HomeMy WebLinkAboutWATERFIELD FOURTH FILING PHASES 1-4 - Filed DCP-DEV. CONSTRUCTION PERMIT -Page 1 of 6 City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 21-16 Issuance Date: 07/22/2021 Project Name: Waterfield Subdivision Fourth Filing Phase 1-4 Project AKA: Project Location: Timberline & Vine Permittee: Jeff Jensen/ Jensen LaPlante City and developer contacts: See attached Exhibit ‘A’ for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee check#1475 $ 400.00 Construction Inspection Fee check#1053 $ 223,185.64 Pavement Impact Fee – excavation permit $ 45.00 Total amount due $ 223,630.64 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 3,802,012.92 Form of security deposited with the City: Bond #:10103 PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1.The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide “as-constructed” plans prepared by an Engineer prior to the City’s acceptance of the constructed public improvements. (All references above to the terms “Project Engineer” and “Engineer” shall mean a Professional Engineer licensed in Colorado.) 2.All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: N/A DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32 Page 2 of 6 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re-apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the “as-constructed” plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any construction activities on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMPs) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. The applicant also understands that at no time pollutants, especially dirt, are allowed to leave the construction site (either by drainage, wind, or track out) and that the applicant shall immediately address and correct the issue regardless of being formally directed by the City. DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32 Page 3 of 6 11. City of Fort Collins Traffic Operations must be notified prior to the installation of permanent traffic signing, symbols and striping. The developer shall place temporary tabs or tape, and/or set up a field meeting for review and approval prior to installation. 12. A permit must be obtained from the City Forester before any trees or shrubs as noted on the approved plans are planted, pruned, or removed in public right-of-way. This includes the area between the sidewalk and curb, medians, and other city property. This permit from the City Forester shall approve the location and species to be planted. Failure to obtain this permit is a violation of the City of Fort Collins Municipal Code subject to citation (Section 27-31) and may also result in replacing or relocation trees and a hold on the issuance of a certificate of occupancy. 13. All tree pruning and removal on the Property must be done by an arborist licensed by the City of Fort Collins and the name of such arborist shall be provided to the City Forestry Division prior to any pruning or removal commencing. A list of licensed arborists is maintained by the City Forestry Division and is available upon request or at fcgov.com/forestry. The use of heavy construction equipment, including but not limited to excavators, backhoes, and bulldozers, to remove trees is not allowed without prior Forestry Division written permission. 14. Tree protection must be installed around all trees that are shown to be preserved and protected on the Final Development Plan Documents and an arborist licensed by the City of Fort Collins must provide written confirmation to the City that such tree protection has been installed. Required tree protection measures are set forth in City Code Section 3.2.1(G) and include, but are not limited to, the requirement that a minimum 4 foot high barrier be erected no closer than six (6) feet from the trunk or one-half (½) the length to the drip line (i.e. the canopy edge), whichever is greater. 14. Prior to landscape work commencing on the Property, the Developer shall schedule a meeting between City Forestry Division staff and the landscapers who will perform the work. 15. Tree protection must be maintained throughout the duration of construction activities on the Property. At any time during construction, and upon City Forestry Division written notice that tree protection is not adequate for one or more trees, the Developer shall cease construction activities adjacent to such tree or trees until required tree protection measures are in place to the satisfaction of the City Forestry Division. 16. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 17. Other conditions: N/A Permittee’s acknowledgment signature: By signing this permit, I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and No work associated with the Vine Drive improvements or the storm sewer outfall on the south side of Vine Drive are to be commence without coordinating with the City Engineering department DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32 Page 4 of 6 authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager’s Signature: ____________________________ Date: ____________ Approval for issuance: City Engineer Approval: __________________________Date: __________________________ (Permit Issuance Date) DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32 7/22/2021 7/23/2021 Page 5 of 6 EXHIBIT ‘A’ DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Waterfield Name, address and numbers City Staff Contact Persons: Development Engineer: Spencer Smith 281 N. College Avenue, Fort Collins, CO 80524 (970) 221-6603 smsmith@fcgov.com Construction Inspector: Wayne Lenard 281 N. College Avenue, Fort Collins, CO 80524 (970) 222-6824 wlenard@fcgov.com Stormwater Engineering: Heidi Hansen 700 Wood Street, Fort Collins, CO 80521 (970) 221-6854 hhansen@fcgov.com Erosion Control Inspector: Jesse Schlam 700 Wood Street, Fort Collins, CO 80521 (970) 224-6700 jschlam@fcgov.com Natural Resources: Kelly Smith 281 N. College Ave., Fort Collins, CO 80521 970-224-6189 ksmith@fcgov.com Traffic Operations: Nicole Hahn 281 N. College Avenue, Fort Collins, CO 80524 (970) 224-6108 nhahn@fcgov.com Street closures: Tom Utech 626 Linden Street, Fort Collins, CO 80524 (970) 221-6815 tutech@fcgov.com Forestry: Molly Roche 413 S. Bryan Avenue, Fort Collins, CO 80521 (224) 616-1992 mroche@fcgov.om DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32 Page 6 of 6 Light and Power: Austin Kreager 700 Wood Street, Fort Collins, CO 80521 (970) 224-6152 akreager@fcgov.com Developer’s Contact Persons: Project Manager/Owner: Jeff Jensen Jensen LaPlante 1603 Oakridge Dr. #101 Fort Collins, CO 80525 (970) 227-0622 (Cell) jeff@jensenlaplante.com Developer: JD Padilla Post Modern Development 144 N Mason St. Unit #4 Fort Collins, CO 80524 (970) 407-7000 (Office) jd@postmoderndevelopment.com Project Engineer: Stephanie Thomas Northern Engineering 301 N. Howes, Ste 100 Fort Collins, CO 80521 (970) 568-5412 (Office) stephanie@northernengineering.com General Contractor: Joe Schumacher Crow Creek Construction 7521 W. 20th St. L-101-B Greeley, CO 80634 (970) 330-5070 (Office) joe@crow-creek.com DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32 H2O WV WV WV WV WV H2OV.P. TESTSTA V.P.V.P. H2O H2OWV VAULT CABLE TELE TESTSTA WVWV S VAULT CABLE S D D TELE S VAULT ELEC ELEC ELEC V.P. ELECBRKR ELEC ELEC S S S H2O WV GAS H2O TESTSTA GAS HY DW WV WV WVWVWV WV WV V.P.CS H2OTESTSTA W VAULT ELEC VAULT ELEC WV WVWV ELEC ELEC ETGAS VAULT ELEC CVAULT ELEC SS SS SS SSSSSSEX X X XXXXXXXXXXXXXXOHE OHE OHE OHE OHE OHE OHEOHE OHE OHE OHE OHE HY D GGGGGGGGGGGGGGGGGGW W W W W W W W W W W W W W W W W W WWWWTELE W GAS TELE RR H2O WV WV WV H2O SWVWVWV W SS WWIRRIRRWWWWWWWWWWWWH2O GAS GAS H2O IRRDD DWWW W W W W W W WWWWWWWWWWWWWWW W W W W W W W W WWVD WWWWWWWWWK AND M COMPANY PO BOX 449 FORT COLLINS, CO 80522 PARKER LAND INVESTMENTS LLC 9162 KENWOOD CT HIGHLANDS RANCH, CO 801263425 WEISS DONALD D/ BEVERLY A 1924 E. VINE DR. FORT COLLINS, CO 80524 POUDRE SCHOOL DISTRICT 2407 LAPORTE AVE FORT COLLINS, CO 80521 CITY OF FORT COLLINS 300 LAPORTE AVE FORT COLLINS, CO 80521 BULL RUN LTD PARTNERSHIP 5575 DTC PKWY STE 250 GREENWOOD VILLAGE, CO 80111 DIVISION SEVEN SYSTEMS 8 GIBBS RD LARAMIE, WY 80207 OPPIE VERA N PO BOX 302 LAPORTE, CO 80535 K AND M COMPANY PO BOX 449 FORT COLLINS, CO 80522WEISS DONALD D/ BEVERLY A 1924 E. VINE DR. FORT COLLINS, CO 80524 K AND M COMPANY PO BOX 449 FORT COLLINS, CO 80522 TIMBERVINE FARM LIMITED PARTNERSHIP PO BOX 272546 FORT COLLINS, CO 80527 VOICE OF TRUTH TABERNACLE 1132 SAWTOOTH OAK CT FORT COLLINS, CO 80525 RYK JOE 1506 GLEN HAVEN DR. FORT COLLINS, CO 80526 HOLTER GEORGE A 3509 S MASON ST FORT COLLINS, CO 80525 PLOOG BARRY L PO BOX 967 BOULDER, CO 80306 JONES LEONARD L & ROMA K 2616 E. VINE DR FORT COLLINS, CO 80524 MARK WHITE 132 JENNINGS LN JOHNSTOWN, CO 80534 PHASE 1 PHASE 2 PHASE 3 PHASE 4 PHASE 5 PHASE 6 PHASE 7 PHASE 8 PHASE 1 PHASE 1 PHASE 1 KEYMAP RR RR SUNIGA DRIVE N TIMBERLINE ROADSheetWATERFIELD FOURTH FILINGThese drawings areinstruments of serviceprovided by NorthernEngineering Services, Inc.and are not to be used forany type of constructionunless signed and sealed bya Professional Engineer inthe employ of NorthernEngineering Services, Inc.NOT FOR CONSTRUCTIONREVIEW SETENGINEERNGIEHTRONRNFORT COLLINS: 301 North Howes Street, Suite 100, 80521GREELEY: 820 8th Street, 80631970.221.4158northernengineering.comof 167 C1.08PHASING PLAN12 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 0 1 INCH = 150 FEET 150 150 300 450 E LEGEND: UD PROPOSED EASEMENT EXISTING RIGHT OF WAY PROPOSED LOT LINE PROPERTY BOUNDARY EDGE OF GRAVEL EXISTING CONTOUR PROPOSED CONTOUR PROPOSED STORM INLET PROPOSED STORM SEWER PROPOSED UNDERDRAIN PROPOSED RIGHT OF WAY SSEXISTING SANITARY SEWER PROPOSED SANITARY SERVICE WEXISTING WATER LINE PROPOSED ELECTRIC MAIN PROPOSED WATER SERVICE 8" WPROPOSED 8" WATER LINE ELEC HY DFE SPROPOSED FIRE HYDRANT EXISITNG ELECTRIC BOX EXISTING FIRE HYDRANT EXISTING FES EXISTING WATER VALVE WV PROPOSED BUTTERFLY VALVE PROPOSED WATER VALVE STEXISTING STORM SEWER GPROPOSED GAS MAIN PROPOSED SANITARY SEWER W12" WPROPOSED 12" WATER LINE SWPROPOSED PIPE DEFLECTION NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL WATER CONSTRUCTION SHALL BE PER THE EAST LARIMER COUNTY WATER DISTRICT (ELCO) STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 4.ALL SEWER CONSTRUCTION SHALL BE PER BOXELDER SANITARY SEWER DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 5.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 6.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 7.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. VAULTPROPOSED ELECTRIC VAULTS PHASE 5 PHASE 5 DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32 ID Task Name Duration Start Finish1Waterfield Subdivision: Phase 1‐4260 daysMon 5/3/21Fri 4/29/222Earthwork45 daysMon 5/3/21Fri 7/2/213Overlot Grading45 daysMon 5/3/21Fri 7/2/214Utilities84 daysMon 7/5/21Thu 10/28/215Sanitary Sewer40 daysMon 7/5/21Fri 8/27/216Underdrain / Irrigation Main 14 daysMon 8/30/21Thu 9/16/217Water15 daysMon 9/13/21Fri 10/1/218Storm20 daysFri 10/1/21Thu 10/28/219Dry Utility Conduit Install5 daysMon 10/11/21Fri 10/15/2110Concrete Curb & Gutter 50 daysMon 9/20/21Fri 11/26/2111Concrete Prep & Offsite 19 daysMon 9/20/21Thu 10/14/2112Concrete Prep & Place Onsite 30 daysThu 10/14/21Wed 11/24/2113Asphalt Paving 34 daysMon 10/4/21Thu 11/18/2114Asphalt Prep & Place  Offsite 15 daysMon 10/4/21Fri 10/22/2115Asphalt Prep & Place Onsite19 daysMon 10/25/21Thu 11/18/2116Dry Utility 45 daysMon 11/8/21Fri 1/7/2217Electric Install 45 daysMon 11/8/21Fri 1/7/2218Gas Install 30 daysMon 11/29/21Fri 1/7/2219Concrete Sidewalks 25 daysMon 12/13/21Fri 1/14/2220Prep and Place Sidewalks25 daysMon 12/13/21Fri 1/14/2221Landscape and Irrigation 100 daysMon 12/13/21Fri 4/29/2222Landscape and Irrigation 100 daysMon 12/13/21Fri 4/29/2223Construction Acceptance 7 daysMon 1/10/22Tue 1/18/2224Site Walk with City Inspectors2 daysMon 1/10/22Tue 1/11/2225Perform Punchlist Items6 daysMon 1/10/22Mon 1/17/2226Site Re‐Walk with City Inspectors1 dayTue 1/18/22Tue 1/18/222728116311530153014291328132812271227112610251227112621May 16, '21Jun 20, '21Jul 25, '21Aug 29, '21Oct 3, '21Nov 7, '21Dec 12, '21Jan 16, '22Feb 20, '22Mar 27, '22May 1TaskSplitMilestoneSummaryProject SummaryInactive TaskInactive MilestoneInactive SummaryManual TaskDuration-onlyManual Summary RollupManual SummaryStart-onlyFinish-onlyExternal TasksExternal MilestoneDeadlineProgressManual ProgressWaterfield Subdivision: Phase 1 - 4Fort Collins, CO Construction ScheduleCrow Creek Construction, LLC7251 W 20th St Bld L Suite 101-BGreeley, CO 80634970.330.5070Waterfield Anticipated Construction Schedule (jas 04-07-2021) 1DocuSign Envelope ID: 1059AE0D-84C2-4F11-BC16-7FAE467AFC32