HomeMy WebLinkAboutWORK ORDER - RFP - 8909 HVAC ON-CALL SERVICES 2019 (3)Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND TOLIN MECHANICAL SYSTEMS COMPANY WORK ORDER NUMBER: 523917 PROJECT TITLE: Ops Services Building HVAC Hydronic ORIGINAL BID/RFP NUMBER & NAME: 8909 HVAC Contractors MASTER AGREEMENT EFFECTIVE DATE: 7/26/2019 WORK ORDER COMMENCEMENT DATE: 12/11/2020 WORK ORDER COMPLETION DATE: 11/30/2021 MAXIMUM FEE: (time and reimbursable direct costs): $63018.00 PROJECT DESCRIPTION/SCOPE OF SERVICES: Ops Services HVAC hydronic system demo/install work in the basement east/west wings. Detail attached Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of four (4) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: Ben Friesen, General Manager ACCEPTANCE: Date: Justin Huntley, Project Manager REVIEWED: Date: Jake Rector, Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) DocuSign Envelope ID: AFC79E52-9277-451F-BCD6-6BB400F54B3E 12/14/2020 12/14/2020 12/14/2020 12/14/2020 Operations Services HVAC Hydronic System Demo/Install – Phase 1 Presented to: Presented by: December 10, 2020 DocuSign Envelope ID: AFC79E52-9277-451F-BCD6-6BB400F54B3E Job Number Registered Quotation Number Presentation Date Page Q-11-2020-201786 December 10, 2020 2 of 6 BY AND BETWEEN: Contractor Tolin Mechanical Systems 2020 Airway Avenue Fort Collins, CO 80524 Customer City of Fort Collins 300 LaPorte Avenue, Building B Fort Collins, CO 80521 PROJECT LOCATION: 300 LaPorte Avenue, Building B Fort Collins, CO 80521 PROJECT DESCRIPTION: Operations Services – HVAC Hydronic System Demo/Install, Phase 1 We are pleased to offer our proposal to complete the requested HVAC hydronic system demo/install work in the basement east/west wings. It is our understanding the work completed to-date includes the installation of (6) VAV boxes (1 thru 6), hot water piping mains in east/west wings and terminal unit hydronic piping for the (6) VAV boxes. The remaining desired work includes the installation of (3) FCUs (FCU 1,2,4), (4) VAVs (7 thru 10), remaining hydronic branch piping, temperature control valves for new equipment and hydronic piping insulation for the entire east/west wings. The demolition of the existing hydronic piping will be completed during a later phase. A highlighted drawing set has been attached to this proposal to clarify which scope has yet to be coordinated/completed in the basement east/west wings. The proposal is based upon a site visit on 12/03/20. Below is our suggested scope of work. DocuSign Envelope ID: AFC79E52-9277-451F-BCD6-6BB400F54B3E Job Number Registered Quotation Number Presentation Date Page Q-11-2020-201786 December 10, 2020 3 of 6 OUR PROPOSAL INCLUDES THE FOLLOWING: General Construction Activities: • Provide permit • Provide new equipment startup and commissioning to ensure proper operation • Provide one-year warranty on new equipment, materials, and installation craftsmanship Demolition: • Provide labor and materials to isolate and drain (3) fan coil units [FCU-1,2,3] • Provide labor and materials to demo existing (3) fan coil units [FCU-1,2,3] • Provide labor and materials to recycle the existing equipment per applicable environmental codes and regulations New Work: • Provide labor and materials to core drill as needed for all remaining new hot water piping paths • Provide labor and materials to install remaining hot water supply/return piping (Copper, ProPress fittings) in the east and west wings, with caps for risers going to 1st level and boiler room • Provide labor and materials to install temperature control valves for the (3) FCUs, (4) VAV boxes, and (6) system 2-way valves shown in drawings • Provide labor and materials to install insulation for all hot water piping in the east and west wings OUR PROPOSAL EXCLUDES THE FOLLOWING: Providing any labor, materials, or equipment for work not explicitly detailed in the above scope, including but not limited to: • Labor outside normal business hours, 7:30 a.m. to 4:30 p.m. Monday through Friday • Engineering • Electrical • Controls • Ceiling Grid • Drywall painting/patching • TAB services • Hazardous material testing and abatement • Any provision of temporary heating, cooling, ventilation or exhaust DocuSign Envelope ID: AFC79E52-9277-451F-BCD6-6BB400F54B3E Job Number Registered Quotation Number Presentation Date Page Q-11-2020-201786 December 10, 2020 4 of 6 PRICING SUMMARY BASE SCOPE HVAC HYDRONIC DEMO/INSTALL, BASEMENT EAST/WEST WING ........................................... $63,018 Labor $32,014 Materials $29,159 Warranty, Permits $1,845 ACCEPTED (INITIAL) ___________ DECLINED (INITIAL) ___________ PAYMENT SCHEDULE Reference Payment Section in Agreement 8909:HVAC Contractors between City of Fort Collins and Tolin Machanical “This Agreement is the property of Tolin and is provided for the Customer's use only. Tolin guarantees the price stated in this Agreement for thirty (30) days from the proposal date.” Tolin Mechanical Systems Company Customer Brian Carpenter, PE Project Sales / Energy Engineer Title December 10, 2020 Date Signature or PO# Print Name and Title Date DocuSign Envelope ID: AFC79E52-9277-451F-BCD6-6BB400F54B3E