HomeMy WebLinkAboutADDENDA 2 - BID - 9891 HVAC EQUIPMENT REPLACEMENTS - FIVE (5) LOCATIONS
ADDENDUM NO. 2
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 9891: HVAC Equipment Replacements - 5 Locations
NEW OPENING DATE: 3:00 PM (Our Clock) December 14th, 2023
To all prospective bidders under the specifications and contract documents described above, the
following changes/additions are hereby made and detailed in the following sections of this
addendum:
BID OPENING EXTENDED TO THURSDAY, DECEMBER 14, 2023 @ 3:00PM MT –
Original ZOOM Bid Opening link in the solicitation is still valid.
ADD additional bid walk for Projects 4 & 5. We will begin at 10AM Friday December
8th, 2023 at: Site 4 – Edora Pool and Ice Center (EPIC) – 1801 Riverside Ave., Fort Collins,
CO 80525. The group will meet at the rear maintenance entrance. The same as the
first job walk.
After we conclude here we will move to Project 5 – FCPS Data Room at: Site 5 – Fort
Collins Police Services – 2221 S. Timberline Rd., Fort Collins, CO 80525.
This walk is not mandatory and is ONLY for those firms who were in attendance to
the first Pre-Bid job walk.
Exhibit 1 – Updated Section 00300 – Added Section 11 – Police Facilities – CJIS
Requirements for Project 5 – FCPS Data Room
Please contact Jake Rector, Senior Buyer, at (970) 221-6776 or jrector@fcgov.com with any
questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID OR QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
EXHIBIT 1
SECTION 00300
BID FORM
SECTION 00300
BID FORM
PROJECT: 9891 HVAC Equipment Replacements – Five (5) Locations
Place:
Date:
1. In compliance with your Invitation to Bid dated , 20 and subject to
all conditions thereof, the undersigned a (Corporation, Limited Liability Company,
Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of
Colorado hereby proposes to furnish and do everything required by the Contract
Documents to which this refers for the construction of all items listed on the following Bid
Schedule or Bid Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in
good faith, without collusion or connection with any other person or persons Bidding for
the same Work, and that it is made in pursuance of and subject to all the terms and
conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the
detailed Specifications, and the Drawings pertaining to the Work to be done, all of which
have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum
of
($ ) in accordance with the Invitation To Bid and Instructions to
Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and
a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days
from the date when the written notice of the award of the contract is delivered to him at
the address given on this Bid. The name and address of the corporate surety with which
the Bidder proposes to furnish the specified performance and payment Bonds is as
follows: .
5. All the various phases of Work enumerated in the Contract Documents with their
individual jobs and overhead, whether specifically mentioned, included by implication or
appurtenant thereto, are to be performed by the CONTRACTOR under one of the items
listed in the Bid Schedule, irrespective of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or Bid
Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through
.
8. The undersigned Bidder hereby acknowledges the documents listed below are required
elements of the bid and must be submitted with the bid. The City may reject any
incomplete bids as non-responsive.
- Bid Form (Section 00300)
- Certified or Cashier’s Check Bid Bond (Item 3 above and Section 00410)
- Acknowledgement of Bid Addenda (Item 7 above)
- Statement of Bidder's Qualifications (Section 00420)
- Schedule of Subcontractors (Section 00430)
o Fill out one for each project.
- CDOT Form #606, Anti-Collusion Affidavit (Section 00440)
- CDOT Form #1413, Bidders List (Section 00450)
- CDOT Form #1414, Anticipated DBE Participation Plan (Section 00460)
- Buy America/Build America Certification (Section 00470)
- Appendix A, 49 CFR Part 20, Certification Regarding Lobbying (Section 00480)
9. PROJECT DETAIL
See Attachments for Construction Drawing.
PROJECT 1 – CITY HALL CHILLER
MECHANICAL
M0.1 GENERAL INFORMATION
M0.2 SPECIFICATIONS
M0.3 SPECIFICATIONS CONT'D
MD1.4 ROOF MECHANICAL DEMOLITION PLAN - BASE BID
MD1.5 ROOF MECHANICAL DEMOLITION PLAN - ADD ALTERNATE 1
M1.4 ROOF MECHANICAL PLAN - BASE BID
M1.5 ROOF MECHANICAL PLAN - ADD ALTERNATE 1
M5.1 DIAGRAMS AND SCHEDULES - BASE BID
M5.2 DIAGRAMS AND SCHEDULES - ADD ALTERNATE 1
M6.1 STRUCTURAL DETAILS
ELECTRICAL
E0.1 GENERAL INFORMATION
E0.2 GENERAL INFORMATION
E0.3 SPECIFICATIONS
ED1.1 ROOF DEMOLITION PLAN
E1.1 ELECTRICAL PLANS
E2.1 ONE-LINE AND SCHEDULES
PROJECT 2 – MUSEUM OF DISCOVERY
M0.01 MECHANICAL SPECIFICATIONS
M1.01 MECHANICAL SCHEDULES & DETAILS
M3.01 MECHANICAL FLOOR PLANS
M5.01 PIPING DIAGRAM
M6.01 CONTROLS
E0.01 ELECTRICAL LEGENDS, NOTES, AND ABBREVIATIONS
E0.02 ELECTRICAL SCHEDULES AND DETAILS
E3.01 ELECTRICAL FLOOR PLANS
PROJECT 3 – TRAFFIC OPERATIONS RTU
M0.00 MECHANICAL LEGEND & GENERAL NOTES
M1.01 MECHANICAL SCHEDULES
MD2.01 DEMO PLAN
M2.01 MECHANICAL FLOOR PLAN
M3.01 MECHANICAL PIPING PLAN
M5.01 PIPING DIAGRAMS
M6.01 CONTROL DIAGRAMS
M7.01 MECHANICAL DETAILS
M7.02 MECHANICAL DETAILS
M7.03 MECHANICAL DETAILS
E0.00 ELECTRICAL LEGENDS, NOTES AND ABBREVIATIONS
E0.01 ELECTRICAL SCHEDULES AND DETAILS
E3.01 ELECTRICAL FLOOR PLAN
ED3.01 DEMO PLAN
CONSTRUCTION DOCUMENT SPECIFICATION
PROJECT 4 – EDORA POOL AND ICE CENTER (EPIC) AHU
M0.1 GENERAL INFORMATION
M0.2 SPECIFICATIONS
M0.3 SPECIFICATIONS CONT'D
M1.1 SECOND FLOOR MECHANICAL PLAN - BASE BID
M1.2 SECOND FLOOR MECHANICAL PLAN - ADD ALTERNATE 1
M1.3 POOL SUPPLY ROOM MECHANICAL PLAN - ADD ALTERNATE 1
M5.1 SCHEDULES AND DIAGRAMS
M5.2 SCHEDULES AND DIAGRAMS - ADD ALTERNATE 1
E0.1 GENERAL INFORMATION
E0.2 GENERAL INFORMATION
E0.3 SPECIFICATIONS
ED1.1 ELECTRICAL DEMOLITION PLANS
E2.1 MAIN MECHANICAL ROOM ELECTRICAL PLAN
E2.2 UPPER LEVEL POOL EQUIPMENT ELECTRICAL PLANS
E2.3 UPPER LEVEL POOL EQUIPMENT ROOM POWER PLAN WEST
E4.1 PARTIAL ONE-LINE DIAGRAM AND SCHEDULES
PROJECT 5 – FORT COLLINS POLICE SERVICES (FCPS) DATA ROOM
M0.00 MECHANICAL LEGEND & GENERAL NOTES
M1.01 MECHANICAL SCHEDULES
MD2.01 MECHANICAL DEMO PLANS
M2.01 MECHANICAL FLOOR PLANS
M5.01 MECHANICAL PIPING DIAGRAM
M6.01 CONTROLS
M6.02 CONTROLS
M7.01 MECHANICAL DETAILS
M7.02 MECHANICAL DETAILS
M7.03 MECHANICAL DETAILS
M7.04 AHU SECTION VIEWS
E0.00 ELECTRICAL LEGENDS, NOTES AND ABBREVIATIONS
E0.01 ELECTRICAL SCHEDULES
ED2.01 ELECTRICAL DEMO PLANS
E2.01 ELECTRICAL FLOOR PLANS
CONSTRUCTION DOCUMENT SPECIFICATIONS
10. DETAILED PRICING BREAKDOWN
At the City’s option the basis of award is the low responsive and responsible Bidder
based on the Lump Sum total price at the bottom of this sheet. The division prices will
only be utilized to evaluate bid response to help assess if scope of bid appears co mplete
and assess the status of work complete on the Pay Application Schedule of Values.
Please provide a Lump Sum total price for the project as well as the individual Division
prices requested below.
Having examined documents prepared by Farnsworth Group dated October 13, 2023
and ICONERGY LTD dated September 15, 2023 and having reviewed site conditions,
applicable codes and all conditions affecting and governing the work, the Undersigned
Contractor hereby offers to provide all engineering, labor, materials, transportation,
services and equipment necessary and incidental to properly execute required work of
the Contract Documents for the sum of:
11. POLICE FACILITIES – CJIS REQUIREMENTS – REQUIRED FOR PROJECT 5 ONLY
1. CJIS Security Compliance.
a. This Agreement is contingent upon the Service Provider registering in the
Colorado Bureau of Investigation (CBI) CJIS Vendor Management Program
within 30 days of contract signing and obtaining and maintaining CJIS
Compliance and enrollment throughout the term of the Agreement. Failure to
comply with CJIS Security Policy/Compliance at any time will immediately be
cause for termination of the Agreement for default with no remedy period. Note:
If CBI is taking longer than 30 days to process your application, please notify
FCPS security for ongoing escorting arrangements and escalation to CBI
(pdsecurity@fcgov.com).
Enrollment in CBI’s CJIS Vendor Management Program can be completed here:
https://www.colorado.gov/pacific/cbi/cjis-vendor-management-program
Forms and Detailed instructions:
https://www.colorado.gov/pacific/cbi/cjis-vendor-management-program-vendor-
instructions.
The Service Provider is required to notify FCPS Security in writing that
registration has been submitted and when registration has been completed and
accepted by CBI. (pdsecurity@fcgov.com)
b. Service Provider employees assigned to support the City under this Agreement
will be required to be fingerprinted and subject to background check. The CBI
will assign a VCP number after enrollment in the CBI CJIS Vendor Management
Program. After assignment of the VCP number, contact Fort Collins Police
Services to schedule fingerprinting.
c. Security awareness training shall be completed as required by the CBI CJIS
Vendor Management Program within six months of initial assignment and
biennially thereafter, for all personnel who have access to CJI.
- Level 1 CJIS Security Awareness Training is required.
- CJIS Security Awareness Training certificate renewal is required every two years
for each person requiring unescorted access. Note: It is the vendors
responsibility to designate a Vendor Services Coordinator to manage their CJIS
Online portal that will be issued by CBI to ensure the right employees are
authorized to participate in the program. The Vendor Services Coordinator must
notify CBI of personnel changes (onboarding/offboarding/access level changes).
For example: If participating employees no longer work for the vendor, the
Vendor Services Coordinator must notify the CBI's CJIS Vendor Management
Group immediately (CJIS Security Policy 5.12.2).
d. The Service Provider shall be solely responsible for compliance to the CBI CJIS
Vendor Management Program.
A. BID SCHEDULE
PROJECT 1 – City Hall Chiller
City Hall Chiller
No. Item Description Quantity Unit of
Measurement Unit Price Extended Cost
Base Bid
1.01 Mobilization 1 LS $ -
1.02 General Conditions 1 LS $ -
2.01 Demolition 1 LS $ -
5.01 Metals 1 LS $ -
9.01 Coatings 1 LS $ -
23.01 Mechanical Materials (including capture and
disposal of refrigerant) 1 LS $ -
23.02 Mechanical Labor 1 LS $ -
26.01 Electrical Materials 1 LS $ -
26.02 Electrical Labor 1 LS $ -
SUBTOTAL BASE BID $ -
Total Base Bid Project 1 In Words: ____________________________________________________________________________
________________________________________________________________________________________________________
Alternate #1 - Chilled Water Pumps
2.01 Demolition 1 LS $ -
3.01 Concrete 1 LS $ -
9.01 Coatings 1 LS $ -
23.01 Mechanical Materials (including capture and
disposal of refrigerant) 1 LS $ -
23.02 Mechanical Labor 1 LS $ -
26.01 Electrical Materials 1 LS $ -
26.02 Electrical Labor 1 LS $ -
SUBTOTAL Alternate 1 $ -
Total City Hall Chiller Base Bid + Alternate 1 $ -
Total Project 1 w/ Alternates In Words: _________________________________________________________________
______________________________________________________________________________________________________
PROJECT 2 – Museum of Discovery
Museum of Discovery
No. Item Description Quantity Unit of
Measurement Unit Price Extended Cost
Base Bid
1.01 Mobilization 1 LS $
-
1.02 General Conditions 1 LS $
-
2.01 Demolition 1 LS $
-
23.01 Mechanical Materials 1 LS $
-
23.02 Mechanical Labor 1 LS $
-
26.01 Electrical Materials 1 LS $
-
26.02 Electrical Labor 1 LS $
-
SUBTOTAL BASE BID $
-
Total Base Bid Project 2 In Words: __________________________________________________________________
Alternate #1 - Boiler 2 Replacement
2.01 Demolition 1 LS $
-
23.01 Mechanical Materials 1 LS $
-
23.02 Mechanical Labor 1 LS $
-
26.01 Electrical Materials 1 LS $
-
26.02 Electrical Labor 1 LS $
-
SUBTOTAL Alternate 1 $
-
Alternate #2 - HW Pumps 1 & 2 Replacement
2.01 Demolition 1 LS $
-
3.01 Concrete 1 LS
23.01 Mechanical Materials 1 LS $
-
23.02 Mechanical Labor 1 LS $
-
26.01 Electrical Materials 1 LS $
-
26.02 Electrical Labor 1 LS $
-
SUBTOTAL Alternate 2 $
-
Alternate #3 - Expansion Tank and Isolation Valve
Replacement
2.01 Demolition 1 LS $
-
23.01 Mechanical Materials 1 LS $
-
23.02 Mechanical Labor 1 LS $
-
26.01 Electrical Materials 1 LS $
-
26.02 Electrical Labor 1 LS $
-
SUBTOTAL Alternate 3 $
-
Alternate #4 - HW System Vavles, Gauges, DDC Hardware
2.01 Demolition 1 LS $
-
23.01 Mechanical Materials 1 LS $
-
23.02 Mechanical Labor 1 LS $
-
26.01 Electrical Materials 1 LS $
-
26.02 Electrical Labor 1 LS $
-
SUBTOTAL Alternate 4 $
-
Total Museum of Discovery Base Bid + Alt 1 + Alt 2 + Alt 3 + Alt 4 $
-
Total Project 2 w/ Alternates In Words: ______________________________________________________________
PROJECT 3 – Traffic Operations
Traffic Operations RTU Replacement
No. Item Description Quantity Unit of
Measurement Unit Price Extended Cost
Base Bid
1.01 Mobilization 1 LS $
-
1.02 General Conditions 1 LS $
-
2.01 Demolition 1 LS $
-
23.01 Mechanical Materials (including capture
and disposal of refrigerant) 1 LS $
-
23.02 Mechanical Labor 1 LS $
-
23.03 Plumbing Materials 1 LS $
-
23.04 Plumbing Labor 1 LS $
-
26.01 Electrical Materials 1 LS $
-
26.02 Electrical Labor 1 LS $
-
SUBTOTAL BASE BID $
-
Total Traffic Operations RTU Base Bid $
-
Total Project 3 Base Bid In Words: _______________________________________________________________________
PROJECT 4 – Edora Pool and Ice Center (EPIC)
EPIC AHU
No. Item Description Quantity Unit of
Measurement Unit Price Extended Cost
Base Bid
1.01 Mobilization 1 LS $
-
1.02 General Conditions 1 LS $
-
2.01 Demolition 1 LS $
-
3.01 Concrete 1 LS $
-
5.01 Metals 1 LS $
-
23.01 Mechanical Materials 1 LS $
-
23.02 Mechanical Labor 1 LS $
-
26.01 Electrical Materials 1 LS $
-
26.02 Electrical Labor 1 LS $
-
SUBTOTAL BASE BID $
-
Total Project 4 Base Bid In Words: ____________________________________________________________
________________________________________________________________________________________
Alternate #1
2.01 Demolition 1 LS $
-
3.01 Concrete 1 LS $
-
5.01 Metals 1 LS $
-
23.01 Mechanical Materials 1 LS $
-
23.02 Mechanical Labor 1 LS $
-
26.01 Electrical Materials 1 LS $
-
26.02 Electrical Labor 1 LS $
-
SUBTOTAL Alternate 1 $
-
Total EPIC AHU Base Bid + Alternate
1 $
-
Total Project 4 w/ Alternate In Words: ________________________________________________________
________________________________________________________________________________________
PROJECT 5 – FCPS Data Room
FCPS Data Room Replacement
No. Item Description Quantity Unit of
Measurement Unit Price Extended Cost
Base Bid
1.01 Mobilization 1 LS $
-
1.02 General Conditions 1 LS $
-
2.01 Demolition 1 LS $
-
23.01 Mechanical Materials (including capture
and disposal of refrigerant) 1 LS $
-
23.02 Mechanical Labor 1 LS $
-
23.03 Plumbing Materials 1 LS $
-
23.04 Plumbing Labor 1 LS $
-
26.01 Electrical Materials 1 LS $
-
26.02 Electrical Labor 1 LS $
-
SUBTOTAL BASE BID $
-
Total FCPS Base Bid $
-
Total Project 5 Base Bid In Words: __________________________________________________________________
______________________________________________________________________________________________
TOTAL ALL 5 BASE BIDS COMBINED: $_______________________
TOTAL ALL 5 BASE BIDS IN WORDS: ________________________________
_________________________________________________________________
*WARRANTY: PRICING INCLUDES WARRANTY ON ALL EQUIPMENT, MATERIALS,
LABOR AND OTHER WORK PROVIDED UNDER THIS AGREEMENT, EXCEPT CITY-
FURNISHED OR EXISTING MATERIALS, EQUIPMENT AND LABOR, AGAINST DEFECTS
AND NONCONFORMANCES IN DESIGN, MATERIALS AND
WORKMANSHIP/WORKWOMANSHIP FOR A PERIOD, THE LONGER OF; I.) THE
ORIGINAL MANUFACTURER’S WARRANTY TERM; OR II.) BEGINNING FROM
COMPLETION OF WORK AND ENDING TWENTY FOUR (24) MONTHS FROM AND
AFTER FINAL ACCEPTANCE UNDER THE AGREEMENT, REGARDLESS WHETHER THE
SAME WERE FURNISHED OR PERFOREMD BY CONTRACTOR OR BY ANY OF ITS
SUBCONTRACTORS OF ANY TIER.*
C. ADDITIONAL WORK
1. If additional work outside the specification is needed the City shall pay the
hourly rates indicated below. If work within the scope of this Agreement is
requested in overtime, City shall pay only the difference between regular time
and overtime hours at the hourly rates indicated below (Davis Bacon Wages
Requirement)
BILLING RATE APPRENTICE MASTER/
JOURNEY
TEAM
Regular Time $.......... $.......... $..........
Overtime Premium at 1.7 $.......... $.......... $..........
Overtime Premium (Double Time) $.......... $.......... $..........
2. Prime Contractor Labor and Material Mark Up: _____________%
3. Subcontractor Mark Up: ____________%
12. ALTERNATE (DEDUCT)
Provide a lump sum deduct per project base bid if awarded all five (5) projects.
A. Traffic _(-$_____________)_
B. City Hall _(-$_____________)_
C. EPIC _(-$_____________)_
D. Museum _(-$_____________)_
E. Fort Collins Police Services _(-$_____________)_
13. BIDDER’S PROPOSED CONSTRUCTION SCHEDULE
A. UNDERSIGNED CONTRACTOR IS REQUIRED TO SUBMIT A COMPLETION
SCHEDULE FOR EACH PROJECT THAT INCLUDES PROCUREMENT,
PERMITTING, SUBMITTAL DEVELOPMENT, FABRICATION/SHIPPING AND
PHYSICAL ON-SITE WORK.
a. The Owner understands that material lead times will have a significant
impact on the delivery of work. As such, a partial notice to proceed is
anticipated to be issued for submittals, fabrication, and material
procurement. Construction Notice to Proceed documents will be issued
for each project, based upon the respective project procurement
schedule. The Contractor shall incorporate material procurement lead
times into the proposed schedule submitted with this Bid.
b. Substantial Completion Work Schedule for Each Project are as Follows,
following the Construction Notice to Proceed. Restrictions on time of
year for installations are listed for each respective project. The
Contractor shall include all restrictions in the proposed project
schedule:
1. City Hall – Work to be done between October-April
BASE BID HAS FORTY FIVE (45) CALENDAR DAYS FROM
CONSTRUCTION NOTICE TO PROCEED
ALTERNATE WILL EXTEND TWENTY (20) CALENDAR DAYS IF
AWARDED
2. Museum of Discovery – Work to be done between May-September
THIRTY (30) CALENDAR DAYS FROM CONSTRUCTION NOTICE TO
PROCEED
EACH ALTERNATE AWARDED WILL EXTEND SUBSTANTIAL
COMPLETION BY FIVE (5) CALENDAR DAYS
3. Traffic RTU – No Restrictions on Time of Year
SIXTY (60) CALENDAR DAYS FROM CONSTRUCTION NOTICE TO
PROCEED
4. EPIC – No Restrictions on Time of Year
SIXTY (60) CALENDAR DAYS FROM CONSTRUCTION NOTICE TO
PROCEED
THE BUILDING WILL ONLY BE UNOCCUPIED FOR THIRTY (30)
DAYS DURING THE DURATION OF THE PROJECT
AWARD OF ALTERNATE DOES NOT EXTEND CONTRACT
COMPLETION TIME
5. Fort Collins Police Services – No Restrictions on Time of Year
NINETY (90) CALENDAR DAYS FROM CONSTRUCTION NOTICE TO
PROCEED
NOTE: PROVIDE A DETAILED LIST OF ANY EXCLUSIONS YOU HAVE FOR
COMPLETING THE SCOPE OF WORK NOTED IN THE BID DOCUMENTS.
14. PRICES
The foregoing prices shall include all labor, materials, transportation, shoring, removal,
dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the
several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the Bid or change
quantities at his sole discretion without affecting the Agreement or prices of any item so
long as the deletion or change does not exceed twenty-five percent (25%) of the total
Agreement Price.
RESPECTFULLY SUBMITTED:
CONTRACTOR
BY:
Printed Date
Title
License Number (If Applicable)
(Seal - if Bid is by corporation)
Attest:
Address
Telephone
Email
Addendum # 2
ITB 9891 Page 17 of 17