following items:
All documentation called for in the Contract Documents, including without limitation
certified payrolls as required for state or federally funded projects;
Consent of the SURETY, if any, to final payment;
Satisfactory evidence that all title issues have been resolved such that title to all Work,
materials, and equipment has passed to OWNER free and clear of any Liens or other
title defects or will so pass upon final payment.
A list of all disputes that CONTRACTOR believes are unsettled; and
Complete and legally effective releases or waivers (satisfactory to OWNER) of all Lien
rights arising out of the Work, and of Liens filed in connection with the Work.
Your continuing obligations and guarantees for the Project will be as provided in the Contract
Documents.
OWNER: City of Fort Collins
By:
Title:
9779 Utility Service Center Gate Replacements Page 50 of 63
SECTION 00650
LIEN WAIVER RELEASE
(CONTRACTOR)
TO: City of Fort Collins, Colorado (OWNER)
FROM: [CONTRACTOR] (CONTRACTOR)
PROJECT:
1. The CONTRACTOR acknowledges having received payment, except retainage from the
OWNER for all work, labor, skill and material furnished, delivered and performed by the
CONTRACTOR for the OWNER or for anyone in the construction, design, improvement,
alteration, addition or repair of the above described project.
2. In consideration of such payment and other good and valuable consideration, the receipt
and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives
all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims
(40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights
which the CONTRACTOR may now or may afterward have, claim or assert for all and any
work, labor, skill or materials furnished, delivered or performed for the construction,
design, improvement, alteration, addition or repair of the above described project, against
the OWNER or its officers, agents, employees or assigns, against any fund of or in the
possession or control of the OWNER, against the project or against all land and the
buildings on and appurtenances to the land improved by the project.
3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or
performed to or for the construction, design, improvement, alteration, addition or repair of
the project were furnished, delivered or performed by the CONTRACTOR or its agents,
employees, and servants, or by and through the CONTRACTOR by various
subcontractors or materialmen or their agents, employees and servants and further affirms
the same have been paid in full and have released in full any and all existing or possible
future mechanic's liens or rights or claims against the project or any funds in the
OWNER'S possession or control concerning the project or against the OWNER or its
officers, agents, employees or assigns arising out of the project.
4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any,
and the SURETY on the project against and from any claim hereinafter made by the
CONTRACTOR'S subcontractors, materialmen, employees, servants, agents or assigns
against the project or against the OWNER or its officers, employees, agents or assigns
arising out of the project for all loss, damage and costs, including reasonable attorney’s
fees, incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth above constitutes an
adequate description of the property and improvements to which this Lien Waiver Release
pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and
may be relied upon by the OWNER, the lender, if any, and SURETY on any Payment and
Performance Bonds for the project.
9779 Utility Service Center Gate Replacements Page 51 of 63
Signed this date , day of month , 20 .
CONTRACTOR: [CONTRACTOR]
By:
Title:
ATTEST:
Secretary
STATE OF )
)ss.
COUNTY OF )
Subscribed and sworn to before me this
date day of month 20 , by printed name of notary .
Witness my hand and official seal.
Signed and sworn to [or affirmed] before me on _______________________, 20____
by __________________________________ (name(s) of individual(s) making statement).
____________________________________
(Notary’s official signature)
____________________________________
(Title of office)
____________________________________
(Commission Expiration)
9779 Utility Service Center Gate Replacements Page 52 of 63
SECTION 00660
CONSENT OF SURETY
TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER")
CONTRACTOR: [CONTRACTOR]
PROJECT:
CONTRACT DATE: [Date]
In accordance with the provisions of the Contract between the OWNER and the CONTRACTOR
as indicated above, for .
(SURETY)
on bond numbers
hereby approves of the Final Payment to the CONTRACTOR and agrees that Final Payment to
the CONTRACTOR shall not relieve the SURETY of any of its obligations to the OWNER, as set
forth in the said SURETY's Bonds.
IN WITNESS WHEREOF, the SURETY has hereunto set its hand this date day of
month , 20 .
(SURETY)
By:
ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact.
State of
County of ____________________
This record was acknowledged before me on _________________________, 20 _____
by _________________________ as (type of authority, such as officer or trustee) of
(name of party/entity on behalf of whom record was executed).
(name of officer or agent, title of officer or agent) of (name of corporation acknowledging)
a (state or place of incorporation) corporation, on behalf of the corporation.
____________________________________
(Notary’s official signature)
____________________________________
(Title of office)
____________________________________
(Commission Expiration)
9779 Utility Service Center Gate Replacements Page 53 of 63
SECTION 00670
APPLICATION FOR EXEMPTION CERTIFICATE
9779 Utility Service Center Gate Replacements Page 54 of 63
9779 Utility Service Center Gate Replacements Page 55 of 63
9779 Utility Service Center Gate Replacements Page 56 of 63
SECTION 00950
CHANGE ORDER NO.
PROJECT TITLE:
CONTRACTOR: [Contractor]
WORK ORDER NUMBER:
PO NUMBER:
DESCRIPTION:
1. Reason for Change: Why is the change required?
2. Description of Change: Provide description of the changes to the Work
3. Change in Work Order Price:
4. Change in Work Order Time:
ORIGINAL WORK ORDER PRICE $ .00
TOTAL APPROVED CHANGE ORDER .00
TOTAL PENDING CHANGE ORDER .00
TOTAL THIS CHANGE ORDER .00
TOTAL % OF THIS CHANGE ORDER %
TOTAL C.O.% OF ORIGINAL WORK ORDER %
ADJUSTED WORK ORDER COST $ .00
CONTRACTOR:
By: Date:
Name: Title:
ACCEPTED: Date:
City PM Name, Title
REVIEWED: Date:
Name, Buyer or Senior Buyer
ACCEPTED: Date:
Name, Title
ACCEPTED: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
9779 Utility Service Center Gate Replacements Page 57 of 63
Section 00960
APPLICATION FOR PAYMENT PAGE 1 OF 4
OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER:
APPLICATION DATE:
PERIOD BEGINNING:
ENGINEER: CONTRACTOR: PERIOD ENDING:
PROJECT NUMBER:
CHANGE ORDERS Application is made for Payment as shown below in connection with Contract
NUMBER DATE AMOUNT
The present status of the account for this Contract
is as follows:
1
2 Original Contract Amount:
3 Net Change by Change Order:
Current contract Amount: $0.00
Total Completed and Stored to Date:
Less Previous Applications:
Amount Due this Application - Before Retainage: $0.00
Less Retainage:
Net Change by Change Order $0.00 AMOUNT DUE THIS APPLICATION: $0.00
CERTIFICATION:
The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection
with
the Work have been satisfied.
OR
The undersigned CONTRACTOR certifies that to the best of its knowledge, information and belief the
Work covered by this Application for Payment has been completed in accordance with the Contract
Documents, that all accounts have been paid for Work for which previous Applications for Payment
were issued and payments received, and this current payment requested herein is now due.
The above Amount Due This Application is requested by the CONTRACTOR.
Date: By:
In accordance with the Contract Documents, based on site observations and the data comprising
the above Application, the ENGINEER certifies to the OWNER that the Work has progressed to the
9779 Utility Service Center Gate Replacements Page 58 of 63
point indicated; that to the best of its knowledge, information and belief, the quality of the Work is
generally in accordance with the Contract Documents, and that the CONTRACTOR is entitled to
payment of the amount requested herein subject to any set-offs set forth on the attached exhibit.
Payment of the above Amount Due This Application is recommended by the ENGINEER.
9779 Utility Service Center Gate Replacements Page 59 of 63
CONTRACT AMOUNTS
APPLICATION FOR
PAYMENT PAGE 2 OF 4
Work
Completed
Work
Completed
Work
Completed Stored
Bid
This
Month
Previous
Periods
To
Date Materials Total
Item This Earned Percent
Number Description Quantity Units
Unit
Price Amount Qty. Amount Qty. Amount Qty. Amount Period
To
Date Billed
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
TOTALS $0.00 $0.00 $0.00 $0.00 $0.00
9779 Utility Service Center Gate Replacements Page 60 of 63
CHANGE ORDERS APPLICATION FOR PAYMENT PAGE 3 OF 4
Work
Completed
Work
Completed
Work
Completed Stored
Bid
This
Month
Previous
Periods
To
Date Materials Total
Item This Earned Percent
Number Description Quantity Units
Unit
Price Amount Qty. Amount Qty. Amount Qty. Amount Period
To
Date Billed
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
TOTALS CHANGE
ORDERS $0.00 $0.00 $0.00 $0.00 $0.00
PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00
9779 Utility Service Center Gate Replacements Page 61 of 63
STORED MATERIALS
SUMMARY PAGE 4 OF 4
On Hand Received Installed On Hand
Item Invoice Previous This This This
Number Number Description Application Period Period Application
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS $0.00 $0.00 $0.00 $0.00
9779 Utility Service Center Gate Replacements Page 62 of 63