Loading...
HomeMy WebLinkAboutOAK/COTTONWOOD FARM AMENDED OVERALL DEVELOPMENT PLAN - 54-87F - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTS ITEM NO. 15 MEETING DATE 6/2 2/9 2 AL. STAFF Ted Shepard City of Fort Collins PLANNING AND ZONING BOARD STAFF REPORT PROJECT: Oak-Cottonwood Farm Amended Overall Development Plan - #54-87F APPLICANT: G.T. Land Colorado, Inc. c/o Cityscape Urban Design 3030 South College Avenue Fort Collins, CO. 80525 OWNER: G.T. Land Colorado, Inc. 3555 Stanford Road, Suite 100 Fort Collins, CO. 80525 PROJECT DESCRIPTION: This is a request for an amendment to Oak-Cottonwood Farm Overall Development Plan. The request includes a redesignation of potential land uses and proposed residential densities. One of the primary changes is the request to change the 2 . 9 acres at the southwest corner of Harmony Road and Boardwalk Drive from Retail/Office to Auto Related and Roadside Commercial. Oak- Cottonwood Farm is located south of Harmony Road, west of Lemay Avenue, north of Southridge Greens Boulevard (extended) , and approximately 1/2 mile east of College Avenue. The 271 acres are zoned r-p, Planned Residential, with conditions. RECOMMENDATION: Approval with Condition EXECUTIVE SUMMARY: The request to amend the Oak-Cottonwood Farm Overall Development Plan was reviewed for compliance with the Land Use Policies Plan, an element of the City' s Comprehensive Plan. The Land Use Policies Plan supports the change of designation on Parcel S to Auto Related and Roadside Commercial. The land use restrictions intended to buffer Fairway Estates that were noted on the 1987 amendment have been codified on the present request. The other changes involve shifting of densities and land use designations and are relatively minor in nature. The drop-off zone for Werner Elementary School, shown on Parcel I, has been approved, in concept, by Poudre R-1 School District. The modified southern collector system is designed to also serve the square mile to the south. The amended O. D. P. is feasible from a traffic engineering standpoint. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303)221-6750 PLANNING DEPARTMENT 110 • Oak/Cottonwood Farm Amended Overall Development Plan, #54-87F June 22 , 1992 P & Z Meeting Page 2 COMMENTS 1. Background: The surrounding zoning and land uses are as follows: N: bp, R-L-P; Vacant and single family homes (Mallards and Whalers Cove) S: r-l-p; Vacant (Huntington Hills P.U.D. and future community park) E: rp, bp; Office, industrial, church, single family (Oak Ridge) W: FA, FA-1, R, (County) ; Single family (Fairway Estates, Fossil Creek Meadows) The 271 acre parcel was annexed and zoned into the City on June 23 , 1980, as part of a larger property known as the Keenland Annexation. The original Overall Development Plan was approved on October 26, 1987. When the Oak-Cottonwood Farm was annexed and zoned in 1980, Ordinance #112-80 stipulated the following conditions: A. The zoning is conditioned that development occur under a master plan in accordance with the zoning ordinance of the City relating to master planning in effect at the time of such development. B. Residential development in the R-P, Planned Residential District, be limited to a maximum of eight (8) dwelling units per acre. On April 24 , 1989, the Planning and Zoning Board approved a request to amend the Oak-Cottonwood Farm Overall Development Plan to designate "Community Regional Shopping Center" as an allowable land use on then Parcel 1-B (now Parcel R) . This parcel is known as the Harmony Market P.U. D. This same amendment also included designating detailed, specific land uses on then Parcels 1-G and 1- H in order to provide transitional buffering along the western edge. The following three filings have been approved in Oak-Cottonwood Farm: Pace Warehouse at Harmony Market - April 24 , 1989 Builders Square at Harmony Market - July 23 , 1990 Steele's Market at Harmony Market - September 24 , 1990 Oak/Cottonwood Farm Amended Overall Development Plan, #54-87F June 22 , 1992 P & Z Meeting Page 3 2 . Comparison of the Current Plan to the Proposed Amendment: PARCEL' 1989 PARCEL 1992 1-A Retail/Office (2 . 8 ac) S Auto Related/Roadside Commercial (2 . 9 ac) 1-B Community/Regional R Community/Regional (50. 9 ac) (50. 3 ac) 1-C Office/Medical Q Business/Multi- (20.7 ac) Family (30. 7 ac) 1-D Multi-Family (10 ac) P Potential Neighborhood Park (13 . 0 ac) 1-E Neighborhood Park P Potential (11. 2 ac) Neighborhood Park (13 . 0 ac) 1-F Patio Homes (6. 4 ac) G/F Low Density Residential 1-G Single Family (18 .7 ac) U/V/G Low Density Residential & R-L Uses (31. 3 ac) 1-H Patio Homes (4 . 0 ac) T R-L-M Uses & Office/Daycare (3 . 8 ac) 2-A Patio Homes (11.4 ac) F/E Low/Medium Density Residential (23 . 6 ac) 2-B Multi-Family (7 . 2 ac) F Low Density Residential (11. 2 ac) 2-C Business Service N Multi- (15.2 ac) Family/Business Service (9.7 ac) 2-D Business Service E Low/Medium Density (6. 4 ac) Residential (12 .4 ac) i • Oak/Cottonwood Farm Amended Overall Development Plan, #54-87F June 22 , 1992 P & Z Meeting Page 4 PARCEL 1989 PARCEL 1992 2-E Patio Homes (25 ac) C/B Low Density Residential (24 . 4 ac) 2-F Multi-Family (23 . 6 ac) B/A Low Density/Multi- Family (26. 3 ac) 2-G Townhomes (10. 3 ac) L Low Density Residential 2-H Single Family (47 .4 ac) J/K/D/H Low/Medium (60. 3 ac) 3 . Features of the Amendment: One of the primary changes is the request to convert old Parcel 1-A from Retail/Office to new Parcel S for Auto Related and Roadside Commercial. Another important change is to consolidate old Parcels 1-G and 1-H into new Parcels T, U, & V. This new configuration reflects the agreement by the landowner to establish low intensity uses along the border with Fairway Estates. South of Oak Ridge Drive, old Parcel 1-C is changed from Office Park/Major Medical to new Parcel Q for Business Services and/or Multi-Family Residential. This change reflects a lowering of intensity on this parcel. The primary function of this parcel, however, does not change and the uses on this parcel are expected to provide a transition from Harmony Market P.U.D. to the single family residential areas. Boardwalk Drive shifts to the east with the amendment but still aligns with Keenland Drive. This allows a deeper area for single family development between Boardwalk Drive and Mail Creek Ditch. This area is reduced in intensity from Patio Homes to Low Density Residential . Overall, the 1989 Plan indicates 66 acres in Single Family while the 1992 Plan indicates 139 acres. The 1989 Plan indicates 98 acres in Townhomes/Patio Homes/Multi-Family while the 1992 Plan indicates 66 acres in Medium Density Residential/Multi-Family. The shift, therefore, is biased in favor of lower densities with the higher densities located along Oak Ridge Drive and Lemay Avenue to provide a transition of intensity. The amendment indicates an easterly access point to Werner Elementary School. This access has been reviewed and approved by the representatives of Poudre R-1 School District. While this 410 II! Oak/Cottonwood Farm Amended Overall Development Plan, #54-87F June 22 , 1992 P & Z Meeting Page 5 access is only a schematic, it is anticipated that it will consist of a one-way drop off loop, gate, and path across the playground. Finally, the southerly collector system has been revised. Fossil Creek Parkway will no longer parallel the southerly property line to intersect with Southridge Greens Boulevard. Rather, a new collector street will extend south over Mail Creek to intersect with an extended Fossil Creek Parkway south of the Oak-Cottonwood Farm. The future Fossil Creek Parkway may pass under this connection. Since the exact alignment of Fossil Creek Parkway and Fossil Creek Trail are not known at this time, the exact location of this street connection will be determined at a future date. 4 . Plans and Policies: A. New Parcel S: The request to amend the Oak-Cottonwood Farm Overall Development Plan has been reviewed against the criteria of the Land Use Policies Plan and other elements of the Comprehensive Plan. The request to amend old Parcel 1-A from Retail/Office to new Parcel S for Auto Related and Roadside Commercial has been evaluated by the elements of the Comprehensive Plan. Since the adoption of the City's Land Use Policies Plan and the implementation of the Land Development Guidance System, Staff has attempted to define a hierarchy of commercial uses in the City. These commercial classifications were made in order to gain a better understanding of commercial development, to provide for a more logical community-wide land use pattern, to protect neighborhoods from intrusive or disruptive commercial development, and to better plan the transportation facilities which are needed to serve these uses. This hierarchy is divided into the following major classifications: 1. Regional/Community Shopping Centers 2 . Neighborhood Service Centers 3 . Neighborhood Convenience Shopping Centers 4 . Business Service Uses 5. Auto Related and Roadside Commercial Uses Much of the strategy behind these classifications is to establish a commercial land use pattern that discourages daily vehicular trips to South College Avenue for day-to-day goods and services. As a result, the spatial dispersion of commercial development is encouraged. This allows College Avenue to better function as a focal point for the less frequent shopping trips such as home furnishings, clothing, and automobiles. 411 • Oak/Cottonwood Farm Amended Overall Development Plan, #54-87F June 22 , 1992 P & Z Meeting Page 6 Staff Finding: Parcel S, as a location for an Auto Related and Roadside Commercial use, is located approximately one-half mile east of South College Avenue. The location on a collector street allows easy access to the internal portions of the 271 acre Oak- Cottonwood Farm. The location is logical for retail activities which are generally considered and typically found along highways and arterial streets. Land Use Policy #21: "All levels of commercial developments, including convenience, neighborhood, community and regional shopping which have significant negative transportation impacts on South College Avenue will be discouraged from gaining their primary access from College Avenue. " Staff Finding: Parcel S is one-half mile east of South College Avenue. Land Use Policy #22 : "Preferential consideration shall be given to urban development proposals which are contiguous to existing development within the city limits or consistent with the phasing plan for the City' s urban growth area. " Staff Finding: Parcel S is adjacent to a major arterial street, a collector street, Harmony Market P.U.D. , and can be served by existing streets and utilities. Development of Parcel S would not be out of sequence with the pattern of urban development. Parcel S does not meet the definition of a Neighborhood Convenience Shopping Center since it does not potentially have sufficient acreage for four or more business establishments. However, it is located within and intended primarily to serve the consumer demands of the residential portions of Oak-Cottonwood Farm. Consequently, development of this site will be reviewed according to the criteria found under the Auto Related and Roadside Commercial Point Chart of the L.D.G.S. In order to promote the desired level of site, landscape, and architectural design quality, Staff recommends the following condition be placed on the Amended Overall Development for Parcel S only" If the development of Parcel S results in evaluation by the Auto Related and Roadside Commercial Point Chart of the Land Development Guidance System, then the design guidelines found in the Neighborhood Convenience Shopping Center: Design Guidelines, Policies and Criteria (an element of the City' s Comprehensive Plan) shall be the pertinent evaluative criteria in order to promote the desired level of site, landscape, and architectural quality. i r Oak/Cottonwood Farm Amended Overall Development Plan, #54-87F June 22 , 1992 P & Z Meeting Page 7 B. Shift in Density: Y The proposed amendment shifts approximately 32 acres out of Multi- Family/Townhome/Patio Home into Low Density Residential. It is estimated that the reduction in the number of all potential dwelling units is 242 . This shift is consistent with prevailing market forces that have resulted in a number of Overall Development Plans being amended over the last several years. In order to be consistent with the City' s Land Use Policy that residential areas provide a mix of housing densities, Staff has become increasingly concerned about the implementation of housing mix in light of market pressures. Staff Finding: Staff finds that although there is a reduction in acreage designated as higher density, approximately 64 acres remain eligible. The balance of the Overall Development Plan remains mixed with Business Services combining with Multi-Family to act as logical transitions from Harmony Market P.U.D. and Lemay Avenue. The multi-family element remains a valid land use component and the policy of promoting housing mix does not suffer. C. New Parcels T, U, V: These three parcels are key to providing an effective transition from Harmony Market P.U.D. and Boardwalk Drive to the Fairway Estates residential subdivision on the west. Formerly known as Parcels 1-G and 1-H, these parcels were subject to restrictive language and strict expectations on the 1989 Plan. These restrictions dealt with allowing only uses found under the R-L, Low Density Residential Zone District, and R-L-M, Low Density Multiple Family Zone District. In addition, child care centers or small office buildings, residential in design, not to exceed 28 feet in height, with finish materials compatible to the neighborhood (brick, wood, stucco) may be considered as future alternative land uses. The amended O.D.P. codifies these restrictions. Staff Finding: Land Use Policy #74: "Transitional land uses or areas (linear greenbelts, or other urban design elements) should be provided between residential neighborhoods and commercial areas in order to enhance the concept of a mixture of land uses." D. Other Amendments: The balance of the other amendments are subtle shifts in road alignments resulting in different configurations and acreages. The primary shift is moving Boardwalk drive slightly east as it curves toward the intersection with Keenland Drive at Lemay Avenue. This allows more depth for single family along the ridge defined by Mail Creek Ditch. Boardwalk remains a collector street. s • Oak/Cottonwood Farm Amended Overall Development Plan, #54-87F June 22 , 1992 P & Z Meeting Page 8 5. Neighborhood Compatibility: A two-part neighborhood information meeting was held on April 29, 1992 . One part addressed the major changes to the O.D.P. with the exception of Parcel S. The minutes to this meeting are attached. One of the primary concerns was the former inclusion of a local street connection south of Werner School with an intersection on Mail Creek Lane. This potential connection has been deleted. The second part of the neighborhood meeting addressed a proposed Preliminary P.U. D. for convenience and lube and thus the request to amend Parcel S to "Auto Related and Roadside Commercial" . The minutes to this portion of the meeting are also attached. This proposed amendment was perceived as not accomplishing the transitional function of buffering Harmony Market Community Regional Shopping Center as would a retail store or office. Staff agrees that Parcel S must take on a transitional role and that this buffering element can be accomplished with an Auto Related and Roadside Commercial Use. In order to further emphasize this buffering element, Staff has recommended the above mentioned condition. 6. Transportation: Access to the eastern side of Werner School is enhanced by the proposed offstreet drop-off zone. This is intended to reduce the length of a vehicular trip from the Oak-Cottonwood Farm, and the residential areas east of Lemay Avenue, to the school property. The drop-off zone would be served by a local street, not a collector. The concept has been reviewed and approved by representatives of the Poudre R-1 School District. Boardwalk Drive continues to function as a collector street with an alignment with existing Keenland Drive at Lemay Avenue. This allows easy access to either Harmony Road or Lemay Avenue. The southerly collector street is modified by the proposed amendment. This collector is designed to provide improved access for the internal portions of both this section and the square mile section to the south. The collector network for these two sections is designed to be circuitous and yet still allow access to Fossil Creek Parkway and thus out to College Avenue, or to the front door of Werner School . This collector is designed to cross Mail Creek and also serve as access for Fossil Creek Community Park, and Huntington Hills P.U.D. By a previous amendment to the City' s Master Street Plan, Fossil Creek Parkway has shifted from a direct alignment along the southerly property line to a new route south of Fossil Creek Community Park. The proposed amended O. D.P. reflects this prior change by general notation since exact alignments are unknown. S 410 Oak/Cottonwood Farm Amended Overall Development Plan, #54-87F June 22 , 1992 P & Z Meeting Page 9 The transportation elements of the amended O.D.P. , in particular, the modified collector system, have been reviewed and approved by the City's Transportation Department. RECOMMENDATION: Staff finds the request to amend the Oak-Cottonwood Farm Overall Development Plan to convert Parcel S from Retail/Office to Auto Related and Roadside Commercial, and to amend parcel sizes and residential densities is in conformance with the adopted Land Use Policies Plan and other elements of the City' s Comprehensive Plan. Staff, therefore, recommends approval of Oak-Cottonwood Farm Amended Overall Development Plan, #54-87F, subject to the following condition: If the development of Parcel S results in evaluation by the Auto Related and Roadside Commercial Point Chart of the Land Development Guidance System, then the design guidelines found in the Neighborhood Convenience Shopping Center: Design Guidelines, Policies, and Criteria (an element of the City' s Comprehensive Plan) shall be the pertinent evaluative criteria in order to promote the desired level of site, landscape, and architectural quality. =i 1 ) ;,-. sk,ox ,F :,, . --1. ----- ,r.iiim, *s Tv- -I/ I • VN \. 11 ;;:., awry rwl It' 4 7 1 ! t\ 'I., #4,c11111164 ir;�'�i-.-.-- ir:!tic ' I n[[ i.[uwr Irr •s•''s�. ?I 1 �';;"u... .-.^-�Q :ty�,�"/y ' , : 3'- EST, ' • ••••-'�J 1v ,tA` - `J - - rp te i ems: bp �' a'" ��-_P.'�y 1V1P! ' F4 I., . 36 _ - - _� ff'? +�` ._ ,•..�, _l,. ��HARMONY R_ hb, w ., ye / >% � bpi ,,, E:5 / II ._ • it �\ r:;; _ . _ ` / H; gip EST As, FS �" ' , 1 1E.-111111111 .s I .•...Ilk bp riT✓/ s ' ^v i ;., ,,,..,.. . .-J--,..-. , ,,r,4,.0. _ ,,,....a.„,(1,1(......1,.,.,7,.,,,z4...:74.......„., I. -1 ( hb , 5 a' m .,- ' i„co.oce.i,uLIA • • r -- - FOSS/L ••< �� � a '`'�'•"• I. : ' 4... '1110.-4. M. Ell II P all ir- I $4,4 ,. ....7) meavows11 ''4 111' ..•0 i rip ^,•/ ,a , Ste: logoy i:'';0• ' I. bpir ii . mi-ir _..... .-7.4,;(05 , .1.... :a iminAmmali • r .■■ \ . �- • . :: wmum r it � ■ rr _� � s fi 1' nI PORTNER \� r �+ '; ' 77 .��f m y`�run RESERVOIR r _ r . ;,. o` � fir ', iii ` _ ^ e :lIIr iI • OAK/COTTONWOOD FARM ITEMS . Amended Overall Development Plan NUMBER: 54-87F . • • ' VACANT LLL ` \/�I I WAR AIM MNVDND, Zi EXIST. O — -1 JZOHO M ` VICINITY MAP s ... N.l o F � : . . 'ZIT' /711- IITQ 9 ,04T, lONED ON llI ~ wJ i4 •y 'lf/zoN[Rar N �� 1 emeo ' '_- E ;Y�/ LI - _ Il 1 I 4. �� _yl����I� �—o e Tji_ ___I r 8 .y - `�—WI4[R COUNtt t� ® eRC0lill IC 1tl 1 y�[}t i �zohm fA PARCEL _o--'-'O, r-• gg w ON ',,�`"t� } kl~° U o--� PARCEL ,�, 1 p I}t4 R __ esr4n o R - f OMMUNITY-RE .NAL •" // �FAJ L y 11 ✓%a. I �0 @ BU' ESS ERVICES ��% C.NR•t�UUL �1',1 '� ��� /I Ja.O.W. -...cc, �- C f r� V ; 11I /' — r S,u pgpu p I' DRIVE SES uo ED .� AItM•GE WEST 33 RULE M[ (Pnoro3[D ZONED b /A Ip sERvlc[s1 LEGAL DESCRIPTION ---I 1ii� LEMAYFES - =_� = - Eirtii.P(/'�.EL AVENUE I _ __ PARCEL Q sxc _— La _ := 30.7 GROSS ACRES± yR• -�--I-E ~f c BUSINESS/S R VICES a o I 20.9 GROSS ACRES± '\ MUITI-YAMILY lIl�ll, _— _ -'� _ - LOW DENSITY RESIDENTIAL O. „` _ _ ^�_^r_".i-T_ RESIDENTIAL * • ,� __ `�` \'w. BOARDWALK E Nrt •"E I0•J'I .". A. \ \ \° DRIVE ..:_......._ .........,._........._._........_ ��� : I i .`fir,,. i i = =ENEFLLS_: ��� LAMER.WNTT " z}ZONED FA1 \A.N1h. I --—-- „,`./ \\ 1 � ,, �...-._..r.. ��._,-�._ s/j _PARCEL_ \''' PARCEL I _ i/11 PARCEL ~, C ••• \� 13.0 GROSS ACRES± A' •, wo[ 17.2 GROSS ACRES± i;, POSSIBLE CITY PARK N LOW DENSITY / ALTERNATIV: 1 + o• RESIDENTIAL ^\0 9.7 GROSS ACRE ' MULTI-FAMILY OR MUITI-FAMI � BRA^ sS-e•��w�l��aW°�- �014,,\ BUSINESS SERVICES AND/OR /� o\,a `; BUSINESS SE- GENERAL NOTES 1 i PARCEL .°i�,/ \ �� 1 IMO �_ r�� \°°.�/ Via; 1 __..== --- _—._..__--- PARCEL\�' 1 I I . CROS`RES3 E `n\ ____ -_ _ � _�2 - 1 L• DEN \ RESI�ENTIAL�J �; _ 12.4 GROSS ACRES± .. a_ • ��-- —� .-__ -- OW ANDD�EN MEDIUM .� � li��- \.` DENSITY �' ° RESIDENTIAL ° IL CME Ili IZON DOUIIIY I 1 \ / , , 41 P . �S PARCEL ,%t MDDE [Ns = SCMDoI \ 0 ', �o •zoN[D N II 8.4 ROSS ACR ......._3 -•"—...._.._... 777■`` Y 1, 8•BLOWD SITY 'W DENSITY ---._ fSIOfNTIAL ° 1�' — _ = PARCEL 1 `\\O\',.47_ , ▪ - ...•—L.w:.... \\�✓✓��'Y 'G Pt' MATES • ,v I r aT mac. "--.- G'•SS ACRES-I: \/ 1 •lOW DENSITY 1111 - __ V E �%� • 1E BLOW •ENSIT °•\ RESIDENTIAL + ---- 11 =-�-• `� _ „�',,,,�L= v \'/ REUI•.NTIAL - "\\`` '1� _ .9 GROSS ACRES± `r `S .. LOW AND/OR MEDIUM X �� J `o DEN•I RE • �'44E� A � 1 LEMAY \Y ` AVENUE [�A0 10.3 GROSS ACRE j ST Euzu[TN ` \� 9.5GRO55 ACRE$± MULTI-FAMILY ''I�'s[TON CHURCH S OW DENSITY • ALTCRNATIV[USE: I ZONED III, \`\ y �°\\ L•MULTI D[NAR_E510[N.RAL_J ---— _ `\l 1 a (RESIDENTIAL �.ta�. *24^ �� __"- .' Gape A�iR��l \ urban design, *ro FOSSIL CREEK 1.1 GR• 5 ACRES± _— .I F9mlmq rw5[SEC No f II ZONED Op COMMUNITY A NUN=0Nr0Nrlplw �.a�(>a�)Tt°-wY. I AND TOE BREAKDOWN SIGNATURE BLOCK OAK/COTTONWOOD FARM ,—s .„,,_„ ,_---_.— AMENDED OVERALL DEVELOPMENT PLAN PROJECT ND. 7173 _ - Y r v.4 `•._�--__w._.__._r.r._ _. v DATE OF PREPARATION.5-04-92 l IIVI REVISIONS �; .. . .. �. � .�+TDS 11- KEY At_ .. _ _ 4 " binRm fig, MIaINN rae 0 200 400 —_ ,..• -- .., _ __ M r ...•... ear w.avww % _I I SKEET No. 1 of 2 .... N•EDN•R wr • (e • • LEGAL DESCRIPTION FOR THE OAK/COTTONWOOD FARM OVERALL DEVELOPMENT PLAN A part of the Northeast 1/4 of Section 1, Township 6 North,,Range 69 West, of the Sixth P.M., City of Fort Collins, County of Larimer, State of Colorado, which, considering the east line of said Northeast 1/4 as bearing S 00°10'W, and with all bearings contained herein relative thereto, begins at a point on said east line which bears S 00°10'W 81.00 feet from the Northeast corner of said Section 1, and runs thence along said east line, S 00°10'W 1345.41 feet to the south line of said Northeast 1/4 to a point which bears N 89°56'50" W 700 feet from the East 1/4 corner of said Section 1; thence along the south line of said Northeast 1/4, N 89°56'50" W 1800.95 feet; thence N 32°1 3'45"W 284,41 feet to the west line of said Northeast 1/4; thence along said west line, N 00°11'05" E 1736.51 feet; thence S 89°48'55" E 400.00 feet; thence N 00°11'05" e 565.00 feet to the southerly line of Colorado State Highway No. 68;thence along said southerly line, S 86°16'E 50.93 feet, and again along said southerly line, N 83°39'E 603.60 feet, and again along said southerly line, N 89°45'15" E 921.30 feet, and again along said southerly line, S 46°21'31" E 70.00 feet, and again along said southerly line, N 89°55'30"E 30.00feetto the point of beginning, containing 124.717 acres, and being subject to all easements and rights-of-way which are existing or are of record. AND A part of the Southeast 1/4 of Section 1, Township 6 North, Range 69 West, of the Sixth P.M., City of Fort Collins, County of Larimer, State of Colorado, which, considering the east line of said Southeast 1/4 as bearing S 00°03'20" W and with all bearings contained herein relative thereto, begins at the East 1/4 corner of said Section 1,and runs thence S 00°03'20"W 777.92 feet;thence N 89°56'40"W 50.00 feet;thence N 88°13'05" W 376.97 feet; thence S 00°03'20" W 241.64 feet; thence S 79°35'E 229.55 feet; thence N 89°46'40" E 201.00 feet to the east line of said southeast 1/4; thence S 00°03'20" W 1591.42 feet to the Southeast corner of said Section 1;thence along the south line of said Southeast 1/4, N 89°09'18" W 2683.81 feet to the South 1/4 corner of said Section 1; thence along the west line of said Southeast 1/4, N 00°43'06" E 2159.50 feet; thence S 70°37'E 126.42 feet; thence N 14°10;W 79.38 feet; thence N 19°07;E 32.15 feet; thence N 47°47' E 112.02 feet; thence N 16°55'30" E 73.67 feet; thence N 21°18'W 129.60 feet; thence N 13°20'W 114.43 feet to the north line of said Southeast 1/4;thence along said north line, S 89°56'50"E 2517.64 feet to the point of beginning, containing 156.290 acres, and being subject to all easements and rights-of-way which are existing or are of record. AND A tract of land located in the NE 1/4 of Section 1, Township 6 North, Range 69 West of the 6th P.M., Larimer County, Colorado, being more particularly described as follows: Considering the North line of the NE 1/4 of Section 1 as bearing N 89°58'54"East and with all bearings contained herein relative thereto. Commencing at the North Quarter corner of said Section 1,thence S 00°1 1'05"W, 72.70 feet to the South right- of-way line of Colorado State Highway No. 68; thence along said South right-of-way line S 86°16'06" E, 348.40 feet to the Point of Beginning; thence continuing along the South right-of-way line S 86°16'06" E, 51.60 feet to the Northeast corner of a tract of land described in Book 2052 at Page 507, recorded in Larimer County records; thence along the East line of said Book 2052 at Page 507 S 00°1 1'05"W, 545.55 feet (recorded S 00°25'1 1"W, 545.55 feet); thence along the South line of said Book 2052 at Page 507 N 86°16'06"W, 51.60 feet (recorded N 86°02'00"West); thence N 00°1 1'05" E, 545.55 feet to the Point of Beginning. EXCEPT A tract of land situate in the Southeast 1/4 of Section 1,Township 6 North, Range 69 West of the 6th P.M., City of Fort Collins, County of Larimer, State of Colorado, which considering the West line of the said Southeast 1/4 as bearing N 00°43'06"E and with all bearings contained herein relative thereto is contained within the boundary lines which begin at a point on the said West line which bears N 00°43'06" E 1007.31 feet from the South 1/4 corner of said Section 1 and run thence N 00°43'06" E 710,00 feet along the said West line; thence S 69°17' E 680.00 feet; thence S 41°28'30" E 165.27 feet; thence S 00°43'06" W 355.00 feet; thence N 89°16'54" W 750.00 feet to the point of beginning, containing 9.7702 acres more or less, and excluding all water rights appertaining thereto. OAK/COTTONW0g&FARM OVERALL DEVELOPMENT Pi" • LAND USE BREAKNN • MAY 4, 1992 PARCEL LAND USE GROSS AREA DWELLING UNITS DENSITY FLOOR AREA A Multi-Family 10.3 sc. 80 units 7.77 du/ac sq.ft.+ B Low Density Residential 16.0 ac. 60 units 3.13 du/ac sq.ft.+ C Low Density Residential 8.4 ac. 20 units 2.38 du/ac sq.ft.± O Low Density Residential 18.6 sc. 44 units 2.37 du/ac sq.ft.+ E Low and/or Medium Density 12.4 ac. 60 units 4.84 du/ac sq.ft.+ Residential F Low Density Residential 11.2 ac. 30 units 2.68 du/ac sq.ft.+ G Low Density Residential 20.9 ac. 62 units 2.97 du/ac sq.ft.+ H Low Density Residential 14.0 ac. 36 units 2.57 du/ac sq.ft.± I School Drop-off 0.8 ac. 0 units 0 du/ac sq.ft.± J Low Density Residential 13.8 ac. 60 units 3.62 du/ac sq.ft.+ K Low and/or Medium Density 13.9 ac. 60 units 4.32 du/ac sq.ft.+ Residential I. Low Density Residential 9.6 sc. 10 units 1.06 du/ac sq.ft.+ M Open Space/Drainage 1.1 sc. 0 units 0 du/ac sq.ft.+ N Multi-Family and/or 9.7 ac. 140 units 14.43 du/ac 6,000 sq.ft.+ Business Services P Possible City Park 13.0 sc. units 0 du/ac sq.ft.+ O Business Services and/or 30.7 ac. 160 units 4.89 du/ac 250,000 sq.h.+ Multi-Family R Community-Regional 60.3 ac. 0 units 0 du/ac 460,000 sq.ft.+ Shopping Center& Business Services S Auto Related Road Side 2.9 ac. 0 units 0 du/ac 30,000 sq.ft.+ Commercial T Uses Allowed in the RLM 3.8 ac. 36 units 9.47 du/ac 10,000 sq.ft.+ Zoning District U Uses Allowed in the RL 4.8 ac. 0 units 0 du/ac 26,000 sq.ft.+ Zoning District ✓ Uses Allowed in the RL 6.6 ac. 20 units 3.67 du/ac sq.ft.+ Zoning District TOTALS 271.7 ac. 848 units 770,000 sq.ft.+ ill/ OAK - COTTONWOOD FARM O.D.P. SOUTHERLY COLLECTOR O.D.P. Note A street connection is desired to cross Mail Creek to provide vehicular access to the residential uses on Parcel L, Huntington Hills P.U.D. and Fossil Creek Community Park. This street is planned to intersect with the extension of Fossil Creek Parkway. It is desired to cross Mail Creek in as ecologically sensitive manner as possible. The future Fossil Creek Trail may pass under this street connection. Since the exact alignment of Fossil Creek Parkway and Fossil Creek Trail are not known at this time, the exact location of this street connection will be determined at a future date. • Q o urban design, inc. OAK/COTTONWOOD FARM Amended Overall Development Plan Statement of Planning Objectives May 4, 1992 The Oak/Cottonwood Farm Overall Development Plan is proposed to be amended to reflect the results of three years of planning and development since the current Master Plan was approved in 1989. Oak/Cottonwood has evolved into a planned community comprising the following general planning areas: The Harmony Market Commercial Area Made up of parcels R and S, this area provides community-regional shopping opportunities, auto related commercial, and business services, being developed in accordance with the design guidelines found in the Harmony Corridor Plan. The Fairway Estates Buffer Area This area - which includes parcels T, U, and V - restricts land uses according to the provisions of a deed restriction negotiated with the adjacent neighborhood. The Mixed Use Transitional Area Parcels N, P, and Q form an area appropriate for multi-family, office/business services, and neighborhood scale recreational uses as a transition between the planned low density neighborhoods to the south and west, and the more intense uses in Harmony Market, OakRidge West, and OakRidge Business Park. The Miramont Residential Area This area - including parcels A through L - is really designed as a coordinated series of neighborhoods. To the extent practical, each neighborhood cluster will have its own identity and local circulation system, with open space corridors and the main collector/connector street system forming the primary unifying design elements. Except uses allowed by right in the RP zoning district,development at Oak/Cottonwood Farm will be regulated by provisions of the City of Fort Collins' Land Development Guidance System (LDGS). Single family residential parcels at Miramont may be developed either as straight subdivisions, or as PUD's through the LDGS. Street and lot orientation at Oak/Cottonwood is largely dictated by: The pre-determined alignment of Boardwalk Drive The pronounced ridge running across the property north of Werner Elementary The alignment of Mail Creek and the Mail Creek Ditch Natural drainage patterns that - particularly on the flatter portions of the site - must be respected in order to meet storm drainage requirements. • • As a result, many of the low density residential parcels lend themselves very well to solar orientation; while other parcels are more appropriately planned with many lots that are 45° to 600 off of true south. It is the intent of the developers of the Miramont area to provide neighborhoods that reflect the best planning for each parcel. This effort will include meeting the solar orientation requirements, except when achieving solar orientation can only be done by diluting the quality of the plan. The applicant's project goals are consistent with the adopted Goals and Objectives and the Land Use Policies Plan of the City of Fort Collins with regard to neighborhood planning, mixed use development, and locational criteria for various land uses. Applicable policies include: Policy 3 The City shall promote: Maximum utilization of land within the city; ... The location of residential development which is close to employment, recreation, and shopping facilities. Policy 12 Urban density residential development usually at three of more units to the acre should be encouraged in the urban growth area. * Although several parcels will be developed at densities below 3 d.u./ac., the overall density is expected to be between 3 and 5 units/residential acre. Policy 69 Regional/community shopping centers should locate in areas which are easily accessible to existing or planned residential areas. Policy 74 Transitional land uses or areas (linear greenbelts or other urban design elements) should be provided between residential neighborhoods and commercial areas in order to enhance the concept of a mixture of land uses. Policy 75 Residential areas should provide for a mix of housing densities. Policy 79 Low density residential uses should locate in areas: a. Which have easy access to existing or planned neighborhood and regional/community shopping centers; b. Which have easy access to major employment centers; c. Within walking distance to an existing or planned elementary school; and d. Within walking distance to an existing or planned neighborhood park and within easy access to a community park; and e. In which a collector street affords the primary access. • • Policy 80 Higher density residential uses should locate: a. Near... regional/community shopping centers; b. Within close proximity to community or neighborhood park facilities; c. Where water and sewer facilities can be adequately provided; and d. Within easy access to major employment centers. Policy 95 Neighborhood parks...should be provided in every square mile section of the City....Primary access should be by Collector streets. Development of Oak/Cottonwood Farm is expected to be complete by the year 2000± •Developit Services Planning Department City of Fort Collins NEIGHBORHOOD MEETING MINUTES PROJECT: Cottonwood Farm, Amended Overall Development Plan DATE: April 29, 1992 REPRESENTATIVES: OWNER: Peter Kast, G.T. Land, Colorado, Inc. DEVELOPER: Gary Nordick, Nordick/Neal Partnership CONSULTANT: Eldon Ward, Cityscape Urban Design PROJECT PLANNER: Ted Shepard QUESTIONS, CONCERNS, COMMENTS 1. We are concerned about the size of the lots south of Werner School. These lots will be across from the largest lots in Fossil Creek Meadows. These lots should be compatible in size with the existing lots, otherwise, our property values will be reduced. RESPONSE: The exact size of these lots is not known at this time, as this area may be one of the last areas to be developed. Also, the lots and layouts are shown conceptually only. At the O.D.P. stage, lots and blocks are usually not indicated. It is our opinion, however, that these lots will average around 7, 000 square feet in lot area. Most of these lots will be separated from Fossil Creek Meadows by the Mail Creek greenbelt. 2. The largest lots should be adjacent to Fossil Creek Meadows to promote compatibility. RESPONSE: The largest lots will be along the ridgeline defined by the Mail Creek Ditch. These lots will be the largest, and most expensive because of the views, and the potential for walk-out basements. The O.D.P. will have a range of lot sizes to offer a variety of choices. The City has a policy that the residential subdivisions not be less than three dwelling units per acre. These factors will influence lot sizes. 3 . We are concerned about the local street connection, south of Werner School, to Mail Creek Lane. This will bring unnecessary traffic into Fossil Creek Meadows. Also, this connection will encourage short-cutting for commuters who want to avoid the College and Harmony intersection. This connection should be reconsidered. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 RESPONSE: Presently, Werner School has poor access for families living in any other neighborhood besides Fossil Creek Meadows. The proposed turn-around on .the east end of the school will allow drop- offs without impacting Fossil Creek Meadows. Mail Creek Lane was platted as a local street on the edge of the subdivision with the purpose of serving the area to the east. By providing an easterly access, some traffic on Mail Creek Lane may actually be reduced. 4 . Werner School has insufficient parking for events. The school should build more parking so cars are not forced to park on Mail Creek Lane. During events, we can barely get out of our driveway and sometimes our driveways are blocked. This lack of parking is a nuisance and should be remedied by the amended O.D.P. RESPONSE: This is a good comment and G.T. Land will talk to Poudre R-1 about more parking. Mail Creek Lane does become overly congested with parked cars during school events and during the afterschool pick-up period. It is difficult to predict how Poudre R-1 will respond. 5. What are the anticipated uses on Parcels E, K, A, N, Q? RESPONSE: At this time, these areas are designed to provide buffering and transitions from the commercial areas to the north and the arterials on the east. Residential densities could be patio homes or smaller-lot single family. One of these parcels is likely to develop as multi-family, but not all. 6. When you say "multi-family" , what kind of density? RESPONSE: At this stage, it is premature to guess the density. 7 . What are the proposed connections to Fossil Creek Parkway? RESPONSE: Under the proposed O. D. P. , there is no direct connection to Fossil Creek Parkway as it is proposed to swing south, and not be contiguous to Cottonwood Farm. One option would be to provide a local street connection but this would involve a bridge over Mail Creek. The exact future alignment for Fossil Creek Parkway has not . yet been determined. It is the desire of the City Transportation Department that Fossil Creek Parkway not be a direct connection to Southridge Greens Boulevard, but serve areas further south. 8. What are the options for Fossil Creek Parkway? RESPONSE: One option is that it would swing south and east and go south of Portner Reservoir, and intersect Lemay in the Huntington Hills project. Another option is that it would swing south and form a tee intersection with an extended Portner Road. As a collector street, Fossil Creek Parkway will be designed to feed the traffic from the residential areas onto the arterial street system. 410 9 . Again, it must be emphasized that the local street connection to Mail Creek Lane is a very big concern. There should be no connection. This street should be terminated with a cul-de- sac and traffic forced to go back to Lemay Avenue. We bought our house before the school and we consider the school to be intrusive enough. A local street connection would only add to the intrusion. RESPONSE: We are sympathetic to this concern. The owner and developer will discuss options with Poudre R-1 and City of Fort Collins Transportation Department. The connection is indicated out of a concern for improving access to the school . 10. The parcels that border Mail Creek Lane should not be considered for multi-family. Only single family is appropriate so there is no impact on the existing homes along Mail Creek Lane. 11. How many homes will the Nordick/Neal Partnership seek approval for and over what time frame? RESPONSE: The partnership is looking at a total of about 400 homes. The time frame depends on the market and interest rates and could be anywhere from two to four years. 12 . With 400 homes, will a new elementary school be built? Developers should be responsible for building new schools. Since we live in Oak Ridge, our kids will be forced out of Werner by the new families which are closer and may not have to be bussed. This will be another disruption for these kids and that is not fair. We will suffer because increased development cannot be handled by the existing schools. RESPONSE: The developer will not be building a new elementary school. Poudre R-1 is responsible for forecasting residential growth and planning accordingly. The Oak-Cottonwood Farm Master Plan was originally approved in 1987 and indicated greater residential density than that envisioned by the proposed amendment. Developers work with Poudre R-1 on streets, utilities, drainage, etc. , but developers do not build schools. 13 . As residents of two county subdivisions, we would like to go on record as opposing the amount of street lighting on city streets. The amount of street lighting on Boardwalk Drive is simply obnoxious and out of character for the area. This level of lighting on a collector street should be reduced. RESPONSE: This is a good comment. Developers install streetlights according to the strict specifications set by the City of Fort Collins. Developers have no choice in this area. Your comments are best directed towards the City and the Light and Power Department which sets the level of street lighting on public streets. 14. Fairway Estates supports the location of the public park. The developer is encouraged to keep greenbelts, bike paths, etc. away from Fairway Estates to discourage future residents from using our system of bridal paths. Our paths are private, and maintained by our homeowner's association. The paths are not available to the public. Please design the transportation system so our paths are not impacted. 15. Where is Fossil Creek Community Park? RESPONSE: This park is located south of Cottonwood Farm around the area of Portner Reservoir. It will not be built by developers but by the City of Fort Collins Parks and Recreation Department. It will not be the size of a neighborhood park, but more like Rolland Moore Park or Edora Park. 16. We must again take this opportunity to protest the local street connection into Mail Creek Lane. This street should terminate in Parcel J, preferably in a new parking lot for Werner School. We are already overly impacted by daily traffic such as buses and parents, not to mention the special events. Also, Hewlett-Packard commuters may use this connection as a short cut. RESPONSE: Again, we are sympathetic, but the objective is provide better access to the school. We will look at design alternatives to accomplish this objective. Keep in mind, improved access to the school may actually reduce traffic by not forcing traffic into Fossil Creek Meadows. Also, Kruse Elementary School, in Golden Meadows, is scheduled to open up this Fall which may drain off some of the student population at Werner. Hewlett-Packard commuters are presently well served by Harmony, College, Lemay, and Trilby which, as arterials, are designed for higher speeds. The collector street system within Cottonwood Farm is specifically designed to discourage long, straight connections in order to reduce speeds and minimize short-cutting. 17. What is meant by "Business Service"? RESPONSE: These uses are defined by the Land Development Guidance System as one of the point charts used to evaluate a land use on a certain location within the City. The definition is quite broad and includes activities which are predominantly retail, office, and service uses, but on a scale smaller than a Neighborhood Center (Scotch Pines) and smaller than a Community-Regional Shopping Center (Harmony Market) . 18. We are concerned about drainage. Where will storm flows go? RESPONSE: All storm flows head east and south. The drainage and grading plan and stormwater detention plans will be reviewed and evaluated by the City of Fort Collins Stormwater Utility. Storm flows north and east of Mail Creek Ditch must be retained within the development and released at a controlled rate that is slower Ilk Ilk than the historic release rate. This drainage system is referred to as McClelland-Mail Creek Drainage Basin. Storm flows that are south of Mail Creek Ditch will be allowed to be conveyed directly into Mail Creek without, detention in order to precede the upstream, detained flows during a major storm. Please keep in mind that Fairway Estates and Fossil Creek Meadows are upstream of Cottonwood Farm. Drainage heads generally east, and south. 19 . What will be the treatment along Mail Creek Ditch and Mail Creek? Will there be development right up the edge? RESPONSE: No, there will be natural transition area that will be planted with a mix of drought-tolerant grasses. Other details are premature and not fully explored at this time. 20. Mail Creek should be made part of the City park system, and treated as a natural amenity. This will provide a buffer between the existing and developing areas. Perhaps a bike path could be built along this linear area. The path could also serve the school. RESPONSE: This is a good comment and will be passed along to the Parks and Recreation Department, and the Department of Natural Resources. 21. Please do not provide Kentucky blue grass and a manicured level of maintenance along the creek and ditch, these areas should be left as natural as possible. RESPONSE: The developer has experience in this area and has worked closely with the affected City Departments in Clarendon Hills along both Fossil Creek and the Burns Tributary. It is not the developer' s desire to place blue grass turf in the riparian areas. 22 . What parcel will develop first? RESPONSE: Parcel G since it is the closest to the existing sewer line in Boardwalk Drive. 23 . Residential lots should be the same size as in Fairway and Fossil Creek Meadows. There should be consistency between subdivisions. RESPONSE: The City has policies about a minimum of three dwelling units per acre, as well as providing a variety of housing opportunities within all areas of the City. For these reason, the proposed lot sizes, perhaps with the exception of estate lots along the ridge, will not be equivalent to the larger lots of Fairway and Fossil Creek Meadows. Again, the developer has experience in this area with Clarendon Hills (City) going in next to Applewood Estates (County) . In Clarendon Hills, a variety of lot sizes has proven successful in protecting the character of Applewood Estates. 24. Will development of Parcel G trigger construction of Boardwalk Drive over to Lemay Avenue? If so, will it be signalized? RESPONSE: Yes, it is likely that Boardwalk will be extended to Lemay with development of Parcel G. It will align with Keenland Drive. Since Keenland and Boardwalk are classified as collectors, the intersection is eligible for a signal when traffic volumes warrant signal control. 25. How big will the lots be along ridgeline? RESPONSE: These lots could range from 12, 000 to 20,000 square feet. Other parcels will not have lots in this range but will be smaller. DevelopmS Services S Planning Department City of Fort Collins NEIGHBORHOOD MEETING MINUTES PROJECT: Pit Stop. Convenience and Lube Preliminary P.U.D. DATE: April 29, 1992 CONSULTANTS: Rick Pickard, The Engineering Company Kevin Meilbeck, Architectural Consultant = PLANNER: Ted Shepard QUESTIONS, CONCERNS, COMMENTS 1. From the site plan it looks like it will be difficult for trailers, R.V. 's, and fifth wheels to get gas. Already Fort Collins has a problem with a lack of gas stations that can accommodate anything besides cars and pick-up trucks. Most folks have to go out to the stations by I-25 to find a station with proper maneuverability. RESPONSE: This station allows full access for the transport (fuel - delivery) truck. The site dictates that this facility will not be a truck stop, but will be a neighborhood serving station. The facility is designed to capture vehicles heading to I-25 from south Fort Collins. Since most of this traffic is cars and pick-up trucks, it is not specifically set up to cater to R.V. 's.- Larger, oversized - vehicles that cannot access the site will have to continue to rely on traditional truck stops or the stations out by the interstate. 2 . The 15 foot setback from the west property line is insufficient to provide proper buffering of this kind of use. This side setback should be greater. RESPONSE: We will look at the possibility of increasing this setback. 3 . The proposed amendment to the Overall Development Plan to allow auto related uses is an amendment for the worse. These kinds of uses are a further intensification of the site. The retail and business service uses were placed on this parcel to allow a transition from the Harmony Market P.U. D. Now, the amendment proposes to undo this original planning. 4 . The architectural character does not promote the transition function. Flat roofs will not be acceptable. During deliberations for Harmony Market, the pad sites were identified as being important to establish a residential character. The proposal must consider pitched roofs, brick 281 North College Avenue • P.O. Boa 5S0 • Fort Collins, CO 80522-05S0 • (303) 22J-6750 • siding, and residential character to begin to address the transitional function. RESPONSE: The developer was notified at conceptual review that residential character would be critically important. The "Shurfast" across from Collindale Golf Course is being considered as the appropriate model for design. 5. Who is the applicant/owner/operator of this convenience and lube and why is he not here tonight? Is this a major oil company? What brand gasoline will be sold? RESPONSE: The owner is John White. He owns approximately 40 of these stores throughout the midwest. He is unable to attend this evening due to a previous commitment in Denver. The operation is considered an independent, not a major oil company. Gasoline is purchased on the open market from a variety of sources, based on best price. - 6. The owner should be aware that there is a high water table in this area. With Mail Creek Ditch and Mail Creek, the water table gets into our basements during irrigation season, especially in July. This will cause problems for underground tank installation. Also, if there is any kind of leakage, it will travel and could contaminate our homes with noxious fumes. The owner should be made fully aware of the future liability of installing underground gas tanks in an area of high water table. Fort Collins has a history of leaking underground gas tanks and the major oil companies have had to come into our community and buy up affected homes. -7 . I am concerned that Mr. White, as an independent, does not have the financial means to compensate property owners in the event of a gas leak. If there is contamination, and Mr. White cannot purchase affected properties, then he could declare bankruptcy and we would be left with nothing but contaminated homes. This is not very reassuring. RESPONSE: The underground tanks will be installed in accordance with the requirements of the Poudre Fire Authority. The design of the installation is based on the soils report, and the water table. 8 . The location will be an additional burden on Fairway Estates. Additional traffic on Harmony Road will make it more difficult to get out via Hogan Drive. There is nothing but negative impact associated with this request. We certainly do not need another one of these types of uses as there is a glut on the market already. RESPONSE: A traffic impact analysis will be prepared to address traffic issues and submitted to the City for evaluation. Any improvements required to mitigate the traffic impact will be built by the developer as a requirement of the P.U.D. 111 9 . As a homeowner in Fairway Estates, I am concerned about yet another amendment to the Cottonwood Farm O.D.P. Everytime there is an amendment, it is for a more intense use than what was allowed on the approved plan. This is how Harmony Market came into being. The amendment process offers no protection for homeowners. • RESPONSE: It is true that O.D.P. ' s get amended over the years, especially on parcels that have no end user at the time the plan is approved. O.D.P. 's are not designed to guarantee a land use and no development rights are vested. Some O.D.P. 's get amended to less intense uses as on the southerly areas of Cottonwood Farm which reduces the number of patio homes and multi-family parcels. The process allows full neighborhood review and a public hearing in front of the Planning and Zoning Board. "10. The proposed uses will require exposure to vehicles along Harmony Road. With the generous setback required by the Harmony Corridor Plan, Pit Stop will be motivated to use lights and signage to draw in the motorist. These attraction devices will be an intrusion on the neighborhood. We do not like excess illumination, neon, signs, or other commercial aspects that promote reliance on roadside customer traffic. RESPONSE: Pit Stop is prepared to commit to constructing a residential style project. As mentioned, we have looked at the Shurfast at Collindale and there are benefits in promoting the residential character. We are sensitive to illumination and signage issues and are willing to work with the Planning Staff on toning down these elements to the appropriate scale. We have already had discussions with Staff on _ minimizing under canopy lighting. 11. Will this be a 24-hour operation? RESPONSE: We do not know at this time. 12. Will the dumpster area and service area be screened from Fairway Estates? RESPONSE: These specific areas have not been designed in detail but can be screened by landscaping, berming, or fencing. 13 . During busy periods for Pace and Builder's Square, it takes several cycles to get through the light at Harmony and Boardwalk. With the additional traffic for a convenience and lube, this will only get worse. This is hardly what you could call "convenient" . RESPONSE: Again, the traffic impact analysis will assess the impact on traffic patterns and volumes at the key intersections. 14 . What is the time frame for this project? RESPONSE: The applicant is in the feasibility stage. This project is not ready to be submitted for preliminary review until further analysis is conducted. 15. The applicant should realize that what is permitted by the Sign Code will not be allowed on this project. Like Pace and Builders Square, signage will have to be downsized from Code allowances to blend into the residential area. RESPONSE: The applicant is aware that much negotiation went into the design of Harmony Market and that signage is an element of design and compatibility. 16. The applicant should be aware that the highly-touted Shurfast at Collindale is considered a minimum standard that must be - - met or exceeded. 17 . I am concerned that the discussion is revolving around design aspects and mitigation. The central issue is the land use and the proposed amendment to the O. D.P. The proposed land use is auto related and roadside commercial which is more intense than business service and retail. Also, the proximity of underground gas tanks should be addressed as a land use issue. Intensification and underground gasoline storage are fundamentally incompatible with Fairway Estates. No amount of design can mitigate these factors. The O.D.P. should not be amended in order to protect the residential character of Fairway Estates. RESPONSE: We agree that the amendment to the O.D.P. is fundamental and is an issue that precedes design, buffering and mitigation. In a neighborhood meeting setting, the two issues are often commingled simply because the discussion must begin with a proposed land use and how it relates to a certain site. 18 . If there is a gas leak, and it is detected by the leak detection system, will the neighbors be notified? RESPONSE: This is a good question and will be passed onto the applicant/operator. 19 . The potential hazard of leaking underground storage tanks cannot be minimized. The potential threat to health and home value is enormous. If there is a leak of any kind, the homeowners should be notified. 20. I am concerned that the development proposal does not consider the well-being of our neighborhood. The proposal is a typical, selfish project that shows a lack of respect for our property values. I agree that the land use is inappropriate and cannot be mitigated. The O.D.P. should not be amended. 21. What will be the quality of the stormwater runoff? Will there be onsite detention? Will there be parking lot detention or a grassy area? Will runoff from the pavement be filtered or treated prior to be released downstream? RESPONSE: These are good concerns and have not been fully explored. All the present criteria required by the City of Fort Collins Stormwater Utility will be met. 22. Is there a carwash proposed for this facility? RESPONSE: No. 23 . Will the facility encourage large trucks and diesels? RESPONSE: No, only cars and pick-up trucks. _ - 24 . Will the store sell 3 .2% beer right next to a private school? Is this allowed by the Liquor Licensing Authority. Isn't there some separation requirement from schools? RESPONSE: Under current State Statutes, there are no separation requirements for sale of 3 . 2% beer. For full strength beer and liquor, the separation requirement is 500 feet minimum. 25. Does City Council have the authority to increase the minimum separation requirements and be more strict than the State? RESPONSE: Yes, with a home-rule charter, the City Council has legal authority to increase the minimum separation requirements. U U U III Ill OAK/COTTONWOOD FARM SITE ACCESS STUDY FORT COLLINS , COLORADO IllMAY 1992 U Prepared for : Nordic Construction 309 West Harmony Road • Fort Collins , Colorado 80526 Ill U Prepared by: MATTHEW J . DELICH, P .E. 3413 Banyan Avenue Loveland, Colorado 80538 Phone ( 303 ) 669-2061 Ill U U U EXECUTIVE SUMMARY Oak/Cottonwood Farm is a proposed 222-acre mixed use devel - opment located south of Harmony Road and west of Lemay Avenue in Fort Collins , Colorado. This traffic impact study involved the steps of trip generation, trip distribution, trip assignment , capacity analysis , traffic signal warrant analysis , and accident analysis . This study assessed the impacts of Oak/Cottonwood Farm on the existing ( short range - 1993 ) and future ( long range - 2010 ) street system in the vicinity of the proposed development . As a result of this analysis , the following is concluded: - The development of Oak/Cottonwood Farm is feasible from a traffic engineering standpoint . At full development as proposed, approximately 14 , 200 trip ends will be generated at this site . Phase 1 development at Oak/Cottonwood Farm is projected to generate 890 vehicle trip ends . - By 1993 , given the existing traffic and proposed Phase 1 development of Oak/Cottonwood Farm, the access points to the site will operate at acceptable levels of service . - A new signal at the intersection of Boardwalk Drive and Lemay Avenue may be warranted as a result of increased -long range traffic. A left turn phase for the north/south legs of Boardwalk at Harmony Road is recommended to accommodate long term traffic Illgrowth. - With the recommended control and geometrics , intersec- tions will operate acceptably during most of the day . Some stop sign controlled left turns will operate at unacceptable level of service conditions during peak hours , but this condition does not warrant improvement . - With proper traffic control and geometries , the accident rate should be minimal for an urban condition. III III Ill I U U N I . INTRODUCTION IIIThis site access study addresses the capacity , geometric , and control requirements at and near a proposed development known III hereinafter as Oak/Cottonwood Farm. It is located south of Harmony Road and west of Lemay Avenue in Fort Collins , Colorado . This study addresses the traffic impacts at two levels of development : 1 ) a short range future ( 1993 ) which includes the III development of 92 single family dwelling units , and 2 ) a long range future ( 2010 ) with full development of Oak/Cottonwood Farm (222 acres) . IIIDuring the course of the analysis , numerous contacts were made with the project planning consultant (Cityscape Urban III Design, Inc. ) , the developer (Nordic Construction Company) , and the Fort Collins Traffic Engineering Department . This study conforms to the format set forth in the Fort Collins Traffic Impact Study Guidelines . The study involved the following steps : III - Collect physical ,.,,traffic and development data. - Perform trip generation, trip distribution, and trip III - assignment . Determine peak hour traffic volumes . - Conduct capacity and operational level of service III - analyses on key intersections . Analyze signal warrants . - Analyze potential changes in accidents and safety illconsiderations . II . EXISTING CONDITIONS IIIThe location of Oak/Cottonwood Farm is shown in Figure 1 . Since the impact in the short range , as well as the long range, is of concern , it is important that a thorough understanding of the existing conditions be presented. IIILand Use Over the past ten years , the City of Fort Collins has III annexed considerable undeveloped land south of Harmony Road. This land is prime development land . Some of this land has been developed, but vast tracts are largely agricultural in nature . Except for the strip developments along U . S . 287 (College Ave- nue) , the most notable developments south of Harmony Road are the Harmony Market , which includes a grocery store, building supply store and membership discount store, Southridge Greens PUD, III which includes residential uses along with a semi-public golf course, and Oak Ridge PUD, an industrial/office park and residential uses . Harmony Market uses Boardwalk Drive for access III to Harmony Road and Oakridge Drive for access to Lemay Avenue . Southridge Greens PUD lies to the south of the Oak Ridge PUD. Primary access to Southridge Greens is via Lemay Avenue . Oak Ridge PUD gains access to the street system from both Lemay r' v, „, , .t:n Dr I CR r. Horutootj !Ill , lr,rt,r .C ,Y.n�C Dr , / A< L- L1. y!!i s, 5 C N. pt Dd Corn,h 4 \ t : }9. c .....................zPr:cr e • y r I i , III ^$ ` WARREN LAKE I .,� L Boar• \\ ----- / Dr o •.; 4e " ,:*•., /.''a \-1 I ib n N•� p '� Cael g 4 Q .Mts N4 MTropkTpr c _III G H of 6 v 6 L 1' 111 gel 1' l� v 1111 ! ‘..... '`ct� I _ 1 T III F yir•tr Low 111 oCo Pa rl,yiy J —y LrC� T • , • �J � t - •• lw ,. C/ ii _ Ili t ,..„, ... ,. a�trdge GeewF •� �' ,F. , �� - c js....7-• r-- iii•A .. , a f • ' sever 1 • S� PORiHER Va.__ r .! SITE LOCATION Figure 1 ill: Avenue and Harmony Road. The center of Fort Collins lies to the north of Oak/Cottonwood Farm. Besides the Oak Ridge PUD to the east of Oak/Cottonwood Farm, the adjacent land uses are as follows : 1 ) to the west is an established residential development (Fairway Estates ) , 2 ) to the north is an established residential area with some vacant land near the Harmony/Boardwalk intersection, and 3) to the south IIIare two areas zoned rlp , Fossil Creek Community Park and Huntington Hills . The topography of the northern portion of Oak/Cottonwood Farm, north of Mill Creek Ditch, is essentially 011 flat . South of Mill Creek Ditch, the land slopes into the valley of Fossil Creek . IIIRoads The primary roads and streets near Oak/Cottonwood Farm are ' Illshown in Figure 2 . Harmony Road (State Highway 68 ) borders Oak/Cottonwood Farm and Harmony Market on the north. It is an east-west street designated as a major arterial on the Fort III Collins Master Street Plan. It has a rural cross section with two 12-foot lanes in each direction with a center grass median. The center median is paved west of Boardwalk . Turn lanes exist III at a number of intersections along Harmony Road . The posted speed limit is 45-50 mph between College and Boardwalk , and 50 mph from Boardwalk Drive to Timberline Road . Sight distance is generally not a problem along Harmony Road. Currently , signalized intersections along Harmony Road are at College, 1 III Boardwalk , Lemay , McMurray and Timberline . It is expected that , in the future , signals will be warranted at the intersection of Harmony/CR 9 . Ill In the future, Harmony Road is expected to be a six-lane III street according to the Fort Collins Master Street Plan. In later analyses in this report , the short range ( 1993) assumes current geometries on Harmony Road, while the long range ( 2010 ) assumes the six-lane geometrics along Harmony Road. IIILemay Avenue borders Oak/Cottonwood Farm on the east . It is a north-south street designated as an arterial on the Fort III Collins Master Street Plan. Adjacent to Oak/Cottonwood Farm, Lemay Avenue is improved to its four-lane plus turn lane curb-to- curb width through the Cottonwood site . However , it functions as a two-lane street south of Oakridge Drive . The widened Lemay III Avenue is from Harmony Road on the north through Rule on the south. It is expected that exclusive turn lanes will be incorporated along Lemay Avenue at appropriate locations . North III of Harmony Road, Lemay Avenue is improved as a four--lane street to Horsetooth Road . At this location, a signalized tee intersection exists . Lemay Avenue is currently posted for a 40 mph speed limit . 111 111 4 AO*- • T 0 T .i' T 145/191 N -+— 568/926 ) / ii/e—5/51 HARMONY ROAD 95/85 —f W ill 855/752—'` Z ILI CO 27/132 w w e > o Q J N - Q Ili Q > M r LIJ • • m rn 00 111 N T in (O �_ 42/33 16/30 1111 KEENLAND .DRIVE a) N T T T III in N N CO CO in 1 T NIII / 84/44 ,e/---13/10 SOUTHRIDGE , I ( GREENS BLVD. • to 1- T T III 4 RECENT PEAK HOUR TRAFFIC Figure 2 III AM Peak/PM Peak III III III Boardwalk Drive is a collector street which connects College Avenue to Harmony Road. It primarily serves the existing residential area north of Harmony Road and also acts as a recirculation street in this area of Fort Collins . It has been IIIextended south of Harmony Road to Oakridge Drive Existing Traffic III Peak hour traffic flow is shown in Figure 2 . Morning and afternoon peak hour traffic data were obtained at the intersec- tions of Harmony Road/Boardwalk Drive, Lemay Avenue/Southridge 1 III Greens Boulevard and Lemay Avenue/Keenland Drive . Boardwalk Drive will be extended through the site to align with Keeneland III Drive at Lemay Avenue . All raw traffic data are presented Appendix A. IIIExisting Operation The peak hour operation using the volumes shown in. Figure 2 III is shown in Table 1 . Calculation forms for these analyses are provided in Appendix B . Appendix C describes level of service for unsignalized and signalized intersections from the 1985 High- "' way Capacity Manual . All movements at the key intersections are currently operating at good levels of service (A or B) . IIIIII . PROPOSED DEVELOPMENT Oak/Cottonwood Farm is a proposed mixed use development I located south. of Harmony Road and west of Lemay Avenue in Fort Collins . It will include residential , retail , office, church and park uses . Figure 3 shows a schematic of the site plan of ill Oak/Cottonwood Farm. As indicated earlier, two levels of analysis were performed: the short range (1993) which includes. ilig Phase 1 development of 92 homes , and the long range ( 2010 ) which includes full development of Oak/Cottonwood Farm. U O O Table 1 1992 Peak Hour Operation U Operation Intersection AM PM IHarmony/Boardwalk(signal ) B B Lemay/Boardwalk • WB L A B WB R A A SB L A A I Lemay/Southridge Greens Boulevard WB L A A IIWB R A A SB L A A I U Table 2 ITrip Generation U Daily A .M. Peak P .M. Peak Land Use Trips Trips Trips Trips Trips in out in out III PHASE 1 Residential 92DU 880 18 51 61 33 PHASE 2 II Residential 756DU 7220 144 416 499 265 Retail 95KSF 3860 293 316 267 201 Office 200KSF 2280 328 50 46 256 ITotal 14240 783 , 833 872 754 III II 1111 AO` 1 • N I Alik HARMONY ROAD __ -- -- 1 i (�- 1 W 1111 COMMERCIAL 1 EXISTING RETAIL Z USES II l W Q -- -- -� n iMIXED USE II 1 PHASE `\ ♦ `�!-, 1 I � -- RESIDENTIAL c PARK \ [-- 92 D.U. ♦♦ �/ 1 f MIXED USE i IN L. > 4S.04/40 ., i --- ---____/ 7......%. M'A/.K DRIVE II __i 111 RESIDENTIAL r -). -$,, 1 . , II . NS BLVD. ],_ III I II SITE PLAN Figure 3 111 (Schematic) I i III III The street system in the area in the short range was assumed III to consist of the streets as they currently exist and the exten- sion of Boardwalk south of Harmony Road to Lemay Avenue. In the Year 2010 , at full development of Oak/Cottonwood Farm, the street system was assumed to be what is indicated in the Fort Collins IIIMaster Plan with appropriate additions within the Oak/Cottonwood Farm area . The long range ( 2010 ) street system in the Oak/Cottonwood Farm area assumes six through travel lanes on III Harmony Road. No improvements to Lemay Avenue were assumed. All intersections were assumed to be full turn intersections . IIITrip Generation III Trip generation is important in considering the impact of a development such as this upon the existing and proposed steet system. A compilation of trip generation information was prepared by the Institute of Transportation Engineers ( ITE) in III 1976 , updated in 1987 and 1991 , and was used to project trips that would be generated by the proposed uses at this site . Table 2 shows the expected trip generation on a daily and peak hour ill basis . The land use types from the ITE Trip Generation Manual chosen were : single-family residential , speciality retail , and office park . A vehicle trip is defined as having either an origin or destination at the site . Ill In order to determine the level of other traffic that would likely use Lemay Avenue near Oak/Cottonwood Farm, it was assumed that by 1993 (short range) , background traffic would increase at Pll two percent per year . In the long range ( 2010) , it was assumed that background traffc would increase as reflected in the North ill Front Range Corridor Study . Approximately 1400 daily vehicle trips were assigned to the internal street system of Oak/Cottonwood Farm that would he generated from other sites . This assumption is based on a gravity model of traffic demand ill 79 which was completed for a nearby project . 01.1 Trip Distribution Two directional distributions were determined for ' Ill Oak/Cottonwood Farm. The short range and long range distributions included a distribution for Oak/Cottonwood Farm based on existing and future travel patterns . The trip distributions are shown in Figure 4 . III Trip Assignment IIITrip assignment is how the generated and distributed trips are expected to be loaded on the street system. The assigned trips are the result of the trip distribution process . Due to IIIthe mixed-use nature of the project , a trip reduction factor of 50 percent was applied to the retail trips beyond the development site . This reduction takes into account the trend of passerby III 1n ■ ■ trips and internal trips that would not impact the intersections ■ on Harmony Road or Lemay Avenue . Figure 5 shows the short range ( 1993 ) morning and afternoon peak hour assignments of the Oak/Cottonwood Farm generated traffic with the background traffic in the area. Figure 6 shows the long range ( 2010 ) morning and afternoon peak hour assignments of the Oak/Cottonwood Farm generated traffic with the background traffic in the area . ■ Signal Warrants As a matter of policy, traffic signals are not installed at any location unless warrants are met according to the Manual on Uniform Traffic Control Devices . However , it is possible to determine whether traffic signal warrants are likely to be met based upon estimated Average Daily Traffic (ADT) and utilizing the charts shown in Appendix D . Using the traffic volumes shown in Figures 5 and 6 , traffic signal warrants will not be met at the intersections of Boardwalk/Lemay or Southridge Creens/Lemay in the short range future . It is possible that signals will be warranted at the Lemay/Boardwalk intersection considering long range peak hour traffic projections . MI I I U U, U ii I in N 0 30%/25% 15%/15% -•--► HARMONY ROAD w ill n z a ill e 0 41 co w I J III e0 1 III 4/it 20° O10% ,0K DRIV - °/3a E 111 111 o°f °/5%.. So ,, I -)0 III Q 4` F o° NS BLVD. N0„,7 1,, 0 0 li 0 0 r I TRIP DISTRIBUTION Figure 4 Ili (Short Range/Long Range) I I I14 AO' III Li) c6 N '''1/4\-- 145/191 N -4,- 568/926 13/75 HARMONY ROAD 95/85 W III 855/752—4"- W 32/150 --\., T N Q N } a W I 1111 J Ill ill CO (O CO ` r Z6 42/33 e0 111 R°1V ASK BRIVE -16/30 1111 A 5/3 —, ) I ( III 5/3 a cv , r S06. N f ili ti� 0 III WA �NSBLVD. II IN I SHORT-TERM PEAK HOUR TRAFFIC Figure 5 111 (YEAR 1992) • AM Peak/PM Peak I Uo -n Co o_ 0 1135/220 N T T -•--- 1030/2065 450/390 HARMONY ROAD III 105/100I W 1595/935-'` Z o 1n o 335/315 N1/4o in L Q N N Q M III W J III 111 P. W 0 0 ov C t 75/50 e0 Ill O itq1-K DRIVE �—25/50 I U �� 175/170 _ ) I ( III in 10 10 SO�j1 70/65 L CO N •r, co Mk h N 10 61, in Lo - � rn � 105/60 O1 mi A\ o ' Coo S I �45/25 U e<fro. 35/35 -/i ) 1 ( ri _,____,.... 70/65 - o (CDO T U III LONG-TERM PEAK HOUR TRAFFIC Figure 6 (YEAR 2010) • AM Peak/PM Peak U Operations Analysis Capacity analyses were performed on key intersections adjacent to Oak/Cottonwood Farm in both the short range and long range conditions . Capacity analysis was not performed on internal streets , but rather the traffic volumes of the streets were examined to determine if the volumes were appropriate for collector streets . Using the traffic volumes shown in Figure 5 and the existing geometrics , the intersections operate in the short range condition as indicated in Table 3 . Calculation forms for these analyses are provided in Appendix E. It is expected that all intersections will operate at acceptable levels (Level of Service D or better) during both peak hours . Using the traffic volumes shown in Figure 6 and recommended geometrics , the intersections operate in the long range condition as indicated in Table 4 . Calculation forms for these analyses are provided in Appendix F . At the intersection of Boardwalk/Harmony , the capacity will be adequate (LOS D) based on the addition of left turn signals for the north/south legs . Left turns out at Southridge Greens will operate at Level of Service E. While this level of service indicates that long delays can be expected, based on recent research on the delay at stop sign controlled intersections , it is more realistic to expect the left turns to operate at Level of Service D. Appendix G contains two research papers related to this topic . Once the intersection of Lemay Avenue and Boardwalk Drive is signalized, it will operate at a good level of service (Level of Service B) . The anticipated traffic volumes for the internal roadway system are suitable for collector streets . Boardwalk Drive can expect 5 ,000 vehicles per day after full development , while Southridge Greens Boulevard is projected to carry 3 ,000 vehicles per day . 7 A Table 3 Short Range ( 1993) Peak Hour Operation Operation Intersection AM PM ;:: Boardwalk/Lemay WB L/T A B WB R A A EB L/T A B EB R A A NB L A A SB L A A Harmony/Boardwalk (Signal ) B C Table 4 Long Range ( 2010 ) Peak Hour Operation Operation Intersection AM PM Southridge Greens/Lemay WB L/T E F WB R A A EB L/T E E EB R A A NB L A A SB L A B Boardwalk/Lemay (Signal ) B B Harmony/Boardwalk ( Signal ) C C III III Accident Analysis III Since the existing development in this area is minimal and the proposed developments of Oak/Cottonwood Farm and others will III significantly increase traffic volumes in the area , evaluation of current accidents was deemed not appropriate . The recommended control devices and geometrics should minimize vehicular III conflicts and maximize vehicle separation. Therefore, the accident rate should be at its minimum for a typical urban condition. ill III I IV . CONCLUSIONS This study assessed the impacts of Oak/Cottonwood Farm on the existing (short range - 1993 ) and future ( long range - 2010) street system in the vicinity of the proposed development . As a result of this analysis , the following is concluded: - The development of Oak/Cottonwood Farm is feasible from a traffic engineering standpoint . At full development as proposed, approximately 14 , 200 trip ends will be generated at this site . r; Phase 1 development at Oak/Cottonwood Farm is projected to generate 880 vehicle trip ends . - By 1993 , given the existing traffic and proposed Phase 1 development of Oak/Cottonwood Farm, the access points to the site will operate at acceptable levels of service. , - A new signal at the intersection of Boardwalk Drive and Lemay Avenue may be warranted as a result of increased long range traffic . A left turn phase for the north/south legs of Boardwalk at Harmony Road is recommended to accommodate long term traffic growth. - With the recommended control and geometrics , intersec- tions will operate acceptably during most of the day . Some stop sign controlled left turns will operate at unacceptable level of service conditions during peak hours , but this condition does not warrant improvement . - With proper traffic control and geometrics , the accident rate should be minimal for an urban condition. ys 1 ^� _ 1 41, 010 C MEMORANDUM cc 0 Q o To : Eldon Ward, Cityscape O Fort Collins Staff J O o From: Matt Delich Date : May 4, 1992 0 Subject : Cottonwood Farm traffic study (File : CTNWDMM1 ) • W z This memorandum is the preliminary traffic study submittal for the Cottonwood Farm Amended Master Plan and the first phase of development. The first phase of development will consist of 30 dwelling units on parcel F and 62 dwelling units on parcel G . These parcels will access Boardwalk, which will be built to a collector level street from Oakridge Drive to Lemay Avenue . At Lemay Avenue, Boardwalk lines up with Keenland Drive in the Oak Ridge PUD. It is expected that Boardwalk will have one travel lane in each direction, a center median/left-turn lane, and bike lanes . There will be no residential driveway accesses on Boardwalk. It is likely that on-street parking will be prohibited. New peak hour traffic counts have been obtained at Harmony/Boardwalk, Lemay/Keenland, and Lemay/Southridge Greens Boulevard. The long range analysis will analyze the arterial and collector street intersections and develop peak hour traffic volumes on arterial and collector level streets . The short range analysis will develop traffic volumes on streets and intersections that relate specifically to that phase of z development. Parcel R of the Cottonwood Farm Master Plan includes the z PACE store, Builders ' Square, and Steele ' s Market . Detailed u� 11 traffic studies and amendments were prepared for development a. > of Parcel R. A street connection is proposed from Boardwalk to Mail Creek Lane . This street will pass east and south of = • Z Werner Elementary School . I have conducted preliminary ca studies regarding this connection and found that the travel demand would be on the order of 1400 vehicles per day. This ovolume could be comfortably handled on a local street . It is my understanding that this connecting street is proposed to • a be built to a local street standard. However, it will not cc have residential driveways accessing it, except for one short • segment on one side of the street . In essence , it will wfunction as a collector street . Discussions are underway with x the developers/consultants for Huntington Hills so that the E'• ~ proposed street systems are compatible . cc 2E Fort Collins Planning Department staff granted a late submission of the traffic study due to the previous studies NJ 41/ 4 performed on various portions of the Cottonwood Farm, and due to the size of the first phase of development which can be accommodated on the existing street system in this area. The submission of the traffic study in a few weeks will still allow ample time for review and comment by city staff .