Loading...
HomeMy WebLinkAboutARBOR PLAZA PUD - Filed DA-DEVELOPMENT AGREEMENT -DEVELOPMENT AGREEMENT THIS AGREEMENT, made and entered into this ZZAVI day of A.D. 198(,, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as "the City," and ARBOR PROPERTIES, LTD., a Colorado limited partnership, hereinafter referred to as "the Developer," 1.1 TTKIC CC CTU. WHEREAS, the Developer is the owner of certain property situate in the County of Larimer, State of Colorado, and legally described as follows, to -wit: Arbor Plaza P.U.D., located in the Northeast Quarter of Section 2, Township 6 North, Range 69 West, of the Sixth P.M., City of Fort Collins, Larimer County, Colorado. WHEREAS, the developer desires to develop said property and has submitted to the City a subdivision plat and/or a site plan, a copy of which is on file in the Office of the City Engineer and made a part hereof by reference: and WHEREAS, the Developer has further submitted to the City a utility plan for said lands, a copy of which is on file in the office of the City Engineer and made a part hereof by reference; and WHEREAS, the parties hereto have agreed that the development of said lands will require increased municipal services from the City in order to serve such area and will further require the installation of certain improvements primarily of benefit to the lands to be developed and not to the City of Fort Collins as a whole; and WHEREAS, the City has approved the subdivision plat and/or site plan submitted by the Developer subject to certain requirements and conditions which involve the installation of and construction of utilities and other municipal improvements in connection with said lands. NOW, THEREFORE, in consideration of the promises of the parties hereto and other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged, it is agreed as follows: 1. General Conditions. A. All water line trenches, sanitary sewer collection line trenches, storm sewer lines and facilities, streets, curbs, gutters, sidewalks, and bikepaths shall be installed as shown on the approved utility plans and in full compliance with the Council -approved standards and specifications of the City on file in the Office of the City Engineer at the time of approval of the utility plans relating to the specific utility, subject to a two (2) year time limitation from the date of execution of this agreement. In the event that the Developer commences or performs any construction pursuant hereto after two (2) years from the date of execution of this agreement, the Developer shall resubmit the project utility plans to the City Engineer for reexamination. The City may require the Developer to comply with approved standards and specifications of the City on file in the Office of the City Engineer at the time of resubmittal. B. No building permit for the construction of any structure within the development shall be issued by the City until the water lines, fire hydrants, sanitary sewer and streets (with at least the base course completed) serving such structure have seen completed and accepted by the City or District. No building permits shall be issued for any structure located in excess of six hundred sixty feet (660') from a single point 2- of access. C. Any water lines, sanitary sewer lines, storm drainage lines, and/or streets described on Exhibit "A", attached hereto, shall be installed within the time and/or sequence required on Exhibit "A". If the City Engineer has determined that any water lines, sanitary sewer lines, storm sewer facilities and/or streets are required to provide service or access to other areas of the City, those facilities shall be shown on the utility plans and shall be installed by the Developer within the time as established under "Special Conditions" in this document. D. Except as otherwise herein specifically agreed, the Developer agrees to install and pay for all water, sanitary sewer and storm sewer facilities and appurtenances, and all streets, curbing, gutter, sidewalks, bikeways and other municipal facilities necessary to serve the lands within the development. E. Street improvements (except curbing, gutter and walks) shall not be installed until all utility lines to be placed therein have been completely installed, including all individual lot service lines leading in and from the main to the property line. F. The installation of all utilities except the water and sanitary sewer but including water and sanitary sewer trenches shown on the utility drawings shall be inspected by the Engineering Division of the City and shall be subjected to such department's approval. The Developer agrees to correct any deficiencies in such installations in order to 3- meet the requirements of the plans and/or specifications applicable to such installation. In case of conflict, the utility drawings shall supersede the standard specifications. G. All storm drainage facilities shall be so designed and constructed by the Developer as to protect downstream and adjacent properties against injury and to adequately serve the property to be developed (and other lands as may be required, if any). The Developer has met or exceeded minimum requirements for storm drainage facilities as have been established by the City in its Drainage Master Plans and Design Criteria. The Developer does hereby indemnify and hold harmless the City from any and all claims that might arise, directly or indirectly, as a result of the discharge of injurious storm drainage or seepage waters from the development in a manner or quantity different from that which was historically discharged and caused by the design or construction of the storm drainage facilities, except for (1) such claims and damages as are caused by the acts or omissions of the City in maintenance of such facilities as have been accepted by the City for maintenance; (2) errors, if any, in the general concept of the City's master plans but not to include any details of such plans, which details shall be the responsibility of the Developer); and (3) specific directives as may be given to the Developer by the City. Approval of and acceptance by the City of any storm drainage facility design or construction shall in no manner he deemed to constitute a waiver or relinquishment by the City of the aforesaid indemnification. The Developer shall 4- engage a licensed professional engineer to design the storm drainage facilities as aforesaid and it is expressly affirmed hereby that such engagement shall be intended for the benefit of the City, subsequent purchasers of property in the development and downstream and adjacent property owners all of whom shall be third party beneficiaries of said agreement between the Developer and Engineer. H. The Developer shall pay storm drainage basin fees in accordance with Chapter 93 of the City Code. Storm drainage improvements eligible for credit or City repayment under provisions of Chapter 93 are described together with the estimated cost of the improvements on the attached Exhibit B", which improvements shall include right of way, design and construction costs. The basin fee payable by the Developer shall be reduced by the estimated cost of said eligible improvements. Upon completion of such eligible improvements, the amount of such reduction shall be adjusted to reflect the actual cost. If the cost of the eligible improvements constructed by the Developer and described in the above mentioned exhibit exceeds the amount of the storm drainage fees payable for the development, the City shall reimburse the excess cost out of the Storm Drainage fund upon completion of the improvements and approval of the construction by the City. I. The Developer shall provide the City Engineer with certified Record Utility Drawing Transparencies on Black Image Diazo Reverse Mylars upon completion of any phase of the construction. 5- 2. Special Conditions. A. Storm drainage lines and appurtenances. All storm drainage facilities shall be completed prior to the issuance of the first Certificate of Occupancy. Under no circumstances shall the City of Fort Collins be responsible for maintaining the box culvert through this development for Mail Creek or any storm drainage facilities on private property. B. Streets. i. The City agrees to repay the Developer for Oversizing Harmony Road and College Avenue to major arterial standards in lieu of local street standards, Mason Street north of Harmony to arterial standards in lieu of local street standards and Mason Street south of Harmony Road to collector standards in lieu of local street standards in accordance with Section 99-6(F) of the Code of the City of Fort Collins. When payment is requested by the Developer, City's obligation for payment shall he limited to those funds then budgeted, appropriated, and available by the City for that development or work then completed. ii. All streets shall be completed by the Developer and approved by the City prior to the issuance of the first Certificate of Occupancy. iii. The parties acknowledge that the Five Year Program Capital Projects adopted by the City for the year 1987 includes plans for the construction of the center medians in South College Avenue between Horsetooth Road and Harmony Road and possibly a quarter mile south of Harmony Road, but that such plans for construction are contingent upon the actual appropriation of funds by the City Council, which event therefore may never occur. In the event such monies are not appropriated for said construction on or before December 31, 1986, certain portions of said median, specifically from 300 feet north of Harmony Road to 300 feet south of the Mason Street -College Avenue -Clubhouse Drive intersection, the design of which shall he subject to the sole discretion of the City Engineer, will become the responsibility solely of the Developer. Accordingly, the Developer hereby agrees to design, construct and pay for any such portions of said median which are not funded by City Council and which are so designated by the City Engineer. Upon written notice by the City that said appropriation has not occurred, said design is to be completed by the Developer by April 30, 1987, and the construction completed by December 31, 1987. The construc- tion shall include but not be limited to, curb, gutter, splash pans, irrigation systems, landscaping and pavement. The landscaping only shall be eligible for repayment under the conditions as stated in paragraph 2.6.(i) above. C. Other. 6- i. The Developer agrees to pay the City the amount of 25,000 as mitigation against the environmental impacts of the development. Said payment shall he made to the City prior to the issuance of the first Building permit. ii. Prior to the issuance of the footing and foundation permit for any buildings within this Planned Unit Development the Developer agrees to the following: 1. No combustible material will be allowed on the site until the water system is installed by the Developer and approved by the District and City. 2. To provide an access to any building under construction, adequate to handle any emergency vehicle or equipment, and to maintain such access at all times. Such access shall be at a minimum, 20'wide and a 4" layer of base course material compacted according to City Standards with a 40' radius turnaround at the building end of said access. 3. The issuance of said footing and foundation permit is solely at the Developer's own risk and the Developer shall hold the City harmless in the event of any damages resulting from the issuance of said permit prior to the completion of the requirements in accordance with Section 99-6(B) of th4e Code of the City of Fort Collins. 3. Miscellaneous. A. The Developer agrees to provide and install, at his expense, adequate barricades, warning signs and similar safety devices at all construction sites within the public right-of-way and/or other areas as deemed necessary by the City Engineer in accordance with the City's "Work Area Traffic Control Handbook" and shall not remove said safety devices until the construction has been approved by the City Engineer. B. The Developer shall, at all times, keep the public right- of-way free from accumulation of waste material or rubbish caused by his operation, shall remove such rubbish no less than weekly and, at the completion of the work, shall remove all such waste materials, rubbish, tools, construction equipment, machinery, and surplus materials from the public right-of-way. He further agrees to maintain the finished 7- street surfaces free from dirt caused by his operation. Any excessive accumulation of dirt and/or construction materials shall be considered sufficient cause for the City to withhold building permits and/or certificates of occupancy until corrected to the satisfaction of the City Engineer. If the Developer fails to adequately clean such streets within two 2) days after receipt of written notice, the City may have the streets cleaned at his expense and he shall be respon- sible for prompt payment of all such costs. C. The Developer hereby insures that his subcontractors shall cooperate with the City's construction inspectors by ceasing operations when winds are of sufficient velocity to create blowing dust which, in the inspector's opinion, is hazardous to the public health and welfare. D. When the inspector determines that erosion (either by wind or water) is likely to be a problem, the surface area of erodable earth material exposed at any one time shall not exceed 200,000 square feet for earthworks operations. Temporary or permanent erosion control shall be incorporated into the suhdivision at the earliest practicable time. By way of explanation and without limitation, said control may consist of seeding of approved grasses, temporary dikes, gabions, and/or other devices. E. The Developer shall, pursuant to the terms of this agreement, complete all improvements and perform all other obligations required herein, as such improvements or obligations may be shown on the original plat, or on any replat subsequently filed by the Developer, and the City may withhold such 8- building permits and certificates of occupancy as it deems necessary to ensure performance hereof. In addition, it is agreed and understood between the developer and the City that the City shall have the right to refuse issuance of building permits and certificates of occupancy in the subject development as the City, in its sole discretion, shall deem necessary in order to insure performance by the Developer of any other obligation the Developer may have to the City, whether pursuant to other development agreements, or otherwise. F. Nothing herein contained shall be construed as a waiver of any requirements of the City Code, and the Developer agrees to comply with all requirements of the same. G. In the event the City waives any breach of this Agreement, no such waiver shall be held or construed to be a waiver of any subsequent breach hereof. H. Financial obligations of the City of Fort Collins payable after the current fiscal year and/or not appropriated or budgeted are contingent upon funds for that purpose being appropriated, budgeted and otherwise made available. I. This Agreement shall run with the real property hereinabove described and shall be binding upon the parties hereto, their personal representatives, heirs, successors, grantees and assigns. Assignment of interest within the meaning of this paragraph shall specifically include, but not be limited to, assignment of any portion of the Developer's proprietary interest in the real property herinabove described, as well as any assignment of the Developer's rights to develop such i property under the terms and conditions of this Agreement. J. In the event the Developer hereafter transfers title to such real property and is thereby divested of all equitable and legal interest in said property, the City hereby agrees to release said Developer from liability under this Agreement with respect to any breach of the terms and conditions of this Agreement occurring after the date of any such transfer of interest. K. Each and every term and condition of this Agreement shall be deemed to be a material element thereof. In the event either party shall fail or refuse to perform according to the terms of this Agreement, such party may he declared in default. In the event a party has been declared in default hereof, such defaulting party shall be allowed a period of five (5) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to: (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or, (c) avail itself of any other remedy at law or equity. In the event of default of any of the provisions hereof by either party which shall require the party not in default to commence legal or equitable action against said defaulting party, the defaulting party shall be liable to the non - defaulting party for the non -defaulting party's reasonable attorneys' fees and costs incurred by reason of default. Nothing herein shall be construed to prevent or interfere with the City's rights and remedies specified in Paragraph 3 E of this Agreement. 10- defaulting party for the non -defaulting party's reasonable attorneys' fees and costs incurred by reason of default. Nothing herein shall be construed to prevent or interfere with the City's rights and remedies specified in Paragraph 3 E of this Agreement. ATTEST: ity erk APPROVED AS TO FO r THE CITY OF FORT COLLINS, COLORADO A Municipal Corporation. By City Manager ARBOR PROPERTIES, LTD., a Colorado limited partnership Gary C. K ein Eir`.a,,' 11- EXHIBIT "A" 1. Schedule of water lines to be installed out of sequence. Not Applicable. 2. Schedule of sanitary sewer lines to be installed out of sequence. Not Applicable. 3. Schedule of street improvements to be installed out of sequence. See paragraph 2.B. 4. Storm drainage improvements to be installed out of sequence. See paragraph 2.A. 12- EXHIBIT "B" The Development Agreement for Arbor Plaza P.U.D. This exhibit does not apply to this development. COST ESTIMATE FOR MAJOR DRAINAGE IMPROVEMENTS Include only those major storm drainage basin improvements required by an adopted basin master plan. ITEM DESCRIPTION QUANTITY UNIT COST TOTAL COST 1. Storm sewer, manholes, end sections, etc. a) L.f. L.f. b) L.f. L.f. c) Ea. Ea. d) Ea. Ea. I Sub -Total Channel excavation, detention pond excavation and riprap Sub -Total H C.Y. C.Y. C.Y. C.Y. C.Y. C.Y.