Loading...
HomeMy WebLinkAboutADDENDA 2 - BID - 9767 POUDRE FIRE AUTHORITY (PFA) TRAINING FACILITY PARKING LOT ADDITIONAddendum 2 Page 1 of 1 ADDENDUM NO. 2 Description of BID 9767: PFA Training Facility Parking Lot Addition BIDS DUE: 3:00 PM MT (Our Clock) March 22, 2023 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Section 00300 – Bid Form (Pages 17-18) of the Specifications and Contract Documents. The bid schedule has been revised to include a new pay item for “Unsuitable Material”. The revisions have been highlighted in yellow. Replace Pages 17 & 18 of the Contract Documents with the attached Exhibit 1. Exhibit 2 – Plans: Tabulations Sheet (Sheet 6): The attached detail (Exhibit 2) for repairing soft spots or areas of unsuitable subgrade will be inserted to the Issued for Construction plans. The Summary of Approximate Quantities is also revised to include a new work item: 203-00050 – Unsuitable Material, 100 CY. Exhibit 3 – Project Special Provisions: Revision of Section 203 – Excavation and Embankment is hereby added to the project. This specification includes language related to the new pay item for “Unsuitable Material”. Please contact Adam Hill, Senior Buyer, at adhill@fcgov.com with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Bidder Name: BID 9767: PFA Training Facility Parking Lot Addition – Addendum 2 Exhibit 1 BID SCHEDULE 9767 POUDRE FIRE AUTHORITY TRAINING FACILITY PARKING LOT IMPROVEMENTS All bids shall be submitted on this form. Submit your unit and total prices for the work listed below. ITEM NO. CDOT ITEM NO. BID ITEM UNIT QUANTITY UNIT PRICE TOTAL ITEM 1 201-00000 Clearing & Grubbing LS 1 2 202-00010 Removal of Tree EACH 3 3 203-00050 Unsuitable Material CY 100 4 203-00060 Embankment Material (Complete in Place) CY 1,170 5 203-02330 Laborer HR 10 6 207-00205 Topsoil CY 150 7 208-00002 Erosion Log Type 1 (12 Inch) LF 125 8 208-00020 Silt Fence LF 1,500 9 208-00035 Aggregate Bag LF 50 10 208-00045 Concrete Washout Structure EACH 1 11 208-00070 Vehicle Tracking Pad EACH 1 12 208-00106 Sweeping (Sediment Removal) HR 10 13 208-00207 Erosion Control Management DAY 10 14 212-00006 Seeding (Native) ACRE 0.30 15 212-00032 Soil Conditioning ACRE 0.30 16 213-00002 Mulching (Weed Free Hay) ACRE 0.30 17 213-00061 Mulch Tackifier LB 60 18 216-00041 Soil Retention Blanket (Straw/Coconut) (Biodegradable Class 1) SY 210 19 304-06000 Aggregate Base Course (Class 6) TON 1,053 20 304-09106 Aggregate Base Course (Crushed Concrete) (Install Only) CY 145 21 306-01000 Reconditioning SY 3,935 22 403-34721 Hot Mix Asphalt (Grading SX) (75) (PG 58-28) TON 750 23 412-00600 Concrete Pavement (6 Inch) SY 34 24 506-00206 Riprap (6 Inch) CY 2 25 603-02185 23x14 Inch Reinforced Concrete Pipe (Complete-In-Place) LF 32 26 603-05118 23x14 Inch Reinforced Concrete End Section (Elliptical) EACH 2 Bidder Name: BID 9767: PFA Training Facility Parking Lot Addition – Addendum 2 Exhibit 1 BID SCHEDULE 9767 POUDRE FIRE AUTHORITY TRAINING FACILITY PARKING LOT IMPROVEMENTS All bids shall be submitted on this form. Submit your unit and total prices for the work listed below ITEM NO. CDOT ITEM NO. BID ITEM UNIT QUANTITY UNIT PRICE TOTAL ITEM 27 607-11525 Fence (Plastic) LF 75 28 608-00010 Concrete Apron EACH 1 29 609-21010 Curb and Gutter (Vertical) (1 Foot) LF 245 30 614-00010 Sign Panel (Class I) SF 3 31 614-00216 Steel Sign Post (2x2 Inch Tubing) LF 10 32 614-00218 Steel Sign Post (2.25x2.25 Inch Tubing) LF 3 33 620-00020 Sanitary Facility EACH 1 34 623-09900 Sprinkler System (Reset) LS 1 35 625-00000 Construction Surveying LS 1 36 626-00000 Mobilization LS 1 37 627-00001 Pavement Marking Paint GAL 8 BASE BID TOTAL: FORCE ACCOUNTS TOTAL: $12,000.00 TOTAL BID (BASE BID + FORCE ACCOUNTS): TOTAL BASE BID + FORCE ACCOUNTS IN WORDS: Force Accounts 700-70010 F/A Minor Contract Revisions F.A. 1 $10,000 700-70320 F/A Sprinklers F.A. 1 $2,000 07-22-068_SOFTSPOT 3/14/2023 Pl o t D a t e : 3/ 1 4 / 2 0 2 3 2 : 0 6 P M P l o t t e d B y : Ky l e R i t c h i e Da t e C r e a t e d : 3/ 1 4 / 2 0 2 3 \\ J U B . C O M \ C E N T R A L \ C L I E N T S \ C O \ F O R T C O L L I N S C I T Y \ P R O J E C T S \ 0 7 - 2 2 - 0 6 8 _ P F A P A R K I N G L O T \ D E S I G N \ C A D \ W O R K \ K R I T C H I E \ 0 7 - 2 2 - 0 6 8 _ S O F T S P O T . D W G FILE: LAST UPDATE: J-U-B ENGINEERS, INC.J-U-B ENGINEERS, INC. TRAINING FACILITY PARKING LOT ADDITIONPOUDRE FIRE AUTHORITY BID ADDENDUM #2 EXHIBIT #2 - SOFT SPOT REPAIR SCALE:A SOFT SPOT REPAIR DETAIL NONE ‘’ BID 9767: PFA Training Facility Parking Lot Addition – Addendum 2 Exhibit 3 REVISION OF SECTION 203 EXCAVATION AND EMBANKMENT Section 203 of the Standard Specifications is hereby revised for this project as follows: Subsection 203.02 Excavation (a) Unclassified Excavation, add the following: Excavated material generated from the access road and parking lot areas will be considered for use as Embankment Material on this project, if the material meets the requirements of section 203.03. If the material is deemed not useable, the Unclassified Excavation material shall become the property of the Contractor. Haul for disposing of removed material will not be paid for separately, but shall be included in the work. Subsection 203.03, add the following: All embankment material used within the access road or parking lot prism shall consist of clean non-expansive, granular fill with a minimum “R” value of 15. The Contractor shall furnish evidence that the material from the site or other sources, for use in the parking lot embankment, meets the above requirements and shall pay for such tests as may be required to show compliance. All material shall be sampled and tested in accordance with the appropriate Colorado Department of Transportation or AASHTO procedures. Subsection 203.05 (c) – Unsuitable Material, shall be deleted and replaced with the following: If encountered on the project, unsuitable materials in the subgrade that are determined to be detrimental to the parking lot, access road or embankment construction shall be removed to the depth and extents as directed by the Engineer. The excavated area shall be backfilled to finished subgrade with approved material per the soft spot repair detail in the plans and compacted per project requirements. Materials that contain organics or that cannot be dried or moisture conditioned, then compacted to the required density will be disposed of and cannot be reused as embankment fill. Unsuitable material includes, but is limited to, topsoil, vegetation, brush, sod, trash, and other deleterious substances. Materials not containing organics and that can be dried, or moisture conditioned and compacted to the required density can be reused as embankment fill as approved by the Engineer. Subsection 203.11, shall include the following: The quantity for Embankment will not be measured, but will be the quantity designated in the Contract, unless field changes are ordered. If field changes are ordered, the quantities will be calculated using the revised dimensions and the additional volume of material shall be approved in writing by the Engineer prior to beginning the work. No allowances shall be made for shrinkage, swell, subsidence due to compaction of the existing ground or any other losses. The quantity for Unsuitable Material will be measured by actual cubic yards of material removed as directed and approved by the Engineer. Subsection 203.12 shall include the following: All excess material generated from earthwork activities shall become property of the Contractor. Haul for disposing of removed materials will not be paid for separately, but shall be included in the work. Payment for Unsuitable Material shall include excavation, hauling and disposing of unsuitable material, furnishing and placing of geo-grid fabric, furnishing, placing and compacting imported material as directed by the Engineer.