HomeMy WebLinkAboutBID - 9718 CHILDCARE CENTER RENOVATION - NORTHSIDE AZTLAN CENTER
SPECIFICATIONS
AND
CONTRACT DOCUMENTS
FOR
CHILDCARE CENTER RENOVATION –
NORTHSIDE AZTLAN CENTER
BID NO. 9718
PURCHASING DIVISION
215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS
FEBRUARY 9, 2023 – 3:00 P.M. (OUR CLOCK)
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
CONTRACT DOCUMENTS TABLE OF CONTENTS
BID INFORMATION
00020 Notice Inviting Bids
00100 Instruction to Bidders
00300 Bid Form
00400 Supplements to Bid Forms
00410 Bid Bond
00420 Statements of Bidders Qualifications
00430 Schedule of Major Subcontractors
00440 CDOT Form #606, Anti-Collusion Affidavit
00450 CDOT Form #1413, Bidders List
00460 CDOT Form #1414, Anticipated DBE Participation Plan
00470 Buy America Certification
00480 Certification Regarding Lobbying
CONTRACT DOCUMENTS
00500 Agreement Forms
00510 Notice of Award
00520 Agreement
00530 Notice to Proceed
00600 Bonds and Certificates
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (Contractor)
00660 Consent of Surety 00660-1
00670 Application for Exemption Certificate
CONDITIONS OF THE CONTRACT
00700 General Conditions
Exhibit GC-A GC-A1 - GC-A2
00800 Supplementary Conditions
Davis Bacon Wage Rates
ARPA ADDENDUM - Contract Provisions for non-Federal Entity Contracts Under
Federal Awards
00900 Addenda, Modifications, and Payment
00950 Contract Change Order
00960 Application for Payment
DRAWINGS
G0.00 Title Sheet & Drawing Index
G0.01 General Notes, Symbols & Abbreviations
G0.10 Code Compliance Plan
G0.20 ADA Details
G0.21 ADA Details
L1.01 Site Layout Plan
A0.00 Wall Type Schedule & Details
A0.01 Typical Interior Stud Framing Details
A0.11 First Floor Demolition Plan
A1.11 First Floor Plan
A1.21 First Floor Reflected Ceiling Plan
A6.10 Enlarged Restroom Plans, Elevations, Schedule & Details
A6.20 Interior Elevations
A6.40 Door Schedule, Door & Window Types, Frame Types
F1.11 First Floor Finishes Plan
FS1.01 First Floor Fire Suppression Plan - Childcare Area
P0.01 Below Floor Plumbing Demo Plan - Childcare Area
P0.02 First Floor Plumbing Demo Plan - Childcare Area
P1.01 Below Floor Plumbing Plan - Childcare Area
P1.02 First Floor Plumbing Plan - Childcare Area
P2.01 Plumbing Schedules
M0.00 Mechanical Abbreviations, Symbols & Notes
M0.01 First Floor HVAC Demo Plan - Childcare Area
M1.01 First Floor HVAC Plan - Childcare Area
M2.01 Mechanical Details
M3.01 Mechanical Schedules
E0.00 Electrical Abbreviations, Symbols Legend & General Notes
E0.02 Electrical Orientation and Demo Plan
E1.11 First Floor Lighting Plan
E2.11 First Floor Power & Auxiliary Systems Plan
E4.01 Electrical Schedules
E5.01 Electrical Details
SECTION 00020
INVITATION TO BID
SECTION 00020
INVITATION TO BID
Date: January 10, 2023
Sealed Bids will be submitted to the City of Fort Collins (hereinafter referred to as OWNER),
through Rocky Mountain E-Purchasing System (RMEPS) at
http://www.bidnetdirect.com/colorado/city-of-fort-collins no later than 3:00 PM MDT February 9,
2022. Note: please ensure adequate time to submit Bids through RMEPS. Bids not submitted
by the designated Opening Date and Time will not be accepted by the system
Public Bid Opening: Bid openings will be conducted by videoconference. At said time, and
promptly thereafter, all Bids that have been duly received will be publicly opened and read
aloud. To access the public Bid opening, please follow the link:
Topic: BID OPENING - 9718 Childcare Center Renovation - NACC
Time: Feb 9, 2023 03:00 PM Mountain Time (US and Canada)
Join Zoom Meeting
https://us02web.zoom.us/j/82467325299?pwd=cC81V1lWZFU2YlJleDdRUDhMUWVYUT09
Meeting ID: 824 6732 5299
Passcode: 164140
One tap mobile
+17193594580,,82467325299#,,,,*164140# US
+12532158782,,82467325299#,,,,*164140# US (Tacoma)
Dial by your location
+1 719 359 4580 US
+1 253 215 8782 US (Tacoma)
+1 346 248 7799 US (Houston)
+1 669 444 9171 US
+1 669 900 9128 US (San Jose)
+1 253 205 0468 US
+1 360 209 5623 US
+1 386 347 5053 US
+1 507 473 4847 US
+1 564 217 2000 US
+1 646 558 8656 US (New York)
+1 646 931 3860 US
+1 689 278 1000 US
+1 301 715 8592 US (Washington DC)
+1 305 224 1968 US
+1 309 205 3325 US
+1 312 626 6799 US (Chicago)
Meeting ID: 824 6732 5299
Passcode: 164140
Find your local number: https://us02web.zoom.us/u/kcVgSUDVH4
The Contract Documents provide for the construction of Bid 9718 Childcare Center Renovation
– Northside Aztlan Community Center. The scope of work consists of providing the renovation
of the City of Fort Collins Northside Aztlan Recreation Center at 112 Willow Street, Fort Collins,
Colorado. The work consists of renovating portions of west side of the building to create a new
childcare center. This work will need to be completed in one phase. See Attachment A for the
drawings which provides the scope of work. The other areas at Northside Aztlan Recreation
Center will need to remain open to the public which will require dust partitions installed and
there may need to be certain portions of work (loud noises) performed outside of City business
hours (7:00AM – 5:00PM). The City will do their best to work with the selected Contractor to limit
work outside the stated business hours and we ask that the selected Contractor make
provisions in their BID to minimize the impact to the public.
The Project start date for construction is anticipated to be March 13, 2023 and the work
shall be Substantially Complete by August 30, 2023. The project will be funded with Federal
funds. Davis Bacon Wage requirements apply.
All Bids must be in accordance with the Contract Documents on file with the City of Fort Collins,
215 North Mason St., 2nd floor, Fort Collins, Colorado 80524.
The City encourages all disadvantaged business enterprises to submit bid in response to all
invitations and will not be discriminated against on the grounds of race, color, national origin.
A MANDATORY pre-bid conference and job walk with representatives of prospective
Bidders will be held at 3:00PM MT, on January 17, 2023, at 112 Willow St., Fort Collins,
CO 80524, Fort Collins.
Prospective Bidders are invited to present their questions relative to this Bid proposal at this
meeting.
All questions must be submitted in writing via email to Brian Hergott at
bhergott@fcgov.com , with a copy to Jake Rector, Senior Buyer at jrector@fcgov.com,
no later than 4:00 PM our clock on January 24, 2023 Questions received after this deadline
may not be answered.
The Contract Documents and Construction Drawings may be examined online at:
http://www.bidnetdirect.com/colorado/city-of-fort-collins
Bids will be received as set forth in the Bidding Documents.
The Work is expected to be commenced within the time as required by Section 2.3 of General
Conditions. Substantial Completion of the Work is required as specified in the Agreement.
The successful Bidder will be required to furnish a Performance Bond and a Payment Bond
guaranteeing faithful performance and the payment of all bills and obligations arising from the
performance of the Contract.
No Bid may be withdrawn within a period of forty-five (45) days after the date fixed for opening
Bids.
The OWNER reserves the right to reject any and all Bids, and to waive any informalities and
irregularities therein.
Bid security in the amount of not less than 5% of the total Bid must accompany each Bid in the
form specified in the Instructions to Bidders.
Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have
a financial interest in the sale to the City of any real or personal property, equipment, material,
supplies or services where such officer or employee exercises directly or indirectly any decision-
making authority concerning such sale or any supervisory authority over the services to be
rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift,
gratuity favor, entertainment, kickback or any items of monetary value from any person who has
or is seeking to do business with the City of Fort Collins is prohibited.
City of Fort Collins
Gerry Paul
Purchasing Director
SECTION 00100
INSTRUCTIONS TO BIDDERS
SECTION 00100
INSTRUCTIONS TO BIDDERS
1.0 DEFINED TERMS
Terms used in these Instructions to Bidders which are defined in the Standard General
Conditions of the Construction Contract (No. 1910-8, 1990 ed.) have the meanings
assigned to them in the General Conditions. The term "Bidder" means one who submits
a Bid to OWNER, as distinct from a sub-bidder, who submits a Bid to Bidder. The terms
"Successful Bidder" means the lowest, qualified, responsible and responsive Bidder to
whom OWNER (on basis of OWNER's evaluation as hereinafter provided) makes an
award. The term "Bidding Documents" includes the Advertisement or Invitation to Bid,
Instructions to Bidders, the Bid Form, and the proposed Contract Documents (including
all Addenda issued prior to receipt of Bids).
2.0 COPIES OF BIDDING DOCUMENTS
2.1. Complete sets of Bidding Documents may be obtained as stated in the Invitation to
Bid. No partial sets will be issued. The Bidding Documents may be examined at the
locations identified in the Invitation to Bid.
2.2. Complete sets of Bidding Documents shall be used in preparing Bids; neither
OWNER nor Engineer assumes any responsibility for errors or misinterpretations
resulting from the use of incomplete sets of Bidding Documents.
2.3. The submitted Bid proposal shall include Sections 00300, 00410, 00420, 00430,
00440, 00450. 00460, 00470 and 00480 fully executed.
2.4. OWNER and Engineer, in making copies of Bidding Documents available on the
above terms, do so only for the purpose of obtaining Bids on the Work and do not
confer a license or grant for any other use.
3.0 QUALIFICATION OF BIDDERS
3.1 To demonstrate qualifications to perform the Work, each Bidder must submit at the
time of the Bid opening, a written statement of qualifications including financial data,
a summary of previous experience, previous commitments and evidence of
authority to conduct business in the jurisdiction where the Project is located. Each
Bid must contain evidence of Bidder's qualification to do business in the state where
the Project is located or covenant to obtain such qualification prior to award of the
contract. The Statement of Qualifications shall be prepared on the form provided in
Section 00420.
3.2. In accordance with Section 8-160 of the Code of the City of Fort Collins in
determining whether a bidder is responsible, the following shall be considered: (1)
The ability, capacity and skill of the bidder to perform the contract or provide the
services required, (2) whether the bidder can perform the contract or provide the
service promptly and within the time specified without delay or interference, (3) the
character, integrity, reputation, judgment, experience and efficiency of the bidder,
(4) the quality of the bidder's performance of previous contracts or services, (5) the
previous and existing compliance by the bidder with laws and ordinances relating to
the contract or service, (6) the sufficiency of the financial resources and ability of the
bidder to perform the contract or provide the service, (7) the quality, availability and
adaptability of the materials and services to the particular use required, (8) the
ability of the bidder to provide future maintenance and service for the use of the
subject of the contract, and (9) any other circumstances which will affect the
bidder's performance of the contract.
3.3. Each Bidder may be required to show that he has handled former Work so that no
just claims are pending against such Work. No Bid will be accepted from a Bidder
who is engaged on any other Work which would impair his ability to perform or
finance this Work.
3.4 No Bidder shall be in default on the performance of any other contract with the City
or in the payment of any taxes, licenses or other monies due to the City.
4.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE
4.1. It is the responsibility of each Bidder, before submitting a Bid, to (a) examine the
Contract Documents thoroughly, (b) visit the site to familiarize himself with local
conditions that may in any manner affect cost, progress or performance of the
Work, (c) familiarize himself with federal, state and local laws, ordinances, rules and
regulations that may in any manner affect cost, progress or performance of the
Work, (d) study and carefully correlate Bidder's observations with the Contract
Documents, and (e) notify Engineer of all conflicts, errors or discrepancies in the
Contract Documents.
4.2. Reference is made to the Supplementary Conditions for identification of: Subsurface
and Physical Conditions SC-4.2.
4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder
that Bidder has complied with every requirement of this Article 4, that without
exception the Bid is premised upon performing and furnishing the Work required by
the Contract Documents and such means, methods, techniques, sequences or
procedures of construction as may be indicated in or required by the Contract
Documents, and that the Contract Documents are sufficient in scope and detail to
indicate and convey understanding of all terms and conditions for performance and
furnishing of the Work.
5.0 INTERPRETATIONS AND ADDENDA.
5.1. All questions about the meaning or intent of the Bidding Documents are to be
submitted in writing to the Engineer and the OWNER. Interpretation or clarifications
considered necessary in response to such questions will be issued only by
Addenda. Questions received less than seven days prior to the date for opening of
the Bids may not be answered. Only questions answered by formal written Addenda
will be binding. Oral and other interpretations or clarifications will be without legal
effect.
5.2. All questions concerning the scope of this project should be directed to the
Engineer. Questions regarding submittal of bids should be directed to the City of
Fort Collins' Purchasing Division.
5.3. Addenda may also be issued to modify the Bidding Documents as deemed
advisable by OWNER or Engineer.
5.4. Addenda will be mailed or delivered to all parties recorded by the OWNER as
having received the Bidding documents.
6.0 BID SECURITY
6.1. Each Bid must be accompanied by Bid Security made payable to OWNER in the
amount stated in the Invitation to Bid. The required security must be in the form of a
certified or bank cashier's check payable to OWNER or a Bid Bond on the form
enclosed herewith. The Bid Bond must be executed by a surety meeting the
requirements of the General Conditions for surety bonds.
6.2. The Bid Security of the successful Bidder will be retained until such Bidder has
executed the Agreement and furnished the required contract security, whereupon
Bid Security will be returned. If the successful Bidder fails to execute and deliver the
Agreement and furnish the required contract security within 15 days of the Notice of
Award, OWNER may annul the Notice of Award and the Bid Security of that Bidder
will be forfeited. The Bid Security of other Bidders whom OWNER believes to have
reasonable chance receiving the award may be retained by OWNER until the earlier
of the seventh day after the effective date of the Agreement or the thirty-first day
after the Bid Opening, whereupon Bid Security furnished by such Bidders will be
returned. Bid Security with Bids which are not competitive will be returned within
seven days after the Bid opening.
7.0 CONTRACT TIME.
The number of days within which, or the date by which the Work is to be Substantially
Complete and also completed and ready for Final Payment (the Contract Times) are set
forth in the Agreement.
8.0 LIQUIDATED DAMAGES.
Provisions for liquidated damages are set forth in the Agreement.
9.0 SUBSTITUTE ("OR EQUAL") MATERIAL AND EQUIPMENT
The Contract, if awarded, will be on the basis of material and equipment described on
the Drawings or specified in the Specifications without consideration of possible
substitute or "or equal" items. Whenever it is indicated on the Drawings or specified in
the Specifications that a substitute or "or equal" item of material or equipment may be
furnished or used by CONTRACTOR if acceptable to Engineer, application for such
acceptance will not be considered by Engineer until after the "effective date of the
Agreement". The procedure for submittal of any such application by CONTRACTOR and
consideration by Engineer is set forth in the General Conditions which may be
supplemented in the General Requirements.
10.0 SUBCONTRACTORS, SUPPLIERS AND OTHERS
10.1. Each Bidder shall submit at the Bid opening to OWNER a list of principal
subcontractors he proposes to use in the Work. Refer to Section 00430 contained
within these Documents.
10.2. If OWNER or Engineer after due investigation has reasonable objection to any
proposed Subcontractor, either may, before the Notice of Award is given, request
the apparent successful Bidder to submit an acceptable substitute without an
increase in Bid price. If the apparent successful Bidder declines to make any
substitution, OWNER may award the contract to the next lowest responsive and
responsible Bidder that proposes to use acceptable subcontractors.
Subcontractors, suppliers, other persons or organization listed and to whom
OWNER or Engineer does not make written objection prior to the giving of the
Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to
revocation of such acceptance after the effective date of the Agreement as
provided in the General Conditions.
10.3. CONTRACTOR shall not be required to employ any subcontractor, supplier or
other persons or organizations against whom he has reasonable objection. The
use of subcontractors listed by the Bidder and accepted by OWNER prior to the
Notice of Award will be required in the performance of the Work.
11.0 BID FORM.
11.1. A copy of the Bid Form is bound in the Contract Documents which may be retained
by the Bidder. A separate unbound copy is enclosed for submission with the Bid.
11.2. Bid Forms must be complete in ink or typed. All lump sum prices on the form must
be stated in words and numerals; in case of conflict, words will take precedence.
Unit prices shall govern over extensions of sums.
11.3. Bids by corporations must be executed in the corporate name by the president or a
vice-president (or other appropriate officer accompanied by evidence of authority to
sign) and the corporate seal shall be affixed and attested by the secretary or an
assistant secretary. The corporate address and state of incorporation shall be
shown below the corporate name.
11.4. Bids by partnerships must be executed in the partnership name and signed by a
partner, his title must appear under his signature and the official address of the
partnership must be shown below the signature.
11.5. Bids by joint venture shall be signed by each participant in the joint venture or by
an authorized agent of each participant. The full name of each person or company
interested in the Bid shall be listed on the Bid Form.
11.6. The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers
of which must be filled in on the Bid Form).
11.7. No alterations in Bids, or in the printed forms therefore, by erasures, interpolations,
or otherwise will be acceptable unless each such alteration is signed or initialed by
the Bidder; if initialed, OWNER may require the Bidder to identify any alteration so
initialed.
11.8. The address and telephone number for communications regarding the Bid shall be
shown.
12.0 BID PRICING.
Bids must be priced as set forth in the Bid Schedule or Schedules.
13.0 SUBMISSION OF BIDS.
13.1. Bids shall be submitted at the time and place indicated in the Invitation to Bid and
shall be enclosed in an opaque sealed envelope marked with the Project title, Bid
No., and name and address of the Bidder and accompanied by the Bid Security,
Bid Form, Bid Bond, Statement of Bidders Qualifications, and Schedule of
Subcontractors as required in Section 00430. If the Bid is sent through the mail or
other delivery system, the sealed envelope shall be enclosed in a separate
envelope with the notation "BID ENCLOSED" on the face of it.
13.2. Bids shall be deposited at the designated location prior to the time and date for
receipt of Bids indicated in the Invitation to Bid, or any extension thereof made by
addendum. Bids received after the time and date for receipt of Bids will be returned
unopened. Bidder shall assume full responsibility for timely delivery at the location
designated for receipt of Bids.
13.3. Oral, telephonic, telegraphic, or facsimile Bids are invalid and will not receive
consideration.
13.4. No Bidder may submit more than one Bid. Multiple Bids under different names will
not be accepted from one firm or association.
14.0 MODIFICATION AND WITHDRAWAL OF BIDS.
14.1. Bids may be modified or withdrawn by an appropriate document duly executed (in
a manner that a Bid must be executed) and delivered to the place where Bids are
to be submitted at any time prior to the opening of Bids.
14.2. Bids may also be modified or withdrawn in person by the Bidder or an authorized
representative provided he can prove his identity and authority at any time prior to
the opening of Bids.
14.3. Withdrawn Bids may be resubmitted up to the time designated for the receipt of
Bids provided that they are then fully in conformance with these Instructions to
Bidders.
15.0 OPENINGS OF BIDS.
Bids will be opened and (unless obviously non-responsive) read aloud publicly as
indicated in the Invitation to Bid. An abstract of the amounts of the Base Bids and major
alternates (if any) will be made available after the opening of Bids.
16.0 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE.
All Bids shall remain open for forty-five (45) days after the day of the Bid Opening, but
OWNER may, in his sole discretion, release any Bid and return the Bid Security prior to
that date.
17.0 AWARD OF CONTRACT.
17.1. OWNER reserves the right to reject any and all Bids, to waive any and all
informalities not involving price, time or changes in the Work, to negotiate contract
terms with the Successful Bidder, and the right to disregard all nonconforming,
nonresponsive, unbalanced or conditional Bids. Also, OWNER reserves the right to
reject the Bid of any Bidder if OWNER believes that it would not be in the best
interest of the Project to make an award to that Bidder, whether because the Bid is
not responsive or the Bidder is unqualified or of doubtful financial ability or fails to
meet any other pertinent standard or criteria established by OWNER.
Discrepancies between the indicated sum of any column of figures and the correct
sum thereof will be resolved in favor of the correct sum.
17.2. In evaluating Bids, OWNER will consider the qualifications of the Bidders, whether
or not the Bids comply with the prescribed requirements, and such alternates, unit
prices and other data, as may be requested in the Bid Form or prior to the Notice of
Award.
17.3. OWNER may consider the qualification and experience of Subcontractors,
Suppliers, and other persons and organizations proposed for those portions of the
Work as to which the identity of Subcontractors, Suppliers, and other persons and
organizations is submitted as requested by OWNER. OWNER also may consider
the operating costs, maintenance requirements, performance data and guarantees
of major items of materials and equipment proposed for incorporation in the Work
when such data is required to be submitted prior to the Notice of Award.
17.4. OWNER may conduct such investigations as OWNER deems necessary to assist
in the evaluation of any Bid and to establish the responsibility, qualifications and
financial ability of the Bidder's proposed Subcontractors, Suppliers and other
persons and organizations to do the Work in accordance with the Contract
Documents to OWNER's satisfaction within the prescribed time.
17.5. If the Contract is to be awarded, it will be awarded to the lowest responsive and
responsible Bidder whose evaluation by OWNER indicates to OWNER that the
award will be in the best interest of the OWNER. At the City’s sole discretion,
Award shall be made on the evaluated lowest responsive and responsible base bid
or lowest base bid plus any alternates. Only one contract will be awarded.
17.6. If the Contract is to be awarded, OWNER will give the Successful Bidder a Notice
of Award within forty-five (45) days after the date of the Bid opening.
18.0 CONTRACT SECURITY.
The General Conditions and the Supplementary Conditions set forth OWNER's
requirements as to performance and other Bonds. When the Successful Bidder delivers
the executed Agreement to the OWNER, it shall be accompanied by the required
Contract Security.
19.0 SIGNING OF AGREEMENT.
When OWNER gives a Notice of Award to the Successful Bidder, it will be accompanied
by the required number of unsigned counterparts of the Agreement with all other written
Contract Documents attached. Within fifteen (15) days thereafter, CONTRACTOR shall
sign and deliver the required number of counterparts of the Agreement and attached
documents to OWNER with the required Bonds. Within ten (10) days thereafter,
OWNER hall deliver one fully signed counterpart to CONTRACTOR. Each counterpart is
to be accompanied by a complete set of the Drawings with appropriate identification.
20.0 TAXES.
OWNER is exempt from Colorado State Sales and Use Taxes on materials and
equipment to be incorporated in the Work. Said taxes shall not be included in the
Contract Price. Reference is made to the General and Supplementary Conditions.
21.0 RETAINAGE.
Provisions concerning retainage are set forth in the Agreement.
22.0 PURCHASING RESTRICTIONS.
Purchasing restrictions: The Bidder's authorized signature of this Bid assures the
Bidder's compliance with the City's purchasing restrictions. A copy of the resolutions is
available for review in the Purchasing and Risk Management Division or the City Clerk's
office.
A. Cement Restrictions: City of Fort Collins Resolution 91-121 requires that
suppliers and producers of cement or products containing cement to certify
that the cement was not made in cement kilns that burn hazardous waste as
a fuel.
23.0 COLLUSIVE OR SHAM BIDS.
Any Bid deemed by the City in its sole discretion to be a collusive or sham Bid will be
rejected and reported to authorities as such. Your authorized signature of this Bid
assures that such Bid is genuine and is not a collusive or sham Bid.
24.0 BID RESULTS.
Bid results will be posted at http://www.bidnetdirect.com/colorado/city-of-fort-collins.
END OF SECTION
SECTION 00300
BID FORM
SECTION 00300
BID FORM
PROJECT: 9718 Childcare Center Renovation – Northside Aztlan Community Center
Place: 215 N Mason, 2nd Floor
Date:
1. In compliance with your Invitation to Bid dated , 20 and subject to
all conditions thereof, the undersigned a (Corporation, Limited Liability Company,
Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of
Colorado hereby proposes to furnish and do everything required by the Contract
Documents to which this refers for the construction of all items listed on the following Bid
Schedule or Bid Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in
good faith, without collusion or connection with any other person or persons Bidding for
the same Work, and that it is made in pursuance of and subject to all the terms and
conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the
detailed Specifications, and the Drawings pertaining to the Work to be done, all of which
have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum
of (IN WORDS)
($ ) in accordance with the Invitation To Bid and Instructions to
Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and
a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days
from the date when the written notice of the award of the contract is delivered to him at
the address given on this Bid. The name and address of the corporate surety with which
the Bidder proposes to furnish the specified performance and payment Bonds is as
follows: .
5. All the various phases of Work enumerated in the Contract Documents with their
individual jobs and overhead, whether specifically mentioned, included by implication or
appurtenant thereto, are to be performed by the CONTRACTOR under one of the items
listed in the Bid Schedule, irrespective of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or Bid
Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through
.
8. The undersigned Bidder hereby acknowledges the documents listed below are required
elements of the bid and must be submitted with the bid. The City may reject any
incomplete bids as non-responsive.
- Bid Form (Section 00300)
- Certified or Cashier’s Check Bid Bond (Item 3 above and Section 00410)
- Acknowledgement of Bid Addenda (Item 7 above)
- Statement of Bidder's Qualifications (Section 00420)
- Schedule of Subcontractors (Section 00430)
- CDOT Form #606, Anti-Collusion Affidavit (Section 00440)
- CDOT Form #1413, Bidders List (Section 00450)
- CDOT Form #1414, Anticipated DBE Participation Plan (Section 00460)
- Buy America Certification (Section 00470)
- Certification Regarding Lobbying (Section 00480)
9. PROJECT DETAIL
See Attachment A: For Construction Drawings.
Anticipated Construction Schedule
Award of Contract - Anticipate Mid February 2023
Permitting - City submitting for permit in parallel to bidding
Anticipate permit End of February
Construction - Anticipate Eleven (18) weeks for construction
- Anticipate Two (2) weeks for punchlist
- Substantial Completion August 30, 2023
Owner Specified Items:
1. Paint Figure wall finish white with one accent wall in each room
2. Flooring/Carpet Milliken – Southern Analog Pinhole
3. Rubber Base Match existing
4. Ceiling Grid/Tile Match existing
5. Wood Doors Match existing tall doors
6. Door Hardware Match existing Hardware
7. Laminate Counter Tops Match existing
10. DETAILED PRICING BREAKDOWN
At the City’s sole discretion, Award shall be made on the evaluated lowest responsive
and responsible base bid or lowest base bid plus any alternates. The division prices will
only be utilized to evaluate bid response to help assess if scope of bid appears complete
and assess the status of work complete on the Pay Application Schedule of Values.
Please provide a Lump Sum total price for the project, Alternate #1, and the individual
Division prices requested below.
Construction Cost Breakout Project: 9718 Childcare Center Renovation - NACC
1. Division 1 - General Conditions/General Requirements $
(Project Mgt, Safety, Vehicles, Small Tools, Gas, etc.)
2. Division 2 – Existing Conditions $
(Demolition, enclosures, trash, recycling, barricades, etc.)
3. Division 3 – Concrete & Reinforcing Steel $
(Footings, paving, walks, slabs, walls, etc.)
4. Division 4 – Masonry $
(Brick, stone, mortar, precast & associated flashings, etc.)
5. Division 5 – Metals & Steel New Fencing: $
Misc. Steel: $
6. Division 6 – Woods, Plastics & Composites $
(Carpentry, joist, decking, framing, cabinets, sheathing, etc.)
7. Division 7 – Thermal & Moisture Protection $
(Insulation, roofing, gutters, downspouts, waterproofing, sealants, etc.)
8. Division 8 – Doors, Windows & Glass $
(Doors, frames, O.H. Doors, windows, door hardware, etc.)
9. Division 9 – Finishes Metal Studs & Drywall: $
Acoustical Ceilings & Grid: $
Flooring & Tile: $
Painting & Coatings: $
10. Division 9 – Finishes Total $
(Carpet, LVT, Base) Carpet Unit Price $ /SY
LVT Unit Price $ /SF
Base Unit Price $ /LF
11. Division 10 – Specialties $
(Toilet & room partitions, toilet accessories, lockers, fire ext., etc.)
12. Division 11 – Equipment $ Allowance: $15,000.00
(Stoves, range hoods, dishwashers, refrigerators, etc.)
13. Division 12 – Furnishings $
(Window Film, blinds, shades, etc.)
(Desk, Chairs, Tables will be by Owner)
14. Division 13 – Fire Protection Systems $
15. Division 14 – Conveying Systems (Elevators) $ N/A
16. Division 15 – Mechanical Systems
15A. Plumbing $
15B. HVAC $
15C. Controls $
17. Division 16 16A. Electrical Power: $
16B. Electrical Lighting: $
16C. Fire Alarm: $
16D. Fob Access/Security $
18. Contractor’s Fee: (Overhead & Profit) $
19. Total Lump Sum Construction Cost: $
(Davis Bacon Wages is a Requirement):
Total Bid In Words:
Alternate #1:
Furnish and install a pair of wood doors in Hall 101 to separate the lobby from the
restrooms and classrooms. This includes labor, materials and equipment as detailed on
the drawings. This also includes access control.
Add: $
NOTE: PROVIDE A DETAILED LIST OF ANY EXCLUSIONS YOU HAVE FOR COMPLETING
THE SCOPE OF WORK NOTED IN THE BID DOCUMENTS.
Bidder acknowledges that the OWNER has the right to delete items in the Bid or change
quantities at his sole discretion without affecting the Agreement or prices of any item so
long as the deletion or change does not exceed twenty-five percent (25%) of the total
Agreement Price.
RESPECTFULLY SUBMITTED:
CONTRACTOR
BY:
Printed Date
Title
License Number (If Applicable)
(Seal - if Bid is by corporation)
Attest:
Address
Telephone
Email
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410 Bid Bond
00420 Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
00440 CDOT Form #606, Anti-Collusion Affidavit
00450 CDOT Form #1413, Bidders List
00460 CDOT Form #1414, Anticipated DBE Participation Plan
00470 Buy America Certification
00480 Certification Regarding Lobbying
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned
as Principal, and , as Surety, are hereby held and firmly bound
unto the City of Fort Collins, Colorado, as OWNER, in the sum of $
for the payment of which, well and truly to be made, we hereby jointly and severally bind
ourselves, successors, and assigns.
THE CONDITION of this obligation is such that whereas the Principal has submitted to the City
of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a
Construction Agreement for the construction of Fort Collins Project, 9718 Childcare Center
Renovation – Northside Aztlan Community Center.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the
form of Contract attached hereto (properly completed in accordance with said Bid) and
shall furnish a BOND for his faithful performance of said Contract, and for payment of all
persons performing labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid, then this
obligation shall be void; otherwise the same shall remain in force and effect, it being
expressly understood and agreed that the liability of the Surety for any and all claims
hereunder shall, in no event, exceed the penal amount of this obligation as herein
stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety
and its BOND shall be in no way impaired or affected by any extension of the time within which
the OWNER may accept such Bid; and said Surety does hereby waive notice of any such
extension.
Surety Companies executing bonds must be authorized to transact business in the State of
Colorado and be accepted by the OWNER.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals
this day of , 20__, and such of them as are corporations have caused
their corporate seals to be hereto affixed and these presents to be signed by their proper
officers, the day and year first set forth above.
PRINCIPAL SURETY
Name:
Address:
By: By:
Title: Title:
ATTEST:
By:
(SEAL) (SEAL)
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and comprehensive. This
statement must be notarized. If necessary, questions may be answered on separate attached
sheets. The Bidder may submit any additional information he desires.
1. Name of Bidder:
2. Permanent main office address:
3. When organized:
4. If a corporation, where incorporated:
5. How many years have you been engaged in the contracting business under your present
firm or trade name?
6. Contracts on hand: (Schedule these, showing the amount of each contract and the
appropriate anticipated dates of completion.)
7. General character of Work performed by your company:
8. Have you ever failed to complete any Work awarded to you?
If so, where and why?
9. Have you ever defaulted on a contract?
If so, where and why?
10. Are you debarred by any government agency?
If yes list agency name.
11. List the more important projects recently completed by your company, stating the
approximate cost of each, and the month and year completed, location and type of
construction.
12. List your major equipment available for this contract.
13. Experience in construction Work similar in importance to this project:
14. Background and experience of the principal members of your organization, including
officers:
15. Credit available: $
16. Bank Reference:
17. Will you, upon request, fill out a detailed financial statement and furnish any other
information that may be required by the OWNER?
18. Are you licensed as a General Contractor?
If yes, in what city, county and state?
What class, license and numbers?
19. Do you anticipate subcontracting Work under this Contract?
If yes, what percent of total contract?
And to whom?
20. Are any lawsuits pending against you or your firm at this time?
IF yes, DETAIL
21. What are the limits of your public liability? DETAIL
What company?
22. What are your company's bonding limitations?
23. The undersigned hereby authorizes and requests any person, firm or corporation to
furnish any information requested by the OWNER in verification of the recital comprising
this Statement of Bidder's Qualifications.
Dated at ________________ this ______ day of __________________, 20__.
Company:
By: Printed:
Title:
State of
County of
being duly sworn deposes and says that he
is of
(Name) (Organization)
and that the answers to the foregoing questions and all statements therein contained are true
and correct.
Subscribed and sworn to before me this _______ day of____________, 20__.
(Seal)
Notary Public
My commission expires: .
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors performing work on
this contract.
ITEM and ESTIMATE % of PROJECT SUBCONTRACTOR
SECTION 00440
SECTION 00450
SECTION 00460
SECTION 00470
BUY AMERICA
The contractor agrees to comply with 49 U.S.C. 5323(j) and 49 C.F.R. Part 661, which provide
that Federal funds may not be obligated unless steel, iron, and manufactured products used in
FTA-funded projects are produced in the United States, unless a waiver has been granted by FTA
or the product is subject to a general waiver. General waivers are listed in 49 C.F.R. 661.7, and
include final assembly in the United States for 15 passenger vans and 15 passenger wagons
produced by Chrysler Corporation, and microcomputer equipment and software. Separate
requirements for rolling stock are set out at 49 U.S.C. 5323(j)(2)(C) and 49 C.F.R. 661.11. Rolling
stock must be assembled in the United States and have a 60 percent domestic content.
A bidder or offeror must submit to the FTA recipient the appropriate Buy America certification
(below) with all bids or offers on FTA-funded contracts, except those subject to a general waiver.
Bids or offers that are not accompanied by a completed Buy America certification must be
rejected as nonresponsive. This requirement does not apply to lower tier subcontractors.
BIDDER MUST SIGN ONE (1) OF THE FOLLOWING:
Certification requirement for procurement of steel, iron, or manufactured products.
Certificate of Compliance with 49 U.S.C. 5323(j)(1)
The bidder or offeror hereby certifies that it will meet the requirements of 49 U.S.C. 5323(j)(1) and
the applicable regulations in 49 C.F.R. Part 661.5.
Date _______________________________________________________________________
Signature ____________________________________________________________________
Company Name _______________________________________________________________
Title ________________________________________________________________________
Certificate of Non-Compliance with 49 U.S.C. 5323(j)(1)
The bidder or offeror hereby certifies that it cannot comply with the requirements of 49 U.S.C.
5323(j)(1) and 49 C.F.R. 661.5, but it may qualify for an exception pursuant to 49 U.S.C.
5323(j)(2)(A), 5323(j)(2)(B), or 5323(j)(2)(D), and 49 C.F.R. 661.7.
Date _______________________________________________________________________
Signature ____________________________________________________________________
Company Name ______________________________________________________________
Title ________________________________________________________________________
SECTION 00480
APPENDIX A, 49 CFR PART 20--CERTIFICATION REGARDING LOBBYING
Certification for Contracts, Grants, Loans, and Cooperative Agreements
(To be submitted with each bid or offer exceeding $100,000)
The undersigned [Contractor] certifies, to the best of his or her knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the
undersigned, to any person for influencing or attempting to influence an officer or employee
of an agency, a Member of Congress, an officer or employee of Congress, or an employee of
a Member of Congress in connection with the awarding of any Federal contract, the making
of any Federal grant, the making of any Federal loan, the entering into of any cooperative
agreement, and the extension, continuation, renewal, amendment, or modification of any
Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person
for making lobbying contacts to an officer or employee of any agency, a Member of Congress,
an officer or employee of Congress, or an employee of a Member of Congress in connection
with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall
complete and submit Standard Form--LLL, "Disclosure Form to Report Lobbying," in
accordance with its instructions [as amended by "Government wide Guidance for New
Restrictions on Lobbying," 61 Fed. Reg. 1413 (1/19/96). Note: Language in paragraph (2)
herein has been modified in accordance with Section 10 of the Lobbying Disclosure Act of
1995 (P.L. 104-65, to be codified at 2 U.S.C. 1601, et seq.)]
(3) The undersigned shall require that the language of this certification be included in the award
documents for all subawards at all tiers (including subcontracts, subgrants, and contracts
under grants, loans, and cooperative agreements) and that all subrecipients shall certify and
disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when this
transaction was made or entered into. Submission of this certification is a prerequisite for making
or entering into this transaction imposed by 31, U.S.C. § 1352 (as amended by the Lobbying
Disclosure Act of 1995). Any person who fails to file the required certification shall be subject to
a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
[Note: Pursuant to 31 U.S.C. § 1352(c)(1)-(2)(A), any person who makes a prohibited expenditure
or fails to file or amend a required certification or disclosure form shall be subject to a civil penalty
of not less than $10,000 and not more than $100,000 for each such expenditure or failure.]
The Contractor, ________________ ___, certifies or affirms the truthfulness and
accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor
understands and agrees that the provisions of 31 U.S.C. A 3801, et seq., apply to this certification
and disclosure, if any.
__________________________ Signature of Contractor's Authorized Official
__________________________ Name and Title of Contractor's Authorized Official
___________________________ Date
SECTION 00500
AGREEMENT FORMS
00510 Notice of Award
00520 Agreement
00530 Notice to Proceed
SECTION 00510
NOTICE OF AWARD
DATE: [Date]
TO: [Contractor]
PROJECT: 9718 Childcare Center Renovation – Northside Aztlan Community Center.
OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the OWNER")
You are hereby notified that your Bid dated [Contractor's Bid Date] for the above project has
been considered. You are the apparent successful Bidder and have been awarded an
Agreement for 9718 Childcare Center Renovation – Northside Aztlan Community Center.
The Price of your Agreement is ($ ).
Three (3) copies of each of the proposed Contract Documents (except Drawings) accompany
this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise
made available to you immediately.
You must comply with the following conditions precedent within fifteen (15) days of the date of
this Notice of Award, that is by [Date].
1. You must deliver to the OWNER three (3) fully executed counterparts of the Agreement
including all the Contract Documents. Each of the Contract Documents must bear your
signature on the cover of the page.
2. You must deliver with the executed Agreement the Contract Security (Bonds) as
specified in the Instructions to Bidders, General Conditions (Article 5.1) and
Supplementary Conditions.
Failure to comply with these conditions within the time specified will entitle OWNER to consider
your Bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited.
Within ten (10) days after you comply with those conditions, OWNER will return to you one (1)
fully signed counterpart of the Agreement with the Contract Documents attached.
City of Fort Collins
OWNER
By:
Gerry Paul
Purchasing Director
SECTION 00520
AGREEMENT
THIS AGREEMENT is dated as of the [Day] day of [Month] in the year of 20[Year] and shall be
effective on the date this AGREEMENT is signed by the City.
The City of Fort Collins (hereinafter called OWNER) and
[Contractor] (hereinafter called CONTRACTOR)
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth,
agree as follows:
ARTICLE 1. WORK
CONTRACTOR shall complete all Work as specified or indicated in the Contract
Documents. The Project for which the Work under the Contract Documents may
be the whole or only a part is defined as the construction of the 9718 Childcare
Center Renovation – Northside Aztlan Community Center and is generally
described in Section 01010.
ARTICLE 2. ENGINEER
The Project has been designed by Clark & Enersen, who is hereinafter called
ENGINEER and who will assume all duties and responsibilities and will have the
rights and authority assigned to ENGINEER in the Contract Documents in
connection with completion of the Work in accordance with the Contract
Documents.
ARTICLE 3. CONTRACT TIMES
3.1 The Work shall be Substantially Complete by August 30, 2023 and ready
for Final Payment and Acceptance in accordance with the General
Conditions within thirty (30) calendar days after the date when the Contract
Times commence to run.
3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is
of the essence of this Agreement and that OWNER will suffer financial loss
if the Work is not completed within the times specified in paragraph 3.1.
above, plus any extensions thereof allowed in accordance with Article 12 of
the General Conditions.
They also recognize the delays, expenses and difficulties involved in
proving in a legal preceding the actual loss suffered by OWNER if the Work
is not completed on time. Accordingly, instead of requiring any such proof,
OWNER and CONTRACTOR agree that as Liquidated damages for delay
(but not as penalty) CONTRACTOR shall pay OWNER the amounts set
forth hereafter.
1) Substantial Completion:
FOUR HUNDRED Dollars ($400) for each calendar day or fraction
thereof that expires after August 30, 2023 for Substantial Completion of
the Work until the Work is Substantially Complete.
2) Final Acceptance:
After Substantial Completion, TWO HUNDRED FIFTY Dollars ($250) for
each calendar day or fraction thereof that expires after thirty (30) days
for Final Payment and Acceptance until the Work is ready for Final
Payment and Acceptance.
ARTICLE 4. CONTRACT PRICE
4.1 OWNER shall pay CONTRACTOR for performance of the Work in
accordance with the Contract Documents in current funds as follows:
($ ), in accordance with Section 00300, attached and incorporated
herein by this reference.
ARTICLE 5. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with Article
14 of the General Conditions. Applications for Payment will be processed by
ENGINEER as provided in the General Conditions.
5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on
account of the Contract Price on the basis of CONTRACTOR's Application
for Payment as recommended by ENGINEER, once each month during
construction as provided below. All progress payments will be on the basis
of the progress of the Work measured by the schedule of values
established in paragraph 2.6 of the General Conditions and in the case of
Unit Price Work based on the number of units completed, and in
accordance with the General Requirements concerning Unit Price Work.
5.1.1. Prior to Substantial Completion, Owner will be entitled to withhold as
contract retainage five percent (5%) of each progress payment, but, in each
case, less the aggregate of payments previously made and less such
amounts as ENGINEER shall determine, or OWNER may withhold, in
accordance with paragraph 14.7 of the General Conditions. If , in the sole
discretion of Owner, on recommendation of Engineer, Owner determines
that the character and progress of the Work have been satisfactory to
OWNER and ENGINEER, OWNER may determine that as long as the
character and progress of the Work remain satisfactory to them, there will
be no additional retainage on account of Work completed in which case the
remaining progress payments prior to Substantial Completion will be in an
amount equal to 100% of the Work completed. 95% of materials and
equipment not incorporated in the Work (but delivered, suitably stored and
accompanied by documentation satisfactory to OWNER as provided in
paragraph 14.2 of the General Conditions) may be included in the
application Section 00520 Page 3 for payment.
5.1.2. Upon Substantial Completion payment will be made in an amount
sufficient, if necessary, to increase total payments to CONTRACTOR to
95% of the Contract Price, less such amounts as ENGINEER shall
determine or OWNER may withhold in accordance with paragraph 14.7 of
the General Conditions or as provided by law.
5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in
accordance with paragraph 14.13 of the General Conditions, OWNER shall
pay the remainder of the Contract Price as recommended by ENGINEER
as provided in said paragraph 14.13.
ARTICLE 6. CONTRACTOR'S REPRESENTATION
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes
the following representations:
6.1. CONTRACTOR has familiarized himself with the nature and extent of the
Contract Documents, Work, site, locality, and with all local conditions and
Laws and Regulations that in any manner may affect cost, progress,
performance or furnishing of the Work.
6.2. CONTRACTOR has studied carefully all reports of explorations and tests of
subsurface conditions and drawings of physical conditions which are
identified in the Supplementary Conditions as provided in paragraph 4.2 of
the General Conditions.
6.3. CONTRACTOR has obtained and carefully studied (or assumes
responsibility for obtaining and carefully studying) all such examinations,
investigations, explorations, tests, reports, and studies (in addition to or to
supplement those referred to in paragraph 6.2 above) which pertain to the
subsurface or physical condition at or contiguous to the site or otherwise
may affect the cost, progress, performance or furnishing of the Work as
CONTRACTOR considers necessary for the performance or furnishing of
the Work at the Contract Price, within the Contract Times and in
accordance with the other terms and conditions of the Contract Documents,
including specifically the provisions of paragraph 4.2 of the General
Conditions; and no additional examinations, investigations, explorations,
tests, reports, studies or similar information or data are or will be required
by CONTRACTOR for such purposes.
6.4. CONTRACTOR has reviewed and checked all information and data shown
or indicated on the Contract Documents with respect to existing
Underground Facilities at or contiguous to the site and assumes
responsibility for the accurate location of said Underground Facilities. No
additional examinations, investigations, explorations, tests, reports, studies
or similar information or data in respect of said Underground Facilities are
or will be required by CONTRACTOR in order to perform and furnish the
Work at the Contract Price, within the Contract Times and in accordance
with the other terms and conditions of the Contract Documents, including
specifically the provision of paragraph 4.3. of the General Conditions.
6.5. CONTRACTOR has correlated the results of all such observations,
examinations, investigations, tests, reports and data with the terms and
conditions of the Contract Documents.
6.6. CONTRACTOR has given ENGINEER written notice of all conflicts, errors
or discrepancies that he has discovered in the Contract Documents and the
written resolution thereof by ENGINEER is acceptable to CONTRACTOR.
ARTICLE 7. CONTRACT DOCUMENTS
7.1 The Contract Documents which comprise the entire Agreement between
OWNER and CONTRACTOR concerning the Work consist of the General
Conditions, Supplementary Conditions, those items included in the
definition of “Contract Documents” in Article 1.10 of the General Conditions,
and such other items as are referenced in this Article 7, all of which are
incorporated herein by this reference.
7.2 Forms for use by CONTRACTOR in performing the Work and related
actions in carrying out the terms of this Agreement are deemed Contract
Documents and incorporated herein by this reference, and include, but are
not limited to, the following:
7.2.1 Certificate of Substantial Completion
7.2.2 Certificate of Final Acceptance
7.2.3 Lien Waiver Releases
7.2.4 Consent of Surety
7.2.5 Application for Exemption Certificate
7.2.6 Application for Payment
7.3 Drawings, consisting of a cover sheet and sheets numbered as follows:
DRAWINGS:
G0.00 Title Sheet & Drawing Index
G0.01 General Notes, Symbols & Abbreviations
G0.10 Code Compliance Plan
G0.20 ADA Details
G0.21 ADA Details
L1.01 Site Layout Plan
A0.00 Wall Type Schedule & Details
A0.01 Typical Interior Stud Framing Details
A0.11 First Floor Demolition Plan
A1.11 First Floor Plan
A1.21 First Floor Reflected Ceiling Plan
A6.10 Enlarged Restroom Plans, Elevations, Schedule & Details
A6.20 Interior Elevations
A6.40 Door Schedule, Door & Window Types, Frame Types
F1.11 First Floor Finishes Plan
FS1.01 First Floor Fire Suppression Plan - Childcare Area
P0.01 Below Floor Plumbing Demo Plan - Childcare Area
P0.02 First Floor Plumbing Demo Plan - Childcare Area
P1.01 Below Floor Plumbing Plan - Childcare Area
P1.02 First Floor Plumbing Plan - Childcare Area
P2.01 Plumbing Schedules
M0.00 Mechanical Abbreviations, Symbols & Notes
M0.01 First Floor HVAC Demo Plan - Childcare Area
M1.01 First Floor HVAC Plan - Childcare Area
M2.01 Mechanical Details
M3.01 Mechanical Schedules
E0.00 Electrical Abbreviations, Symbols Legend & General Notes
E0.02 Electrical Orientation and Demo Plan
E1.11 First Floor Lighting Plan
E2.11 First Floor Power & Auxiliary Systems Plan
E4.01 Electrical Schedules
E5.01 Electrical Details
These drawings are for bidding and permitting purposes only. The final
Contract Drawings shall be stamped "Final for Construction" and dated.
Any revisions made shall be clearly identified and dated. The awarded
contractor will be allowed the opportunity to revise their pricing for the
changes made for “Final for Construction” documents and a price
adjustment made if justification is provided and approved.
7.4. Addenda Numbers to , inclusive.
7.5. The Contract Documents also include all written amendments and other
documents amending, modifying, or supplementing the Contract
Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions.
7.6. There are no Contract Documents other than those listed or incorporated
by reference in this Article 7. The Contract Documents may only be
amended, modified or supplemented as provided in paragraphs 3.5 and 3.6
of the General Conditions.
ARTICLE 8. MISCELLANEOUS
8.1. Terms used in this Agreement which are defined in Article I of the General
Conditions shall have the meanings indicated in the General Conditions.
8.2. No assignment by a party hereto of any rights under or interests in the
Contract Documents will be binding on another party hereto without the
written consent of the party sought to be bound; and specifically but not
without limitations, moneys that may become due and moneys that are due
may not be assigned without such consent (except to the extent that the
effect of this restriction may be limited by law), and unless specifically
stated to the contrary in any written consent to an assignment no
assignment will release or discharge that assignor from any duty or
responsibility under the Contract Document.
8.3. OWNER and CONTRACTOR each binds itself, its partners, successors,
assigns and legal representatives to the other party hereto, its partners,
successors, assigns and legal representatives in respect to all covenants,
Agreement and obligations contained in the Contract Document.
OWNER: CITY OF FORT COLLINS CONTRACTOR: [CONTRACTOR]
By:
PRINTED
By:
GERRY PAUL Title:
PURCHASING DIRECTOR
Date: Date:
Attest: (CORPORATE SEAL)
City Clerk
Address for giving notices:
P. O. Box 580
Fort Collins, CO 80522 Attest:
Approved as to Form Address for giving notices:
Senior Assistant City Attorney
License No.:
SECTION 00530
NOTICE TO PROCEED
Description of Work: 9718 Childcare Center Renovation – Northside Aztlan Community
Center
To: [Contractor]
This notice is to advise you:
That the contract covering the above described Work has been fully executed by the
CONTRACTOR and the OWNER.
That the required CONTRACTOR's Performance Bond and Payment Bond have been received
by the OWNER.
That the OWNER has approved the said Contract Documents.
Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and
directed to proceed within ( ) calendar days from receipt of this notice as
required by the Agreement.
Dated this day of , 20 .
The dates for Substantial Completion and Final Acceptance shall be , 20_ and
, 20__, respectively.
City of Fort Collins
OWNER
By:
Title:
ACKNOWLEDGMENT OF NOTICE
Receipt of the above Notice to Proceed is hereby acknowledged this day of
, 20__.
CONTRACTOR: [Contractor]
By:
Title:
SECTION 00600
BONDS AND CERTIFICATES
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (CONTRACTOR)
00660 Consent of Surety
00670 Application for Exemption Certificate
SECTION 00610
PERFORMANCE BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS: that
(firm)
(address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300
Laporte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as
the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the
payment of which sum well and truly to be made, we bind ourselves, successors and assigns,
jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a
certain Agreement with the OWNER, dated the [Day] day of [Month] in the year of 20[Year], a
copy of which is hereto attached and made a part hereof for the performance of The City of Fort
Collins Project, 9718 Childcare Center Renovation – Northside Aztlan Community Center.
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the
undertakings, covenants, terms, conditions and agreements of said Agreement during the
original term thereof, and any extensions thereof which may be granted by the OWNER, with or
without Notice to the Surety and during the life of the guaranty period, and if the Principal shall
satisfy all claims and demands incurred under such Agreement, and shall fully indemnify and
save harmless the OWNER from all cost and damages which it may suffer by reason of failure
to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER
may incur in making good any default then this obligation shall be void; otherwise to remain in
full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the Agreement or to the
Work to be performed thereunder or the Specifications accompanying the same shall in any way
affect its obligation on this bond; and it does hereby waive notice of any such change, extension
of time, alteration or addition to the terms of the Agreement or to the Work or to the
Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR
shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in
the State of Colorado and be acceptable to the OWNER.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of
which shall be deemed an original, this _____ day of _____ ____, 20__.
IN PRESENCE OF: Principal
(Title) (Title)
(Corporate Seal)
(Address)
IN PRESENCE OF: Other Partners
_____________________________ By:
_____________________________ By:
IN PRESENCE OF: Surety
_____________________________ By:_____________________________________
_____________________________
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is
Partnership, all partners should execute Bond.
SECTION 00615
PAYMENT BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS: that
(firm)
(address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto the City of Fort Collins,
300 Laporte Ave., Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to
as "the OWNER", in the penal sum of ($ ) in lawful money of the United States, for
the payment of which sum well and truly to be made, we bind ourselves, successors and
assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a
certain Agreement with the OWNER, dated the [Day] day of [Month] in the year of 20[Year], a
copy of which is hereto attached and made a part hereof for the performance of The City of Fort
Collins Project, 9718 Childcare Center Renovation – Northside Aztlan Community Center.
NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors,
and corporations furnishing materials for or performing labor in the prosecution of the Work
provided for in such Agreement and any authorized extension or modification thereof, including
all amounts due for materials, lubricants, repairs on machinery, equipment and tools,
consumed, rented or used in connection with the construction of such Work, and all insurance
premiums on said Work, and for all labor, performed in such Work whether by subcontractor or
otherwise, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the Agreement or to the
Work to be performed thereunder or the Specifications accompanying the same shall in any way
affect its obligation on this bond; and it does hereby waive notice of any such change, extension
of time, alteration or addition to the terms of the Agreement or to the Work or to the
Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR
shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in
the State of Colorado and be acceptable to the OWNER.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts,
each one of which shall be deemed an original, this day of , 20__.
IN PRESENCE OF: Principal
(Title) (Title)
(Corporate Seal)
(Address)
IN PRESENCE OF: Other Partners
_____________________________ By:
_____________________________ By:
IN PRESENCE OF: Surety
_____________________________ By:_____________________________________
_____________________________
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is
Partnership, all partners should execute Bond.
SECTION 00630
CERTIFICATE OF INSURANCE
CONTRACTOR shall insert his own standard form for Certificate of Insurance in accordance
with the following requirements:
1. The Contractor will provide, from insurance companies acceptable to the City, the
insurance coverage designated hereinafter and pay all costs. Before commencing work
under this bid, the Contractor shall furnish the City with certificates of insurance showing
the type, amount, class of operations covered, effective dates and date of expiration of
policies, and containing substantially the following statement:
“The insurance evidenced by this Certificate will not reduce coverage or limits and
will not be cancelled, except after thirty (30) days written notice has been received
by the City of Fort Collins.”
In case of the breach of any provision of the Insurance Requirements, the City, at its
option, may take out and maintain, at the expense of the Contractor, such insurance as
the City may deem proper and may deduct the cost of such insurance from any monies
which may be due or become due the Contractor under this Agreement. The City, its
officers, agents and employees shall be named as additional insureds on the Contractor
's general liability and automobile liability insurance policies for any claims arising out of
work performed under this Agreement.
2. Insurance coverages shall be as follows:
A. Workers' Compensation & Employer's Liability. The Contractor shall maintain
during the life of this Agreement for all of the Contractor's employees engaged in
work performed under this agreement:
1. Workers' Compensation insurance with statutory limits as required by
Colorado law.
2. Employer's Liability insurance with limits of $100,000 per accident,
$500,000 disease aggregate, and $100,000 disease each employee.
B. Commercial General & Vehicle Liability. The Contractor shall maintain during the
life of this Agreement such commercial general liability and automobile liability
insurance as will provide coverage for damage claims of personal injury, including
accidental death, as well as for claims for property damage, which may arise
directly or indirectly from the performance of work under this Agreement.
Coverage for property damage shall be on a "broad form" basis. The amount of
insurance for each coverage, Commercial General and Vehicle, shall not be less
than $1,000,000 combined single limits for bodily injury and property damage.
In the event any work is performed by a subcontractor, the Contractor shall be responsible for
any liability directly or indirectly arising out of the work performed under this Agreement by a
subcontractor, which liability is not covered by the subcontractor's insurance
SECTION 00635
CERTIFICATE OF SUBSTANTIAL COMPLETION
TO: CITY OF FORT COLLINS (OWNER)
DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE: 9718 Childcare Center
Renovation – Northside Aztlan
Community Center
PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado
INCLUDE:
OWNER: City of Fort Collins
CONTRACTOR: [Contractor]
CONTRACT DATE: [Date]
The Work performed under this contract has been inspected by authorized representatives of
the OWNER, CONTRACTOR, and the ENGINEER and the project or specified part of the
project, as indicated above) is hereby declared to be substantially completed on the above date.
A tentative list of items to be completed or corrected is appended hereto. This list may not be
exhaustive, and the failure to include an item on it does not alter the responsibility of the
CONTRACTOR to complete all the Work in accordance with the Contract Documents.
ENGINEER AUTHORIZED REPRESENTATIVE
DATE
The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to
complete and correct the items on the tentative list within the time indicated.
CONTRACTOR AUTHORIZED REPRESENTATIVE
DATE
The OWNER accepts the project or specified area of the project as substantially complete and
will assume full possession of the project or specified area of the project at 12:01 a.m., on
. The responsibility for heat, utilities, security, and insurance under
the Contract Documents shall be as set forth under "Remarks" below.
CITY OF FORT COLLINS, COLORADO By:
OWNER AUTHORIZED REPRESENTATIVE
DATE
REMARKS:
SECTION 00640
CERTIFICATE OF FINAL ACCEPTANCE
, 20__
TO: [Contractor]
Gentlemen:
You are hereby notified that on the day of , 20__, the City of
Fort Collins, Colorado, has accepted the Work completed by [Contractor] for the City of Fort
Collins project, 9718 Childcare Center Renovation – Northside Aztlan Community Center.
A check is attached hereto in the amount of $ as Final
Payment for all Work done, subject to the terms of the Contract Documents which are dated
[Contract Date].
In conformance with the Contract Documents for this project, your obligations and guarantees
will continue for the specified time from the following date:____________ _, 20__.
Sincerely,
OWNER: City of Fort Collins
By:
Title:
ATTEST:
Title:
SECTION 00650
LIEN WAIVER RELEASE
(CONTRACTOR)
TO: City of Fort Collins, Colorado (OWNER)
FROM: [Contractor] (CONTRACTOR)
PROJECT: 9718 Childcare Center Renovation – Northside Aztlan Community Center
1. The CONTRACTOR acknowledges having received payment, except retainage from the
OWNER for all work, labor, skill and material furnished, delivered and performed by the
CONTRACTOR for the OWNER or for anyone in the construction, design, improvement,
alteration, addition or repair of the above described project.
2. In consideration of such payment and other good and valuable consideration, the receipt
and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives
all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims
(40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights
which the CONTRACTOR may now or may afterward have, claim or assert for all and any
work, labor, skill or materials furnished, delivered or performed for the construction,
design, improvement, alteration, addition or repair of the above described project, against
the OWNER or its officers, agents, employees or assigns, against any fund of or in the
possession or control of the OWNER, against the project or against all land and the
buildings on and appurtenances to the land improved by the project.
3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or
performed to or for the construction, design, improvement, alteration, addition or repair of
the project were furnished, delivered or performed by the CONTRACTOR or its agents,
employees, and servants, or by and through the CONTRACTOR by various
Subcontractors or materialmen or their agents, employees and servants and further
affirms the same have been paid in full and have released in full any and all existing or
possible future mechanic's liens or rights or claims against the project or any funds in the
OWNER'S possession or control concerning the project or against the OWNER or its
officers, agents, employees or assigns arising out of the project.
4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any,
and the Surety on the project against and from any claim hereinafter made by the
CONTRACTOR'S Subcontractors, materialmen, employees, servants, agents or assigns
against the project or against the OWNER or its officers, employees, agents or assigns
arising out of the project for all loss, damage and costs, including reasonable attorneys
fees, incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth above constitutes and
adequate description of the property and improvements to which this Lien Waiver Release
pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and
may be relied upon by the OWNER, the lender, if any, and Surety on any labor and
material bonds for the project.
Signed this day of , 20__.
CONTRACTOR: [CONTRACTOR]
By:
Title:
ATTEST:
Secretary
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this day of 20__,
by .
Witness my hand and official seal.
Notary Public
My Commission Expires:
SECTION 00660
CONSENT OF SURETY
TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER")
CONTRACTOR: [Contractor]
PROJECT: 9718 Childcare Center Renovation – Northside Aztlan Community Center
CONTRACT DATE: [Date]
In accordance with the provisions of the Contract between the OWNER and the CONTRACTOR
as indicated above, for .
(Surety)
on bond of
hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to
the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the
OWNER, as set forth in the said Surety Company's Bond.
IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this
day of , 20____ .
(Surety Company)
By:
ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact.
SECTION 00670
APPLICATION FOR EXEMPTION CERTIFICATE
SECTION 00700
GENERAL CONDITIONS
SECTION 00800
SUPPLEMENTARY CONDITIONS
DAVIS BACON WAGE RATES
ARPA ADDENDUM - Contract Provisions for non-Federal Entity
Contracts Under Federal Awards
SECTION 00800
SUPPLEMENTARY CONDITIONS
Conditions of the Contract
These Supplementary Conditions amend or supplement the General Conditions of the
Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins
modifications) and other provisions of the Contract Documents as indicated below.
SC-4.2 Subsurface and Physical Conditions:
A. Add the following language to paragraph 4.2.1 of the General Conditions.
4.2.1.1.1 The following report(s) of exploration and tests of subsurface conditions
at the site of the Work:
N/A
Contractor may rely upon the accuracy of the technical data contained in the
geotechnical documents, but not upon nontechnical data, interpretations or
opinions contained therein or upon the completeness of any information in the
report.
B. 4.2.1.2.1 No drawing of physical conditions in or relating to existing surface or
subsurface structures (except Underground Facilities referred to in Paragraph
4.3) which are at or contiguous to the site have been utilized by the Engineer in
preparation of the Contract Documents, except the following:
N/A
SC-5.4.8 Limits of Liability
A. Add the following language at the end of paragraph 5.4.8.
The limits of liability for the insurance required by the paragraph numbers of the
General Conditions listed below are as follows:
5.4.1 and 5.4.2
Coverage A - Statutory Limits
Coverage B - $100,000/$100,000/$500,000
5.4.3 and 5.4.5 Commercial General Liability policy will have limits of
$1,000,000 combined single limits (CSL). This policy will include coverage
for Explosion, Collapse, and Underground coverage unless waived by the
Owner.
5.4.6 The Comprehensive Automobile Liability Insurance policy will have
limits of $1,000,000 combined single limits (CSL).
5.4.9 This policy will include completed operations coverage/product
liability coverage with limits of $1,000,000 combined single limits (CSL).
SC-12.3 Add the following language to the end of paragraph 12.3.
Contractor will include in the project schedule zeor (o) days lost due to abnormal
weather conditions.
DAVIS BACON WAGE RATES
"General Decision Number: CO20230014 01/06/2023
Superseded General Decision Number: CO20220014
State: Colorado
Construction Type: Highway
Counties: Larimer, Mesa and Weld Counties in Colorado.
HIGHWAY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally
required to pay at least the applicable minimum wage rate
required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered
contracts entered into by the federal government that are
subject to the Davis-Bacon Act itself, but do not apply to
contracts subject only to the Davis-Bacon Related Acts,
including those set forth at 29 CFR 5.1(a)(2)-(60).
______________________________________________________________
|If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the |
|2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay |
|option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $16.20 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2023. |
|______________________________|_____________________________|
|If the contract was awarded on|. Executive Order 13658 |
|or between January 1, 2015 and| generally applies to the |
|January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all|
|extended on or after January | covered workers at least |
|30, 2022: | $12.15 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2023. |
|______________________________|_____________________________|
The applicable Executive Order minimum wage rate will be
adjusted annually. If this contract is covered by one of the
Executive Orders and a classification considered necessary for
performance of work on the contract does not appear on this
wage determination, the contractor must still submit a
conformance request.
Additional information on contractor requirements and worker
protections under the Executive Orders is available at
http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/06/2023
ENGI0009-012 05/01/2021
Rates Fringes
POWER EQUIPMENT OPERATOR:
(3)- Drill Rig Caisson
(smaller than Watson 2500
and similar)................$ 31.05 12.35
(4)-Oiler
Weld County................$ 30.29 12.35
(5)-Drill Rig Caisson
(Watson 2500 similar or
larger).....................$ 31.37 12.35
----------------------------------------------------------------
SUCO2011-009 09/15/2011
Rates Fringes
CARPENTER
Excludes Form Work..........$ 20.72 5.34
Form Work Only
Larimer, Mesa..............$ 18.79 3.67
Weld.......................$ 16.54 3.90
CEMENT MASON/CONCRETE FINISHER
Larimer.....................$ 16.05 ** 3.00
Mesa........................$ 17.53 3.00
Weld........................$ 17.48 3.00
ELECTRICIAN
Excludes Traffic
Signalization
Weld.......................$ 33.45 7.58
Traffic Signaliztion
Weld.......................$ 25.84 6.66
FENCE ERECTOR
Weld........................$ 17.46 3.47
GUARDRAIL INSTALLER
Larmer, Weld................$ 12.89 ** 3.39
HIGHWAY/PARKING LOT
STRIPING:Painter
Larimer.....................$ 14.79 ** 3.98
Mesa........................$ 14.75 ** 3.21
Weld........................$ 14.66 ** 3.21
IRONWORKER, REINFORCING
(Excludes Guardrail
Installation)
Larimer, Weld...............$ 16.69 5.45
IRONWORKER, STRUCTURAL
(Excludes Guardrail
Installation)
Larimer, Weld...............$ 18.22 6.01
LABORER
Asphalt Raker
Larimer....................$ 18.66 4.66
Weld.......................$ 16.72 4.25
Asphalt Shoveler............$ 21.21 4.25
Asphalt Spreader............$ 18.58 4.65
Common or General...........$ 16.29 4.25
Concrete Saw (Hand Held)....$ 16.29 6.14
Landscape and Irrigation....$ 12.26 ** 3.16
Mason Tender-
Cement/Concrete.............$ 16.29 4.25
Pipelayer
Larimer....................$ 17.27 3.83
Mesa, Weld.................$ 16.23 3.36
Traffic Control (Flagger)...$ 9.55 ** 3.05
Traffic Control (Sets
Up/Moves Barrels, Cones,
Install Signs, Arrow
Boards and Place
Stationary Flags)(Excludes
Flaggers)
Larimer, Weld..............$ 12.43 ** 3.22
PAINTER (Spray Only).............$ 16.99 2.87
POWER EQUIPMENT OPERATOR:
Asphalt Laydown
Larimer....................$ 26.75 5.39
Mesa,Weld..................$ 23.93 7.72
Asphalt Paver...............$ 21.50 3.50
Asphalt Roller
Larimer....................$ 23.57 3.50
Mesa.......................$ 24.25 3.50
Weld.......................$ 27.23 3.50
Asphalt Spreader
Larimer....................$ 25.88 6.80
Mesa, Weld.................$ 23.66 7.36
Backhoe/Trackhoe
Larimer....................$ 21.46 4.85
Mesa.......................$ 19.81 6.34
Weld.......................$ 20.98 6.33
Bobcat/Skid Loader
Larimer....................$ 17.13 4.46
Mesa, Weld.................$ 15.37 ** 4.28
Boom........................$ 22.67 8.72
Broom/Sweeper
Larimer....................$ 23.55 6.20
Mesa.......................$ 23.38 6.58
Weld.......................$ 23.23 6.89
Bulldozer
Larimer, Weld..............$ 22.05 6.23
Mesa.......................$ 22.67 8.72
Crane.......................$ 26.75 6.16
Drill
Larimer, Weld..............$ 31.39 0.00
Mesa.......................$ 35.06 0.00
Forklift....................$ 15.91 ** 4.68
Grader/Blade
Larimer....................$ 24.82 5.75
Mesa.......................$ 23.42 9.22
Weld.......................$ 24.53 6.15
Guardrail/Post Driver.......$ 16.07 ** 4.41
Loader (Front End)
Larimer....................$ 20.45 3.50
Mesa.......................$ 22.44 9.22
Weld.......................$ 23.92 6.67
Mechanic
Larimer....................$ 27.68 4.57
Mesa.......................$ 25.50 5.38
Weld.......................$ 24.67 5.68
Oiler
Larimer....................$ 24.16 8.35
Mesa.......................$ 23.93 9.22
Roller/Compactor (Dirt and
Grade Compaction)
Mesa, Weld.................$ 21.33 6.99
Roller/Compactor (Dirt and
Grade Compaction
Larimer....................$ 23.67 8.22
Rotomill
Larimer....................$ 18.59 4.41
Weld.......................$ 16.22 4.41
Scraper
Larimer....................$ 21.33 3.50
Mesa.......................$ 24.06 4.13
Weld.......................$ 30.14 1.40
Screed
Larimer....................$ 27.20 5.52
Mesa.......................$ 27.24 5.04
Weld.......................$ 27.95 3.50
Tractor.....................$ 13.13 ** 2.95
TRAFFIC SIGNALIZATION:
Groundsman
Larimier....................$ 11.44 ** 2.84
Mesa........................$ 16.00 ** 5.85
Weld........................$ 16.93 3.58
TRUCK DRIVER
Distributor
Larimer....................$ 19.28 4.89
Mesa.......................$ 19.17 4.84
Weld.......................$ 20.61 5.27
Dump Truck
Larimer....................$ 18.86 3.50
Mesa.......................$ 15.27 ** 4.28
Weld.......................$ 15.27 ** 5.27
Lowboy Truck
Larimer....................$ 18.96 5.30
Mesa,Weld..................$ 18.84 5.17
Mechanic....................$ 26.48 3.50
Multi-Purpose Specialty &
Hoisting Truck
Larimer, Mesa..............$ 16.65 5.46
Weld.......................$ 16.87 5.56
Pickup and Pilot Car........$ 13.93 ** 3.68
Semi/Trailer Truck..........$ 18.39 4.13
Truck Mounted Attenuator....$ 12.43 ** 3.22
Water Truck
Larimer....................$ 19.14 4.99
Mesa.......................$ 15.96 ** 5.27
Weld.......................$ 19.28 5.04
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
** Workers in this classification may be entitled to a higher
minimum wage under Executive Order 14026 ($16.20) or 13658
($12.15). Please see the Note at the top of the wage
determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at
https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
----------------------------------------------------------------
The body of each wage determination lists the classification
and wage rates that have been found to be prevailing for the
cited type(s) of construction in the area covered by the wage
determination. The classifications are listed in alphabetical
order of ""identifiers"" that indicate whether the particular
rate is a union rate (current union negotiated rate for local),
a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed
in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of
the union which prevailed in the survey for this
classification, which in this example would be Plumbers. 0198
indicates the local union number or district council number
where applicable, i.e., Plumbers Local 0198. The next number,
005 in the example, is an internal number used in processing
the wage determination. 07/01/2014 is the effective date of the
most current negotiated rate, which in this example is July 1,
2014.
Union prevailing wage rates are updated to reflect all rate
changes in the collective bargaining agreement (CBA) governing
this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that
no one rate prevailed for this classification in the survey and
the published rate is derived by computing a weighted average
rate based on all the rates reported in the survey for that
classification. As this weighted average rate includes all
rates reported in the survey, it may include both union and
non-union rates. Example: SULA2012-007 5/13/2014. SU indicates
the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. LA indicates
the State of Louisiana. 2012 is the year of survey on which
these classifications and rates are based. The next number, 007
in the example, is an internal number used in producing the
wage determination. 5/13/2014 indicates the survey completion
date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a
new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate
that no single majority rate prevailed for those
classifications; however, 100% of the data reported for the
classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union
average rate. OH indicates the state. The next number, 0010 in
the example, is an internal number used in producing the wage
determination. 08/29/2014 indicates the survey completion date
for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of
each year, to reflect a weighted average of the current
negotiated/CBA rate of the union locals from which the rate is
based.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can
be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
National Office because National Office has responsibility for
the Davis-Bacon survey program. If the response from this
initial contact is not satisfactory, then the process described
in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
================================================================
END OF GENERAL DECISIO"
ARPA ADDENDUM
Construction Contracts > $2,000
Appendix II: Contract Provisions for non-Federal Entity Contracts Under Federal Awards
(A) For a Contract for more than the simplified acquisition threshold ($250,000).
Breach. Any breach of the Contract by Contractor shall be governed by the termination and
remedies provisions of the Contract. Additionally, in the event that the City incurs damages as
a result of Contractor’s breach, the City may pursue recovery of such damages from
Contractor. The City further retains the right to seek specific performance of the Contract at
any time as authorized by law. The City further retains the right to otherwise pursue any
remedies available to the City as a result of the Contractor’s breach, including but not limited
to administrative, Contractual, or legal remedies, as well as any applicable sanctions and
penalties.
Remedies for Non-Performance. If Contractor fails to perform any of its obligations under
this Contract, the City may, at its sole discretion, exercise one or more of the following
remedies, which shall survive expiration or termination of this Contract:
a. Suspend Performance: The City may require the Contractor to suspend performance
of all or any portion of the Work pending necessary corrective action specified by the City
and without entitling Contractor to an increase in compensation or extension of the
performance schedule. Contractor must promptly stop performance and incurring costs upon
delivery of a notice of suspension by the City.
b. Withhold Payment Pending Corrections: The City may permit Contractor to correct
any rejected Work at the City ’s discretion. Upon City ’s request, Contractor must correct
rejected Work at Contractor’s sole expense within the time frame established by the City.
Upon completion of the corrections satisfactory to the City, City will remit payment to
Contractor.
c. Deny Payment: City may deny payment for any Work that does not comply with the
requirements of the Contract or that Contractor otherwise fails to provide or complete, as
determined by the City in its sole discretion. Upon City request, Contractor will promptly
refund any amounts prepaid by the City with respect to such non-compliant Work.
d. Removal: Upon City ’s request, Contractor will remove any of its employees or agents
from performance of the Work, if the City, in its sole discretion, deems any such person to be
incompetent, careless, unsuitable, or otherwise unacceptable.
(B) [All Contracts in excess of $10,000 must address termination for cause and for
convenience including the manner by which it will be effected and the basis of the
settlement.]
Termination.
Termination for Convenience. The City may terminate this Contract, in whole or in part,
for any reason, upon five (5) days written notice to the Contractor. In such event, the City
shall pay the Contractor its costs, including reasonable Contract close-out costs, and
profit on Work performed up to the time of termination. The Contractor shall promptly
submit its termination claim to the City to be paid the Contractor. If the Contractor has
any property in its possession belonging to the City, the Contractor will account for the
same, and dispose of it in a manner the City directs.
Termination for Breach. Either Party’s failure to perform any of its material obligations
under this Contract, in whole or in part or in a timely or satisfactory manner, will be a
breach. The institution of proceedings under any bankruptcy, insolvency, reorganization
or similar law, by or against Contractor, or the appointment of a receiver or similar officer
for Contractor or any of its property, which is not vacated or fully stayed within thirty (30)
days after the institution of such proceeding, will also constitute a breach. In the event of
a breach, the non-breaching Party may provide written notice of the breach to the other
Party. If the notified Party does not cure the breach, at its sole expense, within thirty (30)
days after delivery of notice, the non-breaching Party may exercise any of its remedies
provided under this Contract or at law, including immediate termination of the Contract.
(C) [Except as otherwise provided under 41 CFR Part 60, all Contracts that meet the
definition of “federally assisted construction Contract” in 41 CFR Part 60-1.3]
Equal Employment Opportunity. Contractor agrees to comply with the Equal Opportunity
Clause provided under 41 CFR 60-1.4(a) (Government Contracts) and 41 CFR 60-1.4(b)
(Federal Assisted Construction Contracts), in accordance with Executive Order 11246, “Equal
Employment Opportunity” (30 FR 12319, 12935, 3 CFR Part, 1964-1965 Comp., p. 339), as
amended by Executive Order 11375, “Amending Executive Order 11246 Relating to Equal
Employment Opportunity,” and implementing regulations at 41 CFR part 60, “Office of
Federal Contract Compliance Programs, Equal Employment Opportunity, Department of
Labor.” Contractor further agrees to include this provision, including the Equal Opportunity
Clause or a reference thereto, in any subcontracts it enters into pursuant to the Contract.
During the performance of this Contract, the Contractor agrees as follows:
(1) The Contractor will not discriminate against any employee or applicant for employment
because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The
Contractor will take affirmative action to ensure that applicants are employed, and that
employees are treated during employment without regard to their race, color, religion, sex,
sexual orientation, gender identity, or national origin. Such action shall include, but not be
limited to the following:
Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising;
layoff or termination; rates of pay or other forms of compensation; and selection for training,
including apprenticeship. The Contractor agrees to post in conspicuous places, available to
employees and applicants for employment, notices to be provided setting forth the provisions of
this nondiscrimination clause.
(2) The Contractor will, in all solicitations or advertisements for employees placed by or on
behalf of the Contractor, state that all qualified applicants will receive consideration for
employment without regard to race, color, religion, sex, sexual orientation, gender identity, or
national origin.
(3) The Contractor will not discharge or in any other manner discriminate against any
employee or applicant for employment because such employee or applicant has inquired
about, discussed, or disclosed the compensation of the employee or applicant or another
employee or applicant. This provision shall not apply to instances in which an employee who
has access to the compensation information of other employees or applicants as a part of such
employee's essential job functions discloses the compensation of such other employees or
applicants to individuals who do not otherwise have access to such information, unless such
disclosure is in response to a formal complaint or charge, in furtherance of an investigation,
proceeding, hearing, or action, including an investigation conducted by the employer, or is
consistent with the Contractor's legal duty to furnish information.
(4) The Contractor will send to each labor union or representative of workers with which
he has a collective bargaining agreement or other Contract or understanding, a notice to be
provided advising the said labor union or workers' representatives of the Contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
(5) The Contractor will comply with all provisions of Executive Order 11246 of September
24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
(6) The Contractor will furnish all information and reports required by Executive Order
11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor,
or pursuant thereto, and will permit access to his books, records, and accounts by the
administering agency and the Secretary of Labor for purposes of investigation to ascertain
compliance with such rules, regulations, and orders.
(7) In the event of the Contractor's noncompliance with the nondiscrimination clauses of
this Contract or with any of the said rules, regulations, or orders, this Contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared ineligible for
further Government Contracts or federally assisted construction Contracts in accordance with
procedures authorized in Executive Order 11246 of September 24, 1965, and such other
sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of
September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise
provided by law.
(8) The Contractor will include the portion of the sentence immediately preceding
paragraph (1) and the provisions of paragraphs (1) through (8) in every subContract or
purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor
issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such
provisions will be binding upon each subcontractor or vendor. The Contractor will take such
action with respect to any subContract or purchase order as the administering agency may
direct as a means of enforcing such provisions, including sanctions for noncompliance:
Provided, however, that in the event a Contractor becomes involved in, or is threatened
with, litigation with a subcontractor or vendor as a result of such direction by the administering
agency, the Contractor may request the United States to enter into such litigation to protect the
interests of the United States.
The applicant further agrees that it will be bound by the above equal opportunity clause
with respect to its own employment practices when it participates in federally assisted
construction work: Provided, that if the applicant so participating is a State or local government,
the above equal opportunity clause is not applicable to any agency, instrumentality or
subdivision of such government which does not participate in work on or under the Contract.
The applicant agrees that it will assist and cooperate actively with the administering agency
and the Secretary of Labor in obtaining the compliance of Contractors and subcontractors with
the equal opportunity clause and the rules, regulations, and relevant orders of the Secretary of
Labor, that it will furnish the administering agency and the Secretary of Labor such information
as they may require for the supervision of such compliance, and that it will otherwise assist the
administering agency in the discharge of the agency's primary responsibility for securing
compliance.
The applicant further agrees that it will refrain from entering into any Contract or Contract
modification subject to Executive Order 11246 of September 24, 1965, with a Contractor
debarred from, or who has not demonstrated eligibility for, Government Contracts and federally
assisted construction Contracts pursuant to the Executive Order and will carry out such
sanctions and penalties for violation of the equal opportunity clause as may be imposed upon
Contractors and subcontractors by the administering agency or the Secretary of Labor pursuant
to Part II, Subpart D of the Executive Order. In addition, the applicant agrees that if it fails or
refuses to comply with these undertakings, the administering agency may take any or all of the
following actions: Cancel, terminate, or suspend in whole or in part this grant (Contract, loan,
insurance, guarantee); refrain from extending any further assistance to the applicant under the
program with respect to which the failure or refund occurred until satisfactory assurance of
future compliance has been received from such applicant; and refer the case to the Department
of Justice for appropriate legal proceedings.
(2) [Reserved]
(c) Subcontracts. Each nonexempt prime Contractor or subcontractor shall include the
equal opportunity clause in each of its nonexempt subcontracts.
(d) Inclusion of the equal opportunity clause by reference. The equal opportunity clause
may be included by reference in all Government Contracts and subcontracts, including
Government bills of lading, transportation requests, Contracts for deposit of Government funds,
and Contracts for issuing and paying U.S. savings bonds and notes, and such other Contracts
and subcontracts as the Director of OFCCP may designate.
(e) Incorporation by operation of the order. By operation of the order, the equal opportunity
clause shall be considered to be a part of every Contract and subContract required by the order
and the regulations in this part to include such a clause whether or not it is physically
incorporated in such Contracts and whether or not the Contract between the agency and the
Contractor is written.
(f) Adaptation of language. Such necessary changes in language may be made in the
equal opportunity clause as shall be appropriate to identify properly the parties and their
undertakings.
(D) [When required by Federal program legislation, all prime construction Contracts in excess
of
$2,000 awarded by non-Federal entities]
Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). Contractor must fully comply with
the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by
Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to
Contracts Covering Federally Financed and Assisted Construction”). In accordance
therewith, Contractor must pay wages to laborers and mechanics at a rate not less than the
prevailing wages specified in a wage determination made by the Secretary of Labor. In
addition, Contractors must be required to pay wages not less than once a week.
Copeland “Anti-Kickback” Act (40 U.S.C. 3145). Contractor must fully comply with the
Copeland “Anti-Kickback” Act (40 U.S.C. 3145), as supplemented by Department of Labor
regulations (29 CFR Part 3, “Contractors and Subcontractors on Public Building or Public
Work Financed in Whole or in Part by Loans or Grants from the United States”). Pursuant to
the Act, Contractor is prohibited from inducing, by any means, any person employed in the
construction, completion, or repair of public work, to give up any part of the compensation to
which he or she is otherwise entitled. The City shall report all suspected or reported
violations of the Copeland “Anti-Kickback” Act to the Federal awarding agency.
(E) [Where applicable, all Contracts awarded by the non-Federal entity in excess of
$100,000 that involve the employment of mechanics or laborers]
Contract Work Hours and Safety Standards Act (40 U.S.C. 3701-3708). Contractor must
fully comply with the Contract Work Hours and Safety Standard Act (40 U.S.C. 3701-3708),
including 40 U.S.C. 3702 and 3704, as supplemented by Department of Labor regulations
(29 CFR Part 5). Under 40 U.S.C. 3702 of the Act, Contract is required to compute the
wages of every mechanic and laborer on the basis of a standard work week of 40 hours.
Work in excess of the standard work week is permissible provided that the worker is
compensated at a rate of not less than one and a half times the basic rate of pay for all hours
worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. 3704 are
applicable to construction work and provide that no laborer or mechanic must be required to
work in surroundings or under working conditions which are unsanitary, hazardous or
dangerous. These requirements do not apply to the purchases of supplies or materials or
articles ordinarily available on the open market, or Contracts for transportation or
transmission of intelligence.
a. Overtime requirements. No contractor or subcontractor contracting for any part of the
contract work which may require or involve the employment of laborers or mechanics
shall require or permit any such laborer or mechanic in any workweek in which he or
she is employed on such work to work in excess of forty hours in such workweek unless
such laborer or mechanic receives compensation at a rate not less than one and one-
half times the basic rate of pay for all hours worked in excess of forty hours in such
workweek.
b. Violation; liability for unpaid wages; liquidated damages. In the event of any violation
of the clause set forth in paragraph (a) of this section the contractor and any
subcontractor responsible therefor shall be liable for the unpaid wages. In addition,
such contractor and subcontractor shall be liable to the United States (in the case of
work done under contract for the District of Columbia or a territory, to such District or
to such territory), for liquidated damages. Such liquidated damages shall be computed
with respect to each individual laborer or mechanic, including watchmen and guards,
employed in violation of the clause set forth in paragraph (a) of this section, in the sum
of $26 for each calendar day on which such individual was required or permitted to
work in excess of the standard workweek of forty hours without payment of the overtime
wages required by the clause set forth in paragraph (a) of this section.
c. Withholding for unpaid wages and liquidated damages. The FEMA shall upon its own
action or upon written request of an authorized representative of the Department of
Labor withhold or cause to be withheld, from any moneys payable on account of work
performed by the contractor or subcontractor under any such contract or any other
Federal contract with the same prime contractor, or any other federally-assisted
contract subject to the Contract Work Hours and Safety Standards Act, which is held
by the same prime contractor, such sums as may be determined to be necessary to
satisfy any liabilities of such contractor or subcontractor for unpaid wages and
liquidated damages as provided in the clause set forth in paragraph (b) of this section.
d. Subcontracts. The contractor or subcontractor shall insert in any subcontracts the
clauses set forth in paragraph (a) through (d) of this section and also a clause requiring
the subcontractors to include these clauses in any lower tier subcontracts. The prime
contractor shall be responsible for compliance by any subcontractor or lower tier
subcontractor with the clauses set forth in paragraphs (a) through (d) of this section.
(F) [If the Federal award meets the definition of “funding agreement” under 37 CFR §401.2
(a)]
Rights to Inventions Made Under a Contract or Contract. For Contracts entered into by
the Contractor or the City with a small business firm or nonprofit organization regarding the
substitution of parties, assignment or performance of experimental, developmental, or
research work under that “funding agreement,” the parties must comply with the
requirements of 37 CFR Part 401, “Rights to Inventions Made by Nonprofit Organizations and
Small Business Firms Under Government Grants, Contracts and Cooperative Contracts,” and
any implementing regulations issued by the awarding agency.
(G) [Contracts and subgrants of amounts in excess of $150,000]
Clean Air Act (42 U.S.C. 7401-7671q.) and the Federal Water Pollution Control Act (33
U.S.C. 1251-1387), as amended.
a. All parties agree to comply with all applicable standards, orders or regulations issued
pursuant to the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal Water Pollution
Control Act as amended (33 U.S.C. 1251-1387). All parties shall report violations to the
Federal awarding agency and the Regional Office of the Environmental Protection Agency
(EPA).
b. The Contractor agrees to report each violation to the City and understands and agrees
that the City will, in turn, report each violation as required to assure notification to the
Federal Emergency Management Agency, and the appropriate Environmental Protection
Agency Regional Office.
c. The Contractor agrees to include these requirements in each subcontract exceeding
$150,000 financed in whole or in part with Federal funds.
(H) [For Contract awards (see 2 CFR 180.220)]
Debarment and Suspension (Executive Orders 12549 and 12689). Contractor attests
that it is not listed on the government-wide exclusions in the System for Award Management
(SAM), in accordance with the OMB guidelines at 2 CFR 180 that implement Executive
Orders 12549 (3 CFR part 1986 Comp., p. 189) and 12689 (3 CFR part 1989 Comp., p.
235), “Debarment and Suspension.” SAM Exclusions contains the names of parties
debarred, suspended, or otherwise excluded by agencies, as well as parties declared
ineligible under statutory or regulatory authority other than Executive Order 12549.
a. This contract is a covered transaction for purposes of 2 C.F.R. pt. 180 and 2 C.F.R.
pt. 3000. As such, the C ontractor is required to verify that none of the C ontractor’s
principals (defined at 2 C.F.R. § 180.995) or its affiliates (defined at 2 C.F.R. §
180.905) are excluded (defined at 2 C.F.R. § 180.940) or disqualified (defined at 2
C.F.R. § 180.935).
b. The Contractor must comply with 2 C.F.R. pt. 180, subpart C and 2 C.F.R. pt. 3000,
subpart C, and must include a requirement to comply with these regulations in any lower
tier covered transaction it enters into.
c. This certification is a material representation of fact relied upon by the City. If it is later
determined that the Contractor did not comply with 2 C.F.R. pt. 180, subpart C and 2
C.F.R. pt. 3000, subpart C, in addition to remedies available to the City, the Federal
Government may pursue available remedies, including but not limited to suspension
and/or debarment.
d. The bidder or proposer agrees to comply with the requirements of 2 C.F.R. pt. 180,
subpart C and 2 C.F.R. pt. 3000, subpart C while this offer is valid and throughout the
period of any contract that may arise from this offer. The bidder or proposer further
agrees to include a provision requiring such compliance in its lower tier covered
transactions.
(I) [For Contracts exceeding $100,000]
Byrd Anti-Lobbying Amendment (31 U.S.C. 1352). Contractor attests that it has filed the
required certification under the Byrd Anti-Lobbying Amendment. Contractor attests that it has
certified that it will not and has not used Federal appropriated funds to pay any person or
organization for influencing or attempting to influence an officer or employee of any agency, a
member of Congress, officer or employee of Congress, or an employee of a member of
Congress in connection with obtaining any Federal Contract, grant or any other award covered
by 31 U.S.C.
1352. Contractor further attests that it has disclosed, and will continue to disclose, any
lobbying with non-Federal funds that takes place in connection with obtaining any Federal
award.
(J) [All Contracts]
Procurement of recovered materials (2 CFR §200.323). All parties agree to comply with all
applicable requirements of Section 6002 of the Solid Waste Disposal Act, as amended by the
Resource Conservation and Recovery Act. The requirements of Section 6002 include
procuring only items designated in guidelines of the Environmental Protection Agency (EPA)
at 40 CFR part 247 that contain the highest percentage of recovered materials practicable,
consistent with maintaining a satisfactory level of competition, where the purchase price of
the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal
year exceeded $10,000; procuring solid waste management services in a manner that
maximizes energy and resource recovery; and establishing an affirmative procurement
program for procurement of recovered materials identified in the EPA guidelines.
a. In the performance of this contract, the Contractor shall make maximum use of
products containing recovered materials that are EPA-designated items unless the
product cannot be acquired:
• Competitively within a timeframe providing for compliance with the contract
performance schedule;
• Meeting contract performance requirements; or
• At a reasonable price.
b. Information about this requirement, along with the list of EPA-designated items, is
available at EPA’s Comprehensive Procurement Guidelines web site,
https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program.
(K) [All Contracts]
Prohibition on certain telecommunications and video surveillance services or
equipment (2 CFR §200.216). Contractor is prohibited from using equipment, services, or
systems that uses covered telecommunications equipment or services as a substantial or
essential component of any system, or as critical technology as part of any system. As
described in Public Law 115-232, section 889, covered telecommunications equipment is
telecommunications equipment produced by Huawei Technologies Company or ZTE
Corporation (or any subsidiary or affiliate of such entities).
(i) For the purpose of public safety, security of government facilities, physical
security surveillance of critical infrastructure, and other national security
purposes, video surveillance and telecommunications equipment produced by
Hytera Communications Corporation, Hangzhou Hikvision Digital Technology
Company, or Dahua Technology Company (or any subsidiary or affiliate of such
entities).
(ii) Telecommunications or video surveillance services provided by such entities or
using such equipment.
(iii) Telecommunications or video surveillance equipment or services produced or
provided by an entity that the Secretary of Defense, in consultation with the Director of
the National Intelligence or the Director of the Federal Bureau of Investigation,
reasonably believes to be an entity owned or controlled by, or otherwise connected
to, the government of a covered foreign country.
(L) [All Contracts]
2 C.F.R. § 200.322 Domestic preferences for procurements. As appropriate and to the
extent consistent with law, Contractor should, to the greatest extent practicable, prefer the
purchase, acquisition, or use of goods, products, or materials produced in the United States
(including but not limited to iron, aluminum, steel, cement, and other manufactured products).
The requirements of this section must be included in all subawards including all Contracts
and purchase orders for work or products under this award.
(M) [All Contracts]
2 C.F.R. § 200.321 Small and Minority Businesses, Women’s Business Enterprises, and
Labor Surplus Area Firms. The City will take affirmative steps to solicit and include small,
minority, and women-owned businesses when possible in an effort to encourage participation
and fair competition in providing supplies/services described in this solicitation. As set forth in 2
C.F.R. § 200.321(b)(1)-(5), such affirmative steps must include:
1. Placing qualified small and minority businesses and women's business
enterprises on solicitation lists;
2. Assuring that small and minority businesses, and women's business enterprises are
solicited whenever they are potential sources;
3. Dividing total requirements, when economically feasible, into smaller tasks or
quantities to permit maximum participation by small and minority businesses, and
women's business enterprises;
4. Establishing delivery schedules, where the requirement permits, which
encourage participation by small and minority businesses, and women's
business enterprises; and
5. Using the services and assistance, as appropriate, of such organizations as
the Small Business Administration and the Minority Business Development
Agency of the Department of Commerce.
If subcontracts are to be let, Contractor must take all necessary affirmative steps to
assure that minority businesses, women’s business enterprises, and labor surplus
area firms are used as required by 2 C.F.R. § 200.321.
(N) [Construction or facility improvement Contracts or subcontracts exceeding the
Simplified Acquisition Threshold as defined in 2 C.F.R. § 200.88]
Bonding requirements (2 C.F.R. § 200.326).
Except where the Federal awarding agency or pass-through entity has made a determination
that alternative bonding policy and requirements adequately protect the Federal interest,
Contractor agrees to comply with the following minimum bonding requirements:
(a) Contractor must provide a bid guarantee equivalent to five percent of the bid
price. The "bid guarantee" must consist of a firm commitment such as a bid
bond, certified check, or other negotiable instrument accompanying a bid as
assurance that the Contractor will, upon acceptance of the bid, execute such
Contractual documents as may be required within the time specified.
(b) Contractor must provide a performance bond on the part of the Contractor
for 100 percent of the Contract price. A "performance bond" is one executed
in connection with a Contract to secure fulfillment of all the Contractor's
obligations under such Contract.
(c) Contractor must provide a payment bond on the part of the Contractor for 100
percent of the Contract price. A "payment bond" is one executed in
connection with a Contract to assure payment as required by law of all
persons supplying labor and material in the execution of the work provided for
in the Contract.
(O) Bid Protest Procedures
CITY OF FORT COLLINS BID PROTEST PROCEDURES
The City of Fort Collins has a protest procedure covering any phase of solicitation or award,
including but not limited to specification or award. The protest procedures are available from
the Purchasing Department, City of Fort Collins, 215 N. Mason, Street, 2nd Floor, P. O. Box
580, Fort Collins, CO. 80522. You may also request a copy of the procedures by emailing:
Purchasing@fcgov.com or calling 970-221-6775.
(P) Title VI of the Civil Rights Act of 1964 - The sub-grantee, contractor, subcontractor,
successor, transferee, and assignee shall comply with Title VI of the Civil Rights Act of
1964, which prohibits recipients of federal financial assistance from excluding from a
program or activity, denying benefits of, or otherwise discriminating against a person on
the basis of race, color, or national origin (42 U.S.C. § 2000d et seq.), as implemented by
the Department of the Treasury’s Title VI regulations, 31 CFR Part 22, which are herein
incorporated by reference and made a part of this contract (or agreement). Title VI also
includes protection to persons with “Limited English Proficiency” in any program or activity
receiving federal financial assistance, 42 U.S.C. § 2000d et seq., as implemented by the
Department of the Treasury’s Title VI regulations, 31 CFR Part 22, and herein
incorporated by reference and made a part of this contract or agreement.
(Q) Increasing Seat Belt Use in the United States – Pursuant to Executive Order 13043, 62
FR 19217 (Apr. 18, 1997), the City encourages its contractors to adopt and enforce on-
the-job seat belt policies and programs for their employees when operating company-
owned, rented, or personally owned vehicles.
(R) Reducing Text Messaging While Driving – Pursuant to Executive Order 13513, 74 FR
51225 (Oct. 6, 2009), the City encourages its employees, subrecipients, and contractors to
adopt and enforce policies that ban text messaging while driving, and the City has
established workplace safety policies to decrease accidents caused by distracted drivers.
(S) Publications – Any publications produced under this contract or agreement must display
the following language: “This project is being supported, in whole or in part, by federal
award number 21.019 awarded to the City of Fort Collins by the U.S. Department of the
Treasury.”
SECTION 00900
ADDENDA, MODIFICATIONS AND PAYMENT
00950 Contract Change Order
00960 Application for Payment
SECTION 00950
CHANGE ORDER NO.
PROJECT TITLE: 9718 Childcare Center Renovation – Northside Aztlan Community Center
CONTRACTOR: [Contractor]
DESCRIPTION:
1. Reason for change:
2. Description of Change:
3. Change in Contract Cost:
4. Change in Contract Time:
ORIGINAL CONTRACT COST $ .00
TOTAL APPROVED CHANGE ORDER .00
TOTAL PENDING CHANGE ORDER .00
TOTAL THIS CHANGE ORDER .00
TOTAL % OF THIS CHANGE ORDER %
TOTAL C.O.% OF ORIGNINAL CONTRACT %
ADJUSTED CONTRACT COST $ .00
(Assuming all change orders approved)
ACCEPTED BY: DATE:
Contractor's Representative
ACCEPTED BY: DATE:
Project Manager
REVIEWED BY: DATE:
Title:
APPROVED BY: DATE:
Title:
APPROVED BY: DATE:
Purchasing Agent over $30,000
cc: City Clerk Contractor Engineer
Project File Architect Purchasing
Section 00960
APPLICATION FOR PAYMENT PAGE 1 OF 4
OWNER: City of Fort Collins
PROJECT: 9718 Childcare Center
Renovation – Northside
Aztlan Community Center APPLICATION NUMBER:
APPLICATION DATE:
PERIOD BEGINNING:
ENGINEER: CONTRACTOR: PERIOD ENDING:
PROJECT NUMBER:
CHANGE ORDERS Application is made for Payment as shown below in connection with Contract
NUMBER DATE AMOUNT
The present status of the account for this Contract is as
follows:
1
2 Original Contract Amount:
3 Net Change by Change Order:
Current contract Amount: $0.00
Total Completed and Stored to Date:
Less Previous Applications:
Amount Due this Application - Before Retainage: $0.00
Less Retainage:
Net Change by Change Order $0.00 AMOUNT DUE THIS APPLICATION: $0.00
CERTIFICATION:
The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with
the Work have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract.
The above Amount Due This Application is requested by the CONTRACTOR.
Date: By:
Payment of the above Amount Due This Application is recommended by the ENGINEER.
Date: By:
Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager.
Date: By:
Payment of the above Amount Due This Application is approved by the OWNER.
Date: By:
CONTRACT AMOUNTS
APPLICATION FOR
PAYMENT PAGE 2 OF 4
Work
Completed
Work
Completed
Work
Completed Stored
Bid
This
Month
Previous
Periods
To
Date Materials Total
Item This Earned Percent
Number Description Quantity Units
Unit
Price Amount Qty. Amount Qty. Amount Qty. Amount Period
To
Date Billed
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
TOTALS $0.00 $0.00 $0.00 $0.00 $0.00
CHANGE ORDERS APPLICATION FOR PAYMENT PAGE 3 OF 4
Work
Completed
Work
Completed
Work
Completed Stored
Bid
This
Month
Previous
Periods
To
Date Materials Total
Item This Earned Percent
Number Description Quantity Units
Unit
Price Amount Qty. Amount Qty. Amount Qty. Amount Period
To
Date Billed
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
TOTALS CHANGE
ORDERS $0.00 $0.00 $0.00 $0.00 $0.00
PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00
STORED MATERIALS
SUMMARY PAGE 4 OF 4
On Hand Received Installed On Hand
Item Invoice Previous This This This
Number Number Description Application Period Period Application
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS $0.00 $0.00 $0.00 $0.00