HomeMy WebLinkAboutWORK ORDER - RFP - 9191 CM/GC SERVICES FOR EAST DISTRICT PARK MAINTENANCE FACILITY AND BUCKING HORSE PARKOfficial Purchasing Document Last updated 3/2018 Page 1 of 1 AMENDMENT #1 WORK ORDER BETWEEN THE CITY OF FORT COLLINS AND FRANSEN PITTMAN CONSTRUCTION CO., INC. This first Amendment (Amendment #1) is entered into by and between the CITY OF FORT COLLINS (the “City”) and FRANSEN PITTMAN CONSTRUCTION CO., INC. (the “Contractor”). WHEREAS, the Contractor and the City entered into an Agreement effective November 1, 2020 (the “Agreement”); and WHEREAS, the Contractor and the City entered into Work Order PR-600313 East District Park Maintenance Facility effective October 7, 2021 (the “Work Order”); and WHEREAS, Contractor and the City desire to amend the Work Order PR-600313 East District Park Maintenance Facility . NOW, THEREFORE, in consideration of the foregoing recitals and the mutual promises herein contained, the parties agree to add documents to the Work Order as follows: 21-0528 - EPDMF Initial GMP Tab Sheets 21-0907 - EPDMF GMP Permit Set Allowance List 21-0907 - EPDMF GMP Permit Set Estimate Rev 03 21-0907 - EPDMF GMP Permit Set Summary Revision 03 21-0907 - EPDMF GMP Permit Set Tab Summary Rev 01 21-0907 - EPDMF GMP Permit Set Tracking Log 02 21-0907 - Equipment & Labor Rates Except as expressly amended by this Amendment #1, all other terms and conditions of the Work Order shall remain unchanged and in full force and effect. In the event of a conflict between the terms of the Work Order and this Amendment #1, this Amendment #1 shall prevail. IN WITNESS WHEREOF, the parties have executed this first Amendment the day and year shown. CITY OF FORT COLLINS: By: Gerry Paul Purchasing Director DATE: FRANSEN PITTMAN CONSTRUCTION CO., INC. By: Printed: Title: CORPORATE PRESIDENT OR VICE PRESIDENT Date: DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 1/4/2022 President John Pittman 1/4/2022 Mile High Precise Striping SUS P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 2,748 2,693 2,719 Exempt Exempt Exempt Exempt Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - 4ea Inc Inc Inc - - - 1ea Inc Inc Inc - - - 1ea Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - 200 200 200 - - - - - - - - - - - - - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2,948 2,893 2,919 - - - - 2,948 2,893 2,919 - - - Inc Inc BASE BID Inc LEED Requirements Inc Inc TEXTURA FEES Inc Inc FULL SET OF DOCUMENTS Inc TOTAL SUB TOTAL Performance & Payment Bonds 32 17 23.13 Painted Pavement Marking Stripping Signage Stop Sign Inc Signage per PV1 Stall Striping Directional Arrows ADA Symbol SALES TAX INCLUDED No Parking Fire Lane ADA Parking Sign 10 14 53 Site Signage Inc PER PLANS AND SPECIFICATIONS Inc Inc Inc Bond Rate Inc Inc Inc Late December 2021 Start Ok Ok Ok Q&A Log Inc Inc Inc Inc Inc Inc Inc JOB LOCATION: Addendum 01 Addenda Acknowledged CONSTRUCTORS 2 A JOB NAME: SPEC # / 'S STRIPING & SIGNAGE FRANSEN PITTMAN DESCRIPTION VERIFY FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc Hatched striping Install Post Excavation Concrete for Install Spoil Removal/Spreading DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Martin & Sons Dunrite Harolds P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 343,275 351,886 403,500 Exempt Exempt Exempt Exempt Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - - - - - - - Inc Inc Inc - - - See Estimate See Estimate See Estimate - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - See Estimate See Estimate See Estimate - - - P 2,500 Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - - - - - - - - - - - - - Coord w/ 2F Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - N/A Due to diameter of Trees Add 3,988 if RequiredN/A Due to diameter of Trees - - - N/A Due to diameter of Trees See AboveN/A Due to diameter of Trees - - - Inc Inc Inc - - - - - - - - - - - - - - Export 1,158CY Export 2,288CY Export - - - Inc Inc Inc - - - discuss Inc 4' Inc Inc - - - discuss Inc 18" Inc Inc - - - Inc Inc Inc - - - Figure $10/CY per Ryan 730 Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - 16,200 SFQty Short 1,278 Inc Inc - - - Inc Inc Inc - - - inc Inc Inc Coord w/ 3AThey wont do this By 3A By 3A (9,320) Inc Plug based on their unit cost 1,728 2,045 Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - - Inc Inc - - - - Inc Inc - - - - - - - - - - - - - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - 2,200 Inc Inc - - - Why Allowace There are details Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - RG1 Inc Inc Inc - - - Inc 31,895 Inc - - - Inc Inc Inc - - - ST1 Inc Inc Inc - - - ST1 Inc Inc Inc - - - ST1 Inc Inc Inc - - - ST1 Inc Inc Inc - - - ST1 Inc Inc Inc - - - RG1 Inc Inc Inc - - - Inc Inc Inc - - - Coord w/2D Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - - - - - - - - - - - - - - - - - - - per Ryan 300 Inc Inc - - - Inc Inc Inc - - - Coord w/ 15See 15A 8,750 8,750 8,750 - - - Inc Inc - - - - - - - - - - - - - - - - Inc Rev to 4" in Addenda Inc - - - Inc Inc Inc - - - Inc Rev to 1.5" in Addenda Inc - - - Inc Inc Inc - - - Inc INc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Coord w/2F Excluded Excluded Excluded - - - Inc Inc Inc - - - (5,500) N/A N/A - - - - - - - - - - - - - - - - - - - - - (8,300) (7,635) PH (8,000) - - - (45,850) (22,648) PH (40,000) - - - - - - - - - - - - - - - - 301,111 354,973 364,250 - - - - 301,111 354,973 364,250 - - - 02 23 50 Topsoil 02 23 00 Clearing and Grubbing 02 22 10 Trench, Backfilling, and Compaction 02 22 00 Site Demolition Grading Landscape Grading Site Conc Erosion Control Details per EC2 Erosion Control per EC1 Wattle Dike 33 46 16 High Density Polyethylene (HDPE) Pipe 02 30 60 Recondition Subgrade Traffic Control Grading Conc Pavin North Rain Garden Inlet Protection Rock Socks Tracking Pad Concrete Wash Out Silt Fence Wattle Inlet A2 FES A HW-B2 - Outlet Structure Inlet A3 Over-Ex Below Foundatoins 4' Over-Ex Below Hardscapes 18" 8" Min Gravel Layer meeting CDOT #$ 4" Pea Gravel Layer 18" Bio-Retention Sand Media CDOT Class B Geotextile separator fabric Per DR1 Weir - Detention Forebays Excavation for Pond Gravel Base Course Below SOG Base bid at Shed to be Gravel Scour-Stop 12" HDPE Inlet A1 South Rain Garden 33 46 23 Scourstop transition Mat 33 49 05 ADS Drain Basin 33 13 00 Disinfection of Water Distribution Systems 33 13 01 Water Distribution System Testing 33 31 13.13 Sanitary Sewer Service Lines 33 31 13 Polyvinyl Chloride (PVC) Non-Pressure Pipe 33 34 00 Storm Utility Drainage Piping 33 46 00 Subdrainage SPEC # / 'S EARTHWORK & UTILITIES 2 B FRANSEN PITTMAN CONSTRUCTORS JOB NAME: JOB LOCATION: DESCRIPTION Addenda Acknowledged Inc Addendum 01 Inc Inc Inc Q&A Log Inc Inc Inc LEED Requirements Inc Inc OK Late December 2021 Start OK OK N/A Bond Rate Rate 3.5% Rate 2% IncPER PLANS AND SPECIFICATIONS Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc IncTEXTURA FEES Inc Inc Site Visit Review Soils Report 02 60 10 Manholes 02 70 00 Sanitary Sewer 31 10 00 Site Clearing 31 20 00 Earth Moving 02 20 00 Earthwork and Grading 02 41 00 Site Demolition 02 30 40 Aggregate Base Course 02 24 00 Tree Removal Cleanout Garding Asphalt Permits Storm Drainage Systems Per Sheet RG1 Weir - South Rain Garden Sanitary Sewer Systems 6" Perforated HDPE Sub Drain Grouted RipRap w/ Forebay at Rain Gardens Conc Weir Walls Weir - North Rain Garden Headwall Detention Pond per ST-1 Adjust San Sewer MH Rim 4" PVC Sanitary Line Sand Oil Intercept Tap to existing 36" Sanitary Line Back flow device for irrigation Irrigation Tap Conc Incasement Placeholder Domestic water tap 1" Irrigation line 1" meter Pit & Curb Stop SUB TOTAL Performance & Payment Bonds Credits for GMP Set vs Model Rip Rap in Lieu of Scour Stop Credit for Over Ex at hardscapes TOTAL VERIFY FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc Inc Inc BASE BID SALES TAX INCLUDED Domestic Water 4" Fire Service Connect to existing 12" waterline with 12"x4" Tee w/ TB 1- 4"GV (NW) 1.5" Domestic Service 1.5" Meter Pit & Curb Stop Erosion Control Tree Protection 31 23 33 Trenching and Backfilling 32 11 13 Stabilized Subgrade 32 11 23 Aggregate Base Course 33 01 30 Sanitary Sewer Testing 33 11 13 Ductile Iron Pipe 33 11 14 Polyvinyl Chloride (PVC) Pressure Pipe 33 12 13 Service Lines, Meters and Appurtenances Removal Tracking Pad Refreshes Concrete Wash Out Refreshes Site Demo Tree Removal 17EA Demo Conc Pad Demo Conc Pan Mobilization Earthwork Sidewalk Demo Concrete Drive Demo Licensed Arborist Permit Clear & Grub Gravel Parking Excavation for Rain Gardens Import/Export of approved material (quantity) Foundation Excavation & Backfill Fine Grade Building Spoil Haul off GeoField Overlot Grading DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Connell Martin Marietta Dunrite P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 207,445 116,152 186,119 Exempt Exempt Exempt Inc Inc Inc Inc Inc Inc - - - INc INc INc - - - Excluded Excluded Excluded - - - Inc Inc Inc - - - 2585SY Inc Inc Inc - - - 627SY Inc Inc Inc - - - 1800SYBy Earthwork (24,246) N/A N/A - - - IncThe do not have the crew this is based on $12CY by EW and 1500 mob 15,000 Inc - - - INc Inc Inc - - - 2ea IncAdd for additional mob 4,950 Inc - - - See 2A See 2A (2,000) N/A N/A - - - See Landscape See 2F (12,000) N/A N/A - - - - - - - - - - - - - - - - - - - - - - 169,199 136,102 186,119 - - - - 169,199 136,102 186,119 - - - SPEC # / 'S ASPHALT 2 C FRANSEN PITTMAN CONSTRUCTORS JOB NAME: JOB LOCATION: DESCRIPTION Addenda Acknowledged Inc Addendum 01 Inc Inc Inc Q&A Log Inc Inc Inc LEED Requirements Inc Inc Late December 2021 Start Rate 2% Bond Rate N/A N/A IncPER PLANS AND SPECIFICATIONS Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc TEXTURA FEES Inc Inc 02 40 60 Hot Bituminous Pavement BASE BID SALES TAX INCLUDED Review Soils Report Inc VERIFY FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc Inc HD Paving 5"/6" Gravel Parking 12" Rip & Recondition Soil Sterilant 32 11 13 Stabilized Subgrade 32 11 23 Aggregate Base Course 32 12 16 Hot Mix Asphalt Pavement (HMAP) LD Paving 4"/6" Mobilizations Pavement Marking Crusher Fines SUB TOTAL Performance & Payment Bonds TOTAL Inc DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Pierson Thoutt Bros Coloscapes Marrou P #### P P P P P P F #### F F F F F F SPEC #1 #2 #3 #4 #5 167,730 172,794 215,450 180,941 Exempt Exempt Exempt Exempt Exempt Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - 500 Inc Inc Inc - - Inc Inc Inc Inc - - Coord w/ 2B Deleted From Rev Quote by 2B Excluded Excluded Excluded - - Inc Inc Inc Inc - - Inc in Rev Quote Inc Inc Inc - - Inc Inc Inc Inc - - See Trend Log $1.47/SF for non- epoxy $1.53/SF for Expoy See Trend Log See Trend Log See Trend Log - - Inc Inc Inc Inc - - N See Estimate N See Estimate N See Estimate N See Estimate - - 17,311 SF Inc Inc Inc Inc - - 1,384 SF Inc Inc Inc Inc - - 87 SF Inc Inc Inc Inc - - 1,722 SF They Priced 4"Inc in Rev Quote Inc Inc Inc - - 2 EA Inc Inc Inc Inc - - 580 LF Inc Inc Inc Inc - - 580 LF 5,300 5,300 5,300 5,300 - - 481 SF Inc Inc Inc Inc - - 5,414 SF Colored Inc in Rev Quote Inc Inc Inc - - 3 EA Colored Inc in Rev Quote Inc Inc Inc - - Inc Inc Inc Inc - - N See Estimate N See Estimate N See Estimate N See Estimate - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Coord w/ 5A See 5A See 5A See 5A See 5A - - - - - - - - - - - - - - See Alternes in Revised Quote N/A N/A N/A - - Deleted From Rev Quote by 2B N/A N/A N/A - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 173,530 178,094 220,750 186,241 - - - 173,530 178,094 220,750 186,241 - - Bollard Excavation Light Pole Excavation Pierson Questions Credit for Fueling station this needs to be alternate Credit for Forebay ADA Ramp Colored Concrete Drive SPEC # / 'S SITE CONCRETE PAVING (DRIVES, WALKS, CURBS, ETC) 2 D FRANSEN PITTMAN CONSTRUCTORS JOB NAME: JOB LOCATION: DESCRIPTION Addenda Acknowledged Inc Inc Addendum 01 Inc Inc Inc Inc Q&A Log Inc Inc Inc Inc LEED Requirements Inc Inc Late December 2021 Start OK TBD TBD Bond Rate Rat 2.5 to3% TBD Inc IncPER PLANS AND SPECIFICATIONS Inc Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc Inc IncTEXTURA FEES See Below Inc Sidewalks Colored 6" 02 75 00 Portland Cement Concrete Paving 03 30 00 Cast-in-Place Concrete (Site) 32 13 13 Concrete Paving 32 16 13 Concrete Curbs, Gutters, Sidewalks and Valley Pans TEXTURA FEES All public concrete paving shall be 6" Thick per PV1 - Note 5 Conc Weir Walls Install Bollards 12EA Pans 6" Light Duty Paving 5" Pedsetrian Per Q&A Log Heavy Duty Paving 6" Drives Per Q&A Log CDOT Standar M-412-1 for Typical Paving Joint This was never in our numbers 6' Conc Pan Concrete Paving 6" 4' Trickel Channel 2' Conc Pan Sidewalks 5" ADA Ramp 18" C&G Light Pole Bases SUB TOTAL Performance & Payment Bonds Concrete Pad for Dumpsters Sidewalk Chase TOTAL VERIFY FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc INc INc BASE BID SALES TAX INCLUDED INc Backfill C&G Steel for Chase DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Env Landworks Landtech Bath P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 192,628 210,590 193,519 Exempt Exempt Exempt Exempt - - - - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - - - - - - - - - - - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Coord w/ 2B 2,500 2,500 2,500 - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - - - - - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - 30 Day 30 Day 30 Day - - - Stabilized in cluded Stabilized in cluded Stabilized in cluded - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - See Tracking Log See Tracking Log See Tracking Log - - - Coord w/ 2B See 2B See 2B See 2B - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - - - - - - - - - - - - (43,175) PH (40,000) PH (40,000) - - - - - - - - - - - - - - - - - - - - - - - - - - - - 151,953 173,090 156,019 - - - - 151,953 173,090 156,019 - - - 02 93 50 Planting Maintenance Irrigation Issues Per Addendum 01 Detention Seed Mix Per LP100 Very Low Zones Low Zones Moderate Zones Automatic Controler with Rain/Freeze Senson Bike Racks Backflow Preventer Late December 2021 Start PER PLANS AND SPECIFICATIONS Inc 2 F CONSTRUCTORS LEED Requirements Addenda Acknowledged Inc JOB LOCATION: JOB NAME: TOTAL SUB TOTAL Performance & Payment Bonds Delete Boulders Credits for GMP Set vs Model Planting Details per LP501 Tree Removal 17EA Native See Mix per LP100 Deciduous Trees Evergreen Treels Shrubs Perennials Fort Collins permit Irrigation Detials pre IR2.02 FP - SubContractor Insurance Requirements (Updated Nov. 2010) Wood Mulch per A/LS501 Boulders per D/LS501 Alum Landscape Edging Trenching & Backfill Landscaping Crusher Fines Stabilized per A/LS501 Final Grading Landscape Maintenance Soil Ammendments 3CY/1000SF All irrigation per IR1.01 Irrigation Detials pre IR2.01 TEXTURA FEES Inc Inc Inc Inc Inc Inc Inc Bond Rate N/A N/A N/A N/A Inc Inc Inc Inc Inc IncInc SPEC # / 'S LANDSCAPING AND IRRIGATION FRANSEN PITTMAN Inc SALES TAX INCLUDED VERIFY BASE BID Addendum 01 FULL SET OF DOCUMENTS DESCRIPTION Q&A Log Inc Inc Inc Inc Irrigation Sleeves 02 52 10 Crusher Fines 02 91 20 Landscape Trees, Shrubs, and Perennials 02 92 20 Irrigated Native Seed Construction DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Ideal Jones/Waterford Combo Commercial Fenc Waterford P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 See Below See Below See Below See Below Exempt Exempt Exempt Exempt Exempt Spec #Inc Inc Inc Inc - - - - - - - - 50,810 Waterford #43,965 37,864 43,965 - - Inc See Waterford Inc Inc - - Inc See Waterford Inc Inc - - Inc See Waterford Inc Inc - - Coord w/ 3A N 3,000 See Waterford N 3,000 Inc - - Excluded See Waterford Excluded Inc - - - - - - - - 48,328 49,847 58,515 Excluded Gate only - - Inc Inc Inc Excluded Gate only - - Inc Inc Inc Excluded Gate only - - Inc Inc Inc Excluded Gate only - - Inc Inc Inc Excluded Gate only - - Inc Inc Inc Excluded Gate only - - Inc Inc Inc Excluded Gate only - - Inc Inc Inc Excluded Gate only - - Inc Inc Inc Excluded Gate only - - Inc Inc Inc Excluded Gate only - - - - - - - - 3,550 Inc Above 4,868 Excluded Gate only - - A6.11 Inc Inc Inc Excluded Gate only - - A6.11 Inc Inc Inc Excluded Gate only - - Inc Inc Inc Excluded Gate only - - 764 764 764 Excluded Gate only - - Inc Inc Inc Excluded Gate only - - - - - - - - - - - - - - (29,235) T BD T BD - - - - - - - - - - - - - - - - 77,217 94,576 105,011 43,965 - - - 77,217 94,576 105,011 43,965 - - Install FULL SET OF DOCUMENTS Inc Inc Inc 2x4 Brac attached w/ Metal Pipe Rail Tie to Metal Post Typ. Install Foundations Drilling Posts Bond Rate N/A N/A N/A Inc N/A Inc JOB LOCATION: BASE BID Chain lInk gate in lieu of Pivot SUB TOTAL Performance & Payment Bonds TOTAL 2" Dia Metal Post Core Drilling Interior Chainlink Fence at Forestry Open Shop 8'H Gate at Forestry Open Shop Concrete Credits for GMP Set vs Model Gate is required to comply with IFC D103.5 Design Requirements 7'Hx25'W Tilt-A-Way Hydraulic Veritical Pivot Gate. 2x6 Fence Cap Tilt-A-Way HYJG 1 Hydraulic Vertical Pivot Gate requires aa 4' wide by 11' long x 1'6" deep operator foundation. w/ #4 bars at 6" OC each way @ bottom over (4) 1'-0" dia piers down to frost w/ #4 Ties @ 12"OC per S1.02 Note 20 Controls 2x2 Nailer Site Fence Per 6/A2.10 1x6 WD Fence Panels Ceder Inc Inc VERIFY Gate Per A1.11 Inc Inc 32 31 13 Chain Link Fences and Gates TEXTURA FEES Inc Inc SALES TAX INCLUDED FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc PER PLANS AND SPECIFICATIONS Inc Inc Inc IncInc Inc Late December 2021 Start LEED Requirements Inc Q&A Log Inc Inc CONSTRUCTORS Inc JOB NAME: DESCRIPTION 2 G Addendum 01 Inc Inc Addenda Acknowledged Inc IncInc Inc SPEC # / 'S FENCING FRANSEN PITTMAN DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Pierson Marrou Thoutt JB Coloscapes P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 See Belwo Exempt Exempt Exempt Exempt Exempt Exempt 268 Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - 77,187 107,201 82,363 80,050 84,637 - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - 2,000 2,000 2,000 2,000 2,000 - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - - - - - - - - - - - - - 44,510 31,875 43,511 P 45,000 61,894 - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Exclu See Estimate Exclu See Estimate Exclu See Estimate Exclu See Estimate Exclu See Estimate - In Site Conc # Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - In Revised Proposal 500 Inc 758 500 - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - 2,000 2,000 2,000 2,000 2,000 - - - - - - - - - - - - Coord w/ 2GBy 2G By 2G Add $2,838 if requred See 2G See 2G See 2G See 2G - - - - - - - - - - - - - - - - - - - - - - - - - 125,965 143,576 129,874 129,808 151,031 - - 125,965 143,576 129,874 129,808 151,031 - Grade Beam 8"x3' Grade Beam 1'-4"x3' Grade Beam 2'x3' 4" Locker base C Pad Ftg -5'x5'x1' D Pad Ftg -6'x6'x1' Trench Drain Install Column Diamond Pour Backs Equipment Pads 03 30 00 Cast-in-Place Concrete Place Reinforcment Rebar Cont Footing2'x1' A Pad Ftg - 3'x3'x1' B Pad Ftg -4'x4'x1' LEED Requirements 3 A JOB NAME: JOB LOCATION: CONSTRUCTORS Q&A Log Inc PER PLANS AND SPECIFICATIONS Inc Late December 2021 Start OK Performance & Payment Bonds TOTAL SUB TOTAL Tilt-A-Way HYJG 1 Hydraulic Vertical Pivot Gate requires aa 4' wide by 11' long x 1'6" deep operator foundation. w/ #4 bars at 6" OC each way @ bottom over (4) 1'-0" dia piers down to frost w/ #4 Ties @ 12"OC per S1.02 Note 20 Subgrade Prep 5" Structural Stoop #4 EW on 3" Void Form 4" SOG 6x6 - W2.9xW2.9 6" SOG 6x6 - W2.9xW2.9 Pump Site Foudations Gravel Base Course 4" Inc Reinforcing/Mesh Control Joints Cure Per Spec Grout Base Plates Pilasters Curbs per S1.02 Flatwork Inc Vapor Barrier Inc FULL SET OF DOCUMENTS Inc Inc Inc Inc TEXTURA FEES See Below Inc Inc Inc Rat 2.5 to3% Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc IncInc Inc Inc Inc Inc Inc SPEC # / 'S BUILDING CONCRETE FRANSEN PITTMAN Pump Inc VERIFY DESCRIPTION Addendum 01 Inc Addenda Acknowledged TEXTURA FEES 03 20 00 Concrete Reinforcing Inc Bond Rate Provide & Set Anchor Bolts Inc Inc Foundations Prep Grade Formwork Place Concrete SALES TAX INCLUDED FP - SubContractor Insurance Requirements (Updated Nov. 2010) 03 10 00 Concrete Formwork BASE BID DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Big Horn Berich Dels P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 94,000 109,800 109,963 Exempt Exempt Exempt Exempt Inc Inc Inc - - - - - - - - - Inc Inc Inc - - - - - - s2000 for bar 2500 for cont 4,500 2000 for bar 2500 for cont 4,500 2000 for bar 2500 for cont 4,500 - - - - - - - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Coord w/ 7B See 7B See 7B See 7B - - - - - - - - - Inc Inc Inc - - - Inc Inc Inc - - - - - - - - - Excluded Excluded Excluded - - - See 7B See 7B See 7B - - - Excluded Excluded Excluded - - - See 7B See 7B See 7B - - - See 7B See 7B See 7B - - - See 7B See 7B See 7B - - - - - - - - - - - - - - - - - - - - - (16,000) (10,000) (4,578) - - - - - - - - - - - - - - - - 82,500 104,300 109,885 - - - - 82,500 104,300 109,885 - - - Credits for GMP Set vs Model Local CMU SUB TOTAL Performance & Payment Bonds TOTAL Masonry Layout Install Reinforcing Furnish and install flexible flashing Joint Reinforcing CMU Walls to be full height CMU Details per S4.02 04 22 00 Concrete Unit Masonry Structural 8" CMU Walls per S2.02 TEXTURA FEES inc Inc inc inc FULL SET OF DOCUMENTS inc inc inc PER PLANS AND SPECIFICATIONS inc inc inc Bond Rate Cant meet w/ current materail selectionCant meet w/ current materail selectionCant meet w/ current materail selection Inc Inc Inc Addendum 01 Inc Inc Inc DESCRIPTION CONSTRUCTORS MASONRY 4 A FRANSEN PITTMAN JOB NAME: VERIFY FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc Inc BASE BID SALES TAX INCLUDED SPEC # / 'S JOB LOCATION: Addenda Acknowledged Q&A Log Late December 2021 Start LEED Requirements Exteror Partition Types per A0.02 Reinforcing Materials Unload Reinforcing CMU Wall types per A0.00 Rated CMU Walls Fire Proofing for Rated walls? Make sure all Z-Girts are Metal CMU Assembilies at Metal Wall Panel Locations CMU Veneer - CMU-1 - Echelon, 8x8x16 CMU Block Ebony Ground Face Running Bond CMU Veneer - CMU-1 - Echelon, 4x8x16 CMU Block Ebony Ground Face Running Bond Weather Barriers & Insulation at Exterior Walls 2" Rigid Insulation (R-10 Min)Coord w/ 7B & 7C Fluid-Applied Weahter Barrier AT CMU ONLY Coord w/ 7B & 7C 3" Metal Z-Girt not Fiberglass Coord w/ 7B & 7C DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 CO Steel Red Iron Rons P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 Inc 298,000 345,953 292,512 297,444 Exempt Exempt Exempt Exempt Exempt Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - End of February now if not a year with the sissor trusses Feb N/AEnd of February now if not a year with the sissor trusses - - 36 tons 36 Tons 32.86 Tons 35 Tons and 8.6 tons joinst - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc 7,500 Inc - - Traverse Traverse - Bestel - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - - - - - - Inc Inc Inc - - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Coord w/ 2D 1,500 1,500 1,500 2,500 - - Inc Inc Inc Inc - - - - - - - - - 299,500 347,453 301,512 299,944 - - - 299,500 347,453 301,512 299,944 - - Brace Frames per Schedule S1.02 Beams Columns Sidewalk Drain Covers Steel Lintels SUB TOTAL Performance & Payment Bonds TOTAL Furnish Only: Embeds and Anchor Bolts Bollards - 12EA Roof Framing per D2.03 Steel Detials pre S4.03 Steel Detials per S4.04 Framing Details per S4.05 Framing Details per S4.06 05 12 00 Structural Steel Framing Structural Steel 05 21 00 Steel Joist Framing 05 31 00 Steel Decking 05 50 00 Metal Fabrications Leed time on Joist and Deck from Approved Submittals? Fabricator Qualifications per Specs Erector Qualifications per Specs Inc Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc Inc Inc PER PLANS AND SPECIFICATIONS Inc Inc Inc Inc Rate 1.5% Inc Inc N/A Late December 2021 Start Inc Inc OK LEED Requirements Inc Inc Inc Inc Addenda Acknowledged Inc Inc Inc Inc Addendum 01 Inc Inc Inc Inc JOB LOCATION: STEEL & ORNAMENTAL METALS 5 A FRANSEN PITTMAN JOB NAME: Barton CONSTRUCTORS Inc Steel Erection Bent Plates Mech Frame Channels SPEC # / 'S DESCRIPTION Q&A Log Bond Rate TEXTURA FEES BASE BID SALES TAX INCLUDED FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc Inc Exposed Exterior Tube Steel Columns 1/4 Galvinzed Steel Plante Jamb/Header at OH Doors 3/A7.11 Who are you using for errection? VERIFY Joists Deck Column Schedule per S1.01 Base plates Tonage Tube Steel Outriggers DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Unique Wood Sun Const Pinnacle A&J P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 N/A N/A N/A N/A 19,683 19,900 24,135 21,423 Exempt Exempt Exempt Exempt Exempt Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - - - - - - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - - - - - - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - - - - - - - - - - - - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - - - - - - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Exclude None Shown Excluded Excluded Excluded Excluded - - Add 5% Per mail 984 1,000 Inc 1,000 - - - - - - - - - - - - - - - - - - - - - - - - - - - 20,667 20,900 24,135 22,423 - - - 20,667 20,900 24,135 22,423 - - 06 41 16 Plastic-Laminate-Faced Architectural Cabinets 12 36 13 Metal Countertops 12 36 23 Plastic-Laminate-Clad Countertops 12 36 61 Simulated Stone Countertops Shared Crew 02 06 64 00 Plastic Paneling Performance & Payment Bonds TOTAL FSC Cert SUB TOTAL Steel Support Brackets for Tops Extend SS Counter on other side of service window per 5/A6.30 Wilsonart Plam Dupont Corian SS counters WD-1 Rift Cut Oak, Match Marshfield Aspiro Window Sills West and South Walls Steel Support Brackets for Tops Stainless Steel Counter Parts Checkout 16 Plam Counter Open Office 10 Plam Base Cabinets Plam Counter Break Room 03 Plam Upper Cabinets Plam Base Cabinets Plam Open Shelving w/ Supports Soild Surface Counter Plam Mail Slot Cabinet (36 Slots) Plam Counter (2 Locations) Steel Support Brackets for Tops TEXTURA FEES Inc Inc Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc Inc Inc Bond Rate Inc PER PLANS AND SPECIFICATIONS Inc Inc Inc Late December 2021 Start LEED Requirements Inc Inc Inc Inc Q&A Log Inc Inc Inc Inc Addendum 01 Inc Inc Inc Inc Addenda Acknowledged DESCRIPTION JOB LOCATION: JOB NAME: Inc Inc SPEC # / 'S FINISH CARPENTRY, MILLWORK 6 B FRANSEN PITTMAN CONSTRUCTORS VERIFY BASE BID SALES TAX INCLUDED FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 USI RG Division 7 Holsinger P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 See below See below 74,229 Exempt 51,000 22,665 Inc - - - 16,700 32,912 Inc - - - In WB # In WB # Inc - - - In Insulation # 15,000 Inc - - - - - - - - - Inc Inc Inc - - - Metal Inc Metal Inc Metal Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - See 9A See 9A See 9A - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - 2,434 2,434 2,434 - - - Inc Inc Inc - - - Inc Inc Inc - - - See 9A See 9A See 9A - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - See 9A See 9A See 9A - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Coord w/ 9A See 9A See 9A See 9A - - - Coord w/ 9A See 9A See 9A See 9A - - - See 9A See 9A See 9A - - - 2,180 N 2,500 N 2,500 - - - N 1,500 N 1,500 N 1,500 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Coord w/ 9A N 2,500 N 2,500 N 2,500 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 76,314 79,511 83,163 - - - 76,314 79,511 83,163 - - - Lift /Scaffold Sound Batt insulation in Flute per 9/A0.01 Cementitious Fireproofing in Flute at Rated Walls Per 9/A0.01 Coord w/ 9A R-21 High Density Batt Insulation Spray Foam at Beam per 8/A4.10 Fire Proofing 05 40 00 Cold-formed Metal Framing Insualtion Sound Batt insulation Walls 2" Rigid Insulation (R-10 Min)Coord w/ 9A & 7C Air and moisture barrier - Tyvek (At Stud Walls) Coord w/ 9A & 7C 07 21 00 Thermal Insulation 07 25 00 Weather Barriers (Commercial Building Wrap) 07 27 26 Fluid Applied Membrane Air Barriers TOTAL - SUB TOTAL - Performance & Payment Bonds TEXTURA FEES Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc Inc PER PLANS AND SPECIFICATIONS Inc Inc Inc Bond Rate Inc Inc Inc Late December 2021 Start LEED Requirements Inc Inc Inc Q&A Log Inc Inc Inc Addendum 01 Inc Inc Inc Addenda Acknowledged DESCRIPTION JOB LOCATION: JOB NAME: SPEC # / 'S INSULATION & WEATHER BARRIER 7 B FRANSEN PITTMAN CONSTRUCTORS VERIFY FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc Inc Inc BASE BID SALES TAX INCLUDED Weather Barriers & Insulation at Exterior Walls 2" Metal Z-Girt Coord w/ 9A & 7C R-21 High Density Batt Insulation Coord w/ 9A 2" Rigid Insulation (R-10 Min)Coord w/ 9A & 7D Air and moisture barrier - Tyvek (At Stud Walls) Coord w/ 9A & 7D Metal Stud Assembilies at Block Veneer Locations: Metal Stud Assembilies at Metal Wall Panel Locations: Metal Stud Assembilies at Fiber Cement Sidding Locations: 3" Metal Z-Girt Coord w/ 9A & 7D R-21 High Density Batt Insulation Coord w/ 9A Air and moisture barrier - Tyvek (At Stud Walls) Coord w/ 9A & 7C Make sure all Z-Girts are Metal 7/8" Furring Hat Channel at Horizontal Metal Panels Coord w/ 9A & 7C 2" Rigid Insulation (R-10 Min)Coord w/ 9A & 7C R-21 High Density Batt Insulation Coord w/ 9A CMU Assembilies at Metal Wall Panel Locations 2" Rigid Insulation (R-10 Min)Coord w/ 4A & 7C Fluid-Applied Weahter Barrier AT CMU ONLY Coord w/ 4A 3" Metal Z-Girt not Fiberglass Coord w/ 4A & 7C Pack Beam w/ Mineral Wool per 5/A4.12 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 SRC Roof Check Advanced Douglas Colony Front Range B&M P (303) 783-3900 P P P P P P P F (303) 783-3939 F F F F F F F SPEC #1 #2 #3 #4 #5 214,538 190,744 277,544 263,115 327,278 349,000 Exempt Exempt Exempt Exempt Exempt Exempt Exempt Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Excluded Excluded Excluded Excluded Excluded Excluded - - - - - - - - Spec #- - - - - - - Confirmed Backed out in rev proposal Will back out Confirmed Confirmed Confirmed - OR EQUAL OR EQUAL OR EQUAL OR EQUAL BOD BOD - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Falshing Only Falshing Only Falshing Only Falshing Only Falshing Only Falshing Only - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - OR EQUAL OR EQUAL OR EQUAL OR EQUAL OR EQUAL OR EQUAL - Add for Felt back 15,895 Inc in Rev Proposal Felt back included Felt back included Felt back included Felt back included - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - 2ea No No No No No - - - - - - - - Spec #- - - - - - - Confirmed Backed out in rev proposal Backed out in rev proposal Confirmed Confirmed Confirmed - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - 24GA 22 GA 24GA Custom Shop Manufactured Inc Inc - Inc Inc Inc Custom Shop Manufactured Inc Inc - Inc Inc Inc Custom Shop Manufactured Inc Inc - Inc Inc Inc Custom Shop Manufactured Inc Inc - Inc Inc Inc Custom Shop Manufactured Inc Inc - 14,601 23,250 Inc 15,000 Inc Inc - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Similar Material Only Similar Material Only Similar Material Only Similar Material Only Similar Material Only Similar Material Only - - - - - - - - Excluded Excluded Excluded Excluded Excluded Excluded - Excluded Excluded Backed out in rev proposal Excluded Excluded Excluded - Excluded Excluded Excluded Excluded Excluded Excluded - Excluded Excluded Backed out in rev proposal Excluded Excluded Excluded - Excluded Excluded Excluded Excluded Excluded Excluded - Excluded Excluded Backed out in rev proposal Excluded Excluded Excluded - Excluded Excluded in Rev Proposal Excluded Excluded Excluded Excluded - See Add Above Added in revised proposal Inc See Add Above Inc Inc - Excluded Excluded Excluded Excluded Excluded Excluded - Excluded Excluded Excluded Excluded Excluded Excluded - Excluded Excluded Excluded Excluded Excluded Excluded - Excluded Excluded Excluded Excluded Excluded Excluded - Excluded Excluded Excluded Excluded Excluded Excluded - Excluded Excluded Excluded Excluded Excluded Excluded - Excluded Excluded Excluded Excluded Excluded Excluded - Excluded Excluded Excluded Excluded Excluded Excluded - Excluded Excluded Excluded Excluded Excluded Excluded - Excluded Excluded Backed out in rev proposal Excluded Excluded Excluded - Excluded Excluded Backed out in rev proposal Excluded Excluded Excluded - Excluded Excluded Excluded Excluded Excluded Excluded - Excluded Excluded Backed out in rev proposal Excluded Excluded Excluded - - - - - - - - Spec #- - - - - - - Confirmed Backed out in rev proposal Backed out in rev proposal Confirmed Confirmed Confirmed - 24GA 22GA 22GA Inc Inc Inc - Inc Inc Inc Inc Inc Inc - 5,000 5,000 5,000 5,000 5,000 5,000 - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - Excluded Excluded Excluded Excluded Excluded Excluded - Inc Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc Inc - 24GA 22GA 22GA Custom Shop Manufactured Inc Inc - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 250,034 218,994 282,544 283,115 332,278 354,000 - - 250,034 218,994 282,544 283,115 332,278 354,000 - Inc 60 Mil Sika Saranafil G410 or APPROVED Equal Warranty per specs (2yr/20yr) Type II, Glass-Fiber Reinfroced, FELT BACK Confirm Shed in Not in your Base Bid Confirm Shed in Not in your Base Bid Confirm Shed in Not in your Base Bid Inc Inc Inc Inc Inc Inc 07 41 16 Standing seam Metal Roof Panels (Alternate #6) 07 42 13 Formed Metal Wall Panels 07 54 19 Polyvinyl-Chloride (PVC) Roofing 07 62 00 Sheet Metal Flashing and Trim Inc Inc SUB TOTAL Performance & Payment Bonds TOTAL Splashblocks Snow Fence Conductor Head .040 Prefinished Alum Downspouts Flashing and Sheetmetal Copings w/ Cleat Specified Finish Masonry Flashing Material Drip Edge Tab Holder Specified Gauges Scuppers Gutters Specified Finish Associated Flashings & Trim Specified Gage Horizontal and Vertical Panels 7/8" Furring Hat Channel at Horizontal Metal Panels Metal Panel Facia Metal Panel Facia at South Elev Bay Return Wall 5/A2.10 Sheet Metal Roofing and Siding Roof (R-2) - Single Ply Membrane Roof w/ Ribbs White Fully Adhered Roof Crickets Roof (R-2A) - Single Ply Membrane Roof White (No Ribs) 1/2" Cover Board Metal Panel MP-1 - Metal Sale Image II Prefinished Vertical Metal Panels- 12" Coverage - Silver Metallic Metal Panel MP-2 - Metal Sales, TLC-3 Prefinished Horizontal Metal Panels 12" Coverage - Snowdrift White Associated Flashings & Trim Penetrations Cants Tapered Insulation Roof Tie Off Locations Roof (R-1) - Single Ply Membrane Roof w/ Ribbs Light Grey TEXTURA FEES inc Inc Inc Inc FULL SET OF DOCUMENTS N/ARate3% Rate of 2.5%N/ARate of 1.8% Inc N/A Inc Inc Bond Rate Inc Inc IncInc Inc LEED Requirements PER PLANS AND SPECIFICATIONS Inc Inc Inc Inc Late December 2021 Start Inc Inc Inc Inc Inc Q&A Log Inc Inc Inc IncInc Addendum 01 Inc Inc IncInc Addenda Acknowledged DESCRIPTION JOB LOCATION: JOB NAME: CONSTRUCTORS FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc Inc Inc SPEC # / 'S ROOFING & METAL SIDING 7 C FRANSEN PITTMAN VERIFY Membrane Roofing Approved Manufacturer Warranty per specs (2yr/15yr) Roof Insulation BASE BID SALES TAX INCLUDED 07 72 00 Roof Accessories 07 72 53 Snow Guards Weather Barriers & Insulation at Exterior Walls Coord w/ 9A & 7C Make sure all Z-Girts are Metal Metal Stud Assembilies at Metal Wall Panel Locations: Coord w/ 9A & 7C 7/8" Furring Hat Channel at Horizontal Metal Panels Coord w/ 9A & 7C Metal Stud Assembilies at Fiber Cement Sidding Locations: 2" Metal Z-Girt Coord w/ 9A & 7C R-21 High Density Batt Insulation Coord w/ 9A 2" Rigid Insulation (R-10 Min) Coord w/ 9A & 7C Coord w/ 9A & 7C R-21 High Density Batt Insulation Coord w/ 9A 2" Rigid Insulation (R-10 Min)Coord w/ 9A & 7C Coord w/ 9A & 7C R-21 High Density Batt Insulation Coord w/ 9A CMU Assembilies at Metal Wall Panel Locations Air and moisture barrier - Tyvek (At Stud Walls) Coord w/ 9A & 7C Metal Stud Assembilies at Block Veneer Locations: 2" Rigid Insulation (R-10 Min) Coord w/ 4A & 7C Fluid-Applied Weahter Barrier AT CMU ONLY Coord w/ 4A 3" Metal Z-Girt not Fiberglass Coord w/ 4A & 7C 5" Rigid Insulation Walkway Pads None Shown but called for on GN 8 A1.30 2" Rigid Insulation (R-10 Min) 3" Metal Z-Girt Weather Barriers & Insulation at Exterior Walls Closure Trim Sealants Air and moisture barrier - Tyvek (At Stud Walls) Air and moisture barrier - Tyvek (At Stud Walls) DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 P (303) 783-3900 P P P F (303) 783-3939 F F F SPEC #1 #2 #3 #4 #5 68,125 41,875 Exempt Exempt Exempt Inc Inc - - - - Inc Inc - Inc Inc - Inc Inc - Inc Inc - Inc Inc - Inc Inc - - - - Excluded Excluded - Excluded Excluded - Excluded Excluded - Excluded Excluded - Excluded Excluded - - - - - - - - - - - - - - - - - - - - 68,125 41,875 - - 68,125 41,875 - SUB TOTAL Performance & Payment Bonds TOTAL 07 46 46 Fiber Cement Siding Fiber Cement Soffits Fiber Cement Board Trim 1" Metal Stud Assembilies at Fiber Cement Sidding Locations: 3" Metal Z-Girt Fiber Cement Sidding Vertical - FCB-1 - James Hardi, Hardie Panel Vertical Siding, Select Cedermill - Paint to Match Adjacent Metal Panel. 3/4" Battens Soffit Vents per 8/A7.11 TEXTURA FEES Inc Inc FULL SET OF DOCUMENTS Inc Inc PER PLANS AND SPECIFICATIONS Inc Inc Bond Rate Add 1.6% Add 1.6% Late December 2021 Start LEED Requirements Q&A Log Inc Inc Addendum 01 Inc Inc Addenda Acknowledged DESCRIPTION JOB LOCATION: JOB NAME: CONSTRUCTORS Inc SPEC # / 'S FIBER CEMENT SIDDING 7 D FRANSEN PITTMAN Arrow J Give It Back VERIFY BASE BID SALES TAX INCLUDED FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc Coord w/ 9A & 7B Coord w/ 9A Coord w/ 9A & 7B Coord w/ 9A & 7B R-21 High Density Batt Insulation 2" Rigid Insulation (R-10 Min) Air and moisture barrier - Tyvek (At Stud Walls) DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Colorado Doorways Collins DH Pace ASA Door Tech P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 27,721 27,258 4,698 5,950 Exempt Exempt Exempt Exempt Exempt Inc Inc Excluded Excluded - - Inc Inc Excluded Excluded - - Inc Inc Excluded Excluded - - 8ea Inc Inc Excluded Excluded - - 9ea Inc Inc Excluded Excluded - - Inc Inc Excluded Excluded - - Inc Inc Excluded Excluded - - Inc Inc Excluded Excluded - - Inc Inc Excluded Excluded - - Inc Inc Excluded Excluded - - N 425 N 425 Excluded Excluded - - 17ea Inc Inc Excluded Excluded - - Excluded Excluded Excluded Inc - - Excluded Excluded Excluded 3,400 - - Excluded Excluded Excluded 1,275 - - Excluded Excluded Excluded 765 - - 1,500 1,500 Excluded Excluded - - Coord w/ 8C Excluded Excluded Inc Excluded - - IncPer Email Inc N/A N/A - - ExcludedPer Email Excluded Excluded Excluded - - IncPer Email Inc N/A N/A - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 29,646 29,183 4,698 11,390 - - - 29,646 29,183 4,698 11,390 - - 08 11 13 Hollow Metal Doors and Frames 08 14 16 Flush Wood Doors 08 71 00 Door Hardware 30x70HM Door 30x70WD Door Prefinished Specified Guage TOTAL Performance & Payment Bonds SUB TOTAL Light Kits Specified Mfg SALES TAX INCLUDED Install Doors & Hardware TEXTURA FEES Inc Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc Inc Inc PER PLANS AND SPECIFICATIONS Inc Inc Inc Inc Bond Rate N/A N/A N/A N/A Late December 2021 Start LEED Requirements Inc Inc Inc Q&A Log Inc Inc Inc Inc Addendum 01 Inc Inc Inc Inc Addenda Acknowledged DESCRIPTION JOB LOCATION: JOB NAME: VERIFY SPEC # / 'S DOORS FRAMES & HARDWARE 8 A FRANSEN PITTMAN CONSTRUCTORS HM Frames No Added UF AWI Labels Hardware FRC Cert Keying Automatic Operator & Install Grouting of HM Frames in CMU Walls Sort & Distribute Final Adjustment Door Protectoin Inc BASE BID FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc Inc Inc DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 DH Pace Door Specialties Overhead Door Co Raynor P (303) 783-3900 P P P P P F (303) 783-3939 F F F F F SPEC #1 #2 #3 #4 #5 45,252 37,809 44,800 40,590 Exempt Exempt Exempt Exempt Exempt Inc Inc Inc Inc - - - - - - 6ea Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc 1,750 Inc Inc - Inc Amarr Inc Inc - - - - - - - - - - - - 45,252 39,559 44,800 40,590 - - 45,252 39,559 44,800 40,590 - Inc SPEC # / 'S OH DOORS 8 B FRANSEN PITTMAN CONSTRUCTORS JOB NAME: JOB LOCATION: DESCRIPTION Addenda Acknowledged Inc Inc Addendum 01 Inc Inc Inc Inc Q&A Log Inc Inc Inc Inc LEED Requirements Inc Inc Late December 2021 Start Bond Rate Inc IncPER PLANS AND SPECIFICATIONS Inc Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc IncTEXTURA FEES Inc Inc 08 36 13 Sectional Doors a. Amarr Garage Doors. b. Arm-R-Lite. c. C.H.I. Overhead Doors. d. Clopay Building Products. e. Fimbel Architectural Door Specialties. f. Haas Door. g. Harmann LLC. h. Martin Door Manufacturing. i. Overhead Door Corporation. j. Rite-Hite Corporation. k. Wayne-Dalton Corp. l. Windsor Door. Inc Inc Inc VERIFY BASE BID SALES TAX INCLUDED FP - SubContractor Insurance Requirements (Updated Nov. 2010) 14x14 OH Doors Operators Install Modify operator in washbay for moisture SUB TOTAL Performance & Payment Bonds TOTAL Inc DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Moffat Horizon Glass Glass Masters Commercial Glass P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 69,051 84,800 55,142 67,175 Exempt Exempt Exempt Exempt Exempt Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - - - - - - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Or Equal Per Spec Kawneer Tublite - - 3 Leafs Inc Inc Inc Inc - - Inc Inc 16,500 Inc - - Coord w/ 8A Inc Inc Inc Inc - - Inc Inc Inc Inc - - 3,500 3,500 3,500 3,500 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 72,551 88,300 75,142 70,675 - - - 72,551 88,300 75,142 70,675 - - ST-12 Kawneer 451T BOD, Tublite or Approved Equal ST-03 ST-04 ST-05 ST-06 ST-07 ST-08 ST-09 Glazing in Alum Windows to be EFCO Series 403 with 1" Insulated Low E Glazing Alum Windows Per A6.50 ST-01 ST-02 ST-10 ST-11 Pass-Thru Window at Parts Checkout JOB NAME: SPEC # / 'S GLASS AND GLAZING 8 C FRANSEN PITTMAN CONSTRUCTORS JOB LOCATION: DESCRIPTION Addenda Acknowledged Inc Inc Addendum 01 Inc Inc Inc Inc Q&A Log Inc Inc Inc Inc LEED Requirements Inc Inc Late December 2021 Start Bond Rate Inc IncPER PLANS AND SPECIFICATIONS Inc Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc Inc IncTEXTURA FEES Inc Inc 08 41 13 Aluminum-Framed Entrances and Storefronts SALES TAX INCLUDED BASE BID VERIFY FP - SubContractor Insurance Requirements (Updated Nov. 2010) 08 58 00 Aluminum Sliding Service Window Performance & Payment Bonds SUB TOTAL 08 80 00 Glazing TOTAL Inc Inc Inc Inc Beauty Bead Sealants Spandrel Panels Storefront Doors Door Hardware Automatic Operator Sealant Door lites Sidelites DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fossil Creek Phase 2 Holsinger Diversified P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 218,910 259,000 273,728 297,825 Exempt Exempt Exempt Exempt Exempt - - - - - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Per rev Quote 22,525 Will Add 22,750 Inc Inc - - Inc Above Will Add Inc Inc - - Inc Above Will Add Inc Inc - - 11,000 Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - See 6A See 6A See 6A See 6A - - Inc INc Inc Inc - - Inc All 20GA Inc Inc - - See 6A See 6A See 6A See 6A - - Install only Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - See5A See5A See5A See5A - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - 425 425 425 425 - - - - - - - - Excluded Excluded Excluded Excluded - - Excluded Excluded Excluded Excluded - - Excluded Excluded Excluded Excluded - - Per rev Quote Inc Inc Inc Inc - - Excluded Excluded Excluded Excluded - - Excluded Excluded Excluded Excluded - - Excluded Excluded Excluded Excluded - - Excluded Excluded Excluded Excluded - - Excluded Excluded Excluded Excluded - - Inc Inc Inc Inc - - Excluded Excluded Excluded Excluded - - Excluded Excluded Excluded Excluded - - Excluded Excluded Excluded Excluded - - Excluded Excluded Excluded Excluded - - Excluded Excluded Excluded Excluded - - Inc Inc Inc Inc - - - - - - - - - - - - - - Coord w/ 7B Inc Inc Inc Inc - - Coord w/ 7B Inc Inc Inc Inc - - Coord w/ 7B Per rev Quote 9,770 Inc Inc Inc - - - - - - - - - - - - - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - - - - - - - - - - - - - - - - - - - - 262,630 282,175 274,153 298,250 - - - 262,630 282,175 274,153 298,250 - - Inc Simpson Strong Tie-S/SSW24x10xstrong wall panels Ceiling at Chem Storage to have 3/4" Plywood FR and 2 layer of gyp per S2.02 Delegated Design? Steel Stud Clip Schedule per S4.01 SPEC # / 'S PLASTER, DRYWALL, CEILINGS 9 A FRANSEN PITTMAN CONSTRUCTORS JOB NAME: JOB LOCATION: DESCRIPTION Addenda Acknowledged Inc Inc Addendum 01 Inc Inc Inc Inc Q&A Log Inc Inc Inc Inc LEED Requirements Inc Inc Late December 2021 Start N/A N/A Bond Rate Rate 2.5% Rate 1.2% Inc IncPER PLANS AND SPECIFICATIONS Inc Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc Inc IncTEXTURA FEES Inc Inc SALES TAX INCLUDED BASE BID 07 92 19 Acoustical Joint Sealants 09 22 16 Non-Structural Metal Framing 09 29 00 Gypsum Board Shearwall Framing per S1.02 Framing Details per S4.06 Framing Details per S4.05 Stud wall Framing Details per S4.01 Wall types per A0.00 Insulation Sound Batt insulation Walls 5/8" Typ X Fiberglass Reinf Gyp Sheathing at Exteior metal stud wall assembilies. Plywood Sheathing at E1A Assemblie bpe rA0.02 Specified guages Shop Drawings Acoustical Sealants TOTAL Performance & Payment Bonds SUB TOTAL Fire Stopping of rated walls. Inc Inc VERIFY FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc Ext Steel Stud Header Schedule Per S4.01 06 16 00 Sheathing 05 40 00 Cold-formed Metal Framing Sound Batt insulation in Flute per 9/A0.01 Joint Sealants R-21 High Density Batt Insulation Exteror Partition Types per A0.02 HM Frame Install Weather Barriers & Insulation at Exterior Walls Make sure all Z-Girts are Metal Metal Stud Assembilies at Metal Wall Panel Locations: 2" Metal Z-Girt Coord w/ 9A & 7C R-21 High Density Batt Insulation Coord w/ 9A 2" Rigid Insulation (R-10 Min) 2" Rigid Insulation (R-10 Min)Coord w/ 9A & 7C Air and moisture barrier - Tyvek (At Stud Walls) Coord w/ 9A & 7C 7/8" Furring Hat Channel at Horizontal Metal Panels Coord w/ 9A & 7C Coord w/ 9A & 7C Metal Stud Assembilies at Fiber Cement Sidding Locations: 2" Rigid Insulation (R-10 Min)Coord w/ 9A & 7C 3" Metal Z-Girt Coord w/ 9A & 7C R-21 High Density Batt Insulation Coord w/ 9A STC-Rated assembilies as noted Coord w/ 9A & 7C Drywall in washbay needs to be impact resistant Air and moisture barrier - Tyvek (At Stud Walls) Coord w/ 9A & 7C R-21 High Density Batt Insulation Coord w/ 9A Roof Over Framing Install Metal Deck For Roof over Framing Air and moisture barrier - Tyvek (At Stud Walls) Typical Interior Stud Details per A0.01 Metal Stud Assembilies at Block Veneer Locations: Anchor Bolts for Shearwall All steel studs to be 25GA UNO. 20GA Studs are required at all wall tile finishes. Per General Note 7 on A1.11 Plywood 8'H at Parts/Tools per A1.11 Access Panels at restrooms 3ea Gyp Ceilings Gyp Soffits Cement board at tile locations Slip connections DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Revolution Masters Carpet one Mountain Valley Resource P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 29,995 30,471 25,544 26,505 21,280 Exempt Exempt Exempt Exempt Exempt Exempt Inc IncConcrete Visions 7,925 Inc 7,925 - Inc Inc See Conc Vision Inc See Conc Vision - Coord w/ 9E Inc Inc See Conc Vision Inc See Conc Vision - - - - - - - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - - - - - - - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - - - - - - - Inc Inc Inc - Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - - - - - - - Inc Inc Inc Inc Inc - 1,500 1,500 1,500 1,500 1,500 - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 31,495 31,971 34,969 28,005 30,705 - - 31,495 31,971 34,969 28,005 30,705 - Attic Stock Moisture Testing Transitions Minor Floor prep CPT-2 Interface Step Repeat SR899, 13886, 50cmx50cm, Onyx, Monolithic Install RB-1 Tarkett/Johnsonite, 4" Duracover Rubber Base, Colonial Grey TA5 TE-1 Transition 09 65 13 Resilient Base 09 68 13 Tile Carpeting 09 30 00 Tile PCON (Polished Concrete) SCON (Sealed Concrete) Epoxy Grout CPT-1 Interface Neighbohood blocks 16325, 25Cmx1M Taupe Blocks 105619, Ashlar Install SPEC # / 'S FLOORING-TILE, CARPET, RESILIENT 9 B FRANSEN PITTMAN CONSTRUCTORS JOB NAME: JOB LOCATION: Addenda Acknowledged DESCRIPTION Inc Inc Q&A Log Inc Inc Inc Inc Inc Addendum 01 Inc Inc Inc Inc Inc Late December 2021 Start Inc Inc Inc LEED Requirements PER PLANS AND SPECIFICATIONS Inc Inc Bond Rate Inc Inc Inc Inc Inc TEXTURA FEES Inc Inc Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc Inc Inc Inc CT-1 - Daltile, color wheel, classic glazed tile, 6x6x5/16, artic white, 0190 semi-gloss, wall tile. CT-1A - Daltile, color wheel, classic slim foot design, S3619TN, 6x6, arctic white 0190 semiglass, cove base 03 35 43 Polished Concrete Finishing TOTAL Performance & Payment Bonds SUB TOTAL VERIFY FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc Inc Inc SALES TAX INCLUDED BASE BID DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Innovative Heartland SRB P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 16,741 17,600 18,500 Exempt Exempt Exempt Exempt Inc Inc Inc - - Inc Inc Inc - - Inc Inc Inc - - Inc Inc Inc - - Inc Inc Inc - - Inc Inc Inc - - 1,000 1,000 1,000 - - - - - - - - - - - - - - - - - - - - - - - 17,741 18,600 19,500 - - 17,741 18,600 19,500 - LAP-1 - Acoustic Panels At 8 Locations Armstrong Soundscape Blades 3923, 22x94x2 vert panel, 4 point hanging kit. Attic Stock Mesa 683 Square Layin 24x48x3/4, 15/16 grid white SPEC # / 'S FP - SubContractor Insurance Requirements (Updated Nov. 2010) ACOUSTICAL CEILINGS & SOUND TREATMENT 9 D FRANSEN PITTMAN CONSTRUCTORS JOB NAME: JOB LOCATION: DESCRIPTION Addenda Acknowledged Inc Addendum 01 Inc Inc Inc Q&A Log Inc Inc Inc LEED Requirements Inc Inc Late December 2021 Start N/A Bond Rate N/A N/A IncPER PLANS AND SPECIFICATIONS Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc IncTEXTURA FEES Inc Inc 09 51 13 Acoustical Panel Ceilings SALES TAX INCLUDED BASE BID VERIFY APC-1 2x4 Acoustical Ceiling - - SUB TOTAL - - TOTAL Performance & Payment Bonds Inc Inc Inc DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Commercial Coating Craftsman Maximum Phase 2 Southwest Co Painting Plus P (303) 783-3900 P P P P P P P P F (303) 783-3939 F F F F F F F F SPEC #1 Inc Inc Inc Inc Inc Inc #2 Inc Inc Inc Inc Inc Inc #3 Inc Inc Inc Inc Inc Inc #4 - - - - - - #5 - Rate of 3% - - - - Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc Inc 49,200 37,418 46,825 51,200 65,853 50,752 Exempt Exempt Exempt Exempt Exempt Exempt Exempt Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - - - - - - - - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - 1,000 1,000 1,000 1,000 1,000 1,000 - - Coord w/ 9B See 9B See 9B See 9B See 9B See 9B See 9B - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - - - - - - - - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Inc Inc Inc Inc Inc Inc - - Incper todd on phone 4,850 Inc Inc Inc Inc - - - - - - - - - - - - - - - - - - (4,500) (4,850) (4,500) (4,500) (4,500) (4,500) - - - - - - - - - - - 45,700 38,418 43,325 47,700 62,353 47,252 - - - 45,700 38,418 43,325 47,700 62,353 47,252 - - Credits for GMP Set vs Model Joint Sealants At exposed deck paint all deck, ductwork, conduits and piping. Exterior CMU Walls Delete Exterior CMU Walls PT2 Paint High perfomance coating for wash bay Epoxy Urithane paint at exposed ceilings PT-1 Paint Paint wall in open shop starting 8'AFF Touch up before punch SCON (Sealed Concrete) SPEC # / 'S PAINTING 9 E FRANSEN PITTMAN CONSTRUCTORS JOB NAME: JOB LOCATION: DESCRIPTION Addenda Acknowledged Addendum 01 Q&A Log LEED Requirements Late December 2021 Start Bond Rate PER PLANS AND SPECIFICATIONS FULL SET OF DOCUMENTS TEXTURA FEES SALES TAX INCLUDED BASE BID 09 91 13 Exterior Painting VERIFY FP - SubContractor Insurance Requirements 09 91 23 Interior Painting 09 93 00 Staining and Transparent Finishing 09 96 00 High Performance Coatings Caulking grid to drywall Caulking HM jambs (coordinate with Div 7 caulking) Sherwin-Williams Specified Manufacturer Painting - Interior High Performance Coatings Sherwin-Williams Paint Fiber Cement Soffits PT-4 Paint Paint Fiber Cement Sidding Specified Manufacturer Painting - Exterior CMU With block filler PT-3 Paint TOTAL Performance & Payment Bonds SUB TOTAL Paint Exposed Steel Columns Sherwin-Williams Paint Bollards DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fast Signs BSC Signage Works Signage Works P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 4,071 2,573 3,167 Exempt Exempt Exempt Exempt Inc Inc Inc - - - Inc Inc Inc - - - Inc 2,300 Inc - - - 500 500 500 - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc Inc - - - Inc Inc NO - - - - - - - - - - 4,571 5,373 3,667 - - - - 4,571 5,373 3,667 - - - SPEC # / 'S SIGNAGE 1 0 F FRANSEN PITTMAN CONSTRUCTORS JOB NAME: JOB LOCATION: NO PER SPECDESCRIPTION Addenda Acknowledged Inc Addendum 01 Inc Inc Inc Q&A Log Inc Inc Inc LEED Requirements Inc Inc Late December 2021 Start Inc Bond Rate Inc Inc IncPER PLANS AND SPECIFICATIONS Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc IncTEXTURA FEES Inc Inc Building Address Signage Per City Standards A2.10 10 14 23 Signage 10 14 19 Dimensional Letter Signage SALES TAX INCLUDED BASE BID Per Spec Sign Type B Restroom Sign Sige Type A - General Room Sign Per F1.30 Sit Sign TOTAL Performance & Payment Bonds SUB TOTAL VERIFY FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc Inc Inc DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Blind Shine Elements Gotcha Covered Premier Royal Textiles Shading Systems Ultra Clean P (303) 783-3900 P P P P P P P P P P F (303) 783-3939 F F F F F F F F F F SPEC #1 #2 #3 #4 #5 Inc 4,945 3,996 3,952 4,053 3,833 4,759 6,428 Exempt Exempt Exempt Exempt Exempt Exempt Exempt Exempt Inc Inc Inc Inc Inc Inc Inc - - - Inc Mecho Draper Approved in Spec Inc Draper Approved in Spec Inc Inc - - - Inc Inc Inc Inc Inc Inc Inc - - - Inc Inc Inc Inc Inc Inc Inc - - - Inc Inc Inc Inc Inc Inc Inc - - - Inc Inc Inc Inc Inc Inc Inc - - - 650 650 650 650 650 650 650 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5,595 4,646 4,602 4,703 4,483 5,409 7,078 - - - - 5,595 4,646 4,602 4,703 4,483 5,409 7,078 - - - Inc Inc Inc Inc Inc Inc Inc SPEC # / 'S WINDOW COVERINGS 1 2 A FRANSEN PITTMAN CONSTRUCTORS JOB NAME: JOB LOCATION: DESCRIPTION Addenda Acknowledged Inc Inc Inc Addendum 01 Inc Inc Inc Inc Inc Inc Inc Q&A Log Inc Inc Inc Inc Inc LEED Requirements Inc Inc Inc Inc Late December 2021 Start N/A N/A Rate 2% Bond Rate N/A N/A N/A N/A Inc Inc IncPER PLANS AND SPECIFICATIONS Inc Inc Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc Inc Inc Inc NO See Add Inc TEXTURA FEES Inc Inc Inc Inc Mech Manual Clutch Roller Shade WIC-1 - Mecho-Shade System 12 24 13 Roller Window Shades SALES TAX INCLUDED BASE BID Inc IncIncFP - SubContractor Insurance Requirements (Updated Nov. 2010) Field Measure Opening At interior Door Lites Exterior Windows noted on Finish Floor Plan Cloth Eurotwill 6000 Series Charcoal 6012 TOTAL Performance & Payment Bonds SUB TOTAL VERIFY DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Mtn Aire Co Mech Corprate Plumbing Newworks P (303) 783-3900 P P P P P F (303) 783-3939 F F F F F SPEC #1 #2 #3 #4 #5 693,024 582,800 666,677 706,642 Exempt Exempt Exempt Exempt Exempt Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - lf Inc Inc Inc Inc - 3,500 3,500 3,500 3,500 - See3A See3A See3A See3A - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - NA All HWC NA All HWC NA All HWC NA All HWC - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - See15C See15C See15C See15C - Inc Inc Inc Inc - - - - - - - - - - - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Spec #Inc Inc Inc Inc - Inc Inc Inc Inc - 3,500 3,500 3,500 3,500 - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Excluded N/A Per Code Excluded N/A Per Code Excluded N/A Per Code Excluded N/A Per Code - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - See 15C See 15C See 15C See 15C - 7,501 7,501 7,501 7,501 - - - - - - Spec #Inc Inc Inc Inc - Inc Inc Inc Inc - MSI Credit (43,000) MSIMSI Credit (43,000) MSI Credit (43,000) - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc - Inc Inc - Spec #Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - Inc Inc Inc Inc - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 664,525 597,301 638,178 678,143 - 664,525 597,301 638,178 678,143 - FCO FS-1 GCO PET-1 PET-2 FD-1 PRV-1 HR-1 WM-1 WM-2 SI-1 TMV-1 CA-1 CW-1 HWH-1 HWH-2 HWCP-1 HWCP-2 AC-1 WB-1 WH-1 WH-2 S-1 SH-1 TD-1 WC-1 KS-1 RH-1 HEWC-1 HL-1 HWC-1 Manifold for GSHP Vibration isolation roof curb for DOAs-1 Gas Sensors Geothermal Loop Schematc per M6.01 All exposed ductwork shall be internnaly lined Supply and Return Piping for GSHP System Isolation valves at all heat pumps Fire/Smoke Dampers MSB EH-1 to 7 Supply and Return Piping for GSHP System Condensate Piping Manifold for GSHP Alum Ductwork for EF-4 per Note 2 M1.01 Waterproof cover for T-stat in washbay 23 05 29 HVAC Hangers and Supports SPEC # / 'S MECHANICAL 1 5 A FRANSEN PITTMAN CONSTRUCTORS JOB NAME: JOB LOCATION: DESCRIPTION Addenda Acknowledged Addendum 01 Inc Q&A Log Inc LEED Requirements Inc Late December 2021 Start Inc Bond Rate Inc PER PLANS AND SPECIFICATIONS Inc FULL SET OF DOCUMENTS Inc TEXTURA FEES Inc 22 05 00 Basic Plumbing Requirements SALES TAX INCLUDED BASE BID VERIFY FP - SubContractor Insurance Requirements (Updated Nov. 2010) 22 05 19 Plumbing Meters and Gauges 22 05 13 Electrical Requirements for Plumbing Equipment 22 05 00 Pressure Test Log 22 05 53 Plumbing Identification 22 05 48 Plumbing Vibration Controls 22 05 29 Plumbing Hangers and Supports 22 07 16 Plumbing Equipment Insulation 22 07 19 Plumbing Piping Insulation 22 10 00 Plumbing Piping Plumbing to 5' outside of foundation Condensate Piping DWV Piping per Spec Indoor Trenching and Backfill Permits for Plumbing Controls per M3.03 BFP-1 BFP-3 Housekeeping/Equipment Pads By Concrete Furnish access doors for own work ESH-1 HB-1 23 05 00 Basic HVAC Requirements 23 05 19 HVAC Meters and Gauges 23 05 13 Electrical Requirements for Mechanical Equipment 23 21 16 Hydronic Specialties 23 05 93 Testing, Adjusting, and Balancing 23 05 53 HVAC Identification 23 07 16 HVAC Equipment Insulation 23 07 19 HVAC Piping Insulation 23 31 13 Ductwork 23 25 00 Chemical Water Treatment 23 21 23 HVAC Pumps Controls per M3.04 TOTAL - Performance & Payment Bonds SUB TOTAL - Temperature Controls Controls per specs ESCO or MSI Water Balance Controls per M3.01 Controls per M3.02 Fire Sealant at rated penetrations Air Balance Certified per specs Test & Balance Permits for HVAC Inc 22 11 19 Plumbing Specialties 22 30 00 Plumbing Equipment 22 40 00 Plumbing Fixtures 22 95 00 Plumbing Commissioning Requirements Domestic water piping per spec 23 07 13 Ductwork Insulation 23 05 48 HVAC Vibration Controls 23 05 30 HVAC Firestopping 23 09 00 Digital Control System 23 09 01 Instrumentation and Control Elements 23 09 02 Variable Frequency Drives 23 09 93 Sequence of Operations 23 21 13 Hydronic Piping 23 21 14 Ground-Loop Heat Pump Piping 23 33 00 Ductwork Accessories 23 34 23 Power Ventilators 23 37 00 Air Outlets and Inlets 23 73 13 Air Handling Units 23 81 46 Water-Source Unitary Heat Pumps 23 82 39 Terminal Heat Transfer Units MD-1 &2 L-1 to 6 Grilles/Registers/Diffusers EF-1 to 5 DOAS Unit RUH-1 to 6 VEHR-1 PK-1 Mech Coordination non BIM Details per M4.01 Details per M4.02 Duct work Mech insulation per spec HP-01 to 08 AS-1/AV-1 CF-1 ET-1 SRV-1 PRV-1 HPP-1 &2 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 American Front Range Frontier Fire Kobobel FP Western States P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 24,400 24,995 31,262 31,500 36,670 Exempt Exempt Exempt Exempt Exempt Exempt Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Excluded None Anticipated Excluded None Anticipated Excluded None Anticipated Excluded None Anticipated Excluded None Anticipated - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - 1,950 1,950 1,950 1,950 1,950 - At ACT only At ACT only At ACT only At ACT only At ACT only - Inc Inc Inc Inc Inc - Inc Inc Inc Inc Inc - 1,000 1,000 1,000 1,000 1,000 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 27,350 27,945 34,212 34,450 39,620 - - 27,350 27,945 34,212 34,450 39,620 - Coordination with Trades Coordinate with Electrical to hook up alarms Areas per FS2.01 Inc Inc FDC Sprinkler Head type Riser Assembliy Submit to Fire Marshall for Approval Shopdrawings Sprinklers centered in tiles? SPEC # / 'S FIRE SPRINKLER 1 5 B FRANSEN PITTMAN CONSTRUCTORS JOB NAME: JOB LOCATION: DESCRIPTION Addenda Acknowledged Inc Inc Inc Addendum 01 Inc Inc Inc Inc Inc Q&A Log Inc Inc Inc Inc Inc LEED Requirements Inc Inc Late December 2021 Start N/A N/A N/A Bond Rate N/A N/A Inc Inc IncPER PLANS AND SPECIFICATIONS Inc Inc Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc Inc IncTEXTURA FEES Inc Inc Knox Caps 21 05 00 Basic Fire Suppression Requirements SALES TAX INCLUDED Inc Inc 21 05 00 Pressure Test Log 21 05 13 Electrical Requirements for Fire Suppression Equipment 21 05 19 Fire Suppression Gauges Performance & Payment Bonds SUB TOTAL TOTAL VERIFY BASE BID FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc Inc Sidewall heads at overhangs? 21 05 29 Fire Suppression Hangers and Supports 21 05 53 Fire Suppression Identification 21 13 13 Fire Suppression System BFP-2 Backflow Per NFPA 13 Fully Sprinklered Building DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Can-Am P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 57,046 Exempt Exempt Spec #Inc - - - - - Spec #Inc - - - - - Spec #Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Inc - - - - - Q&A Inc - - - - - Q&A Inc - - - - - Q&A Inc - - - - - Q&A Inc - - - - - Q&A Inc - - - - - - - - - - - - - - - - - - - - - - - 57,046 - - - - - 57,046 - - - - - It is acceptable to utilize a minimum of 2' per second velocity for the purge. The specifications will be updated to reflect this. The engineer will make site observation visits to aid in quality control and confirming installation matches the design intent but proper installation and system flushing is the responsible of the installing contractor. This detail will be updated to show a reducing manifold. It is acceptable to utilize a minimum of 2' per second velocity for the purge. The specifications will be updated to reflect this. Hole depths will be revised to reflect the TC depth of 500'. This detail will be updated to reflect high solids bentonite grout from top to bottom. SPEC # / 'S GEOTHERMAL 1 5 A FRANSEN PITTMAN CONSTRUCTORS JOB NAME: JOB LOCATION: DESCRIPTION Addenda Acknowledged Addendum 01 Inc Q&A Log Inc LEED Requirements Inc Late December 2021 Start Bond Rate Rate 3% PER PLANS AND SPECIFICATIONS Inc FULL SET OF DOCUMENTS Inc FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc TEXTURA FEES Inc BASE BID SALES TAX INCLUDED VERIFY 23 21 16 Hydronic Specialties 23 21 13 Hydronic Piping 23 21 14 Ground-Loop Heat Pump Piping 6ea Well Holes Reuse 1ea TC test Bore Hole PIPING WILL BE ROUTED IN A REVERSE RETURN LAYOUT BEFORE PIPING IS ROUTED INTO EACH INDIVIDUAL BORE. PROVIDE GPS COORDINATES TO EACH WELL TO THE CITY OF FORT COLLINS UPON COMPLETION OF WELL FIELD. ALL WELLS SHALL BE DRILLED ON A 20'-0" x 20'-0" GRID 2" HPS/HPR 2" LPS/LPR Loop Branch Trench per 1/M4.03 Excavation 7 Backfill Coper Tracer Wire Wells per 5/M4.03 Bentonite Chip Seal Well Depth 500'? Bentonite Grout Glycol for System 1.25" SDR 11 HDPE Pipe Prefab U Bends 7.5" Bore Hole Drilling Details per M4.03 It is acceptable to use 1.10 BTUh/ft/F for the grout. The drawings and specifications will be updated to reflect this. SUB TOTAL - Performance & Payment Bonds TOTAL - DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Gregory Duro High Point ADK P (303) 783-3900 P P P P P P F (303) 783-3939 F F F F F F SPEC #1 #2 #3 #4 #5 297,060 346,297 324,731 414,550 Exempt Exempt Exempt Exempt Exempt Spec #Inc Inc Inc Inc - - Spec #Inc Inc Inc Inc - - Spec #Inc Inc Inc Inc - - Spec #Inc Inc Inc Inc - - Spec #Inc Inc Inc Inc - - Spec #Inc Inc Inc Inc - - Spec #Inc Inc Inc Inc - - Spec #Inc Inc Inc Inc - - Spec #Inc Inc Inc Inc - - Spec #Inc Inc Inc Inc - - Spec #Inc Inc Inc Inc - - Spec #Inc Inc Inc Inc - - Inc Inc Inc Inc - - - - - - - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc - - See Add Above Inc Inc - - See Add Above Inc Inc Inc - - See Add Above Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - - - - - - - - - - - - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - See 3A See 3A See 3A See 3A - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - 8,282 Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - 15,970 Inc 17,236 Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - 3,900 Inc Inc Inc - - - - - - - - - - - - - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - - - - - - - - - - - - - Conduit Where Exposed Conduit Where Exposed Conduit Where Exposed Conduit Where Exposed - - not Required by code not Required by code not Required by code not Required by code - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Inc Inc Inc Inc - - Notifier Notifier Notifier Notifier - - - - - - - - - - - - - - - - - - - (10,920) (10,000) (10,000) (10,000) - - (2,420) (2,000) (2,000) (2,000) - - (2,880) (2,500) (2,500) (2,500) - - - - - - - - - - - - - - - - - - - - - - - - - - - 308,992 331,797 327,467 400,050 - - - 308,992 331,797 327,467 400,050 - - Inc Alum Conductors Credit Set Screw Fitting 1/2" Conduit Light Fixtures per E4.01 Light Fixtures per Spec Details per E5.01 Details per E5.02 Details per E5.03 Details per E5.04 Arch Flash Study Rough-In for future EV Charging Stations Attic Stock Low Volt Rough-In Shed Floor Boxes Disconnect for PV System Nlight System System routed in 3/4" Conduit Coxreel Cord Reel Power to OH Doors Power to Radiant Heaters Dedicated Receptacles as noted Copper Feeders 16000 26 05 00 Electrical General Provisions 23 05 13 Electrical Requirements for Mechanical Equipment 22 05 13 Electrical Requirements for Plumbing Equipment 21 05 13 Electrical Requirements for Fire Suppression Equipmen 26 27 26 Wiring Devices 26 24 16 Panelboards 26 05 33 Raceways ELECTRICAL 1 6 A FRANSEN PITTMAN CONSTRUCTORS JOB NAME: JOB LOCATION: DESCRIPTION Addenda Acknowledged Inc Inc Addendum 01 Inc Inc Inc Inc Q&A Log Inc Inc Inc Inc LEED Requirements Inc Inc Late December 2021 Start N/A N/A Bond Rate Rate .99% N/A Inc IncPER PLANS AND SPECIFICATIONS Inc Inc Inc Inc FULL SET OF DOCUMENTS Inc Inc Inc IncTEXTURA FEES Inc Inc 26 05 26 Grounding System 26 05 19 Conductors 26 05 01 Basic Materials and Methods Site Electric 28 31 11 Fire Alarm System 26 51 00 Lighting Fuel Station Base bid: Conduit stubbed and all necessary infrastructure installed below grade Site lighting & Power Electrical Permit Primary Service Secondary Service Conduits Trenching Light Pole Bases Power to Irrigation Controller Controls Power to Mech Per E4.01 Daylight Harvestnig Fire Alarm Gear One Line Work per E3.01 Panels MDP In Couduit MFG Fully Designed System Shops Permit SUB TOTAL Credits for GMP Set vs Model Fire Sealants Duct Detectors VERIFY FP - SubContractor Insurance Requirements (Updated Nov. 2010)Inc Inc Inc SALES TAX INCLUDED BASE BID Base Bid; Install conduit for future infrastructure to site of 3-sided shed Gate Power and conduit Coundiut for low volt. Building Indoor Trenching and Backfill Fire Sealant at rated penetrations Furnish access doors for own work Housekeeping/Equipment Pads Temp Power-Building Temp Power to Trailer Temp Lighting Temp Power for Sub's Equipment Task Lighting Occupancy Sensor Energy Code TOTAL Performance & Payment Bonds DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 EPDMF GMP Permit Set List of Allowances 9/07/2021 1. 12" Over-Excavation Below Hardscapes Allowance - $33,115 2. Mock Up Allowance - $6,000 3. Ironridge Attachment Flashing Allowance Labor Only Allowance - $4,212 4. Metal Stud Structural Engineering & Shop Drawing Allowance - $8,950 5. Fall Arrest System Allowance - $55,000 6. Controls Conduit Allowance - $10,000 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM ESTIMATE DATE: 09/07/21 BUILDING AREA IN SQ FT: 6658 DRAWINGS PREPARED BY: Clark & Enersen DRAWINGS ARE DATED: 8/27/2021 DIV NO DIVISION TOTAL $ PER S.F. % OF TTL 1 General Conditions 252,000 $37.85 5.3% 2 Demolition & Sitework 1,278,782 $192.07 27.0% 3 Concrete 164,197 $24.66 3.5% 4 Masonry 98,750 $14.83 2.1% 5 Metals 348,927 $52.41 7.4% 6 Carpentry 92,239 $13.85 1.9% 7 Moisture Protection 379,045 $56.93 8.0% 8 Doors, Windows & Glass 174,861 $26.26 3.7% 9 Finishes 404,393 $60.74 8.5% 10 Specialties 35,741 $5.37 0.8% 11 Equipment 55,000 $8.26 1.2% 12 Furnishings 5,085 $0.76 0.1% 13 Special Construction 50,000 $7.51 1.1% 14 Conveying Systems 0 $0.00 0.0% 15 Mechanical 737,129 $110.71 15.6% 16 Electrical 369,322 $55.47 7.8% 4,445,471 $667.69 93.97% Exempt Excluded Use Tax Excluded By Owner Permit & Plan Review Fee Excluded By Owner Overhead & Profit 2.5%115,379 $17.33 2.44% Insurance 71,573 $10.75 1.51% Precon Fees 2,500 $0.38 0.05% Design/Estimate Contingency Excluded for GMP Construction Contingency 2%57,596 $8.65 1.22% Performance & Payment Bonds 2-Year Warranty LS 38,033 $5.71 0.80% TOTAL COST $4,730,553 $710.51 100.0% State & Local Tax DIRECT COST DIVISION RECAP East Park District Maintenance Facility GMP - Revision 03 Permit Set Reduced Contingency Page 1 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM Item Code ITEM DESCRIPTION QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 01 11 01 Superintendent 36 Wks 143,657 $21.58 3.0% 01 11 06 Project Engineer 8.00 Wks 19,935 $2.99 0.4% 01 11 07 Project Coordinator 7.00 Wks 11,350 $1.70 0.2% 01 11 00 Project Manager 9.00 Wks 40,149 $6.03 0.8% 01 12 01 Courier 9 Mos 882 $0.13 0.0% 01 12 02 Reproductions/Reprographics 9 Mos 882 $0.13 0.0% 01 12 03 Progress photographs - by Superintendent 1 Clar Clarification 01 12 04 Field Office Equip. computer, fax, etc.)9 Mos 2,475 $0.37 0.1% 01 12 05 Field Office Supplies 9 Mos 2,700 $0.41 0.1% 01 12 06 Textura will be in the Cost of the Work 1 LS Clarification 01 21 01 Jobsite telephone/Sup. Cell phone/Radios 9 Mo 2,565 $0.39 0.1% 01 21 02 Internet 9 Mo 2,565 $0.39 0.1% 01 21 03 Electrical, Gas, Water Consumption Costs By Owner 1 Clar Clarification 01 21 04 Portable chemical toilets 9 Mo 1,890 $0.28 0.0% 01 21 05 Temporary Building Heat - Will be in a mutually agreed upon Div. 2 Weather Protection Allowance Excl Clarification 01 22 01 Office trailer 9 Mo 18,000 $2.70 0.4% 01 22 02 Job sign is in the Cost of the Work 1 Clar Clarification 01 22 04 Temporary job fence is in the Cost of the Work 1 Clar Clarification 01 22 05 Temporary storage 9 Mo 3,825 $0.57 0.1% 01 22 07 Safety supplies/First Aid 9 Mo 1,125 $0.17 0.0% 01 22 08 Water, ice and cups - Will be in a mutually agreed upon Div. 2 Weather Protection Allowance 1 Clar Clarification 252,000 $37.85 5.3%DIVISION 1 TOTALS 01 10 00 ADMINISTRATIVE REQUIREMENTS 01 21 00, 01 22 00 TEMPORARY FACILITIES 01 12 00 FIELD OFFICE EXPENSES Division 1 General Requirements Page 2 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 02 32 00 Geotechnical Investigation 1 Exclu Excluded 02 32 00 Geotechnical Investigation 0 $0.00 0.0% 02 25 10 Site Basic Means & Materials 1 4 MO 15,200 $2.28 0.3% 2 1 LS 2,500 $0.38 0.1% 3 1 LS 2,450 $0.37 0.1% 02 25 10 Site Basic Means & Materials 20,150 $3.03 0.4% 02 41 13 Selective Site Demolition 1 1 Inc Included 2 17 ea 2,392 $0.36 0.1% 02 41 13 Selective Site Demolition 2,392 $0.36 0.1% 02 41 20 Recycling & Waste Removal (LEED) 1 9 Mo 18,000 $2.70 0.4% 02 41 20 Recycling & Waste Removal (LEED)18,000 $2.70 0.4% 31 00 00 Earthwork 1 1 LS 337,061 $50.62 7.1% 2 1 Inc Inc Above 3 1 Inc Inc Above 4 80 Mh 3,629 $0.55 0.1% 5 1 Inc Inc Above 6 1 Inc Inc Above 7 1 Inc Inc Above 8 1 Inc Inc Above 9 16 MH 2,928 $0.44 0.1% 10 6,658 SF 1,665 $0.25 0.0% 11 1 Inc Inc Above 12 1 Inc Inc Above 13 1 Inc Inc Above 14 1 Inc Inc Above 15 1 Inc Inc Above 16 6,658 SF 3,329 $0.50 0.1% 17 1 Inc Inc Above 18 60 MH 2,722 $0.41 0.1% 19 1 LS 2,000 $0.30 0.0% 20 1 LS 500 $0.08 0.0% 21 1 Inc Inc Above 22 1 Inc Inc Above 23 1 Inc Inc Above 24 1 Inc Inc Above 25 1 Inc Inc Above 26 1 Inc Inc Above 27 1 Inc Inc Above 28 1 Inc Inc Above 29 1 Inc Inc Above 30 1 Inc Inc Above 31 1 Inc Inc Above 32 1 Inc Inc Above 33 1 Inc Inc Above 34 1 Inc Inc Above 35 1 Inc Inc Above 36 1 Inc Inc Above 37 1 Inc Inc Above 38 1 Inc Inc Above 39 Exclu Excluded 40 (1) LS Included 41 1 Allow 33,115 $4.97 0.7% 31 00 00 Earthwork 386,949 $58.12 8.2% 31 10 00 Layout - Site 1 1 LS 18,000 $2.70 0.4% 31 10 00 Layout - Site 18,000 $2.70 0.4% 31 23 19 Dewatering 1 Exclu Excluded 31 23 19 Dewatering 0 $0.00 0.0% 31 25 00 Erosion/Sedimentation Control (SWMP) 1 1 Inc Included 2 9 MO 4,950 $0.74 0.1% 3 1 LS 1,500 $0.23 0.0% 4 6 MO 5,178 $0.78 0.1% Meter Pit Erosion/Sedimentation Control (SWMP) - Included See Earthwork Selective Site Demolition Pkg - Included See Earthwork Skidsteer & Attachments Remove Erosion Control Maintain Erosion Control By Owner Division 2 Site Work ITEM DESCRIPTION Dust Control Locates Private Tree Protection Utilities Check rough grade to ensure +/- 1/10' Daily safety audits and inspections on trenching and compaction Survey Adjust San Sewer MH Rim Export Earthwork 4" PVC Sanitary Line Sanitary FES & Outlet Structures Weir Walls Inlets Pot Holing Recycling & Waste Removal Additional Import for Gravel for waste with Trade Trenching Earthwork & Utility Pkg Meters - Excluded By Utility Provider Dewatering Allowance - Excluded as Discussed During Cost Model 4" Gravel for SOG Licensed Arborist Site Demolition (Trees, Conc Pads, Sidewalk, etc. ) 1" Irrigation line Piping Tattle Tale Alarm System Fuel for Common Use Trade Equipment Site Foundation Excavation Tap Existing MH SOG Fine Grading & Handwork Pond Excavation Traffic Control & Flaggers for Export Trucks Scour Stop Forebays Rain Gardens Storm Sewer Grading Over-Ex Below Hardscapes 18" Over-Ex Below Foundations 4' Foundation Excavation & Backfill Allowance for 12" Over-Excavation Below Hardscapes TL #38 - Credit to Revise 18" Over-Excavation below site hardscapes to 12" Over-Excavation below site hardscapes. 1.5" Domestic Service 4" Fire Service Water Taps Page 3 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL Division 2 Site Work ITEM DESCRIPTION 5 9 MO 8,838 $1.33 0.2% 31 25 00 Erosion/Sedimentation Control (SWMP)20,466 $3.07 0.4% 31 25 01 Stormwater Inspection & Audit 1 9 Mo 4,500 $0.68 0.1% 31 25 01 Stormwater Inspection & Audit 4,500 $0.68 0.1% 32 12 00 Asphalt Paving 1 1 LS 145,581 $21.87 3.1% 2 1 LS Inc Above 3 1 LS Inc Above 4 1 LS Inc Above 5 14 MH 2,562 $0.38 0.1% 6 1 LS 5,500 $0.83 0.1% 32 12 00 Asphalt Paving 153,643 $23.08 3.2% 32 17 23 Pavement Markings 1 1 LS 2,893 $0.43 0.1% 2 1 LS Inc Above 3 1 EA Inc Above 4 4 EA Inc Above 5 1 EA Inc Above 6 1 LS Inc Above 7 1 LS Inc Above 32 17 23 Pavement Markings 2,893 $0.43 0.1% 32 13 13 Site Concrete 1 1 LS 218,609 $32.83 4.6% 2 17,311 SF Inc Above 3 1,384 SF Inc Above 4 87 SF Inc Above 5 1,722 SF Inc Above 6 Exclu Excluded 7 5 EA Inc Above 8 580 LF Inc Above 9 481 SF Inc Above 10 5,414 SF Inc Above 11 1 LS Inc Above 12 12 EA Inc Above 13 1 LS 4,500 $0.68 0.1% 14 Exclu Excluded 15 16 MH 1,214 $0.18 0.0% 16 1 LS 3,255 $0.49 0.1% 17 1 LS 1,550 $0.23 0.0% 32 13 13 Site Concrete 229,128 $34.41 4.8% 32 31 00 Fences & Gates 1 1 LS 87,441 $13.13 1.8% 2 1 Inc Inc Above 3 1 Inc Inc Above 4 1 Inc Inc Above 32 31 00 Fences & Gates 87,441 $13.13 1.8% 32 32 00 Retaining Walls 1 Exclu Excluded 32 32 00 Retaining Walls 0 $0.00 0.0% 32 90 00 Landscaping 1 1 LS 203,752 $30.60 4.3% 2 1 Inc Inc Above 3 1 LS 2,840 $0.43 0.1% 4 1 Inc Inc Above 5 1 Inc Inc Above 6 1 Inc Inc Above 7 Exclu Excluded 8 1 Inc Inc Above 9 1 Inc Inc Above 10 1 Inc Inc Above 11 16 MH 1,160 $0.17 0.0% 12 1 Inc Inc Above 13 1 Inc Inc Above 14 1 Inc Inc Above 15 1 Inc Inc Above 16 1 Inc Inc Above 17 1 LS Inc Above 32 90 00 Landscaping 207,752 $31.20 4.4% 12 93 00 Site Furnishings Striping Stalls/Diagonals Evergreen Tree Deciduous Trees Detention Seed Mix Native See Mix Alum Landscape Edging Wood Fence with Steel Posts Wood Mulch Gate Chain Link Motorized - Pivot Gate is Excluded See Tracking Log TL #36 - Missing Irrigation One year landscape maintenance No Parking Sign Site Concrete Pkg 4'H Bin Blocks - Excluded By Owner per Q&A Perennials Boulders - Excluded See Tracking Log Shrubs ADA Sign Landscaping & Design Build Irrigation Pkg Pavement Markings Bollard Install Equipment to Unload Rebar Material Concrete Drive Stop Sign 2' Conc Pan Asphalt Parking Stalls 4"HMA over 6"ABC(Per Geotech Report) Grade checks for sidewalks prior to concrete pours CDOT Standard M-412-1 for Typical Paving Joint - Excluded see Tracking Log Light Pole & Bollard Excavation/Drilling Asphalt Paving Pkg Verify Grades Prior to Placement Asphalt Drive Lanes 5"HMA over 6"ABC (Per Geotech Report) Asphalt Patching Directional Arrows ADA Striping Symbol Street Sweeping 3rd Party Inspections & Audits Interior Chain Link Fence at Forestry Fencing Pkg 18" C&G ADA Ramps Concrete Washout Refresh Sidewalks 5" Verify Landscape Planting Materials and Placement 4' Trickle Channel Light Pole Bases Sidewalks Colored 6" Concrete Paving 6" Soil Sterilant Gravel Under Sidewalks - None Shown Excluded See Tracking Log Sleeving for Irrigation Crusher Fines Stabilized Soil Amendments 3CY/1000SF Irrigation Page 4 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL Division 2 Site Work ITEM DESCRIPTION 1 Exclu Excluded 12 93 00 Site Furnishings 0 $0.00 0.0% 33 10 00 Utilities 1 1 Inc Included 33 10 00 Utilities 0 $0.00 0.0% 33 46 13 Foundation Drainage 1 Exclu Excluded 33 46 13 Foundation Drainage 0 $0.00 0.0% 33 51 00 Fuel Stations 1 1 LS 68,256 $10.25 1.4% 33 51 00 Fuel Stations 68,256 $10.25 1.4% 33 90 00 Sewer Line Intersection/Camera 1 1 LS 1,500 $0.23 0.0% 33 90 00 Sewer Line Intersection/Camera 1,500 $0.23 0.0% 02 99 01 Fransen Pittman Means and Methods 1 1 LS 2,400 $0.36 0.1% 2 6658 SF 4,994 $0.75 0.1% 3 1 LS 750 $0.11 0.0% 5 2,091 LF 18,819 $2.83 0.4% 6 1 LS 24,750 $3.72 0.5% 02 99 01 Fransen Pittman Means and Methods 51,713 $7.77 1.1% 02 99 02 Wind and Weather Protection Allowance 1 Exclu Excluded 02 99 02 Wind and Weather Protection Allowance 0 $0.00 0.0% 02 99 03 Mock Up 1 1 Allow 6,000 $0.90 0.1% 02 99 03 Mock Up 6,000 $0.90 0.1% 1,278,782 $192.07 27.0% Utilities - Inc Above See Earthwork Job Site Sign Final Cleaning Material Storage for Early Procurement Site Construction Fence Perimeter Drain System Pkg - Excluded Not Required per Geotech Fuel Station Inspect New & Existing Sewer Lines DIVISION 2 TOTALS Textura Site Furnishings Allowance - Excluded See Tracking Log Mock Up Allowance Excluded to be Carried by the Owner per the Cost Model Page 5 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 03 06 00 Layout - Concrete 1 10 Mh 1,830 $0.27 0.0% 03 06 00 Layout - Concrete 1,830 03 11 00 Concrete Foundations & Flatwork 1 1 LS 85,842 $12.89 1.8% 2 1 Inc Inc Above 3 1 Inc Inc Above 4 1 Inc Inc Above 5 1 Inc Inc Above 6 24 MH 1,740 $0.26 0.0% 7 1 Inc Inc Above 8 1 Inc Inc Above 9 32 MH 4,820 $0.72 0.1% 10 1 Inc Inc Above 11 1 Inc Inc Above 12 1 Inc Inc Above 13 2 EA 3,000 $0.45 0.1% 03 11 00 Concrete Foundations & Flatwork 95,401 $14.33 2.0% 03 11 16 Flatwork 1 1 LS 50,000 $7.51 1.1% 2 1 Inc Inc Above 3 1 Inc Inc Above 4 1 Inc Inc Above 5 1 Inc Inc Above 6 16 MH 2,408 $0.36 0.1% 7 1 Inc Inc Above 8 1 Inc Inc Above 9 1 Inc Inc Above 10 1 Inc Inc Above 11 50 ea 1,500 $0.23 0.0% 12 1 Inc Inc Above 13 1 LS 2,000 $0.30 0.0% 14 2 EA 3,000 $0.45 0.1% 15 8 MH 580 $0.09 0.0% 16 24 MH 1,728 $0.26 0.0% 03 11 16 Flatwork 61,216 $9.19 1.3% 03 60 00 Grouting 1 50 ea 2,750 $0.41 0.1% 2 1 LS 3,000 $0.45 0.1% 03 60 00 Grouting 5,750 $0.86 0.1% 164,197 $24.66 3.5% Pump Grade Beams Curbs 4" Locker base 6" SOG 6x6 - W2.9xW2.9 4" SOG 6x6 - W2.9xW2.9 5" Structural Stoop #4 EW on 3" Void Form Control Joints Column Diamonds Pour Back Vapor Barrier Pad Footing Cont Footings Washout Refresh Anchor Bolt Layout Pilasters Unload and inventory Rebar Grouting of Columns and Base Plates DIVISION 3 TOTALS Core Drilling Washout Refresh Concrete Foundation & Formwork Pkg Layout - Concrete Foundations Mech Eqpt Pads Hand Excavation for Foundations Division 3 Concrete ITEM DESCRIPTION Rebar Unload and inventory Rebar Trench Drain Layout Control Joint Layout Shed Foundations Fuel Station Slab Shed Flatwork Concrete Flatwork & Finishing Pkg Reinforcing/Mesh Page 6 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 04 20 00 Unit Masonry 1 1 LS 96,250 $14.46 2.0% 2 1 LS 1,000 $0.15 0.0% 3 1 LS 1,500 $0.23 0.0% 4 1 Inc Inc Above 5 1 Inc Inc Above 6 1 Inc Inc Above 7 1 Inc Inc Above 04 20 00 Unit Masonry 98,750 $14.83 2.1% 98,750 $14.83 2.1%DIVISION 4 TOTALS CMU @ Shed CMU Veneer Masonry Pkg ITEM DESCRIPTION Division 4 Masonry Hoisting CMU Walls Install Loose Lintels Rebar Page 7 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 05 90 00 Layout -Steel 1 20 MH 3,660 $0.55 0.1% 05 90 00 Layout -Steel 3,660 $0.55 0.1% 05 12 00 Structural Steel 1 1 LS 345,267 $51.86 7.3% 2 1 Inc Inc Above 3 1 Inc Inc Above 4 1 Inc Inc Above 5 1 Inc Inc Above 6 1 Inc Inc Above 7 1 LS Inc Above 05 12 00 Structural Steel 345,267 $51.86 7.3% 05 51 00 Misc Metals 1 1 LS Inc Above 05 51 00 Misc Metals 0 $0.00 0.0% 348,927 $52.41 7.4%DIVISION 5 TOTALS Misc Metals Division 5 Steel Joist & Deck Layout -Steel Structural Steel Pkg ITEM DESCRIPTION Beams Bollards for Fuel Station Erection Columns Brace Frames Page 8 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 06 10 00 Rough Carpentry 1 1 LS Inc Below 2 51 EA 3,788 $0.57 0.1% 3 300 LF 1,200 $0.18 0.0% 4 384 LF 1,152 $0.17 0.0% 5 1,268 LF 2,536 $0.38 0.1% 6 289 LF 578 $0.09 0.0% 7 187 LF 374 $0.06 0.0% 8 92 MH 6,669 $1.00 0.1% 9 1 LS 1,665 $0.25 0.0% 06 10 00 Rough Carpentry 17,962 $2.70 0.4% 06 16 00 Sheathing & Siding 1 1 LS 47,875 $7.19 1.0% 2 1 Inc Inc Above 3 1 Inc Inc Above 4 1 Inc Inc Above 5 1 Inc Inc Above 6 1 Inc Inc Above 06 16 00 Sheathing & Siding 47,875 $7.19 1.0% 06 18 00 Glued-Laminated Construction 1 Exclu Excluded 06 18 00 Glued-Laminated Construction 0 $0.00 0.0% 06 40 00 Finish Carp/Arch Woodwork 1 1 LS 21,667 $3.25 0.5% 2 1 Inc Inc Above 3 1 Inc Inc Above 4 1 Inc Inc Above 5 1 Inc Inc Above 6 Exclu Excluded 06 40 00 Finish Carp/Arch Woodwork 21,667 $3.25 0.5% 06 82 00 Glass-Fiber Reinforced Plastic 1 1 LS 4,735 $0.71 0.1% 06 82 00 Glass-Fiber Reinforced Plastic 4,735 $0.71 0.1% 92,239 $13.85 1.9% Labor for Install Vents DIVISION 6 TOTALS Wood Siding Battens Fiber Cement Siding Vertical Breakroom 03 (Cabinets, Shelving, Solid Surface Counter) Deleted from Project Scope Excluded Cabinetry & Millwork Pkg 2x4 Roof Blocking FRP Tools/Equipment Plywood Sheathing FR 2x10 Roof Blocking 2x6 Roof Blocking 2x Blocking Millwork/Specialties 2x Blocking Door Frames ITEM DESCRIPTION Division 6 Woods & Plastics Trims Backing & Blocking Soffits Wood Window Sills - Excluded None Shown Parts Checkout 16 (Plam Counter, Stainless Steel Counter, Support Brackets) Open Office 10 (Cabinets, Plam Counter) Shared Crew 02 (Mail Slot, Counter, Support Brackets) Page 9 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 07 10 00 Dampproofing & Waterproofing 1 1 LS 9,000 $1.35 0.2% 2 1 Inc Inc Above 3 1 Inc Inc Above 4 1 LS 1,750 $0.26 0.0% 07 10 00 Dampproofing & Waterproofing 10,750 $1.61 0.2% 07 21 00 Thermal Insulation 1 1 LS 79,204 $11.90 1.7% 2 1 Inc Inc Above 3 1 Inc Inc Above 4 1 Inc Inc Above 5 1 Inc Inc Above 6 1 Inc Inc Above 7 1 LS 3,500 $0.53 0.1% 8 1 LS 4,500 $0.68 0.1% 9 1 LS 1,500 $0.23 0.0% 10 1 LS 1,500 $0.23 0.0% 07 21 00 Thermal Insulation 90,204 $13.55 1.9% 07 41 13 Roofing & Metal Wall Panels 1 1 LS 237,428 $35.66 5.0% 2 1 Inc Inc Above 3 1 Inc Inc Above 4 1 Inc Inc Above 5 1 Inc Inc Above 6 1 Inc Inc Above 7 1 Inc Inc Above 8 1 Inc Inc Above 9 1 Allow 4,212 $0.63 0.1% 07 41 13 Roofing & Metal Wall Panels 241,640 $36.29 5.1% 07 62 00 Sheet Metal Flashing and Trim 1 1 LS 16,566 $2.49 0.4% 07 62 00 Sheet Metal Flashing and Trim 16,566 $2.49 0.4% 07 81 00 Applied Fireproofing 1 Exclu Excluded 07 81 00 Applied Fireproofing 0 $0.00 0.0% 07 84 00 Firestopping 1 1 Inc Included 07 84 00 Firestopping 0 $0.00 0.0% 07 92 00 Joint Sealers 1 1 LS 19,885 $2.99 0.4% 07 92 00 Joint Sealers 19,885 $2.99 0.4% 07 95 00 BECx Commissioning 1 Exclu Excluded 07 95 00 BECx Commissioning 0 $0.00 0.0% 379,045 $56.93 8.0% Fluid-Applied Weather Barrier AT CMU ONLY DIVISION 7 TOTALS Building & Joint Sealants Pkg By Owner Excluded None Shown Excluded Roofing & Metal Wall Panels Pkg Fascia By Trades As Required TL #37 - Add for Ironridge Install Only Allowance for 300EA Thermal Insulation Pkg Patching Prior to Façade Install Self Adhered Flashing Parapet Caps/RO Tyvek at Stud Walls 3" Metal Z Girts 2" Rigid Insulation (R-10 Min) 2" Metal Z Girts Dampproofing & Foundation Insulation Pkg Dampproofing Included No Spec Provided Flashings Division 7 Thermal & Moisture Protection ITEM DESCRIPTION Cover Board Insulation PVC Roofing with Ribs 60Mil Metal Panel MP2 Metal Panel MP1 Fully Adhered Protection During Back Fill 2" Poly Iso Rigid Foundation Insulation Insulation for Heated Slab Lift Page 10 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 08 10 00 Doors & Frames 1 1 LS 33,790 $5.08 0.7% 2 1 LS 11,390 $1.71 0.2% 3 9 EA Inc Above 4 8 EA Inc Above 5 17 EA Inc Above 6 1 Lot Inc Above 08 10 00 Doors & Frames 45,180 $6.79 1.0% 08 31 16 Access Panels and Frames 1 3 ea Included 08 31 16 Access Panels and Frames 0 $0.00 0.0% 08 33 23 OH Doors 1 1 LS 51,350 $7.71 1.1% 08 33 23 OH Doors 51,350 $7.71 1.1% 08 41 13 Entrances & Storefronts 1 1 LS 75,134 $11.28 1.6% 2 1 LS 1,000 $0.15 0.0% 3 716 SF 2,197 $0.33 0.0% 4 1 Inc Inc Above 5 1 Inc Inc Above 6 1 Inc Inc Above 7 1 Inc Inc Above 08 41 13 Entrances & Storefronts 78,331 $11.76 1.7% 08 62 00 Unit Skylights 1 Exclu Excluded 08 62 00 Unit Skylights 0 $0.00 0.0% 174,861 $26.26 3.7% Installation Wood Doors HM Frames HM Doors Hardware DIVISION 8 TOTALS Excluded Storefront Doors & Hardware Automatic Operator Entrances & Storefronts Pkg Pass-Thru Window Temp Protection of Openings Prior to SF installation Guaranteed Opening/Field Verification Storefront Windows Doors & Hardware Pkg Access Panels at Restroom OH Doors Pkg Division 8 Doors & Windows ITEM DESCRIPTION Page 11 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 09 06 00 Temp. Prot. For New/Existing Finishes 1 1 LS 4,923 $0.74 0.1% 09 06 00 Temp. Prot. For New/Existing Finishes 4,923 $0.74 0.1% 09 10 00 Layout - Framing Systems 1 20 MH 3,660 $0.55 0.1% 09 10 00 Layout - Framing Systems 3,660 $0.55 0.1% 09 21 15 Wire Mesh Partitions 1 Exclu Excluded 09 21 15 Wire Mesh Partitions 0 $0.00 0.0% 09 21 16 Gypsum Board Assemblies 1 1 LS 292,480 $43.93 6.2% 2 1 Inc Inc Above 3 1 Inc Inc Above 4 1 Inc Inc Above 5 1 Inc Inc Above 6 1 Inc Inc Above 7 1 Inc Inc Above 8 1 LS 2,500 $0.38 0.1% 9 1 LS 5,500 $0.83 0.1% 09 21 16 Gypsum Board Assemblies 300,480 $45.13 6.4% 09 51 00 Acoustical Ceilings 1 1 LS 18,672 $2.80 0.4% 2 1 LS 500 $0.08 0.0% 3 1 Inc Inc Above 4 1 Inc Inc Above 09 51 00 Acoustical Ceilings 19,172 $2.88 0.4% 09 01 60 Flooring Prep 1 1 LS 1,000 $0.15 0.0% 2 Exclu Excluded 09 01 60 Flooring Prep 1,000 $0.15 0.0% 09 60 00 Flooring 1 1 LS 28,853 $4.33 0.6% 2 1 Inc Inc Above 3 1 Inc Inc Above 4 1 Inc Inc Above 5 1 Inc Inc Above 6 1 Inc Inc Above 7 1 Inc Inc Above 8 1 LS 1,000 $0.15 0.0% 9 Exclu Excluded 09 60 00 Flooring 29,853 $4.48 0.6% 09 91 00 Painting 1 1 LS 44,055 $6.62 0.9% 2 1 Inc Inc Above 3 1 Inc Inc Above 4 1 Inc Inc Above 5 1 Inc Inc Above 6 1 Inc Inc Above 7 1 Inc Inc Above 8 Exclu Excluded 9 1 LS 1,250 $0.19 0.0% 09 91 00 Painting 45,305 $6.80 1.0% 404,393 $60.74 8.5%DIVISION 9 TOTALS Exposed Ceilings Painting Minor Floor Prep Major Floor Prep Excluded Flooring Pkg Layout - Framing Systems Interior Gyp Wall Assemblies Division 9 Finishes Temp Prot of Finishes Exterior Gyp Wall Assemblies Excluded None Required Drywall/Framing Pkg Moisture Mitigation Moisture Testing Carpet Resilient Base Sealed Conc Walkoff Mat Tile ITEM DESCRIPTION Engineering Polished Conc APC-1 2x4 Acoustical Ceiling LAP-1 - Acoustic Panels Wires for Lighting Gyp Ceilings Bollards Fiber Cement Siding Washbay Wall Ceilings Touchup Plywood for Parts Checkout Patching Cavity Insulation Sound Batt Insulation Exterior CMU - Excluded See Tracking Log Acoustical Ceilings Page 12 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 10 11 00 Visual Display Surfaces 1 1 LS 605 $0.09 0.0% 10 11 00 Visual Display Surfaces 605 $0.09 0.0% 10 12 00 Display Cases 1 Exclu Excluded 10 12 00 Display Cases 0 $0.00 0.0% 10 14 00 Building Signage 1 1 LS 5,232 $0.79 0.1% 10 14 00 Building Signage 5,232 $0.79 0.1% 10 21 13 Metal Toilet Compartments 1 Exclu Excluded 10 21 13 Metal Toilet Compartments 0 $0.00 0.0% 10 28 13 Toilet Accessories 1 1 LS 3,671 $0.55 0.1% 10 28 13 Toilet Accessories 3,671 $0.55 0.1% 10 21 23 Cubicles 1 Exclu Excluded 10 21 23 Cubicles 0 $0.00 0.0% 10 26 00 Wall and Door Protection 1 1 LS 3,936 $0.59 0.1% 10 26 00 Wall and Door Protection 3,936 $0.59 0.1% 10 41 16 Emergency Key Cabinets 1 1 EA 750 $0.11 0.0% 10 41 16 Emergency Key Cabinets 750 $0.11 0.0% 10 43 16 First Aid Cabinets & AED 1 Exclu Excluded 10 43 16 First Aid Cabinets & AED 0 $0.00 0.0% 10 44 00 Fire Protection Specialties 1 1 LS 1,019 $0.15 0.0% 10 44 00 Fire Protection Specialties 1,019 $0.15 0.0% 10 51 00 Lockers & Benches 1 1 LS 20,528 $3.08 0.4% 10 51 00 Lockers & Benches 20,528 $3.08 0.4% 10 55 00 Misc Specialties 1 Exclu Excluded 10 55 00 Misc Specialties 0 $0.00 0.0% 10 56 00 Storage Assemblies 1 Exclu Excluded 10 56 00 Storage Assemblies 0 $0.00 0.0% 35,741 $5.37 0.8% Lockers & Benches Storage Assemblies By Owner Per Cost Model Fire Extinguishers & Cabinets DIVISION 10 TOTALS Signage By Owner Under FF&E Wall and Door Protection Boot Wash By Owner Per Cost Model By Owner Under FF&E Knox Boxes None Single Hole Restroom Only - Excluded Excluded None Shown Toilet Accessories Install Only Division 10 Specialties ITEM DESCRIPTION Page 13 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 11 31 00 Appliances 1 Exclu Excluded 11 31 00 Appliances 0 $0.00 0.0% 11 99 01 Fall Arrest Systems 1 1 Allow 55,000 $8.26 1.2% 11 99 01 Fall Arrest Systems 55,000 $8.26 1.2% 55,000 $8.26 1.2% Fall Arrest Systems Allowance DIVISION 11 TOTALS By Owner Under FF&E per Cost Model - Excluded ITEM DESCRIPTION Division 11 Equipment Page 14 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 12 20 00 Window Treatments 1 1 LS 5,085 $0.76 0.1% 12 20 00 Window Treatments 5,085 $0.76 0.1% 12 51 00 Furniture 1 Exclu Excluded 12 51 00 Furniture 0 $0.00 0.0% 5,085 $0.76 0.1% By Owner Under FF&E - Excluded DIVISION 12 TOTALS Division 12 Furnishings ITEM DESCRIPTION Window Treatments Pkg Page 15 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 13 34 19 Metal Building Systems 1 Exclu Excluded 13 34 19 Metal Building Systems 0 $0.00 0.0% 13 99 01 Pole Barn 1 1 LS 65,000 $9.76 1.4% 2 (1) LS (15,000)($2.25)-0.3% 13 99 01 Pole Barn 50,000 $7.51 1.1% 50,000 $7.51 1.1%DIVISION 13 TOTALS TL #32 - Credit to Revise Pole Barn Shed to gable style roof PEMB 3-Sided Shed - Excluded See Alternates Pole Barn 3-Sided Shed Division 13 Special Construction ITEM DESCRIPTION Page 16 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 14 20 00 Elevators 1 Exclu Excluded 14 20 00 Elevators 0 $0.00 0.0% 14 42 00 Wheelchair Lifts 1 Exclu Excluded 14 42 00 Wheelchair Lifts 0 $0.00 0.0% 14 43 00 Equipment Lifts 1 Exclu Excluded 14 43 00 Equipment Lifts 0 $0.00 0.0% 0 $0.00 0.0%DIVISION 14 TOTALS Excluded N/A Excluded N/A ITEM DESCRIPTION Division 14 Conveying Systems Excluded N/A Page 17 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 21 00 00 Fire Suppression 1 1 LS 35,200 $5.29 0.7% 2 Exclu Excluded 21 00 00 Fire Suppression 35,200 $5.29 0.7% 22 00 00 Plumbing 1 1 LS 222,750 $33.46 4.7% 2 Exclu Excluded 22 00 00 Plumbing 222,750 $33.46 4.7% 23 00 00 HVAC 1 1 LS 416,301 $62.53 8.8% 2 Exclu Excluded 23 00 00 HVAC 416,301 $62.53 8.8% 23 90 00 Geothermal 1 Exclu Excluded 2 1 LS 62,878 $9.44 1.3% 23 90 00 Geothermal 62,878 $9.44 1.3% 21 99 01 Wash Bay Equipment 1 1 Inc Inc Above 21 99 01 Wash Bay Equipment 0 $0.00 0.0% 737,129 $110.71 15.6%DIVISION 15 TOTALS Thermal Conductivity Test - Excluded Already Completed By Owner Geo Wells Included Above Division 15 Mechanical Mechanical Pkg BIM - Excluded per Cost Model ITEM DESCRIPTION BIM - Excluded per Cost Model Plumbing Pkg BIM - Excluded per Cost Model Fire Protection Systems Pkg Page 18 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman General Contractors 9/7/2021 5:07 PM LINE NO.QUAN UNIT ITEM TOTAL $ PER S.F. % OF TTL 26 00 00 Electrical 1 1 LS 372,982 $56.02 7.9% 2 Exclu Excluded 3 1 Allow 10,000 $1.50 0.2% 4 1 LS 2,420 $0.36 0.1% 5 1 LS 2,880 $0.43 0.1% 6 (1) LS (18,960)($2.85)-0.4% 26 00 00 Electrical 369,322 $55.47 7.8% 26 41 00 Facility Lightning Protection 1 Exclu Excluded 26 41 00 Facility Lightning Protection 0 $0.00 0.0% 27 00 00 Communications 1 Exclu Excluded 27 00 00 Communications 0 $0.00 0.0% 28 13 00 Access Control 1 Exclu Excluded 28 13 00 Access Control 0 $0.00 0.0% 28 16 00 Intrusion Detection 1 Exclu Excluded 28 16 00 Intrusion Detection 0 $0.00 0.0% 26 99 01 Solar 1 Exclu Excluded 26 99 01 Solar 0 $0.00 0.0% 369,322 $55.47 7.8% Solar System - By Owner DIVISION 16 TOTALS Security Alarm Systems - By Owner Security Access Control - By Owner Division 16 Electrical ITEM DESCRIPTION Electrical Communications/Structured Cabling - By Owner Excluded Not Required per Cost Model BIM - Excluded per Cost Model TL #18 - Credit for Alternate Site Lighting Package TL#17 - Add for 3/4" EMT in Lieu of 1/2" EMT TL #16 - Add for Compression Fittings in Lieu of Set Srew Controls Conduit Allowance Page 19 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 September 7, 2021 EPDMF GMP Permit Set Revision 03 - Project Summary July GMP Revision 01 TOTAL $ 4,663,868 Earthwork TL #38 - Credit to Revise 18" Over-Excavation below site hardscapes to 12" Over-Excavation below site hardscapes. $ (12,735) Permit Revisions $ (500) Fencing Subcontractor Commodity Increase $ 8,861 Landscaping Permit Revisions Place Holder Delta $ (608) TL Place Holder for incomplete Design $ 39,291 Site Concrete Permit Revisions $ 3,744 Foundations Permit Revisions $ 1,320 Steel Permit Revisions $ 12,017 Roofing Permit Revisions $ 1,875 TL #37 - Add for Ironridge Install Only Allowance for 300EA $ 4,212 Doors & Hardware Permit Revisions $ 4,144 Glass & Glazing Permit Revisions $ 1,709 OH Doors Subcontractor Commodity Increase $ 9,300 Acoustical Ceilings Permit Revisions $ 399 Drywall Permit Revisions $ 17,120 Flooring Permit Revisions $ 173 Paint Subcontractor Commodity Increase $ 4,072 Signage Permit Revisions $ 662 Specialties Permit Revisions $ 1,514 Subcontractor Commodity Increase $ 4,081 Window Coverings Permit Revisions $ 420 Pole Barn TL #32 - Credit to Revise Pole Barn Shed to gable style roof $ (15,000) HVAC & Plumbing Permit Revisions $ 2,750 Controls Permit Revisions $ 2,500 Fire Sprinkler Subcontractor Commodity Increase $ 5,000 Electrical Permit Revisions $ 10,356 TL #16 - Add for Compression Fittings in Lieu of Set Screw $ 2,420 TL#17 - Add for 3/4" EMT in Lieu of 1/2" EMT $ 2,880 TL #18 - Credit for Alternate Site Lighting Package $ (18,960) Reduced Construction Contingency $ (31,313) Indirect Cost Increases $ 4,982 REVISED TOTAL $ 4,730,553 DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 ITEM DESCRIPTION Bid Total RECOMMENDED SUBCONTRACTOR DIVISION 02 SITE WORK 2A - Striping & Signage 1 Precise Striping 2,893$ Precise Striping GMP Memo Update Revision N/A GMP Permit Set Update N/A 2 SUS 2,919$ 3 Mile High 2,948$ 4 KC Striping No Bid 5 All Striping No Bid 6 Rocky Mountain Parking Lot No Bid 2B - Earthwork & Utilities 1 Martin & Sons 301,111$ Martin & Sons GMP Memo Update Revision 3-Sided Shed Added 7,600$ Fuel Station Added 2,500$ Scour Stpp Add 8,300$ 18" Over Ex Add 45,850$ Licensed Arborist Add 5,500$ Pricing Escalation 12,550$ GMP Permit Set Update Tracking Log Credit To Revise 18" Over Ex to 12"(12,735)$ Permit Drawing Revisions (500)$ 2 Dunrite 354,973$ 3 Harolds 364,250$ 4 JD Enterprises No Bid 5 Bear Excavating No Bid 6 Dyer Const No Bid 7 Diamond Contracting No Bid 2C - Asphalt Paving 1 Martin Marietta 136,102$ Martin Marietta GMP Memo Update Revision Pricing Escalation 9,479$ GMP Permit Set Update N/A 2 Connell 169,199$ 3 Dunrite 186,119$ 4 Aggregate Industries No Bid 5 Avery Asphalt No Bid 6 Colorado Asphalt Services No Bid 7 Asphalt Specialties No Bid 2D - Site Concrete Paving 1 Pierson 173,530$ Pierson GMP Memo Update Revision 3-Sided Shed Added 29,874$ Fuel Station Added 3,000$ Pricing Escalation 8,461$ GMP Permit Set Update Permit Drawing Revisions 3,744$ 2 Thoutt Bros 178,094$ 3 Marrou 186,241$ 4 Coloscapes 220,750$ 5 Total Concrete Services No Bid 6 All Phase No Bid 7 Buildings By Design No Bid 8 Top Gun No Bid 9 A Concrete No Bid 10 Carrasco Kube No Bid 11 Colorado Hardscapes No Bid 2F - Landscaping & Irrigation 1 Env Landworks 151,953$ Env Landworks GMP Memo Update Revision 1 Year Landscape Maintenance Add 13,116$ GMP Permit Set Update Tracking Log Placeholder for Incomplete Irrigation Design 39,291$ EAST PARK DISTRICT MAINT FACILITY - TAB SUMMARY REV 01 COMMENTS DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Permit Drawing Revisions Credit for Actual Cost (608)$ 2 Bath 156,019$ 3 Landtech 173,090$ 4 Brightview No Bid 5 Enviromental Design No Bid 6 Korby Landscape No Bid 7 Metoco No Bid 8 Mill Brothers No Bid 2G - Fencing 1 Ideal 77,217$ Ideal GMP Memo Update Revision Pricing Escalation 1,363$ GMP Permit Set Update Pricing Escalation 8,861$ 2 Jones/Waterford 94,576$ 3 Commercial Fence 105,011$ 4 Colorado Exteriors No Bid 5 Metro Fence Co No Bid 6 AJI Fence No Bid 7 Barco Fence No Bid 8 KRK Products No Bid 9 Split Rail Fence No Bid 10 Steelock No Bid DIVISION 03 Concrete 3A - Building Concrete 1 Pierson 125,965$ Pierson GMP Memo Update Revision Pricing Escalation Foundations 5,067$ Pricing Escalation Flatwork 3,490$ GMP Permit Set Update Permit Drawing Revisions 1,320$ 2 Thoutt Bros 129,874$ 3 JB Concrete 129,808$ 4 Marrou 143,576$ 5 Coloscapes 151,031$ 6 All Phase No Bid 6 Buildings By Design No Bid 6 Christopher Concrete No Bid 6 Top Gun No Bid 6 Carrasco Kube No Bid DIVISION 04 Masonry 4A - Masonry 1 Big Horn 82,500$ Big Horn GMP Memo Update Revision 3-Sided Shed Added 13,750$ GMP Permit Set Update N/A 2 Berich 104,300$ 3 Dels 109,885$ 4 303 Building Envelopes No Bid 5 Ammex No Bid 6 JVS Masonry No Bid 7 Pearson No Bid 8 C Morgen No Bid 9 Scott's Masonry No Bid 10 Soderberg No Bid 11 Petra Bee No Bid DIVISION 05 Steel 5A - Structral Steel 1 Barton 299,500$ Barton GMP Memo Update Revision Fuel Station Added 2,000$ Pricing Escalation 26,750$ GMP Permit Set Update Permit Drawing Revisions 12,017$ 2 Rons Welding 299,944$ 3 Red Iron 301,512$ 4 Colorado Steel 347,453$ 5 Metal Solutions No Bid 6 D&E Steel No Bid 7 Pikes Peak No Bid 8 Puma Steel No Bid 9 Distinctive Welding No Bid 10 Drake Williams No Bid 11 High Plains No Bid DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 DIVISION 06 Casework 6B - Finish Carpentry/Millwork 1 Unique Wood 20,667$ Unique Wood GMP Memo Update Revision Pricing Escalation 1,000$ GMP Permit Set Update N/A 2 Sun Const 20,900$ 3 A&J 22,423$ 4 Pinnacle 24,135$ 5 LA Woodworks No Bid 6 Cab-Con No Bid 7 Cutting Edge No Bid 8 Genesis No Bid 9 Woodco No Bid 10 Benchmark No Bid 11 Concepts in Millwork No Bid 12 Edge Construction No Bid 13 ISEC No Bid 14 Nauhaus No Bid 15 USA Millwork No Bid 16 Wood Masters No Bid DIVISION 07 Moisture Protection 7B - Thermal Insulation 1 USI RG 76,314$ USI RG GMP Memo Update Revision Pricing Escalation 2,890$ GMP Permit Set Update N/A 2 Division 7 79,511$ 3 Holsinger 83,163$ 4 Custom Restroation No Bid 5 Kinzlre No Bid 6 Rocky Mountain Insulation No Bid 7 Allied Insulation No Bid 8 Bison Insulation No Bid 9 EcoFoam No Bid 10 JG Insulation No Bid 11 Spec 7 No Bid 12 Alpha Insulation No Bid 13 Rolling Plains No Bid 7C - Roofing, Metal, Flashing/Trim 1 Roof Check 218,994$ Roof Check GMP Memo Update Revision Pricing Escalation 16,559$ GMP Permit Set Update Permit Drawing Revisions 1,875$ Tracking Log Add for Ironridge Flashing Install 4,212$ 2 SRC 250,034$ 3 Advanced 282,544$ 4 Douglas Colony 283,115$ 5 Front Range 332,278$ 6 B&M Roofing 354,000$ 7 Araphaoe No Bid 8 ICI Roofing No Bid 9 Academy No Bid 7D - Fiber Cement Sidding 1 Give It Back 41,875$ Give It Back GMP Memo Update Revision Pricing Escalation 6,000$ GMP Permit Set Update N/A 2 Arrow J 68,125$ 3 DJK Const No Bid 4 5280 Exteriors No Bid 5 Front Range Property Solutinos No Bid 6 MVA Wall System No Bid 7 National Building Company No Bid 8 FDG Products No Bid 9 MV Constrcution No Bid DIVISION 08 Doors, Windows & Glass 8A - Doors, Frames & Hardware 1 Collins 29,183$ DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 2 Colorado Doorways 29,646$ Colorado Doorways GMP Memo Update Revision N/A GMP Permit Set Update Permit Drawing Revisions 4,144$ 3 DH Pace (Auto Operator Only)4,698$ 4 ASA Door Tech (Install Only)11,390$ ASA Door Tech 5 BSM No Bid 6 McKinney No Bid 7 Arch Concepts No Bid 8 Arch Doors No Bid 9 Edge Construction No Bid 8B - Special Doors 1 Door Specialties 39,559$ Door Specialties 2 Raynor 40,590$ GMP Memo Update Revision Pricing Escalation 2,491$ GMP Permit Set Update Pricing Escalation 9,300$ 3 Overhead Door Co 44,800$ 4 DH Pace 45,252$ 8C - Glass and Glazing 1 Commercial Glass 70,675$ Commercial Glass GMP Memo Update Revision Pricing Escalation 2,750$ GMP Permit Set Update Permit Drawing Revisions 1,709$ 2 Moffat 72,551$ 3 Glass Masters 75,142$ 4 Horizon Glass 88,300$ 5 Santa Fe No Bid 5 Cutting Edge No Bid 5 EAP No Bid 5 JRB Services No Bid 5 Ken Caryl No Bid 5 Metropolitan No Bid 5 Ram Glass No Bid 5 Arch Concepts No Bid 5 Black S Glass No Bid 5 LA Facades No Bid 5 Skyline No Bid DIVISION 09 Finishes 9A - Framing/Drywall 1 Fossil Creek 262,630$ Fossil Creek GMP Memo Update Revision Pricing Escalation 12,730$ GMP Permit Set Update Permit Drawing Revisions 17,120$ 2 Holsinger 274,153$ 3 Phase 2 282,175$ 4 Diversified 298,250$ 5 DELMC No Bid 6 Pinter Drywall No Bid 7 Copper Sprinkgs No Bid 8 Delta Drywall No Bid 9 Drywall Partitions No Bid 10 South Valley Drywall No Bid 9B - Floor Coverings 1 Mountain Valley 28,005$ Mountain Valley GMP Memo Update Revision Pricing Escalation 675$ GMP Permit Set Update Permit Drawing Revisions 173$ 2 Resource 30,705$ 3 Revolution 31,495$ 4 Masters 31,971$ 5 Carpet one 34,969$ 6 Elements No Bid 7 Next Generation No Bid 8 Advanced Flooring No Bid This was revised from Collins to Colorado Doorways. When we received the GMP Memo Update Pricing Colorado Door was less expensive. By 8C DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 9 All Commercial Floor No Bid 10 Commercial Flooring Services No Bid 11 Gary Leimer No Bid 9D - Acoustical Ceilings /Sound Treatment 1 Innovative 17,741$ Innovative GMP Memo Update Revision Pricing Escalation 532$ GMP Permit Set Update Permit Drawing Revisions 399$ 2 Heartland 18,600$ 3 SRB 19,500$ 4 Above All Acoustics No Bid 5 Beeline No Bid 6 Hang'Em High No Bid 7 Phase 2 No Bid 8 Acoustics Systems No Bid 9 Aspen Acoustical No Bid 10 Drywall Partitions No Bid 9E - Painting/Wall Coverings 1 Craftsman 38,418$ Craftsman GMP Memo Update Revision Pricing Escalation 1,565$ GMP Permit Set Update Pricing Escalation 4,072$ 2 Maximum 43,325$ 3 Commercial Coating 45,700$ 4 Painting Plus 47,252$ 5 Phase 2 47,700$ 6 Southwest Co 62,353$ 7 Pappas Paint No Bid 8 Contempoary No Bid 9 KV Painting No Bid 10 Lundquist No Bid 11 Conerstone No Bid 12 Heggem-Lundquist No Bid DIVISION 10 Specialties 10B - Toilet Partitions & Accessories , Fire Protection Specialties 1 Specialties Contracting 26,028$ Specialties Contracting GMP Memo Update Revision Pricing Escalation FRP 291$ Pricing Escalation Toilet Acc.97$ Pricing Escalation Wall & Door Protection 420$ Pricing Escalation Fire Ext 25$ Pricing Escalation Lockers & Benches 1,469$ GMP Permit Set Update Permit Drawing Revisions 1,514$ Pricing Escalation 4,081$ 2 Dynamic 27,480$ 3 Division 10 28,127$ 4 ABS 33,272$ 5 Colorado Spec 33,540$ 6 Norcon (Lockers Only)14,940$ 10F - Identifying Devices (signage) 1 Fast Signs 4,571$ Fast Signs GMP Memo Update Revision N/A GMP Permit Set Update Permit Drawing Revisions 662$ 2 BSC 5,373$ 3 Signage Works (Not Per Spec)3,667$ 4 5280 Signpros No Bid 5 Art Form Sings No Bid 6 Schlosser Signs No Bid 7 SignARama No Bid 8 YESCO No Bid 9 Ad Light Group No Bid 10 Arch Signs LLD No Bid 11 ASI Signs No Bid 12 Boyd Signs No Bid 13 DaVinci No Bid DIVISION 12 Furnishings 12A - Window Coverings 1 Royal Textiles 4,483$ Royal Textiles GMP Memo Update Revision Pricing Escalation 182$ Not Per Spec N/A Locker Only DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 GMP Permit Set Update Permit Drawing Revisions 420$ 2 Gotcha Covered 4,602$ 3 Elements 4,646$ 4 Premier 4,703$ 5 Shading Systems 5,409$ 6 Blind Shine 5,595$ 7 Ultra Clean 7,078$ DIVISION 15 Mechanical 15A - HVAC & Plumbing 1 Colorado Mechanical 597,301$ Colorado Mechanical GMP Memo Update Revision Pricing Escalation Plumbing 12,750$ Pricing Escalation HVAC 23,750$ GMP Permit Set Update Permit Drawing Revisions Mech/Plumbing 2,750$ Permit Drawing Revisions Controls 2,500$ 2 Corprate Plumbing 638,178$ 3 Mountain Aire 664,525$ 4 Newworks 678,143$ 5 Ari Comfort No Bid 6 Braconier No Bid 7 Kuck Mech No Bid 8 Strait Mech No Bid 9 Fisher Mech No Bid 10 Front Range Plumbing No Bid 11 Linds Plumbing No Bid 12 Major No Bid 13 Central Mech No Bid 14 Phillips Plumbing No Bid 15 ProCraft No Bid 16 Quality mech No Bid 15B - Fire Sprinklers 1 American 27,350$ American GMP Memo Update Revision Pricing Escalation 2,850$ GMP Permit Set Update Pricing Escalation 5,000$ 2 Front Range 27,945$ 3 Frontier Fire 34,212$ 4 Kobobel FP 34,450$ 5 Western States 39,620$ 6 Freedom Fire No Bid 7 Rapid Fire No Bid 8 Martin Fire Protection No Bid 9 Nothhaft No Bid 10 Simplex No Bid 15C - Geothermal 1 Can-Am 57,046$ Can-Am GMP Memo Update Revision Pricing Escalation 5,832$ GMP Permit Set Update N/A 2 Colorado Geothermal No Bid 3 Major Heating No Bid 4 Panterra No Bid 5 Boulder GWS No Bid DIVISION 16 Electrical 16A - Electrical 1 Gregory 308,992$ Gregory GMP Memo Update Revision 3-Sided Shed Added 10,150$ Fuel Station Added 1,640$ Heated Slab Added 13,150$ Pricing Escalation Electrical 28,694$ GMP Permit Set Update Permit Drawing Revisions 10,356$ Tracking Log Add for Compression Fittings 2,420$ Tracking Log Add for 3/4" EMT 2,880$ Tracking Log Credit for Alternate Site Lighting Package (18,960)$ 2 Duro 331,797$ 3 High Point 327,467$ 4 ADK 400,050$ 5 Conduct All Electric No Bid DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 6 Benchmark Electrical No Bid 7 Merit Electric No Bid 16B - Low Voltage Systems 1 Excluded N/A N/A DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 9/7/2021GMP Rev 3 Permit Set TotalRevised GMP Total% ChangeDwg Pkg Area System Rejected Pending Accepted$4,730,553$4,730,5530%100% CDALLEnclosure$0$0$0Foundation$0$0$06658$710.51/sf costInteriors$0$0$0Mech/Elec$0$13,849$0Roof$0$0$0Site$0$61,096$0Multi$0($98,152)$0TOTALS$0($23,208)$0Item # Drawing Package SystemDate InitiatedInitiated ByDescriptionAdd DeductChange AmountDate PresentedDisposition of ChangeAssignable To:Notes01 100% CD Site 4/30/21 ArchALTERNATE #1. (Yellow) – Fuel StationDeductive Alternate:• Delete in elevated fueling station pad and required site elements• (2) New 500 Gallon Gas tanks• (2) New fueling pumps• All associated safety features and necessary equipment to meet code requirements • System to allow tracking of Fuel usageDeduct($80,689)7/16/21 PendingOwnerMove to COR Log for future tracking.02 100% CD Site 4/30/21 ArchALTERNATE # 3. (Purple) –Fire laneAdd Alternate:The main Drive Lane defined as the Emergency Access Alignment along the loop inside the maintenance yard to be concrete to match the concrete in the maintenance yard.Add $12,3687/16/21 PendingOwnerMove to COR Log for future tracking.Note this excludes CDOT Joints03 100% CD Site 4/30/21 ArchALTERNATE # 4. (Salmon) – Future PhaseAdd Alternate:Pave this area with Asphalt.Add $25,5677/16/21 PendingOwnerMove to COR Log for future tracking.04 100% CD Site 4/30/21 ArchALTERNATE # 5. (Green) – Perimeter AsphaltAdd Alternate:Area to be Concrete to match the concrete used in the maintenance yardAdd $40,0277/16/21 PendingOwnerMove to COR Log for future tracking.Note this excludes CDOT Joints05 100% CD Site 5/26/21 FPCredit for one (1) year landscaped maintenanceDeduct($13,772)7/16/21 PendingOwnerMove to COR Log for future tracking.06 100% CD Site 5/26/21 FPAdd Boulders to landscape package. Note these were added to the GMP set. Add $47,3457/16/21 PendingOwnerMove to COR Log for future tracking.If we do go with Korby we would have less of an add for the boulders07 100% CD Site 5/26/21 FPAdd to upgrade from chain link rolling motorized gate to Custom Pivot gate with foundations. Note we have been carrying a chain link rolling gate per the model and similar sites. This was not shown in any of the design phases and was added to the GMP Set. Add $39,0007/16/21 PendingOwnerMove to COR Log for future tracking.Trend LogDocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 9/7/202108 100% CD Mech/Elec 5/26/21 FPAdd for copper conductors in lieu of aluminum. Note we agreed during the cost model that aluminum conductors were acceptable. Add $12,0127/16/21 PendingContractorMove to COR Log for future tracking.Per 8/5/21 meeting we are to proceed with Aluminum as Base Bid. FP to reach out to manufacture's to confirm aluminum will work with the mechanical units. Per 8/30/21 meeting copper conductors will likely be required FP to follow up to verify what all needs to be included.09 100% CD Mech/Elec 5/26/21 FP Add Fire Alarm Radio CommunicatorAdd $1,8377/16/21 PendingContractorMove to COR Log for future tracking.Additional testing required prior to substantial completion to see if this is required. 10 100% CD Site 7/16/21 FPAdd to increase landscaped maintenance form 1 year to 2 yearsAdd $14,0347/16/21 PendingOwnerMove to COR Log for future tracking.11 100% CD Multi 7/16/21 FPDelete Pole Barn Shed (See Gryphon Quote for specifics on panels and roofing)Deduct ($132,537)7/16/21 PendingOwnerMove to COR Log for future tracking.12 100% CD Site 8/18/21 OwnerCredit to delete the motorized rolling chain link gate. This will now be Owner furnished Owner installed. This credit does not include the foundations or power requirements. Deduct ($22,785)8/18/21 PendingOwnerMove to COR Log for future tracking.This was added per at the request of the Owner via email on 8/16/21Per the 8/30/21 Meeting this item is to remain open until the City receives pricing from their on-call fencing sub. 13 100% CD Multi 8/24/21 FPAdd to revise the Gable Style (as selected in item #32) Pole Barn Metal Panels to Match Building Façade. Wall Panels will be Metal Sales Vertical Panels. The Roof will be Metal Sales Vertical Seam this is not the Image II roof specified. The manufacture suggested changing the roof to the Vertical Seam so it can be installed over open framing. Note the roof has a taller rib then specified 1-3/4" vs 1" but otherwise has the same appearance. Also note that the maintenance facility does not have a standing seam roof at this time it has a PVC or TPO Roof so the roof noted above will not match. Add $34,3858/24/21 PendingMove to COR Log for future tracking.Please note that the roof is a standing seam and will not match the maintenance facility roof.Per the 8/30/21 meeting this item will remain open there is some additional investigation the will need to be done upon receiving samples. DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Fransen Pittman Labor Rates - 3101 East District Park Maintenance Facility Position Rate Project Manager $105.08 Project Superintendent $92.89 Project Engineer $62.31 Project Administrator $40.54 Foreman $75.89 Carpenter $72.48 Carpenter Apprentice $54.17 Laborer $45.37 Licensed Surveyor $183.00 These rates subject to adjustment at the beginning of every calendar quarter Overtime for hourly positions will be billed at 1.5 times the above burdened rates Makeup of bill rates not subject to audit Fransen Pittman Insurance Rates General Liability CGL 7.95$ Umbrella 4.95$ Professional Liability 1.15$ Builder's Risk 1.08$ 2 Year Payment & Performace Bond 7.30$ DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Equipment Description Bill Code Monthly Billing Rate AIR BREAKER-25-90 LB 1B 785$ AIR COMPSR-DSL-175-185CFM 1C 1,850$ AIR COMPSR-DSL-375 CFM 1D 3,250$ AIR MONITOR-GAS DETECTOR B2 290$ AIRLESS SPRAYER B3 130$ APPLIANCE DOLLY 1E 160$ ARC WELDER 180-250 AMP-DS 1F 1,075$ ART BOOM LIFT 30-34' 4WD 1G 3,675$ ART BOOM LIFT 40-49' 4WD 1H 5,040$ ART BOOM LIFT-60-64'-FWD 1L 5,500$ ART-STR-BOOM LIFT-80-89-4 1K 9,765$ 50-55 SPECIALTY BOOM 5N 3,000$ Boom Lift 40'-49';DSL-4WD 7F 5,040$ PUSH AROUND BOOM LIFT 5P 1,000$ STR BM LIFT 120-126' 4WD 4M 16,800$ STR BM LIFT 60-69' 4WDDSL 4N 5,050$ TOW BOOM LIFT 33-50' PLAT 4V 2,790$ BACKHOE-4WD 12-15' W/CAB 1N 4,200$ BACKHOE-4WD 7-8' MINI 1Y 3,950$ BARRIER CLAMP 7E 700$ BLOWER 5J 500$ BODY HARNESS KIT B6 275$ BREAKER ATTACH HYD 1000LB 2X 3,780$ BREAKER ATTACH HYD LARGE R10 6,000$ BREAKER ATTACHMENT SMALL Q1 2,074$ BRICK/BLOCK SAW-ELEC-14" 1P 945$ BRUSH CUTTER; 24" 6N 1,000$ BUILDERS LEVEL B7 375$ BULL FLOAT 5F 250$ CHAIN FALL; 2-TON> 6B 350$ CHAINSAW 6T 650$ CLUB CAR GOLF CART GA 350$ CNCRETE VIBRATOR-ELEC 1-3 2F 850$ CNCRTE FLOOR GRINDER 1-2 1X 1,100$ CNCRTE MIXER-5-9 CU FT 2A 980$ CNCRTE PLANE/SCARFR-GAS 2B 4,000$ CNCRTE PWR BUGGY-R/O-16 2C 1,680$ CNCRTE SAW-SP/WB-GAS10-20 2D 1,050$ COMPACTION WHEEL 6F 700$ COMPACTOR ATTACHMENT R11 2,500$ COMPRESSOR (LARGE TWIN) C3 525$ COMPRESSOR (PANCAKE) C4 105$ COMPRESSOR (SMALL TWIN) C5 425$ CONCRETE BUCKET 1W 750$ CONTAINER-20'-25' 1A 340$ CORE DRILL W/STAND, ETC. KA 865$ DATA VAULT R4 330$ DEMO SAW D4 960$ DEMOLITION HAMMER D5 970$ DIGITAL TRANSIT D8 375$ DOOR HANGING CART D9 150$ DOOR JAMB PROTECTORS P4 50$ DOOR SHIELD PROTECTORS P3 50$ DRILL PRESS 5K 1,000$ DRYWALL DOLLY E2 275$ DUMP HOPPER (1/2 CY) E3 500$ ELECTRIC BREAKER 60-75LB 2J 1,200$ FAN =<36" E6 400$ FAN 36"> R8 700$ 10 LB. FIRE EXTINGUISHER A1 40$ 5 LB. FIRE EXTINGUISHER A3 20$ FLOOR BUFFER 5H 650$ FLOOR SCABBLER-AIR 5 HEAD 2K 3,500$ INDUS FORKLIFT-5K LB 3B 2,100$ FRKLFT ATTCH; JIB 5S 450$ FRKLFT ATTCH; TRSH HOPPER 5T 850$ REACH FORKLIFT-FXD 5K LB 3W 3,255$ REACH FORKLIFT-FXD 8K LB 3X 4,780$ FRANSEN PITTMAN / DOUGLAS COUNTY EQUIPMENT (RELATED PARTY) STANDARD TOOL AND RENTAL EQUIPMENT PRICING LIST EXHIBIT CDocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Equipment Description Bill Code Monthly Billing Rate FRANSEN PITTMAN / DOUGLAS COUNTY EQUIPMENT (RELATED PARTY) STANDARD TOOL AND RENTAL EQUIPMENT PRICING LIST REACH FORKLIFT-FXD 9K > 4B 6,040$ REACH FORKLIFT-TRV 6K LB 4A 3,860$ FUEL CUBE 7G 225$ GANG BOX TOOLS-LEVEL 1 O1 350$ GANG BOX TOOLS-LEVEL 2 O2 550$ GENERATOR-5-10 KW 2S 950$ GENERATOR, 20-39 KW 5E 2,250$ GENERATOR 45-89 KW IA 2,250$ GENERATOR-90-119 KW 2R 3,780$ HAND TRUCK-2 WHEEL F7 95$ HEATER > 500k BTU 6J 7,500$ HEATER: FORCED/CONV 150K>2P 750$ HEATER; INDRCT; 300K-500K 6H 1,750$ HYDRO TST PUMP:300-10Kpsi 6A 1,350$ EXTENSION LADDER E4 100$ STEP LADDER L2 75$ LASER-ROTATING-HORIZ ONLY FB 680$ LIGHT TOWER 3C 1,300$ MACHINERY DOLLY KIT 8T 3D 550$ MANOMETER R9 400$ MATERIAL LIFT 18-25' 3E 950$ MEDIA BLASTER 5L 1,500$ MINI EXCAVATOR >10' DEPTH P9 4,500$ MINI EXCAVATOR 6-9.9' DEP 3G 2,730$ MITRE SAW H1 390$ NEGATIVE AIR MACHINE H5 775$ OFFICE TRAILER 12' X 60' BD 2,500$ OFFICE TRLR(12X40)EQUIPD O4 1,995$ PALLET JACK H6 500$ PERSON LIFT 12-30 AC W/ 3H 975$ PLANER W/STAND - 15" H9 300$ PLATE COMPACTOR GAS 3L 1,040$ PLATE COMPACTR REVERSIBLE 5G 2,000$ POWER AUGER 3M 750$ POWER THREADER 3J 1,575$ PRESSURE WASH COLD-GAS 3P 1,500$ PRESSURE WASH HOT-GAS 3Q 2,150$ PROJECT MANAGER VEHICLE Q2 900$ PROJECT SUPT VEHICLE Q3 975$ RADIO J8 95$ RAMMER ELEC 3T 1,040$ RAMMER-GAS 2.2-3.2K 3V 1,040$ RAPTOR SECURITY-BASE P7 1,200$ REBAR BENDER CUTTER 4C 450$ RO ROLL-VB SMOOTH 45-60" 3S 4,500$ RO ROLL-VB SMOOTH 65"> 5X 5,500$ RO ROLL-VB SMOOTH-DD 1.5T 3R 2,100$ WB ROLLER-PADFOOT 3000LB 5B 3,200$ ROLL-A-LIFT 1500-6000 LB 4D 1,000$ SCAFFOLD SINGLE SEC 6D 250$ SCAFFOLD UTILITY: PERRY K6 400$ SCFFLD: 5x5x7 SEC 2-4;10'6E 700$ SCISSOR LIFT 12'-19' 4J 975$ SCISSOR LIFT 25-34 4WD DF 4E 2,153$ SCISSOR LIFT 26' 4K 1,280$ SCISSOR LIFT 30-34' DC 46 4F 1,496$ SCISSOR LIFT 35-44' 4WD 4G 2,468$ SECURITY SYSTEM: CAMERA R13 300$ SHOT BLASTER 5M 5,500$ SILT PLOW 6X 650$ SKIDSTEER-1351-1750# 1845 AA 2,850$ SKIDLOADER 1800-2000LB Q4 3,150$ Skidloader bucket Q9 650$ PALLET FORKS FOR SKIDSTEE AC 650$ SKIDSTEER ATTACHMENT 7A 1,400$ AUGER ATTACH -SKIDSTEER 1M 1,900$ SLAB GRABBER RAIL SYSTEM R12 20$ SNOW BLOWER 6S 500$ DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234 Equipment Description Bill Code Monthly Billing Rate FRANSEN PITTMAN / DOUGLAS COUNTY EQUIPMENT (RELATED PARTY) STANDARD TOOL AND RENTAL EQUIPMENT PRICING LIST STORAGE TRAILER-38' BA 275$ SUBMERSIBLE PUMP < 3" L5 650$ SUBMERSIBLE PUMP-ELEC 3">4Q 900$ SURVEYOR VEHICLE Q8 975$ SWEEPER/BROOM-SKIDSTEER JA 1,400$ TABLE SAW L6 200$ TATTLE TALE ALARM SYSTEM CA 350$ TECHNOLOGY FEE R14 150$ TEMP FENCE PANELS PER FT R5 2$ TEMP LIGHT SYSTEM 6U 150$ TEMP PWR DIST(SPIDER BOX)6P 650$ TILE STRIPPER-ELEC 4S 920$ TORCH, CART & GUAGES M2 320$ TOTAL STATION EA 4,000$ TRACTOR DSL 5Q 2,700$ TRACTOR,LOADER,LANDSCAPE 5R 4,200$ TRAILER;DUMP 12,000 lb 6K 1,200$ TRAILER;TILT: 12'-16' 6R 1,200$ TRAILER;VACUUM; 500 gal. 6L 5,000$ TRASH CART M3 300$ TRASH CHUTE ACCESSORY 6Q 100$ TRASH PUMP 4W 1,200$ TRENCHER RO 35-39 HP 4X 3,550$ TRENCHER WB 12-20 HP 5A 1,995$ TRIMMER MOWER;WB 6M 450$ TRUCK;SINGLE-AXLE DUMP 6G 5,000$ UTILITY CART W/TRAY 4-WHE M6 150$ UTILITY VEHICLE Q5 1,200$ WATER METER 6W 250$ WATER TRUCK 2000 GAL 5D 5,000$ WEATHER PROTECT BLANKET C7 90$ WELDER (110 VOLT-STICK) N1 235$ WHEEL LOADER: 1 YD 5V 4,000$ WHEEL LOADER: 1> 5W 7,500$ DocuSign Envelope ID: 325403F6-1B84-4431-8D1F-B111D3020234