Loading...
HomeMy WebLinkAboutTATONKA CONTRACTORS, LLC - CONTRACT - RFP - 9459 PLAYGROUND SURFACING CONSTRUCTION SERVICES (2)Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 1 of 116 REQUEST FOR PROPOSAL 9459 PLAYGROUND SURFACING CONSTRUCTION SERVICES RFP DUE: 3:00 PM MT (Mountain Time), July 20, 2022 The City of Fort Collins, Park Planning Department, is seeking proposals from qualified Service Providers to provide project management, design, and construction services for various playground surfacing projects throughout the City. The successful Service Provider will address all of the tasks, issues, and requested information in their proposal, possess the requisite skills, experience and manpower necessary to produce high quality projects on time and on budget, and be motivated to work with City staff, citizens, and to accomplish the project goals and objectives. As part of the City’s commitment to sustainability, proposals must be submitted online through the Rocky Mountain E-Purchasing System (RMEPS) at http://www.bidnetdirect.com/colorado/city- of-fort-collins. Note: please ensure adequate time to submit proposals through RMEPS. Proposals not submitted by the designated Opening Date and Time will not be accepted by RMEPS. All questions should be submitted, in writing via email, to Adam Hill Senior Buyer at adhill@fcgov.com, no later than 3:00 PM MT on July 6, 2022. Please format your e-mail to include: RFP 9459 Playground Surfacing Construction Services in the subject line. Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an addendum and posted on the Rocky Mountain E-Purchasing System webpage. Rocky Mountain E-Purchasing System hosted by BidNet A copy of the RFP may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins. This RFP has been posted utilizing the following Commodity Code(s): 650-00 Park, Playground, Recreational Area and Swimming Pool Equipment and Supplies 912-23 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.) 912-26 Construction, Hike and Bike Trail 912-35 Construction, Tennis/Sports Court 912-52 Maintenance and Repair, Hike and Bike Trails 912-65 Maintenance and Repair, Tennis/Sport Court 912-73 Paver Block Installation 913-36 Construction, Parking Lot and Alley 913-47 Construction, Sidewalk and Driveway (Includes Pedestrian and Handicap Ramps) 913-75 Maintenance and Repair, Parking Lot and Alley 913-82 Maintenance and Repair, Sidewalk and Driveway (Including Removal) 914-30 Concrete 914-44 Flooring Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 2 of 116 Prohibition of Unlawful Discrimination: The City of Fort Collins, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d- 4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality. The City also strictly prohibits unlawful harassment in the workplace, including sexual harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding. The City requires its Service Providers to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment and retaliation. This requirement applies to all third-party Service Providers and their subcontractors/subconsultants at every tier. Public Viewing Copy: The City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. Service Providers may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version of the proposal, Service Providers may redact text and/or data that it deems confidential or proprietary pursuant to CORA. Failure to provide a public viewing copy will be considered a waiver of any claim of confidentiality under CORA without regard to how the applicant’s proposal or certain pages of the proposal are marked confidential, proprietary, or similar. Such statement does not necessarily exempt such documentation from public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other applicable law. Generally, under CORA trade secrets, confidential commercial and financial data information is not required to be disclosed by the City. Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. By responding to this RFP, Service Providers hereby waives any and all claims for damages against the City for the City’s good faith compliance with CORA. All provisions of any contract resulting from this request for proposal will be public information. Service Providers Registration: The City requires new Service Providers receiving awards from the City to submit IRS form W-9 or W-8BEN/W8-BEN-E (international firms) and requires all Service Providers to accept Direct Deposit (Electronic) payment. If needed, the W-9 form and the Vendor Direct Deposit Authorization Form can be found on the City’s Purchasing website at www.fcgov.com/purchasing under Vendor Reference Documents. Please do not submit these documents with your proposal, however, if you take exception to participating in Direct Deposit (Electronic) payments please clearly note such in your proposal as an exception. The City may waive the requirement to participate in Direct Deposit (Electronic) payments at its sole discretion. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 3 of 116 Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Collusive or Sham Proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow other state and local governmental agencies, political subdivisions, and/or school districts to utilize the resulting award under all terms and conditions specified and upon agreement by all parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in the current term or in any future terms. The selected Service Provider shall be required to sign the City’s Agreement prior to commencing services (see sample attached to this document). Sincerely, Gerry Paul Purchasing Director Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 4 of 116 I. PURPOSE The City of Fort Collins, Park Planning Department, is seeking proposals from qualified Service Providers to provide project management, design, and construction services for various playground surfacing projects throughout the City. The successful Service Provider will address all of the tasks, issues, and requested information in their proposal, possess the requisite skills, experience and manpower necessary to produce high quality projects on time and on budget, and be motivated to work with City staff, citizens, and to accomplish the project goals and objectives. II. BACKGROUND The City has historically demonstrated a need for on-call playground surfacing. Typical services requested include project design and/or construction of rubberized playground surfacing. This contract may be utilized by all City Departments and other governmental agencies. The City intends to award this agreement effective for a period of one year from the date on the Services Agreement, and may be renewable for four (4) additional one-year terms (one year at a time), at the option of the City. At time of renewal unit pricing can be negotiated with the City. Billings and payments will be made using the prices listed on the agreed to Price Schedule. In the event that a service is requested, which is not listed on the Price Schedule, the Contractor, and the City will negotiate an appropriate unit price for the service. A copy of the City's standard Professional Services Agreement is attached. III. SCOPE OF SERVICES A. Scope of Work On-Call Playground surfacing Installation and Design Services The Service Provider will work closely with City Project Managers to design conceptual, preliminary, and final improvement plans. The services to be provided will consist of, but not be limited to, the following: plan documents, renovation design and documentation, general notes, specifications, construction notes and details suitable for construction, and construction installation and observation services. The Service Provider may also assist in calculation of plan quantities, details, and other work related to producing plan documents. It is essential that the successful Service Provider’s product be compatible with Industry standards such as: • IPEMA certification • Aromatic urethane or Aliphatic urethane binder (in the top or wear layer only) • Standard manufacturers installation and materials warranty (7 or 10 years) Additional requirements may include: • Attend coordination and review meetings • Coordination with other contractors (landscape, engineering, etc.) When the City provides survey data, that data will be provide in an ASCII file – comma delineated format (point number, northing, easting, elevation, description). For new projects, the Service Provider may be required to provide construction and/or design services. In such case, the Service Provider will work closely with a City Project Manager to produce the best possible product and within the budget constraints associated with that project. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 5 of 116 The City does not require specific design software to be used, but final drawings shall be submitted to the City in AutoCAD and as mylar documents. Our anticipated need for design and construction work is expected to be on an “as needed” basis. The Service Provider should expect that services required for individual projects could range up to 800 hours depending on the complexity of the project(s). The City is seeking Service Provider’s that can excel at delivering projects with complex requirements (City and Parks Standards etc.). Equally important is the Service Provider’s ability to quickly, efficiently and cost-effectively complete small, straightforward projects. B. Anticipated Schedule The following represents the City’s target schedule for the RFP. The City reserves the right to amend the target schedule at any time. • RFP issuance: June 27, 2022 • Question deadline: 3:00 PM MT on July 6, 2022 • Proposal due date: 3:00 PM MT (our clock) on July, 20, 2022 • Interviews (tentative): Week of August 2, 2022 • Award of Contract (tentative): Week of August 9, 2022 C. Interviews In addition to submitting a written proposal, the top-rated Service Providers may be interviewed by the RFP assessment team and asked to participate in an oral presentation to provide an overview of the company, approach to the project and to address questions. The evaluation criteria for the oral interviews will be the same as the criteria for the written evaluations and is included in Section V. Because of recent events involving COVID-19, the City may use non-traditional methods for the optional interview phase of the assessment process. The City will receive and score written proposals. However, instead of traditional in-person interviews for the optional interview session, the City may opt to use alternate methods including, but not limited to remote interviews through a platform such as Microsoft Teams or Zoom. D. Travel & Expenses Subject to the terms of the applicable Work Order, reasonable expenses will be reimbursable per the current rates found at www.gsa.gov. E. Subcontractors/Subconsultants Service Provider will be responsible for identifying any subcontractors and/or subconsultants in their proposal. Please note that the City will contract solely with the awarded Service Provider; therefore, subcontractors and/or subconsultants will be the responsibility of the Service Provider. F. Financial Qualifications (CONFIDENTIAL) Service Providers selected as finalists may be required to submit a banking reference and the most recent financial statement (audited preferred) including balance sheet and income statement, as well as a statement of cash flows (the “Financial Information”). Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 6 of 116 G. Current standards All work and/or materials must meet current standards in force by recognized technical and professional societies, trade and materials supply associations, institutes and organizations, bureaus and testing laboratories, and national, federal, state, county, and local laws, codes and ordinances. H. Fees, Licenses, Permits The successful Service Provider shall be responsible for obtaining any necessary licenses, fees or permits without additional expense to the City. All vehicles and equipment shall be properly licensed and insured, carry the appropriate permits and be placarded as required by law. I. Laws and Regulations The Service Provider agrees to comply fully with all applicable local, State of Colorado and Federal laws and regulations and municipal ordinances to include American Disabilities Act (ADA). J. Work Orders The awarded Service Provider(s) will be required to sign the City’s Work Order Type Agreement, a sample of which is attached as Section VII for reference purposes. In the event that the City has agreements with multiple Service Providers for the Work, the City reserves the right to request proposals for individual Work Order assignments from the awarded Service Providers or assign Work Orders directly to a Service Provider at its sole discretion. Selection for individual Work Orders may be based on, but not limited to, availability, approach, prior experience, firm capability, and cost. Individual Work assignments will be requested and agreed to utilizing the City’s Work Order (included in the Agreement). Each Work Order must include a start and completion date, total cost and a Scope of Work. Subsequent supporting documentation pages may include a project schedule, deliverables, hours, cost detail supporting total cost, and personnel details. Fees outlined in the Work Order will conform with those stated in the Agreement. The maximum allowable Work Order must not exceed $300,000 unless authorized by the Purchasing Director. No Work Order over $7,500 will be considered valid until signed, at a minimum, by the Service Provider, project manager and Purchasing Department representative. Depending on the cost and nature of the Work, additional signature authorization may be required. Any changes to the dates, cost or scope of any Work Order must be agreed upon in writing utilizing the City’s Change Order (included in the Agreement) and will not be considered valid until signed, at a minimum, by the Service Provider, project manager and Purchasing Department representative. K. Invoicing and Payment Invoices should be emailed monthly to invoices@fcgov.com with a copy to the Project Manager. The cost of the work completed shall be paid to the Service Provider each month following the submittal of a correct invoice by the Service Provider indicating the project name, Purchase Order number, task description, hours worked, personnel/work type category, hourly rate for each employee/work type category, date of the work performed specific to the task, percentage of that work that has been completed by task, 3rd party supporting documentation with the same detail and a brief progress report. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 7 of 116 Payments will be made using the prices stated in the Work Order and Agreement. In the event a service is requested which is not stated in the Work Order and/or Agreement, the Service Provider and the City will negotiate an appropriate unit price for the service prior to the Service Provider initiating such work. The City pays invoices on Net 30 terms. L. COVID-19 Compliance The Service Provider and its subcontractors/consultants shall comply with all state, county, and local laws, ordinances, and public health orders established to reduce the spread of COVID-19, as applicable. The Service Provider shall ensure employees and subcontractors/subconsultants with COVID-19 symptoms do not report to the job site. Service Provider must organize work to ensure individuals minimize contact and maximize social distancing. Individuals must wear all standard worksite personal protective equipment (PPE). In addition, individuals should wear a mask or cloth face covering consistent with local public health recommendations and other applicable safety requirements. IV. PROPOSAL SUBMITTAL Please limit the total length of your proposal to a maximum of fifty (20) 8 ½ x 11” pages (excluding cover pages, table of contents, dividers and Authorization form). Font shall be a minimum of 10 Arial and margins are limited to no less than .5” for sides and top/bottom. Extended page sizes, such as 11” x 17”, count as a single page and may be used for detailed pricing. Links to other files or websites shall not be permitted. Proposals that do not conform to these requirements may be rejected. Service Providers are required to provide detailed written responses to the following items in the order outlined below. The responses shall be considered technical offers of what Service Providers propose to provide and shall be incorporated in the contract award as deemed appropriate by the City. A proposal that does not include all the information required may be deemed non-responsive and subject to rejection. Responses must include all the items in the order listed below. It is suggested that the Service Providers include each of the City’s questions with their response. The City of Fort Collins shall not reimburse any firm for costs incurred in the preparation and presentation of their proposal. A. Cover Letter / Executive Summary The Executive Summary should highlight the content of the proposal and features of the program offered, including a general description of the program and any unique aspects or benefits provided by your firm. B. Service Provider Information 1. Describe the Service Provider’s business and background 2. Number of years in the business 3. Details about ownership 4. An overview of services offered and qualifications 5. Size of the firm Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 8 of 116 6. Location(s) of offices. If multiple, please identify which will be the primary for our account. 7. Primary contact information for the company including contact name(s) and title(s), mailing address(s), phone number(s), and email address(s). C. Scope of Proposal 1. Provide a detailed narrative of the services proposed if awarded the contract per the scope above. The narrative should include any options that may be beneficial for the City to consider. 2. Describe how the project would be managed and who would have primary responsibility for its timely and professional completion. 3. Describe the methods and timeline of communication your firm will use with the City’s Project Manager and other parties. Also, will the project team be available to attend weekly meetings as required for this scope of work. 4. Identify what portion of work, if any, may be subcontracted. Include all applicable information herein requested for each Service Provider. D. Firm Capability and Assigned Personnel Provide relevant information regarding previous experience related to this or similar projects, to include the following: 1. Provide an Organization Chart/Proposed Project Team: An organization chart containing the names of all key personnel and subconsultants with titles and their specific task assignment for this Agreement shall be provided in this section. 2. Provide resumes for each professional and technical person to be assigned to the project, including partners & subcontractors. Please limit resumes to one page. 3. A list of qualifications for your firm and qualifications and experience of the specific staff members proposed to perform the services described above. 4. References. Provide a minimum of three similar projects with public agencies in the last 5 years that have involved the staff and subcontractors/subconsultants proposed to work on this project. Include the owner’s name, title of project, beginning price, ending price, contact name, email and phone number, subconsultants on the team and a brief description of the work and any change orders. The Service Provider authorizes the City to verify any and all information contained herein and hereby releases all those concerned providing information as a reference from any liability in connection with any information provided. 5. Provide any information that distinguishes Service Provider from its competition and any additional information applicable to this RFP that might be valuable in assessing Service Provider’s proposal. E. Sustainability/TBL Methodology In concise terms (no more than two pages), please describe your organization’s commitment to sustainability and supporting values. Each element of the TBL sustainability criteria will receive equal consideration in determining the final Sustainability/TBL score. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 9 of 116 1. Address how your firm strives to incorporate all three aspects (social, environmental, and economic) of Triple Bottom Line (TBL) sustainable practices into the workplace. Provide examples along with any metrics used to measure success within your firm. 2. Also provide examples of how your firm has incorporated all three aspects of TBL sustainable practices in previous similar projects on which your firm has been the prime Service Provider. Some examples are provided below: a. Environmental – Experience delivering projects / programs focused on environmental health priorities in the areas of climate resiliency, water quality and watershed protection, regulatory performance, management systems, air quality, renewable energy, sustainable building and design, construction materials management, and solid waste reduction. b. Economic – Experience working and delivering projects with an emphasis on strategic financial planning, job creation, business development, asset management, various project delivery methods, value engineering, regional partnerships, transparency, stakeholder engagement, strategic investments, aging infrastructure, repurposing of existing facilities, and competing financial priorities. c. Social - Experience working and delivering projects, programs, and/or initiatives that support Equity, Diversity, and Inclusion throughout your firm’s workplace, including leadership, and supply chain. Examples of this may be demonstration of working within cultural and language gaps, development of diversity programs, diverse project teams, equitable opportunity vendor supply chain, and how your firm has applied an equity lens to processes such as recruitment, hiring, purchasing, career pathways, salaries, and staff engagement. F. Cost and Work Hours In your response to this proposal, please provide the following: 1. Complete Cost Matrix Provided: Provide costs as outlined below in the cost matrix. 2. Provide Schedule of Rates: Provide a schedule of billing rates by category of employee and job title to be used during the term of the Agreement. This fee schedule will be firm for at least one (1) year from the date of the Agreement. The fee schedule will be used as a basis for determining fees should additional services be necessary. A fee schedule for subcontractors, if used, shall be included. 3. All direct costs (i.e., travel, printing, postage, etc.) specifically attributed to the project and not included in the billing rates must be identified. Reasonable expenses will be reimbursable as per the current rates found at www.gsa.gov. Service Provider/Consultant will be required to provide original receipts to the City for all travel expenses. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 10 of 116 Cost Matrix Critical Fall Heights (CFH)/Thickness (includes basemat and top course with aromatic urethane binder) SF Range NA- top only in color per note 1 below 4’ CFH (1.75”) 5’ CFH (2”) 8’ CFH (3.5”) 9’ CFH (4”) 10’ CFH (4.5”) 12’ CFH (5”) 13’ CFH (6”) 1 - 1,000 sf 1,001 - 3,000 sf 3,001 – 5,000 sf 5,001 – 10,000+ sf Additional Pricing Item Quantity Unit Price Cost Additional price per square foot for each 10% of color in top surface 1 $________ /square foot $________ Deduct price per square foot for each 10% of black added to top surface 1 $________ /square foot $________ Demolition, removal and disposal of existing PIP surfacing (includes calling in locates) 100 sf $________ /square foot $________ Supply and installation/ removal of temporary safety fencing 100 lf $________ /linear foot $________ Substitute Aliphatic binder for Aromatic binder 1 $________ /square foot $________ Additional materials mark-up (cost + %) %________ Notes: 1. Prices in CFH chart categories are to be “per square foot” and are for 50% color/50% black speckled top surface. 2. Prices include manufacturer warranty for materials and installation. 3. Prices include materials and installation. Freight would be priced on a per project basis and is not included in the above price. 4. Edge details to follow Surface America standard details per link: https://www.surfaceamerica.com/wp- content/uploads/2015/04/PlayBound_PIP_Edge_Details.pdf Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 11 of 116 G. Sample Agreement Included with this request for proposals is a sample Agreement that the City intends to use for obtaining the services of the Service Provider. The Service Provider is required to review this Agreement and indicate any objections to the terms of the contract. If revisions to the contractual terms are requested, provide suggested revisions. H. Acknowledgement The Acknowledgement form is attached as Section VI. Complete the attached form indicating the Service Provider hereby acknowledges receipt of the City of Fort Collins Request for Proposal and acknowledges that the Service Provider has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 12 of 116 V. REVIEW AND ASSESSMENT CRITERIA A. Proposal and Interview Criteria Service Providers will be evaluated on the following criteria. This set of criteria will be the basis for review and assessment of the written proposals and optional interview session. At the discretion of the City, interviews of the top-rated Service Providers may be conducted. The rating scale shall be from 1 to 10, a rating of 1 doesn’t meet minimum requirements, a rating of 5 means the category fulfills the minimum requirements, and 10 exceeds minimum requirements in that category. WEIGHTING FACTOR QUALIFICATION STANDARD 2.0 Scope of Proposal Does the proposal address all elements of the RFP? Does the proposal show an understanding of the project objectives, methodology to be used and results/outcomes required by the project? Are there any exceptions to the specifications, Scope of Work, or agreement? 2.0 Assigned Personnel Do the persons who will be working on the project have the necessary skills and qualifications? Are sufficient people of the requisite skills and qualifications assigned to the project? 1.0 Sustainability/TBL Methodology Does the firm demonstrate a commitment to Sustainability and incorporate Triple Bottom Line methodology in both their Scope of Work for the project, and their day-to-day business operating processes and procedures? 3.0 Cost and Work Hours Does the proposal included detailed cost break- down for each cost element as applicable and are the line-item costs competitive? Are the work hours presented reasonable for the effort required by each project task or phase? 2.0 Firm Capability Does the firm have the resources, financial strength, capacity and support capabilities required to successfully complete the project on- time and in-budget? Has the firm successfully completed previous projects of this type and scope? Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 13 of 116 VI. ACKNOWLEDGEMENT Service Provider hereby acknowledges receipt of the City of Fort Collins Request for Proposal and acknowledges that it has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP 9459 Playground Surfacing Construction Services and sample Agreement except as otherwise noted. Additionally, Service Provider hereby makes the following representations to City: a. All of the statements and representations made in this proposal are true to the best of the Service Provider’s knowledge and belief. b. Service Provider commits that it is able to meet the terms provided in this proposal. c. This proposal is a firm and binding offer, for a period of 90 days from the date hereof. d. Service Provider further agrees that the method of award is acceptable. e. Service Provider also agrees to complete the proposed Agreement with the City of Fort Collins within 10 days of notice of award. If contract is not completed and signed within 10 days, City reserves the right to cancel and award to the next highest rated firm. f. Service Provider acknowledges receipt of addenda. g. Service Provider acknowledges no conflict of interest. h. Failure to provide a public viewing copy will be considered a waiver of any claim of confidentiality under Colorado Open Records Act (CORA). Service Provider hereby waives any and all claims for damages against the City for the City’s good faith compliance with CORA. Legal Firm Name: Physical Address: Remit to Address: Phone: Name of Authorized Agent of Firm: Signature of Authorized Agent: Primary Contact for Project: Title: Email Address: Phone: Cell Phone: NOTE: ACKNOWLEDGMENT IS TO BE SIGNED & RETURNED WITH YOUR PROPOSAL. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 14 of 116 VII. SAMPLE AGREEMENT (FOR REFERENCE ONLY – DO NOT SIGN ) SERVICES AGREEMENT WORK ORDER TYPE THIS AGREEMENT made and entered into the day and year set forth below, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and hereinafter referred to as "Service Provider". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Services to be Performed. a. This Agreement shall constitute the basic agreement between the parties for 9459 Playground Surfacing Construction Services. The conditions set forth herein shall apply to all services performed by the Service Provider on behalf of the City and particularly described in Work Orders agreed upon in writing by the parties from time to time. Such Work Orders, samples of which are attached hereto as Exhibit A & B, consisting of two (2) and ( ) pages and incorporated herein by this reference, shall include a description of the services to be performed, the location and time for performance, the amount of payment, any materials to be supplied by the City and any other special circumstances relating to the performance of services. A general scope of services is attached hereto as Exhibit , consisting of ( ) pages, and incorporated herein by this reference. The only services authorized under this Agreement are those which are performed after receipt of such Work Order, except in emergency circumstances where oral work requests may be issued. Oral requests for emergency actions will be confirmed by issuance of a written Work Order within two (2) working days. Irrespective of references in Exhibit A & B to certain named third parties, Service Provider shall be solely responsible for performance of all duties hereunder. b. The City may, at any time during the term of a particular Work Order and without invalidating such Work Order, make changes to the scope of the particular services. Such changes shall be agreed upon in writing by the parties by Change Order, a sample of which is attached hereto as Exhibit C, consisting of ( ) page(s), and incorporated herein by this reference. 2. Changes in the Work. The City reserves the right to independently bid any services rather than issuing work to the Service Provider pursuant to this Agreement. Nothing within this Agreement shall obligate the City to have any particular service performed by the Service Provider. 3. Time of Commencement and Completion of Services. The services to be performed Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 15 of 116 pursuant to this Agreement shall be initiated as specified by each written Work Order or oral emergency service request. Oral emergency service requests will be acted upon without waiting for a written Work Order. Time is of the essence. 4. Contract Period. This Agreement shall commence and shall continue in full force and effect until , unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for additional one year periods not to exceed four (4) additional one year periods. Renewals and pricing changes shall be negotiated by and agreed to by both parties only at the time of renewal. Written notice of renewal shall be provided to the Service Provider and mailed no later than thirty (30) days prior to contract end. 5. Delay. If either party is prevented in whole or in part from performing its obligations by unforeseeable causes beyond its reasonable control and without is fault or negligence, then the party so prevented shall be excused from whatever performance is prevented by such cause. To the extent that the performance is actually prevented, the Service Provider must provide written notice to the City of such condition within ten (10) days from the onset of such condition. 6. Early Termination by City/Notices. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Service Provider. Such notice shall be mailed at least ten (10) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective immediately when emailed or three business days from the date of the notice when mailed to the following addresses: Service Provider: City: Copy to: Attn: email address City of Fort Collins Attn: Jill Wuertz PO Box 580 Fort Collins, CO 80522 jwuertz@fcgov.com City of Fort Collins Attn: Purchasing Dept. PO Box 580 Fort Collins, CO 80522 purchasing@fcgov.com In the event of early termination by the City, the Service Provider shall be paid for services rendered to the date of termination, subject only to the satisfactory performance of the Service Provider's obligations under this Agreement. Service Provider shall submit a final invoice within ten (10) days of the effective date of termination. Undisputed invoices shall be paid Net 30 days of the date of the invoice. Such payment shall be the Service Provider's sole right and remedy for such termination. 7. Contract Sum. This is an open-end indefinite quantity Agreement with no fixed price. The actual amount of work to be performed will be stated on the individual Work Orders. The City makes no guarantee as to the number of Work Orders that may be issued or the actual amount of services which will in fact be requested. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 16 of 116 8. Payments. a. The City agrees to pay and the Service Provider agrees to accept as full payment for all work done and all materials furnished and for all costs and expenses incurred in performance of the work the sums set forth for the hourly labor rate and material costs, with markups, stated within the Bid Schedule Proposal Form, attached hereto as Exhibit , consisting of ( ) pages, and incorporated herein by this reference. b. Invoices shall be emailed to invoices@fcgov.com with a copy to the Project Manager. The cost of the work completed shall be paid to the Service Provider following the submittal of a correct itemized invoice by the Service Provider. Payment shall be made by the City only upon acceptance of the work by the City and upon the Service Provider furnishing satisfactory evidence of payment of all wages, taxes, supplies and materials, and other costs incurred in connection with the performance of such work. The City is exempt from sales and use tax. The City’s Certificate of Exemption license number is 09804502. A copy of the license is available upon written request. The City pays invoices on Net 30 days from the date of the invoice. 9. Appropriation. To the extent this Agreement or any provision in it constitutes a multiple fiscal year debt or financial obligation of the City, it shall be subject to annual appropriation by City Council as required in Article V, Section 8(b) of the City Charter, City Code Section 8-186, and Article X, Section 20 of the Colorado Constitution. The City shall have no obligation to continue this Agreement in any fiscal year for which no such supporting appropriation has been made. 10. Liquidated Damages. OWNER and CONTRCTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in the Work Order, plus any extensions thereof allowed in accordance with Article 12 of the General conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amount set forth in each Work Order. 11. City Representative. The City's representative will be shown on the specific Work Order and shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the work requested. All requests concerning this Agreement shall be directed to the City Representative. 12. Independent Contractor. It is agreed that in the performance of any services hereunder, the Service Provider is an independent contractor responsible to the City only as to the results to be obtained in the particular work assignment and to the extent that the work shall be done in accordance with the terms, plans and specifications furnished by the City. 13. Subcontractors/subconsultants. Service Provider may not subcontract any of the Work set forth in the subsequent Work Orders without the prior written consent of the city, which shall Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 17 of 116 not be unreasonably withheld. If any of the Work is subcontracted hereunder (with the consent of the City), then the following provisions shall apply: (a) the subcontractor/subconsultant must be a reputable, qualified firm with an established record of successful performance in its respective trade performing identical or substantially similar work, (b) the subcontractor/subconsultant will be required to comply with all applicable terms of this Agreement, (c) the subcontract will not create any contractual relationship between any such subcontractor/subconsultant and the City, nor will it obligate the City to pay or see to the payment of any subcontractor/subconsultant, and (d) the work of the subcontractor/subconsultant will be subject to inspection by the City to the same extent as the work of the Service Provider. 14. Personal Services. It is understood that the City enters into the Agreement based on the special abilities of the Service Provider and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Service Provider shall neither assign any responsibilities nor delegate any duties arising under the Agreement without the prior written consent of the city. 15. Acceptance Not Waiver. The City's approval or acceptance of, or payment for any of the services shall not be construed to operate as a waiver of any rights under the Agreement or of any cause of action arising out of the performance of this Agreement. 16. Warranty. a. Service Provider warrants that all work performed hereunder shall be performed with the highest degree of competence and care in accordance with accepted standards for work of a similar nature. b. Unless otherwise provided in the Agreement, all materials and equipment incorporated into any work shall be new and, where not specified, of the most suitable grade of their respective kinds for their intended use, and all workmanship shall be acceptable to City. c. Service Provider warrants all equipment, materials, labor and other work, provided under this Agreement, except City-furnished materials, equipment and labor, against defects and nonconformances in design, materials and workmanship/workwomanship for a period beginning with the start of the work and ending twenty-four (24) months from and after final acceptance under the Work Order, regardless whether the same were furnished or performed by Service Provider or by any of its subcontractors/subconsultants of any tier. Upon receipt of written notice from City of any such defect or nonconformances, the affected item or part thereof shall be redesigned, repaired, or replaced by Service Provider in a manner and at a time acceptable to City. 17. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this Agreement, such party may be declared in default thereof. 18. Remedies. In the event a party has been declared in default, such defaulting party shall be Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 18 of 116 allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail themselves of any other remedy at law or equity. If the non-defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees and costs incurred because of the default. 19. Entire Agreement; Binding Effect; Order of Precedence; Authority to Execute. This Agreement, along with all Exhibits and other documents incorporated herein, shall constitute the entire Agreement of the parties regarding this transaction and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. Covenants or representations not contained in this Agreement shall not be binding on the parties. In the event of a conflict between terms of the Agreement and any exhibit or attachment, the terms of the Agreement shall prevail. Each person executing this Agreement affirms that they have the necessary authority to sign on behalf of their respective party and to bind such party to the terms of this Agreement. 20. Indemnity/Insurance. a. The Service Provider agrees to indemnify and save harmless the City, its officers, agents and employees against and from any and all actions, suits, claims, demands or liability of any character whatsoever, brought or asserted for injuries to or death of any person or persons, or damages to property arising out of, result from or occurring in connection with the performance of any service hereunder. b. The Service Provider shall take all necessary precautions in performing the work hereunder to prevent injury to persons and property. c. Without limiting any of the Service Provider's obligations hereunder, the Service Provider shall provide and maintain insurance coverage naming the City as an additional insured under this Agreement of the type and with the limits specified within Exhibit , consisting of ( ) page(s), attached hereto, and incorporated herein by this reference. The Service Provider before commencing services hereunder shall deliver to the City's Purchasing Director, purchasing@fcgov.com, P. O. Box 580, Fort Collins, Colorado 80522 one copy of a certificate evidencing the insurance coverage required from an insurance company acceptable to the city. 21. Law/Severability. The laws of the State of Colorado shall govern the construction, interpretation, execution, and enforcement of this Agreement. The Parties further agree that Larimer County District Court is the proper venue for all disputes. If the City subsequently agrees in writing that the matter may be heard in federal court, venue will be in Denver District Court. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 19 of 116 22. Governmental Immunity Act. No term or condition of this Agreement shall be construed or interpreted as a waiver, express or implied, of any of the notices, requirements, immunities, rights, benefits, protections, limitations of liability, and other provisions of the Colorado Governmental Immunity Act, C.R.S. § 24-10-101 et seq. and under any other applicable law. 23. Prohibition Against Unlawful Discrimination. The City of Fort Collins, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality. The City also strictly prohibits unlawful harassment in the workplace, including sexual harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding. The City requires its vendors to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment, and retaliation. This requirement applies to all third-party vendors and their subcontractors/subconsultants at every tier. 24. Prohibition Against Employing Workers Without Authorization. Pursuant to Section 8-17.5- 101, C.R.S., et. seq., Service Provider represents and agrees that: a. As of the date of this Agreement: 1) Service Provider does not knowingly employ or contract with a worker without authorization who will perform work under this Agreement; and 2) Service Provider will participate in either the e-Verify program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the “e-Verify Program”) or the Department Program (the “Department Program”), an employment verification program established pursuant to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired employees to perform work under this Agreement. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 20 of 116 b. Service Provider shall not knowingly employ or contract with a worker without authorization to perform work under this Agreement or knowingly enter into a contract with a subcontractor/subconsultant that knowingly employs or contracts with a worker without authorization to perform work under this Agreement. c. Service Provider is prohibited from using the e-Verify Program or Department Program procedures to undertake pre-employment screening of job applicants while this Agreement is being performed. d. If Service Provider obtains actual knowledge that a subcontractor/subconsultant performing work under this Agreement knowingly employs or contracts with a worker without authorization, Service Provider shall: 1) Notify such subcontractor/subconsultant and the City within three days that Service Provider has actual knowledge that the subcontractor/subconsultant is employing or contracting with a worker without authorization; and 2) Terminate the subcontract with the subcontractor/subconsultant if within three days of receiving the notice required pursuant to this section the subcontractor/subconsultant does not cease employing or contracting with a worker without authorization; except that Service Provider shall not terminate the contract with the subcontractor/subconsultant if during such three days the subcontractor/subconsultant provides information to establish that the subcontractor/subconsultant has not knowingly employed or contracted with a worker without authorization. e. Service Provider shall comply with any reasonable request by the Colorado Department of Labor and Employment (the “Department”) made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. f. If Service Provider violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement is so terminated, Service Provider shall be liable for actual and consequential damages to the City arising out of Service Provider’s violation of Subsection 8-17.5-102, C.R.S. g. The City will notify the Office of the Secretary of State if Service Provider violates this provision of this Agreement and the City terminates the Agreement for such breach. 25. Dust Control. The Service Provider shall abide by the City of Fort Collins “Dust Control and Prevention Manual,” which is available for public download at https://www.fcgov.com/airquality/pdf/dust-prevention-and-control-manual.pdf, and is incorporated herein by this reference. The City of Fort Collins has implemented this manual for all projects performed for the City of Fort Collins or located within the City of Fort Collins Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 21 of 116 City limits. 26. Colorado Open Records Act. The City is subject to Sec. 24-72-201 et seq. of the Colorado Revised Statute (CORA). This Agreement is subject to public disclosure in whole pursuant to CORA. 27. Special Provisions. Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit - Confidentiality, consisting of ( ) page(s), and Exhibit , Section 00700 General Conditions consisting of fifty-three (53) pages. [Signature Page Follows] Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 22 of 116 THE CITY OF FORT COLLINS, COLORADO By: Gerry Paul Purchasing Director Date: ATTEST: APPROVED AS TO FORM: SERVICE PROVIDER'S NAME By: Printed: Title: Date: Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 23 of 116 EXHIBIT A WORK ORDER FORM (Short form) PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND SERVICE PROVIDER'S NAME WORK ORDER NUMBER: PM's Tracking # PROJECT TITLE: ORIGINAL BID/RFP NUMBER & NAME: 9459 Playground Surfacing Construction Services MASTER AGREEMENT EFFECTIVE DATE: Original Contract Date WORK ORDER COMMENCEMENT DATE: WORK ORDER COMPLETION DATE: MAXIMUM FEE: (time and reimbursable direct costs): PROJECT DESCRIPTION/SCOPE OF SERVICES: Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of ( ) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: Name, Title ACCEPTANCE: Date: Jill Wuertz, Project Manager REVIEWED: Date: Adam Hill, Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 24 of 116 EXHIBIT B WORK ORDER FORM (Construction over $100,000) CONSTRUCTION WORK ORDER FOR 9459 PLAYGROUND SURFACING CONSTRUCTION SERVICES WORK ORDER NO. TITLED (WORK ORDER TITLE) DATE: CONTRACTOR: Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 25 of 116 TABLE OF CONTENTS AGREEMENT FORMS 00525 Work Order & Notice of Award 00530 Work Order Notice to Proceed 00600 Bonds and Certificates 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate CONDITIONS OF THE CONTRACT 00700 General Conditions Exhibit GC-A GC-A1 - GC-A2 00800 Supplementary Conditions 00900 Addenda, Modifications and Payment 00950 Work Order Change Order Form 00960 Application for Payment Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 26 of 116 SECTION 00500 CONSTRUCTION WORK ORDER AGREEMENT FORMS 00525 Work Order, Notice of Award & Bid Schedule 00530 Work Order Notice to Proceed Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 27 of 116 SECTION 00525 WORK ORDER, NOTICE OF AWARD AND BID SCHEDULE TO (CONTRACTOR OR CM/GC): WORK ORDER # & TITLE: PURCHASE ORDER: ORIGINAL BID/RFP # & TITLE: 9459 Playground Surfacing Construction Services ENGINEER: OWNER’S REPRESENTATIVE: NOTICE OF AWARD DATE: OWNER: City of Fort Collins (hereinafter referred to as OWNER) 1. WORK. You are hereby notified that your bid dated , for the above Work Order has been considered. Pursuant to your AGREEMENT with OWNER dated , you have been awarded a Work Order for this Work Order Description: A. See Section 01100 – Summary of Work. 2. CONTRACT PRICE, BONDS AND CERTIFICATES. The price of your Work Order is ($ ). Pursuant to the AGREEMENT and the Contract Documents, Performance and Payment Bonds and insurance are required. 3. CONTRACT TIMES. Pursuant to the AGREEMENT and the Contract Documents, the date for Substantial Completion of this Work Order is , and after Substantial Completion, the date for Final Completion is . 4. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTACTOR shall pay OWNER the amounts set forth hereafter. 1. Substantial Completion: ($ ) for each calendar day or fraction thereof that expires after until the work is Substantially Complete. 2. Final Acceptance: After Substantial Completion ($ ) for each calendar day or fraction thereof that expires after the period for Final Payment and Acceptance until the Work is ready for Final Payment and Acceptance. 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 28 of 116 5.1 PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. 5.1.1 Prior to Substantial Completion, Owner will be entitled to withhold as contract retainage five percent (5%) of each progress payment, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. If , in the sole discretion of Owner, on recommendation of Engineer, Owner determines that the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 95% of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application Section 00960. 5.1.2 Upon Substantial Completion payment will be made in an amount sufficient, if necessary, to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as ENGINEER shall determine or OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. 5.2 FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. 6. CONTRACTOR'S REPRESENTATION. In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 6.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 29 of 116 supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 6.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. 6.5 CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. 7. CONTRACT DOCUMENTS. 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of “Contract Documents” in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. 7.2 Forms for use by CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: 7.2.1 Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3 Lien Waiver Releases 7.2.4 Consent of Surety 7.2.5 Application for Exemption Certificate 7.2.6 Application for Payment 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 30 of 116 The Contract Drawings shall be stamped "Final for Construction" and dated. Any revisions made shall be clearly identified and dated. 7.4 The Contract Documents also include all written amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 7.5 There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. 8. MISCELLANEOUS 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 8.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, Agreement and obligations contained in the Contract Document. 9. EXECUTION. Three (3) copies of this proposed Work Order & Notice of Award, and accompanying amendments or supplements to the Contract Documents (except any applicable Drawings) incorporated herein, are provided. Three (3) sets of any applicable Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is, by . A. You must deliver to OWNER three (3) fully-executed counterparts of this Work Order, including all amendments or supplements to the Contract Documents incorporated herein. Each Work Order must bear your signature as provided. B. You must deliver with the executed Work Order the Contract Security (Bonds) and insurance, as specified in the Agreement, this Work Order, the General Conditions (Article 5.1) and the Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned and to annul this Work Order & Notice of Award. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully-signed counterpart of this Work Order with any amendments or supplements to the Contract Documents attached. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 31 of 116 CONTRACTOR’S NOTICE OF AWARD REPRESENTATION & EXECUTION: CONTRACTOR agrees to perform the services identified above, in accordance with the terms and conditions contained herein and in the AGREEMENT dated , and the NOTICE OF AWARD dated , between the parties. In the event of a conflict between or ambiguity in the terms of the AGREEMENT or specific Work Orders, the AGREEMENT shall control. CONTRACTOR: By: Date: Name: Title: Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 32 of 116 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference and the attached Notice to Proceed is hereby given. ACCEPTANCE: Date: _____ Jill Wuertz, Projects Manager OWNER: CITY OF FORT COLLINS ACCEPTANCE: ___________________________________________ Date: __________ Kelly DiMartino, Interim City Manager (if greater than $1,000,000) ACCEPTANCE: ___________________________________________ Date: __________ Gerry Paul, Purchasing Director (if greater than $60,000) APPROVED AS TO FORM: __________________________________ Date: __________ ATTEST: ___ ________________________________________ Date: __________ Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 33 of 116 BID SCHEDULE Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 2 of 116 SECTION 00530 WORK ORDER NOTICE TO PROCEED NOTICE TO PROCEED DATE: WORK ORDER TITLE: WORK ORDER NUMBER: ORIGINAL BID/RFP # & TITLE: 9459 Playground Surfacing Construction Services TO: Attn: This notice is to advise you: That the Work Order and all amendments and supplements to the Contract Documents covering the above described Work have been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance and Payment Bonds and insurance have been received by the OWNER. That the OWNER has approved the said Work Order and Contract Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Work Order and the AGREEMENT. The dates for Substantial Completion and Final Acceptance shall be , and , respectively. Dated this _____________ day of ___________, _____. CITY OF FORT COLLINS (OWNER) By: ___________________________________________ ___________________________________________ Name & Title ACKNOWLEDGMENT OF NOTICE Receipt of the above Work Order Notice to Proceed is hereby acknowledged this _____________ day of ___________, _____. (CONTRACTOR) By: ___________________________________________ ___________________________________________ Name & Title Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 3 of 116 SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00651 Lien Waiver Release (SUBCONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 4 of 116 SECTION 00610 PERFORMANCE BOND Bond No __ KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , 2 , for 9459 Playground Surfacing Construction Services a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled , Work Order Number , dated the day of , , a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Work Order and Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Work Order and Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 5 of 116 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _____ day of ___________, _____. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners _____________________________ By: _____________________________ By: IN PRESENCE OF: Surety _____________________________ By: _____________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 6 of 116 SECTION 00615 PAYMENT BOND Bond No __ KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the day of , , for 9459 Playground Surfacing Construction Services, a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled , Work Order Number , dated the day of , , a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Work Order and Agreement and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 7 of 116 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _____ day of ___________, _____. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners _____________________________ By: _____________________________ By: IN PRESENCE OF: Surety _____________________________ By: _____________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Page 8 of 116 SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall insert his own standard form for Certificate of Insurance in accordance with the following: 1. The Contractor will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Contractor shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: “The insurance evidenced by this Certificate will not reduce coverage or limits and will not be cancelled, except after thirty (30) days written notice has been received by the City of Fort Collins.” In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Contractor, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Contractor under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Contractor’s general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Contractor shall maintain during the life of this Agreement for all of the Contractor's employees engaged in work performed under this agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Contractor shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Contractor shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. Official Purchasing Document Last updated 10/2017 SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) WORK ORDER # & TITLE: DATE OF SUBSTANTIAL COMPLETION: ORIGINAL BID/RFP # & TITLE: 9459 Playground Surfacing Services PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado INCLUDE: OWNER: City of Fort Collins CONTRACTOR: WORK ORDER DATE: The Work performed under this Work Order, pursuant to the Contract Documents, has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. _____________________________ By: __________________________ ________ PROJECT MANAGER AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. _____________________________ By: __________________________ ________ CONTRACTOR AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS ________ By: __________________________ ________ OWNER AUTHORIZED REPRESENTATIVE DATE REMARKS: _________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ Official Purchasing Document Last updated 10/2017 SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE DATE: ________________, _____ TO: Gentlemen: You are hereby notified that on the day of , , the City of Fort Collins, Colorado, has accepted the Work completed by , for the City of Fort Collins Work Order, titled , Work Order Number under 9459 Playground Surfacing Construction Services. A check is attached hereto in the amount of $ as Final Payment for all Work done, subject to the terms of the Contract Documents, including the Work Order, which is dated , and the AGREEMENT, which is dated . In conformance with the Work Order and Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date: ___________________, _____. Sincerely, City of Fort Collins OWNER By: ___________________________________________ ___________________________________________ Name & Title ATTEST: _________________________________________ ___________________________________________ Name & Title Official Purchasing Document Last updated 10/2017 SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: (CONTRACTOR) WORK ORDER TITLE: WORK ORDER NUMBER: ORIGINAL BID/RFP # & TITLE: 9459 Playground Surfacing Construction Services 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR's Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes an adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and Official Purchasing Document Last updated 10/2017 may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Signed this ______ day of __________, ___. CONTRACTOR: By: ___________________________________________ ___________________________________________ Name & Title ATTEST: _____________________________ Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this _________ day of __________, _____, by ________________________________________________________________. Witness my hand and official seal. My Commission Expires: ___________________________. _________________________ Notary Public Official Purchasing Document Last updated 10/2017 SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: WORK ORDER # & TITLE: ORIGINAL BID/RFP # & TITLE: 9459 Playground Surfacing Construction Services CONTRACT DATE: WORK ORDER DATE: In accordance with the provisions of the Work Order and Contract between the OWNER and the CONTRACTOR as indicated above, for the Work Order titled on bond of , (Surety) _______________________________________ hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this _________ day of _________ _, _____. ____________________________________________ (Surety Company) By: ________________________________________ (Name) Attorney-in-Fact ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact. Official Purchasing Document Last updated 10/2017 SECTION 00670 APPLICATION FOR EXEMPTION CERTIFICATE Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 SECTION 00700 GENERAL CONDITIONS Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 Official Purchasing Document Last updated 10/2017 SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition, with City of Fort Collins Modifications, Rev. 9/94) and other provisions of the Contract Documents as indicated below. SC-1 DEFINITIONS SC-1.38. Add the following language to the conclusion of paragraph 1.38 of the General Conditions: 1.38. Substantial Completion. .... Substantial Completion is further defined as that degree of completion of the operating facilities or systems of the Project defined in the Work Order sufficient to provide the OWNER the full time, uninterrupted, continuous, beneficial operation of the modifications, and all inspections required have been completed and identified conditions corrected. SC-1.43.A. Add the following new paragraph immediately after paragraph 1.43 of the General Conditions: 1.43.A. Work Order--A written document executed by OWNER and CONTRACTOR that provides for the construction of a portion of the Work, pursuant to the Agreement and all as required by the Contract Documents, and that becomes a Contract Document when executed. SC-2 PRELIMINARY MATTERS SC-2.8. Delete paragraph 2.8 of the General Conditions entirely and replace it with the following paragraph: 2.8. Preconstruction Conference. Within ten days after the Contract Times for a Work Order start to run, but before any Work at the site is started, a conference attended by CONTRACTOR, ENGINEER and others as appropriate will be held to establish a working relationship among the parties as to the Work and to discuss the schedules referred to in paragraph 2.6, procedures for handling Shop Drawings and other submittals, processing Applications for Payment, and maintaining required records. SC-2.10. Add the following new paragraph immediately after paragraph 2.9 of the General Conditions: 2.10. Work Order Required for All Work. References to the Agreement in this Article 2 and in the General and Supplementary Conditions and Contract Documents notwithstanding, no Work shall be initiated or performed until CONTRACTOR has received a signed and executed Work Order, incorporating the Notice to Proceed, from OWNER; and no provision of this Article 2 or of the General and Supplementary Official Purchasing Document Last updated 10/2017 Conditions and Contract Documents shall permit or require any action of CONTRACTOR in the absence of a signed and executed Work Order. All provisions of this Article 2 and of the General and Supplementary Conditions and Contract Documents referencing the Agreement or other parts of the Contract Documents, or permitting or requiring any action of CONTRACTOR, shall be read as referencing and, as appropriate, requiring a signed and executed Work Order. SC-4 AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS SC-4.2.1.2. Add the following new paragraph immediately following paragraph 4.2.1.2 of the General Conditions: 4.2.1.2.1. No drawing of physical conditions in or relating to existing surface or subsurface structures (except Underground Facilities referred to in paragraph 4.3) which are at or contiguous to the site have been utilized by the Engineer in preparation of the Contract Documents, except the following: SC-5 BONDS AND INSURANCE SC-5.4.7. Include the following parties or entities as additional insureds, as provided in paragraph 5.4.7 of the General Conditions: 5.4.7.1. City of Fort Collins, Colorado, 4316 LaPorte Avenue, Fort Collins, Colorado 80522 5.4.7.2. . SC-5.4.8.1. Add the following new paragraph immediately following paragraph 5.4.8 of the General Conditions: 9.4.8.1. Limits of Liability. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed below are as follows: For Paragraphs 5.02.A.1 and 5.02.A.2: Coverage A - Statutory Limits; Coverage B - $100,000 / $100,000 / $500,000. For Paragraphs 5.02.A.3 and 5.02.A.5: The Commercial General Liability policy will have limits of $1,000,000 combined single limits (CSL). This policy will include coverage for Explosion, Collapse, and Underground coverage unless waived by the Owner. For Paragraph 5.02.A.6: The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000 combined single limits (CSL). For Paragraph 5.02.B.3: This policy will include completed operations coverage / product liability coverage with limits of $1,000,000 combined single limits (CSL). This policy shall also include an Umbrella Excess Liability as follows: General liability and automobile liability insurance in an amount not less than $1,000,000 per occurrence in excess of the above stated primary limits. Official Purchasing Document Last updated 10/2017 SC-6 CONTRACTOR’S RESPONSIBILITIES SC-6.14.3. Add the following new paragraph immediately after paragraph 6.14.2 of the General Conditions: 6.14.3. The following Laws or Regulations are included in the Contract Documents as mandated by statute or for the convenience of the CONTRACTOR. Other Laws and Regulations apply which are not included herein, and are within the CONTRACTOR's duty and responsibility for compliance thereto: 6.14.3.1. Notice to owners of Underground Facilities is required prior to excavations in the vicinity of such facilities. 6.14.3.2. Unless otherwise decided by reason of the amount of the Contract Price involved, or other good reason, before or at the time that the contract is awarded to a corporation outside the State of Colorado, such corporation must carry out the proper procedure to become authorized to do business in the State of Colorado, designate a place of business therein, and appoint an agent for service of process. Such corporation must furnish the OWNER with a certificate from the Secretary of State of Colorado has been issued by its office and there shall also be procured from the Colorado Secretary of State of photostatic or certified copy of the designated of place of business and appointment of agent for service of process, or a letter from the Colorado Secretary of State that such designation of place of business and agent for service of process have been made. 6.14.3.3. The CONTRACTOR must conform to the rules and regulations of the Industrial Commission of Colorado. Particular reference is made to rules and regulations governing excavation Work adopted by the Industrial Commission of Colorado. SC-11 CHANGE OF CONTRACT PRICE SC-11.6.2.7. Add the following new paragraph to paragraph 11.6.2 of the General Conditions: 11.6.2.7. Cost of the Work. Allowances for profit, overhead and mark-up prescribed by Article 4 of the Agreement shall be used in lieu of any CONTRACTOR'S fee, overhead, profit or mark-up allowances as prescribed in paragraphs 11.6.2.1, 11.6.2.2, and 11.6.2.3. SC-12 CHANGE OF CONTRACT TIMES SC-12.3. Add the following language to the end of paragraph 12.3 of the General Conditions: 12.3. .... Lost days due to abnormal weather conditions will be allocated as required. SC-14 PAYMENTS TO CONTRACTOR AND COMPLETION Official Purchasing Document Last updated 10/2017 SC-14.1. Add the following language to the end of paragraph 14.1 of the General Conditions: 14.1. Schedule of Values. .... Progress payments on the fixed fee shall be in proportion to the cumulative actual Cost of the Work as a percentage of the Allowable Cost of the Work. An amount not to exceed fifteen (15%) percent of the fixed fee shall be advanced to the Contractor for mobilization in the first progress payment. Official Purchasing Document Last updated 10/2017 SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Change Order 00960 Application for Payment Official Purchasing Document Last updated 10/2017 SECTION 00950 CHANGE ORDER FORM CHANGE ORDER NO. CONTRACTOR: WORK ORDER TITLE & NO. : ORIGINAL BID/RFP # & TITLE: 9459 Playground Surfacing Construction Services DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost: 4. Change in Contract Time: ORIGINAL CONTRACT COSTS $ ________________ TOTAL APPROVED CHANGE ORDER(S) $ ________________ TOTAL PENDING CHANGE ORDER(S) $ ________________ TOTAL THIS CHANGE ORDER $ ________________ TOTAL % OF ORIGINAL CONTRACT, THIS CO: _______________ % TOTAL % OF ORIGINAL CONTRACT, ALL CO’S: _______________ % ADJUSTED CONTRACT COST $ ________________ _________________ (Assuming all change orders approved) ACCEPTED BY: _____________________________________ DATE: ____________ Contractor's Representative ACCEPTED BY: _____________________________________ DATE: ____________ Project Manager REVIEWED BY: _____________________________________ DATE: ____________ Title: APPROVED BY: _____________________________________ DATE: ____________ Title: APPROVED BY: _____________________________________ DATE: ____________ (Purchasing Agent if > $60,000) cc: City Clerk Architect/Engineer Finance Purchasing Project Manager Contractor Official Purchasing Document Last updated 10/2017 SECTION 00960 PAYMENT APPLICATION Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services Section 00960 APPLICATION FOR PAYMENT PAGE 1 OF 4 OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER: APPLICATION DATE: PERIOD BEGINNING: ENGINEER: CONTRACTOR: PERIOD ENDING: PROJECT NUMBER: CHANGE ORDERS Application is made for Payment as shown below in connection with Contract NUMBER DATE AMOUNT The present status of the account for this Contract is as follows: 1 2 Original Contract Amount: 3 Net Change by Change Order: Current contract Amount: $0.00 Total Completed and Stored to Date: Less Previous Applications: Amount Due this Application - Before Retainage: $0.00 Less Retainage: Net Change by Change Order $0.00 AMOUNT DUE THIS APPLICATION: $0.00 CERTIFICATION: The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with the Work have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract. The above Amount Due This Application is requested by the CONTRACTOR. Date: By: Payment of the above Amount Due This Application is recommended by the ENGINEER. Date: By: Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager. Date: By: Payment of the above Amount Due This Application is approved by the OWNER. Date: By: Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services CONTRACT AMOUNTS APPLICATION FOR PAYMENT PAGE 2 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services CHANGE ORDERS APPLICATION FOR PAYMENT PAGE 3 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS CHANGE ORDERS $0.00 $0.00 $0.00 $0.00 $0.00 PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services STORED MATERIALS SUMMARY PAGE 4 OF 4 On Hand Received Installed On Hand Item Invoice Previous This This This Number Number Description Application Period Period Application $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00 Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services ATTACHMENT A POURED-IN-PLACE RUBBERIZED SURFACING MIMINUM GENERAL SPECIFICATIONS SCOPE OF WORK Supply all materials and labor required for poured-in-place rubberized safety surfacing. Surfacing shall be installed in an existing playground site, to be used as an entrance and access to play structures. Owner will provide maximum height of play structures. QUALIFICATIONS 1. Qualified installer must be a licensed contractor approved and trained by the manufacturer of the playground surfacing system. B. SUBMITTALS 1. Manufacturer must submit proof of compliance to: ♦ Certification by manufacturer that installer is an approved applicator of the playground surfacing system. ♦ U.S. Consumer Product Safety Commission publication entitled “Handbook for Public Playground Safety” ♦ American Society for Testing and Materials standard (ASTM) F1292 Standard Specification for Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment ♦ ASTM F1951 Standard Specification for Determination of Accessibility of Surface Systems Under and Around Playground Equipment ♦ Performance Requirements: Provide a 2 layer rubber-urethane playground surfacing system which has been designed, manufactured and installed to meet the following criteria: ♦ 1. Shock Attenuation (ASTM F1292): ♦ a. Gmax: Less than 200. ♦ b. Head Injury Criteria: Less than 1000. ♦ 2. Flammability (ASTM D2859): Pass. ♦ 3. Tensile Strength (ASTM D412): 60 psi (413 kPa). ♦ 4. Tear Resistance (ASTM D624): 140%. ♦ 5. Water Permeability: 0.4 gal/yd2/second. 2. Manufacturer’s written specifications and manufacturer’s sales brochure marked to annotate the specific product to be utilized. 3. Statement of compliance with volatile emission regulations for all components, including adhesive systems or binders. 4. Materials Safety Data Sheet shall be submitted for the proposed product. 5. Manufacturer and installer must submit proof of liability insurance. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services 6. Guarantee and written warranty for materials and installation for no less than 10 years. 7. Submit a representative sample of the product and the recommended manufacturer’s installation instructions. SITE CONDITIONS If Installer is responsible for the completion of the subsurface in the area where the poured-in- place rubberized surfacing is to be applied, the Installer shall: 1. Establish and maintain required lines and elevations for grade. 2. Sub-base shall slope to provide positive drainage at a minimum of 1” per 10’ and shall not pond water at any location. 3. If surfacing is to be laid on a stone base, provide subsurface drainage where shown on plans. 4. Materials shall be delivered in clearly labeled unopened containers. 5. Materials shall be stored and handled in a manner that will insure protection from weather. 6. Materials stored on site shall be protected by use of barricades and fencing. 7. Environmental Requirements: Install surfacing system when minimum ambient temperature is 40 degrees F and maximum ambient temperature is 90 degrees F. Do not install in steady or heavy rain. PRODUCT Provide a base layer and top wearing course to meet critical fall height standards for CPSC and ASTM guidelines for maximum height of play structures provided by the owner. 1. Cast-in-place surfaces shall be manufactured on site of UV stabilized polyurethane and rubber granules, no less than specified thickness. 2. Basemat – 100% recycled SBR (Styrene Butadiene Rubber), free of all dust and extraneous fiber, metal and similar substances and urethane. Foam rubber fillers are not acceptable. 14% urethane, 86% rubber (based on entire rubber & urethane mix). 3. Top surface – 100% new EPDM (Ethylene Propylene Diene Monomer) rubber, peroxide cured, UV stabilized; size 1-3 mm. with aliphatic urethane binder. 18% urethane, 82% rubber (based on entire rubber & urethane mix). 4. Color to be determined by owner. EXECUTION When laying surfaces on a compacted stone base, proof-roll prepared sub-base surface immediately prior to paving to check for unstable loose areas and areas requiring additional compaction. Compact the base material as required to secure moisture content and a uniform compaction of not less than 90%. Compacted stone base should be water permeable and sub- grade should allow for free drainage by weeps and/or slumps. When laying surfaces on asphalt or concrete, be assured that the surface is fully cured for no less than 30 days for asphalt and 7 days for concrete, clean of dust and debris, oil free and dry. Fill and patch any surface irregularities with structural bonding type fillers. Official Purchasing Document Last updated 10/2017 RFP 9459 Playground Surfacing Construction Services 1. Do not proceed with playground surfacing installation until all applicable site work, including substrate preparation, fencing, playground equipment installation and other relevant work, has been completed. 2. Notify owner of unsatisfactory conditions. Do not begin laying paving until deficient sub-base areas have been corrected and are ready to receive paving. 3. Plan the layout and placement of varying thickness zones by string line, chalk line and grade stakes to provide reference points throughout the installation process. 4. Follow manufacturer’s instructions for installation. • Basemat Installation: o Using screeds and hand trowels, install the basemat at a consistent density of 29 pounds, 1 ounce per cubic foot (466 kg/m3) to the specified thickness. o Allow basemat to cure for sufficient time so that indentations are not left in the basemat from applicator foot traffic or equipment. o Do not allow foot traffic or use of the basemat surface until it is sufficiently cured. • Primer Application: Using a brush or short nap roller, apply primer to the basemat perimeter and any adjacent vertical barriers such as playground equipment support legs, curbs or slabs that will contact the surfacing system at the rate of 300 ft2/gal (7.5 m2/L). • Top Surface Installation: o Using a hand trowel, install top surface at a consistent density of 58 pounds, 9 ounces per cubic foot (938 kg/m3) to a nominal thickness of 1/2″ (12.7 mm). o Allow top surface to cure for a minimum of 48 hours. o At the end of the minimum curing period, verify that the top surface is sufficiently dry and firm to allow foot traffic and use without damage to the surface. o Do not allow foot traffic or use of the surface until it is sufficiently cured. 5. Taper edges to existing, surrounding surfaces when shown on plan. 6. Finished site shall be free of tools, equipment, unused materials and debris; broom area clean. PROTECTION Contractor to provide fencing and barricades that shall protect finished surfaces. Owner will provide reasonable supervision on site after hours. Cure shall be no less than manufacturer’s recommendations. FINAL INSPECTION Manufacturer’s sales representative and/or installer must attend a follow up inspection with a City of Ft. Collin’s Certified Playground Safety Inspector prior to acceptance of the installation.