DRAINAGE LETTER
To: City of Ft. Collins
From: Brice Hammersland, P.E.
Kimley-Horn and Associates, Inc
Date: May 25, 2022
Subject: City of Ft. Collins
Rocky Mountain Archery Communication Tower
Kimley-Horn and Associates, Inc. (Kimley-Horn) is submitting this Drainage Letter for the above referenced project.
The purpose of this letter is to serve as an outline for changes to the existing development and associated drainage
analysis.
PROJECT DESCRIPTION
The proposed Rocky Mountain Archery Communication Tower Project (the “Project”) is located at 4518
Innovation Drive, Fort Collins, Colorado (the “Site”). The Project is anticipated to consist of the construction of
communication tower, ground equipment platform, chain-link fence, permeable pavers, and waveguide bridge.
The communication tower is located at the southeast corner of the parcel adjacent to the existing stormwater
pond.
The Site is within Flood Zone “X” and lies outside of the mapped 100-year floodplain as shown on FIRM Map
Panels 08069C1000F dated December 19, 2006. Please see Appendix A for the FIRM Maps and NRCS Soil
Map.
Below outlines the supporting calculations and documentation for the Drainage Letter.
ASSUMPTIONS
In coordination with City of Ft. Collins guidelines, it was determined that a limited drainage study would be
performed with this project. The main objective of this project is to minimize the increase in impervious area of
the parcel and impact to the existing stormwater pond. Due to the scope of this project not including a major
drainage analysis, the limited analysis provided is intended to demonstrate that negative impacts to the existing
storm infrastructure are not anticipated with the construction of the tower and ground improvements.
kimley-horn.com 4582 South Ulster Street, Suite 1500, Denver, CO 80237 303 228 2300
DRAINAGE ANALYSIS
Impervious Area
The existing development has a ±10,000 sf building, concrete parking lot, and stormwater pond. Please see
Appendix B for the Original Drainage Analysis prepared by North Star Design in September 2009. The proposed
development conditions of the North Star Design analysis were used as the existing conditions of the proposed
analysis. The development met or exceeded all the regulations of the City of Ft. Collins Strom Drainage Design
Criteria Manual at the time of approval.
The proposed development includes the construction of a communication tower, ground equipment platform,
chain-link fence, permeable pavers, and waveguide bridge. The increase in impervious area for the proposed
development is limited to the tower, ground equipment platform foundation, chain link fence, permeable pavers,
and waveguide bridge foundations. The proposed ground equipment platform will have a grated surface;
therefore, will not be included in the impervious calculations. Please see Appendix C for the impervious
calculations and the Proposed Development Exhibit depicting the proposed impervious area.
The proposed development’s impervious area is shown on the Impervious Table in Appendix D. The “C” values
depicted in the in the Impervious Table have been updated based on the latest City of Ft. Collins Storm Drainage
Design Criteria Manual. The Impervious Table shows the proposed improvements will create a very small
increase in the percent impervious (less than 1%). It should be noted that the total new impervious area that will
be added due to the proposed improvements will be approximately 347 square feet. Per Table 5.0.1 in the Cities
Stormwater Criteria Manual this is less than the 350 square feet threshold where a Drainage submittal is
required. The improvements do result in a small increase in the “C” values for the 2-yr and 5-yr for the site. The
“C” value for the 100-yr does remain unchanged.
Pond Volume
The original development of the site completed a Storm Drainage Certification for the pond volume. Please see
Appendix E for the Storm Drainage Certification. It is believed that there is a typo in the Storm Drainage
Certification in that the provided volume is in cu-ft instead of ac-ft. The As-Built condition of the original
development pond provides 909 cu-ft at the water quality elevation and 1,290 cu-ft at the 100-year High Water
Elevation (HWEL), which is 213 cu-ft and 334 cu-ft more than the approved design, respectively.
The elevations shown on the Proposed Development Exhibit have been taken from a survey prepared by Daley
Land Surveying, Inc. dated 3/18/2019. The Daley Land Surveying survey is in the NAVD 88 vertical datum, while
the original analysis is in the NGVD 29 vertical datum. The conversion from NAVD 88 to NGVD 29 is NAVD 88 –
2.9’ = NGVD 29. The depicted elevations in Appendix C have been converted to the NGVD 29 vertical datum.
Temporary impacts to the pond during construction will have minor impacts to the detention pond side slopes
along the west side of the detention pond. These will be restored to match existing grades once construction
within the detention pond is completed to ensure the existing detention pond does not reduce the current pond
volume. The proposed ground equipment platform is located at the edge of the existing stormwater pond.
Appendix C calls out the ground elevation at the center of piers located within the 100-yr water surface elevation
and piers adjacent to the 100-yr water surface elevation. The proposed 2 ft diameter concrete pier at the north
Page 3
kimley-horn.com 4582 South Ulster Street, Suite 1500, Denver, Colorado, 80237 303 228 2300
east corner and the middle pier along the east side of the platform will encroach the volume provided in the
pond. A Volume Encroachment Table has been added to Appendix C to show the volume encroachment of the
existing pond. Due to the minimal impact to the pond, the proposed development condition continues to provide
sufficient volume at both the Water Quality and 100-year HWEL levels.
CONCLUSION
The drainage analysis presented in this letter is intended to show that with the above listed assumptions, the
proposed conditions are not significantly different from existing conditions and existing infrastructure is not
anticipated to be negatively impacted by the proposed improvements.
SIGNATURE: _________________________________
Brice Hammersland, P.E.
Registered Professional Engineer
State of Colorado No. 56012
Page 4
kimley-horn.com 4582 South Ulster Street, Suite 1500, Denver, Colorado, 80237 303 228 2300
APPENDIX
Appendix A – FIRM and NRCS Soil Map
Appendix B – Original Drainage Analysis
Appendix C – Proposed Development Exhibit
Appendix D – Impervious Table
Appendix E – Storm Drainage Certification
Page 5
kimley-horn.com 4582 South Ulster Street, Suite 1500, Denver, Colorado, 80237 303 228 2300
EXHIBIT
A
USGS The National Map: Orthoimagery. Data refreshed April 2020
National Flood Hazard Layer FIRMette
0 500 1,000 1,500 2,000250
Feet
Ü
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE)
Zone A, V, A99
With BFE or DepthZone AE, AO, AH, VE, AR
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas
of 1% annual chance flood with average
depth less than one foot or with drainage
areas of less than one square mileZone X
Future Conditions 1% Annual
Chance Flood HazardZone X
Area with Reduced Flood Risk due to
Levee. See Notes.Zone X
Area with Flood Risk due to LeveeZone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood HazardZone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline
Profile Baseline
Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study
Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of
digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap
accuracy standards
The flood hazard information is derived directly from the
authoritative NFHL web services provided by FEMA. This map
was exported on 7/29/2020 at 9:30 AM and does not
reflect changes or amendments subsequent to this date and
time. The NFHL and effective information may change or
become superseded by new data over time.
This map image is void if the one or more of the following map
elements do not appear: basemap imagery, flood zone labels,
legend, scale bar, map creation date, community identifiers,
FIRM panel number, and FIRM effective date. Map images for
unmapped and unmodernized areas cannot be used for
regulatory purposes.
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
8
B 20.2
The pin displayed on the map is an approximate
point selected by the user and does not represent
an authoritative property location.
1:6,000
105°3'3"W 40°31'42"N
105°2'26"W 40°31'15"N
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/17/2020
Page 1 of 4448595044859604485970448598044859904486000448595044859604485970448598044859904486000496080496090496100496110496120496130496140496150496160496170
496080 496090 496100 496110 496120 496130 496140 496150 496160 496170
40° 31' 29'' N 105° 2' 46'' W40° 31' 29'' N105° 2' 42'' W40° 31' 27'' N
105° 2' 46'' W40° 31' 27'' N
105° 2' 42'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 20 40 80 120
Feet
0 5 10 20 30
Meters
Map Scale: 1:434 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 15, Jun 9, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Aug 11, 2018—Aug
12, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/17/2020
Page 2 of 4
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
74 Nunn clay loam, 1 to 3
percent slopes
C 0.7 100.0%
Totals for Area of Interest 0.7 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/17/2020
Page 3 of 4
Tie-break Rule: Higher
Hydrologic Soil Group—Larimer County Area, Colorado
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/17/2020
Page 4 of 4
Page 6
kimley-horn.com 4582 South Ulster Street, Suite 1500, Denver, Colorado, 80237 303 228 2300
EXHIBIT
B
Page 7
kimley-horn.com 4582 South Ulster Street, Suite 1500, Denver, Colorado, 80237 303 228 2300
EXHIBIT
C
NORTHPROPOSED IMPERVIOUS PIER AREAPRELIMINARYNOT FOR CONSTRUCTION4582 S ULSTER ST. #1500DENVER, CO 80237PHONE (303) 228-2300WWW.KIMLEY-HORN.COMBoca Raton, FL 33487750 Park of Commerce DriveSuite 200Aurora, CO 8001118400 East 22nd AvenueSITE NAME:ROCKY MOUNTAIN ARCHERYT-MOBILE SITE #:DN01586CVERTICAL BRIDGE SITE #:US-CO-5082PROPOSEDDEVELOPMENTEXHIBITEXHIBITLEGENDPROPOSED IMPERVIOUS AREAPOND VOLUME ENCROACHMENTTOWER FOUNDATION = 19.6 SFPLATFORM FOUNDATION/GRATED WALKWAY = 108.8 SFFENCE POST & ICE BRIDGE FOUNDATION (1' DIA)= 3.2 SFPERMEABLE PAVERS = 215 SFTOTAL = 346.6 SFNORTH EAST PLATFORM FOUNDATION AND GRATED WALKWAYDIAMETER = 1.5'VOLUME AT 4969.86 = 0.64 CU-FTVOLUME AT 4970.1 = 0.92 CU-FTPROPOSED PERMEABLE PAVERS
Page 8
kimley-horn.com 4582 South Ulster Street, Suite 1500, Denver, Colorado, 80237 303 228 2300
EXHIBIT
D
Rocky Mountain ArcheryDATE:8/24/2021140064064RRJBHTYPE C SOILASPHALT/ CONCRETE ROOFTOP PAVERSLAWNS, SANDY SOIL, AVG SLOPELAND USE:AREAAREAAREAAREA2-YR RUNOFF COEFFICIENT 0.95 0.95 0.500.205-YR RUNOFF COEFFICIENT 0.95 0.95 0.500.20100-YR RUNOFF COEFFICIENT 1.19 1.19 0.630.25IMPERVIOUS % 100% 90% 40%2%ASPHALT/ CONCRETE ROOFTOP PAVERSLAWNS, SANDY SOIL, AVG SLOPETOTALDESIGN DESIGN AREAAREAAREAAREAAREABASIN POINT (AC) (AC) (AC) (AC) (AC) Cc(2) Cc(5) Cc(100) Imp %EX1 EX10.18 0.23 0.00 0.170.580.73 0.73 0.92 67.9%AA0.18 0.23 0.010.160.580.74 0.74 0.93 68.7%CHECKED BY:PROJECT NUMBER:CALCULATED BY:NOTE: C5-YR = C2-YR*1.00 PER FCSCM TABLE 3-2-3ON-SITE BASINSRUNOFF COEFFICIENTS - IMPERVIOUS CALCULATIONPROJECT NAME:COMPOSITE RUNOFF COEFFICIENTNOTE: C100-YR =C2-YR*1.25 PER FCSCM TABLE 3-2-3EXISTING BASINS
Page 9
kimley-horn.com 4582 South Ulster Street, Suite 1500, Denver, Colorado, 80237 303 228 2300
EXHIBIT
E