Loading...
HomeMy WebLinkAbout4700 LADY MOON DR - DISCLOSURES - 2/18/2021Planning, Development & Transportation Services Community Development & Neighborhood Services 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 970.416.274 970.224.6134- fax fcgov.com Commercial Air Barrier Checklist - Non-Isolation.docx 12/5/2016 Project Address_______________________________________ Permit # ________________ Builder representative _________________________________ Inspection date___________ Per City of Fort Collins Building Air Leakage Test Protocol: Where it is impractical to isolate the renovation or addition and perform a blower door test, the building air barrier shall be inspected for continuity and integrity by an approved inspector. It will be necessary to define wall and roof assembly materials serving as the air barrier in the existing building and ensure that there is a continuous plane of air tightness between them and the addition air barrier. The inspection should be performed during a time when items in the checklist below are visible and can be inspected. Detail **Initial pertinent columnN/A Approved Inspector Verified (site visit) Builder verified (not visible during inspection) Air barrier identified on construction documents by DOR* Roof-wall intersections Fenestration flashing Fenestration installation Bottom of wall (wall to foundation connection) Connection of dissimilar wall and roof assemblies Isolation of interior rooms (ie: mechanical room & paint rooms) Wall and roof penetrations *DOR designates Designer of Record Approved Inspector_______________________ Signature___________________________ Builder representative signature___________________________ Commercial Air Barrier Checklist for Non-Isolation of Renovation or Addition BANNER HEALTH CATH LAB 4700 LADY MOON DRIVE • Vestibule is an addition to the hospital structure which connects to a modular building. • Vestibule is Slab On Grade. BANNER HEALTH CATH LAB 4700 LADY MOON DRIVE • Wall system is sealed at Exterior Wall/Slab and built per plan. • TPO Roof is flashed at dissimilar roof/wall junction and penetrations per manufacture specification. • Architect and engineering firms have both certified the construction meets design criteria.