Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 8909 HVAC ON-CALL SERVICES 2019Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND TOLIN MECHANICAL SYSTEMS COMPANY WORK ORDER NUMBER: 523914 PROJECT TITLE: IT Data Center East Unit – City Hall ORIGINAL BID/RFP NUMBER & NAME: 8909 HVAC Contractors MASTER AGREEMENT EFFECTIVE DATE: 7/26/2019 WORK ORDER COMMENCEMENT DATE: 12/11/2020 WORK ORDER COMPLETION DATE: 2/28/2021 MAXIMUM FEE: (time and reimbursable direct costs): $74860.00 PROJECT DESCRIPTION/SCOPE OF SERVICES: Replace the Liebert CRAC East unit serving the IT Data Center at City Hall. Detail attached. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of five (5) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: Ben Friesen, General Manager ACCEPTANCE: Date: Justin Huntley, Project Manager REVIEWED: Date: Jake Rector, Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) DocuSign Envelope ID: EDFF10BB-1BCB-476B-8A0A-605467E990F1 12/14/2020 12/14/2020 12/14/2020 12/14/2020 City Hall Liebert Replacement Presented to: Presented by: December 8, 2020 DocuSign Envelope ID: EDFF10BB-1BCB-476B-8A0A-605467E990F1 Job Number Registered Quotation Number Presentation Date Page Q-12-2020-202798 December 8, 2020 2 of 7 BY AND BETWEEN: Contractor Tolin Mechanical Systems 2020 Airway Avenue Fort Collins, CO 80524 Customer City of Fort Collins 300 Laporte Avenue Fort Collins, CO 80521 PROJECT LOCATION: 300 Laporte Avenue Fort Collins, CO 80521 PROJECT DESCRIPTION: City Hall – Liebert Replacement We are pleased to offer our proposal to replace the Liebert CRAC East unit serving the IT Data Center at City Hall. The unit has been scheduled due to age, condition and use of R22 refrigerant. Liebert is the preferred manufacture, and the system has been requested to match the CRAC West design to include a drycooler instead of an air cooled condensing unit. It has been recommended by the manufacture to have a dedicated drycooler to each CRAC to ensure sufficient redundancy is in place and the desired capacities are attained. The new Liebert system will be procured by the City of Fort Collins. The proposal is based upon a site visit on 12/03/20. Below is our suggested scope of work. DocuSign Envelope ID: EDFF10BB-1BCB-476B-8A0A-605467E990F1 Job Number Registered Quotation Number Presentation Date Page Q-12-2020-202798 December 8, 2020 3 of 7 OUR PROPOSAL INCLUDES THE FOLLOWING: General Construction Activities: • Provide permit • Provide new equipment startup and commissioning to ensure proper operation • Provide one-year warranty on new equipment, materials, and installation craftsmanship • Provide a clean and safe work environment • Provide engineering package (mechanical, electrical, structural) Demolition: • Provide labor and materials to recover existing refrigerant prior to removal • Provide labor and materials to disconnect, demo and cap existing refrigeration lines as necessary • Provide labor and materials to disconnect electrical and control wiring to unit for removal • Provide labor and materials to demo and haul offsite the indoor CRAC unit • Provide labor and materials to demo and haul offsite the outdoor condensing unit using crane services • Provide labor and materials to recycle the existing equipment per applicable environmental codes and regulations New Work: • Provide labor and materials to install (1) Indoor CRAC Unit o Liebert, Model #: DS077KUA10I252S o 77kW (22 TON) o Downflow (RA top/SA bottom) o Paradenser TM Heat Exchanger o 14 gauge welded frame o EC Motor o Infrared Humidifier o Dual Refrigeration Circuits o A-Frame Evaporator Coil o Liebert iCOM Control w/HD Display  Base Communications & Connectivity includes one Ethernet port and one RS-485 port on iCOM controller, dedicated to supporting BACnet IP, Modbus TCP/IP, BACnet 485 , Modbus 485 and SNMP v1/v2c/v3 o Locking Disconnect Switch o Smoke Detector DocuSign Envelope ID: EDFF10BB-1BCB-476B-8A0A-605467E990F1 Job Number Registered Quotation Number Presentation Date Page Q-12-2020-202798 December 8, 2020 4 of 7 o Condensate Pump o 12” floor stand o 460/3/60 o 65,000A SCCR •Provide labor and materials to install steel structure base for new Drycooler •Provide labor and materials for necessary roof work associated with new structure •Provide labor and materials to install (1) Outdoor Liebert Drycooler o Liebert, Model#: DD0650A40 o 6 Fan Standard Drycooler o 105F outdoor ambient o 460/3/60 o Disconnect Switch o Dual Pump Model D5ANT o 15 gal expansion tank, ASME rated •Provide labor and materials to install copper supply and return condenser water piping from outdoor drycooler to indoor CRAC unit •Provide labor and materials to install piping insulation on new condenser water piping •Provide labor and materials to install plenum return transition ductwork from new CRAC unit to ceiling grid •Provide labor and materials to fill new condenser water loop with 40% glycol/water mixture OUR PROPOSAL EXCLUDES THE FOLLOWING: Providing any labor, materials, or equipment for work not explicitly detailed in the above scope, including but not limited to: •Labor outside normal business hours, 7:30 a.m. to 4:30 p.m. Monday through Friday •Taxes •Payment or performance bonding •Liebert equipment (Provided by COF) •Electrical (larger wire may be required for outdoor drycooler, Tolin will help determine this will manufacture) •Ceiling grid •Drywall patching/panting •Relocation of roof ballast rock & pavers work (if necessary) •Controls (Integration to BAS & Liebert lead/lag controls) •Hazardous material testing and abatement •Any provision of temporary heating, cooling, ventilation or exhaust DocuSign Envelope ID: EDFF10BB-1BCB-476B-8A0A-605467E990F1 Job Number Registered Quotation Number Presentation Date Page Q-12-2020-202798 December 8, 2020 5 of 7 PRICING SUMMARY BASE SCOPE CRAC EAST LIEBERT REPLACEMENT/RETROFIT .......................................................................... $74,860 Labor $48,082 Materials $25,375 Warranty, Permits $1,403 ACCEPTED (INITIAL) ___________ DECLINED (INITIAL) ___________ PAYMENT SCHEDULE City of Fort Collins and Tolin Agreement 8909: HVAC Contractors “This Agreement is the property of Tolin and is provided for the Customer's use only. Tolin guarantees the price stated in this Agreement for thirty (30) days from the proposal date.” Tolin Mechanical Systems Company Customer Brian Carpenter, PE Project Sales / Energy Engineer Title December 8, 2020 Date Signature or PO# Print Name and Title Date DocuSign Envelope ID: EDFF10BB-1BCB-476B-8A0A-605467E990F1