Loading...
HomeMy WebLinkAboutTATONKA CONTRACTORS, LLC - CONTRACT - RFP - 9459 PLAYGROUND SURFACING CONSTRUCTION SERVICES (3)Addendum 1 ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of RFP 9459: PLAYGROUND SURFACING CONSTRUCTION SERVICES OPENING DATE: 3:00 PM (Our Clock) July 20, 2022 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Revised pricing matrix Please contact Adam Hill, Senior Buyer, at adhill@fcgov.com .with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE REQUEST FOR PROPOSAL STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Cost Matrix Critical Fall Heights (CFH)/Thickness (includes basemat and top course with aromatic urethane binder) SF Range NA- top only in color per note 1 below 4’ CFH (1.75”) 5’ CFH (2”) 8’ CFH (3.5”) 9’ CFH (4”) 10’ CFH (4.5”) 12’ CFH (5”) 13’ CFH (6”) 1 - 1,000 sf 1,001 - 3,000 sf 3,001 – 5,000 sf 5,001 – 10,000+ sf Additional Pricing Item Quantity Unit Price Cost Additional price per square foot for each 10% of color in top surface 1 $________ /square foot $________ Deduct price per square foot for each 10% of black added to top surface 1 $________ /square foot $________ Demolition, removal and disposal of existing PIP surfacing (includes calling in locates) 100 sf $________ /square foot $________ Supply and installation/ removal of temporary safety fencing 100 lf $________ /linear foot $________ Substitute Aliphatic binder for Aromatic binder 1 $________ /square foot $________ Roll coat Aliphatic binder on existing surface 1 $________ /square foot $________ Additional materials mark-up (cost + %) %________ Notes: 1.Prices in CFH chart categories are to be “per square foot” and are for 50% color/50% black speckled top surface. 2.Prices include manufacturer warranty for materials and installation. 3. Prices include materials and installation. Freight would be priced on a per project basis and is not included in the above price. 4.Edge details to follow Surface America standard details per link: https://www.surfaceamerica.com/wp- content/uploads/2015/04/PlayBound_PIP_Edge_Details.pdf Exhibit 1