HomeMy WebLinkAboutPOWERHOUSE 2 - PDP220006 - SUBMITTAL DOCUMENTS - ROUND 2 - ELEVATIONSSOUTH ELEVATION
WEST ELEVATION
0 5 10 20 30
0 5 10 20 30
SCALE 81'-6"TOP OF PARAPETMECANICAL EQUIPMENT
SCREENING - MATERIAL #3
MECANICAL EQUIPMENT
SCREENING - MATERIAL #3STAIR TOWER
MATERIAL #1 SUN SHADING
DEVICES
ARCHITECTURAL
METAL PANEL, PREFINISHED
MATERIAL #3
MASONRY VENEER-
MATERIAL #2
STONE VENEER -
MATERIAL #1
81'-6"TOP OF PARAPETVERTICAL SUN SHADES
ARCHITECTURAL METAL
PANEL, PREFINISHED -
MATERIAL #4
MATERIAL # 1 -
SANDSTONE VENEER
EDGE SAWN, SPLIT (CLEFT) FACE
MATERIAL PALETTE
MATERIAL # 2 -
BRICK VENEER
(COLOR TO BE SIMULAR TO
POWERHOUSE 1 BUILDING)
MATERIAL # 3 & 4
ARCHITECTURAL METAL PANELS
RIBBED & SMOOTH TEXTURED
PREFINISHED
COLOR MATERIAL # 3
COLOR MATERIAL # 4
The Neenan Company
3325 S. Timberline Rd.
Fort Collins, CO 80525
www.neenan.com
POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:EXTERIOR BUILDING ELEVATIONSBULDING MATERIALSISSUE DATE:
APRIL 13, 2022
REVISIONS:
SHT. #
1
OF
4
SCALE10'10'THERE WERE NO ARCHITECTURAL COMMENTS
IN THE FIRST ROUND, SO THE ARCHITECTURAL
SHEETS HAVE NOT CHANGED SINCE THE
FIRST PDP SUBMITTAL.
10'STAIR/ ELEVATOR
TOWER
10'STAIR TOWERS & MECHANICAL
EQUIPMENT SCREENING
FOLDING
OVERHEAD
DOORS
MECANICAL EQUIPMENT
SCREENING - MATERIAL #3
MECANICAL EQUIPMENT
SCREENING - MATERIAL #3 STAIR TOWER
MATERIAL #1
ARCHITECTURAL
METAL PANEL, PREFINISHED
MATERIAL #3
MASONRY VENEER-
MATERIAL #2
STONE VENEER -
MATERIAL #1 ARCHITECTURAL METAL
PANEL, PREFINISHED -
MATERIAL #4
MECANICAL EQUIPMENT
SCREENING - MATERIAL #3
NORTH ELEVATION
0 5 10 20 30
SCALE
EAST ELEVATION
0 5 10 20 30
SCALE 81'-6"TOP OF PARAPETThe Neenan Company
3325 S. Timberline Rd.
Fort Collins, CO 80525
www.neenan.com
POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:EXTERIOR BUILDING ELEVATIONSCOVERED PARKINGSOLAR CANOPYISSUE DATE:
APRIL 13, 2022
REVISIONS:
SHT. #
2
OF
4
COVERED PARKING SOLAR CANOPIES
GLU-LAM TIMBERS w/
STEEL REINFORCING
AS REQUIRED
SOLAR PANELS 8'MECHANICAL
EQUIPMENT
SCREENING -
MATERIAL #3
8' H. WALL
TRASH ENCLOSURE -
MATERIAL #3 - 8' H. WALL
AERIAL PERSPECTIVE from NORTHWEST
AERIAL PERSPECTIVE from SOUTHWEST
SHADOW STUDY
The Neenan Company
3325 S. Timberline Rd.
Fort Collins, CO 80525
www.neenan.com
POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:AERIALPERSPECTIVESSHADOW STUDYISSUE DATE:
APRIL 13, 2022
REVISIONS:
SHT. #
3
OF
4COLLEGE AVE.VINE ST.JEROME ST. NORTH
THE SHADOW SHOWN REPRESENTS THE SHADOW
THE BUILDING WILL CAST ON THE WINTER
SOLSTICE (DEC. 21ST) @ 12:00 P.M.
THIS SHADOW WILL BE THE LONGEST SHADOW OF THE YEAR.
PERSPECTIVE VIEW from SOUTHWEST
PERSPECTIVE VIEW from SOUTH / VINE STREET
The Neenan Company
3325 S. Timberline Rd.
Fort Collins, CO 80525
www.neenan.com
POWERHOUSE 2 CLIMATE SOLUTIONS CAMPUS FORT COLLINS, COLORADOSHEET NAME:PERSPECTIVEBUILDINGVIEWSISSUE DATE:
APRIL 13, 2022
REVISIONS:
SHT. #
4
OF
4