HomeMy WebLinkAboutWATERFIELD FOURTH FILING PHASES 1-4 - Filed DCP-DEV. CONSTRUCTION PERMIT -Page 1 of 6
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 21-16 Issuance Date: 07/22/2021
Project Name: Waterfield Subdivision Fourth Filing Phase 1-4
Project AKA:
Project Location: Timberline & Vine
Permittee: Jeff Jensen/ Jensen LaPlante
City and developer contacts: See attached Exhibit ‘A’ for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee check#1475 $ 400.00
Construction Inspection Fee check#1053 $ 223,185.64
Pavement Impact Fee – excavation permit $ 45.00
Total amount due $ 223,630.64
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 3,802,012.92
Form of security deposited with the City: Bond #:10103
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1.The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions
to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as
required by the City in the Development Agreement, that the improvements are constructed in
conformance with the approved Utility Plans and the standards and specifications of the City. The
Permittee shall provide “as-constructed” plans prepared by an Engineer prior to the City’s
acceptance of the constructed public improvements. (All references above to the terms “Project
Engineer” and “Engineer” shall mean a Professional Engineer licensed in Colorado.)
2.All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
3. Construction time restrictions: N/A
DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32
Page 2 of 6
4. The applicant understands that additional permits may be required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 2.6.3(K) of the Land Use Code, whichever is
applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re-apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code are
met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted
by the City; and (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and the
“as-constructed” plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and
3.3.2(C) of the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to
any construction activities on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMPs) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any land
disturbing activity begins. The applicant also understands that at no time pollutants, especially dirt,
are allowed to leave the construction site (either by drainage, wind, or track out) and that the
applicant shall immediately address and correct the issue regardless of being formally directed by
the City.
DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32
Page 3 of 6
11. City of Fort Collins Traffic Operations must be notified prior to the installation of permanent
traffic signing, symbols and striping. The developer shall place temporary tabs or tape, and/or set
up a field meeting for review and approval prior to installation.
12. A permit must be obtained from the City Forester before any trees or shrubs as noted on the
approved plans are planted, pruned, or removed in public right-of-way. This includes the area
between the sidewalk and curb, medians, and other city property. This permit from the City
Forester shall approve the location and species to be planted. Failure to obtain this permit is a
violation of the City of Fort Collins Municipal Code subject to citation (Section 27-31) and may
also result in replacing or relocation trees and a hold on the issuance of a certificate of occupancy.
13. All tree pruning and removal on the Property must be done by an arborist licensed by the City
of Fort Collins and the name of such arborist shall be provided to the City Forestry Division prior
to any pruning or removal commencing. A list of licensed arborists is maintained by the City
Forestry Division and is available upon request or at fcgov.com/forestry. The use of heavy
construction equipment, including but not limited to excavators, backhoes, and bulldozers, to
remove trees is not allowed without prior Forestry Division written permission.
14. Tree protection must be installed around all trees that are shown to be preserved and protected
on the Final Development Plan Documents and an arborist licensed by the City of Fort Collins
must provide written confirmation to the City that such tree protection has been installed. Required
tree protection measures are set forth in City Code Section 3.2.1(G) and include, but are not limited
to, the requirement that a minimum 4 foot high barrier be erected no closer than six (6) feet from
the trunk or one-half (½) the length to the drip line (i.e. the canopy edge), whichever is greater.
14. Prior to landscape work commencing on the Property, the Developer shall schedule a meeting
between City Forestry Division staff and the landscapers who will perform the work.
15. Tree protection must be maintained throughout the duration of construction activities on the
Property. At any time during construction, and upon City Forestry Division written notice that
tree protection is not adequate for one or more trees, the Developer shall cease construction
activities adjacent to such tree or trees until required tree protection measures are in place to the
satisfaction of the City Forestry Division.
16. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
17. Other conditions: N/A
Permittee’s acknowledgment signature:
By signing this permit, I acknowledge that I am acting with the knowledge, consent, and authority
of the owners of the property (including all owners having legal or equitable interest in the real
property, as defined in Section 1-2 of the City Code; and including common areas legally connected
to or associated with the property which is the subject of this application) without whose consent and
No work associated with the Vine Drive improvements or the storm sewer
outfall on the south side of Vine Drive are to be commence without coordinating with the City Engineering
department
DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32
Page 4 of 6
authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby
permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter
upon such property to perform work required of the applicant if the applicant were to fail to perform
the required work. I also acknowledge that I have read this permit document with all its requirements
and conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager’s Signature: ____________________________ Date: ____________
Approval for issuance:
City Engineer Approval: __________________________Date: __________________________
(Permit Issuance Date)
DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32
7/22/2021
7/23/2021
Page 5 of 6
EXHIBIT ‘A’
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Waterfield
Name, address and numbers
City Staff Contact Persons:
Development Engineer: Spencer Smith
281 N. College Avenue, Fort Collins, CO 80524
(970) 221-6603
smsmith@fcgov.com
Construction Inspector: Wayne Lenard
281 N. College Avenue, Fort Collins, CO 80524
(970) 222-6824
wlenard@fcgov.com
Stormwater Engineering: Heidi Hansen
700 Wood Street, Fort Collins, CO 80521
(970) 221-6854
hhansen@fcgov.com
Erosion Control Inspector: Jesse Schlam
700 Wood Street, Fort Collins, CO 80521
(970) 224-6700
jschlam@fcgov.com
Natural Resources: Kelly Smith
281 N. College Ave., Fort Collins, CO 80521 970-224-6189
ksmith@fcgov.com
Traffic Operations: Nicole Hahn
281 N. College Avenue, Fort Collins, CO 80524
(970) 224-6108
nhahn@fcgov.com
Street closures: Tom Utech
626 Linden Street, Fort Collins, CO 80524
(970) 221-6815
tutech@fcgov.com
Forestry: Molly Roche
413 S. Bryan Avenue, Fort Collins, CO 80521
(224) 616-1992
mroche@fcgov.om
DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32
Page 6 of 6
Light and Power: Austin Kreager
700 Wood Street, Fort Collins, CO 80521
(970) 224-6152
akreager@fcgov.com
Developer’s Contact Persons:
Project Manager/Owner: Jeff Jensen
Jensen LaPlante
1603 Oakridge Dr. #101
Fort Collins, CO 80525
(970) 227-0622 (Cell)
jeff@jensenlaplante.com
Developer: JD Padilla
Post Modern Development
144 N Mason St. Unit #4
Fort Collins, CO 80524
(970) 407-7000 (Office)
jd@postmoderndevelopment.com
Project Engineer: Stephanie Thomas
Northern Engineering
301 N. Howes, Ste 100
Fort Collins, CO 80521
(970) 568-5412 (Office)
stephanie@northernengineering.com
General Contractor: Joe Schumacher
Crow Creek Construction
7521 W. 20th St. L-101-B
Greeley, CO 80634
(970) 330-5070 (Office)
joe@crow-creek.com
DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32
H2O
WV
WV
WV
WV
WV
H2OV.P.
TESTSTA
V.P.V.P.
H2O H2OWV
VAULT
CABLE
TELE
TESTSTA
WVWV
S
VAULT
CABLE
S
D
D
TELE
S
VAULT
ELEC
ELEC
ELEC
V.P.
ELECBRKR
ELEC
ELEC
S
S
S
H2O
WV
GAS
H2O
TESTSTA
GAS
HY DW WV
WV
WVWVWV WV
WV
V.P.CS
H2OTESTSTA
W
VAULT
ELEC
VAULT
ELEC
WV
WVWV
ELEC
ELEC
ETGAS
VAULT
ELEC
CVAULT
ELEC
SS SS SS SSSSSSEX X
X
XXXXXXXXXXXXXXOHE OHE OHE OHE OHE
OHE OHEOHE OHE OHE OHE OHE
HY D
GGGGGGGGGGGGGGGGGGW W W W W W
W
W W W W W W W
W
W
W
W
WWWWTELE W
GAS
TELE
RR
H2O
WV
WV
WV
H2O
SWVWVWV
W
SS
WWIRRIRRWWWWWWWWWWWWH2O
GAS
GAS
H2O
IRRDD
DWWW
W W W W W W WWWWWWWWWWWWWWW
W
W
W
W
W W W
W WWVD WWWWWWWWWK AND M COMPANY
PO BOX 449
FORT COLLINS, CO 80522
PARKER LAND INVESTMENTS LLC
9162 KENWOOD CT
HIGHLANDS RANCH, CO 801263425
WEISS DONALD D/ BEVERLY A
1924 E. VINE DR.
FORT COLLINS, CO 80524
POUDRE SCHOOL DISTRICT
2407 LAPORTE AVE
FORT COLLINS, CO 80521
CITY OF FORT COLLINS
300 LAPORTE AVE
FORT COLLINS, CO 80521
BULL RUN LTD PARTNERSHIP
5575 DTC PKWY STE 250
GREENWOOD VILLAGE, CO 80111
DIVISION SEVEN SYSTEMS
8 GIBBS RD
LARAMIE, WY 80207
OPPIE VERA N
PO BOX 302
LAPORTE, CO 80535
K AND M COMPANY
PO BOX 449
FORT COLLINS, CO 80522WEISS DONALD D/ BEVERLY A
1924 E. VINE DR.
FORT COLLINS, CO 80524
K AND M COMPANY
PO BOX 449
FORT COLLINS, CO 80522
TIMBERVINE FARM
LIMITED PARTNERSHIP
PO BOX 272546
FORT COLLINS, CO 80527
VOICE OF TRUTH TABERNACLE
1132 SAWTOOTH OAK CT
FORT COLLINS, CO 80525
RYK JOE
1506 GLEN HAVEN DR.
FORT COLLINS, CO 80526
HOLTER GEORGE A
3509 S MASON ST
FORT COLLINS, CO 80525
PLOOG BARRY L
PO BOX 967
BOULDER, CO 80306
JONES LEONARD L
& ROMA K
2616 E. VINE DR
FORT COLLINS, CO 80524
MARK WHITE
132 JENNINGS LN
JOHNSTOWN, CO 80534
PHASE
1
PHASE
2
PHASE
3
PHASE
4
PHASE
5
PHASE
6
PHASE
7
PHASE
8
PHASE
1
PHASE 1
PHASE 1
KEYMAP
RR
RR
SUNIGA DRIVE N TIMBERLINE ROADSheetWATERFIELD FOURTH FILINGThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETENGINEERNGIEHTRONRNFORT COLLINS: 301 North Howes Street, Suite 100, 80521GREELEY: 820 8th Street, 80631970.221.4158northernengineering.comof 167
C1.08PHASING PLAN12
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
NORTH
( IN FEET )
0
1 INCH = 150 FEET
150 150 300 450
E
LEGEND:
UD
PROPOSED EASEMENT
EXISTING RIGHT OF WAY
PROPOSED LOT LINE
PROPERTY BOUNDARY
EDGE OF GRAVEL
EXISTING CONTOUR
PROPOSED CONTOUR
PROPOSED STORM INLET
PROPOSED STORM SEWER
PROPOSED UNDERDRAIN
PROPOSED RIGHT OF WAY
SSEXISTING SANITARY SEWER
PROPOSED SANITARY SERVICE
WEXISTING WATER LINE
PROPOSED ELECTRIC MAIN
PROPOSED WATER SERVICE
8" WPROPOSED 8" WATER LINE
ELEC
HY DFE
SPROPOSED FIRE HYDRANT
EXISITNG ELECTRIC BOX
EXISTING FIRE HYDRANT
EXISTING FES
EXISTING WATER VALVE
WV
PROPOSED BUTTERFLY VALVE
PROPOSED WATER VALVE
STEXISTING STORM SEWER
GPROPOSED GAS MAIN
PROPOSED SANITARY SEWER
W12" WPROPOSED 12" WATER LINE SWPROPOSED PIPE DEFLECTION
NOTES:
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES
ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE
COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE
RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT
DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER
SURVEY INFORMATION.
3.ALL WATER CONSTRUCTION SHALL BE PER THE EAST LARIMER COUNTY
WATER DISTRICT (ELCO) STANDARD CONSTRUCTION SPECIFICATIONS,
LATEST EDITION.
4.ALL SEWER CONSTRUCTION SHALL BE PER BOXELDER SANITARY SEWER
DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION.
5.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED
AND ARE NOT TO SCALE.
6.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT
LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE
UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD.
7.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION
BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES.
VAULTPROPOSED ELECTRIC VAULTS
PHASE
5
PHASE 5
DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32
ID Task Name Duration Start Finish1Waterfield Subdivision: Phase 1‐4260 daysMon 5/3/21Fri 4/29/222Earthwork45 daysMon 5/3/21Fri 7/2/213Overlot Grading45 daysMon 5/3/21Fri 7/2/214Utilities84 daysMon 7/5/21Thu 10/28/215Sanitary Sewer40 daysMon 7/5/21Fri 8/27/216Underdrain / Irrigation Main 14 daysMon 8/30/21Thu 9/16/217Water15 daysMon 9/13/21Fri 10/1/218Storm20 daysFri 10/1/21Thu 10/28/219Dry Utility Conduit Install5 daysMon 10/11/21Fri 10/15/2110Concrete Curb & Gutter 50 daysMon 9/20/21Fri 11/26/2111Concrete Prep & Offsite 19 daysMon 9/20/21Thu 10/14/2112Concrete Prep & Place Onsite 30 daysThu 10/14/21Wed 11/24/2113Asphalt Paving 34 daysMon 10/4/21Thu 11/18/2114Asphalt Prep & Place Offsite 15 daysMon 10/4/21Fri 10/22/2115Asphalt Prep & Place Onsite19 daysMon 10/25/21Thu 11/18/2116Dry Utility 45 daysMon 11/8/21Fri 1/7/2217Electric Install 45 daysMon 11/8/21Fri 1/7/2218Gas Install 30 daysMon 11/29/21Fri 1/7/2219Concrete Sidewalks 25 daysMon 12/13/21Fri 1/14/2220Prep and Place Sidewalks25 daysMon 12/13/21Fri 1/14/2221Landscape and Irrigation 100 daysMon 12/13/21Fri 4/29/2222Landscape and Irrigation 100 daysMon 12/13/21Fri 4/29/2223Construction Acceptance 7 daysMon 1/10/22Tue 1/18/2224Site Walk with City Inspectors2 daysMon 1/10/22Tue 1/11/2225Perform Punchlist Items6 daysMon 1/10/22Mon 1/17/2226Site Re‐Walk with City Inspectors1 dayTue 1/18/22Tue 1/18/222728116311530153014291328132812271227112610251227112621May 16, '21Jun 20, '21Jul 25, '21Aug 29, '21Oct 3, '21Nov 7, '21Dec 12, '21Jan 16, '22Feb 20, '22Mar 27, '22May 1TaskSplitMilestoneSummaryProject SummaryInactive TaskInactive MilestoneInactive SummaryManual TaskDuration-onlyManual Summary RollupManual SummaryStart-onlyFinish-onlyExternal TasksExternal MilestoneDeadlineProgressManual ProgressWaterfield Subdivision: Phase 1 - 4Fort Collins, CO Construction ScheduleCrow Creek Construction, LLC7251 W 20th St Bld L Suite 101-BGreeley, CO 80634970.330.5070Waterfield Anticipated Construction Schedule (jas 04-07-2021) 1DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32