HomeMy WebLinkAboutTATONKA CONTRACTORS, LLC - CONTRACT - RFP - 9459 PLAYGROUND SURFACING CONSTRUCTION SERVICES (3)Addendum 1
ADDENDUM NO. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of RFP 9459: PLAYGROUND SURFACING CONSTRUCTION SERVICES
OPENING DATE: 3:00 PM (Our Clock) July 20, 2022
To all prospective bidders under the specifications and contract documents described above,
the following changes/additions are hereby made and detailed in the following sections of this
addendum:
Exhibit 1 – Revised pricing matrix
Please contact Adam Hill, Senior Buyer, at adhill@fcgov.com .with any questions regarding this
addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE REQUEST FOR PROPOSAL STATING THAT THIS ADDENDUM HAS
BEEN RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
Official Purchasing Document
Last updated 10/2017
RFP 9459 Playground Surfacing Construction Services
Cost Matrix
Critical Fall Heights (CFH)/Thickness (includes basemat and top course with aromatic urethane binder)
SF Range
NA- top
only in
color per
note 1
below
4’ CFH
(1.75”)
5’ CFH
(2”)
8’ CFH
(3.5”) 9’ CFH (4”) 10’ CFH
(4.5”) 12’ CFH (5”) 13’ CFH (6”)
1 - 1,000 sf
1,001 - 3,000 sf
3,001 – 5,000 sf
5,001 – 10,000+ sf
Additional Pricing
Item Quantity Unit Price Cost
Additional price per square foot for each 10% of color in
top surface 1 $________ /square foot $________
Deduct price per square foot for each 10% of black added
to top surface 1 $________ /square foot $________
Demolition, removal and disposal of existing PIP surfacing
(includes calling in locates) 100 sf $________ /square foot $________
Supply and installation/ removal of temporary safety
fencing 100 lf $________ /linear foot $________
Substitute Aliphatic binder for Aromatic binder 1 $________ /square foot $________
Roll coat Aliphatic binder on existing surface 1 $________ /square foot $________
Additional materials mark-up (cost + %) %________
Notes:
1.Prices in CFH chart categories are to be “per square foot” and are for 50% color/50% black speckled top surface.
2.Prices include manufacturer warranty for materials and installation.
3. Prices include materials and installation. Freight would be priced on a per project basis and is not included in the above price.
4.Edge details to follow Surface America standard details per link: https://www.surfaceamerica.com/wp-
content/uploads/2015/04/PlayBound_PIP_Edge_Details.pdf
Exhibit 1