Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
POWERHOUSE 2 - FDP220015 - SUBMITTAL DOCUMENTS - ROUND 3 - LANDSCAPE PLAN (2)
SSDSSF ESFESFESFESDDHYDTFTFEMGMWF SIR NORTH COLLEGE AVENUE EAST VINE DRIVEEAST VINE DRIVEJEROME STREET IRRIGATION METERSIZE: 1-INCHREFER TO CIVIL PLANSIRRIGATION CONTROLLERREQUIRES 120 VAC POWERPOINT-OF-CONNECTION (POC #1)SIZE: 1-INCHMAXIMUM FLOW: 25 GPMREQUIRED PRESSURE: 87 PSIWIRELESS RAIN SENSORMOUNTED ON LIGHT POLERAIN GARDENRAIN GARDENRAIN GARDENRAIN GARDENRAIN GARDENRAIN GARDENRAIN GARDENRAIN GARDENRAIN GARDENRAIN GARDEN12341.25"1.25"1.25"1.25"1" COPPER2"2"2"2"2"2"2"2"2"2"2"2"2"2"2"2"2"2"2"2"2"2"2"2"2"1"PVC2"2"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"MFBA35Q25Q25Q35Q35Q25Q30Q30Q30Q25H25FA-11"17SA-471"22SA-481"25T25Q25H25H25Q30Q35Q35Q35Q35Q30Q30QESESSSSS 30H35H30H35H35H35H35H35H35H35Q35F35F35Q35Q35Q35Q35Q35Q35Q35Q35Q35Q35H35H35H35H35Q35F30F30F25F30H35Q35H35F35H35H35H35H35H35H35H35H35H35H35H35H35Q30F30F30F25F25F25F25F25F25F25F25F25F25F25F25FA-421"2PA-431"23SA-411"23SA-361"23SA-381"20SA-331"25SA-301"11SA-291"8SA-261.5"25TA-271"14SA-211"13SA-231"22TA-201"7SA-161"13SA-151"8SA-181"19TA-131"21TA-111"4SA-121"15SA-91"20TA-71"16SA-41.5"25SA-461"11T.5.5.5.5.5.5.5.5.5.5.5.5.5.5.5.5.5.5.5.5.5.25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25A-371"25BA-401"12BR.5.25 .25 .25 .25 .25 .25 .25 .25 .25 .25.25.25 .25 .25 .25 .25.5.5.5.5.25 .25 .25 .25 .25 .25 .25.5.5.25 .25 .25 .25A-491"10B.5.25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25.25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25.5.5.5.5.5.5.5.25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25 .25.25A-101"11BA-351"3PA-141"5PA-221"7P.5.5.5.5A-241"3SA-251"3PQQQQQQQQQQ555555525Q25H25H.25 .25 .25 .25.535H.25 .25 .25 .25 .25 .25 .25 .25 .25.5.5A-441"23SA-451"19SA-391"17SA-321"19SA-341"19BA-281"22TA-191"18TA-171"13SA-81"20TA-61"12SA-51"21SA-31.5"25SA-21"14B35Q35Q35H35H30F30FA-311"23S555Sheet Number:Project Number:Project: Client: O:\BHA\CSU-POWER2\P-POWER 2.DWGPlot Date:4/18/2023 5:22 PM Plotted By: Jason H. KlausnerDate Created:4/17/2023 Produced by:Date:Revision:IR1.0Date:111 S. Meldrum St, Suite 110Fort Collins, CO 80521(970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignPlanningPOWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FINAL DESIGN REVIEW04/19/2023 20573944 JFK Parkway, Unit 12CFort Collins, CO 80525-3089970.229.9668www.aquaengineering.comJHKGENERAL DESCRIPTIONGENERAL NOTESLEGENDA-151"12TMFQANOZZLE NUMBERARC - QUARTER (Q), HALF (H), FULL (F)30HB.5RESSSFLAG NOTES12345IRRIGATION COVER SHEETIR2.0IR2.1KEYMAPNTS FESDDHYD TFTFEMGMWF SNORTH COLLEGE AVENUE EAST VINE DRIVERAIN GARDENRAIN GARDENRAIN GARDENRAIN GARDENRAIN GARDENRAIN GARDEN1.25"1.25"2"2"2"2"2"2"2"2"2"2"2"2"2"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"35Q35F35F35Q35Q35Q35Q35Q35Q35Q35Q35Q35H35H35H35H35Q35F30F30F25F30H35Q35H35F35H35H30F30A-361"23SA-381"20SA-331"25SA-301"11SA-291"8SA-261.5"25TA-271"14SA-211"13SA-231"22TA-201"7SA-161"13SA-151"8SA-181"19TA-131"21TA-111"4SA-121"15S.5.5.5.5.5.5.5.5.5.5.5.5.5.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25A-371"25B.5A-351"3PA-141"5PA-221"7P.5.5.5.5A-241"3SA-251"3PQQQQQQ555525H25H35H.25.25.5A-391"17SA-321"19SA-341"19BA-281"22TA-191"18TA-171"13S35Q35Q35H35H30F30FA-311"23S5Sheet Number:Project Number:Project: Client: O:\BHA\CSU-POWER2\P-POWER 2.DWGPlot Date:4/18/2023 5:23 PM Plotted By: Jason H. KlausnerDate Created:4/17/2023 Produced by:Date:Revision:IR2.0Date:111 S. Meldrum St, Suite 110Fort Collins, CO 80521(970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignPlanningPOWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FINAL DESIGN REVIEW04/19/2023 20573944 JFK Parkway, Unit 12CFort Collins, CO 80525-3089970.229.9668www.aquaengineering.comJHKSCALE MUST MEASURE 1 INCH OR DRAWING IS NOT TO SCALE.0'20'10'40'60'MATCHLINE SEE SHEET IR2.1 IRRIGATION PLAN SSSSDSF ESF ESIREAST VINE DRIVEJEROME STREET IRRIGATION METERSIZE: 1-INCHREFER TO CIVIL PLANSIRRIGATION CONTROLLERREQUIRES 120 VAC POWERPOINT-OF-CONNECTION (POC #1)SIZE: 1-INCHMAXIMUM FLOW: 25 GPMREQUIRED PRESSURE: 87 PSIWIRELESS RAIN SENSORMOUNTED ON LIGHT POLERAIN GARDENRAIN GARDENRAIN GARDENRAIN GARDEN12341.25"1.25"1" COPPER2"2"2"2"2"2"2"2"2"2"2"2"2"1"PVC2"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"1.25"MFBA35Q25Q25Q35Q35Q25Q30Q30Q30Q25H25FA-11"17SA-471"22SA-481"25T25Q25H25H25Q30Q35Q35Q35Q35Q30Q30QESESSSSS30H 35H30H35H35H35H35H35H35H35Q35H35H35H35H35H35H35H35H35H35H35Q30F30F25F25F25F25F25F25F25F25F25F25F25F25FA-421"2PA-431"23SA-411"23SA-91"20TA-71"16SA-41.5"25SA-461"11T.5.5.5.5.5.5.5.5.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25A-401"12BR.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.5.5.5.5.25.25.25.25.25.25.25.5.5.25.25.25.25A-491"10B.5.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.5.5.5.5.5.5.5.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25.25A-101"11BQQQQ55525Q.25.25.25.25.5.25.25.25.25.25.25.25.5A-441"23SA-451"19SA-81"20TA-61"12SA-51"21SA-31.5"25SA-21"14B55Sheet Number:Project Number:Project: Client: O:\BHA\CSU-POWER2\P-POWER 2.DWGPlot Date:4/18/2023 5:23 PM Plotted By: Jason H. KlausnerDate Created:4/17/2023 Produced by:Date:Revision:IR2.1Date:111 S. Meldrum St, Suite 110Fort Collins, CO 80521(970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignPlanningPOWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FINAL DESIGN REVIEW04/19/2023 20573944 JFK Parkway, Unit 12CFort Collins, CO 80525-3089970.229.9668www.aquaengineering.comJHKSCALE MUST MEASURE 1 INCH OR DRAWING IS NOT TO SCALE.0'20'10'40'60'MATCHLINE SEE SHEET IR2.0 IRRIGATION PLAN Sheet Number:Project Number:Project: Client: O:\BHA\CSU-POWER2\P-POWER 2.DWGPlot Date:4/18/2023 5:23 PM Plotted By: Jason H. KlausnerDate Created:4/17/2023 Produced by:Date:Revision:IR3.0Date:111 S. Meldrum St, Suite 110Fort Collins, CO 80521(970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignPlanningPOWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FINAL DESIGN REVIEW04/19/2023 20573944 JFK Parkway, Unit 12CFort Collins, CO 80525-3089970.229.9668www.aquaengineering.comJHK1WINTERIZATIONASSEMBLYN.T.S.NOTES:1. FURNISH NOMINAL PIPE AND FITTING SIZES IDENTICAL WITHNOMINAL TAP SIZE UNLESS OTHERWISE NOTED.2. THIS ASSEMBLY IS INTENDED TO BE USED FORWINTERIZATION OF BACKFLOW PREVENTION ASSEMBLYONLY.ABCDEFGHIJA.12" STANDARD VALVE BOX WITH COVERB.FINISH GRADE/TOP OF MULCHC.1/4" THREADED BRASS CAPD.1/2" REDUCING MALE ADAPTERE.1/2" COPPER PIPE (LENGTH AS REQUIRED)F.6" PVC CL 200 PIPE (LENGTH AS REQUIRED)G.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELH.BRICK (1 OF 4)I.COPPER PIPE TO BACKFLOW PREVENTIONASSEMBLY (LENGTH AS REQUIRED)J.COPPER TEEK.COPPER MALE ADAPTER (1 OF 2)L.CURB STOP VALVE WITH COPPER SERVICE,THREAD BOTH ENDSM.COPPER PIPE TO EXISTING COPPER PIPEOUTSIDE EXISTING WATER METERKLM2BACKFLOW PREVENTIONASSEMBLYN.T.S.NOTES:1. FURNISH FITTINGS AND PIPING SIZED IDENTICALLY WITH NOMINAL BACKFLOW PREVENTION DEVICE.2. SUBMIT SHOP DRAWINGS SPECIFYING ENCLOSURE SIZE AND SHOWING RELATIVE LAYOUT OF EQUIPMENT.ABCDEFGHIJKA.BACKFLOW PREVENTER ENCLOSURE (SIZEAS NECESSARY)B.BACKFLOW PREVENTION DEVICEC.C x M COPPER ADAPTER (1 OF 2)D.TYPE K COPPER PIPE (TYPICAL) (LENGTH ASREQUIRED)E.CL200 PVC PIPE SLEEVE (1 OF 2)F.4" THICK CONCRETE PAD 6" LARGER IN ALLDIMENSIONS THAN ENCLOSUREG.FINISH GRADE/TOP OF MULCHH.COPPER FEMALE ADAPTERI.SCH 40 PVC MALE ADAPTERJ.PVC MAINLINEK.TYPE K COPPER PIPE3MASTER VALVEASSEMBLYN.T.S.4FLOW SENSORASSEMBLYN.T.S.MNOTES:1. USE VALVE BOX EXTENSION AS NECESSARY TO ACHIEVE MINIMUM DIMENSIONS ABOVE ASSEMBLY.2. NOMINAL SIZE OF ALL COMPONENTS ARE TO BE THE SAME NOMINAL SIZE AS THE SOLENOID VALVE(SIZED AS SHOWN).3. INSTALL FILTER FABRIC AROUND EXTERIOR OF VALVE BOX. USE DUCT TAPE TO SECURE FABRIC TOPIPE AND VALVE BOX.4. DO NOT CUT OUT ENDS OF VALVE BOX UNNECESSARILY.5. POSITION VALVE BOX OVER VALVE TO ALLOW ACCESS TO SOLENOID.6. INSTALL SO THAT NO GRAVEL IS IN CONTACT WITH VALVE ASSEMBLY.ABCDEFGHIJKLA.TRACING WIREB.FINISH GRADE/TOP OF MULCHC.STANDARD RECTANGULAR VALVE BOX W/EXTENSIOND.WIRE SPLICE, TYPICALE.DECODERF.SOLENOID VALVEG.TWO-WIRE CABLEH.PVC MAINLINEI.BRICK (1 OF 4)J.FILTER FABRICK.3" MINIMUM DEPTH OF 3/4" WASHEDGRAVELL.PVC SCH 40 MALE ADAPTERLABCDEFGHIJKA.TRACING WIREB.12" VALVE BOX WITH COVERC.FINISH GRADE/TOP OF MULCHD.SENSOR DECODERE.WIRE SLICE, TYPICALF.FLOW SENSORG.TWO WIRE CABLEH.FILTER FABRICI.PVC PIPEJ.BRICK (1 OF 4)K.3" MINIMUM DEPTH OF 3/4"WASHED GRAVELNOTES:1. ALLOW 10 PIPE DIAMETERS UPSTREAM AND 5 PIPE DIAMETERS DOWNSTREAM OFSTRAIGHT RUN OF PIPE TO ACHIEVE PROPER FLOW REGIME.2. INSTALL FILTER FABRIC AROUND EXTERIOR OF VALVE BOX. USE DUCT TAPE TOSECURE FABRIC TO PIPE AND VALVE BOX.3. DO NOT CUT OUT ENDS OF VALVE BOX UNNECESSARILY.4. INSTALL SO THAT GRAVEL IS ONLY IN CONTACT WITH BOTTOM OF SENSOR ASSEMBLY.F6ISOLATION GATE VALVEASSEMBLY N.T.S.5QUICK COUPLING VALVEASSEMBLYN.T.S.QABCDEFGHIA.FINISH GRADE/TOP OF MULCHB.QUICK-COUPLING VALVEC.10" ROUND VALVE BOX WITH COVERD.HARCO QUICK COUPLER ANCHORE.PVC SCH 80 TOE NIPPLE (LENGTH ASREQUIRED)F.BRICK (1 OF 2)G.PRE-FABRICATED UNITIZED SWING JOINT 1"MIPT INLET X SOC OUTLETH.TEE OR EL: SEE SPECIFICATIONS FORMATERIALSI.PVC MAINLINE PIPEJ.TRACING WIRENOTES:1. FURNISH FITTINGS AND PIPING NOMINALLY SIZED IDENTICAL TO NOMINAL QUICKCOUPLING VALVE INLET SIZE.2. INSTALLATION HEIGHT OF QUICK COUPLER VALVE IN VALVE BOX MUST ASSURE PROPEROPERATION OF QUICK COUPLER KEY.3. INSTALL SWING JOINT LAY ARM BETWEEN 30° AND 45° OF LATERAL PIPE IN ORDER TOABSORB DOWNWARD IMPACT.JNOTE:1. NOMINAL SIZE OF GATE VALVE TO MATCH NOMINAL MAINLINE SIZE.ABCDEFGHIA.FINISH GRADE/TOP OF MULCHB.10" ROUND VALVE BOX WITH COVERC.6" PVC CL 200 PIPE (LENGTH AS REQUIRED)D.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELE.BRICK (1 OF 2)F.THREADED BRONZE GATE VALVE WITH SOLIDWEDGE, NON-RISING STEMG.PVC MAINLINEH.PVC SCH 40 MALE ADAPTER (1 OF 2)I.TRACING WIREIRRIGATION DETAILS Sheet Number:Project Number:Project: Client: O:\BHA\CSU-POWER2\P-POWER 2.DWGPlot Date:4/18/2023 5:23 PM Plotted By: Jason H. KlausnerDate Created:4/17/2023 Produced by:Date:Revision:IR3.1Date:111 S. Meldrum St, Suite 110Fort Collins, CO 80521(970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignPlanningPOWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FINAL DESIGN REVIEW04/19/2023 20573944 JFK Parkway, Unit 12CFort Collins, CO 80525-3089970.229.9668www.aquaengineering.comJHK1BLOW OUTASSEMBLY N.T.S.2AIR VACCUM RELIEF VALVEASSEMBLY N.T.S.BNOTE:1. FURNISH NOMINAL PIPE AND FITTING SIZES IDENTICAL WITH NOMINALTAP SIZE UNLESS OTHERWISE NOTED.ABCDEFGHIJKLKA.12" STANDARD VALVE BOX WITH COVERB.FINISH GRADE/TOP OF MULCHC.1" BRONZE BALL VALVE FEMALETHREADED ENDSD.1" COPPER MALE ADAPTERE.1" COPPER PIPE (LENGTH AS REQUIRED)F.3" MIN. DEPTH OF 3/4" WASHED GRAVELG.BRICK (1 OF 4)H.COPPER FEMALE THREADED ADAPTERI.SCH. 40 PVC MALE THREADED ADAPTERJ.PVC MAINLINEK.COPPER PIPEL.COPPER TEEHIJABCDEFGHIJA.JUMBO VALVE BOX WITH EXTENSION ANDCOVER (HEIGHT AS REQUIRED)B.FINISH GRADE/TOP OF MULCHC.AIR VACUUM RELIEF VALVED.PVC SCH 80 NIPPLE (LENGTH AS REQUIRED)E.PVC SCH 40 BALL VALVE (SIZE 1")F.PVC SCH 80 NIPPLE (LENGTH AS REQUIRED)G.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELH.BRICK (1 OF 4)I.PVC MAINLINE PIPEJ.TEE OR EL: SEE SPECIFICATIONS FORMATERIALSK.TRACING WIRENOTES:1. OPEN BALL VALVE IN ASSEMBLY 1/4 TURN UNTIL IRRIGATION SYSTEM IS FULLY CHARGED WITH WATER.2. CLOSE VALVE DURING WINTERIZATION AND OPEN 1/2 TURN AFTER WINTERIZATION OF SYSTEM TOPROTECT VALVE DURING FREEZING WEATHER.3. REPLACE PVC BALL VALVE WITH BRASS BALL VALVE IN THE EVENT AN AIR VACUUM RELIEF VALVE WITHMALE INLET IS USED.K3REMOTE CONTROL VALVEASSEMBLYN.T.S.NOTES:1. USE VALVE BOX EXTENSION AS NECESSARY TO ACHIEVE MINIMUM DIMENSIONS ABOVE ASSEMBLY.2. NOMINAL SIZE OF ALL COMPONENTS ARE TO BE THE SAME NOMINAL SIZE AS THE SOLENOID VALVE(SIZED AS SHOWN).3. INSTALL FILTER FABRIC AROUND EXTERIOR OF VALVE BOX. USE DUCT TAPE TO SECURE FABRIC TOPIPE AND VALVE BOX.4. TRANSITION TO PROPER LATERAL PIPE BURIAL DEPTH USING 45° ELBOW FITTINGS DOWNSTREAMOF REMOTE CONTROL VALVE ASSEMBLY.5. DO NOT CUT OUT ENDS OF VALVE BOX UNNECESSARILY.6. POSITION VALVE BOX OVER VALVE TO ALLOW ACCESS TO SOLENOID AND PROPER OPERATION OFBALL VALVE.7. COIL 3-FEET OF WIRE FOR EACH DECODER FOR SERVICE PURPOSES.ABCDEFGIKLMNOPQRSTUVJHA.DECODERB.WIRE FROM DECODER TO VALVE SEE SPECIFICATIONSC.PVC BALL VALVED.REMOTE CONTROL VALVEE.WIRE CONNECTOR FROM TWO-WIRE CABLE TODECODER (1 OF 2)F.CHRISTY ID TAGG.FINISH GRADEH.PVC SCH 80 CLOSE NIPPLEI.WIRE CONNECTOR FROM DECODER TO SOLENOIDVALVE (1 OF 2)J.PVC SCH 40 MALE ADAPTERK.12" STANDARD VALVE BOX WITH COVERL.PVC LATERAL PIPEM.FILTER FABRICN.PVC SCH 80 TOE NIPPLE (LENGTH AS REQUIRED)O.PVC SCH 40 ELP.PVC SCH 40 PIPE (LENGTH AS REQUIRED)Q.BRICK (1 OF 4)R.PVC MAINLINES.TWO-WIRE CABLET.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELU.TEE OR EL: SEE SPECIFICATIONS FOR MATERIALSV.PVC SCH 80 TOE NIPPLE (LENGTH AS REQUIRED,HIDDEN) AND PVC SCH 40 EL4POP-UP SPRAY SPRINKLERASSEMBLYN.T.S.5POP-UP ROTOR SPRINKLERASSEMBLYN.T.S.CDEFA.FINISH GRADE/TOP OF MULCHB.POP-UP SPRAY SPRINKLERC.SWING PIPE, 12" LENGTHD.1/2" MALE NPT x BARB ELE.PVC SCH 40 TEE OR ELF.PVC LATERAL PIPEDBA6"BCDEA.FINISH GRADEB.POP-UP ROTOR SPRINKLERC.PRE-FABRICATED SWING JOINTMIPT INLET x MIPT OUTLETD.PVC LATERAL PIPEE.PVC SCH 40 TEE OR EL30°to 45°A6"6POP-UP BUBBLERASSEMBLYN.T.S.ROOT BALLABCDEFGHIA.WATER BASINB.STREAM BUBBLERC.FINISH GRADED.POP-UP SPRAY SPRINKLER W/ BUBBLERE.1/2" MALE NPT x 0.490" BARB ELF.SWING PIPE, 12" LENGTHG.1/2" MALE NPT x 0.49" BARB ELH.PVC LATERAL PIPEI.PVC SCH. 40 TEE OR ELIRRIGATION DETAILS Sheet Number:Project Number:Project: Client: O:\BHA\CSU-POWER2\P-POWER 2.DWGPlot Date:4/18/2023 5:23 PM Plotted By: Jason H. KlausnerDate Created:4/17/2023 Produced by:Date:Revision:IR3.2Date:111 S. Meldrum St, Suite 110Fort Collins, CO 80521(970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignPlanningPOWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FINAL DESIGN REVIEW04/19/2023 20573944 JFK Parkway, Unit 12CFort Collins, CO 80525-3089970.229.9668www.aquaengineering.comJHK1DRIP REMOTE CONTROLVALVE ASSEMBLYN.T.S.2ZONE CONTROLVALVE ASSEMBLYN.T.S.ABCDEFHQKLMNOPQRSTIGJA.PRESSURE REGULATING FILTERB.WIRE FROM DECODER TO VALVE SEESPECIFICATIONSC.DECODERD.WIRE CONNECTOR FROM TWO-WIRE CABLETO DECODER (1 OF 2)E.CHRISTY I.D. TAGF.JUMBO VALVE BOX WITH COVERG.PVC BALL VALVEH.FINISH GRADE/TOP OF MULCHI.PVC SCH 80 NIPPLEJ.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELK.REMOTE CONTROL VALVEL.PVC SCH 80 TOE NIPPLEM.PVC SCH 40 ELN.PVC SCH 40 PIPE (TYPICAL) (LENGTH ASREQUIRED)O.FILTER FABRICP.BRICK (1 OF 4)Q.MANIFOLD/DRIP LATERAL. SEE NOTE 8.R.TWO-WIRE CABLES.TEE OR EL: SEE SPECIFICATIONS FORMATERIALST.PVC SCH 80 TOE NIPPLE (LENGTH ASREQUIRED, HIDDEN) AND PVC SCH 40 ELNOTES:1. USE VALVE BOX EXTENSION AS NECESSARY TO ACHIEVE MINIMUM DIMENSIONS ABOVE ASSEMBLY.2. NOMINAL SIZE OF ALL COMPONENTS ARE TO BE THE SAME NOMINAL SIZE AS THE SOLENOID VALVE(SIZED AS SHOWN).3. INSTALL FILTER FABRIC AROUND EXTERIOR OF VALVE BOX. USE DUCT TAPE TO SECURE FABRICTO PIPE AND VALVE BOX.4. TRANSITION TO PROPER LATERAL PIPE BURIAL DEPTH USING 45° ELBOW FITTINGS DOWNSTREAMOF REMOTE CONTROL VALVE ASSEMBLY.5. DO NOT CUT OUT ENDS OF VALVE BOX UNNECESSARILY.6. POSITION VALVE BOX OVER VALVE TO ALLOW ACCESS TO SOLENOID, AND PROPER OPERATION OFBALL VALVE.7. COIL 3-FEET OF WIRE FOR EACH DECODER FOR SERVICE PURPOSES.8. IN CASES OF DIRECT DRIP LATERAL PIPE CONNECTION INSTALL SCH. 40 PVC BARB FITTING TOPRESSURE REGULATING BASKET. SECURE CONNECTION WITH STAINLESS STEEL PINCH CLAMPS.9. SEE DECODER GROUNDING SCHEMATIC FOR ADDITIONAL DECODER GROUNDING INFORMATION.ABCDEFGHIJKLMNOA.6" ROUND VALVE BOX WITH COVERB.FINISH GRADE/TOP OF MULCHC.PVC SCH. 40 ELD.PVC BALL VALVEE.PVC SCH. 40 TRANSITION NIPPLE(MIPTxMHT)F.COMPRESSIONxFEMALE HOSESWIVEL ADAPTERG.DRIP LATERAL PIPINGH.3" MINIMUM DEPTH OF 3/4" WASHEDGRAVELI.BRICK (1 OF 2)J.PVC SCH 80 NIPPLE (LENGTH ASREQUIRED, 1 OF 2)K.PVC SCH 40 ELL.PVC SCH 40 STREET EL (1 OF 2)M.PVC DRIP MANIFOLD PIPEN.PVC SCH 40 TEE OR ELO.PVC SCH 80 NIPPLE (LENGTH ASREQUIRED)3TYPICAL DRIP LAYOUTN.T.S.4FLUSH CAPASSEMBLYN.T.S.XXXXXXXXXXXXXXXXXXXXXXXXNOTES:1. EMITTERS SHALL BE LOCATED IMMEDIATELY ADJACENT TO PERENNIALS AND ATTHE OUTSIDE PERIMETER OF THE PLANTING PIT OF ALL SHRUBS AND TREES.2. INSTALL FOUR 1 GPH EMITTERS PER DECIDUOUS TREE.3. INSTALL THREE 1 GPH EMITTER PER CONIFEROUS TREE.4. INSTALL TWO 1 GPH EMITTER PER SHRUB.5. INSTALL ONE 1 GPH EMITTER PER PERENNIAL.ABCDEFA.DRIP LATERAL PIPEB.CONIFEROUS TREEC.DECIDUOUS TREED.EMITTERE.SHRUBF.PERENNIALNOTE:1. INSTALL FLUSH CAP ASSEMBLY AT THE END OF EACHDRIP LATERAL SEGMENT.ABCDEFA.FINISH GRADE/TOP OF MULCHB.6" ROUND VALVE BOX WITH COVERC.FLUSH CAP WITH HOSE THREAD CAPD.DRIP IRRIGATION LATERALE.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELF.BRICK (1 OF 2)5IRRIGATION CONTROLLERASSEMBLYN.T.S.AABCDEFGHA.IRRIGATION CONTROLLER ASSEMBLYB.OPTIONAL: RAIN SENSOR WITH VANDALGUARD CAN BE MOUNTED TO SIDE OFPEDESTAL IN LIEU OF WIRELESS RAINSENSOR INDICATED ON PLANSC.FINISH GRADED.STRONG BOX QUICK PADE.COMPACTED SUBGRADEF.3" SCH 40 ELECTRICAL CONDUIT AND SWEEPEL FOR TWO WIRE CABLEG.1" SCH 40 ELECTRICAL CONDUIT AND SWEEPEL FOR ELECTRICAL GROUNDINGH.1" SCH 40 ELECTRICAL CONDUIT AND SWEEPEL FOR ELECTRICAL SERVICE6IRRIGATION CONTROLLER GROUNDINGDETAILN.T.S.PLAN VIEWA.IRRIGATION CONTROLLER ASSEMBLYB.UL LISTED 5/8" X 10' COPPER-CLADGROUNDING RODC.UL LISTED 4" X 8' COPPER GROUNDING PLATED.10" ROUND VALVE BOX WITH COVERE.BRONZE GROUND ROD CLAMP OR CADWELDCONNECTION: PAIGE ELECTRICF.3" MINIMUM DEPTH OF 3/4" WASHED GRAVELG.BRICK (1 OF 4)H.#6 AWG INSULATED SOLID COPPER WIRE. NOSHARP BENDS.I.SPHERE OF INFLUENCEJ.EARTH CONTACT MATERIAL, POWERSET© ORPOWERFILL© DEPENDING ON SOIL CONDITIONSK.FINISH GRADEACB8'10'11'II30" MINIMUM12"SECTION VIEWHHHBCJDGFENOTES:1.CONNECT ALL #6 AWG WIRES INSIDE THECONTROLLER. CONNECT ONE WIRE TOTHE CONTROLLER GROUND LUG ANDUSE A #4 SPLIT BOLT TO CONNECT ALLWIRES TOGETHER.2.EARTH CONTACT MATERIAL MUSTCOMPLETELY COVER THE WELD JOINTON THE GROUND PLATE.KIRRIGATION DETAILS Sheet Number:Project Number:Project: Client: O:\BHA\CSU-POWER2\P-POWER 2.DWGPlot Date:4/18/2023 5:23 PM Plotted By: Jason H. KlausnerDate Created:4/17/2023 Produced by:Date:Revision:IR3.3Date:111 S. Meldrum St, Suite 110Fort Collins, CO 80521(970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignPlanningPOWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FINAL DESIGN REVIEW04/19/2023 20573944 JFK Parkway, Unit 12CFort Collins, CO 80525-3089970.229.9668www.aquaengineering.comJHK1WIRESPLICEN.T.S.2DECODER GROUNDINGSCHEMATICN.T.S.1.2.3.4.1/2"5.NOTE:1. VISUALLY CHECK THAT CONNECTOR IS BELOW LOCKING "FINGERS".1. STRIP ENDS OF WIRE2. SECURE WIRES INTO WIRE NUT3. INSERT WIRE NUT INTO GEL-FILLED TUBE4. POSITION WIRES INTO CHANNELS5. CLOSE SPLICE KIT FOR SECURED SEALAA.TWO-WIRE CABLEB.VALVE BOX (10" ROUND OR AS NECESSARY)C.REMOTE CONTROL VALVED.5/8" X 8' U.L. LISTED GROUND RODE.DECODERF.LINE SURGE PROTECTORG.BARE AWG #10 COPPER WIREH.3M DBR/Y-6 CONNECTIONI.BARE COPPER CONNECTION ("CADWELD")J.REMOTE CONTROL VALVE ASSEMBLY500' MAX OR 5 DECODERSBETWEEN GROUND POINTSWHICHEVER IS FIRSTGROUND ALL DEAD ENDS25' AND LONGERSPHERE OF INFLUENCEWIRE PATHOUTSIDE SPHEREOF INFLUENCE(10' MIN.)GROUND TWO WIRE CABLE NEARCONTROLLER PER MANUFACTURER'SGUIDELINESNOTES:1. ALL WIRE CONNECTION SHALL BE MADE WITH APPROVED CONNECTORS.2. MAKE ALL WIRE SPLICES IN VALVE BOXES.3. LEAVE A MINIMUM OF 5' EXTRA WIRE AT ALL SPLICE POINTS.4. TEST EARTH TO GROUND RESISTANCE AT ALL GROUND POINTS.5. EARTH TO GROUND RESISTANCE MUST MEET OR EXCEED MANUFACTURER REQUIREMENTS.6. INSTALL ALL GROUND ASSEMBLIES IN VALVE BOXES.7. INSTALL GROUNDING EQUIPMENT AS INDICATED ON THE IRRIGATION DOCUMENTS AND ASRECOMMENDED BY THE MANUFACTURER.CDAJBEGHFIB3RAIN SENSOR ASSEMBLYN.T.S.R5SLEEVEDETAILN.T.S.4TRENCHDETAILN.T.S.ABCDEFGA.WARNING TAPEB.FINISH GRADEC.BACKFILLD.LATERAL/MANIFOLD PIPEE.TWO-WIRE CABLEF.MAINLINE PIPEG.TRACING WIREREFER TOSPECIFICATIONSREFER TOSPECIFICATIONS12" MINIMUMNOTE:1. INSTALL SLEEVE SO THAT ITS LOWEST ELEVATION OCCURS AT ONE OR BOTHENDS - NOT ALONG ITS LENGTH.ABCDA.FINISHED GRADE OF PAVED SURFACEB.SLEEVE FOR LATERAL PIPEC.SLEEVE FOR MAINLINE PIPED.SLEEVE FOR WIRINGSLEEVE SIZING SCHEDULE6TRACING WIREN.T.S.FINISHED GRADEELEVATION VIEWPLAN VIEWNOTES:1. COPPER TRACING WIRE WILL START AT THE MASTER VALVE ANDWILL BE ROUTED WITH ALL MAINLINE PIPE.2. SPLICE TRACING WIRE IN IRRIGATION MAINLINE COMPONENT VALVEBOXES WHEN POSSIBLE, OTHERWISE, PLACE SPLICE IN SEPARATEVALVE BOX.ABCDEFGHA.10" ROUND VALVE BOXB.INSTALL TRACING WIRE TO THE TOP OF VALVE BOXC.WATER PROOF CONNECTION (SEE SPECIFICATIONS)D.PIPE SLEEVE SEE VALVE DETAILE.TAPE COPPER WIRE TO TOP OF PIPE EVERY 10 FT.F.CONTINUOUS LOOP COPPER TRACING WIRE (SEE SPECIFICATIONS)G.PVC PIPEH.VALVE (TYPICAL)IRRIGATION DETAILS NOTE:1. MOUNT RAIN SENSOR IN SUITABLELOCATION PER MANUFACTURER'SINSTRUCTIONS.ABCA.RAIN SENSORB.MOUNTING BRACKETC.POLE Sheet Number:Project Number:Project: Client: O:\BHA\CSU-POWER2\P-POWER 2.DWGPlot Date:4/18/2023 5:23 PM Plotted By: Jason H. KlausnerDate Created:4/17/2023 Produced by:Date:Revision:IR3.4Date:111 S. Meldrum St, Suite 110Fort Collins, CO 80521(970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignPlanningPOWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FINAL DESIGN REVIEW04/19/2023 20573944 JFK Parkway, Unit 12CFort Collins, CO 80525-3089970.229.9668www.aquaengineering.comJHK1HYDRAULIC ESTIMATION3IRRIGATION CONTROLLERPEAK IRRIGATION SCHEDULENOTES:1. THE PEAK SEASON RUN TIME HAS BEEN CALCULATED ASSUMING AN IRRIGATION EFFICIENCY OF 70% AND A PEAK SEASON ETo OF 0.21INCHES/DAY. THE CROP COEFFICIENT IS ASSUMED TO BE 0.8 FOR TURF, .6 FOR PLANTERS, SHRUBS, AND RAIN GARDEN AREAS.2. THE POC SIZE WAS CALCULATED FOR A 8 HR X 6 DAYS/WEEK IRRIGATION WINDOW TO IRRIGATE THE PLANT MATERIAL.3. ADJUST INDIVIDUAL STATION RUN TIMES AS NECESSARY TO ACCOMMODATE TURF/PLANT ESTABLISHMENT, TURF TYPE, TURF/PLANT SOLAREXPOSURE, SOIL TYPES, WIND, AND SLOPE.4. ADJUST DRIP RUN TIMES AS NECESSARY FOR PLANT ESTABLISHMENT. RECORD RUN TIMES ON THE RECORD DRAWINGS.5. BLANK ITEMS TO BE COMPLETED ON AS-BUILT DRAWINGS BY CONTRACTOR. SOIL TYPE - CLAY, SAND, LOAM, ETC. SLOPE - NONE, GENTLE, MILD,STEEP. MICROCLIMATE - SHADE, PARTIAL SUN/SHADE, FULL SUN.6. PROVIDE LAMINATED COPY OF PEAK IRRIGATION SCHEDULE WITHIN IRRIGATION CONTROLLER ENCLOSURE.2ANNUAL WATER USETABLEIRRIGATION DETAILS SSSSDSSFESF ESFESF ESF ESF ESF ESDDHYD TFTFEMGMWFS IR IRRIGATION METER NEAR THISLOCATION. REFER TO IRRIGATIONPLANS. ALL IRRIGATED MATERIALON THIS SITE IS SERVED BY THISMETER.Sheet Number:Project Number:Project: Client: O:\BHA\CSU-POWER2\P-POWER 2.DWGPlot Date:4/18/2023 5:27 PM Plotted By: Jason H. KlausnerDate Created:4/17/2023 Produced by:Date:Revision:IR4.0Date:111 S. Meldrum St, Suite 110Fort Collins, CO 80521(970) 223-7577www.bhadesign.comLandscape ArchitectureUrban DesignPlanningPOWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FINAL DESIGN REVIEW04/19/2023 20573944 JFK Parkway, Unit 12CFort Collins, CO 80525-3089970.229.9668www.aquaengineering.comJHKSCALE MUST MEASURE 1 INCH OR DRAWING IS NOT TO SCALE.0'30'15'60'90'HYDROZONE PLAN HYDROZONE LEGEND - THIS SHEET ONLY