Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 9005 HAIL ROOF REPLACEMENTS AND REPAIR PROJECT (2) Operation Services 300 LaPorte Avenue Building B PO Box 580 Fort Collins, CO 80522 970.221.6610 970.221.6534 - fax fcgov.com DATE: January 28, 2021 TO: Darin A. Atteberry, City Manager THRU: Ken Mannon, Facilities & Fleet Director Gerry Paul, Purchasing Director Brian Hergott, Senior Facilities Project Manager FROM: Matthew Schaefer, Senior Facilities Project Manager RE: USC 700 Wood St., Building A / B Roof Replacement – 2018 Hail Claim Attached you will find Change Order 2 for the USC 700 Wood St., Building A / B Roof Replacement as part of the 2018 hail claim. This Work Order was awarded to Independent Roofing Specialists, LLC. A summary of the relevant contract details is as follows: Original Contract Value: $1,493,687.87 Change Order 1 (Accepted): ($76,405.06) Change Order 2 (Proposed): $112,203.49 Proposed Contract Value: $1,529,486.30 Total Change Order percentage of Original Work Order: 2.4% Narrative: Change Order 1 (Accepted): A reduction in contract value that is primarily attributable to reutilizing an existing base layer of roof insulation across the facility’s roof surfaces. Change Order 1 has been approved and is included in this document for your reference. Change Order 2 (Proposed): Current building code requires parapet reinforcement at three roof decks which significantly contribute to the cost of Change Order 2. See attached copy of Change Order 2 for other factors contributing to the proposed change in contract value. Recommendation: Please execute the attached Change Order. Please note that this is paid for by insurance money. DocuSign Envelope ID: 51F91247-B8CF-4984-AFB8-DE207D02411F SECTION 00950 CHANGE ORDER FORM CHANGE ORDER NO. 2 CONTRACTOR: Independent Roofing Specialists, LLC WORK ORDER TITLE & NO. : Work Order 1 - 700 Wood Street Roof Replacement ORIGINAL BID/RFP # & TITLE: 9005 Hail Damage Roof Replacement and Repair Project DESCRIPTION: 1. Reason for change: Extension of Substantial Completion and Final Completion Dates. To acknowledge and address discovered conditions in the course of construction. 2. Description of Change: Change Order Requests (COR) as follows: COR 7 Shop Drawings for window system replacement $747.50 COR 8 Install two (2) overflow roof drains on Roof Deck 17 $11,776.00 COR 9 Roof curb replacement and HVAC unit freon recharge $1,081.00 COR 10 Install six (6) roof drains on Roof Decks 17 and 21 $6,833.33 COR 11 Remove angle iron under Roof Deck 21 $276.00 COR 12 Replace flashing and EIFS repair at Roof Deck 18/23 $3,050.38 COR 13 Install L-panel system at parapet of Roof Decks 15, 17, 23 $31,722.58 COR 14 Install parapet reinforcement at Roof Deck 1 $51,025.93 COR 15 Install scuppers, Josam parts, raise vent pipes $5,690.77 3. Change in Contract Cost: $112,203.49 4. Change in Contract Time: Extend the date for Substantial Completion of this Work Order to January 16, 2021, and after Substantial Completion, the date for Final Completion is February 16, 2021. ORIGINAL CONTRACT COSTS $ 1,493,687.87 _____ TOTAL APPROVED CHANGE ORDER(S) $ (76,405.06) ______ TOTAL PENDING CHANGE ORDER(S) $ N/A ____________ TOTAL THIS CHANGE ORDER $ 112,203.49 ______ TOTAL % OF ORIGINAL CONTRACT, THIS CO: 7.9 __________ % TOTAL % OF ORIGINAL CONTRACT, ALL CO’S: 2.4 ____________ % ADJUSTED CONTRACT COST $ 1,529,486.30 _____ _________________ (Assuming all change orders approved) DocuSign Envelope ID: 51F91247-B8CF-4984-AFB8-DE207D02411F ACCEPTED BY: _____________________________________ DATE: ____________ Authorized Representative, Independent Roofing Specialists, LLC ACCEPTED BY: _____________________________________ DATE: ____________ Matthew Schaefer, Project Manager REVIEWED BY: _____________________________________ DATE: ____________ Jake Rector, Senior Buyer REVIEWED BY: _____________________________________ DATE: ____________ Ken Mannon, Director of Operation Services APPROVED BY: _____________________________________ DATE: ____________ Gerry Paul (Purchasing Agent if > $60,000) cc: City Clerk Architect/Engineer Finance Purchasing Project Manager Contractor DocuSign Envelope ID: 51F91247-B8CF-4984-AFB8-DE207D02411F 2/4/2021 2/8/2021 2/9/2021 2/9/2021 2/9/2021 DocuSign Envelope ID: 51F91247-B8CF-4984-AFB8-DE207D02411F DocuSign Envelope ID: 51F91247-B8CF-4984-AFB8-DE207D02411F DocuSign Envelope ID: 51F91247-B8CF-4984-AFB8-DE207D02411F DocuSign Envelope ID: 51F91247-B8CF-4984-AFB8-DE207D02411F DocuSign Envelope ID: 51F91247-B8CF-4984-AFB8-DE207D02411F DocuSign Envelope ID: 51F91247-B8CF-4984-AFB8-DE207D02411F DocuSign Envelope ID: 51F91247-B8CF-4984-AFB8-DE207D02411F DocuSign Envelope ID: 51F91247-B8CF-4984-AFB8-DE207D02411F DocuSign Envelope ID: 51F91247-B8CF-4984-AFB8-DE207D02411F DocuSign Envelope ID: 51F91247-B8CF-4984-AFB8-DE207D02411F DocuSign Envelope ID: 51F91247-B8CF-4984-AFB8-DE207D02411F