HomeMy WebLinkAboutBID - 9912 CONCRETE MAINTENANCE PHASE IVBID 9912 Streets Concrete Maintenance Phase IV Page 1 of 116
INVITATION TO BID
9912 Concrete Maintenance Phase IV
BID OPENING: 3:00 PM MST (our clock), January 17, 2024
The City of Fort Collins Streets Department is requesting bids for concrete maintenance phase IV
work, which will be a services agreement work order type. The City intends to award the contract
to the low responsive and responsible Bidder. The City may at its’ sole discretion and subject to
the second low responsive and responsible Bidder’s agreement, award a contract to one
additional Bidder to serve as an alternate to the primary awarded Bidder. The City will utilize the
lowest responsive and responsible Bidder for all work orders issued under this bid and awarded
Agreement unless; 1) the low Bidder is unable to execute a specific work order with the City; or
2) is unable to meet the City’s schedule requirements. In such event, the City will work with the
alternate Bidder, subject to the alternate Bidder’s availability, to quote and perform the work.
Rates utilized for quotes and work orders will be based on the pricing included in the bid and
Agreement. Projects may consist of entire neighborhoods, lengths of collector and arterial
roadways varying in size and scope. Sample projects are listed in Exhibit E the project index and
Exhibit F project maps and anticipated quantities are provided in the bid tabulation.
Concrete maintenance projects will consist of various repairs within a project area that may
include curb, gutter, sidewalk, crosspans, concrete pavement, pedestrian access ramps, etc. All
repairs must conform to Americans with Disabilities Act (ADA) requirements and US Access
Board’s Public Right-of-Way Accessibility Guidelines (PROWAG). Knowledge and understanding
of these requirements are critical to project success. Provide references for this type of work under
Section 00420 Statement of Bidder’s Qualifications.
Work under this Agreement is anticipated to begin in winter/spring 2024.
As part of the City’s commitment to Sustainable Purchasing, electronic bid submission is
preferred. Bids shall be submitted online through the Rocky Mountain E-Purchasing
System (RMEPS) at http://www.bidnetdirect.com/colorado/city-of-fort-collins. Please note:
submitting bids through RMEPS may need additional time for completion. Bids not submitted by
the designated Opening Date and Time will not be accepted by the system.
Public Bid Opening: The bid opening will be conducted by video conference per the following
information. At said place and time, and promptly thereafter, all Bids that have been duly received
will be publicly opened and read aloud. To access the public Bid opening, please follow the link
to join the Microsoft Teams meeting:
Click here to join the meeting
https://teams.microsoft.com/l/meetup-
join/19%3ameeting_NGVhMTgxY2ItNzg1Yi00ZWViLWEzYzMtNDRiMTFjMzg5NGZj%40thread.
v2/0?context=%7b%22Tid%22%3a%2247fa2f5f-0d0a-4a68-b431-
6d1a27b66660%22%2c%22Oid%22%3a%2237299b31-8a43-4b66-8642-
b5358a21cda9%22%7d
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
fcgov.com/purchasing
BID 9912 Streets Concrete Maintenance Phase IV Page 2 of 116
To call in to the meeting use the information below:
Call-In Number: 1 970 628 0892
Conference ID: 555 514 006#
A pre-bid conference and job walk with representatives of prospective Bidders will be held
at 10:00 AM MT on January 5, 2024, on Microsoft Teams. Select or copy/paste the below link
into your browser for access to the meeting. Please be prepared to announce your name and
mute your microphone:
Click here to join the meeting
https://teams.microsoft.com/l/meetup-
join/19%3ameeting_NDY1ZWJiNzItYjkwOC00YzFhLTk3OGItZDYyYTUyZTdmODE4%40thread
.v2/0?context=%7b%22Tid%22%3a%2247fa2f5f-0d0a-4a68-b431-
6d1a27b66660%22%2c%22Oid%22%3a%2237299b31-8a43-4b66-8642-
b5358a21cda9%22%7d
To call in to the meeting use the information below:
Call-In Number: 1 970 628 0892
Conference ID: 673 618 880#
All questions should be submitted in writing via email, to Adam Hill Senior Buyer at
adhill@fcgov.com no later than 3:00 PM MST (our clock) on January 9, 2024. Please format
your e-mail to include: Bid 9912 Concrete Maintenance Phase IV in the subject line. Questions
received after this deadline may not be answered. Responses to all questions submitted before
the deadline will be addressed in an addendum and posted on the Rocky Mountain E-Purchasing
System webpage.
Rocky Mountain E-Purchasing System hosted by BidNet
A copy of the Bid may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins.
This RFP has been posted utilizing the following Commodity Code(s):
912 Construction Services, General
913 Construction Services, Heavy
914 Construction Services, Trade
Prohibition of Unlawful Discrimination: The City of Fort Collins, in accordance with the
provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d-
4) and the Regulations, hereby notifies all Bidders that it will affirmatively ensure that any contract
entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded
full and fair opportunity to submit bids in response to this invitation and will not be discriminated
against on the grounds of race, color, or national origin in consideration for an award.
The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of
gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age
40 years or older, marital status, disability, sexual orientation, genetic information, or other
characteristics protected by law. For the purpose of this policy “sexual orientation” means a
person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality.
The City also strictly prohibits unlawful harassment in the workplace, including sexual
harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages
in protected activity. Protected activity includes an employee complaining that he or she has been
BID 9912 Streets Concrete Maintenance Phase IV Page 3 of 116
discriminated against in violation of the above policy or participating in an employment
discrimination proceeding.
The City requires its Contractor to comply with the City’s policy for equal employment opportunity
and to prohibit unlawful discrimination, harassment and retaliation. This requirement applies to
all third-party Contractor and their subcontractors/subconsultants at every tier.
Public Viewing Copy: The City is a governmental entity subject to the Colorado Open Records
Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to
public disclosure by the City pursuant to CORA and City ordinances. Contractor may submit one
(1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version of the
proposal, Contractor may redact text and/or data that it deems confidential or proprietary pursuant
to CORA. Failure to provide a public viewing copy will be considered a waiver of any claim of
confidentiality under CORA without regard to how the applicant’s proposal or certain pages of the
proposal are marked confidential, proprietary, or similar. Such statement does not necessarily
exempt such documentation from public disclosure if required by CORA, by order of a court of
appropriate jurisdiction, or other applicable law. Generally, under CORA trade secrets,
confidential commercial and financial data information is not required to be disclosed by the City.
Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. By responding to this
RFP, Contractor hereby waives any and all claims for damages against the City for the City’s
good faith compliance with CORA. All provisions of any contract resulting from this request
for proposal will be public information.
Special Instructions
All bids must be properly signed by an authorized representative of the company with the legal
capacity to bind the company to the agreement. Bids may be withdrawn up to the date and hour
set for closing. Once bids have been accepted by the City and closing has occurred, failure to
enter into contract or honor the purchase order will be cause for removal of supplier's name from
the City of Fort Collins' bidders list for a period of twelve months from the date of the opening.
The City may also pursue any remedies available at law or in equity.
Submission of a bid is deemed as acceptance of all terms, conditions and specifications contained
in the City's specifications initially provided to the Contractor. Any proposed modification must be
accepted in writing by the City prior to award of the bid.
Only bids properly received by the Purchasing Office will be accepted. All bids should be
clearly identified by the bid number and bid name contained in the bid proposal.
No bid will be accepted from, or any purchase order awarded, to any person, firm or corporation
in default on any obligation to the City.
Bids must be furnished exclusive of any federal excise tax, wherever applicable.
Contractors must be properly licensed and secure necessary permits wherever applicable.
The City may elect where applicable to award bids on an individual item/group basis or on a total
bid basis, whichever is most beneficial to the City. The City of Fort Collins reserves the right to
split the Bid award to multiple Contractors as deemed by the City to be most advantageous. The
City reserves the right to accept or reject any and all bids, and to waive any irregularities or
informalities.
BID 9912 Streets Concrete Maintenance Phase IV Page 4 of 116
Sales prohibited/conflict of interest: no officer, employee, or member of City Council, shall
have a financial interest in the sale to the City of any real or personal property, equipment,
material, supplies or services where such officer or employee exercises directly or indirectly any
decision-making authority concerning such sale or any supervisory authority over the services to
be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift,
gratuity, favor, entertainment, kickback or any items of monetary value from any person who has
or is seeking to do business with the City of Fort Collins is prohibited.
Freight terms: unless otherwise noted, all freight is F.O.B. Destination, Freight Prepaid. All
freight charges must be included in the unit prices submitted.
Collusive or sham bids: any bid deemed to be collusive or a sham bid will be rejected and
reported to authorities as such. Your authorized signature of this bid assures that such bid is
genuine and is not a collusive or sham bid.
Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow
other state and local governmental agencies, political subdivisions, and/or school districts to
utilize the resulting award under all terms and conditions specified and upon agreement by all
parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in
the current term or in any future terms.
Contractor Registration: The City requires new Contractors receiving awards from the City to
submit IRS form W-9 and requires all Contractor to accept Direct Deposit (Electronic) payment. If
needed, the W-9 form and the Contractor Direct Deposit Authorization Form can be found on the
City’s Purchasing website at www.fcgov.com/purchasing under Contractor Reference
Documents. Please do not submit these documents with your bid, however, if you take
exception to participating in Direct Deposit (Electronic) payments please clearly note such in your
proposal as an exception. The City may waive the requirement to participate in Direct Deposit
(Electronic) payments at its sole discretion.
Bid results are posted online at http://www.bidnetdirect.com/colorado/city-of-fort-collins.
Gerry Paul
Purchasing Director
BID 9912 Street Concrete Maintenance Phase IV Page 5 of 116
I. GENERAL INFORMATION
The City of Fort Collins Streets Department is requesting bids for concrete maintenance phase IV
work, which will be a services agreement work order type. The City intends to award the contract
to the low responsive and responsible Bidder. The City may at its’ sole discretion and subject to
the second low responsive and responsible Bidder’s agreement, award a contract to one
additional Bidder to serve as an alternate to the primary awarded Bidder. The City will utilize the
lowest responsive and responsible Bidder for all work orders issued under this bid and awarded
Agreement unless; 1) the low Bidder is unable to execute a specific work order with the City; or
2) is unable to meet the City’s schedule requirements. In such event, the City will work with the
alternate Bidder, subject to the alternate Bidder’s availability, to quote and perform the work.
Rates utilized for quotes and work orders will be based on the pricing included in the bid and
Agreement. Projects may consist of entire neighborhoods, lengths of collector and arterial
roadways varying in size and scope. Sample projects are listed in Exhibit E the project index and
Exhibit F project maps and anticipated quantities are provided in the bid tabulation.
Concrete maintenance projects will consist of various repairs within a project area that may
include curb, gutter, sidewalk, crosspans, concrete pavement, pedestrian access ramps, etc. All
repairs must conform to Americans with Disabilities Act (ADA) requirements and US Access
Board’s Public Right-of-Way Accessibility Guidelines (PROWAG). Knowledge and understanding
of these requirements are critical to this projects success. Provide references for this type of work
under Section 00420 Statement of Bidder’s Qualifications.
Work under this Agreement is anticipated to in winter/spring 2024.
A. Schedule
The following represents the City’s target schedule for the bid. The City reserves the right to
amend the target schedule at any time.
• Bid issuance: December 13, 2023
• Pre-Bid Meeting 10:00 MST on January 5, 2024
• Question deadline: 3:00 PM MST on January 9, 2024
• Addendum issued: January 11, 2024
• Bid Opening Date: 3:00 PM MST (our clock) on January 17, 2024
B. Method Of Award
Bid price evaluations will be completed using the estimated quantities given multiplied by the
unit price. The City reserves the right to award to one or multiple Contractors. Awards will be
based primarily on the lowest responsive and responsible base bid or base bid plus selected
alternates as well as references, experience and as deemed in the best interest of the City.
C. Agreement
The awarded Contractor(s) will receive a Purchase Order from the City authorizing work under
this Agreement. Contractor should not begin any Work prior to receipt of the Purchase Order.
The awarded Contractor(s) shall sign the City’s Agreement, a sample of which is attached.
The Agreement will be effective for a period of one (1) year. At the option of the City, the
BID 9912 Street Concrete Maintenance Phase IV Page 6 of 116
Agreement may be extended for up to four (4) additional one (1) year periods. Renewals and
pricing changes for subsequent extensions shall only be considered by the City at the time of
such Agreement renewal. The Contractor shall propose any such changes in price at least
forty-five (45) days prior to Agreement expiration. Written notice of renewal shall be provided
to the Contractor and emailed no later than sixty (60) days prior to the Agreement expiration
date.
D. Invoices & Payments
Invoices should be emailed monthly to invoices@fcgov.com with a copy to the Project
Manager. The cost of the Work completed shall be paid to the Contractor each month following
the submittal of a correct invoice/pay application by the Contractor indicating the project name,
Purchase Order number, task description, hours worked, Work Order number, personnel/work
type category, hourly rate for each employee/work type category, date of the Work performed
specific to the task, percentage of that Work that has been completed by task, 3rd party
supporting documentation with the same detail and a brief progress report.
Payments will be made using the prices stated in the Work Order and Agreement. In the
event a service is requested which is not stated in the Work Order and/or Agreement, the
Contractor and the City will negotiate an appropriate unit price for the service prior to the
Contractor initiating such Work.
The City pays invoices on Net 30 terms.
E. Subcontractors
Contractor will be responsible for identifying any subcontractors in their proposal. Please note
that the City will contract solely with the awarded Contractor; therefore, subcontractors will be
the responsibility of the Contractor.
F. Fees, Licenses, Permits
The successful Contractor shall be responsible for obtaining any necessary licenses, fees and
permits without additional expense to the City. All equipment shall be properly licensed and
insured, carry the appropriate permits and be placarded as required by law.
G. Laws And Regulations
All Work and/or materials must meet current standards in force by recognized technical and
professional societies, trade and materials supply associations, institutes and organizations,
bureaus and testing laboratories.
The Contractor agrees to comply fully with all applicable local, State of Colorado and Federal
laws and regulations and municipal ordinances to include American Disabilities Act (ADA).
The Contractor further agrees to comply fully with the Occupational Safety and Health Act, all
regulations issued there under, and all state laws and regulations enacted and adopted
pursuant thereto.
H. Insurance
Contractor is responsible for providing the City with insurance as required in the attached
Agreement.
I. Warranty
Contractor warrants all equipment, materials, labor and other Work, provided under this
Agreement, except City-furnished materials, equipment and labor, against defects and
nonconformances in design, materials and workmanship for a period beginning with delivery
BID 9912 Street Concrete Maintenance Phase IV Page 7 of 116
and ending twenty-four months (24) months from and after final acceptance under the
Agreement regardless whether the same were furnished or performed by Contractor or by
any of its subcontractors of any tier. Upon receipt of written notice from City of any such
defect or nonconformances, the affected item or part thereof shall be redesigned, repaired or
replaced by Contractor in a manner and at a time acceptable to City.
J. Work Orders
The awarded Contractor(s) will be required to sign the City’s Services Agreement Work Order
Type, a sample of which is attached as Exhibit A for reference purposes. The City will utilize
the lowest responsive and responsible Bidder for all work orders issued under this bid and
awarded Agreement unless; 1) the low Bidder is unable to execute a specific work order with
the City; or 2) is unable to meet the City’s schedule requirements. In such event, the City will
work with the alternate Bidder, subject to the alternate Bidder’s availability, to quote and
perform the work. Rates utilized for quotes and work orders will be based on the pricing
included in the bid and Agreement.
There is no guaranteed minimum number of services to be ordered through this Bid.
Individual Work assignments will be requested and agreed to utilizing the City’s Work Order
(included in the Agreement) which refers back to the Agreement. Each Work Order must
include a start and completion date, total cost and a Scope of Work. Subsequent supporting
documentation pages may include a project schedule, deliverables, hours, cost detail
supporting total cost, and personnel details. Unit prices outlined in the Work Order will
conform with those stated in the Agreement.
Any Work Orders exceeding $100,000 will require 100% Performance and Payment bonds,
5% retainage and will be subject to the General Conditions as stated in the attached Exhibit
A.
No Work Order will be considered valid until signed, at a minimum, by the Contractor, Project
Manager and Purchasing Department representative. Depending on the cost and nature of
the Work, additional signature authorization may be required. Any changes to the dates, cost
or scope of any Work Order must be agreed upon in writing utilizing the City’s Change Order
(included in the Agreement) and will not be considered valid until signed, at a minimum, by
the Contractor, Project Manager and Purchasing Department representative.
All Work must begin within the time frame negotiated with the Contractor and Project Manager
based upon the needs of the project following issue of a Work Order or per the project
schedule. It shall be each Contractor's responsibility to familiarize themselves with the
complexities involved for each type before submitting a quote.
K. Standard of Conduct
The successful Contractor(s) shall be responsible for maintaining satisfactory standards of
employees' competency, conduct, courtesy, appearance, honesty, and integrity, and shall be
responsible for taking such disciplinary action with respect to any employee, as may be
necessary.
The City may request the successful Contractor(s) to immediately remove from this
assignment any employee the City identifies to be unfit to perform duties due to one or more
of the following reasons:
1. Neglect of duty.
2. Disorderly conduct, use of abusive or offensive language, quarreling, intimidation by
words or actions or fighting.
3. Theft, vandalism, immoral conduct or any other criminal action.
BID 9912 Street Concrete Maintenance Phase IV Page 8 of 116
4. Selling, consuming, possessing, or being under the influence of intoxicants, including
alcohol, or illegal substances while on assignment for the City.
5. Acting in an unsafe manner
All City owned or operated facilities and their grounds are non-smoking sites. All City parks,
trails and natural areas are also non-smoking.
Agents and employees of Contractor(s) working for the City shall present a clean and neat
appearance. Prior to performing any Work for the City, Contractor(s) shall require each of their
employees to wear ID badges or uniforms identifying: Contractor by name, the first name of
their employee and a photograph of their employee if using an ID badge. Their employee shall
wear or attach the ID badge to the outer garments at all times.
L. Accident Reporting
Any incident/accident resulting in damage to property or causing personal injury under this
Agreement shall be immediately reported to the appropriate police agency, other required
agencies, Project Manager and the City of Fort Collins Risk Management Department.
The Contractor shall immediately contact the Utility Operator/Owner and the City of Fort
Collins when damage to an underground facility is identified. If a natural or propane gas line
is damaged, the Contractor must call 911 prior to notifying the Utility Operator. The Contractor
shall not backfill around the underground utility line until the Utility Operator has repaired the
damage and has given clearance to backfill. The City of Fort Collins will not pay the Contractor
for labor, vehicles, material, or equipment or any other cost associated with the repair to any
at-fault damage. Failure to comply may result in a verbal warning, suspension of the crew,
loss of work, and/or termination of the Agreement.
M. Safety Practices, Safety Documentation and Training
Contractor(s) shall comply with all engineering, safety, and operating requirements
concerning installation of equipment in, on or around utility facilities; obtaining access
facilities; and adhering to operating rules and requirements involving safe contact with utility
equipment and water, gas and power lines, and confined spaces. The Contractor shall comply
fully with the Occupational Safety and Health Act and all regulations issued there under.
N. Unsatisfactory Operations
Should it be necessary to halt the Work because of incorrect or unsatisfactory operations
under the terms of the awarded contract or because of failure to follow safety standards
applicable hereto, the Contractor must take immediate steps to remedy the deficiencies.
Should repair or correction of any safety defect or deficiency not be immediately undertaken
and should the City of Fort Collins be required to protect the site or make the repair or
correction, the cost of such Work shall be deducted from payment due the Contractor.
O. Compliance Standards
1. Contractor must comply with the Larimer County Urban Area Street Standards
(LCUASS) latest edition. These documents are available at www.larimer.org.
2. The Contractor must submit approved concrete mix designs for use in the right-of-way
prior to starting Work. The City may require the Contractor to use rapid set concrete.
3. All temporary asphalt patching shall be performed in accordance with the current City
specifications and by a Contractor licensed with the City of Fort Collins.
BID 9912 Street Concrete Maintenance Phase IV Page 9 of 116
4. All Work must comply with the latest versions of Americans with Disabilities Act (ADA)
requirements and US Access Board’s Public Right-of-Way Accessibility Guidelines
(PROWAG).
5. The Contractor shall abide by Exhibit H – Section 04000 Dust Control and Prevention
Manual and Environmental Standard Operation Procedures.
6. The Master Street Plan depicting the classification of City roads is available on the
internet at:
http://citydocs.fcgov.com/?dt=Master+Street+Plan+Map&dn=GIS+MAPS&vid=192&c
md=showdt
7. Work must comply with Exhibit B – Section 01010-01800 General Requirements.
8. The Colorado Department of Transportation (CDOT) Standard Specifications for Road
and Bridge Construction (attached) have been modified and are attached as Exhibit C
- Section 2000 Special Revisions.
9. Additional specifications are included in the attached Exhibit D - Section 03000 Index
& Details
10. Work must comply with Exhibit G – Accessibility Push Button Specifications
Official Purchasing Document
Last updated 8/15/2022
BID 9912 Street Concrete Maintenance Phase IV Page 10 of 116
CITY OF FORT COLLINS
BID SUBMITTAL INSTRUCTIONS
The documents that comprise the Bid Submittal will be uploaded separately to BidNet for
Contractors to complete.
The following items must be provided in the Bid Submittal package:
1)Completed Bid Submittal Form, including:
•Bid Form (Section 00300)
•Acknowledgement
•Statement of Bidder’s Qualifications (Section 00420)
•Schedule of Subcontractors (Section 00430) (if applicable)
•Bid Schedule, submitted in Excel format
•Other documents may be submitted in PDF format
Failure to submit any of the above may result in your bid being considered non-responsive.
Official Purchasing Document
Last updated 8/15/2022
BID 9912 Street Concrete Maintenance Phase IV Page 11 of 116
SECTION 00300
BID FORM
PROJECT: 9912 Concrete Maintenance Phase IV Date:
1.In compliance with your Invitation to Bid dated , 20 and subject to all
conditions thereof, the undersigned a (Corporation, Limited Liability Company,
Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of
Colorado hereby proposes to furnish and do everything required by the Contract
Documents to which this refers for the construction of all items listed on the following Bid
Schedule or Bid Schedules.
2.The undersigned Bidder does hereby declare and stipulate that this proposal is made in
good faith, without collusion or connection with any other person or persons Bidding for
the same Work, and that it is made in pursuance of and subject to all the terms and
conditions of the Contract Documents pertaining to the Work to be done, all of which have
been examined by the undersigned.
3.The undersigned Bidder agrees to execute the Agreement within fifteen (15) calendar
days from the date when the written Notice of Award is delivered to the address given on
this Bid.
4.All the various phases of Work enumerated in the Contract Documents with their individual
jobs and overhead, whether specifically mentioned, included by implication or appurtenant
thereto, are to be performed by the Contractor under one of the items listed in the Bid
Schedule, irrespective of whether it is named in said list.
5.Payment for Work performed will be in accordance with the Bid Schedule(s) subject to
change(s) as provided in the Contract Documents.
6.The undersigned Bidder hereby acknowledges receipt of Addenda No. through .
7.The undersigned Bidder hereby acknowledges the documents listed below are required
elements of the Bid and must be submitted with the Bid. The City may reject any
incomplete Bids as non-responsive.
-Bid Form (this Section 00300)
-Acknowledgement
-Statement of Bidder's Qualifications (Section 00420)
-Schedule of Subcontractors (Section 00430) (if applicable)
-Bid Schedule, submitted in Excel format
-Other documents may be submitted in PDF format
8.Bid Schedule (Base Bid)
At the City’s option the basis of award is the low responsive and responsible Bidder(s)
based on the total price for base bid or base bid plus selected alternates. The City may at
its’ sole discretion and subject to the second low responsive and responsible Bidder’s
agreement, award a contract to one additional bidder to serve as an alternate to the
primary awarded Bidder
Official Purchasing Document
Last updated 8/15/2022
BID 9912 Street Concrete Maintenance Phase IV Page 12 of 116
Exceptions to Sample Agreement. Does your company have any objections to the draft
Agreement attached to this proposal? If revisions to the contract terms are requested, provide
suggested revisions.
10.Prices
The foregoing prices shall include but is not limited to all labor, materials, overhead, profit,
insurance etc., for completion of the Work.
Official Purchasing Document
Last updated 8/15/2022
BID 9912 Street Concrete Maintenance Phase IV Page 13 of 116
ACKNOWLEDGEMENT
Bidder hereby acknowledges receipt of the City of Fort Collins Invitation to Bid and
acknowledges that it has read and agrees to be fully bound by all the terms, conditions and
other provisions set forth in the Bid. Additionally, Bidder hereby makes the following
representations to City:
a. In compliance with your Invitation to Bid 9912 and subject to all conditions thereof, the
undersigned is authorized to do business in the State of Colorado and hereby proposes
to furnish and/or perform the services set forth in the Scope of Work and Specifications,
including all items listed on the Bid Schedule. Bidder commits that it is able to meet the
terms set forth in the Invitation to Bid, and further acknowledges familiarity with all aspects
of the project affecting the cost of the Work to be performed.
b. The undersigned does hereby declare and stipulate that this bid proposal is made in good
faith, without collusion or connection with any other person or persons bidding for the
same Work.
c. This bid proposal is a firm and binding offer, for a period of 90 days from the date hereof.
d. Bidder further agrees that the method of award is acceptable.
e. Bidder also agrees to complete the proposed Agreement with the City of Fort Collins within
30 days of notice of award. If contract is not completed and signed within 30 days, City
reserves the right to cancel and award to the next lowest bidder.
f. Contractor acknowledges receipt of Addenda.
Legal Firm Name:
Physical Address:
Remit to Address:
Phone:
Name of Authorized Agent of Firm:
Signature of Authorized Agent:
Primary Contact for Project:
Title: Email Address:
Phone: Cell Phone:
NOTE: ALL BID SUBMITTAL FORM PAGES MUST BE COMPLETED, SIGNED WHERE
REQUIRED & RETURNED WITH YOUR BID PROPOSAL PACKAGE.
Official Purchasing Document
Last updated 8/15/2022
BID 9912 Street Concrete Maintenance Phase IV Page 14 of 116
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered, and the data given must be clear and comprehensive. This
statement must be notarized. If necessary, questions may be answered on separate attached
sheets. The Bidder may submit any additional information if needed.
1. Name of Bidder:
2. When was Bidder’s firm organized:
3. If your firm is a corporation, where is the firm incorporated:
4. How many years has the firm been engaged under the present firm or trade name?
5. Provide a list of the contracts on hand: (list these, showing the amount of each contract
and the appropriate anticipated dates of completion.)
6. What is the general character of Work performed by your company:
7. Provide a list of essential equipment that will be used.
8. Have you or a firm for which you were a principal ever failed to complete any Work
awarded to you?
If so, where and why?
9. Has the firm ever defaulted on a contract?
If so, where and why?
10. Is the firm debarred by any government agency?
If yes, list agency name.
Official Purchasing Document
Last updated 8/15/2022
BID 9912 Street Concrete Maintenance Phase IV Page 15 of 116
11. Provide the background and experience of the principal members of your organization,
including officers:
12. Credit available: $
13. Bank Reference:
14. Will you, upon request, provide a detailed financial statement for your Company and
furnish any other information that may be required?
15. Confirm Bidder has a City of Fort Collins Right-of-Way Contractors License and list any
other applicable licenses of the Bidder. See this link and follow steps for information on
how to become licensed Excavation – City of Fort Collins (fcgov.com).
16. Are any lawsuits pending against you or your firm at this time?
If yes, provide detail
17. References
The undersigned Bidder shall provide three (3) references of projects similar in scope and
price from the past three (3) years specifically projects with the City or another
governmental institution and projects requiring American with Disabilities Act (ADA) and
US Access Board’s Public Right-of Way Accessibility Guidelines (PROWAG) as they
relate to street pedestrian facilities. It is the City’s preference that the reference projects
use the same Project Manager as the Contractor is proposing for this project. It is
preferred that references are from three separate owners and shall include a brief project
description, owner contact information (name, title, email, and phone number), and total
contract value. References may be checked by the City and bids that do not include the
required and satisfactory references may be deemed non-responsive. The City reserves
the right to request additional project references at its sole discretion.
Project 1 Name:
Brief Description:
Contract Value:
Client:
Contact Name: Title:
Phone: Email:
Official Purchasing Document
Last updated 8/15/2022
BID 9912 Street Concrete Maintenance Phase IV Page 16 of 116
Project 2 Name:
Brief Description:
Contract Value:
Client:
Contact Name: Title:
Phone: Email:
Project 3 Name:
Brief Description:
Contract Value:
Client:
Contact Name: Title:
Phone: Email:
The undersigned hereby authorizes and requests any person, firm or corporation to furnish any
information requested by the City in verification of the recital comprising this Statement of Bidder’s
Qualifications.
By signing below, the Contractor agrees that the answers to the foregoing questions and all
statements therein contained are true and correct.
Company:
By: Printed:
Title:
Official Purchasing Document
Last updated 8/15/2022
BID 9912 Street Concrete Maintenance Phase IV Page 17 of 116
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors and their corresponding Work items. Identify subcontractors who are
performing critical manufacturing processes.
ITEM SUBCONTRACTOR
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 18 of 116
EXHIBIT A
SAMPLE SERVICES AGREEMENT (FOR REFERENCE ONLY – DO NOT SIGN)
SERVICES AGREEMENT
WORK ORDER TYPE
THIS AGREEMENT made and entered into the day and year set forth below, by and
between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter
referred to as the "City" and hereinafter referred to as "Contractor".
WITNESSETH:
In consideration of the mutual covenants and obligations herein expressed, it is agreed by
and between the parties hereto as follows:
1. Services to be Performed.
a. This Agreement shall constitute the basic agreement between the parties for .
The conditions set forth herein shall apply to all services performed by the Contractor
on behalf of the City and particularly described in Work Orders agreed upon in writing
by the parties from time to time. Such Work Orders, samples of which are attached
hereto as Exhibit A & B, consisting of two (2) and ( ) pages and
incorporated herein by this reference, shall include a description of the services to be
performed, the location and time for performance, the amount of payment, any
materials to be supplied by the City and any other special circumstances relating to
the performance of services. A general scope of services is attached hereto as Exhibit
, consisting of ( ) pages, and incorporated herein by this reference.
The only services authorized under this Agreement are those which are performed
after receipt of such Work Order, except in emergency circumstances where oral work
requests may be issued. Oral requests for emergency actions will be confirmed by
issuance of a written Work Order within two (2) working days. Irrespective of
references in Exhibit A & B to certain named third parties, Contractor shall be solely
responsible for performance of all duties hereunder.
b. The City may, at any time during the term of a particular Work Order and without
invalidating such Work Order, make changes to the scope of the particular services.
Such changes shall be agreed upon in writing by the parties by Change Order, a
sample of which is attached hereto as Exhibit C, consisting of ( ) page(s),
and incorporated herein by this reference.
2. Changes in the Work. The City reserves the right to independently bid any services rather
than issuing work to the Contractor pursuant to this Agreement. Nothing within this
Agreement shall obligate the City to have any particular service performed by the
Contractor.
3. Time of Commencement and Completion of Services. The services to be performed
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 19 of 116
pursuant to this Agreement shall be initiated as specified by each written Work Order or oral
emergency service request. Oral emergency service requests will be acted upon without
waiting for a written Work Order. Time is of the essence.
4. Contract Period. This Agreement shall commence and shall continue in full force
and effect until , unless sooner terminated as herein provided. In addition, at the
option of the City, the Agreement may be extended for additional one year periods not to
exceed ( ) additional one year periods. Renewals and pricing changes shall be
negotiated by and agreed to by both parties only at the time of renewal. Written notice of
renewal shall be provided to the Contractor and mailed no later than thirty (30) days prior to
contract end.
5. Delay. If either party is prevented in whole or in part from performing its obligations by
unforeseeable causes beyond its reasonable control and without is fault or negligence, then
the party so prevented shall be excused from whatever performance is prevented by such
cause. To the extent that the performance is actually prevented, the Contractor must
provide written notice to the City of such condition within ten (10) days from the onset of
such condition.
6. Early Termination by City/Notices. Notwithstanding the time periods contained herein, the
City may terminate this Agreement at any time without cause by providing written notice of
termination to the Contractor. Such notice shall be mailed at least ten (10) days prior to the
termination date contained in said notice unless otherwise agreed in writing by the parties.
All notices provided under this Agreement shall be effective immediately when emailed or
three business days from the date of the notice when mailed to the following addresses:
Contractor: City: Copy to:
Attn:
email address
City of Fort Collins
Attn:
PO Box 580
Fort Collins, CO 80522
email address
City of Fort Collins
Attn: Purchasing Dept.
PO Box 580
Fort Collins, CO 80522
email address
In the event of early termination by the City, the Contractor shall be paid for services
rendered to the date of termination, subject only to the satisfactory performance of the
Contractor's obligations under this Agreement. Contractor shall submit a final invoice within
ten (10) days of the effective date of termination. Undisputed invoices shall be paid Net 30
days of the date of the invoice. Such payment shall be the Contractor's sole right and
remedy for such termination.
7. Contract Sum. This is an open-end indefinite quantity Agreement with no fixed price. The
actual amount of work to be performed will be stated on the individual Work Orders. The
City makes no guarantee as to the number of Work Orders that may be issued or the actual
amount of services which will in fact be requested.
8. Payments.
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 20 of 116
a. The City agrees to pay and the Contractor agrees to accept as full payment for all work
done and all materials furnished and for all costs and expenses incurred in performance
of the work the sums set forth for the hourly labor rate and material costs, with markups,
stated within the Bid Schedule Proposal Form, attached hereto as Exhibit ,
consisting of ( ) pages, and incorporated herein by this reference.
b. Invoices shall be emailed to invoices@fcgov.com with a copy to the Project Manager.
The cost of the work completed shall be paid to the Contractor following the submittal of
a correct itemized invoice by the Contractor. Payment shall be made by the City only
upon acceptance of the work by the City and upon the Contractor furnishing satisfactory
evidence of payment of all wages, taxes, supplies and materials, and other costs
incurred in connection with the performance of such work. The City is exempt from sales
and use tax. The City’s Certificate of Exemption license number is 09804502. A copy
of the license is available upon written request.
The City pays invoices on Net 30 days from the date of the invoice.
9. Appropriation. To the extent this Agreement or any provision in it constitutes a multiple
fiscal year debt or financial obligation of the City, it shall be subject to annual appropriation
by City Council as required in Article V, Section 8(b) of the City Charter, City Code Section
8-186, and Article X, Section 20 of the Colorado Constitution. The City shall have no
obligation to continue this Agreement in any fiscal year for which no such supporting
appropriation has been made.
10. Liquidated Damages. OWNER and CONTRCTOR recognize that time is of the essence of
this Agreement and that OWNER will suffer financial loss if the Work is not completed within
the times specified in the Work Order, plus any extensions thereof allowed in accordance
with Article 12 of the General conditions. They also recognize the delays, expenses and
difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if
the Work is not completed on time. Accordingly, instead of requiring any such proof,
OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as
penalty) CONTRACTOR shall pay OWNER the amount set forth in each Work Order.
11. City Representative. The City's representative will be shown on the specific Work Order
and shall make, within the scope of his or her authority, all necessary and proper decisions
with reference to the work requested. All requests concerning this Agreement shall be
directed to the City Representative.
12. Independent Contractor. It is agreed that in the performance of any services hereunder, the
Contractor is an independent contractor responsible to the City only as to the results to be
obtained in the particular work assignment and to the extent that the work shall be done in
accordance with the terms, plans and specifications furnished by the City.
13. Subcontractors/subconsultants. Contractor may not subcontract any of the Work set forth
in the subsequent Work Orders without the prior written consent of the city, which shall not
be unreasonably withheld. If any of the Work is subcontracted hereunder (with the consent
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 21 of 116
of the City), then the following provisions shall apply: (a) the subcontractor/subconsultant
must be a reputable, qualified firm with an established record of successful performance in
its respective trade performing identical or substantially similar work, (b) the
subcontractor/subconsultant will be required to comply with all applicable terms of this
Agreement, (c) the subcontract will not create any contractual relationship between any
such subcontractor/subconsultant and the City, nor will it obligate the City to pay or see to
the payment of any subcontractor/subconsultant, and (d) the work of the
subcontractor/subconsultant will be subject to inspection by the City to the same extent as
the work of the Contractor.
14. Personal Services. It is understood that the City enters into the Agreement based on the
special abilities of the Contractor and that this Agreement shall be considered as an
agreement for personal services. Accordingly, the Contractor shall neither assign any
responsibilities nor delegate any duties arising under the Agreement without the prior written
consent of the city.
15. Acceptance Not Waiver. The City's approval or acceptance of, or payment for any of the
services shall not be construed to operate as a waiver of any rights under the Agreement or
of any cause of action arising out of the performance of this Agreement.
16. Warranty.
a. Contractor warrants that all work performed hereunder shall be performed with the
highest degree of competence and care in accordance with accepted standards for work
of a similar nature.
b. Unless otherwise provided in the Agreement, all materials and equipment incorporated
into any work shall be new and, where not specified, of the most suitable grade of their
respective kinds for their intended use, and all workmanship shall be acceptable to City.
c. Contractor warrants all equipment, materials, labor and other work, provided under this
Agreement, except City-furnished materials, equipment and labor, against defects and
nonconformances in design, materials and workmanship/workwomanship for a period
beginning with the start of the work and ending twenty-four (24) months from and after
final acceptance under the Work Order, regardless whether the same were furnished or
performed by Contractor or by any of its subcontractors/subconsultants of any tier. Upon
receipt of written notice from City of any such defect or nonconformances, the affected
item or part thereof shall be redesigned, repaired, or replaced by Contractor in a manner
and at a time acceptable to City.
17. Default. Each and every term and condition hereof shall be deemed to be a material
element of this Agreement. In the event either party should fail or refuse to perform
according to the terms of this Agreement, such party may be declared in default thereof.
18. Remedies. In the event a party has been declared in default, such defaulting party shall be
allowed a period of ten (10) days within which to cure said default. In the event the default
remains uncorrected, the party declaring default may elect to (a) terminate the Agreement
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 22 of 116
and seek damages; (b) treat the Agreement as continuing and require specific performance;
or (c) avail themselves of any other remedy at law or equity. If the non-defaulting party
commences legal or equitable actions against the defaulting party, the defaulting party shall
be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees
and costs incurred because of the default.
19. Entire Agreement; Binding Effect; Order of Precedence; Authority to Execute. This
Agreement, along with all Exhibits and other documents incorporated herein, shall constitute
the entire Agreement of the parties regarding this transaction and shall be binding upon said
parties, their officers, employees, agents and assigns and shall inure to the benefit of the
respective survivors, heirs, personal representatives, successors and assigns of said
parties. Covenants or representations not contained in this Agreement shall not be binding
on the parties. In the event of a conflict between terms of the Agreement and any exhibit or
attachment, the terms of the Agreement shall prevail. Each person executing this
Agreement affirms that they have the necessary authority to sign on behalf of their
respective party and to bind such party to the terms of this Agreement.
20. Indemnity/Insurance.
a. The Contractor agrees to indemnify and save harmless the City, its officers, agents and
employees against and from any and all actions, suits, claims, demands or liability of
any character whatsoever, brought or asserted for injuries to or death of any person or
persons, or damages to property arising out of, result from or occurring in connection
with the performance of any service hereunder.
b. The Contractor shall take all necessary precautions in performing the work hereunder
to prevent injury to persons and property.
c. Without limiting any of the Contractor's obligations hereunder, the Contractor shall
provide and maintain insurance coverage naming the City as an additional insured under
this Agreement of the type and with the limits specified within Exhibit , consisting
of ( ) page(s), attached hereto, and incorporated herein by this reference.
The Contractor before commencing services hereunder shall deliver to the City's
Purchasing Director, purchasing@fcgov.com, P. O. Box 580, Fort Collins, Colorado
80522 one copy of a certificate evidencing the insurance coverage required from an
insurance company acceptable to the city.
21. Law/Severability. The laws of the State of Colorado shall govern the construction,
interpretation, execution, and enforcement of this Agreement. The Parties further agree that
Larimer County District Court is the proper venue for all disputes. If the City subsequently
agrees in writing that the matter may be heard in federal court, venue will be in Denver
District Court. In the event any provision of this Agreement shall be held invalid or
unenforceable by any court of competent jurisdiction, such holding shall not invalidate or
render unenforceable any other provision of this Agreement.
22. Governmental Immunity Act. No term or condition of this Agreement shall be construed or
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 23 of 116
interpreted as a waiver, express or implied, of any of the notices, requirements, immunities,
rights, benefits, protections, limitations of liability, and other provisions of the Colorado
Governmental Immunity Act, C.R.S. § 24-10-101 et seq. and under any other applicable
law.
23. Prohibition Against Unlawful Discrimination. The City of Fort Collins, in accordance with the
provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to
2000d-4) and the Regulations, hereby notifies all Bidders that it will affirmatively ensure that
any contract entered into pursuant to this advertisement, disadvantaged business
enterprises will be afforded full and fair opportunity to submit bids in response to this
invitation and will not be discriminated against on the grounds of race, color, or national
origin in consideration for an award.
The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless
of gender identity or gender expression), race, color, religion, creed, national origin,
ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic
information, or other characteristics protected by law. For the purpose of this policy “sexual
orientation” means a person’s actual or perceived orientation toward heterosexuality,
homosexuality, and bisexuality. The City also strictly prohibits unlawful harassment in the
workplace, including sexual harassment. Further, the City strictly prohibits unlawful
retaliation against a person who engages in protected activity. Protected activity includes
an employee complaining that he or she has been discriminated against in violation of the
above policy or participating in an employment discrimination proceeding.
The City requires its vendors to comply with the City’s policy for equal employment
opportunity and to prohibit unlawful discrimination, harassment, and retaliation. This
requirement applies to all third-party vendors and their subcontractors/subconsultants at
every tier.
24. Dust Control. The Contractor shall abide by the City of Fort Collins “Dust Control and
Prevention Manual,” which is available for public download at
https://www.fcgov.com/airquality/pdf/dust-prevention-and-control-manual.pdf, and is
incorporated herein by this reference. The City of Fort Collins has implemented this manual
for all projects performed for the City of Fort Collins or located within the City of Fort Collins
City limits.
25. Colorado Open Records Act. The City is subject to Sec. 24-72-201 et seq. of the Colorado
Revised Statute (CORA). This Agreement is subject to public disclosure in whole pursuant
to CORA.
26. Special Provisions. Special provisions or conditions relating to the services to be performed
pursuant to this Agreement are set forth in Exhibit - Confidentiality, consisting of
( ) page(s), and Exhibit , Section 00700 General Conditions consisting of
fifty-three (53) pages.
[Signature Page Follows]
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 24 of 116
THE CITY OF FORT COLLINS, COLORADO
By:
Gerry Paul
Purchasing Director
Date:
ATTEST:
APPROVED AS TO FORM:
CONTRACTOR'S NAME
By:
Printed:
Title:
Date:
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 25 of 116
EXHIBIT A
WORK ORDER FORM (Short form)
PURSUANT TO A MASTER AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
CONTRACTOR'S NAME
WORK ORDER NUMBER: PM's Tracking #
PROJECT TITLE:
ORIGINAL BID/RFP NUMBER & NAME:
MASTER AGREEMENT EFFECTIVE DATE: Original Contract Date
WORK ORDER COMMENCEMENT DATE:
WORK ORDER COMPLETION DATE:
MAXIMUM FEE: (time and reimbursable direct costs):
PROJECT DESCRIPTION/SCOPE OF SERVICES:
Contractor agrees to perform the services identified above and on the attached forms in
accordance with the terms and conditions contained herein and in the Master Agreement between
the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement
and this Work Order (including the attached forms) the Master Agreement shall control.
The attached forms consisting of ( ) pages are hereby accepted and incorporated
herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this
document.
CONTRACTOR: Date:
Name, Title
ACCEPTANCE: Date:
Name, Project Manager
REVIEWED: Date:
Name, Buyer or Senior Buyer
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 26 of 116
EXHIBIT B
WORK ORDER FORM (Construction over $100,000)
CONSTRUCTION WORK ORDER
FOR
[ORIGINAL PROJECT # AND NAME]
WORK ORDER NO.
TITLED
(WORK ORDER TITLE)
DATE:
CONTRACTOR:
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 27 of 116
TABLE OF CONTENTS
AGREEMENT FORMS
00525 Work Order & Notice of Award
00530 Work Order Notice to Proceed
00600 Bonds and Certificates
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (CONTRACTOR)
00660 Consent of Surety
00670 Application for Exemption Certificate
CONDITIONS OF THE CONTRACT
00700 General Conditions
Exhibit GC-A GC-A1 - GC-A2
00800 Supplementary Conditions
00900 Addenda, Modifications and Payment
00950 Work Order Change Order Form
00960 Application for Payment
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 28 of 116
SECTION 00500
CONSTRUCTION WORK ORDER AGREEMENT FORMS
00525 Work Order, Notice of Award & Bid Schedule
00530 Work Order Notice to Proceed
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 29 of 116
SECTION 00525
WORK ORDER, NOTICE OF AWARD AND BID SCHEDULE
TO (CONTRACTOR OR CM/GC):
WORK ORDER # & TITLE:
PURCHASE ORDER:
ORIGINAL BID/RFP # & TITLE:
ENGINEER:
OWNER’S REPRESENTATIVE:
NOTICE OF AWARD DATE:
OWNER: City of Fort Collins (hereinafter referred to as OWNER)
1. WORK. You are hereby notified that your bid dated , for the above Work Order has
been considered. Pursuant to your AGREEMENT with OWNER dated , you have
been awarded a Work Order for this Work Order Description:
A. See Section 01100 – Summary of Work.
2. CONTRACT PRICE, BONDS AND CERTIFICATES. The price of your Work Order is
($ ). Pursuant to the AGREEMENT and the Contract Documents, Performance
and Payment Bonds and insurance are required.
3. CONTRACT TIMES. Pursuant to the AGREEMENT and the Contract Documents, the date
for Substantial Completion of this Work Order is , and after Substantial Completion,
the date for Final Completion is .
4. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work is not
completed within the times specified in paragraph 3 above, plus any extensions thereof
allowed in accordance with Article 12 of the General Conditions. They also recognize the
delays, expenses and difficulties involved in proving in a legal proceeding the actual loss
suffered by OWNER if the Work is not completed on time. Accordingly instead of requiring
any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay
(but not as penalty) CONTACTOR shall pay OWNER the amounts set forth hereafter.
1. Substantial Completion: ($ ) for each calendar day or fraction
thereof that expires after until the work is Substantially Complete.
2. Final Acceptance: After Substantial Completion ($ ) for each
calendar day or fraction thereof that expires after the period for Final
Payment and Acceptance until the Work is ready for Final Payment and
Acceptance.
5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in
accordance with Article 14 of the General Conditions. Applications for Payment will be
processed by ENGINEER as provided in the General Conditions.
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 30 of 116
5.1 PROGRESS PAYMENTS. OWNER shall make progress payments on account
of the Contract Price on the basis of CONTRACTOR's Application for
Payment as recommended by ENGINEER, once each month during
construction as provided below. All progress payments will be on the basis
of the progress of the Work measured by the schedule of values established
in paragraph 2.6 of the General Conditions and in the case of Unit Price Work
based on the number of units completed, and in accordance with the General
Requirements concerning Unit Price Work.
5.1.1 Prior to Substantial Completion, Owner will be entitled to withhold as contract
retainage five percent (5%) of each progress payment, but, in each case,
less the aggregate of payments previously made and less such amounts as
ENGINEER shall determine, or OWNER may withhold, in accordance with
paragraph 14.7 of the General Conditions. If , in the sole discretion of Owner,
on recommendation of Engineer, Owner determines that the character and
progress of the Work have been satisfactory to OWNER and ENGINEER,
OWNER may determine that as long as the character and progress of the
Work remain satisfactory to them, there will be no additional retainage on
account of Work completed in which case the remaining progress payments
prior to Substantial Completion will be in an amount equal to 100% of the
Work completed. 95% of materials and equipment not incorporated in the
Work (but delivered, suitably stored and accompanied by documentation
satisfactory to OWNER as provided in paragraph 14.2 of the General
Conditions) may be included in the application Section 00960.
5.1.2 Upon Substantial Completion payment will be made in an amount sufficient,
if necessary, to increase total payments to CONTRACTOR to 95% of the
Contract Price, less such amounts as ENGINEER shall determine or
OWNER may withhold in accordance with paragraph 14.7 of the General
Conditions or as provided by law.
5.2 FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in
accordance with paragraph 14.13 of the General Conditions, OWNER shall
pay the remainder of the Contract Price as recommended by ENGINEER as
provided in said paragraph 14.13.
6. CONTRACTOR'S REPRESENTATION. In order to induce OWNER to enter into this
Agreement, CONTRACTOR makes the following representations:
6.1 CONTRACTOR has familiarized himself with the nature and extent of the
Contract Documents, Work, site, locality, and with all local conditions and
Laws and Regulations that in any manner may affect cost, progress,
performance or furnishing of the Work.
6.2 CONTRACTOR has studied carefully all reports of explorations and tests of
subsurface conditions and drawings of physical conditions which are
identified in the Supplementary Conditions as provided in paragraph 4.2 of
the General Conditions.
6.3 CONTRACTOR has obtained and carefully studied (or assumes
responsibility for obtaining and carefully studying) all such examinations,
investigations, explorations, tests, reports, and studies (in addition to or to
supplement those referred to in paragraph 6.2 above) which pertain to the
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 31 of 116
subsurface or physical condition at or contiguous to the site or otherwise may
affect the cost, progress, performance or furnishing of the Work as
CONTRACTOR considers necessary for the performance or furnishing of the
Work at the Contract Price, within the Contract Times and in accordance with
the other terms and conditions of the Contract Documents, including
specifically the provisions of paragraph 4.2 of the General Conditions; and
no additional examinations, investigations, explorations, tests, reports,
studies or similar information or data are or will be required by
CONTRACTOR for such purposes.
6.4 CONTRACTOR has reviewed and checked all information and data shown
or indicated on the Contract Documents with respect to existing Underground
Facilities at or contiguous to the site and assumes responsibility for the
accurate location of said Underground Facilities. No additional examinations,
investigations, explorations, tests, reports, studies or similar information or
data in respect of said Underground Facilities are or will be required by
CONTRACTOR in order to perform and furnish the Work at the Contract
Price, within the Contract Times and in accordance with the other terms and
conditions of the Contract Documents, including specifically the provision of
paragraph 4.3. of the General Conditions.
6.5 CONTRACTOR has correlated the results of all such observations,
examinations, investigations, tests, reports and data with the terms and
conditions of the Contract Documents.
6.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or
discrepancies that he has discovered in the Contract Documents and the
written resolution thereof by ENGINEER is acceptable to CONTRACTOR.
7. CONTRACT DOCUMENTS.
7.1 The Contract Documents which comprise the entire Agreement between
OWNER and CONTRACTOR concerning the Work consist of the General
Conditions, Supplementary Conditions, those items included in the definition
of “Contract Documents” in Article 1.10 of the General Conditions, and such
other items as are referenced in this Article 7, all of which are incorporated
herein by this reference.
7.2 Forms for use by CONTRACTOR in performing the Work and related actions
in carrying out the terms of this Agreement are deemed Contract Documents
and incorporated herein by this reference, and include, but are not limited to,
the following:
7.2.1 Certificate of Substantial Completion
7.2.2 Certificate of Final Acceptance
7.2.3 Lien Waiver Releases
7.2.4 Consent of Surety
7.2.5 Application for Exemption Certificate
7.2.6 Application for Payment
7.3 Drawings, consisting of a cover sheet and sheets numbered as follows:
The Contract Drawings shall be stamped "Final for Construction" and dated.
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 32 of 116
Any revisions made shall be clearly identified and dated.
7.4 The Contract Documents also include all written amendments and other
documents amending, modifying, or supplementing the Contract Documents
pursuant to paragraphs 3.5 and 3.6 of the General Conditions.
7.5 There are no Contract Documents other than those listed or incorporated by
reference in this Article 7. The Contract Documents may only be amended,
modified or supplemented as provided in paragraphs 3.5 and 3.6 of the
General Conditions.
8. MISCELLANEOUS
8.1. Terms used in this Agreement which are defined in Article I of the General
Conditions shall have the meanings indicated in the General Conditions.
8.2. No assignment by a party hereto of any rights under or interests in the
Contract Documents will be binding on another party hereto without the
written consent of the party sought to be bound; and specifically but not
without limitations, moneys that may become due and moneys that are due
may not be assigned without such consent (except to the extent that the
effect of this restriction may be limited by law), and unless specifically stated
to the contrary in any written consent to an assignment no assignment will
release or discharge that assignor from any duty or responsibility under the
Contract Document.
8.3. OWNER and CONTRACTOR each binds itself, its partners,
successors, assigns and legal representatives to the other party
hereto, its partners, successors, assigns and legal representatives in
respect to all covenants, Agreement and obligations contained in the
Contract Document.
9. EXECUTION. Three (3) copies of this proposed Work Order & Notice of Award, and
accompanying amendments or supplements to the Contract Documents (except any
applicable Drawings) incorporated herein, are provided. Three (3) sets of any applicable
Drawings will be delivered separately or otherwise made available to you immediately. You
must comply with the following conditions precedent within fifteen (15) days of the date of
this Notice of Award, that is, by .
A. You must deliver to OWNER three (3) fully-executed counterparts of this Work Order,
including all amendments or supplements to the Contract Documents incorporated
herein. Each Work Order must bear your signature as provided.
B. You must deliver with the executed Work Order the Contract Security (Bonds) and
insurance, as specified in the Agreement, this Work Order, the General Conditions
(Article 5.1) and the Supplementary Conditions.
Failure to comply with these conditions within the time specified will entitle OWNER to consider
your Bid abandoned and to annul this Work Order & Notice of Award. Within ten (10) days after
you comply with those conditions, OWNER will return to you one (1) fully-signed counterpart of
this Work Order with any amendments or supplements to the Contract Documents attached.
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 33 of 116
CONTRACTOR’S NOTICE OF AWARD REPRESENTATION & EXECUTION:
CONTRACTOR agrees to perform the services identified above, in accordance with the terms
and conditions contained herein and in the AGREEMENT dated , and the NOTICE OF
AWARD dated , between the parties. In the event of a conflict between or ambiguity in the
terms of the AGREEMENT or specific Work Orders, the AGREEMENT shall control.
CONTRACTOR:
By: Date:
Name: Title:
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 34 of 116
OWNER’S ACCEPTANCE & EXECUTION:
This Work Order and the attached Contract Documents are hereby accepted and incorporated
herein by this reference and the attached Notice to Proceed is hereby given.
ACCEPTANCE: Date: _____
, Projects Manager
OWNER: CITY OF FORT COLLINS
ACCEPTANCE: ___________________________________________ Date: __________
Kelly DiMartino, City Manager
(if greater than $1,000,000)
ACCEPTANCE: ___________________________________________ Date: __________
Gerry Paul, Purchasing Director
(if greater than $60,000)
APPROVED AS TO FORM: __________________________________ Date: __________
ATTEST: ___ ________________________________________ Date: __________
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 35 of 116
BID SCHEDULE
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 2 of 116
SECTION 00530
WORK ORDER NOTICE TO PROCEED
NOTICE TO PROCEED DATE:
WORK ORDER TITLE:
WORK ORDER NUMBER:
ORIGINAL BID/RFP # & TITLE:
TO:
Attn:
This notice is to advise you:
That the Work Order and all amendments and supplements to the Contract Documents covering
the above described Work have been fully executed by the CONTRACTOR and the OWNER.
That the required CONTRACTOR's Performance and Payment Bonds and insurance have been
received by the OWNER. That the OWNER has approved the said Work Order and Contract
Documents.
Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and
directed to proceed within ( ) calendar days from receipt of this notice as required by
the Work Order and the AGREEMENT.
The dates for Substantial Completion and Final Acceptance shall be , and ,
respectively.
Dated this _____________ day of ___________, _____.
CITY OF FORT COLLINS (OWNER)
By: ___________________________________________
___________________________________________
Name & Title
ACKNOWLEDGMENT OF NOTICE
Receipt of the above Work Order Notice to Proceed is hereby acknowledged this _____________
day of ___________, _____.
(CONTRACTOR)
By: ___________________________________________
___________________________________________
Name & Title
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 3 of 116
SECTION 00600
BONDS AND CERTIFICATES
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (CONTRACTOR)
00651 Lien Waiver Release (SUBCONTRACTOR)
00660 Consent of Surety
00670 Application for Exemption Certificate
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 4 of 116
SECTION 00610
PERFORMANCE BOND
Bond No __
KNOW ALL MEN BY THESE PRESENTS: that
(Firm)
(Address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300
LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as
the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the
payment of which sum well and truly to be made, we bind ourselves, successors and assigns,
jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a
certain Agreement with the OWNER, dated the day of , 2 , for (original bid/rfp
# & name) a copy of which is hereto attached and made a part hereof, for the performance of The
City of Fort Collins Work Order, titled , Work Order Number , dated the day
of , , a copy of which is hereto attached and made a part hereof.
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the
undertakings, covenants, terms, conditions and agreements of said Work Order and Agreement
during the original term thereof, and any extensions thereof which may be granted by the
OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the
Principal shall satisfy all claims and demands incurred under such Work Order and Agreement,
and shall fully indemnify and save harmless the OWNER from all cost and damages which it may
suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and
expense which the OWNER may incur in making good any default, then this obligation shall be
void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the Work Order and
Agreement or to the Work to be performed thereunder or the Specifications accompanying the
same shall in any way affect its obligation on this bond; and it does hereby waive notice of any
such change, extension of time, alteration or addition to the terms of the Work Order and
Agreement or to the Work or to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR
shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the
State of Colorado and be acceptable to the OWNER.
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 5 of 116
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which
shall be deemed an original, this _____ day of ___________, _____.
IN PRESENCE OF: Principal
(Title) (Title)
(Corporate Seal)
(Address)
IN PRESENCE OF: Other Partners
By:
By:
IN PRESENCE OF: Surety
By:
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is
Partnership, all partners should execute Bond.
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 6 of 116
SECTION 00615
PAYMENT BOND
Bond No __
KNOW ALL MEN BY THESE PRESENTS: that
(Firm)
(Address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300
LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as
the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the
payment of which sum well and truly to be made, we bind ourselves, successors and assigns,
jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a
certain Agreement with the OWNER, dated the day of , , for (original bid/rfp #
& name), a copy of which is hereto attached and made a part hereof, for the performance of The
City of Fort Collins Work Order, titled , Work Order Number , dated the day of
, , a copy of which is hereto attached and made a part hereof.
NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors,
and corporations furnishing materials for or performing labor in the prosecution of the Work
provided for in such Work Order and Agreement and any authorized extension or modification
thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and
tools, consumed, rented or used in connection with the construction of such Work, and all
insurance premiums on said Work, and for all labor, performed in such Work whether by
subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and
effect.
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the Work Order and
Agreement or to the Work to be performed thereunder or the Specifications accompanying the
same shall in any way affect its obligation on this bond; and it does hereby waive notice of any
such change, extension of time, alteration or addition to the terms of the Work Order and
Agreement or to the Work or to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR
shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the
State of Colorado and be acceptable to the OWNER.
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 7 of 116
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which
shall be deemed an original, this _____ day of ___________, _____.
IN PRESENCE OF: Principal
(Title) (Title)
(Corporate Seal)
(Address)
IN PRESENCE OF: Other Partners
By:
By:
IN PRESENCE OF: Surety
By:
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is
Partnership, all partners should execute Bond.
Official Purchasing Document
Last updated 8/15/2022
Services Agreement – Work Order Type
BID 9912 Streets Concrete Maintenance Phase IV Page 8 of 116
SECTION 00630
CERTIFICATE OF INSURANCE
CONTRACTOR shall insert his own standard form for Certificate of Insurance in
accordance with the following:
1. The Contractor will provide, from insurance companies acceptable to the City, the
insurance coverage designated hereinafter and pay all costs. Before commencing work
under this bid, the Contractor shall furnish the City with certificates of insurance showing
the type, amount, class of operations covered, effective dates and date of expiration of
policies, and containing substantially the following statement:
“The insurance evidenced by this Certificate will not reduce coverage or limits and
will not be cancelled, except after thirty (30) days written notice has been received
by the City of Fort Collins.”
In case of the breach of any provision of the Insurance Requirements, the City, at its
option, may take out and maintain, at the expense of the Contractor, such insurance as
the City may deem proper and may deduct the cost of such insurance from any monies
which may be due or become due the Contractor under this Agreement. The City, its
officers, agents and employees shall be named as additional insureds on the Contractor’s
general liability and automobile liability insurance policies for any claims arising out of work
performed under this Agreement.
2. Insurance coverages shall be as follows:
A. Workers' Compensation & Employer's Liability. The Contractor shall maintain during
the life of this Agreement for all of the Contractor's employees engaged in work
performed under this agreement:
1. Workers' Compensation insurance with statutory limits as required by
Colorado law.
2. Employer's Liability insurance with limits of $100,000 per accident, $500,000
disease aggregate, and $100,000 disease each employee.
B. Commercial General & Vehicle Liability. The Contractor shall maintain during the
life of this Agreement such commercial general liability and automobile liability
insurance as will provide coverage for damage claims of personal injury, including
accidental death, as well as for claims for property damage, which may arise directly
or indirectly from the performance of work under this Agreement. Coverage for
property damage shall be on a "broad form" basis. The amount of insurance for
each coverage, Commercial General and Vehicle, shall not be less than $1,000,000
combined single limits for bodily injury and property damage.
In the event any work is performed by a subcontractor, the Contractor shall be
responsible for any liability directly or indirectly arising out of the work performed
under this Agreement by a subcontractor, which liability is not covered by the
subcontractor's insurance.
Official Purchasing Document
Last updated 8/15/2022
SECTION 00635
CERTIFICATE OF SUBSTANTIAL COMPLETION
TO: CITY OF FORT COLLINS (OWNER) WORK ORDER # & TITLE:
DATE OF SUBSTANTIAL COMPLETION: ORIGINAL BID/RFP # & TITLE:
PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado
INCLUDE: OWNER: City of Fort Collins
CONTRACTOR:
WORK ORDER DATE:
The Work performed under this Work Order, pursuant to the Contract Documents, has been
inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER
and the project (or specified part of the project, as indicated above) is hereby declared to be
substantially completed on the above date.
A tentative list of items to be completed or corrected is appended hereto. This list may not be
exhaustive, and the failure to include an item on it does not alter the responsibility of the
CONTRACTOR to complete all the Work in accordance with the Contract Documents.
_____________________________ By: __________________________ ________
PROJECT MANAGER AUTHORIZED REPRESENTATIVE DATE
The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to
complete and correct the items on the tentative list within the time indicated.
_____________________________ By: __________________________ ________
CONTRACTOR AUTHORIZED REPRESENTATIVE DATE
The OWNER accepts the project or specified area of the project as substantially complete and
will assume full possession of the project or specified area of the project at 12:01 a.m., on
. The responsibility for heat, utilities, security, and insurance
under the Contract Documents shall be as set forth under "Remarks" below.
CITY OF FORT COLLINS ________ By: __________________________ ________
OWNER AUTHORIZED REPRESENTATIVE DATE
REMARKS: _________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Official Purchasing Document
Last updated 8/15/2022
SECTION 00640
CERTIFICATE OF FINAL ACCEPTANCE
DATE: ________________, _____
TO:
Gentlemen:
You are hereby notified that on the day of , , the City of Fort Collins, Colorado,
has accepted the Work completed by , for the City of Fort Collins Work Order, titled ,
Work Order Number under (original bid/rfp # & name).
A check is attached hereto in the amount of $ as Final Payment for all Work done, subject
to the terms of the Contract Documents, including the Work Order, which is dated , and the
AGREEMENT, which is dated .
In conformance with the Work Order and Contract Documents for this project, your obligations
and guarantees will continue for the specified time from the following date:
___________________, _____.
Sincerely,
City of Fort Collins
OWNER
By: ___________________________________________
___________________________________________
Name & Title
ATTEST: _________________________________________
___________________________________________
Name & Title
Official Purchasing Document
Last updated 8/15/2022
SECTION 00650
LIEN WAIVER RELEASE
(CONTRACTOR)
TO: City of Fort Collins, Colorado (OWNER)
FROM: (CONTRACTOR)
WORK ORDER TITLE:
WORK ORDER NUMBER:
ORIGINAL BID/RFP # & TITLE:
1. The CONTRACTOR acknowledges having received payment, except retainage from the
OWNER for all work, labor, skill and material furnished, delivered and performed by the
CONTRACTOR for the OWNER or for anyone in the construction, design, improvement,
alteration, addition or repair of the above described project.
2. In consideration of such payment and other good and valuable consideration, the receipt
and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives
all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims
(40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights
which the CONTRACTOR may now or may afterward have, claim or assert for all and any
work, labor, skill or materials furnished, delivered or performed for the construction, design,
improvement, alteration, addition or repair of the above described project, against the
OWNER or its officers, agents, employees or assigns, against any fund of or in the
possession or control of the OWNER, against the project or against all land and the buildings
on and appurtenances to the land improved by the project.
3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or
performed to or for the construction, design, improvement, alteration, addition or repair of
the project were furnished, delivered or performed by the CONTRACTOR or its agents,
employees, and servants, or by and through the CONTRACTOR by various Subcontractors
or materialmen or their agents, employees and servants and further affirms the same have
been paid in full and have released in full any and all existing or possible future mechanic's
liens or rights or claims against the project or any funds in the OWNER'S possession or
control concerning the project or against the OWNER or its officers, agents, employees or
assigns arising out of the project.
4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any,
and the Surety on the project against and from any claim hereinafter made by the
CONTRACTOR's Subcontractors, materialmen, employees, servants, agents or assigns
against the project or against the OWNER or its officers, employees, agents or assigns
arising out of the project for all loss, damage and costs, including reasonable attorneys fees,
incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth above constitutes an
adequate description of the property and improvements to which this Lien Waiver Release
pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and
may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material
Official Purchasing Document
Last updated 8/15/2022
bonds for the project.
Signed this ______ day of __________, ___.
CONTRACTOR:
By: ___________________________________________
___________________________________________
Name & Title
ATTEST:
_____________________________
Secretary
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this _________ day of __________, _____, by
________________________________________________________________.
Witness my hand and official seal.
My Commission Expires: ___________________________.
_________________________
Notary Public
Official Purchasing Document
Last updated 8/15/2022
SECTION 00660
CONSENT OF SURETY
TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER")
CONTRACTOR:
WORK ORDER # & TITLE:
ORIGINAL BID/RFP # & TITLE:
CONTRACT DATE:
WORK ORDER DATE:
In accordance with the provisions of the Work Order and Contract between the OWNER and the
CONTRACTOR as indicated above, for the Work Order titled on bond of
, (Surety) _______________________________________
hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to
the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER,
as set forth in the said Surety Company's Bond.
IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this _________ day of
_________ _, _____.
____________________________________________
(Surety Company)
By: ________________________________________
(Name) Attorney-in-Fact
ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact.
Official Purchasing Document
Last updated 8/15/2022
SECTION 00670
APPLICATION FOR EXEMPTION CERTIFICATE
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
SECTION 00700
GENERAL CONDITIONS
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
Official Purchasing Document
Last updated 8/15/2022
SECTION 00800
SUPPLEMENTARY CONDITIONS
Conditions of the Contract
These Supplementary Conditions amend or supplement the General Conditions of the
Construction Contract (EJCDC General Conditions 1910-8, 1990 edition, with City of Fort Collins
Modifications, Rev. 9/94) and other provisions of the Contract Documents as indicated below.
SC-1 DEFINITIONS
SC-1.38. Add the following language to the conclusion of paragraph 1.38 of the General
Conditions:
1.38. Substantial Completion. .... Substantial Completion is further defined as that
degree of completion of the operating facilities or systems of the Project defined in the
Work Order sufficient to provide the OWNER the full time, uninterrupted, continuous,
beneficial operation of the modifications, and all inspections required have been
completed and identified conditions corrected.
SC-1.43.A. Add the following new paragraph immediately after paragraph 1.43 of the General
Conditions:
1.43.A. Work Order--A written document executed by OWNER and
CONTRACTOR that provides for the construction of a portion of the Work, pursuant
to the Agreement and all as required by the Contract Documents, and that becomes a
Contract Document when executed.
SC-2 PRELIMINARY MATTERS
SC-2.8. Delete paragraph 2.8 of the General Conditions entirely and replace it with the
following paragraph:
2.8. Preconstruction Conference. Within ten days after the Contract Times
for a Work Order start to run, but before any Work at the site is started, a conference
attended by CONTRACTOR, ENGINEER and others as appropriate will be held to
establish a working relationship among the parties as to the Work and to discuss the
schedules referred to in paragraph 2.6, procedures for handling Shop Drawings and
other submittals, processing Applications for Payment, and maintaining required
records.
SC-2.10. Add the following new paragraph immediately after paragraph 2.9 of the General
Conditions:
2.10. Work Order Required for All Work. References to the Agreement in this
Article 2 and in the General and Supplementary Conditions and Contract Documents
notwithstanding, no Work shall be initiated or performed until CONTRACTOR has
received a signed and executed Work Order, incorporating the Notice to Proceed, from
OWNER; and no provision of this Article 2 or of the General and Supplementary
Official Purchasing Document
Last updated 8/15/2022
Conditions and Contract Documents shall permit or require any action of
CONTRACTOR in the absence of a signed and executed Work Order. All provisions
of this Article 2 and of the General and Supplementary Conditions and Contract
Documents referencing the Agreement or other parts of the Contract Documents, or
permitting or requiring any action of CONTRACTOR, shall be read as referencing and,
as appropriate, requiring a signed and executed Work Order.
SC-4 AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS;
REFERENCE POINTS
SC-4.2.1.2. Add the following new paragraph immediately following paragraph 4.2.1.2 of the
General Conditions:
4.2.1.2.1. No drawing of physical conditions in or relating to existing surface or
subsurface structures (except Underground Facilities referred to in paragraph 4.3)
which are at or contiguous to the site have been utilized by the Engineer in preparation
of the Contract Documents, except the following:
SC-5 BONDS AND INSURANCE
SC-5.4.7. Include the following parties or entities as additional insureds, as provided in
paragraph 5.4.7 of the General Conditions:
5.4.7.1. City of Fort Collins, Colorado, 4316 LaPorte Avenue, Fort Collins, Colorado
80522
5.4.7.2. .
SC-5.4.8.1. Add the following new paragraph immediately following paragraph 5.4.8 of the
General Conditions:
9.4.8.1. Limits of Liability. The limits of liability for the insurance required by the
paragraph numbers of the General Conditions listed below are as follows:
For Paragraphs 5.02.A.1 and 5.02.A.2: Coverage A - Statutory Limits; Coverage B -
$100,000 / $100,000 / $500,000.
For Paragraphs 5.02.A.3 and 5.02.A.5: The Commercial General Liability policy will
have limits of $1,000,000 combined single limits (CSL). This policy will include
coverage for Explosion, Collapse, and Underground coverage unless waived by the
Owner.
For Paragraph 5.02.A.6: The Comprehensive Automobile Liability Insurance policy
will have limits of $1,000,000 combined single limits (CSL).
For Paragraph 5.02.B.3: This policy will include completed operations coverage /
product liability coverage with limits of $1,000,000 combined single limits (CSL). This
policy shall also include an Umbrella Excess Liability as follows: General liability and
automobile liability insurance in an amount not less than $1,000,000 per occurrence
in excess of the above stated primary limits.
Official Purchasing Document
Last updated 8/15/2022
SC-6 CONTRACTOR’S RESPONSIBILITIES
SC-6.14.3. Add the following new paragraph immediately after paragraph 6.14.2 of the
General Conditions:
6.14.3. The following Laws or Regulations are included in the Contract Documents
as mandated by statute or for the convenience of the CONTRACTOR. Other Laws
and Regulations apply which are not included herein, and are within the
CONTRACTOR's duty and responsibility for compliance thereto:
6.14.3.1. Notice to owners of Underground Facilities is required prior to excavations in
the vicinity of such facilities.
6.14.3.2. Unless otherwise decided by reason of the amount of the Contract Price
involved, or other good reason, before or at the time that the contract is awarded to a
corporation outside the State of Colorado, such corporation must carry out the proper
procedure to become authorized to do business in the State of Colorado, designate a
place of business therein, and appoint an agent for service of process.
Such corporation must furnish the OWNER with a certificate from the Secretary of
State of Colorado has been issued by its office and there shall also be procured from
the Colorado Secretary of State of photostatic or certified copy of the designated of
place of business and appointment of agent for service of process, or a letter from the
Colorado Secretary of State that such designation of place of business and agent for
service of process have been made.
6.14.3.3. The CONTRACTOR must conform to the rules and regulations of the
Industrial Commission of Colorado. Particular reference is made to rules and
regulations governing excavation Work adopted by the Industrial Commission of
Colorado.
SC-11 CHANGE OF CONTRACT PRICE
SC-11.6.2.7. Add the following new paragraph to paragraph 11.6.2 of the General Conditions:
11.6.2.7. Cost of the Work. Allowances for profit, overhead and mark-up prescribed
by Article 4 of the Agreement shall be used in lieu of any CONTRACTOR'S fee,
overhead, profit or mark-up allowances as prescribed in paragraphs 11.6.2.1, 11.6.2.2,
and 11.6.2.3.
SC-12 CHANGE OF CONTRACT TIMES
SC-12.3. Add the following language to the end of paragraph 12.3 of the General Conditions:
12.3. .... Lost days due to abnormal weather conditions will be allocated as
required.
SC-14 PAYMENTS TO CONTRACTOR AND COMPLETION
Official Purchasing Document
Last updated 8/15/2022
SC-14.1. Add the following language to the end of paragraph 14.1 of the General Conditions:
14.1. Schedule of Values. .... Progress payments on the fixed fee shall be in
proportion to the cumulative actual Cost of the Work as a percentage of the Allowable
Cost of the Work. An amount not to exceed fifteen (15%) percent of the fixed fee shall
be advanced to the Contractor for mobilization in the first progress payment.
Official Purchasing Document
Last updated 8/15/2022
SECTION 00900
ADDENDA, MODIFICATIONS AND PAYMENT
00950 Change Order
00960 Application for Payment
Official Purchasing Document
Last updated 8/15/2022
SECTION 00950
CHANGE ORDER FORM
CHANGE ORDER NO.
CONTRACTOR:
WORK ORDER TITLE & NO. :
ORIGINAL BID/RFP # & TITLE:
DESCRIPTION:
1. Reason for change:
2. Description of Change:
3. Change in Contract Cost:
4. Change in Contract Time:
ORIGINAL CONTRACT COSTS $ ________________
TOTAL APPROVED CHANGE ORDER(S) $ ________________
TOTAL PENDING CHANGE ORDER(S) $ ________________
TOTAL THIS CHANGE ORDER $ ________________
TOTAL % OF ORIGINAL CONTRACT, THIS CO: _______________ %
TOTAL % OF ORIGINAL CONTRACT, ALL CO’S: _______________ %
ADJUSTED CONTRACT COST $ ________________
_________________
(Assuming all change orders approved)
ACCEPTED BY: _____________________________________ DATE: ____________
Contractor's Representative
ACCEPTED BY: _____________________________________ DATE: ____________
Project Manager
REVIEWED BY: _____________________________________ DATE: ____________
Title:
APPROVED BY: _____________________________________ DATE: ____________
Title:
APPROVED BY: _____________________________________ DATE: ____________
(Purchasing Agent if > $60,000)
cc: City Clerk Architect/Engineer
Finance Purchasing
Project Manager Contractor
Official Purchasing Document
Last updated 8/15/2022
SECTION 00960
PAYMENT APPLICATION
Section 00960
APPLICATION FOR PAYMENT PAGE 1 OF 4
OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER:
APPLICATION DATE:
PERIOD BEGINNING:
ENGINEER: CONTRACTOR: PERIOD ENDING:
PROJECT NUMBER:
CHANGE ORDERS Application is made for Payment as shown below in connection with Contract
NUMBER DATE AMOUNT
The present status of the account for this Contract is as
follows:
1
2 Original Contract Amount:
3 Net Change by Change Order:
Current contract Amount: $0.00
Total Completed and Stored to Date:
Less Previous Applications:
Amount Due this Application - Before Retainage: $0.00
Less Retainage:
Net Change by Change Order $0.00 AMOUNT DUE THIS APPLICATION: $0.00
CERTIFICATION:
The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with
the Work have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract.
The above Amount Due This Application is requested by the CONTRACTOR.
Date: By:
Payment of the above Amount Due This Application is recommended by the ENGINEER.
Date: By:
Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager.
Date: By:
Payment of the above Amount Due This Application is approved by the OWNER.
Date: By:
CONTRACT AMOUNTS
APPLICATION FOR
PAYMENT PAGE 2 OF 4
Work
Completed
Work
Completed
Work
Completed Stored
Bid
This
Month
Previous
Periods
To
Date Materials Total
Item This Earned Percent
Number Description Quantity Units
Unit
Price Amount Qty. Amount Qty. Amount Qty. Amount Period
To
Date Billed
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
CHANGE ORDERS APPLICATION FOR PAYMENT PAGE 3 OF 4
Work
Completed
Work
Completed
Work
Completed Stored
Bid
This
Month
Previous
Periods
To
Date Materials Total
Item This Earned Percent
Number Description Quantity Units
Unit
Price Amount Qty. Amount Qty. Amount Qty. Amount Period
To
Date Billed
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
TOTALS CHANGE
ORDERS $0.00 $0.00 $0.00 $0.00 $0.00
PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00
STORED MATERIALS
SUMMARY PAGE 4 OF 4
On Hand Received Installed On Hand
Item Invoice Previous This This This
Number Number Description Application Period Period Application
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS $0.00 $0.00 $0.00 $0.00