Loading...
HomeMy WebLinkAboutRFP - 9793 UTILITY INFRASTRUCTURE CONSTRUCTION RFP #9793 Utility Infrastructure Construction Page 1 of 129 9793 UTILITY INFRASTRUCTURE CONSTRUCTION RFP DUE 3:00 PM MT (OUR CLOCK), October 4, 2023 The City of Fort Collins is requesting proposals from qualified Contractors to provide construction services on an as-needed basis for Utility Infrastructure Construction. The City intends to award contracts to multiple qualified Contractors under this Request for Proposal (RFP) for small capital projects with a total cost less than $300,000. Contractors awarded agreements from this RFP are to be included in a pool of Contractors pre-qualified to bid on services for Utility Infrastructure Construction. As projects are identified, awarded Contractors will have the opportunity to bid on such project. As part of the City’s commitment to sustainability, proposals must be submitted online through the Rocky Mountain E-Purchasing System (RMEPS) at http://www.bidnetdirect.com/colorado/city- of- fort-collins. Note: please ensure adequate time to submit proposals through RMEPS. Proposals not submitted by the designated Opening Date and Time will not be accepted by RMEPS. A pre-proposal meeting will be held at 9:00 AM MT on September 15, 2023. The pre- proposal meeting will be hosted on-line via Zoom. Select or copy/paste the below link into your browser for access to the meeting. Please be prepared to type your name, company name, and email address and mute your microphone: Join Zoom Meeting https://us02web.zoom.us/j/82610907214?pwd=VXVQUCtGcmdnUEZ3RU9LTVZNenc3UT09 Meeting ID: 826 1090 7214 Passcode: 990306 One tap mobile +17193594580,,82610907214#,,,,*990306# US +12532158782,,82610907214#,,,,*990306# US (Tacoma) Dial by your location • +1 719 359 4580 US • +1 253 215 8782 US (Tacoma) All questions should be submitted, in writing via email, to Pat Johnson, CPPB, Senior Buyer at pjohnson@fcgov.com no later than 3:00 PM MT on September 20, 2023. Please format your e-mail to include: RFP #9793 Utility Infrastructure Construction in the subject line. Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an addendum and posted on the Rocky Mountain E-Purchasing System webpage. Rocky Mountain E-Purchasing System hosted by BidNet A copy of the RFP may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins. Prohibition of Unlawful Discrimination: The City of Fort Collins, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d- Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing RFP #9793 Utility Infrastructure Construction Page 2 of 129 4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality. The City also strictly prohibits unlawful harassment in the workplace, including sexual harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding. The City requires its Contractors to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment, and retaliation. This requirement applies to all third-party Contractors and their subcontractors/subconsultants at every tier. Public Viewing Copy: The City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. Contractors may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version of the proposal, Contractors may redact text and/or data that it deems confidential or proprietary pursuant to CORA. All pricing will be considered public records subject to disclosure under CORA and as such pricing cannot be redacted from the “FOR PUBLIC VIEWING” version of the proposal. Failure to provide a public viewing copy will be considered a waiver of any claim of confidentiality under CORA without regard to how the applicant’s proposal or certain pages of the proposal are marked confidential, proprietary, or similar. Such statement does not necessarily exempt such documentation from public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other applicable law. Generally, under CORA, trade secrets, confidential commercial information and financial data information may not be disclosed by the City. Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. By responding to this RFP, Contractors hereby waives any and all claims for damages against the City for the City’s good faith compliance with CORA. All provisions and pricing of any contract resulting from this request for proposal will be public information. Contractor Registration: The City requires all Contractors to accept Direct Deposit (Electronic) payment. If needed, the W-9 form and the Vendor Direct Deposit Authorization Form can be found on the City’s Purchasing website at www.fcgov.com/purchasing under Vendor Reference Documents. Please do not submit these documents with your proposal, however, if you take exception to participating in Direct Deposit (Electronic) payments please clearly note such in your proposal as an exception. The City may waive the requirement to participate in Direct Deposit (Electronic) payments at its sole discretion. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to RFP #9793 Utility Infrastructure Construction Page 3 of 129 be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Collusive or Sham Proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow other state and local governmental agencies, political subdivisions, and/or school districts to utilize the resulting award under all terms and conditions specified and upon agreement by all parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in the current term or in any future terms. The selected Contractors shall be required to sign the City’s Master Agreement prior to commencing services (see sample attached to this document). Sincerely, Gerry Paul Purchasing Director RFP #9793 Utility Infrastructure Construction Page 4 of 129 I. BACKGROUND & OVERVIEW A. Overview The City of Fort Collins (City) is requesting proposals from qualified Contractors to provide construction services on an as-needed basis and emergencies for Utility Infrastructure Construction. This RFP will be used as the basis for awarded Contractors to be included in a pool of Contractor’s qualified to bid on services for (fill in service) in support of small capital projects not to exceed $300,000. As projects are identified, awarded Contractors will have the opportunity to bid on such project. The City makes no guarantee as to the number of projects that may be awarded as a result of this RFP. It is anticipated that the primary use of these construction services will be in the areas of underground system improvements and rehabilitation for water distribution, wastewater collection and stormwater management. Additional services may include site restoration, concrete flatwork, pavement restoration, minor capital improvements, emergency repair services, use of trenchless technology and other general construction services related to Water Utility operations. B. Background Fort Collins is a vibrant community of approximately 168,000 located 65 miles north of Denver, at the base of the foothills of the Rocky Mountains. The City is 57 square miles in size and is the northern extension of the “Colorado Front Range” urban corridor. The City’s population includes over 37,000 college students. City of Fort Collins Utilities (Utilities) is a municipal community-owned utility that provides electric, water, wastewater, and stormwater services to approximately 87,000 residential and commercial customers. More information about Fort Collins Utilities can be found at fcgov.com/utilities. Utilities has a dedicated annual budget that for the proactive replacement of aged or failing Water Distribution and Wastewater Collections Infrastructure. These projects are predominantly on the smaller 4” to mid size 12” size and are within existing right of way or easements within the City of Fort Collins. Utilities has dedicated daytime and nighttime crews to repair these pipe sizes but is looking to also include on-call repair services for larger emergencies and/or to create redundancy with the existing response plans. II. SCOPE OF PROPOSAL A. Scope of Work 1. The following is a list of the types of services and projects to be performed which may encompass replacement, rehabilitation, repair, improvement, and new construction. While it identifies several services that are anticipated to be required, it may not be all inclusive of the types of services to be performed. a. Construction of new or rehabilitation or replacement of existing underground water distribution system pipelines up to 20 inches in diameter; b. Repair or replacement of water distribution, wastewater and stormwater appurtenances such as but not limited to manholes, valves, water meters, air vacs, fire hydrants, cathodic protection, etc.; RFP #9793 Utility Infrastructure Construction Page 5 of 129 c. Construction of new or rehabilitation or replacement of existing underground wastewater collection system pipelines up to 15 inches in diameter and service connections; d. Construction of new or rehabilitation or replacement of existing stormwater management systems including pipelines up to 24 inches, curb inlets, open channels, and storage facilities; e. General site work including clearing and grubbing, excavation of backfill, earth moving, compaction, and soil disposal; f. Pavement restoration including asphalt and concrete paving and patching, curb and gutter removal and replacement, and general flatwork replacement; g. Stream dredging, cleaning, and restoration services; h. Installation of cathodic protection systems on new and existing underground pipelines; i. Emergency repair on-call services for water distribution pipelines, wastewater collection pipelines and stormwater management facilities, in and out of the right-of- way. Construction services may include the following: a. Construction schedule preparation; b. Construction cost estimation; c. Site supervision; d. Applicable construction permits; e. Stormwater management/management plan; f. Site protection and security; g. Traffic control; h. Bypass pumping; i. Groundwater management pumping; j. Pavement demolition; k. Concrete patching and paving; l. Concrete flatwork; m. Asphalt patching and paving; n. Earthwork, clearing and grubbing, earth moving, backfill, compaction, disposal o. Riprap installation; p. Pipeline installation for water distribution, wastewater and stormwater collection; q. Manhole and vault installations; r. Use of trenchless technologies; s. Warranty and management of project safety and quality control; t. Other related services as mutually agreed by the parties. The City intends to award contracts to two or more contractors to provide the services outlined in this RFP. The resulting Agreement(s) will have an initial term of one (1) year and may be extended at the City’s option for additional one year periods not to exceed two (2) additional one year periods, subject to mutual agreement by both parties. At the City’s discretion, it may choose not to incorporate one or more portions of the general scope of services described in this RFPs into any contract(s) executed pursuant to this RFP. Work will be on an as-needed basis with the Scope of Work to be defined, Work Orders negotiated, and Purchase Orders issued prior to commencement of any work. The cumulative total of each project associated with this RFP shall not exceed $300,000. Any project exceeding a cumulative total of $300,000 requires prior written approval by the Purchasing RFP #9793 Utility Infrastructure Construction Page 6 of 129 Director and only after such exception has been determined to be in the City’s best interest. 2. Emergency Services Emergency service Work Orders will be awarded on a Time & Materials not to exceed basis. Emergency services can include any of the repairs in Section I above and may also include services for water distribution pipelines, wastewater collection pipelines and stormwater management facilities, in and out of the right-of-way. The Contractors will occasionally be required to perform emergency work on weekends, holidays and outside normal business hours of 7:00 am to 5:00 pm, Monday through Friday. The Contractor will need to be reachable 24/7/365 days a year by calling one common phone number. Contractor should have positive response within 30 minutes via phone and initial mobilization to the site within two (2) hours of positive response. III. GENERAL INFORMATION A. Utility Master Agreement Requirements Work Order Type Master Agreements will be awarded to multiple Contractors to support small capital projects no greater than $300,000 on an as-needed basis. The Master Agreements may also be utilized to support emergency repairs up to $100,000 unless otherwise approved by the City. The City intends to award to multiple Contractors under this RFP. The awarded Contractor(s) shall sign the City’s Master Agreement, a sample of which is attached. The Master Agreement will be effective for a period of one (1) year. At the option of the City, the Master Agreement may be extended for up to two (2) additional one (1) year periods. Renewals and pricing changes for subsequent extensions shall only be considered by the City at the time of such Master Agreement renewal. The Contractor shall propose any such changes in price at least forty-five (45) days prior to the Master Agreement annual expiration date. Rate increases will be limited to a three percent (3%) fixed annual escalation for all labor, equipment, materials, and subcontractors. Written notice of renewal shall be provided to the Contractor and emailed no later than thirty (30) days prior to the Master Agreement expiration date. No greater than seven and one-half percent (7.5%) markup allowed on rental items, materials, or subcontractors. Overhead, profit, insurance, bonds, general & administrative expenses, shall be included in the unit prices. As detailed in the sample Master Agreement, Construction Work Orders greater than $100,000 require 100% performance and payment bonds. In addition, prior to Substantial Completion, the City will withhold as contract retainage five percent (5%) of each progress payment. Liquidated damages may also apply on a project-by-project basis. The City intends to bid projects amongst all Contractors awarded an agreement but reserves the right to request bids for individual projects from the pool of awarded Contractors or assign Work Orders directly to an awarded Contractor at its sole discretion. In addition, the City reserves the right to conduct independent competitive processes for similar work at its sole discretion. Work Orders will be created for each individual project, from start to finish, no phasing. RFP #9793 Utility Infrastructure Construction Page 7 of 129 See the Work Order section below for more detail. Awards from the bid will be based on low price and the ability to meet the project schedule. B. Work Order Procedure Each project will utilize the City’s Work Order, included in the Master Agreement, which incorporates the Master Service Agreement terms and conditions. The Project Manager will initiate the Work Order by providing the Contractor with all the pertinent information required, and available, to accurately bid the project. A site visit, drawings, and other additional information may be provided to the Contractor to assist in the process. The Contractor shall provide all personnel, subcontractors, materials, equipment, and supplies necessary to complete the requested Work. The City reserves the right to furnish materials at its discretion. Work Order bid schedule/schedule of values pricing shall be based on the Bid Schedule provided by the Contractor during the RFP process and incorporated into the Master Agreement; however the Contractor may elect to propose pricing which is more competitive that the Master Agreement on individual project Work Order proposals. In the event a service is requested which requires specialty labor or equipment which is not stated in the Master Agreement Bid Schedule, the Contractor will propose pricing. For such items, the City reserves the right to negotiate such proposed unit price(s) with the low bidder prior to the City awarding the Work Order to the Contractor. Each Work Order will include a start and completion date, bid schedule/schedule of values, total cost with details supporting the total cost, and a general summary of Work. Supporting documentation could include, but is not limited to, the project schedule, deliverables, cost details supporting total project cost to include hourly labor rates, equipment rates, material quotes as required, and subcontractor quotes as required. Rental equipment costs and estimated hours should be included in Work Orders if applicable. All pricing is to be on a not to exceed, time and materials unit cost basis, invoiced based upon actual quantities utilized. The awarded Contractor(s) will receive a Purchase Order and Work Order from the City authorizing work under this Agreement. Contractor should not begin any Work prior to receipt of the Purchase Order and signed Work Order. No Work Order will be considered valid until signed, at a minimum, by the Contractor, Project Manager, and Purchasing Department representative. Depending upon the cost and nature of the Work, additional signature authorization may be required. Work Orders will be created for each individual project, from start to finish, no phasing will be permitted. Any changes to the dates, cost, or scope of any Work Order must be agreed upon in writing utilizing the City’s Change Order (included in the sample agreement) and will not be considered valid until signed, at a minimum, by the Contractor, Project Manager, and Purchasing Department representative. C. Anticipated Schedule The following represents the City’s target schedule for the RFP. The City reserves the right to amend the target schedule at any time. RFP #9793 Utility Infrastructure Construction Page 8 of 129 • RFP issuance: September 8, 2023 • Pre-Proposal Meeting: September 15, 2023 at 9:00 AM MT • Question deadline: 3:00 PM MT on September 20, 2023 • Final Addendum Issued: September 25, 2023 • Proposal due date: 3:00 PM MT on October 4, 2023 • Interviews (tentative): October 23 & 24 D. Interviews In addition to submitting a written proposal, the top-rated Contractors may be interviewed by the RFP assessment team and asked to participate in an oral presentation to provide an overview of the company, approach to the project and to address questions. The evaluation criteria for the oral interviews will be the same as the criteria for the written evaluations and is included in Section V. E. Subcontractors/Subconsultants Contractors will be responsible for identifying any subcontractors and/or subconsultants in their proposal. Please note that the City will contract solely with the awarded Contractor(s); therefore, subcontractors and/or subconsultants will be the responsibility of the Contractor(s). F. Financial Qualifications (May be kept Confidential) Contractor(s) selected as finalists may be required to submit a banking reference and the most recent financial statement (audited preferred) including balance sheet and income statement, as well as a statement of cash flows (the “Financial Information”). G. Current standards All work and/or materials must meet current standards in force by recognized technical and professional societies, trade and materials supply associations, institutes and organizations, bureaus and testing laboratories, and national, federal, state, county, and local laws, codes and ordinances. All Work shall be performed in accordance with applicable ANSI, OSHA, or AWWA standards. 1. The City’s Development Construction Standards shall be followed for all projects. The standards can be accessed via the following link: https://www.fcgov.com/utilities/img/site_specific/uploads/water_wastewater_construct ion_standards.pdf?1551818062. 2. Dust Control. The Contractor shall abide by the City of Fort Collins “Dust Control and Prevention Manual,” which is available for public download at https://www. fcgov.com/airquality/pdf/dust-prevention-and-control-manual.pdf, and is incorporated herein by this reference. The City has implemented this manual for all projects performed for the City or located within the City of Fort Collins City limits. H. Fees, Licenses, Permits The successful Contractor(s) shall be responsible for obtaining any necessary licenses, fees or permits without additional expense to the City. All vehicles and equipment shall be RFP #9793 Utility Infrastructure Construction Page 9 of 129 properly licensed and insured, carry the appropriate permits and be placarded as required by law. The CONTRACTOR and all subcontractors will be required to have a City of Fort Collins Right of Way (ROW) License, prior to the start of construction and throughout the project duration. I. Laws and Regulations The Contractor agrees to comply fully with all applicable local, State of Colorado and Federal laws and regulations and municipal ordinances to include the American Disabilities Act (ADA). The Contractor further agrees to comply fully with the Occupational Safety and Health Act, all regulations issued there under, and all state laws and regulations enacted and adopted pursuant thereto. J. Invoicing and Payment Invoices (Application for Payment) should be emailed monthly to invoices@fcgov.com with a copy to the Project Manager. The cost of the work completed shall be paid as progress payments to the Contractor each month following the submittal of a correct Application for Payment by the Contractor indicating the project name, Purchase Order number, task description, hours worked, personnel/work type category, hourly rate for each employee/work type category, date of the work performed specific to the task, percentage of that work that has been completed by task, 3rd party supporting documentation with the same detail and a brief progress report. Payments will be made using the prices stated in the Work Order and Agreement. In the event a service is requested which is not stated in the Work Order and/or Agreement, the Contractor and the City will negotiate an appropriate unit price for the Work prior to the Contractor initiating such Work. The City is exempt from sales and use tax. The City’s Certificate of Exemption license number is 09804502. A copy of the license is available upon request. The City pays invoices on Net 30 terms from the date of the invoice. K. Warranty Contractor warrants all equipment, materials, labor and other work, provided under this Master Agreement, except City-furnished materials, equipment and labor, against defects and nonconformances in design, materials and workmanship for a period beginning with delivery and ending twenty-four months (24) months from and after final acceptance under the Master Agreement regardless whether the same were furnished or performed by Contractor or by any of its subcontractors of any tier. Warranty for installation and workmanship Upon receipt of written notice from City of any such defect or nonconformances, the affected item or part thereof shall be redesigned, repaired or replaced by Contractor in a manner and at a time acceptable to City. L. Standard of Conduct The successful Contractor shall be responsible for maintaining satisfactory standards of employees' competency, conduct, courtesy, appearance, honesty, and integrity, and shall be responsible for taking such disciplinary action with respect to any employee, as may be necessary. The City may request the successful Contractor to immediately remove from this assignment any employee the City identifies to be unfit to perform duties due to one or more of the following reasons: RFP #9793 Utility Infrastructure Construction Page 10 of 129 1. Neglect of duty. 2. Disorderly conduct, use of abusive or offensive language, quarreling, intimidation by words or actions or fighting. 3. Theft, vandalism, immoral conduct or any other criminal action. 4. Selling, consuming, possessing, or being under the influence of intoxicants, including alcohol, or illegal substances while on assignment for the City. 5. Acting in an unsafe manner All City owned or operated facilities and their grounds are non-smoking sites. All City parks, trails and natural areas are also non-smoking. Agents and employees of Contractor(s) working for the City shall present a clean and neat appearance. Prior to performing any work for the City, Contractor(s) shall require each of their employees to wear ID badges or uniforms identifying: Contractor by name, the first name of their employee and a photograph of their employee if using an ID badge. Their employee shall wear or attach the ID badge to the outer garments at all times. M. Accident Reporting Any incident/accident resulting in damage to property or causing personal injury within the limits of a work site shall be immediately reported to the appropriate police agency, other required agencies, Project Manager and the City of Fort Collins Safety and Risk Management Department. The Contractor shall immediately contact the Project Manager when damage to an underground facility is identified. If a natural or propane gas line is damaged, the Contractor must call 911 prior to notifying the City Representative. The Contractor shall not backfill around the underground utility line until the Project Manager has repaired the damage and has given clearance to backfill. The City will not pay the Contractor for labor, vehicles, material, or equipment or any other cost associated with the repair to any at-fault damage. Failure to comply may result in a verbal warning, suspension of the crew, loss of work, and/or termination of the Master Agreement. N. Safety Practices, Safety Documentation and Training Contractor(s) shall comply with all engineering, safety, and operating requirements concerning installation of equipment in, on or around utility facilities; obtaining access facilities; and adhering to operating rules and requirements involving safe contact with utility equipment and water, gas and power lines, and confined spaces. Contractor(s) shall adopt Utility's minimum safety standards as the baseline requirements. Contractor(s) safety record will be evaluated by the evaluation team as an element of determining whether the Contractor(s) is responsible. Contractor(s) whose safety record is above 1.0 for Experience Modification Rating (EMR) and 5.0 for Total Recordable Incident Rate (TRIR) will be reviewed in depth and may be deemed ineligible to be considered for an award at the City’s sole discretion. Contractor(s) shall complete the attached Contractor Safety Form, EXHIBIT A. O. Unsatisfactory Operations Should it be necessary to halt the work because of incorrect or unsatisfactory operations under the terms of the awarded contract or because of failure to follow safety standards RFP #9793 Utility Infrastructure Construction Page 11 of 129 applicable hereto, the Contractor must take immediate steps to remedy the deficiencies. Should repair or correction of any safety defect or deficiency not be immediately undertaken and should the City be required to protect the site or make the repair or correction, the cost of such work shall be deducted from payment due the Contractor. IV. PROPOSAL SUBMITTAL Please limit the total length of your proposal to a maximum of twenty-five (25) 8 ½ x 11” pages (excluding cover pages, table of contents, dividers and Acknowledgment form). Font shall be a minimum of 10 Arial and margins are limited to no less than .5” for sides and top/bottom. Extended page sizes, such as 11” x 17”, count as a single page and may be used for detailed pricing. Links to other files or websites shall not be permitted. Proposals that do not conform to these requirements may be rejected. Contractors are required to provide detailed written responses to the following items in the order outlined below. It is suggested that the Contractor include each of the City’s questions with their response. The responses shall be considered technical offers of what the Contractor proposes to provide and shall be incorporated in the contract award as deemed appropriate by the City. A proposal that does not include all the information required may be deemed non- responsive and subject to rejection. The City shall not reimburse any Contractor for costs incurred in the preparation and presentation of their proposal. A. Cover Letter / Executive Summary The Executive Summary should highlight the content of the proposal. Indicate your availability to participate in the interviews/demonstrations on the proposed dates as stated in the Schedule section. B. Contractor Information 1. Describe the Contractors business and background to include an overview of services offered. 2. Number of years in the business 3. Details about ownership 4. Size of the Contractors firm 5. Location(s) of offices. If multiple, please identify which will be the primary for our account. 6. Have you or a firm for which you were a principal ever failed to complete any Work awarded to you? If so, where and why? 7. Has the firm ever defaulted on a contract? If yes, please explain. 8. Is the firm debarred by any government agency? If yes, list agency name. 9. What amount of credit does the firm have available? 10. Please provide a bank reference. 11. Are any lawsuits pending against you, the firm or any of its principals at this time? If yes, provide detail. RFP #9793 Utility Infrastructure Construction Page 12 of 129 C. Firm Capability & Experience Provide relevant information regarding previous experience related to this or similar projects, to include the following: 1. Provide an Organization Chart/Proposed Project Team: An organization chart containing the names of all key personnel and subconsultants with titles and their specific task assignment for this Agreement shall also be provided in this section. Resumes shall be limited to one (1) page each. 2. Detail your firm’s experience in the areas of underground system improvements and rehabilitation for water distribution, wastewater collection and stormwater management. 3. References. Provide a minimum of three similar projects with public agencies in the last 5 years (not to include the City of Fort Collins) that have involved the staff and subcontractors/subconsultants proposed to work on this project. Include the owner’s name, title of project, beginning price, ending price, contact name, email and phone number, subconsultants on the team and a brief description of the work and any change orders. The Contractor authorizes the City to verify any and all information contained herein and hereby releases all those concerned providing information as a reference from any liability in connection with any information provided. 4. Provide resumes for each professional and technical person to be assigned to the project, including partners, subconsultants, and subcontractors. Please limit resumes to one page. The résumés shall include at least three individual references from previous assignments. 5. Provide any information that distinguishes the Contractor from its competition and any additional information applicable to this RFP that might be valuable in assessing Contractor’s proposal. 6. Contractor(s) shall complete the attached Contractor Safety Form, EXHIBIT A. 7. Do the CONTRACTOR and all subcontractors have a City of Fort Collins Right of Way (ROW) License or the ability to obtain one? D. Scope of Proposal 1. Provide a detailed narrative of the services proposed if awarded the contract per the scope above. The narrative should include any options that may be beneficial for the City to consider. 2. Describe how the Contractor would potentially manage several projects at different sites and with different levels of expertise required to ensure each project’s timely and professional completion. 3. Include a list of equipment available for use on City projects. 4. Describe the methods and timeline of communication the Contractor will use with the City’s Project Manager and other parties. 5. Describe the scheduling software the Contractor typically uses for sequencing tasks and scheduling materials and equipment. 6. Describe the way in which the Contractor develops and maintains project schedules RFP #9793 Utility Infrastructure Construction Page 13 of 129 for projects. Please also address how the Contractor works to overcome challenges. 7. Provide details on the Contractor’s commitment to quality and attention to detail. Explain the processes your team will use to assure delivery of a high quality finish product. 8. Include a description of the software and other analysis tools utilized for project cost estimation. 9. Identify what types of work and services, if any, may be subcontracted. 10. Is the Contractor able to respond within two (2) hours, 24/7 for an emergency? E. Sustainability/TBL Methodology In concise terms (no more than two pages), please describe the Contractor’s commitment to sustainability and supporting values. Each element of the TBL sustainability criteria will receive equal consideration in determining the final Sustainability/TBL score. 1. Address how the Contractor strives to incorporate all three aspects (social, environmental, and economic) of Triple Bottom Line (TBL) sustainable practices into the workplace. Provide examples along with any metrics used to measure success by the Contractor. 2. Also provide examples of how the Contractor has incorporated all three aspects of TBL sustainable practices in previous similar projects on which the Contractor has been the prime Contractor. Some examples are provided below: a. Environmental – Experience delivering projects / programs focused on environmental health priorities in the areas of climate resiliency, water quality and watershed protection, regulatory performance, management systems, air quality, renewable energy, sustainable building and design, construction materials management, and solid waste reduction. b. Economic – Experience working and delivering projects with an emphasis on strategic financial planning, job creation, business development, asset management, various project delivery methods, value engineering, regional partnerships, transparency, stakeholder engagement, strategic investments, aging infrastructure, repurposing of existing facilities, and competing financial priorities. c. Social - Experience working and delivering projects, programs, and/or initiatives that support Equity, Diversity, and Inclusion throughout the Contractor’s workplace, including leadership, and supply chain. Examples of this may be demonstration of working within cultural and language gaps, development of diversity programs, diverse project teams, equitable opportunity vendor supply chain, and how the Contractor has applied an equity lens to processes such as recruitment, hiring, purchasing, career pathways, salaries, and staff engagement. F. Sample Project The Sample Project requirement is meant to demonstrate the Contractor’s process and approach for the work and includes building a cost estimate and developing a RFP #9793 Utility Infrastructure Construction Page 14 of 129 corresponding schedule. Using one of the references provided in the Contractor Capability and Assigned Personnel section, provide an outline of one project from start to finish. 1. Provide a listing of the tasks undertaken during that project. 2. Provide an outline of the schedule for completing tasks and personnel involved. 3. Describe how the project would be managed and who would have primary responsibility for its timely and professional completion. 4. Cost: Provide the total project cost for the work. Include detail showing milestones, hours, hourly rates, and the same for subcontractors. 5. Provide a narrative of the services for the Sample Project to describe what you have included in the scope, state assumptions used to build the costs and schedule, identify potential issues/risks, sequences, means/methods, materials, equipment used, etc. Also include whether or the not the project was completed on time and/or within the original proposed cost. If not completed on time and/or within budget, please explain why not. G. Cost In your response to this proposal, please provide the following: 1. Rate Schedule: Provide a schedule of billing rates by category of employee and job title, and equipment to be used during the first year of the Master Agreement. 2. A separate schedule for after-hours/emergency and overtime should also be included. Standard operating hours are expected to be between 7:00 AM MT and 5:00 PM MT During this time period overtime rates will not apply. 3. This Rate Schedules will be firm for at least one (1) year from the date of the Master Agreement. Escalation for future years will be fixed at three percent (3%) per year for all labor, equipment, materials, and subcontractor rates. Markup for subconsultants, rental equipment and any materials shall not exceed seven and a half percent (7.5%). Overhead, profit, insurance, bonds, general & administrative expenses shall be included in the line item of the rate schedule. H. Sample Agreement Included with this request for proposals is a sample of the Master Agreement that the City intends to use for obtaining the services of the Contractor(s). The Contractor(s) is required to review this Master Agreement and indicate any objections to the terms of the contract. If revisions to the contractual terms are requested, provide suggested revisions. I. Acknowledgment The Acknowledgment form is attached as Section VI. Complete the attached form indicating the Contractor hereby acknowledges receipt of the City of Fort Collins Request for Proposal and acknowledges that the Contractor has read and agrees to be fully bound by all the terms, conditions and other provisions set forth in the RFP. RFP #9793 Utility Infrastructure Construction Page 15 of 129 V. REVIEW AND ASSESSMENT CRITERIA A. Proposal and Interview Criteria Contractors will be evaluated on the following criteria. This set of criteria will be the basis for review and assessment of the written proposals and optional interview session. At the discretion of the City, interviews of the top-rated Contractors may be conducted. The rating scale shall be from 1 to 10, a rating of 1 doesn’t meet minimum requirements, a rating of 5 means the category fulfills the minimum requirements, and 10 exceeds minimum requirements in that category. CRITERIA NUMBER EVALUATION CRITERIA WEIGHTING FACTOR 1 FIRM CAPABILITY AND EXPERIENCE 55% 2 SCOPE OF PROPOSAL 15% 3 COST 15% 4 SAMPLE PROJECT 10% 5 SUSTAINABILITY/TBL METHODOLOGY 5% RFP #9793 Utility Infrastructure Construction Page 16 of 129 VI. ACKNOWLEDGMENT Contractor hereby acknowledges receipt of the City of Fort Collins Request for Proposal and acknowledges that it has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP #9793 Utility Infrastructure Construction and sample Master Agreement except as otherwise noted. Additionally, Contractor hereby makes the following representations to City: a. All of the statements and representations made in this proposal are true to the best of the Contractor’s knowledge and belief. b. Contractor commits that it is able to meet the terms provided in this proposal. c. This proposal is a firm and binding offer, for a period of ninety (90) days from the date hereof. d. Contractor further agrees that the method of award is acceptable. e. Contractor also agrees to complete the proposed Master Agreement with the City of Fort Collins within 10 days of notice of award. If contract is not completed and signed within 10 days, City reserves the right to cancel and award to the next highest rated Contractor. f. Contractor acknowledges receipt of addenda. g. Contractor acknowledges no conflict of interest. h. The City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. Contractors may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version of the proposal, Contractors may redact text and/or data that it deems confidential or proprietary pursuant to CORA. All pricing will be considered public records subject to disclosure under CORA and as such pricing cannot be redacted from the “FOR PUBLIC VIEWING” version of the proposal. Failure to provide a public viewing copy will be considered a waiver of any claim of confidentiality under CORA without regard to how the applicant’s proposal or certain pages of the proposal are marked confidential, proprietary, or similar. Such statement does not necessarily exempt such documentation from public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other applicable law. Generally, under CORA, trade secrets, confidential commercial information and financial data information may not be disclosed by the City. Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. By responding to this RFP, Contractors hereby waives any and all claims for damages against the City for the City’s good faith compliance with CORA. All provisions and pricing of any contract resulting from this request for proposal will be public information. Contractor’s Legal Name: Physical Address: Remit to Address: Name of Authorized Agent of the Contractor: Email of Authorized Agent: RFP #9793 Utility Infrastructure Construction Page 17 of 129 Signature of Authorized Agent: Primary Contact for Project: Title: Email Address: Phone: Cell Phone: NOTE: ACKNOWLEDGMENT IS TO BE SIGNED & RETURNED WITH YOUR PROPOSAL. RFP #9793 Utility Infrastructure Construction Page 18 of 129 VII. SAMPLE MASTER AGREEMENT (FOR REFERENCE ONLY – DO NOT SIGN) SERVICES AGREEMENT CONSTRUCTION WORK ORDER TYPE THIS AGREEMENT made and entered into the day and year set forth below, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and , a(n) (ENTER STATE) corporation, hereinafter referred to as "Contractor". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Services to be Performed. a. This Agreement shall constitute the basic agreement between the parties for . The conditions set forth herein shall apply to all services performed by the Contractor on behalf of the City and particularly described in Work Orders agreed upon in writing by the parties from time to time. Such Work Orders, samples of which are attached hereto as Exhibit A & B, consisting of two (2) pages and ( ) pages and incorporated herein by this reference, shall include a description of the services to be performed, the location and time for performance, the amount of payment, any materials to be supplied by the City and any other special circumstances relating to the performance of services. A general scope of services is attached hereto as Exhibit , consisting of ( ) pages, and incorporated herein by this reference. The only services authorized under this Agreement are those which are performed after receipt of such Work Order, except in emergency circumstances where oral work requests may be issued. Oral requests for emergency actions will be confirmed by issuance of a written Work Order within two (2) working days. Irrespective of references in Exhibit A & B to certain named third parties, Contractor shall be solely responsible for performance of all duties hereunder. b. The City may, at any time during the term of a particular Work Order and without invalidating such Work Order, make changes to the scope of the particular services. Such changes shall be agreed upon in writing by the parties by Change Order, a sample of which is attached hereto as Exhibit C, consisting of ( ) page(s), and incorporated herein by this reference. 2. Changes in the Work. The City reserves the right to independently bid any services rather than issuing work to the Contractor pursuant to this Agreement. Nothing within this Agreement shall obligate the City to have any particular service performed by the Contractor. 3. Time of Commencement and Completion of Services. The services to be performed RFP #9793 Utility Infrastructure Construction Page 19 of 129 pursuant to this Agreement shall be initiated as specified by each written Work Order or oral emergency service request. Oral emergency service requests will be acted upon without waiting for a written Work Order. Time is of the essence. 4. Contract Period. This Agreement shall commence and shall continue in full force and effect until , unless sooner terminated as herein provided. At the option of the City, the Agreement may be extended for up to two (2) additional one (1) year periods. Renewals and pricing changes for subsequent extensions shall only be considered by the City at the time of such Agreement renewal. The Contractor shall propose any such changes in price at least forty-five (45) days prior to Agreement expiration. Rate increases will be limited to three percent (3%) per year. Written notice of renewal shall be provided to the Contractor and emailed no later than thirty (30) days prior to the Agreement expiration date. No greater than seven and one-half percent (7.5%) markup allowed on rental items, materials or subcontractors. Overhead, profit, insurance, bonds, general & administrative expenses shall be included in the line items of the Unit Pricing Sheet. 5. Delay. If either party is prevented in whole or in part from performing its obligations by unforeseeable causes beyond its reasonable control and without is fault or negligence, then the party so prevented shall be excused from whatever performance is prevented by such cause. To the extent that the performance is actually prevented, the Contractor must provide written notice to the City of such condition within ten (10) days from the onset of such condition. 6. Early Termination by City. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Contractor. Such notice shall be mailed at least ten (10) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. In the event of early termination by the City, the Contractor shall be paid for services rendered to the date of termination, subject only to the satisfactory performance of the Contractor's obligations under this Agreement. Contractor shall submit a final invoice within ten (10) days of the effective date of termination. Undisputed invoices shall be paid Net 30 days of the date of the invoice. Such payment shall be the Contractor's sole right and remedy for such termination. 7. Notices. All notices provided under this Agreement shall be effective immediately when emailed or three business days from the date of the notice when mailed to the following addresses: Contractor: City: Copy to: Attn: City of Fort Collins Attn: PO Box 580 Fort Collins, CO 80522 City of Fort Collins Attn: Purchasing Dept. PO Box 580 Fort Collins, CO 80522 RFP #9793 Utility Infrastructure Construction Page 20 of 129 email address email address email address 5. Contract Sum. This is an open-end indefinite quantity Agreement with no fixed price. The actual amount of work to be performed will be stated on the individual Work Orders. The City makes no guarantee as to the number of Work Orders that may be issued or the actual amount of services which will in fact be requested. 8. Payments. a. The City agrees to pay and the Contractor agrees to accept as full payment for all work done and all materials furnished and for all costs and expenses incurred in performance of the work the sums set forth for the hourly labor rate and material costs, with markups, stated within the Bid Schedule Proposal Form, attached hereto as Exhibit , consisting of ( ) pages, and incorporated herein by this reference. b. Invoices shall be emailed to invoices@fcgov.com with a copy to the City Representative. The cost of the work completed shall be paid to the Contractor following the submittal of a correct itemized invoice by the Contractor. Payment shall be made by the City only upon acceptance of the work by the City and upon the Contractor furnishing satisfactory evidence of payment of all wages, taxes, supplies and materials, and other costs incurred in connection with the performance of such work. The City is exempt from sales and use tax. The City’s Certificate of Exemption license number is 09804502. A copy of the license is available upon written request. The City pays invoices on Net 30 days from the date of the invoice. 9. Appropriation. To the extent this Agreement or any provision in it constitutes a multiple fiscal year debt or financial obligation of the City, it shall be subject to annual appropriation by City Council as required in Article V, Section 8(b) of the City Charter, City Code Section 8-186, and Article X, Section 20 of the Colorado Constitution. The City shall have no obligation to continue this Agreement in any fiscal year for which no such supporting appropriation has been made. 10. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in the Work Order, plus any extensions thereof allowed in accordance with Article 12 of the General conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amount set forth in each Work Order. 11. City Representative. The City will designate, prior to commencement of the work, its representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the services provided under this agreement. All requests for contract interpretations, change orders, and other clarification or instruction shall be RFP #9793 Utility Infrastructure Construction Page 21 of 129 directed to the City Representative. The initial City Representative for this agreement is project manager's name, email and phone #. The Representative is subject to change by the City. 12. Independent Contractor. It is agreed that in the performance of any services hereunder, the Contractor is an independent contractor responsible to the City only as to the results to be obtained in the particular work assignment and to the extent that the work shall be done in accordance with the terms, plans and specifications furnished by the City. 13. Subcontractors/subconsultants. Contractor may not subcontract any of the Work set forth in the subsequent Work Orders without the prior written consent of the city, which shall not be unreasonably withheld. If any of the Work is subcontracted hereunder (with the consent of the City), then the following provisions shall apply: (a) the subcontractor/subconsultant must be a reputable, qualified firm with an established record of successful performance in its respective trade performing identical or substantially similar work, (b) the subcontractor/subconsultant will be required to comply with all applicable terms of this Agreement, (c) the subcontract will not create any contractual relationship between any such subcontractor/subconsultant and the City, nor will it obligate the City to pay or see to the payment of any subcontractor/subconsultant, and (d) the work of the subcontractor/subconsultant will be subject to inspection by the City to the same extent as the work of the Contractor. 14. Personal Services. It is understood that the City enters into the Agreement based on the special abilities of the Contractor and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Contractor shall neither assign any responsibilities nor delegate any duties arising under the Agreement without the prior written consent of the city. 15. Acceptance Not Waiver. The City's approval or acceptance of, or payment for any of the services shall not be construed to operate as a waiver of any rights under the Agreement or of any cause of action arising out of the performance of this Agreement. 16. Warranty. a. Contractor warrants that all work performed hereunder shall be performed with the highest degree of competence and care in accordance with accepted standards for work of a similar nature. b. Unless otherwise provided in the Agreement, all materials and equipment incorporated into any work shall be new and, where not specified, of the most suitable grade of their respective kinds for their intended use, and all workmanship shall be acceptable to City. c. Contractor warrants all equipment, materials, labor and other work, provided under this Agreement, except City-furnished materials, equipment and labor, against defects and RFP #9793 Utility Infrastructure Construction Page 22 of 129 nonconformances in design, materials and workmanship/workwomanship for a period, the longer of, i.) The original manufacturer’s warranty term; or ii.) beginning with the start of the work and ending twenty-four (24) months from and after final acceptance under the Agreement, regardless of whether the same were furnished or performed by Contractor or by any of its subcontractors of any tier. Upon receipt of written notice from City of any such defect or nonconformances, the affected item or part thereof shall be redesigned, repaired, or replaced by Contractor in a manner and at a time acceptable to City. 17. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this Agreement, such party may be declared in default thereof. 18. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail themselves of any other remedy at law or equity. If the non-defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees and costs incurred because of the default. 19. Entire Agreement; Binding Effect; Order of Precedence; Authority to Execute. This Agreement, along with all Exhibits and other documents incorporated herein, shall constitute the entire Agreement of the parties regarding this transaction and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. Covenants or representations not contained in this Agreement shall not be binding on the parties. In the event of a conflict between terms of the Agreement and any exhibit or attachment, the terms of the Agreement shall prevail. Each person executing this Agreement affirms that they have the necessary authority to sign on behalf of their respective party and to bind such party to the terms of this Agreement. 20. Indemnity/Insurance. a. The Contractor agrees to indemnify and save harmless the City, its officers, agents and employees against and from any and all actions, suits, claims, demands or liability of any character whatsoever, brought or asserted for injuries to or death of any person or persons, or damages to property arising out of, result from or occurring in connection with the performance of any service hereunder. b. The Contractor shall take all necessary precautions in performing the work hereunder to prevent injury to persons and property. RFP #9793 Utility Infrastructure Construction Page 23 of 129 c. Without limiting any of the Contractor's obligations hereunder, the Contractor shall provide and maintain insurance coverage naming the City as an additional insured under this Agreement of the type and with the limits specified within Exhibit , consisting of ( ) page(s), attached hereto, and incorporated herein by this reference. The Contractor before commencing services hereunder shall deliver to the City's Purchasing Director, purchasing@fcgov.com, P. O. Box 580, Fort Collins, Colorado 80522 one copy of a certificate evidencing the insurance coverage required from an insurance company acceptable to the city. 21. Law/Severability. The laws of the State of Colorado shall govern the construction, interpretation, execution, and enforcement of this Agreement. The Parties further agree that Larimer County District Court is the proper venue for all disputes. If the City subsequently agrees in writing that the matter may be heard in federal court, venue will be in Denver District Court. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. 22. Utilization by Other Agencies. [Optional] The City of Fort Collins reserves the right to allow other state and local governmental agencies, political subdivisions, and/or school districts to utilize the resulting award under all terms and conditions specified and upon agreement by all parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in the current term or in any future terms. Nothing herein shall be deemed to authorize or empower the Agency to act as an agent for the City of Fort Collins in connection with the exercise of any rights hereunder, and neither party shall have any right or authority to assume or create any obligation or responsibility on behalf of the other. The other Agency shall be solely responsible for any debts, liabilities, damages, claims, or expenses incurred in connection with any agreement established between them and the Contractor. The City’s concurrence hereunder is subject to the Contractor’s commitment that this authorization shall not have a negative impact on the work to be completed for the City. 23. Governmental Immunity Act. No term or condition of this Agreement shall be construed or interpreted as a waiver, express or implied, of any of the notices, requirements, immunities, rights, benefits, protections, limitations of liability, and other provisions of the Colorado Governmental Immunity Act, C.R.S. § 24-10-101 et seq. and under any other applicable law. 24. Prohibition Against Unlawful Discrimination. The City of Fort Collins, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. RFP #9793 Utility Infrastructure Construction Page 24 of 129 The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality. The City also strictly prohibits unlawful harassment in the workplace, including sexual harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding. The City requires its vendors to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment, and retaliation. This requirement applies to all third-party vendors and their subcontractors/subconsultants at every tier. 25. Force Majeure. No Party hereto shall be considered in default in the performance of an obligation hereunder to the extent that performance of such obligation is delayed, hindered, or prevented by force majeure. Force majeure shall be any cause beyond the control of the defaulting Party which could not reasonably have been foreseen and guarded against. Force majeure includes, but is not limited to, acts of God, fires, riots, pandemics, incendiarism, interference by civil or military authorities, compliance with regulations or orders of military authorities, and acts of war (declared or undeclared), provided such cause could not have been reasonably foreseen and guarded against by the defaulting Party. Force majeure shall not include increases in labor, commodity, utility, material, supply, fuel, or energy costs, or compliance with regulations or orders of civil authorities. To the extent that the performance is actually prevented, the Contractor must provide written notice to the City of such condition within ten (10) days from the onset of such condition. 26. Dust Control. The Contractor shall abide by the City of Fort Collins “Dust Control and Prevention Manual,” which is available for public download at https://www.fcgov.com/airquality/pdf/dust-prevention-and-control-manual.pdf, and is incorporated herein by this reference. The City of Fort Collins has implemented this manual for all projects performed for the City of Fort Collins or located within the City of Fort Collins City limits. 27. Colorado Open Records Act. The City is subject to Sec. 24-72-201 et seq. of the Colorado Revised Statute (CORA). This Agreement is subject to public disclosure in whole pursuant to CORA. 28. Special Provisions. Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit - Confidentiality, consisting of ( ) page(s), and Exhibit , Section 00700 General Conditions consisting of fifty-three (53) pages. In the event of any conflict between the main body of this Agreement and the Special Provisions (or any other exhibit or attachment to this RFP #9793 Utility Infrastructure Construction Page 25 of 129 Agreement), the main body of the Agreement shall control. [Signature Page Follows] THE CITY OF FORT COLLINS, COLORADO By: Gerry Paul Purchasing Director Date: ATTEST: APPROVED AS TO FORM: CONTRACTOR'S NAME By: Printed: Title: Date: RFP #9793 Utility Infrastructure Construction Page 26 of 129 EXHIBIT A WORK ORDER FORM (Short form) PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CONTRACTOR'S NAME WORK ORDER NUMBER: PM's Tracking # PROJECT TITLE: ORIGINAL BID/RFP NUMBER & NAME: MASTER AGREEMENT EFFECTIVE DATE: Original Contract Date ARCHITECT/ENGINEER: If using a 3rd party architect/engineer or City PM/Engineer OWNER’S REPRESENTATIVE: City PM WORK ORDER COMMENCEMENT DATE: WORK ORDER COMPLETION DATE: MAXIMUM FEE: (time and reimbursable direct costs): PROJECT DESCRIPTION/SCOPE OF SERVICES: Contractor agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The City will designate, prior to commencement of the work, its representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the services provided under this agreement. All requests for contract interpretations, change orders, and other clarification or instruction shall be directed to the City Project Manager. The initial City Project Manager for this agreement is enter name, email, phone. The Project Manager is subject to change by the City. Pricing stated on this Work Order shall be consistent with the pricing in the Master Agreement or subsequent renewals as of the Work Order commencement date and will be held firm through completion of this Work Order. The attached forms consisting of ( ) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. RFP #9793 Utility Infrastructure Construction Page 27 of 129 CONTRACTOR: Contractor's Name By: Date: Name: Title: OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference. ACCEPTANCE: Date: Name, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer APPROVED AS TO FORM: Date: Name,City Attorney's Title (if greater than $1,000,000) ACCEPTANCE: Date: Name, Title ACCEPTANCE: Date: Name, Title ACCEPTANCE: Date: Name, Utilities Executive Director (if greater than $1,000,000) ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) ACCEPTANCE: Date: Name, City Manager (if greater than $1,000,000) ATTEST: Date: City Clerk (if greater than $1,000,000) RFP #9793 Utility Infrastructure Construction Page 28 of 129 EXHIBIT B WORK ORDER FORM (Construction over $100,000) FORT COLLINS UTILITIES CONSTRUCTION WORK ORDER PROJECT TITLE WORK ORDER NO. PM'S TRACKING # CONTRACTOR: Company Name RFP #9793 Utility Infrastructure Construction Page 29 of 129 TABLE OF CONTENTS AGREEMENT FORMS 00525 Work Order, Notice of Award & Bid Schedule 00530 Work Order Notice to Proceed 00600 Bonds and Certificates 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00651 Lien Waiver Release (SUBCONTRACTOR/SUBCONSULTANT) 00660 Consent of Surety 00670 Application for Exemption Certificate 00900 Addenda, Modifications and Payment 00950 Work Order Change Order Form 00960 Application for Payment ADDITIONAL DOCUMENTS Attachment A DRAWING INDEX RFP #9793 Utility Infrastructure Construction Page 30 of 129 SECTION 00500 CONSTRUCTION WORK ORDER AGREEMENT FORMS 00525 Work Order, Notice of Award & Bid Schedule 00530 Work Order Notice to Proceed RFP #9793 Utility Infrastructure Construction Page 31 of 129 SECTION 00525 WORK ORDER, NOTICE OF AWARD AND BID SCHEDULE TO: Company Name WORK ORDER NUMBER: PM's Tracking # PROJECT TITLE: ORIGINAL BID/RFP NUMBER & NAME: MASTER AGREEMENT EFFECTIVE DATE: Original Contract Date ARCHITECT/ENGINEER: If using a 3rd party architect/engineer or can be City PM/Engineer OWNER’S REPRESENTATIVE: City PM WORK ORDER COMMENCEMENT DATE: MAXIMUM FEE: (time and reimbursable direct costs): NOTICE OF AWARD DATE: Date of this Document OWNER: City of Fort Collins (hereinafter referred to as OWNER) 1. WORK. Pursuant to your MASTER AGREEMENT with OWNER dated Original Contract Date, and your Work Order Proposal dated Date of Quote, you have been awarded a Work Order for Project Title. PROJECT DESCRIPTION & SITE LOCATION: 2. CONTRACT PRICE, BONDS AND CERTIFICATES. The price of your Work Order is Written Dollar Amount ($Numerical Dollar Amount). Pursuant to the AGREEMENT and the Work Order Documents, Performance and Payment Bonds and insurance are required. Pricing stated on this Work Order shall be consistent with the pricing in the Master Agreement or subsequent renewals as of the Work Order commencement date and will be held firm through completion of this Work Order. 3. CONTRACT TIMES. Pursuant to the MASTER AGREEMENT and the Work Order Documents, the date for Substantial Completion of this Work Order is Date, and after Substantial Completion, the date for Final Completion is Date. 4. PROJECT MANAGER. The City will designate, prior to commencement of the work, its representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the services provided under this agreement. All requests for contract interpretations, change orders, and other clarification or instruction shall be directed to the Project Manager. The initial Project Manager for this agreement is (ENTER NAME, EMAIL, PHONE). The Project Manager is subject to change by the City. RFP #9793 Utility Infrastructure Construction Page 32 of 129 5. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the essence of this Work Order and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTACTOR shall pay OWNER the amounts set forth hereafter. 1) Substantial Completion: Written Dollar Amount ($Numerical Dollar Amount) for each calendar day or fraction thereof after Date until the work is Substantially Complete. 2) Final Acceptance: After Substantial Completion, Written Dollar Amount ($Numerical Dollar Amount) for each calendar day or fraction thereof after XX number of calendar days until the Work is ready for Final Payment and Acceptance. 6. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by OWNER. PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. Prior to Substantial Completion, Owner will be entitled to withhold as contract retainage five percent (5%) of each progress payment, but, in each case, less the aggregate of payments previously made and less such amounts as OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. If, in the sole discretion of Owner, Owner determines that the character and progress of the Work have been satisfactory to OWNER, OWNER may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 95% of materials and equipment not incorporated in the Work (but delivered, suitably stored, and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application Section 00960. Upon Substantial Completion payment will be made in an amount sufficient, if necessary, to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as provided RFP #9793 Utility Infrastructure Construction Page 33 of 129 in said paragraph 14.13. 7. EXECUTION. Work Order Documents must be executed in DocuSign within fifteen (15) calendar days of the date of this Notice of Award. Contractor shall attach Payment and Performance Bonds and Certificate of Insurance (COI) to the Work Order Documents in DocuSign. In addition, one original set of executed Bonds and COI shall be provided to the Buyer. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Work Order Proposal abandoned and to annul this Work Order & Notice of Award. CONTRACTOR’S NOTICE OF AWARD REPRESENTATION & EXECUTION: CONTRACTOR agrees to perform the services identified above, in accordance with the terms and conditions contained herein, the MASTER AGREEMENT, and the NOTICE OF AWARD between the parties. In the event of a conflict between or ambiguity in the terms of the MASTER AGREEMENT or specific Work Orders, the MASTER AGREEMENT shall control. CONTRACTOR: Company Name By: Date: Name: Title: RFP #9793 Utility Infrastructure Construction Page 34 of 129 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Documents are hereby accepted and incorporated herein by this reference. ACCEPTANCE: Date: Name, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer REVIEWED: Date: Name, Purchasing Manager APPROVED AS TO FORM: Date: Name,City Attorney's Title (if greater than $1,000,000) ACCEPTANCE: Date: Name, Title ACCEPTANCE: Date: Name, Title ACCEPTANCE: Date: Kendall Minor, Utilities Executive Director (if greater than $1,000,000) ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) ACCEPTANCE: Date: Kelly DiMartino, City Manager (if greater than $1,000,000) ATTEST: Date: City Clerk (if greater than $1,000,000) RFP #9793 Utility Infrastructure Construction Page 35 of 129 BID SCHEDULE Insert Work Order Quote/Proposal Here RFP #9793 Utility Infrastructure Construction Page 36 of 129 SECTION 00530 WORK ORDER NOTICE TO PROCEED NOTICE TO PROCEED DATE: WORK ORDER TITLE: WORK ORDER NUMBER: TO: Attn: This notice is to advise you: That the Work Order and all amendments and supplements to the Work Order Documents covering the above described Work have been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance and Payment Bonds and insurance have been received by the OWNER. That the OWNER has approved the said Work Order and Work Order Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Work Order and the AGREEMENT. The dates for Substantial Completion and Final Acceptance shall be , and , respectively. Dated this _____________ day of ___________, _____. CITY OF FORT COLLINS (OWNER) By: Name, Title ACKNOWLEDGMENT OF NOTICE Receipt of the above Work Order Notice to Proceed is hereby acknowledged this Day day of Month, Year. (CONTRACTOR) By: ___________________________________________ Name, Title RFP #9793 Utility Infrastructure Construction Page 37 of 129 SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00651 Lien Waiver Release (SUBCONTRACTOR/SUBCONSULTANT) 00660 Consent of Surety 00670 Application for Exemption Certificate RFP #9793 Utility Infrastructure Construction Page 38 of 129 SECTION 00610 PERFORMANCE BOND Bond No KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Master Agreement with the OWNER, dated the Day day of Month, Year, a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled Work Order Project Title, Work Order Number PM's Tracking #, dated Work Order Date, a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Work Order and Master Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Work Order and Master Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Master Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Master Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. RFP #9793 Utility Infrastructure Construction Page 39 of 129 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _________ day of , _________. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners ___________________________________ By: _____________________________ By: IN PRESENCE OF: Surety _____________________________ By: ___________________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Work Order. If CONTRACTOR is Partnership, all partners should execute Bond. RFP #9793 Utility Infrastructure Construction Page 40 of 129 SECTION 00615 PAYMENT BOND Bond No KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Master Agreement with the OWNER, dated the Day day of Month, Year, a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled Work Order Project Title, Work Order Number PM's Tracking #, dated Work Order Date, a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors/subconsultants, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Work Order and Master Agreement and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor/subconsultant or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Master Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Master Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. RFP #9793 Utility Infrastructure Construction Page 41 of 129 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _________ day of , _________. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners _____________________________ By: ___________________________________ By: IN PRESENCE OF: Surety _____________________________ By: ___________________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Work Order. If CONTRACTOR is Partnership, all partners should execute Bond. RFP #9793 Utility Infrastructure Construction Page 42 of 129 SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall submit Certificate of Insurance in compliance with the Work Order Documents. RFP #9793 Utility Infrastructure Construction Page 43 of 129 SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) PROJECT TITLE: DATE OF SUBSTANTIAL COMPLETION: LOCATION: Fort Collins, Colorado OWNER: City of Fort Collins PROJECT OR SPECIFIED PART SHALL CONTRACTOR: INCLUDE: WORK ORDER DATE: The Work performed under this Work Order, pursuant to the Work Order Documents, has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Work Order Documents. _____________________________ By: __________________________ ________ PROJECT MANAGER AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. _____________________________ By: __________________________ ________ CONTRACTOR AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Work Order Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS ________ By: __________________________ ________ OWNER AUTHORIZED REPRESENTATIVE DATE REMARKS: _________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ RFP #9793 Utility Infrastructure Construction Page 44 of 129 SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE DATE: TO: You are hereby notified that on the Day day of Month, Year, the City of Fort Collins, Colorado, has accepted the Work completed by Company Name, for the City of Fort Collins Work Order, titled Project Title, Work Order Number PM's Tracking #. Your continuing obligations and guarantees for the Project will be as provided in the Work Order and Work Order Documents. Sincerely, City of Fort Collins OWNER By: ___________________________________________ ___________________________________________ Name, Title RFP #9793 Utility Infrastructure Construction Page 45 of 129 SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: Company Name (CONTRACTOR) WORK ORDER TITLE: WORK ORDER NUMBER: 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill, and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various subcontractors/subconsultants or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR's subcontractors/subconsultants, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorney’s fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes an adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. RFP #9793 Utility Infrastructure Construction Page 46 of 129 Signed this ______ day of __________, ___. CONTRACTOR: Company Name By: ___________________________________________ ___________________________________________ Name, Title ATTEST: _____________________________ Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this _________ day of __________, _____, by ________________________________________________________________. Witness my hand and official seal. My Commission Expires: ___________________________. _________________________ Notary Public RFP #9793 Utility Infrastructure Construction Page 47 of 129 SECTION 00650 LIEN WAIVER RELEASE (SUBCONTRACTOR/SUBCONSULTANT) TO: City of Fort Collins, Colorado (OWNER) FROM: Company Name (SUBCONTRACTOR) WORK ORDER TITLE: WORK ORDER NUMBER: 1. The subcontractor/subconsultant acknowledges having received payment from the CONTRACTOR for all work, labor, skill, and material furnished, delivered and performed by the subcontractor/subconsultant for the CONTRACTOR or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the subcontractor/subconsultant voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the subcontractor/subconsultant may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the CONTRACTOR or its officers, agents, employees or assigns, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The subcontractor/subconsultant affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the subcontractor/subconsultant or its agents, employees, and servants, or by and through the subcontractor/subconsultant by various sub-subcontractors/subconsultants or materialmen or their agents, employees and servants, and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or against the CONTRACTOR or its officers, agents, employees or assigns arising out of the project. 4. The subcontractor/subconsultant agrees to defend and hold harmless the CONTRACTOR, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the subcontractor/subconsultant's sub-subcontractors/subconsultants, materialmen, employees, servants, agents or assigns against the project or against the CONTRACTOR or OWNER, lender or Surety or their officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorney’s fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes an adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the CONTRACTOR, OWNER, the lender, if any, and Surety on any RFP #9793 Utility Infrastructure Construction Page 48 of 129 labor and material bonds for the project. Signed this ______ day of _________, ___. SUBCONTRACTOR/SUBCONSULTANT: By: ___________________________________________ ___________________________________________ Name, Title ATTEST: _____________________________ Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this _________ day of __________, _____, by __________________________________________________________________. Witness my hand and official seal. My Commission Expires: ___________________________. __________________________________ Notary Public RFP #9793 Utility Infrastructure Construction Page 49 of 129 SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: Company Name TITLE: WORK ORDER NUMBER: WORK ORDER DATE: In accordance with the provisions of the Work Order and Master Agreement between the OWNER and the CONTRACTOR as indicated above, for the Work Order titled Work Order Project Title on bond of , (Surety) _______________________________________ hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this _________ day of , _____. ____________________________________________ (Surety Company) By: ________________________________________ (Name) Attorney-in-Fact ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact. RFP #9793 Utility Infrastructure Construction Page 50 of 129 SECTION 00670 APPLICATION FOR EXEMPTION CERTIFICATE RFP #9793 Utility Infrastructure Construction Page 51 of 129 RFP #9793 Utility Infrastructure Construction Page 52 of 129 RFP #9793 Utility Infrastructure Construction Page 53 of 129 SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins modifications) and other provisions of the Contract Documents as indicated below. SC-1.38 Definitions A. Add the following language to the conclusion of paragraph 1.38 of the General Conditions: Substantial Completion. .... Substantial Completion is further defined as that degree of completion of the operating facilities or systems of the Project defined in the Work Order sufficient to provide the OWNER the full time, uninterrupted, continuous, beneficial operation of the modifications, and all inspections required have been completed and identified conditions corrected. SC-1.43 Work Order A. Add the following new paragraph immediately after paragraph 1.43 of the General Conditions: 1.43 Work Order--A written document executed by OWNER and CONTRACTOR that provides for the construction of a portion of the Work, pursuant to the Agreement and all as required by the Contract Documents, and that becomes a Contract Document when executed. SC-2.8 Preliminary Matters A. Delete paragraph 2.8 of the General Conditions entirely and replace it with the following paragraph: Preconstruction Conference. Within ten days after the Contract Times for a Work Order start to run, but before any Work at the site is started, a conference attended by CONTRACTOR, ENGINEER and others as appropriate will be held to establish a working relationship among the parties as to the Work and to discuss the schedules referred to in paragraph 2.6, procedures for handling Shop Drawings and other submittals, processing Applications for Payment, and maintaining required records. SC-2.10 Work Order A. Add the following new paragraph immediately after paragraph 2.9 of the General Conditions: 2.10 Work Order Required for All Work. References to the Agreement in this Article 2 and in the General and Supplementary Conditions and Contract Documents notwithstanding, no Work shall be initiated or performed until CONTRACTOR has received a signed and executed Work Order, RFP #9793 Utility Infrastructure Construction Page 54 of 129 incorporating the Notice to Proceed, from OWNER; and no provision of this Article 2 or of the General and Supplementary Conditions and Contract Documents shall permit or require any action of CONTRACTOR in the absence of a signed and executed Work Order. All provisions of this Article 2 and of the General and Supplementary Conditions and Contract Documents referencing the Agreement or other parts of the Contract Documents, or permitting or requiring any action of CONTRACTOR, shall be read as referencing and, as appropriate, requiring a signed and executed Work Order. SC-4.2 Subsurface and Physical Conditions: A. Add the following language to paragraph 4.2.1 of the General Conditions. 4.2.1.1.1 The following report(s) of exploration and tests of subsurface conditions at the site of the Work: [Report Title, Report #, Author, Date] Contractor may rely upon the accuracy of the technical data contained in the geotechnical documents, but not upon nontechnical data, interpretations or opinions contained therein or upon the completeness of any information in the report. B. 4.2.1.2.1 No drawing of physical conditions in or relating to existing surface or subsurface structures (except Underground Facilities referred to in Paragraph 4.3) which are at or contiguous to the site have been utilized by the Engineer in preparation of the Contract Documents, except the following: [Report Title, Report #, Author, Date] SC-5.4.7 Additional Insureds. Include the following parties or entities as additional insureds, as provided in paragraph 5.4.7 of the General Conditions: 5.4.7.1 City of Fort Collins, PO Box 580, Fort Collins, Colorado 80522 5.4.7.2 [Other Party Name, Address, City, State, Zip] SC-5.4.8 Limits of Liability A. Add the following language at the end of paragraph 5.4.8. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed below are as follows: 5.4.1 and 5.4.2 Coverage A - Statutory Limits Coverage B - $100,000/$100,000/$500,000 5.4.3 and 5.4.5 Commercial General Liability policy will have limits of $1,000,000 combined single limits (CSL). This policy will include coverage for RFP #9793 Utility Infrastructure Construction Page 55 of 129 Explosion, Collapse, and Underground coverage unless waived by the Owner. 5.4.6 The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000 combined single limits (CSL). 5.4.9 This policy will include completed operations coverage/product liability coverage with limits of $1,000,000 combined single limits (CSL). SC-6.14.3 Contractors Responsibilities A. Add the following new paragraph immediately after paragraph 6.14.2 of the General Conditions: 6.14.3. The following Laws or Regulations are included in the Contract Documents as mandated by statute or for the convenience of the CONTRACTOR. Other Laws and Regulations apply which are not included herein, and are within the CONTRACTOR's duty and responsibility for compliance thereto: 6.14.3.1 Notice to owners of Underground Facilities is required prior to excavations in the vicinity of such facilities. 6.14.3.2 Unless otherwise decided by reason of the amount of the Contract Price involved, or other good reason, before or at the time that the contract is awarded to a corporation outside the State of Colorado, such corporation must carry out the proper procedure to become authorized to do business in the State of Colorado, designate a place of business therein, and appoint an agent for service of process. Such corporation must furnish the OWNER with a certificate from the Secretary of State of Colorado has been issued by its office and there shall also be procured from the Colorado Secretary of State of photostatic or certified copy of the designated of place of business and appointment of agent for service of process, or a letter from the Colorado Secretary of State that such designation of place of business and agent for service of process have been made. 6.14.3.3 The CONTRACTOR must conform to the rules and regulations of the Industrial Commission of Colorado. Particular reference is made to rules and regulations governing excavation Work adopted by the Industrial Commission of Colorado. SC-8.10 OWNER’s Project Manager A. Add the following language to ARTICLE 8: RFP #9793 Utility Infrastructure Construction Page 56 of 129 8.10. The OWNER will provide a Project Manager. The CONTRACTOR shall direct all questions concerning Contract interpretation, Change Orders, and other requests for clarification or instruction to the Project Manager. 8.10.1 Authority: The Project Manager will be the OWNER's representative during the construction of the project. The Project Manager shall have the authority set forth in the OWNER's Capital Project Procedures Manual. The Project Manager shall have the authority to reject work and materials whenever such rejection may be necessary to ensure the proper performance of the Work in accordance with the Contract Documents. 8.10.2 Duties and Responsibilities: The Project Manager will make periodic visits to the project site to observe the progress and quality of the Work and to determine, in general, if the Work is proceeding in accordance with the Contract Documents. The Project Manager shall not be required to make comprehensive or continuous inspections to check the progress or quality of the Work. The Project Manager shall not be responsible for construction means, methods, techniques, sequences, or procedures, or for safety precautions or programs in connection with the Work, or for any failure of the Contractor to comply with laws and regulation applicable to the performance or furnishing of the Work. Visits and observations made by the Project Manager shall not relieve the CONTRACTOR of his obligation to conduct comprehensive inspections of the Work, to furnish materials and perform acceptable Work, and to provide adequate safety precautions in conformance with the Contract Documents. The Project Manager shall at all times have access to the Work. The CONTRACTOR shall provide facilities for such access so the Project Manager may perform his or her functions under the Contract Documents. 8.10.3 One or more Resident Construction Inspector(s) (RCI) may be assigned to assist the Project Manager in providing observation of the Work, to determine whether or not the Work is proceeding according to the construction documents. CONTRACTOR will receive written notification from the OWNER of any RCI assignments. The RCI shall not supervise, direct or have control or authority over, nor be responsible for, CONTRACTOR's means, methods, techniques, sequences or procedures of construction or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the furnishing or performance of the Work. The RCI will not be responsible for CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. The RCI's dealings in matters pertaining to the on-site work will be to keep the Project Manager properly apprised about such matters. 8.10.4 Communications: All instructions, approvals, and decisions of the Project Manager shall be in writing. The CONTRACTOR may not RFP #9793 Utility Infrastructure Construction Page 57 of 129 rely on instructions, approvals, or decisions of the Project Manager until the same are reduced to writing. SC-11.6.2 Change of Contract Price A. Add the following new paragraph to paragraph 11.6.2 of the General Conditions: 11.6.2.7. Cost of the Work. Allowances for profit, overhead and mark-up prescribed by Article 4 of the Agreement shall be used in lieu of any CONTRACTOR'S fee, overhead, profit or mark-up allowances as prescribed in paragraphs 11.6.2.1, 11.6.2.2, and 11.6.2.3. SC-12.3 Add the following language to the end of paragraph 12.3. Contractor will include in the project schedule ( ) days lost due to abnormal weather conditions. SC-13.12 Correction Period: 13.12.1 If within one year after the date of Substantial Completion or such longer period of time as may be prescribed by Laws or Regulations or by the terms of any applicable special guarantee required by the Contract Documents or by any specific provision of the Contract Documents, and Work is found to be defective, CONTRACTOR shall promptly, without cost to OWNER and in accordance with OWNER’s written instructions . . . RFP #9793 Utility Infrastructure Construction Page 58 of 129 SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Change Order 00955 Work Change Directive 00960 Application for Payment RFP #9793 Utility Infrastructure Construction Page 59 of 129 SECTION 00950 CHANGE ORDER NO. PROJECT TITLE: CONTRACTOR: [Contractor] WORK ORDER NUMBER: PO NUMBER: DESCRIPTION: 1. Reason for Change: Why is the change required? 2. Description of Change: Provide description of the changes to the Work 3. Change in Work Order Price: 4. Change in Work Order Time: ORIGINAL WORK ORDER PRICE $ .00 TOTAL APPROVED CHANGE ORDER .00 TOTAL PENDING CHANGE ORDER .00 TOTAL THIS CHANGE ORDER .00 TOTAL % OF THIS CHANGE ORDER % TOTAL C.O.% OF ORIGINAL WORK ORDER % ADJUSTED WORK ORDER COST $ .00 CONTRACTOR: Company Name By: Date: Name: Title: ACCEPTED: Date: City PM Name, Title REVIEWED: Date: Name, Buyer or Senior Buyer ACCEPTED: Date: Name, Title ACCEPTED: Date: Gerry Paul, Purchasing Director (if greater than $60,000) RFP #9793 Utility Infrastructure Construction Page 60 of 129 SECTION 00955 WORK CHANGE DIRECTIVE A. GENERAL INFORMATION This document was developed for use in situations involving changes in the Work which, if not processed expeditiously, might delay the Project. These changes are often initiated in the field and may affect the Contract Price or the Contract Times. This is not a Change Order, but only a directive to proceed with the Work that may be included in a subsequent Change Order. For supplemental instructions and minor changes not involving a change in the Contract Price or the Contract Times a Field Order should be used. B. COMPLETING THE WORK CHANGE DIRECTIVE FORM Engineer initiates the form, including a description of the items involved and attachments. Based on conversations between the Engineer/Owner and Contractor, Engineer completes the following: METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT PRICE: Mark the method to be used in determining the final cost of Work involved and the estimated net effect on the Contract Price. If the change involves an increase in the Contract Price and the estimated amount is approached before the additional or changed Work is completed, another Work Change Directive must be issued to change the estimated price or Contractor may stop the changed Work when the estimated time is reached. If the Work Change Directive is not likely to change the Contract Price, the space for estimated increase (decrease) should be marked “Not Applicable”. Once Engineer has completed and signed the form, all copies should be sent to Owner for authorization because Engineer alone does not have authority to authorize changes in Price or Times. Once authorized by Owner, a copy should be sent by Engineer to Contractor. Price and Times may only be changed by Change Order signed by Owner and Contractor with Engineer’s recommendation. Article 10 of the General Conditions requires that a Change Order be initiated and processed to cover any undisputed sum or amount of time for Work actually performed pursuant to this Work Change Directive. Once the Work covered by this directive is completed or final cost and times are determined, Contractor should submit documentation for inclusion in a Change Order. IF THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT PRICE OR CONTRACT TIMES. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED PROMPTLY. RFP #9793 Utility Infrastructure Construction Page 61 of 129 WORK CHANGE DIRECTIVE NO. PROJECT TITLE: Name CONTRACTOR: Name ENGINEER: Name PO NUMBER: You are directed to proceed promptly with the following change(s): Description: Purpose of Work Change Directive: Attachments: (List documents supporting change) If OWNER OR CONTRACTOR believe that the above change has affected Contract Price, any Claim for a Change Order based thereon will involve one or more of the following methods as defined in the Contract Documents. Method of determining change in Contract Price: Unit Prices Lump Sum Cost of the Work Estimated increase (decrease) in Contract Price: $ If the change involves an increase, the estimated amount is not to be exceeded without further authorization. Estimated increase (decrease) in Contract Times: Substantial Completion: days; Ready for Final Acceptance: days REQUESTED: Name CONTRACTOR AUTHORIZED REPRESENTATIVE DATE RECOMMENDED: ENGINEER AUTHORIZED REPRESENTATIVE DATE AUTHORIZED: OWNER AUTHORIZED REPRESENTATIVE DATE Services Agreement – Work Order Type - Utilities RFP/BID [# and Title] Page 62 of 129 SECTION 00960 APPLICATION FOR PAYMENT PROJECT Page 1 of 1 OWNER: ENGINEERS: ADDRESS: NUMBER DATE AMOUNT -$ -$ -$ NUMBER DATE AMOUNT FUND OBJECT Amount Due this Pay Application (before retainage): -$ -$ 0.00% Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager BY:DATE:DATE: NAME & TITLE: BY:DATE: NAME & TITLE:Official Purchasing Form Last updated 10/2017 Net Change by Change Order: Change order %: Original Contract Amount Net Change by Change Order Revised Current Contract Amount Total Work Completed to Date: Total Stored to Date: CHANGE ORDERS PAY APPLICATION Application is made for Payment as shown below in connection with the Contract. The present status of the account for this Contract is as follows: CONTRACTOR: -$ -$ RETAINAGE Charge Numbers-$ -$ -$ Less Previous Payments: Total Completed and Stored Materials to Date: Less Retainage -$ -$ -$ AMOUNT DUE THIS APPLICATION:-$ The above Amount Due this Application is requested by the CONTRACTOR's Project Manager. BY: PO NUMBER ADDRESS: ADDRESS: APPLICATION NUMBER APPLICATION DATE PERIOD BEGINNING PERIOD ENDING PROJECT NUMBER Retainage to Date: NAME & TITLE: Total (after retainage): Payment of the above Amount Due This Application is approved by the OWNER. The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with the WORK have been satisfied as required in paragraph 14.3 of the General Conditions of the Contract. CERTIFICATION BU SCOPE OF WORK CHANGE ORDERS RECONCILIATION CHANGE ORDERS INVOICE NUMBER Total Change Order Work to Date: -$ -$ Retainage Previous: Change in Retainage: Services Agreement – Work Order Type - Utilities RFP/BID [# and Title] Page 63 of 129 Unit Price Total Quanitity Total Quantity Total Quantity Total 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 -$ -$ -$ -$ -$ 0.00% -$ -$ -$ -$ -$ 0.00% Official Purchasing Form Last Updated 10/2017 Total to Date Less Retention Change Orders to Date (see attached) -$ -$ CONTRACT SUMMARY Total Due Adjusted Contract Amount -$ Total Change Order Work to Date (see attached) Value of Work in Place Percent Complete Including Stored Materials Less Retention @ 10% up to 50% complete, 5% beyond 50% of Adjusted Contract Crosscheck Total Completed to Date Total Materials Remaining @ Site -$ -$ -$ Original Contract Amount Less Previous Billings -$ -$ -$ -$ -$ -$ Combined Total Completed to Date Total Contract Amount Total This Period Previous Billings Balance Remaining Percent Complete PAY REQUEST Item #Description Quantity Cost Remaining Percent CompleteUOMContract Summary This Period Previous Total to Date Period Ending: RFP #9793 Utility Infrastructure Construction Page 64 of 129 ATTACHMENT A DRAWING INDEX WORK ORDER # WORK ORDER TITLE BY: Company Name who last revised the drawings Sheet Title Drawing Revision Date RFP #9793 Utility Infrastructure Construction Page 65 of 129 EXHIBIT CHANGE ORDER NO. PROJECT TITLE: CONTRACTOR: Company Name WORK ORDER NUMBER: PO NUMBER: DESCRIPTION: 1. Reason for Change: Why is the change required? 2. Description of Change: Provide details of the changes to the Work 3. Change in Work Order Price: 4. Change in Work Order Time: ORIGINAL WORK ORDER PRICE $ .00 TOTAL APPROVED CHANGE ORDER .00 TOTAL PENDING CHANGE ORDER .00 TOTAL THIS CHANGE ORDER .00 TOTAL % OF THIS CHANGE ORDER % TOTAL C.O.% OF ORIGINAL WORK ORDER % ADJUSTED WORK ORDER COST $ .00 CONTRACTOR: Company Name By: Date: Name: Title: ACCEPTANCE: Date: Name, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer ACCEPTANCE: Date: Name, Title ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) RFP #9793 Utility Infrastructure Construction Page 66 of 129 EXHIBIT GENERAL SCOPE OF SERVICES RFP #9793 Utility Infrastructure Construction Page 67 of 129 EXHIBIT (BID SCHEDULE/COMPENSATION) The following pricing shall remain fixed for the initial term of this Agreement. Any applicable price adjustments may only be negotiated and agreed to in writing at the time of renewal. RFP #9793 Utility Infrastructure Construction Page 68 of 129 EXHIBIT INSURANCE REQUIREMENTS The Contractor will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Contractor shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies. In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Contractor, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Contractor under this Agreement. Insurance certificates should show the certificate holder as follows: City of Fort Collins Purchasing Division PO Box 580 Fort Collins, CO 80522 The City, its officers, agents and employees shall be named as additional insureds on the Contractor 's general liability and automobile liability insurance policies by marking the appropriate box or adding a statement to this effect on the certificate, for any claims arising out of work performed under this Agreement. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Contractor shall maintain during the life of this Agreement for all of the Contractor's employees engaged in work performed under this agreement. Workers' Compensation & Employer’s Liability insurance shall conform with statutory limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee, or as required by Colorado law. B. General Liability. The Contractor shall maintain during the life of this Agreement such General Liability as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for General Liability, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. C. Automobile Liability. The Contractor shall maintain during the life of this Agreement such Automobile Liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for Automobile Liability, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. D. Builder’s Risk. The CONTRACTOR shall maintain during the term of this Agreement builder’s risk insurance in the amount of full insurable replacement cost. The insurance shall: RFP #9793 Utility Infrastructure Construction Page 69 of 129 Be written on a builder’s risk “all risk” policy form that shall at least include insurance for physical loss or damage to the Work, temporary buildings, falsework, and materials and equipment in transit, and shall insure against at least the following perils or causes of loss: fire; lightning; windstorm; riot; civil commotion; terrorism; vehicle impact; aircraft; smoke; theft; vandalism and malicious mischief; earthquake and other earth movement; flood; collapse; explosion; debris removal; demolition; and water damage (other than that caused by flood). Cover, as insured property, at least the following: (a) the Work and all materials, supplies, machinery, apparatus, equipment, fixtures, and other property of a similar nature that are to be incorporated into or used in the preparation, fabrication, construction, erection, or completion of the Work, including OWNER-furnished or assigned property; (b) spare parts inventory required within the scope of the Contract; and (c) temporary works which are not intended to form part of the permanent constructed Work but which are intended to provide working access to the Site, or to the Work under construction, or which are intended to provide temporary support for the Work under construction, including scaffolding, form work, fences, shoring, falsework, and temporary structures E. Subcontractors. In the event any work is performed by a subcontractor, the CONTRACTOR shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. F. Primary Coverage. For any claims related to the Agreement, CONTRACTOR’s insurance shall be primary coverage, and any insurance or self-insurance maintained by the OWNER, its officers, agents and employees shall be in excess of the CONTRACTOR’s insurance and shall not contribute with it. G. Waiver of Subrogation. CONTRACTOR will grant to the OWNER a waiver of any right of subrogation which any insurer of CONTRACTOR may acquire against the OWNER by virtue of any payment of any loss. CONTRACTOR agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the OWNER has received a waiver of subrogation endorsement from the insurer. In the event any work is performed by a subcontractor/subconsultant, the Contractor shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor/subconsultant, which liability is not covered by the subcontractor/subconsultant's insurance. RFP #9793 Utility Infrastructure Construction Page 70 of 129 EXHIBIT CONFIDENTIALITY IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the “City”) pursuant to this Agreement (the “Agreement”), the Contractor hereby acknowledges that it has been informed that the City has established policies and procedures with regard to the handling of confidential information and other sensitive materials. In consideration of access to certain information, data and material (hereinafter individually and collectively, regardless of nature, referred to as “information”) that are the property of and/or relate to the City or its employees, customers or suppliers, which access is related to the performance of services that the Contractor has agreed to perform, the Contractor hereby acknowledges and agrees as follows: That information that has or will come into its possession or knowledge in connection with the performance of services for the City may be confidential and/or proprietary. The Contractor agrees to treat as confidential (a) all information that is owned by the City, or that relates to the business of the City, or that is used by the City in carrying on business, and (b) all information that is proprietary to a third party (including but not limited to customers and suppliers of the City). The Contractor shall not disclose any such information to any person not having a legitimate need- to-know for purposes authorized by the City. Further, the Contractor shall not use such information to obtain any economic or other benefit for itself, or any third party, except as specifically authorized by the City. The foregoing to the contrary notwithstanding, the Contractor understands that it shall have no obligation under this Agreement with respect to information and material that (a) becomes generally known to the public by publication or some means other than a breach of duty of this Agreement, or (b) is required by law, regulation or court order to be disclosed, provided that the request for such disclosure is proper and the disclosure does not exceed that which is required. In the event of any disclosure under (b) above, the Contractor shall furnish a copy of this Agreement to anyone to whom it is required to make such disclosure and shall promptly advise the City in writing of each such disclosure. In the event that the Contractor ceases to perform services for the City, or the City so requests for any reason, the Contractor shall promptly return to the City any and all information described hereinabove, including all copies, notes and/or summaries (handwritten or mechanically produced) thereof, in its possession or control or as to which it otherwise has access. The Contractor understands and agrees that the City’s remedies at law for a breach of the Contractor’s obligations under this Confidentiality Agreement may be inadequate and that the City shall, in the event of any such breach, be entitled to seek equitable relief (including without limitation preliminary and permanent injunctive relief and specific performance) in addition to all other remedies provided hereunder or available at law. RFP #9793 Utility Infrastructure Construction Page 71 of 129 RFP #9793 Utility Infrastructure Construction Page 72 of 129 EXHIBIT SECTION 00700 GENERAL CONDITIONS RFP #9793 Utility Infrastructure Construction Page 73 of 129 RFP #9793 Utility Infrastructure Construction Page 74 of 129 RFP #9793 Utility Infrastructure Construction Page 75 of 129 RFP #9793 Utility Infrastructure Construction Page 76 of 129 RFP #9793 Utility Infrastructure Construction Page 77 of 129 RFP #9793 Utility Infrastructure Construction Page 78 of 129 RFP #9793 Utility Infrastructure Construction Page 79 of 129 RFP #9793 Utility Infrastructure Construction Page 80 of 129 RFP #9793 Utility Infrastructure Construction Page 81 of 129 RFP #9793 Utility Infrastructure Construction Page 82 of 129 RFP #9793 Utility Infrastructure Construction Page 83 of 129 RFP #9793 Utility Infrastructure Construction Page 84 of 129 RFP #9793 Utility Infrastructure Construction Page 85 of 129 RFP #9793 Utility Infrastructure Construction Page 86 of 129 RFP #9793 Utility Infrastructure Construction Page 87 of 129 RFP #9793 Utility Infrastructure Construction Page 88 of 129 RFP #9793 Utility Infrastructure Construction Page 89 of 129 RFP #9793 Utility Infrastructure Construction Page 90 of 129 RFP #9793 Utility Infrastructure Construction Page 91 of 129 RFP #9793 Utility Infrastructure Construction Page 92 of 129 RFP #9793 Utility Infrastructure Construction Page 93 of 129 RFP #9793 Utility Infrastructure Construction Page 94 of 129 RFP #9793 Utility Infrastructure Construction Page 95 of 129 RFP #9793 Utility Infrastructure Construction Page 96 of 129 RFP #9793 Utility Infrastructure Construction Page 97 of 129 RFP #9793 Utility Infrastructure Construction Page 98 of 129 RFP #9793 Utility Infrastructure Construction Page 99 of 129 RFP #9793 Utility Infrastructure Construction Page 100 of 129 RFP #9793 Utility Infrastructure Construction Page 101 of 129 RFP #9793 Utility Infrastructure Construction Page 102 of 129 RFP #9793 Utility Infrastructure Construction Page 103 of 129 RFP #9793 Utility Infrastructure Construction Page 104 of 129 RFP #9793 Utility Infrastructure Construction Page 105 of 129 RFP #9793 Utility Infrastructure Construction Page 106 of 129 RFP #9793 Utility Infrastructure Construction Page 107 of 129 RFP #9793 Utility Infrastructure Construction Page 108 of 129 RFP #9793 Utility Infrastructure Construction Page 109 of 129 RFP #9793 Utility Infrastructure Construction Page 110 of 129 RFP #9793 Utility Infrastructure Construction Page 111 of 129 RFP #9793 Utility Infrastructure Construction Page 112 of 129 RFP #9793 Utility Infrastructure Construction Page 113 of 129 RFP #9793 Utility Infrastructure Construction Page 114 of 129 RFP #9793 Utility Infrastructure Construction Page 115 of 129 RFP #9793 Utility Infrastructure Construction Page 116 of 129 RFP #9793 Utility Infrastructure Construction Page 117 of 129 RFP #9793 Utility Infrastructure Construction Page 118 of 129 RFP #9793 Utility Infrastructure Construction Page 119 of 129 RFP #9793 Utility Infrastructure Construction Page 120 of 129 RFP #9793 Utility Infrastructure Construction Page 121 of 129 RFP #9793 Utility Infrastructure Construction Page 122 of 129 RFP #9793 Utility Infrastructure Construction Page 123 of 129 RFP #9793 Utility Infrastructure Construction Page 124 of 129 RFP #9793 Utility Infrastructure Construction Page 125 of 129 RFP #9793 Utility Infrastructure Construction Page 126 of 129 EXHIBIT A CONTRACTOR SAFETY FORM Please complete the following form to provide information about your Company’s safety records and procedures. This information will be included in the evaluation of the submitted proposal. We reserve the right to request additional documentation, at any point, that supports the accuracy of this form. Contractor(s) safety record will be evaluated by the evaluation team as an element of determining whether the Contractor(s) is responsible. Contractor(s) whose safety record is above 1.0 for Experience Modification Rating (EMR) and 5.0 for Total Recordable Incident Rate (TRIR) will be reviewed in depth and may be deemed ineligible to be considered for award at the City’s sole discretion. Section 1. General Information Company Name Number of Employees Full Time: Part Time: Seasonal: Insurance Carrier Self-insured for Workers Compensation? Y ☐ N ☐ Section 2. Health and Safety Professional Information Does your company have a full-time dedicated Safety Officer? Y ☐ N ☐ If yes, provide the following information for the dedicated Safety Officer: Name: Title: Phone Number: Email: If no, provide the following information of the person responsible for safety in your company: Name: Title: Phone Number: Email: Provide the following information for the site safety Point of Contact: Name: Title: Phone Number: Email: Section 3. Health and Safety Program Does your company have a written Company Safety Program? Y ☐ N ☐ Does the written Company Safety Program cover the work activities proposed by your company for this project? Y ☐ N ☐ RFP #9793 Utility Infrastructure Construction Page 127 of 129 Does the written Company Safety Program include the following: Health and Safety Training Y ☐ N ☐ Employee/Management Responsibility Y ☐ N ☐ Hazard Recognition and Control Y ☐ N ☐ Incident Reporting and Investigation Y ☐ N ☐ Describe a typical job site safety briefing (time, location, frequency, topics, documentation). How does your company ensure health and safety program compliance throughout the project? Does your company perform written Job Hazard Analysis’s (JHA’s) regularly and document them? Y ☐ N ☐ How often does your company conduct Health and Safety audits or inspections? Does your company have a written corrective action plan for any findings? Y ☐ N ☐ Section 4. Training and Certifications List required safety training ALL employees receive: List specialized safety training employees receive as needed: RFP #9793 Utility Infrastructure Construction Page 128 of 129 Does your company maintain records of all safety training and certifications? Y ☐ N ☐ Section 5. Safety Equipment (Engineered Controls) Will your company be performing any Trenching/Excavation and Confined Space Activities? Y ☐ N ☐ If yes, list what protective shoring equipment you will have available for the job site? If entering Permit Required Confined Spaces (PRCS), such as vaults or sewers, what is your procedure for these activities? Section 6. Health and Safety Records List the Company’s Experience Modification Rate (EMR) for the previous 3 years Year: EMR: Year: EMR: Year: EMR: For any EMR greater than 1, provide an explanation for the rating and describe the corrective action taken by the Company. Use additional pages if needed. RFP #9793 Utility Infrastructure Construction Page 129 of 129 Provide the number of injuries and illnesses recorded (OSHA 300 log or equivalent) in the previous 3 years: Calendar Year Year: Year: Year: Number of Fatalities Number of OSHA recordable cases Number of OSHA modified duty cases Number of OSHA lost time cases OSHA Total Recordable Incident Rate (TRIR) Number of recordable cases x 200,000 Number of hours worked OSHA DART Rate (Days Away Restricted or Transferred) Number of DART cases x 200,000 Number of hours worked Average number of employees on payroll Have any OSHA citations been issued to your company in the past 3 years? Y ☐ N ☐ If yes, list the citations and for each, provide the type of violation, an explanation for the citation, the penalty issued, and describe the corrective action taken by the Company. Limit your response to projects that have occurred in the Rocky Mountain region. Use additional pages if needed.