Loading...
HomeMy WebLinkAboutNORTHFIELD COMMONS - Filed E-ELEVATION PLAN -A0.1 6 Gas meters Electric meters Gas meters Electric meters Gas meters Electric meters Gas meters Electric meters Gas meters Electric meters A0.1 6 Sim A0.1 6 Sim Building A Building B Building A Building B Building BBuilding A with Clubhouse Building A 30' - 10" 20' - 1"20' - 4"20' - 0" Site Plan Legend One Bedroom -Type A Adaptable Unit Two Bedroom -Type A Adaptable Unit Three Bedroom -Type A Adaptable Unit All other ground-level units -Type B Adaptable Unit Unit with Accessible Communication Features Gas Meter Location Electric Meter Location 6' - 4"3' - 2"10"6' - 0"Cast stone wall cap 8" CMU wall with manufactured stone veneer applied to outside of trash enclosure 6' - 0"3' - 8"7' - 10"2' - 10" Cast stone wall cap 8" CMU wall with stone veneer applied to entire outside of the trash enclosure Galvanized 3x3 tube steel diagonal braces, paint. Powder coated steel gate Steel cane bolt gate stops at each gate 6' - 0"Cast stone wall cap 8" CMU wall with manufactured stone veneer applied to outside of trash enclosure 14' - 4" 8 A0.1 Cast stone wall cap 8" CMU wall with manufactured stone veneer applied to outside of trash enclosure 10' - 4"6' - 0"2' - 6"8' - 2"3' - 4"8"3' - 4"6' - 0"8"8' - 8"8"8"12' - 8"8" 7' - 0" 8" CMU wall with stone veneer applied to the entire outside of enclosure and return at open ends. Steel angle curb at perimeter of inside walls trash enclosure Trash dumpsters by owner Steel gates 8 A0.1 A0.1 10Typ.6"3' - 0"3' - 0"1' - 0" 1 1/2" diameter steel handrail, paint. Core drill, embed in concrete, fill with non- shrink grout One tread length 4" dowel into concrete walk Reference structure for reinforcement requirements, depth and thickness of slab and footers for stair Compacted subgrade per geotech report Extend handrail 12" past the top riser. Return handrail down to the ground. Typical detail: reference site plan for individual stair lengths Cast stone wall cap Manufactured stone veneer Polymer modified mortar 8" CMU wall system Grout all CMU cores solid. Rebar per structural 6" concrete slab inside of trash enclosure Steel angle at perimeter of trash enclosure Inside face of CMU masonry filler/primer and painted per specifications. CONC. FOUND. REF. STRUC. A0.1 9 Cast stone wall cap, reference elevations Between cast stone cap pieces rake back joints to accommodate sealant and backer rod the entire joint Stainless steel through wall flashing with hemmed drip, at both sides of cap. Extend beyond face of masonry as shown. Stainless steel dowel with sealant at penetrations through flashing. Sealant below drip 1/8" sawcut drip, both sides of wall cap. Manufactured stone veneer Polymer modified mortar. 8" CMU wall system Grout all cores solid Self-adhering modified bitumen flashing 8x8x16 CMU wall with manufactured stone veneer applied to entire outside of the trash enclosure 6x6x1/4 galvanized HSS column. Seal weld cap, paint. C 3x5 galvanized channel frame with mitered corners, paint. Round galvanized steel, G90, 18 gauge perforated with 1/2" round holes on 11/16" staggered centers at front and back face of gates, paint. (McNichols #14126118 as basis of design) Extend footing below and anchor (3) Guardian Series 2000 heavy duty hinge, paint. Grout all CMU core solid Weld angled galvanized HSS 3x3 cross diagonal bracing, paint.01/2"1"2"PROJECT DATE DRAWN 712 WHALERS WAY SUITE, B-100 FORT COLLINS, CO 80525 (970) 223-1820 www.alm2s.com PRINTED FILE NAME: © alm2s 2017NOT FOR CONSTRUCTION10/1/2021 11:51:37 AM0000-Project-SD.rvtArchitectural Site Plan and Details 1942 CAK 10.01.2021 A0.1Mercy HousingFort Collins, ColoradoNorthfield CommonsSCALE: N 1" = 40'-0" Site Plan Visitable Units For new construction of buildings containing four (4) or more units of housing, the Fair Housing Act requires that all units and common areas in elevator buildings, and all ground floor units and common areas in non- elevator buildings, are visitable by persons with physical disabilities (“visitable”). To meet the requirements of the Fair Housing Act, all covered multifamily dwelling units shall be designed and constructed in a manner such that: • The public and common-use areas are readily accessible to and usable by persons with disabilities; • All doors designed to allow passage into and within all premises are sufficiently wide to allow passage by persons in wheelchairs; and • All premises within covered multifamily dwelling units comply with the appropriate requirements of ICC/ANSI A117.1-2003, or another HUD-recognized safe harbor listed at 24 CFR 100.205(e). Number of Visitable Units: 22 Accessible Units In addition, all Federally Assisted new construction housing developments with five (5) or more units must design and construct five percent (5%) of the dwelling units, or at least one unit, whichever is greater, to be accessible for persons with mobility disabilities (“accessible units”) Accessible units must be located on an accessible route where they can be approached, entered, and used by individuals with physical disabilities, and constructed in accordance with the Uniform Federal Accessibility Standards (UFAS) or a standard that is equivalent or stricter. An additional two percent (2%) of the dwelling units, or at least one unit, whichever is greater, must be accessible for persons with hearing or visual disabilities. For more information on the accessibility requirements for Federally Assisted new construction and substantial alterations of existing Federally assisted housing, see Section 504: Disability Rights in HUD Programs. Number of accessible units (designed for persons with mobility impairment): 5 Total Type A Units per ANSI A117.1 which equates to 6% of the total unit count in the project. Number of accessible units (designed for persons with sensory impairment): 2 Total Audio/Visual Sensory Impaired Units which equates to 2.4% of the total unit count in the SCALE:3/8" = 1'-0"A0.1 2 Trash Enclosure - East SCALE:3/8" = 1'-0"A0.1 3 Trash Enclosure - North Compliance with accessible unit types and quantities: Total Units: 1 bedroom 24 2 bedroom 42 3 bedroom 18 Total 84 Per Federal Housing Standards: -5% of all units to be Type A Adaptable = (4.2 units) 5 total units -2% of all units must have accessible communication features = (1.6 units) 2 total units 5% Type A Adaptable units -5 total units required: 1 bedroom units: (1) One in Building 4 2 bedroom units: (2) One each in Building 1 and Building 6 3 bedroom units: (2) One each in Building 3 and Building 7 Total Type A adaptable units:5 units 2% Units with Accessible Communication Features -2 total units required: 2 bedroom unit: (1) in Building 2 3 bedroom unit: (1) in Building 6 Total:2 units SCALE:3/8" = 1'-0"A0.1 4 Trash Enclosure - South SCALE:3/8" = 1'-0"A0.1 5 Trash Enclosure - West SCALE:3/8" = 1'-0"A0.1 6 Plan - Trash Enclosure SCALE:1/2" = 1'-0"A0.1 7 Detail - Typical Site Stair and Railing SCALE:3/4" = 1'-0"A0.1 8 Section - Trash Enclosure SCALE:3" = 1'-0"A0.1 9 Detail - Cap at Trash Enclosure SCALE:1 1/2" = 1'-0"A0.1 10 Detail - Trash Enclosure Gate Jamb NO ISSUE DATE 1 90% Set 10.01.2021 3 " / 1 2 "3" / 12" 3" / 12" 3 " / 1 2 " 3 " / 1 2 " 3" / 12" 4" / 12" Architecture grade asphalt shingles; dark grey 5" pre-finished metal gutter on built-up 1x8 fascia Manufactured stone veneer Fiber cement lap siding system with 8" exposure Fiber cement lap siding system with 8" exposure, accent color Steel juliett balcony railing with powder coat finish Fiber cement board and batten siding Wood beam and posts; paint finish Vinyl windows and doors Vinyl windows and doors Built-up fiber cement trim 41' - 7"1x8 head trim -paint1x6 vertical trim -paint 1x6 corner trim - paint to match siding 1x3 trim at accent siding -paint 1x8 base trim -paint 1x4 window trim -paint 3 " / 1 2 " 3 " / 1 2 "3 " / 1 2 " 3 " / 1 2 " Architecture grade asphalt shingles; dark grey 5" pre-finished metal gutter on built-up 1x8 fascia Manufactured stone veneer Fiber cement lap siding system with 6" exposure Fiber cement lap siding system with 8" exposure, accent color Fiber cement board and batten siding Vinyl windows and doors Built-up fiber cement trim Wood brackets supporting canopies -paint 1x6 corner trim -paint to match siding 1x3 trim at accent siding -paint 1x6 vertical trim -paint 1x8 head trim -paint 1x4 window trim -paint Condensing unit screen fence Material Legend Lap Siding Fiber Cement Boothbay Blue Lap Siding Fiber Cement Night Gray Stone Veneer Coronado Stone Element Ledgestone -Natural Trim Fiber Cement White Roofing Asphalt Shingle Grey Board and Batten Siding Fiber Cement Evening Blue NOTE: All exposed mechanical, plumbing, and electrical equipment to be screened or painted to match the adjacent exterior finish AC condensing units to be screened with a fence made of 4x4 wood posts, 1x wood rails, and a 2x wood top rail. Fence to be painted same colors as building siding. Alternate Color Scheme Lap Siding Fiber Cement Boothbay Blue Lap Siding Fiber Cement Country Lane Red Board and Batten Siding Fiber Cement Evening Blue 2x6 wood top rail, painted accent color to match building siding 4x4 wood post, painted accent color to match building siding 1x6 wood rails, painted field color to match building siding. Return wood rails at end posts. Section Detail Plan Detail 5 1/2"Top rail positioned so that overhang is equal on all sides 1x6 wood rails 10"6"6"6"6"6"2"3' - 6"01/2"1"2"5 4 3 2 1 A B C D PROJECT DATE DRAWN 712 WHALERS WAY SUITE, B-100 FORT COLLINS, CO 80525 (970) 223-1820 www.alm2s.com PRINTED FILE NAME: © alm2s 2020NOT FOR CONSTRUCTION9/7/2021 1:52:45 PM1942 - Mercy Housing - Building A.rvt Building A Planning Elevations 1942 Author 09.07.2021 PLA-01Mercy HousingFort Collins, ColoradoNorthfield Commons - Building A SCALE:3/16" = 1'-0"PLA-01 1 Front Elevation, Planning SCALE:3/16" = 1'-0"PLA-01 2 Side Elevation A, Planning NO ISSUE DATE SCALE:3/4" = 1'-0"PLA-01 4 Detail - Condenser Screen 3 " / 1 2 "3" / 12" 3" / 12" Architecture grade asphalt shingles; dark grey 5" pre-finished metal gutter on built-up 1x8 fascia Manufactured stone veneer Fiber cement lap siding system with 6" exposure Fiber cement lap siding system with 8" exposure, accent color Steel juliett balcony railing with powder coat finish Fiber cement board and batten siding Vinyl windows and doors Vinyl windows and doors Built-up fiber cement trim 1x6 corner trim -paint to match siding Wood brackets supporting canopies -paint 1x8 base trim -paint 1x8 head trim -paint 1x3 trim accent siding -paint 1x4 window trim -paint 1x6 vertical trim -paint 3" / 12" 3" / 12" 3" / 12" Architecture grade asphalt shingles; dark grey 5" pre-finished metal gutter on built-up 1x8 fascia Manufactured stone veneerFiber cement lap siding system with 6" exposure, accent color Fiber cement board and batten siding Vinyl windows and doors Built-up fiber cement trim Fiber cement lap siding system with 6" exposure, field color 1x8 head trim -paint 1x6 corner trim -paint to match siding Wood brackets supporting canopies -paint 1x8 base trim -paint 1x3 trim accent siding -paint 1x6 vertical trim -paint 1x4 window trim -paint Condensing unit screen fence Material Legend Lap Siding Fiber Cement Boothbay Blue Lap Siding Fiber Cement Night Gray Stone Veneer Coronado Stone Element Ledgestone -Natural Trim Fiber Cement White Roofing Asphalt Shingle Grey Board and Batten Siding Fiber Cement Evening Blue NOTE: All exposed mechanical, plumbing, and electrical equipment to be screened or painted to match the adjacent exterior finish AC condensing units to be screened with a fence made of 4x4 wood posts, 1x wood rails, and a 2x wood top rail. Fence to be painted same colors as building siding. Alternate Color Scheme Lap Siding Fiber Cement Boothbay Blue Lap Siding Fiber Cement Country Lane Red Board and Batten Siding Fiber Cement Evening Blue 01/2"1" 2" 5 4 3 2 1 A B C D PROJECT DATE DRAWN 712 WHALERS WAY SUITE, B-100 FORT COLLINS, CO 80525 (970) 223-1820 www.alm2s.com PRINTED FILE NAME: © alm2s 2020NOT FOR CONSTRUCTION9/7/2021 1:53:18 PM1942 - Mercy Housing - Building A.rvt Building A Planning Elevations 1942 Author 09.07.2021 PLA-02Mercy HousingFort Collins, ColoradoNorthfield Commons - Building A SCALE:3/16" = 1'-0"PLA-02 1 Back Elevation, Planning SCALE:3/16" = 1'-0"PLA-02 2 Side Elevation B, Planning NO ISSUE DATE Unit 102 3 Bedroom Type 4A Unit 101 2 Bedroom Type 3A (Mirrored) Unit 103 2 Bedroom Type 3A Unit 104 1 Bedroom Type 1 5' - 6"1' - 0"1' - 0" 4' - 1 1/2"2' - 5 1/2"6' - 6"Unit 202 3 Bedroom Type 4 Unit 201 2 Bedroom Type 3 (Mirrored) Unit 203 2 Bedroom Type 3 Unit 204 1 Bedroom Type 1 1' - 0"5' - 6"6' - 6"2' - 0"1' - 0"1' - 0"4' - 1 1/2" Unit 302 3 Bedroom Type 4 Unit 301 2 Bedroom Type 3 (Mirrored) Unit 303 2 Bedroom Type 3 Unit 304 1 Bedroom Type 1 5' - 6"1' - 0"1' - 0"1' - 0"1' - 0"4' - 1 1/2"2' - 0"6' - 6"01/2"1" 2" 5 4 3 2 1 A B C D PROJECT DATE DRAWN 712 WHALERS WAY SUITE, B-100 FORT COLLINS, CO 80525 (970) 223-1820 www.alm2s.com PRINTED FILE NAME: © alm2s 2020NOT FOR CONSTRUCTION7/20/2021 4:26:51 PM1942 - Mercy Housing -Building A.rvt Floor Plans 1942 Author 07.21.2021 PLA-03Mercy HousingFort Collins, ColoradoNorthfield Commons - Building A NO ISSUE DATE SCALE: N 1/8" = 1'-0" Building A, First Floor Plan SCALE: N 1/8" = 1'-0" 02 - Second Level Plan, Clean SCALE: N 1/8" = 1'-0" 03 - Third Level Plan, Clean Architecture grade asphalt shingles; dark grey 5" pre-finished metal gutter on built-up 1x8 fascia Manufactured stone veneer Fiber cement lap siding system with 8" exposure Fiber cement lap siding system with 8" exposure, accent color Steel juliett balcony railing with powder coat finish Fiber cement board and batten siding Wood beam and posts; paint finish Wood beam and posts; paint finish 5 " / 1 2 "5" / 12" 5" / 12"5 " / 1 2 " 5 " / 1 2 "5" / 12" Vinyl windows and doors Vinyl windows and doors Built-up fiber cement trim 1x3 accent trim siding -paint 1x6 corner trim -paint to match siding 1x6 corner trim -paint to match siding 1x8 head trim -paint 1x4 window trim -paint 1x8 base trim -paint Condensing unit screen fence 5 " / 1 2 " Architecture grade asphalt shingles; dark grey 5" pre-finished metal gutter on built-up 1x8 fascia Manufactured stone veneer Fiber cement lap siding system with 6" exposure Fiber cement lap siding system with 8" exposure, accent color Steel juliett balcony railing with powder coat finish Fiber cement board and batten siding Vinyl windows and doors Built-up fiber cement trim 5 " / 1 2 "5" / 12" 5" / 12" 5 " / 1 2 " 5" / 12"41' - 3"Wood brackets supporting canopies -paint 1x6 corner trim -paint to match siding 1x3 trim at accent siding -paint Condensing unit screen fence Material Legend Lap Siding Fiber Cement Gray Slate Lap Siding Fiber Cement Monetery Taupe Stone Veneer Coronado Stone Element Ledgestone -Natural Trim Fiber Cement White Roofing Asphalt Shingle Grey Board and Batten Siding Fiber Cement Timber Bark NOTE: All exposed mechanical, plumbing, and electrical equipment to be screened or painted to match the adjacent exterior finish. AC condensing units to be screened with a fence made of 4x4 wood posts, 1x wood rails, and a 2x wood top rail. Fence to be painted same colors as building siding. 2x6 wood top rail, painted accent color to match building siding 4x4 wood post, painted accent color to match building siding 1x6 wood rails, painted field color to match building siding. Return wood rails at end posts. Section Detail Plan Detail 5 1/2"Top rail positioned so that overhang is equal on all sides 1x6 wood rails 10"6"6"6"6"6"2"3' - 6"01/2"1"2"5 4 3 2 1 A B C D PROJECT DATE DRAWN 712 WHALERS WAY SUITE, B-100 FORT COLLINS, CO 80525 (970) 223-1820 www.alm2s.com PRINTED FILE NAME: © alm2s 2020NOT FOR CONSTRUCTION7/20/2021 4:53:15 PM1942 - Mercy Housing - Building B.rvt Building B Planning Elevations 1942 Author 07.21.2021 PLB-01Mercy HousingFort Collins, ColoradoNorthfield Commons - Building B SCALE:3/16" = 1'-0"PLB-01 1 Front Elevation, Planning SCALE:3/16" = 1'-0"PLB-01 2 Side Elevation, Planning NO ISSUE DATE SCALE:3/4" = 1'-0"PLB-01 4 Detail - Condenser Screen Architecture grade asphalt shingles; dark grey 5" pre-finished metal gutter on built-up 1x8 fascia Manufactured stone veneer Fiber cement lap siding system with 6" exposure Fiber cement lap siding system with 8" exposure, accent color Steel juliett balcony railing with powder coat finish Fiber cement board and batten siding Vinyl windows and doors Vinyl windows and doors Built-up fiber cement trim 5 " / 1 2 "5" / 12"41' - 10"1x8 base trim -paint 1x3 trim at accent siding -paint 1x8 head trim -paint1x6 vertical trim -paint 1x6 corner trim -paint to match siding 1x4 window trim -paint Wood brackets supporting canopies -paint Condensing unit screen fence 5 " / 1 2 "5" / 12" 5" / 12"5 " / 1 2 " Architecture grade asphalt shingles; dark grey 5" pre-finished metal gutter on built-up 1x8 fascia Manufactured stone veneer Fiber cement lap siding system with 6" exposure, accent color Steel juliett balcony railing with powder coat finish Fiber cement board and batten sidingVinyl windows and doors Built-up fiber cement trim 1x6 corner trim -paint to match siding Wood brackets supporting canopies -paint 1x4 window trim -paint 1x3 trim accent siding -paint Condensing unit screen fence Material Legend Lap Siding Fiber Cement Gray Slate Lap Siding Fiber Cement Monetery Taupe Stone Veneer Coronado Stone Element Ledgestone -Natural Trim Fiber Cement White Roofing Asphalt Shingle Grey Board and Batten Siding Fiber Cement Timber Bark NOTE: All exposed mechanical, plumbing, and electrical equipment to be screened or painted to match the adjacent exterior finish. AC condensing units to be screened with a fence made of 4x4 wood posts, 1x wood rails, and a 2x wood top rail. Fence to be painted same colors as building siding.01/2"1" 2" 5 4 3 2 1 A B C D PROJECT DATE DRAWN 712 WHALERS WAY SUITE, B-100 FORT COLLINS, CO 80525 (970) 223-1820 www.alm2s.com PRINTED FILE NAME: © alm2s 2020NOT FOR CONSTRUCTION7/20/2021 4:54:05 PM1942 - Mercy Housing - Building B.rvt Building B Planning Elevations 1942 Author 07.21.2021 PLB-02Mercy HousingFort Collins, ColoradoNorthfield Commons - Building B SCALE:3/16" = 1'-0"PLB-02 1 Back Elevation, Planning SCALE:3/16" = 1'-0"PLB-02 2 Side Elevation B, Planning NO ISSUE DATE Unit 101 Three Bedroom -Type 4 Unit 103 Two Bedroom Type 3 Unit 102 Two Bedroom Type 3 (Mirrored) Unit 104 One Bedroom Type 2 Unit 105 One Bedroom Type 12' - 0"1' - 0"5' - 0"2' - 0"2' - 6"1' - 0"8' - 6 1/2"Unit 201 Three Bedroom -Type 4 Unit 203 Two Bedroom Type 3 Unit 202 Two Bedroom Type 3 (Mirrored) Unit 204 One Bedroom Type 2 Unit 205 One Bedroom Type 1 5' - 0"1' - 0"2' - 0"8' - 6 1/2"1' - 0"2' - 6"5' - 6"2' - 0"Unit 303 Two Bedroom Type 3 Unit 302 Two Bedroom Type 3 (Mirrored)1' - 0"2' - 6"1' - 0"01/2"1" 2" 5 4 3 2 1 A B C D PROJECT DATE DRAWN 712 WHALERS WAY SUITE, B-100 FORT COLLINS, CO 80525 (970) 223-1820 www.alm2s.com PRINTED FILE NAME: © alm2s 2020NOT FOR CONSTRUCTION7/20/2021 4:54:09 PM1942 - Mercy Housing - Building B.rvt Floor Plans 1942 Author 07.21.2021 PLB-03Mercy HousingFort Collins, ColoradoNorthfield Commons - Building B NO ISSUE DATE SCALE: N 1/8" = 1'-0" Building B, First Floor Plan SCALE: N 1/8" = 1'-0" Building B, Second Floor Plan SCALE: N 1/8" = 1'-0" Building B, Third Floor Plan Architecture grade asphalt shingles; dark grey 5" pre-finished metal gutter on built-up 1x8 fascia Manufactured stone veneer Fiber cement lap siding system with 8" exposure Fiber cement lap siding system with 8" exposure, accent color Steel juliett balcony railing with powder coat finish Fiber cement board and batten siding Wood beam and posts; paint finish Vinyl windows and doors Vinyl windows and doors Built-up fiber cement trim Aluminum storefront windows and doors, clear anodized 3 " / 1 2 "3" / 12" 3" / 12" 3 " / 1 2 " 3" / 12"3 " / 1 2 " 3" / 12" Fiber cement rainscreen panels (accent color) with aluminum reveals Fiber cement rainscreen panels with aluminum reveals 1x8 base trim -paint 1x8 head trim -paint1x6 vertical trim -paint 1x6 corner trim -paint to match siding 1x3 trim accent siding -paint 1x4 window trim -paint 3 " / 1 2 "3" / 12" 3" / 12"3 " / 1 2 " Architecture grade asphalt shingles; dark grey 5" pre-finished metal gutter on built-up 1x8 fascia Manufactured stone veneer Fiber cement lap siding system with 6" exposure Fiber cement rainscreen panels (accent color) with aluminum reveals Fiber cement rainscreen panels with aluminum reveals Aluminum storefront windows and doors, clear anodized Built-up fiber cement trim Wood trellis and posts; paint finish 3 " / 1 2 " 3 " / 1 2 " 3" / 12" 3" / 12"3 " / 1 2 " 3 " / 1 2 " 3" / 12" 1x8 head trim -paint1x6 vertical trim -paint 1x6 corner trim -paint to match siding 1x3 trim accent siding -paint 1x4 window trim -paint 3" / 12" Material Legend Lap Siding Fiber Cement Boothbay Blue Lap Siding Fiber Cement Night Gray Stone Veneer Coronado Stone Element Ledgestone -Natural Trim Fiber Cement White Roofing Asphalt Shingle Grey Board and Batten Siding Fiber Cement Evening Blue NOTE: All exposed mechanical, plumbing, and electrical equipment to be screened or painted to match the adjacent exterior finish. AC condensing units to be screen with a fence made of 4x4 wood posts, 1x wood rails, and a 2x wood top rail. Fence to be painted same colors as building siding. 2x6 wood top rail, painted accent color to match building siding 4x4 wood post, painted accent color to match building siding 1x6 wood rails, painted field color to match building siding. Return wood rails at end posts. Section Detail Plan Detail 5 1/2"Top rail positioned so that overhang is equal on all sides 1x6 wood rails 10"6"6"6"6"6"2"3' - 6"01/2"1"2"PROJECT DATE DRAWN 712 WHALERS WAY SUITE, B-100 FORT COLLINS, CO 80525 (970) 223-1820 www.alm2s.com PRINTED FILE NAME: © alm2s 2020NOT FOR CONSTRUCTION7/20/2021 4:19:20 PM1942 - Mercy Housing - Building A and CommunityBuilding.rvtBuilding A w Community Building - Planning Elevations 1942 Author 07.21.2021 PLC-01Mercy HousingFort Collins, ColoradoNorthfield Commons - Clubhouse SCALE:3/16" = 1'-0"PLC-01 1 Front Elevation, Planning SCALE:3/16" = 1'-0"PLC-01 2 Side Elevation A, Planning SCALE:3/4" = 1'-0"PLC-01 4 Detail - Condenser Screen NO ISSUE DATE Architecture grade asphalt shingles; dark grey 5" pre-finished metal gutter on built-up 1x8 fascia Manufactured stone veneer Fiber cement lap siding system with 6" exposure Fiber cement lap siding system with 8" exposure, accent color Steel juliett balcony railing with powder coat finish Fiber cement board and batten siding Vinyl windows and doors Vinyl windows and doors Built-up fiber cement trim Aluminum storefront windows and doors, clear anodized Wood trellis and posts; paint finish 3 " / 1 2 "3" / 12" 3" / 12" Wood brackets supporting canopies -paint 1x6 corner trim -paint to match siding 1x3 trim accent siding -paint 1x8 base trim -paint 1x4 window trim -paint 1x8 head trim -paint1x6 vertical trim -paint Condensing unit screen fence Architecture grade asphalt shingles; dark grey 5" pre-finished metal gutter on built-up 1x8 fasciaManufactured stone veneer Fiber cement lap siding system with 6" exposure, accent color Fiber cement board and batten sidingVinyl windows and doors Built-up fiber cement trim Fiber cement lap siding system with 6" exposure, field color 3" / 12" 1x8 base trim -paint Wood brackets supporting canopies -paint 1x6 corner trim -paint to match siding 1x3 trim accent siding -paint 1x6 vertical trim -paint 1x8 head trim -paint 1x4 window trim -paint Condensing unit screen fence Material Legend Lap Siding Fiber Cement Boothbay Blue Lap Siding Fiber Cement Night Gray Stone Veneer Coronado Stone Element Ledgestone -Natural Trim Fiber Cement White Roofing Asphalt Shingle Grey Board and Batten Siding Fiber Cement Evening Blue NOTE: All exposed mechanical, plumbing, and electrical equipment to be screened or painted to match the adjacent exterior finish. AC condensing units to be screen with a fence made of 4x4 wood posts, 1x wood rails, and a 2x wood top rail. Fence to be painted same colors as building siding.01/2"1" 2" PROJECT DATE DRAWN 712 WHALERS WAY SUITE, B-100 FORT COLLINS, CO 80525 (970) 223-1820 www.alm2s.com PRINTED FILE NAME: © alm2s 2020NOT FOR CONSTRUCTION7/20/2021 4:20:30 PM1942 - Mercy Housing - Building A and CommunityBuilding.rvtBuilding A w Community Building - Planning Elevations 1942 Author 07.21.2021 PLC-02Mercy HousingFort Collins, ColoradoNorthfield Commons - Clubhouse SCALE:3/16" = 1'-0"PLC-02 1 Back Elevation, Planning SCALE:3/16" = 1'-0"PLC-02 2 Side Elevation B, Planning NO ISSUE DATE Unit 102 3 Bedroom Type 4A Unit 101 2 Bedroom Type 3A (Mirrored) Unit 103 2 Bedroom Type 3A Unit 104 1 Bedroom Type 1 Stair Office Copy Files Office Entry HallSupply Meeting Storage Janitor Mech/Elec ClosetMaintenance Flex Space Kitchenette Storage RestroomRestroom Outdoor Patio Outdoor Patio 37' - 2 1/8"1' - 0"5' - 6"2' - 0"6' - 6"8' - 2 1/2"2' - 0"2' - 3"1' - 0"1' - 0" Unit 202 3 Bedroom Type 4 Unit 201 2 Bedroom Type 3 (Mirrored) Unit 203 2 Bedroom Type 3 Unit 204 1 Bedroom Type 1 5' - 3 3/16"1' - 0"9 3/16"1' - 0"1' - 0"4' - 1 1/2"2' - 0"6' - 6"Unit 302 3 Bedroom Type 4 Unit 301 2 Bedroom Type 3 (Mirrored) Unit 303 2 Bedroom Type 3 Unit 304 1 Bedroom Type 1 Stair 5' - 6"1' - 0"1' - 0"1' - 0"1' - 0"4' - 1 1/2"2' - 0"6' - 6"01/2"1" 2" PROJECT DATE DRAWN 712 WHALERS WAY SUITE, B-100 FORT COLLINS, CO 80525 (970) 223-1820 www.alm2s.com PRINTED FILE NAME: © alm2s 2020NOT FOR CONSTRUCTION7/20/2021 4:20:32 PM1942 - Mercy Housing - Building A and CommunityBuilding.rvtFloor Plans 1942 Author 07.21.2021 PLC-03Mercy HousingFort Collins, ColoradoNorthfield Commons - Clubhouse SCALE: N 1/8" = 1'-0" First Level Plan SCALE: N 1/8" = 1'-0" Second Level Plan SCALE: N 1/8" = 1'-0" Third Floor Plan NO ISSUE DATE